Multi-hose
Discharging
BULK FUELS
PRODUCT
RECEIVING and
DRAINING
PROCEDURE
ZCOTT
Driver’s Responsibility.....

 Deliver the correct Product Quality and Quantity
 Accomplish Lorry Delivery Checklist (LDC)
with Authorized Receiver
 Ensure proper Hose Connection
 Full Attention during Product Unloading
 Identify and Eliminate Site Hazards
 Use proper Equipment (Hose & Camlock)

 No Product to Ground (Spills)
…...Customer Receiver’s Responsibility

 Sufficient Ullage of the Receiving Tank
 Accomplish LDC with Lorry Driver
 Assist in Proper Connection to Fill Pipe

 Full Attention during Product Unloading
 Ensure all Receiving Valves are Open
 Identify and Eliminate Site Hazards
Bulk Fuels Receiving Procedure

To guide our customers and
drivers on the safe and proper
handling of petroleum
products (-through the use of
the-) following the
Lorry Delivery Checklist
Step 1

Level Ground
Ang lorry ba ay nasa patag at “designated” na lugar at malayo
sa ano mang puwedeng pagmulan ng apoy? (siguruhin ito nang
sa ganoon ay maisagawa ng maayos at ligtas ang inspeksiyon)
Step 2

Lorry Safety
Ang lorry ba ay naka-parkbrake at mayroong kalso ang gulong
para maiwasan ang hindi inaasahang pag-galaw nito?
Step 3

Proper Unloading Position
Matapos ma-inspeksiyon, ang lorry ba ay nakaparada sa
ligtas na lugar, malapit sa pagdidiskargahan at nakaharap sa
Exit o labasan?
Step 4

Driver ID at PPE

Ang lorry driver ba ay may valid ID na galing sa Pilipinas Shell at nakasuot ng tamang uniform – cotton long sleeves at long pants, hard hat,
safety shoes, nitrille gloves?
Step 5

Authorized Receiver
Ang tatanggap ba ng delivery ay may valid I.D., “authorized”
ayon sa Competent Person Register o CDSS Card at naka-suot
ng tamang uniform – reflectorized vest, safety shoes, nitrile
gloves?
Step 6

Delivery
Note

Kumpleto ba ang mga dokumentong
dala ng lorry driver at nakasaad sa
Delivery note ang tamang pangalan
ng customer, numero ng customer,
address, produkto at quantity?
Step 7

Calibration
Certificate

Valid pa rin ba ang Calibration
Certificate ng lorry (hindi pa lampas ng
isang taon)?
Step 8

Valve Seals

Nasa ayos ba ang kundisyon ng mga selyo at magkakasunod ba
ang numero ng mga ito sa pang-itaas na takip (tank hatch cover) at
barbula ng tangke (discharge valves) sa numero na nakalagay sa
dokumentong dala ng lorry driver ?
Step 9

Lorry Fire Extinguisher

Nakababa na ba ang fire extinguisher at madaling makuha sa oras ng
emergency at naka-cordon ba ang discharge area gamit ang “reflectorized
cones/signs” at “cordon tapes”?
Step 10

Sufficient Ullage

Susukatin ni authorized receiver ang U.G.T.
kasama ang driver, upang masiguro ang
eksaktong laman ng UGT
Step 11

Smart Box

Kukunin ng driver ang susi sa smartbox para buksan ang
padlock sa discharge valve ng compartment na ididiskarga.
Step 12

Unloading Sequence, Tank Ullage, Hose Connection
Malinaw bang napagkasunduan ang planong pagkasunod-sunod na
pagdidiskarga ng mga produktong ide-”deliver”? (punan ang mga detalye
at “sequence” ng pag-diskarga sa lorry delivery checklist)
Step 13

Unloading
Sequence

Produktong idi-diskarga
Step 14

Unloading
Sequence
4000

10000

6000

Laman ng compartment

8000

2000
Step 15

Unloading
Sequence

If the tank has no
identification, report it!
AVOID CONTAMINATIONS !!!

