Trail Work with Rocks:
An Uplifting Experience
By
Guy Hamblen
10 July 2018
Intro: Why are we here?
• Part of a developing Trail Workshop Series by TKO
• Focus on developing TKO team expertise in Trail
Rock Work
• 8-10 person focus-teams with Rock Work
experience
• Called into work parties for a specific rock work
projects
• Some “classroom” discussion but 90% field
“hands on” learning
• Build trust with Land Managers and Staff
personnel
Many types of Rock work
• Protection for vulnerable trail sections: retaining
walls, creek crossings, soggy/wet areas.
• Only durable solution for heavy use soggy trail
sections (horse or heavy hiker usage)
• User protection from dangerous/risky areas.
• Aesthetic uses… guide and focal point rocks or
structures.
• Trail and structure durability and sustainability.
For instance, a properly completed rock retaining
wall will last for many decades compared to a log
crib wall.
Broad Classification of Rock Work
• Retaining Walls:
– Switchback walls (anchor and focal rocks)
– Upslope retaining wall, downslope tread support
– Guide or gargoyle rocks
• Armoring:
– Soggy area tread support
– Hole fill -> tread support
– Seasonal creek swale and french drains
– Fords for small creeks
– Raised treads: turnpikes
• Rock Stairs: Attached and detached
• Rock Shaping: splitting, wedge/feathers, bushing
Ok…What’s in it for you?
• A different trail work experience. 50% a learned
skill, 50% art and aesthetics.
• A lot of exercise…..different than tread work.
• Team work essential. Women are welcome –
actually a safer rock team!
• Constant team communication necessary.
• Lots of skills: rock shopping, fitting, planting,
some shaping – a new vocabulary!
• Friends, fame, fortune…well, maybe not fortune.
• Learn the geology of the Pacific Northwest:
become a geology wonk!
Safety
(You, others near you, visitors)
• Always a JHA – “Jobsite Hazard Analysis” briefing
• “Never throw a rock away – always save it uphill”. You
will always need that rock…sometime
• “If you can lift a rock, it’s too small.”
• Anybody on the rock team can close the trail/work
section for safety reasons
• Trails team should always ask for permission to pass
through an active rock team section -> safety
• A runaway rock could ruin someone’s day -> “Rock
Rock”
Safety
(You, others near you, visitors)
• “Brains first, muscles last”
• Remember that the two most common injuries in
rock work are pinched (or smashed) fingers, smashed
toes, and tweaked (or blown out) backs/knees. Both
sets of injuries are a result of using muscles first and
brains last. High-quality rock work is almost always a
methodical, even a tedious task. Safe work is ALWAYS
faster than taking time out for a trip to the infirmary.
Tools for the Rock Trade
• Lots of high-quality, high tensile strength steel rockbars.
• Pick mattock, grub hoe, rockbars are the primary work tools.
• Eye protection, gloves, and hardhat. Don't even think of
swinging a tool at a rock without wearing the required
personal protective equipment (PPE). Basalt rock often
splinters – think arrowheads!
• Rock nets, rock sling, straps—all useful for carrying rocks of
various sizes.
• Grip hoist and rope puller systems. Many rocks can be
dragged into place or removed from the trail.
• All sorts of equipment, including rock drills, wedge and
feathers, shaping hammers, chisels, and other tools. Lots of
advanced techniques.
Really nice trail rock…
• Initial new trail flagging:
2” of this rock showing
• After duffing, 8”
showing
• “Ok…take it out…..”
• 2 hrs later, we have a
30” diameter and a
1200 lb rock!
• Now what????
Different Techniques
for Moving Rocks
• Rock nets, web straps, two-person lift, grip
hoist, rope pullers, and choker(s) with block
and tackle
• Skidding a rock safer than rolling a rock which
safer than lifting the rock
• Rock bar techniques: the Flip, the Pick and Pry,
the Waddle, the Row
• A runaway rock can be deadly!
Remember These 4 Guidelines
1. Bars and Hands, never the two should meet (on a
