This document provides a summary of a presentation on the North Western Railway power system. It discusses the introduction of Indian Railways and describes the North Western Railway zone. It then summarizes the key components of the railway power house including the electrical power house, repair shop, and control room. It describes the equipment used in substations such as circuit breakers, transformers, and insulators. It also discusses the control room layout and the different train lighting, refrigeration, and air conditioning systems used on Indian Railways.
CONTAINS
INTRODUCTION TO INDIAN RAILWAY………………..
POWER HOUSE…………………………..
TRAIN LIGHTING……………………….
FITTING SHOP……………………………...
REFRIGERATION AND AIR CONDITIONING…………………………..
CARRIAGE MOTORS WORKSHOP……
Er.Amit Chaurasiya studies at Azad Technical Campus Lucknow.All slide make very clear and easily understood suitable for Electrical Engineering students. I hope you will easily understand.
I had done 1 month summer training on topic " AIR BRAKE SYSTEM USED IN LOCOMOTIVE " from LOCO workshop, LKO....students who are doing so....this file can help them to prepare project file...
This is training report of chittaranjan locomotives works. This is useful for those student who want to give presentation in collage which is held in 7th semester. In this report , you will find brief introduction of clw, locomotives parts , about electric engines and manufacturing shops in clw.
CONTAINS
INTRODUCTION TO INDIAN RAILWAY………………..
POWER HOUSE…………………………..
TRAIN LIGHTING……………………….
FITTING SHOP……………………………...
REFRIGERATION AND AIR CONDITIONING…………………………..
CARRIAGE MOTORS WORKSHOP……
Er.Amit Chaurasiya studies at Azad Technical Campus Lucknow.All slide make very clear and easily understood suitable for Electrical Engineering students. I hope you will easily understand.
I had done 1 month summer training on topic " AIR BRAKE SYSTEM USED IN LOCOMOTIVE " from LOCO workshop, LKO....students who are doing so....this file can help them to prepare project file...
This is training report of chittaranjan locomotives works. This is useful for those student who want to give presentation in collage which is held in 7th semester. In this report , you will find brief introduction of clw, locomotives parts , about electric engines and manufacturing shops in clw.
Application of dc generator at railway coachjjasdxjz
this ppt will explain the basics about dc generator and also it will briefly explain the applications of dc generator at railway coach and its uses.so its very useful for engineering students
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Northern western raiways ppt
1. A
PRACTICAL TRAINING PRESENTATION
ON
NORTH WESTERN RAILWAY
Submitted in the practical fulfillment of the award of Bachelor Of Technology
(Rajasthan Technical University, Kota)
IN
ELECTRICAL ENGINEERING
Session:2019-20
SUBMITTED TO: Dr. Annapurna Bhargava SUBMITTED BY: Deepak Singh Chauhan
Professor 16/270,E2,7th Semester
2. TABLE OF CONTENTS
INTRODUCTION OF INDIAN RAILWAYS
ABOUT RAILWAY POWER HOUSE
CONTROL OF POWER HOUSE
TRAIN AND LIGHTING SYSTEM
REFRIGENRATION AND AIR CONDITIONING SYSTEM IN
TRAIN
3. Introduction Of Indian Railway
Indian Railways (IR) is India's national railway system operated by
the Ministry of Railways. It manages the fourth largest railway network
in the world by size, with a route length of 67,368-kilometre (41,861 mi)
and total track length of 121,407-kilometre (75,439 mi) as of March
2017. Routes are electrified with 25 kV AC electric traction while thirty
33% of them are double or multi-tracked.[
4. North -Western Railway
North -Western Railway is the second largest zone of Indian railway. Its head quarter is in
Mumbai at church gate. It undertakers the Rajasthan, Gujarat, Maharashtra and some part of
M.P & U.P. The total length of route in north -western railway has reached approximate 10,000
Km. The western offer a long travel of 100 years.
