Boiler Tube Failures
 Boiler Tube Failures - main cause of forced outages and
availability in steam generating boilers
 One tube failure in a 500 MW unit  Rs. 5 to 5.5Crores
(replacement, generation charges for 3-4 days to repair)
besides affecting Plant Morale.
Bharat Heavy Electricals Limited TIRUCHIRAPALLI
Committed to making a better world
1. Sudden or abnormal loud noise
2. Continuous hissing noise
3. Steam / Water leakage
4. Furnace draft fluctuations / pressurization
5. Flame out
6. Falling in drum level
7. Increase in quantum of make-up water
8. Uncontrolled Boiler Feed Regulation / Feed Pump Trip
Tube failure indications
Bharat Heavy Electricals Limited TIRUCHIRAPALLI
Committed to making a better world
Design stage: Selection of material
1. Compatible for working pressure and temperature
2. Steam flow, velocity / pressure – tube size
3. Heat transfer characteristics
4. Metal temperature / Thermal expansion /
constraints
5. Radius of bends
6. Attachments
Manufacturing • Material mix-up
• Welding defects
• Forming defect / Radius of bend
• Heat treatment
Aspects to be considered at various stages
Bharat Heavy Electricals Limited TIRUCHIRAPALLI
Committed to making a better world
Transportation /
Handling
• Length of panel/walls
• Packing, bottom support
Storage • Foreign material entrapment
• Corrosion attack
• Atmospheric corrosion
Erection • Handling, temporary supports/lugs for lifting,
• Welding, plugging of tubes
• Material mix-up
• Expansion restriction ,
• Supports & hangers etc
Commissioning • Initial commissioning activities
• Boiler thermal expansion
Operation and
Maintenance
Fatigue, creep, erosion, corrosion etc.
Aspects to be considered at various stages
Bharat Heavy Electricals Limited TIRUCHIRAPALLI
Committed to making a better world
Failure Mechanisms which cause Boiler
Tube Failure
1. Stress rupture
2. Water-side corrosion
3. Fire-side corrosion
4. Erosion
5. Fatigue
6. Lack of quality control
Bharat Heavy Electricals Limited TIRUCHIRAPALLI
Committed to making a better world
Boiler Tube Failures (22 Primary Mechanisms)
Stress Rupture
 Short Term Overheating
 High Temperature Creep
 Dissimilar Metal Welds
Fatigue
 Vibration
 Thermal
 Corrosion
Water-side Corrosion
 Caustic Corrosion
 Hydrogen Damage
 Pitting
 Stress Corrosion Cracking
Erosion
 Fly Ash
 Falling Slag
 Soot Blower
 Coal Particle
Fire-side Corrosion
 Low Temperature
 Waterwall -$
 Coal Ash - $
 Oil Ash
Lack of Quality Control
 Maintenance cleaning damage
 Chemical excursion damage
 Material Defects
 Welding Defects
$ - indicates that such problems have not been reported in India
Bharat Heavy Electricals Limited TIRUCHIRAPALLI
Committed to making a better world
Source: EPRI Manual
This is the highest metal temperature for which maximum allowable stress values are given.
Bharat Heavy Electricals Limited TIRUCHIRAPALLI
Committed to making a better world
Source: EPRI Manual
Bharat Heavy Electricals Limited TIRUCHIRAPALLI
Committed to making a better world
Lack of Quality
• Raw material defect
• Tube manufacturing defects
• Test Certificate not in order
• Quality requirement (non adherence)
• Inspection – Visual & NDT
Bharat Heavy Electricals Limited TIRUCHIRAPALLI
Committed to making a better world
STRESS RUPTURE FAILURES
STOH occurs when the tube temperature rises above the design limits
for a brief period.
Depending on the temperature, the failure might occur in a very short
time.
STOH – mostly due to an upset over a short period.
Operating procedures or parameters are to be analysed to find out the
reason for the failure.
Short term overheating
Bharat Heavy Electricals Limited TIRUCHIRAPALLI
Committed to making a better world
STOH
Identification:
• Mostly a fish mouth opening with gradual reduction in thickness
• Uniform tube expansion.
• Absence of large amount of thermally formed magnetite
• No significant internal deposit
Metallographic examination will reveal the reason.
Bharat Heavy Electricals Limited TIRUCHIRAPALLI
Committed to making a better world
Bharat Heavy Electricals Limited TIRUCHIRAPALLI
Committed to making a better world
Short Term Overheating
Location: Steam & water cooled
sections
Reasons:
 Plugged by debris, scale etc.
 Drum level low
 High Heat Transfer / Improper
firing
 Low water/steam flow due to
poor circulation /upstream leak
Corrective Action:
 Prevent Blockage
 Maintain Drum level
 Assure Coolant flow
 Reduce over firing
 Redesign tubing to promote
flow
 Relocation of horiz. /
inclined tubes to avoid film
boiling
Bharat Heavy Electricals Limited TIRUCHIRAPALLI
Committed to making a better world
SHORT TERM OVERHEATING
Fish mouth opening with gradual reduction in thickness
Bharat Heavy Electricals Limited TIRUCHIRAPALLI
Committed to making a better world
SHORT TERM OVERHEATING
Bharat Heavy Electricals Limited TIRUCHIRAPALLI
Committed to making a better world
1. STOH - ORIGINAL STRUCTURE
2. STOH - TRANSFORMED MARTENSITE
1 2
Bharat Heavy Electricals Limited TIRUCHIRAPALLI
Committed to making a better world
High temperature Creep
(Long term overheating)
 Metal temperature exceed the design limit for days, weeks,
months or longer.
 LTOH is the cause for more failures because the metal loses its
strength at elevated temperatures
Causes:
o Tubes often contain significant deposit
o Long term system operating problem
o Reduced coolant flow
o Excessive heat input (nearer to burner)
Bharat Heavy Electricals Limited TIRUCHIRAPALLI
Committed to making a better world
High temperature creep
(Long term overheating)
Identification:
 A thick, brittle oxide layer near the failure
 Bulging and plastic deformation at the failure
 Rupture is always longitudinal with a fish-mouth shape
 Rupture edge can be thick or knifelike depending upon the time
temperature and stress level.
 Multiple bulges might also be there in case of deposit inside.
Metallograhic inspection will ascertain the failure.
Bharat Heavy Electricals Limited TIRUCHIRAPALLI
Committed to making a better world