Unleaded
S.P.U
Diesel
Kerosene
V- Power

Numero o code ng tangke
Step 16

Hose Adaptor

Ikabit ang hose adaptor sa lorry discharge
valve at siguruhin na may dust cap
Step 17

Color test

Gamit ang adaptor, padaluyin ang produkto para macheck ito ayon sa kulay
Step 18

Product Sample

ADO

VP-D

VP

SPU

ULG

URM

KERO

(Please refer to Proper
sampling procedure )

Na-check ba ang sample na kinuha sa bawat
compartment ng lorry upang matiyak ang tamang
kulay, o kung ito ay may dumi o tubig?
Step 19

Ensure Correct Fill-point

Ibigay sa authorized receiver ang
isang dulo ng product tag at ikakabit
nya ito kung saang fill-pipe dapat
ikabit ang lorry discharge hose upang
maka-siguro sa tamang tangke (UGT)
Step 20

Hose Connection
Connect to fill-pipe first

Ikakabit

ng driver ang discharge hose sa fill-pipe na pinag
kabitan ng MISSION Z cable ng authorized receiver
Step 21

Hose Connection

Connect to discharge valve next

Ikabit ang kabilang dulo ng discharge hose sa lorry,
buksan ang E.S.V. at gate valve
Step 22

Hose Integrity


Wala bang maaaring pag-mulan ng leak ng
produkto ang discharge hoses at fittings?
For Multi Product Drop, Repeat
Steps 16 to 22
for the second (Discharge Hose)
product to unload
Step 23

Commence Product Unloading

Simulan ang pag-didiskarga ng produkto
Step 24

Product Sampling from
Compartment 1 and 2 and so on…

Habang nag-didiskarga, kumuha ng retaining
sample gamit ang adaptor at tamang sampling bottle
na ayon sa compartment number
Step 25

Sampling

Ang produkto ba sa bawat compartment ng lorry ay nakunan ng
sample at tama sa nakasulat sa delivery note?
Step 26

Sample Retention

Ilagay ang mga bote sa sample box at lagyan ng tag
Step 26

Observe Proper
Storage of
Samples
- secure and well ventilated
area
- not exposed to direct sunlight
- away from source/s of
ignition

Matapos makunan ng sample ang lahat na compartment at
malagyan ng tag, isara ang sample box gamit ang sealing wire na
kasama sa invoice
Step 27

Tank Emptiness

(Please refer to Proper
Draining Procedure)

Wala na bang laman ang lahat ng lorry
compartments, lorry pipelines at discharge hose
pagkatapos magdiskarga?
Step 28

DOUBLE CHECK
-Check MISSION Z Cable connections
-Perform “Finger Follow” Check
-Confirm by signing off proper entry at the LDC
Step 29

Level Ground

Siguruhin na ang lorry ay nasa patag na lugar
bago mag-drain ng produktong naiwan sa
compartment.
Step 30

Proper Grounding

Isa-ayos ang grounding cable sa pamamagitan ng pag-clip ng
kabilang dulo sa discharge valve at ihanda ang draining bucket bago
mag-umpisa.
Step 31

Open and Close Valves

Umpisahan ang pag-drain ng produktong naiwan sa compartment
(naka-masid ang customer’s receiver habang isinasagawa ito).
Siguruhing nai-sara ang discharge valve pagkatapos mag-drain.
Step 32

Remove Grounding

Alisin ang grounding cable mula sa pagkaka-kabit sa discharge
valve (siguruhing wala ng produktong naiwan bago isagawa ito).
Step 33

Residual Product Turnover

I-turn over ang na-drain na produkto sa customer’s receiver
para ito ay mai-salin sa underground tank muli.
step 27
to

step 33
Ulitin ang mga hakbang na ito para sa ibang
compartment na may producktong residual.
Step 35

Isara ang discharge valve pagkatapos mag drain at
ibalik ang padlock
Step 34

Ang authorized receiver ba ay maayos na
nasagutan, napirmahan ang mga dokumentong
dala ng driver at naka-tanggap ng tamang mga
kopya nito?

1. Lorry Delivery Checklist
2. Delivery Note
3. CDSS / CCSS Cards
Step 35

House keeping

Ang discharge hose ba ay maayos na nailigpit at ang lugar
na pinagdiskargahan ay malinis at walang tulo o tapon ng
produkto?
Non-Compliance
Activity
Lorry Delivery Checklist
(LDC) not accomplished
prior to unloading
Product sample not taken
before unloading
Unlabelled Fill-Pipe
UGT ullage not taken
prior to unloading;
Unattended unloading
activity

Risks
Contamination due to
Erroneous connection
Wrong product unloaded,
resulting to
contamination;
Product contamination
coming from the lorry
Spillage from overfilling
of UGT