North-Western Railway is also divided into eight divisions which are as follows:-
•Ratlam
•Rajkot
•Ajmer
•Jaipur
•Bharnagar
•Kota
•Bombay
•Baroda
5. Railway Power House
Railway Power House is situated at “Nagara Ajmer“. In 1922 two major power plants was
established in India by British Govt. One is Ajmer and second is Dahod (Baroda). At that time,
Ajmer power house was a Thermal Power Station and therefore it is still known as Power
House.
In this year a 33 KV feeder is given to the power house from Rajasthan state electricity board
[R.S.E.B] and a three 500 KVA D.G. SET were also installed in this year. In 1988-89
constructions for the installation of 1750 KVA D.G. SET was started. In 1988-90 a modernization
was done. In which some modern oil circuit breaker[O.C.B] were installed. This power house
supplies the electrical energy to different parts of Ajmer division with the rate of 4.5 Lakh Unit
/month.
6. Classification Of Railway Power House
Railway Power House can be broadly classified into three parts:-
Electrical power house
Electrical repair shop
Mains and office
• Yard
• Control room
• 1750 K.V.A D.G. set room
7.
8.
9.
10.
11. Equipment Used In Railway Power House Substations
LIGHTING ARRESTOR
CIRCUIT BREAKER
CURRENT TRANSFORMER
POTENTIAL TRANSFORMER
RELAY
INSULATOR
12. Lightning Arresters :
The most common device used for protection of the power system against
high voltage surge is the surge diverter which divert the incoming high
voltage wave to earth. Such a diverter alternatively called lightening arrester
13. Circuit Breaker :
Circuit Breaker is one of the most important equipment in the power system.It has ability
to close a circuit or break a circuit during maintenance work or where there fault in a
system.
Circuit Breaker is capable of making and breaking an electrical circuit under normal and
abnormal condition.
Major types of circuit breaker –
Air blast CB
Oil CB
Vacuum CB
SF6 CB
14. Current Transformer :
A current transformer (CT) is a type of transformer that is used to
measure alternating current (AC). It produces a current in its secondary
which is proportional to the current in its primary.
15. Potential Transformer :
Potential transformer which step down the voltage at system to sufficiently low
values, are necessary on every power system for –
Indicator of voltage condition
Metering of supply for exchange of energy
Relaying and synchronizing
16. Relay :
A relay is the device that detects the fault and initiates the operation of
circuit breaker to isolates the defective element from the rest of the system
Buchholz relay
Over current relay
Earth current relay
17. INSULATOR :
The insulator play one of the key roles in provision of safe transmission of
electric energy and minimization of energy loss.
Rod insulator - to be used as rotary insulating elements ,supporting conductor
lines and outside plant disconnectors, and as a part of bus rod support.
Line post insulator - to be used at high voltage power transmission line electric
distribution plant.
18. Control Room Of Power House
A Control Room is the most important part of any sub station. In Railway Power House,
Control Room is situated between yard and 1750 KW D.G. set room.
Control room can be classified into four parts which are as follows :-
11 KV Control Relay and Distribution Panel.
500 KVA D.G SETS.
Diesel Power Station 1750 KW D.G. Set
20. 500 KVA D.G. SETS
There are two D.G. set in Control Room. Capacity of each D.G. set is 500 KVA. The other details
of D.G. set are as follows:
Capacity
Output Volt
Output Current
Connection
Power factor
R.P.M.
Frequency
Phase
500 KVA
415 V
697 A
Star Connected
0.8
1500
50 Hz
3 Phase
21. Whenever supply is not available from R.S.E.B. these D.G. sets can be
started for making local arrangements. If any fault occur during starting of
D.G. sets the indicating light for that fault will glow on A.V.R. panel.
22. Diesel Power Station 1750 KW D.G. Set
Diesel Power station is the most
important part of Railway Power
House
when R.S.E.B. supply is failure due
to any reason then this set is used
to feed the supply to the Loco
workshop and Carriage and Wagon
shop.