rock)! Only use one or the other when moving a rock,
never at the same time.
2. Communication! Especially when working with
someone to move a rock, use phrases like “Got it” to
let your partner know when things are steady and
ready to change. If you are working near the area but
not actively involved in the rock moving be aware of
your own blood bubble and theirs!
3. Always ask before helping. Do not assume someone
needs your help moving a rock.
4. Patience!! Slow and steady is safer
Goals for Building Rock
Structures
• “Simple is best” – Don’t over-engineer a solution
• Quality of Work vs Scope of work effort vs project
duration tradeoffs
• Rock Team participates in the design of the structure
• Solutions dependent on the availability of “good”
rock
Project Objective Tradeoffs
Project Duration?
Quality of Work Scope of Work Effort
1
2 3
Competing Project Objectives:
• Quality of Work
• When complete
• Scope of Work Effort
Project Scenarios
Balance these Project objectives:
• Scenario 1: “Get it done ASAP”
• Scenario 2: “Make it last – Do it
right”
• Scenario 3: Limit/size the work
effort (constrained by resources)
Be ready: These objectives will change during the project!
Retaining Wall Structures
• Complex, demanding work effort, and sophisticated
requirements
• Actual structure requirements are site specific
• Generally two to four layers of rock
• Will generally take several days to build
• Each rock is “fitted” – 50% of shopped rocks not usable
for wall -> backfill
• Foundation rocks, tie rocks, cap stones; backfill rocks
• Each wall rock is placed and “tested” for stability: min 3
points of contact
• Frontside shimming not allowed
Original CCC(?) retaining wall on Angels Rest
Rock Armoring
• Harden the entry/exit of a small drainage
crossing
• Reinforce the tread mud pothole
• Rock turnpikes: tread is a soggy mess (McIver)
– Larger rocks for base, medium rocks as fill, crown with
crushed
• Rock as fill for holes or trail segments (the
“grave” at Augspurger)
• Raised tread: log turnpikes through a wet area
The mud puddle…
The Yacolt root..
Tread Armoring
Switchback Rock Requirements
• Well-designed switchbacks are complex trail
structures
• Can have several retaining walls based on site
requirements
• Tread slopes (in slope, out slope) change in the
structure
• Hillside hydrology issues; drainage ditches often
necessary
• Use guide rocks to “steer” the user through the
structure
1st Switchback: Angels Rest
Decades of cutting the switchback corner. Live roots badly damaged.
Plant the anchor rock….
Add more rocks for protection
Everything is a mess….
About 75% done…
From the top…better but not done
99% done! Yea Rock Team!
Uphill hiker view….
33
Washout: From the front From the top: 3 ft depth into tread
Further Resources
• USFS Trail Construction and Maintenance Notebook (2007 Edition). See
https://www.fs.fed.us/t-d/pubs/pdfpubs/pdf07232806/pdf07232806dpi72.pdf
• Lightly on the Land: The SCA Trail Building and Maintenance Manual, 2005. Robert
Birkby.
• PCTA Trails Skills College Courses. See https://www.pcta.org/volunteer/trail-skills-
college/trail-skills-college-course-curriculum/ for Powerpoint, Word, and PDF
documents.
• Natural Surface Trails by Design, by Troy Scott Parker. (2004 Edition). NatureShape,
LLC.
• Roadside Geology of Washington, by Marli B. Miller (2017 Edition). Mountain
Press Publishing, Missoula, MT
• Roadside Geology of Oregon, by Marli B. Milller (2014 Edition). Mountain Press
Publishing, Missoula, MT
• A new Geological Era?, Youtube TED talk by Johan Rockstrom: Let the environment
guide our development, https://www.youtube.com/watch?v=RgqtrlixYR4
Complexity
Type Basic -A Advanced -B Complex -C
Certification Levels
Retaining
Walls
Upslope Wall Downslope Wall
Modernize or Repair New structure
Overlapping/attachedDetached
Basic Shaping
and Bushing
Splitting; wedge &
feathers use
Tread DrainageArmoring
Switchbacks
Rock Stairs
Rock Shaping
Questions?
• My email:
guy.hamblen@trailkeepersoforegon.org