Control Measure
Strict Adherence to Lorry
Delivery Checklist to
prevent complacency
Product sampling of lorry
compartment thru the
discharge valves and
confirmation by receiver
Perform Pre and Post
dipping at UGT.
Full attention of both
driver and customer
receiver during unloading
Hazard Identification
Source of Ignition/Open Flame
• Static Electricity
• Hot Works within the Vicinity
• Loose Electrical Connection
• Naked Flame
Leaks/Spills/Contamination
• Mislabeled Fill-Pipe
• Hose/Camlock Connection
• Pumps
• Lorry Discharge Valves
• Receiving Manifold/Valves
• Tanks
• Fill Pipe
Protect
•Drains/Canals
Access/Escape Route
• Lorry Position
• Storage Tank Ladder

Control Measure
• Static Grounding Before
and Post Discharge
• Safe Distance/Shut off
• Insulation
• Area Cushion of Safety
•Correct Labeling
• PRV – Certified
• Maintenance
• Procedure
•Sufficient Ullage
• Isolate / Plugging
• Fill Pipe Fitting
• Easy Access
• Non-Slip, Railing, Grab Bar
SUMMARY
Remember the 6 Key Steps in MultiHose Discharging!

3
1

OPEN

2
5

4
UGT

LORRY

OPEN

6
Big Rules
•
•
•
•
•

Do not take shortcuts when completing the LDC.
Do the Finger Follow!
MHD shall only be done in Retail sites with Remote Fill
Ensure to have different colored Mission Z cables and hoses.
Before proceeding to hose connection of the 2nd product,
ensure that there are no leaks or problems on the 1st product
being discharged.
• Only drivers TRAINED IN MULTI-HOSE DISCHARGING
shall be allowed to perform simultaneous discharging. Driver
ID will be updated after training (1 classroom session and 1
actual product discharging witnessed by Mentor Driver)
THANK YOU

THE END
Road Transport two-hose Discharging
Remember the 6 Key Steps in
Multi-Hose Discharging!

More Related Content

Viewers also liked

41 Atg&Ctm Fope06
41 Atg&Ctm Fope0641 Atg&Ctm Fope06
41 Atg&Ctm Fope06jubin
 
LPG specifications for candidates
LPG specifications for candidatesLPG specifications for candidates
LPG specifications for candidatesMohsen Saber, MSc
 
Operations Management at Petrol retail outlet
Operations Management at Petrol retail outletOperations Management at Petrol retail outlet
Operations Management at Petrol retail outlet
Darshit Paun
 
TankerCalc for Bunker Surveyors
TankerCalc for Bunker SurveyorsTankerCalc for Bunker Surveyors
TankerCalc for Bunker Surveyors
Md. Moynul Islam
 
V Agrawal A Sarmad Stoc Expo Presentation Updated2
V Agrawal A Sarmad Stoc Expo Presentation Updated2V Agrawal A Sarmad Stoc Expo Presentation Updated2
V Agrawal A Sarmad Stoc Expo Presentation Updated2
Vijay Agrawal
 
20100022074
2010002207420100022074
20100022074
jangoam123
 
Compressed hydrogen2011 11_chato
Compressed hydrogen2011 11_chatoCompressed hydrogen2011 11_chato
Compressed hydrogen2011 11_chato
David Chato
 
Duti 254 D
Duti 254 DDuti 254 D
Duti 254 D
neilc5703
 
CargoSurveyor: toolbox for marine cargo surveyors
CargoSurveyor: toolbox for marine cargo surveyorsCargoSurveyor: toolbox for marine cargo surveyors
CargoSurveyor: toolbox for marine cargo surveyors
Ron Mooring
 
Oil Terminals And Custody Transfer
Oil Terminals And Custody TransferOil Terminals And Custody Transfer
Oil Terminals And Custody Transfer
haesah
 
Preparation of the Cargo Plan
Preparation of the Cargo PlanPreparation of the Cargo Plan
Preparation of the Cargo PlanDivine Greatman
 
pengukuran perhitungan volume minyak standard di tangki darat
pengukuran perhitungan volume minyak standard di tangki daratpengukuran perhitungan volume minyak standard di tangki darat
pengukuran perhitungan volume minyak standard di tangki darat
Helmi Wijaya
 
Level measuring instruments
Level measuring instrumentsLevel measuring instruments
Level measuring instrumentsAttiya Rehman
 
Marine surveys – loss adjuster – p& i agent
Marine surveys – loss adjuster – p& i agentMarine surveys – loss adjuster – p& i agent
Marine surveys – loss adjuster – p& i agent
AGRICULTURE – INDUSTRY – MARINE SURVEY CONTROL INSPECTION GROUP
 