23. This power station is installed here due to its following advantages –
•Diesel is used as a fuel in this plant
which is easily available in Ajmer as
compared to coal.
•The design & installation of this
plant is very simple.
•The space requirement for this plant
is less.
•Less staff is required to operate this
plant because many functions are
controlled by panel board.
24. Carriage And Wagon Shop
Carriage and Wagon Shop is one of the most important workshop of the western
railway. Here the poll of the meter gauge and board gauge coaches of carried out
even the repairing and over hauling of the coaches of tourism trains like palace
on wheel & royal oriented luxury of western railway express is carried out these
are most important and costly trains here poll of MG & BG wagons are also
carried out.
. In carriage and wagon shop, the electrical repairing of the coaches is done
in following department
Train lighting
R.A.C. section
Carriage motor
25. Types of Train
Lighting System
Self Generation
Mid-On-
Generation(MOG)
End-On-
Generation(EOG)
Train Lighting System
26. Train Lighting System
On the basis of generation following train lightning system are used :-
1. EOG (End On Generation)
1.1 Generating Voltage 415 V
1.2 Generating Voltage 450V
2. Mid On Generation (MOG)
3 Self Generating System0
3.1 V DC (from Dynamo)
3.2 24 V DC (from Alternator)
27. 1. End On Generation
In this type of system electricity is generated in power car instead of coach. This system
is used in trains having AC coaches like Rajdhani express, Shatabdi express etc. In this
system two power cars are installed on the basis of generating voltage. Two type of
power cars are used
415 V, 3 Phase AC
750 V, 3 Phase AC
In this days 750V, 3 Phase AC system are preferred.
In 415 V AC capacity of alternator is 160KVA, 220 KVA, 250 KVA etc. while in 750
volt system 500KVA alternator are used.
This alternator is coupled to 390 BHP. 1500 RPM diesel engine.
Electricity generation from alternator is given to individual coach from two feeders.
These feeder are provided with overload, earth fault and fuses. Alternator are also
provided with overload, earth leakage, under voltage protection etc.
28. 2. MOG (Mid On Generation)
This train lightning system is used on small branch lines, hill area. In this system
power car is used in the middle of all coaches therefore it is called as Mid On
Generator. In this trains maximum 13 coaches are used with power car.
In power car two DG sets of 30 KVA capacity each are used which generates 415
V, 3 f AC diesel engine of 41,43,47BHP 1500RPM air cooled are used.
Only one alternator is used at a time. Second is used as a stand by for alternator
excitation 24V 320 AH battery and battery charger are given.
415V generated by alternating is step down to 110 V 3 A f C 50Hz by 30 KVA step
down transformer. This 110 V 3 f is given to bus bar
29. 3. Self Generation System
In self generating coach the apparatus used for generating electricity are known as
generating equipment. In old T/L system dynamo was used but in modified system
brushless alternator are used. Alternator produces AC which is converted into DC
rectifier cum regulator and this DC is given to coach load and battery.
Following alternator are used in coaches .
1. 3 KW , 30 V , 100 AMP Meter Gauge , Non AC Coach
2. 4.5 KW , 120 V , 150 Amp Broad Gauge , Non AC Coach
3. 3 KW , 120 V , 150 Amp Meter Gauge , Non AC Coach
4. 12 KW , 120 V , 100 Amp Meter Gauge , AC Coach
5. 18 KW , 130 V , 133 Amp Broad Gauge , AC Coach
6. 22.75 KW / 25 KW , 130 V Broad Gauge , AC-3 tier Coach
30. RRU / ERRU ( Rectifier Regulated Unit)
To start the fan, light in a Indian rail battery system are used . the o/p of a 3
phase AC of the alternator is change in DC with the help of RRU ( rectifier
regulated unit) and new technical electronic based ERRU are used,
Function of RRU
AC to DC for battery charging.
Control the alternator o/p by the field excitation.
To control the o/p voltage according to o/p current.