More Related Content

Similar to Trail Work with Rocks: An Uplifting Experience

G11-Principles of External Fixation.pdf
G11-Principles of External Fixation.pdfG11-Principles of External Fixation.pdf
G11-Principles of External Fixation.pdf
Universitas Kristen Krida Wacana (Ukrida)
 
Underground construction
Underground constructionUnderground construction
Underground construction
Pavan Kumar N
 
Marine-Shipbuilding-and-Onboard-Systems.ppt
Marine-Shipbuilding-and-Onboard-Systems.pptMarine-Shipbuilding-and-Onboard-Systems.ppt
Marine-Shipbuilding-and-Onboard-Systems.ppt
devmarineacademy
 
Drilling Operations of Ground Water Wells Up-Geologist Team Zagazig Univ 06-0...
Drilling Operations of Ground Water Wells Up-Geologist Team Zagazig Univ 06-0...Drilling Operations of Ground Water Wells Up-Geologist Team Zagazig Univ 06-0...
Drilling Operations of Ground Water Wells Up-Geologist Team Zagazig Univ 06-0...
Mohamed _el_shora
 
shaftab-170524171214.pdf
shaftab-170524171214.pdfshaftab-170524171214.pdf
shaftab-170524171214.pdf
SaimHaq
 
Shaft
Shaft Shaft
Shaft
Pramoda Raj
 
Ground Support System
Ground Support System Ground Support System
Ground Support System
RAMPRASAD KUMAWAT
 
brief INTRODUCTION TO ROCK MECHANICS.pptx
brief INTRODUCTION TO ROCK MECHANICS.pptxbrief INTRODUCTION TO ROCK MECHANICS.pptx
brief INTRODUCTION TO ROCK MECHANICS.pptx
dalisanjennethcabint
 
Ziplining management
Ziplining managementZiplining management
Ziplining management
Harold Sowards
 
1.U1 MCO STONE.pdf
1.U1 MCO STONE.pdf1.U1 MCO STONE.pdf
1.U1 MCO STONE.pdf
rahuldoddamani7
 
A general consideration of stage i in begg /certified fixed orthodontic cours...
A general consideration of stage i in begg /certified fixed orthodontic cours...A general consideration of stage i in begg /certified fixed orthodontic cours...
A general consideration of stage i in begg /certified fixed orthodontic cours...
Indian dental academy
 
Trenching & Excavation
Trenching & ExcavationTrenching & Excavation
Trenching & Excavation
Shivananda Roy
 
A general consideration of stage i in begg /certified fixed orthodontic cours...
A general consideration of stage i in begg /certified fixed orthodontic cours...A general consideration of stage i in begg /certified fixed orthodontic cours...
A general consideration of stage i in begg /certified fixed orthodontic cours...
Indian dental academy
 
SUSPENSION BRIDGE
SUSPENSION BRIDGESUSPENSION BRIDGE
SUSPENSION BRIDGE
Himadri Samal
 
MOUNTAINEERING EQUIPMENTS AND THEIR PURPOSE
MOUNTAINEERING EQUIPMENTS AND THEIR PURPOSEMOUNTAINEERING EQUIPMENTS AND THEIR PURPOSE
MOUNTAINEERING EQUIPMENTS AND THEIR PURPOSE
lorenzobondoc4
 
Underground mining method
Underground mining methodUnderground mining method
Underground mining method
Safdar Ali
 
COLLECTION OF SAMPLE
COLLECTION OF SAMPLECOLLECTION OF SAMPLE
COLLECTION OF SAMPLE
Saad Raja
 
Underground construction
Underground constructionUnderground construction
Underground construction
Aglaia Connect
 
Coastal management
Coastal managementCoastal management
Coastal management
ManYan So
 
Underground construction Techniques civil final year seminar
Underground construction Techniques civil final year seminarUnderground construction Techniques civil final year seminar
Underground construction Techniques civil final year seminar
Pavan Kumar N
 

Similar to Trail Work with Rocks: An Uplifting Experience (20)

G11-Principles of External Fixation.pdf
G11-Principles of External Fixation.pdfG11-Principles of External Fixation.pdf
G11-Principles of External Fixation.pdf
 