Tsil profile summary
Tsil profile summaryTsil profile summary
Tsil profile summary
Samuel K. Swaray
 

Viewers also liked (15)

41 Atg&Ctm Fope06
41 Atg&Ctm Fope0641 Atg&Ctm Fope06
41 Atg&Ctm Fope06
 
LPG specifications for candidates
LPG specifications for candidatesLPG specifications for candidates
LPG specifications for candidates
 
Operations Management at Petrol retail outlet
Operations Management at Petrol retail outletOperations Management at Petrol retail outlet
Operations Management at Petrol retail outlet
 
TankerCalc for Bunker Surveyors
TankerCalc for Bunker SurveyorsTankerCalc for Bunker Surveyors
TankerCalc for Bunker Surveyors
 
V Agrawal A Sarmad Stoc Expo Presentation Updated2
V Agrawal A Sarmad Stoc Expo Presentation Updated2V Agrawal A Sarmad Stoc Expo Presentation Updated2
V Agrawal A Sarmad Stoc Expo Presentation Updated2
 
20100022074
2010002207420100022074
20100022074
 
Compressed hydrogen2011 11_chato
Compressed hydrogen2011 11_chatoCompressed hydrogen2011 11_chato
Compressed hydrogen2011 11_chato
 
Duti 254 D
Duti 254 DDuti 254 D
Duti 254 D
 
CargoSurveyor: toolbox for marine cargo surveyors
CargoSurveyor: toolbox for marine cargo surveyorsCargoSurveyor: toolbox for marine cargo surveyors
CargoSurveyor: toolbox for marine cargo surveyors
 
Oil Terminals And Custody Transfer
Oil Terminals And Custody TransferOil Terminals And Custody Transfer
Oil Terminals And Custody Transfer
 
Preparation of the Cargo Plan
Preparation of the Cargo PlanPreparation of the Cargo Plan
Preparation of the Cargo Plan
 
pengukuran perhitungan volume minyak standard di tangki darat
pengukuran perhitungan volume minyak standard di tangki daratpengukuran perhitungan volume minyak standard di tangki darat
pengukuran perhitungan volume minyak standard di tangki darat
 
Level measuring instruments
Level measuring instrumentsLevel measuring instruments
Level measuring instruments
 
Marine surveys – loss adjuster – p& i agent
Marine surveys – loss adjuster – p& i agentMarine surveys – loss adjuster – p& i agent
Marine surveys – loss adjuster – p& i agent
 
Tsil profile summary
Tsil profile summaryTsil profile summary
Tsil profile summary
 

Similar to Training pack multi hose product receiving z cott translated

Mix contaminations spills rev gew 6 6 09
Mix contaminations spills rev gew 6 6 09Mix contaminations spills rev gew 6 6 09
Mix contaminations spills rev gew 6 6 09George E Wendleton
 
CGL402N, 2024 YEAR.pptx for helping youjhsihuuih
CGL402N, 2024 YEAR.pptx for helping youjhsihuuihCGL402N, 2024 YEAR.pptx for helping youjhsihuuih
CGL402N, 2024 YEAR.pptx for helping youjhsihuuih
shuklamittt0077
 
WAGON TEST EQUIPMENTS.pdf
WAGON TEST EQUIPMENTS.pdfWAGON TEST EQUIPMENTS.pdf
WAGON TEST EQUIPMENTS.pdf
TCCW1
 
lpg safety.pptx
lpg safety.pptxlpg safety.pptx
lpg safety.pptx
samygs1
 
IZAJE DE CARGA EN MANIOBRAS PARA OPERADORES DE CARGA
IZAJE DE CARGA EN MANIOBRAS PARA OPERADORES DE CARGAIZAJE DE CARGA EN MANIOBRAS PARA OPERADORES DE CARGA
IZAJE DE CARGA EN MANIOBRAS PARA OPERADORES DE CARGA
ssuser9df777
 
Procedure for Inspection Pistons and Cylinder Liners
Procedure for Inspection Pistons and Cylinder Liners Procedure for Inspection Pistons and Cylinder Liners
Procedure for Inspection Pistons and Cylinder Liners
Erkut Denizci
 
Pamphlet on rake testing procedure for freight stock
Pamphlet on rake testing procedure for freight stockPamphlet on rake testing procedure for freight stock
Pamphlet on rake testing procedure for freight stock
SrinivasaRao Guduru
 
bunkering procedure 2.pptx marine engineering
bunkering procedure  2.pptx marine engineeringbunkering procedure  2.pptx marine engineering
bunkering procedure 2.pptx marine engineering
JeradJason
 