31. ELECTRONIC RECTIFIER CUM REGULATOR UNIT (ERRU)
This is Electronic Control is having two numbers IGBTs to control
the field current of the 25 KW Alternator. The out put Voltage can
be set from 125 to 130 Volts DC insteps of 0.5 Volts and the
current can be set from 180 to 212 Amps. as per the
requirements of Railway.
An OVP (Over Voltage Protection) with electronic Control is
used in the Control box to open the field control in case the
control fails or the control components damage to avoid the Over
Voltage Generation which will be harmful for the coach
appliances and maintain fail safe operation.
A display board is provided in the control panel to set the
voltage and current.
32. Battery Set Arrangement :
Train lighting cells are secondary cells such as “lead acid cell” .In a charged lead
acid cell the positive active material consist of lead peroxide [Pbo2] and the
negative spongy lead [ pb ]. Dilute sulphuric acid [HSo4] serves as a electrolyte
One battery set consisting 56 cells, 120 Amp-hour capacity is in parallel with the
alternator and feeds electrical loads when the alternator is not generating.
Fuses are provided for safety against excessive current for each component.
At a junction box, rotary switches and MCBs are provided to switch ON and OFF
power supply to light/fan and emergency feeding terminals (EFT).
33. Emergency feeding terminals give electrical power supply to adjoining coach in
emergency through temporary connections (TC).
34. Flow Chart of Self Generating System of Train Lighting
35. Fans used in trains
There may be of three main types of fans i.e. DC fans, A.C. fans, DC / AC
fans. An electric fans is simply an electric motor to which the blades are fixed
so that when the motor of the fan rotates the blades throw the air.
In the train bogies generally two types of fans are used
1. 110 V A.C. fans
2. 24 V D.C. fans
36. Scale of Illumination
Here are the specification of lamp fitted in train
1.
2.
3.
4.
5.
6.
Night lamp fitting
Cooling fitting gallery
Cooling light passage
Postal van dining
Reading light
Bulbs (BG), Bulbs(MG)
20 Watt.
20 Watt.
30 Watt.
30 Watt.
10 Watt.
110V/ 25 Watt, 24 V/20 Watt.
38. Head On Generation
750 V DC - light & fan works on 110 V AC
1500 V DC - light & fan works on 110 V AC
25 KV AC - light & fan works on 141 V AC
39. Pantograph :
A pantograph (or "pan") is an apparatus mounted on the roof of an electric train,
tram or electric bus to collect power through contact with an overhead catenary
wire.
They are provided with steel stripes for current collection .
The raising and lowering of pantograph is by means of pneumatically operated
servomotor.
Used for suitable operation up to 140 km/hr.
41. EQUIPMENTS OF AC SYSTEM :
COMPRESSOR :- Compress & delivers gas into condenser at a high pressure
& high temperature.
CONDENSOR :- It cools the hot gas and liquidates it under pressure.
EXPANSION VALVE :- It controls and regulates the rate of flow of liquid Freon
under high pressure.
EVAPORATOR :- The cooling unit in which liquid Freon under low pressure
evaporators & in-doing so takes away the latent heat thereby cooling the
medium surrounding the cooling coil.
42. Air-Conditioning Comfort Factors :
In air-conditioning, the following factors decide comfort or discomfort for
human beings –
Temperature
Humidity
Draft (velocity of air)
Purity of air and noise
43. Travel Classes of Indian Railway
Indian railway uses the two types of coaches,
1. ICF (Integral Coach Factory)
2. LHB (Link Hofmann Busch) coaches.
ICF Coaches is a conventional railway bogie used on
the majority of Indian Railway main line passenger
coaches. The design of the bogie was developed by
ICF (Integral Coach Factory), Paramour, Chennai,
India. The ICF design refers to the conventional
design of coaches seen across trains in India.
44. LHB Coaches are the passenger compartments of Indian Railways that have
been developed by Linke-Hofmann-Busch of Germany. The coaches are designed
for an operating speed up to 160 km/h and could go up to 200 km/h. However,
they have been tested up to 180 km/h.