More Related Content

Similar to Tube failure systems 1-slide 1 to 20.ppt

Report on Boilers at NTPC Ramagunadam
Report on  Boilers at NTPC RamagunadamReport on  Boilers at NTPC Ramagunadam
Report on Boilers at NTPC Ramagunadam
Abhinay Angari
 
Thermal Power Plants
Thermal Power PlantsThermal Power Plants
Thermal Power Plants
peeyush95
 
Boiler thermalpowerplants 12898051220529-phpapp02
Boiler thermalpowerplants 12898051220529-phpapp02Boiler thermalpowerplants 12898051220529-phpapp02
Boiler thermalpowerplants 12898051220529-phpapp02
akjshare
 
BOILER SAFETY CHECKLIST.pdf
BOILER SAFETY CHECKLIST.pdfBOILER SAFETY CHECKLIST.pdf
BOILER SAFETY CHECKLIST.pdf
eldoctol
 
Boiler safety checklist.pdf
Boiler safety checklist.pdfBoiler safety checklist.pdf
Boiler safety checklist.pdf
huzaifaali22
 
BTL Steag Presentation for improving the reliability
BTL Steag Presentation for improving the reliabilityBTL Steag Presentation for improving the reliability
BTL Steag Presentation for improving the reliability
abhilashg51
 
Methanol Reformer Designs
Methanol Reformer DesignsMethanol Reformer Designs
Methanol Reformer Designs
Gerard B. Hawkins
 
IRJET-Case Study of Supercritical Boiler Technology
IRJET-Case Study of Supercritical Boiler TechnologyIRJET-Case Study of Supercritical Boiler Technology
IRJET-Case Study of Supercritical Boiler Technology
IRJET Journal
 
Theory and Operation - Secondary Reformers -
Theory and Operation - Secondary Reformers - Theory and Operation - Secondary Reformers -
Theory and Operation - Secondary Reformers -
Gerard B. Hawkins
 