Underground construction
Underground constructionUnderground construction
Underground construction
 
Marine-Shipbuilding-and-Onboard-Systems.ppt
Marine-Shipbuilding-and-Onboard-Systems.pptMarine-Shipbuilding-and-Onboard-Systems.ppt
Marine-Shipbuilding-and-Onboard-Systems.ppt
 
Drilling Operations of Ground Water Wells Up-Geologist Team Zagazig Univ 06-0...
Drilling Operations of Ground Water Wells Up-Geologist Team Zagazig Univ 06-0...Drilling Operations of Ground Water Wells Up-Geologist Team Zagazig Univ 06-0...
Drilling Operations of Ground Water Wells Up-Geologist Team Zagazig Univ 06-0...
 
shaftab-170524171214.pdf
shaftab-170524171214.pdfshaftab-170524171214.pdf
shaftab-170524171214.pdf
 
Shaft
Shaft Shaft
Shaft
 
Ground Support System
Ground Support System Ground Support System
Ground Support System
 
brief INTRODUCTION TO ROCK MECHANICS.pptx
brief INTRODUCTION TO ROCK MECHANICS.pptxbrief INTRODUCTION TO ROCK MECHANICS.pptx
brief INTRODUCTION TO ROCK MECHANICS.pptx
 
Ziplining management
Ziplining managementZiplining management
Ziplining management
 
1.U1 MCO STONE.pdf
1.U1 MCO STONE.pdf1.U1 MCO STONE.pdf
1.U1 MCO STONE.pdf
 
A general consideration of stage i in begg /certified fixed orthodontic cours...
A general consideration of stage i in begg /certified fixed orthodontic cours...A general consideration of stage i in begg /certified fixed orthodontic cours...
A general consideration of stage i in begg /certified fixed orthodontic cours...
 
Trenching & Excavation
Trenching & ExcavationTrenching & Excavation
Trenching & Excavation
 
A general consideration of stage i in begg /certified fixed orthodontic cours...
A general consideration of stage i in begg /certified fixed orthodontic cours...A general consideration of stage i in begg /certified fixed orthodontic cours...
A general consideration of stage i in begg /certified fixed orthodontic cours...
 
SUSPENSION BRIDGE
SUSPENSION BRIDGESUSPENSION BRIDGE
SUSPENSION BRIDGE
 
MOUNTAINEERING EQUIPMENTS AND THEIR PURPOSE
MOUNTAINEERING EQUIPMENTS AND THEIR PURPOSEMOUNTAINEERING EQUIPMENTS AND THEIR PURPOSE
MOUNTAINEERING EQUIPMENTS AND THEIR PURPOSE
 
Underground mining method
Underground mining methodUnderground mining method
Underground mining method
 
COLLECTION OF SAMPLE
COLLECTION OF SAMPLECOLLECTION OF SAMPLE
COLLECTION OF SAMPLE
 
Underground construction
Underground constructionUnderground construction
Underground construction
 
Coastal management
Coastal managementCoastal management
Coastal management
 
Underground construction Techniques civil final year seminar
Underground construction Techniques civil final year seminarUnderground construction Techniques civil final year seminar
Underground construction Techniques civil final year seminar
 

Recently uploaded

Global Peatlands Map and Hotspot Explanation Atlas
Global Peatlands Map and Hotspot Explanation AtlasGlobal Peatlands Map and Hotspot Explanation Atlas
Global Peatlands Map and Hotspot Explanation Atlas
Global Landscapes Forum (GLF)
 
Enhanced action and stakeholder engagement for sustainable peatland management
Enhanced action and stakeholder engagement for sustainable peatland managementEnhanced action and stakeholder engagement for sustainable peatland management
Enhanced action and stakeholder engagement for sustainable peatland management
Global Landscapes Forum (GLF)
 
world-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptxworld-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptx
mfasna35
 
Peatlands of Latin America and the Caribbean
Peatlands of Latin America and the CaribbeanPeatlands of Latin America and the Caribbean
Peatlands of Latin America and the Caribbean
Global Landscapes Forum (GLF)
 