Testing_of_transformers_adjusted.ppt
Testing_of_transformers_adjusted.pptTesting_of_transformers_adjusted.ppt
Testing_of_transformers_adjusted.ppt
Satish Pydimarla
 
Sealweld commissioning enhancement
Sealweld commissioning enhancementSealweld commissioning enhancement
Sealweld commissioning enhancementkokan007
 
Alpine Titan Logix® automated tanker over fill prevention
Alpine Titan Logix® automated tanker over fill preventionAlpine Titan Logix® automated tanker over fill prevention
Alpine Titan Logix® automated tanker over fill prevention
Steve Lehmer - EMS
 
Hazard operability study - in Industires and plant
Hazard operability study - in Industires and plantHazard operability study - in Industires and plant
Hazard operability study - in Industires and plant
JayaKarthic1
 
HAZOP.ppt
HAZOP.pptHAZOP.ppt
HAZOP.ppt
JayaKarthic1
 
Various Mechanical Units Involved in The Bottling Of LPG cylinders
Various Mechanical Units Involved in The Bottling Of LPG cylindersVarious Mechanical Units Involved in The Bottling Of LPG cylinders
Various Mechanical Units Involved in The Bottling Of LPG cylinders
Mohit Dhull
 
171839416-commissioning-of-hydro-ppt.ppt
171839416-commissioning-of-hydro-ppt.ppt171839416-commissioning-of-hydro-ppt.ppt
171839416-commissioning-of-hydro-ppt.ppt
ssuser9e9be71
 
MINNAL MANI PROD TECH CV 2012
MINNAL MANI PROD TECH CV 2012MINNAL MANI PROD TECH CV 2012
MINNAL MANI PROD TECH CV 2012Minnal Mani
 
Api682
Api682Api682
hydraulic analysis pumping costs for pvc and ductile iron pipe
hydraulic analysis pumping costs for pvc and ductile iron pipehydraulic analysis pumping costs for pvc and ductile iron pipe
hydraulic analysis pumping costs for pvc and ductile iron pipe
ManishPatel169454
 
SURAKSHA KAVACH - Fatality Prevention Controls for MILL I.pdf
SURAKSHA KAVACH - Fatality Prevention Controls for MILL  I.pdfSURAKSHA KAVACH - Fatality Prevention Controls for MILL  I.pdf
SURAKSHA KAVACH - Fatality Prevention Controls for MILL I.pdf
zawarhydrofill
 

Similar to Training pack multi hose product receiving z cott translated (20)

Mix contaminations spills rev gew 6 6 09
Mix contaminations spills rev gew 6 6 09Mix contaminations spills rev gew 6 6 09
Mix contaminations spills rev gew 6 6 09
 
CGL402N, 2024 YEAR.pptx for helping youjhsihuuih
CGL402N, 2024 YEAR.pptx for helping youjhsihuuihCGL402N, 2024 YEAR.pptx for helping youjhsihuuih
CGL402N, 2024 YEAR.pptx for helping youjhsihuuih
 
WAGON TEST EQUIPMENTS.pdf
WAGON TEST EQUIPMENTS.pdfWAGON TEST EQUIPMENTS.pdf
WAGON TEST EQUIPMENTS.pdf
 
lpg safety.pptx
lpg safety.pptxlpg safety.pptx
lpg safety.pptx
 
IZAJE DE CARGA EN MANIOBRAS PARA OPERADORES DE CARGA
IZAJE DE CARGA EN MANIOBRAS PARA OPERADORES DE CARGAIZAJE DE CARGA EN MANIOBRAS PARA OPERADORES DE CARGA
IZAJE DE CARGA EN MANIOBRAS PARA OPERADORES DE CARGA
 
Procedure for Inspection Pistons and Cylinder Liners
Procedure for Inspection Pistons and Cylinder Liners Procedure for Inspection Pistons and Cylinder Liners
Procedure for Inspection Pistons and Cylinder Liners
 
Pamphlet on rake testing procedure for freight stock
Pamphlet on rake testing procedure for freight stockPamphlet on rake testing procedure for freight stock
Pamphlet on rake testing procedure for freight stock
 
bunkering procedure 2.pptx marine engineering
bunkering procedure  2.pptx marine engineeringbunkering procedure  2.pptx marine engineering
bunkering procedure 2.pptx marine engineering
 
Testing_of_transformers_adjusted.ppt
Testing_of_transformers_adjusted.pptTesting_of_transformers_adjusted.ppt
Testing_of_transformers_adjusted.ppt
 