Steam genrator
Steam genratorSteam genrator
Steam genrator
Pramod kathamore
 
Thermoplastic Liners
Thermoplastic LinersThermoplastic Liners
Thermoplastic Liners
westernfalcontx
 
Evolution in pipe mfg
Evolution in pipe mfgEvolution in pipe mfg
Evolution in pipe mfg
Amit Kushwaha
 
Ntpc unchar boiler accident and reasonand my condolence and advise
Ntpc unchar boiler accident and reasonand  my condolence and adviseNtpc unchar boiler accident and reasonand  my condolence and advise
Ntpc unchar boiler accident and reasonand my condolence and advise
Mahesh Chandra Manav
 
Steam_Boiler_Basics_tim_powell_hughes.pdf
Steam_Boiler_Basics_tim_powell_hughes.pdfSteam_Boiler_Basics_tim_powell_hughes.pdf
Steam_Boiler_Basics_tim_powell_hughes.pdf
GaluhAjeng26
 
Harga pasang water heater 082122541663
Harga pasang water heater 082122541663Harga pasang water heater 082122541663
Harga pasang water heater 082122541663
pasangwaterheater
 
Shashi
ShashiShashi
Shashi
shashikesh
 
Boiler md. shahidul ilsam
Boiler md. shahidul ilsamBoiler md. shahidul ilsam
Boiler md. shahidul ilsam
ShouvikDhali
 
Unit II boiloers and its mountings
Unit II boiloers and its mountingsUnit II boiloers and its mountings
Unit II boiloers and its mountings
Prashant Kumar
 
SECONDARY STEEL MAKING.pptx
SECONDARY STEEL MAKING.pptxSECONDARY STEEL MAKING.pptx
SECONDARY STEEL MAKING.pptx
ssuserdb9631
 
ntpc unchahar
ntpc unchaharntpc unchahar
ntpc unchahar
Aditya Narain
 

Similar to Tube failure systems 1-slide 1 to 20.ppt (20)

Report on Boilers at NTPC Ramagunadam
Report on  Boilers at NTPC RamagunadamReport on  Boilers at NTPC Ramagunadam
Report on Boilers at NTPC Ramagunadam
 
Thermal Power Plants
Thermal Power PlantsThermal Power Plants
Thermal Power Plants
 
Boiler thermalpowerplants 12898051220529-phpapp02
Boiler thermalpowerplants 12898051220529-phpapp02Boiler thermalpowerplants 12898051220529-phpapp02
Boiler thermalpowerplants 12898051220529-phpapp02
 
BOILER SAFETY CHECKLIST.pdf
BOILER SAFETY CHECKLIST.pdfBOILER SAFETY CHECKLIST.pdf
BOILER SAFETY CHECKLIST.pdf
 
Boiler safety checklist.pdf
Boiler safety checklist.pdfBoiler safety checklist.pdf
Boiler safety checklist.pdf
 
BTL Steag Presentation for improving the reliability
BTL Steag Presentation for improving the reliabilityBTL Steag Presentation for improving the reliability
BTL Steag Presentation for improving the reliability
 
Methanol Reformer Designs
Methanol Reformer DesignsMethanol Reformer Designs
Methanol Reformer Designs
 
IRJET-Case Study of Supercritical Boiler Technology
IRJET-Case Study of Supercritical Boiler TechnologyIRJET-Case Study of Supercritical Boiler Technology
IRJET-Case Study of Supercritical Boiler Technology
 
Theory and Operation - Secondary Reformers -
Theory and Operation - Secondary Reformers - Theory and Operation - Secondary Reformers -
Theory and Operation - Secondary Reformers -
 
Steam genrator
Steam genratorSteam genrator
Steam genrator
 
Thermoplastic Liners
Thermoplastic LinersThermoplastic Liners
Thermoplastic Liners
 
Evolution in pipe mfg
Evolution in pipe mfgEvolution in pipe mfg
Evolution in pipe mfg
 
Ntpc unchar boiler accident and reasonand my condolence and advise
Ntpc unchar boiler accident and reasonand  my condolence and adviseNtpc unchar boiler accident and reasonand  my condolence and advise
Ntpc unchar boiler accident and reasonand my condolence and advise
 