Sealweld commissioning enhancement
Sealweld commissioning enhancementSealweld commissioning enhancement
Sealweld commissioning enhancement
 
Alpine Titan Logix® automated tanker over fill prevention
Alpine Titan Logix® automated tanker over fill preventionAlpine Titan Logix® automated tanker over fill prevention
Alpine Titan Logix® automated tanker over fill prevention
 
Hazard operability study - in Industires and plant
Hazard operability study - in Industires and plantHazard operability study - in Industires and plant
Hazard operability study - in Industires and plant
 
HAZOP.ppt
HAZOP.pptHAZOP.ppt
HAZOP.ppt
 
CV operator Oil movement
CV operator Oil movementCV operator Oil movement
CV operator Oil movement
 
Various Mechanical Units Involved in The Bottling Of LPG cylinders
Various Mechanical Units Involved in The Bottling Of LPG cylindersVarious Mechanical Units Involved in The Bottling Of LPG cylinders
Various Mechanical Units Involved in The Bottling Of LPG cylinders
 
171839416-commissioning-of-hydro-ppt.ppt
171839416-commissioning-of-hydro-ppt.ppt171839416-commissioning-of-hydro-ppt.ppt
171839416-commissioning-of-hydro-ppt.ppt
 
MINNAL MANI PROD TECH CV 2012
MINNAL MANI PROD TECH CV 2012MINNAL MANI PROD TECH CV 2012
MINNAL MANI PROD TECH CV 2012
 
Api682
Api682Api682
Api682
 
hydraulic analysis pumping costs for pvc and ductile iron pipe
hydraulic analysis pumping costs for pvc and ductile iron pipehydraulic analysis pumping costs for pvc and ductile iron pipe
hydraulic analysis pumping costs for pvc and ductile iron pipe
 
SURAKSHA KAVACH - Fatality Prevention Controls for MILL I.pdf
SURAKSHA KAVACH - Fatality Prevention Controls for MILL  I.pdfSURAKSHA KAVACH - Fatality Prevention Controls for MILL  I.pdf
SURAKSHA KAVACH - Fatality Prevention Controls for MILL I.pdf
 

Training pack multi hose product receiving z cott translated

  • 2. Driver’s Responsibility.....  Deliver the correct Product Quality and Quantity  Accomplish Lorry Delivery Checklist (LDC) with Authorized Receiver  Ensure proper Hose Connection  Full Attention during Product Unloading  Identify and Eliminate Site Hazards  Use proper Equipment (Hose & Camlock)  No Product to Ground (Spills)
  • 3. …...Customer Receiver’s Responsibility  Sufficient Ullage of the Receiving Tank  Accomplish LDC with Lorry Driver  Assist in Proper Connection to Fill Pipe  Full Attention during Product Unloading  Ensure all Receiving Valves are Open  Identify and Eliminate Site Hazards
  • 4. Bulk Fuels Receiving Procedure To guide our customers and drivers on the safe and proper handling of petroleum products (-through the use of the-) following the Lorry Delivery Checklist
  • 5. Step 1 Level Ground Ang lorry ba ay nasa patag at “designated” na lugar at malayo sa ano mang puwedeng pagmulan ng apoy? (siguruhin ito nang sa ganoon ay maisagawa ng maayos at ligtas ang inspeksiyon)
  • 6. Step 2 Lorry Safety Ang lorry ba ay naka-parkbrake at mayroong kalso ang gulong para maiwasan ang hindi inaasahang pag-galaw nito?
  • 7. Step 3 Proper Unloading Position Matapos ma-inspeksiyon, ang lorry ba ay nakaparada sa ligtas na lugar, malapit sa pagdidiskargahan at nakaharap sa Exit o labasan?
  • 8. Step 4 Driver ID at PPE Ang lorry driver ba ay may valid ID na galing sa Pilipinas Shell at nakasuot ng tamang uniform – cotton long sleeves at long pants, hard hat, safety shoes, nitrille gloves?
  • 9. Step 5 Authorized Receiver Ang tatanggap ba ng delivery ay may valid I.D., “authorized” ayon sa Competent Person Register o CDSS Card at naka-suot ng tamang uniform – reflectorized vest, safety shoes, nitrile gloves?
  • 10. Step 6 Delivery Note Kumpleto ba ang mga dokumentong dala ng lorry driver at nakasaad sa Delivery note ang tamang pangalan ng customer, numero ng customer, address, produkto at quantity?
  • 11. Step 7 Calibration Certificate Valid pa rin ba ang Calibration Certificate ng lorry (hindi pa lampas ng isang taon)?
  • 12. Step 8 Valve Seals Nasa ayos ba ang kundisyon ng mga selyo at magkakasunod ba ang numero ng mga ito sa pang-itaas na takip (tank hatch cover) at barbula ng tangke (discharge valves) sa numero na nakalagay sa dokumentong dala ng lorry driver ?
  • 13. Step 9 Lorry Fire Extinguisher Nakababa na ba ang fire extinguisher at madaling makuha sa oras ng emergency at naka-cordon ba ang discharge area gamit ang “reflectorized cones/signs” at “cordon tapes”?
  • 14. Step 10 Sufficient Ullage Susukatin ni authorized receiver ang U.G.T. kasama ang driver, upang masiguro ang eksaktong laman ng UGT
  • 15. Step 11 Smart Box Kukunin ng driver ang susi sa smartbox para buksan ang padlock sa discharge valve ng compartment na ididiskarga.
  • 16. Step 12 Unloading Sequence, Tank Ullage, Hose Connection Malinaw bang napagkasunduan ang planong pagkasunod-sunod na pagdidiskarga ng mga produktong ide-”deliver”? (punan ang mga detalye at “sequence” ng pag-diskarga sa lorry delivery checklist)
  • 19. Step 15 Unloading Sequence If the tank has no identification, report it! AVOID CONTAMINATIONS !!! Unleaded S.P.U Diesel Kerosene V- Power Numero o code ng tangke
  • 20. Step 16 Hose Adaptor Ikabit ang hose adaptor sa lorry discharge valve at siguruhin na may dust cap
  • 21. Step 17 Color test Gamit ang adaptor, padaluyin ang produkto para macheck ito ayon sa kulay
  • 22. Step 18 Product Sample ADO VP-D VP SPU ULG URM KERO (Please refer to Proper sampling procedure ) Na-check ba ang sample na kinuha sa bawat compartment ng lorry upang matiyak ang tamang kulay, o kung ito ay may dumi o tubig?
  • 23. Step 19 Ensure Correct Fill-point Ibigay sa authorized receiver ang isang dulo ng product tag at ikakabit nya ito kung saang fill-pipe dapat ikabit ang lorry discharge hose upang maka-siguro sa tamang tangke (UGT)
  • 24.
  • 25. Step 20 Hose Connection Connect to fill-pipe first Ikakabit ng driver ang discharge hose sa fill-pipe na pinag kabitan ng MISSION Z cable ng authorized receiver
  • 26. Step 21 Hose Connection Connect to discharge valve next Ikabit ang kabilang dulo ng discharge hose sa lorry, buksan ang E.S.V. at gate valve
  • 27. Step 22 Hose Integrity  Wala bang maaaring pag-mulan ng leak ng produkto ang discharge hoses at fittings?
  • 28. For Multi Product Drop, Repeat Steps 16 to 22 for the second (Discharge Hose) product to unload
  • 29. Step 23 Commence Product Unloading Simulan ang pag-didiskarga ng produkto
  • 30. Step 24 Product Sampling from Compartment 1 and 2 and so on… Habang nag-didiskarga, kumuha ng retaining sample gamit ang adaptor at tamang sampling bottle na ayon sa compartment number
  • 31. Step 25 Sampling Ang produkto ba sa bawat compartment ng lorry ay nakunan ng sample at tama sa nakasulat sa delivery note?
  • 32. Step 26 Sample Retention Ilagay ang mga bote sa sample box at lagyan ng tag