Steam_Boiler_Basics_tim_powell_hughes.pdf
Steam_Boiler_Basics_tim_powell_hughes.pdfSteam_Boiler_Basics_tim_powell_hughes.pdf
Steam_Boiler_Basics_tim_powell_hughes.pdf
 
Harga pasang water heater 082122541663
Harga pasang water heater 082122541663Harga pasang water heater 082122541663
Harga pasang water heater 082122541663
 
Shashi
ShashiShashi
Shashi
 
Boiler md. shahidul ilsam
Boiler md. shahidul ilsamBoiler md. shahidul ilsam
Boiler md. shahidul ilsam
 
Unit II boiloers and its mountings
Unit II boiloers and its mountingsUnit II boiloers and its mountings
Unit II boiloers and its mountings
 
SECONDARY STEEL MAKING.pptx
SECONDARY STEEL MAKING.pptxSECONDARY STEEL MAKING.pptx
SECONDARY STEEL MAKING.pptx
 
ntpc unchahar
ntpc unchaharntpc unchahar
ntpc unchahar
 

Recently uploaded

Exception Handling notes in java exception
Exception Handling notes in java exceptionException Handling notes in java exception
Exception Handling notes in java exception
Ratnakar Mikkili
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
yokeleetan1
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
Series of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.pptSeries of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.ppt
PauloRodrigues104553
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
heavyhaig
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
ssuser36d3051
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
University of Maribor
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
gerogepatton
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
Madhumitha Jayaram
 
2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
PuktoonEngr
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 

Recently uploaded (20)

Exception Handling notes in java exception
Exception Handling notes in java exceptionException Handling notes in java exception
Exception Handling notes in java exception
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
Series of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.pptSeries of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.ppt
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
 