  • 33. Step 26 Observe Proper Storage of Samples - secure and well ventilated area - not exposed to direct sunlight - away from source/s of ignition Matapos makunan ng sample ang lahat na compartment at malagyan ng tag, isara ang sample box gamit ang sealing wire na kasama sa invoice
  • 34. Step 27 Tank Emptiness (Please refer to Proper Draining Procedure) Wala na bang laman ang lahat ng lorry compartments, lorry pipelines at discharge hose pagkatapos magdiskarga?
  • 35. Step 28 DOUBLE CHECK -Check MISSION Z Cable connections -Perform “Finger Follow” Check -Confirm by signing off proper entry at the LDC
  • 36. Step 29 Level Ground Siguruhin na ang lorry ay nasa patag na lugar bago mag-drain ng produktong naiwan sa compartment.
  • 37. Step 30 Proper Grounding Isa-ayos ang grounding cable sa pamamagitan ng pag-clip ng kabilang dulo sa discharge valve at ihanda ang draining bucket bago mag-umpisa.
  • 38. Step 31 Open and Close Valves Umpisahan ang pag-drain ng produktong naiwan sa compartment (naka-masid ang customer’s receiver habang isinasagawa ito). Siguruhing nai-sara ang discharge valve pagkatapos mag-drain.
  • 39. Step 32 Remove Grounding Alisin ang grounding cable mula sa pagkaka-kabit sa discharge valve (siguruhing wala ng produktong naiwan bago isagawa ito).
  • 40. Step 33 Residual Product Turnover I-turn over ang na-drain na produkto sa customer’s receiver para ito ay mai-salin sa underground tank muli.
  • 41. step 27 to step 33 Ulitin ang mga hakbang na ito para sa ibang compartment na may producktong residual.
  • 42. Step 35 Isara ang discharge valve pagkatapos mag drain at ibalik ang padlock
  • 43. Step 34 Ang authorized receiver ba ay maayos na nasagutan, napirmahan ang mga dokumentong dala ng driver at naka-tanggap ng tamang mga kopya nito? 1. Lorry Delivery Checklist 2. Delivery Note 3. CDSS / CCSS Cards
  • 44. Step 35 House keeping Ang discharge hose ba ay maayos na nailigpit at ang lugar na pinagdiskargahan ay malinis at walang tulo o tapon ng produkto?
  • 45. Non-Compliance Activity Lorry Delivery Checklist (LDC) not accomplished prior to unloading Product sample not taken before unloading Unlabelled Fill-Pipe UGT ullage not taken prior to unloading; Unattended unloading activity Risks Contamination due to Erroneous connection Wrong product unloaded, resulting to contamination; Product contamination coming from the lorry Spillage from overfilling of UGT Control Measure Strict Adherence to Lorry Delivery Checklist to prevent complacency Product sampling of lorry compartment thru the discharge valves and confirmation by receiver Perform Pre and Post dipping at UGT. Full attention of both driver and customer receiver during unloading
  • 46. Hazard Identification Source of Ignition/Open Flame • Static Electricity • Hot Works within the Vicinity • Loose Electrical Connection • Naked Flame Leaks/Spills/Contamination • Mislabeled Fill-Pipe • Hose/Camlock Connection • Pumps • Lorry Discharge Valves • Receiving Manifold/Valves • Tanks • Fill Pipe Protect •Drains/Canals Access/Escape Route • Lorry Position • Storage Tank Ladder Control Measure • Static Grounding Before and Post Discharge • Safe Distance/Shut off • Insulation • Area Cushion of Safety •Correct Labeling • PRV – Certified • Maintenance • Procedure •Sufficient Ullage • Isolate / Plugging • Fill Pipe Fitting • Easy Access • Non-Slip, Railing, Grab Bar
  • 48. Remember the 6 Key Steps in MultiHose Discharging! 3 1 OPEN 2 5 4 UGT LORRY OPEN 6
  • 49. Big Rules • • • • • Do not take shortcuts when completing the LDC. Do the Finger Follow! MHD shall only be done in Retail sites with Remote Fill Ensure to have different colored Mission Z cables and hoses. Before proceeding to hose connection of the 2nd product, ensure that there are no leaks or problems on the 1st product being discharged. • Only drivers TRAINED IN MULTI-HOSE DISCHARGING shall be allowed to perform simultaneous discharging. Driver ID will be updated after training (1 classroom session and 1 actual product discharging witnessed by Mentor Driver)
  • 51. Road Transport two-hose Discharging Remember the 6 Key Steps in Multi-Hose Discharging!

Editor's Notes

  1. Products to discharge/unload.
  2. Compartment capacity.
  3. Tank code.
  4. Attach the hose adaptor to lorry discharge valve and ensure that there is a dust cap.
  5. Use the adaptor in order to check the color of the product.
  6. Authorized receiver should ensure/identify correct fill-point before placing each lorry discharge hose
  7. The driver will connect the discharge hose to fill-pipe where Mission Z cable was placed by the authorized receiver.
  8. Connect the end part of the discharge hose to lorry then open the E.S.V and gate valve.
  9. Start unloading the product.
  10. While discharging, get a retaining sample using adaptor and place it to a proper sampling bottle in accordance with compartment number/label.
  11. Properly tagged the bottles and place it in sample box.
  12. After attaining sample from each compartment, labeled bottled should be sealed in the sample box with the sealing wire provided with the invoice.