2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 

Tube failure systems 1-slide 1 to 20.ppt

  • 1. Bharat Heavy Electricals Limited TIRUCHIRAPALLI Committed to making a better world DISCUSSION ON BOILER TUBE FAILURES TYPES CAUSES & REMADIES
  • 2. Bharat Heavy Electricals Limited TIRUCHIRAPALLI Committed to making a better world Boiler Tube Failures  Boiler Tube Failures - main cause of forced outages and availability in steam generating boilers  One tube failure in a 500 MW unit  Rs. 5 to 5.5Crores (replacement, generation charges for 3-4 days to repair) besides affecting Plant Morale.
  • 3. Bharat Heavy Electricals Limited TIRUCHIRAPALLI Committed to making a better world 1. Sudden or abnormal loud noise 2. Continuous hissing noise 3. Steam / Water leakage 4. Furnace draft fluctuations / pressurization 5. Flame out 6. Falling in drum level 7. Increase in quantum of make-up water 8. Uncontrolled Boiler Feed Regulation / Feed Pump Trip Tube failure indications
  • 4. Bharat Heavy Electricals Limited TIRUCHIRAPALLI Committed to making a better world Design stage: Selection of material 1. Compatible for working pressure and temperature 2. Steam flow, velocity / pressure – tube size 3. Heat transfer characteristics 4. Metal temperature / Thermal expansion / constraints 5. Radius of bends 6. Attachments Manufacturing • Material mix-up • Welding defects • Forming defect / Radius of bend • Heat treatment Aspects to be considered at various stages
  • 5. Bharat Heavy Electricals Limited TIRUCHIRAPALLI Committed to making a better world Transportation / Handling • Length of panel/walls • Packing, bottom support Storage • Foreign material entrapment • Corrosion attack • Atmospheric corrosion Erection • Handling, temporary supports/lugs for lifting, • Welding, plugging of tubes • Material mix-up • Expansion restriction , • Supports & hangers etc Commissioning • Initial commissioning activities • Boiler thermal expansion Operation and Maintenance Fatigue, creep, erosion, corrosion etc. Aspects to be considered at various stages
  • 6. Bharat Heavy Electricals Limited TIRUCHIRAPALLI Committed to making a better world Failure Mechanisms which cause Boiler Tube Failure 1. Stress rupture 2. Water-side corrosion 3. Fire-side corrosion 4. Erosion 5. Fatigue 6. Lack of quality control
  • 7. Bharat Heavy Electricals Limited TIRUCHIRAPALLI Committed to making a better world Boiler Tube Failures (22 Primary Mechanisms) Stress Rupture  Short Term Overheating  High Temperature Creep  Dissimilar Metal Welds Fatigue  Vibration  Thermal  Corrosion Water-side Corrosion  Caustic Corrosion  Hydrogen Damage  Pitting  Stress Corrosion Cracking Erosion  Fly Ash  Falling Slag  Soot Blower  Coal Particle Fire-side Corrosion  Low Temperature  Waterwall -$  Coal Ash - $  Oil Ash Lack of Quality Control  Maintenance cleaning damage  Chemical excursion damage  Material Defects  Welding Defects $ - indicates that such problems have not been reported in India
  • 8. Bharat Heavy Electricals Limited TIRUCHIRAPALLI Committed to making a better world Source: EPRI Manual This is the highest metal temperature for which maximum allowable stress values are given.
  • 9. Bharat Heavy Electricals Limited TIRUCHIRAPALLI Committed to making a better world Source: EPRI Manual
  • 10. Bharat Heavy Electricals Limited TIRUCHIRAPALLI Committed to making a better world Lack of Quality • Raw material defect • Tube manufacturing defects • Test Certificate not in order • Quality requirement (non adherence) • Inspection – Visual & NDT
  • 11. Bharat Heavy Electricals Limited TIRUCHIRAPALLI Committed to making a better world STRESS RUPTURE FAILURES STOH occurs when the tube temperature rises above the design limits for a brief period. Depending on the temperature, the failure might occur in a very short time. STOH – mostly due to an upset over a short period. Operating procedures or parameters are to be analysed to find out the reason for the failure. Short term overheating
  • 12. Bharat Heavy Electricals Limited TIRUCHIRAPALLI Committed to making a better world STOH Identification: • Mostly a fish mouth opening with gradual reduction in thickness • Uniform tube expansion. • Absence of large amount of thermally formed magnetite • No significant internal deposit Metallographic examination will reveal the reason.
  • 13. Bharat Heavy Electricals Limited TIRUCHIRAPALLI Committed to making a better world
  • 14. Bharat Heavy Electricals Limited TIRUCHIRAPALLI Committed to making a better world Short Term Overheating Location: Steam & water cooled sections Reasons:  Plugged by debris, scale etc.  Drum level low  High Heat Transfer / Improper firing  Low water/steam flow due to poor circulation /upstream leak Corrective Action:  Prevent Blockage  Maintain Drum level  Assure Coolant flow  Reduce over firing  Redesign tubing to promote flow  Relocation of horiz. / inclined tubes to avoid film boiling
  • 15. Bharat Heavy Electricals Limited TIRUCHIRAPALLI Committed to making a better world SHORT TERM OVERHEATING Fish mouth opening with gradual reduction in thickness
  • 16. Bharat Heavy Electricals Limited TIRUCHIRAPALLI Committed to making a better world SHORT TERM OVERHEATING
  • 17. Bharat Heavy Electricals Limited TIRUCHIRAPALLI Committed to making a better world 1. STOH - ORIGINAL STRUCTURE 2. STOH - TRANSFORMED MARTENSITE 1 2
  • 18. Bharat Heavy Electricals Limited TIRUCHIRAPALLI Committed to making a better world High temperature Creep (Long term overheating)  Metal temperature exceed the design limit for days, weeks, months or longer.  LTOH is the cause for more failures because the metal loses its strength at elevated temperatures Causes: o Tubes often contain significant deposit o Long term system operating problem o Reduced coolant flow o Excessive heat input (nearer to burner)
  • 19. Bharat Heavy Electricals Limited TIRUCHIRAPALLI Committed to making a better world High temperature creep (Long term overheating) Identification:  A thick, brittle oxide layer near the failure  Bulging and plastic deformation at the failure  Rupture is always longitudinal with a fish-mouth shape  Rupture edge can be thick or knifelike depending upon the time temperature and stress level.  Multiple bulges might also be there in case of deposit inside. Metallograhic inspection will ascertain the failure.
  • 20. Bharat Heavy Electricals Limited TIRUCHIRAPALLI Committed to making a better world