Global Climate Change and global warming
Global Climate Change and global warmingGlobal Climate Change and global warming
Global Climate Change and global warming
ballkicker20
 
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Open Access Research Paper
 
Microbial characterisation and identification, and potability of River Kuywa ...
Microbial characterisation and identification, and potability of River Kuywa ...Microbial characterisation and identification, and potability of River Kuywa ...
Microbial characterisation and identification, and potability of River Kuywa ...
Open Access Research Paper
 
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Joshua Orris
 
Wildlife-AnIntroduction.pdf so that you know more about our environment
Wildlife-AnIntroduction.pdf so that you know more about our environmentWildlife-AnIntroduction.pdf so that you know more about our environment
Wildlife-AnIntroduction.pdf so that you know more about our environment
amishajha2407
 
Overview of the Global Peatlands Assessment
Overview of the Global Peatlands AssessmentOverview of the Global Peatlands Assessment
Overview of the Global Peatlands Assessment
Global Landscapes Forum (GLF)
 
Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...
Open Access Research Paper
 
Climate Change All over the World .pptx
Climate Change All over the World  .pptxClimate Change All over the World  .pptx
Climate Change All over the World .pptx
sairaanwer024
 
ENVIRONMENT~ Renewable Energy Sources and their future prospects.
ENVIRONMENT~ Renewable Energy Sources and their future prospects.ENVIRONMENT~ Renewable Energy Sources and their future prospects.
ENVIRONMENT~ Renewable Energy Sources and their future prospects.
tiwarimanvi3129
 
Recycling and Disposal on SWM Raymond Einyu pptx
Recycling and Disposal on SWM Raymond Einyu pptxRecycling and Disposal on SWM Raymond Einyu pptx
Recycling and Disposal on SWM Raymond Einyu pptx
RayLetai1
 
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
pjq9n1lk
 
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
p2npnqp
 
Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Improving the Management of Peatlands and the Capacities of Stakeholders in I...Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Global Landscapes Forum (GLF)
 
Peatland Management in Indonesia, Science to Policy and Knowledge Education
Peatland Management in Indonesia, Science to Policy and Knowledge EducationPeatland Management in Indonesia, Science to Policy and Knowledge Education
Peatland Management in Indonesia, Science to Policy and Knowledge Education
Global Landscapes Forum (GLF)
 
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Joshua Orris
 
Epcon is One of the World's leading Manufacturing Companies.
Epcon is One of the World's leading Manufacturing Companies.Epcon is One of the World's leading Manufacturing Companies.
Epcon is One of the World's leading Manufacturing Companies.
EpconLP
 

Recently uploaded (20)

Global Peatlands Map and Hotspot Explanation Atlas
Global Peatlands Map and Hotspot Explanation AtlasGlobal Peatlands Map and Hotspot Explanation Atlas
Global Peatlands Map and Hotspot Explanation Atlas
 
Enhanced action and stakeholder engagement for sustainable peatland management
Enhanced action and stakeholder engagement for sustainable peatland managementEnhanced action and stakeholder engagement for sustainable peatland management
Enhanced action and stakeholder engagement for sustainable peatland management
 
world-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptxworld-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptx
 
Peatlands of Latin America and the Caribbean
Peatlands of Latin America and the CaribbeanPeatlands of Latin America and the Caribbean
Peatlands of Latin America and the Caribbean
 
Global Climate Change and global warming
Global Climate Change and global warmingGlobal Climate Change and global warming
Global Climate Change and global warming
 
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
 
Microbial characterisation and identification, and potability of River Kuywa ...
Microbial characterisation and identification, and potability of River Kuywa ...Microbial characterisation and identification, and potability of River Kuywa ...
Microbial characterisation and identification, and potability of River Kuywa ...
 
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
 
Wildlife-AnIntroduction.pdf so that you know more about our environment
Wildlife-AnIntroduction.pdf so that you know more about our environmentWildlife-AnIntroduction.pdf so that you know more about our environment
Wildlife-AnIntroduction.pdf so that you know more about our environment
 
Overview of the Global Peatlands Assessment
Overview of the Global Peatlands AssessmentOverview of the Global Peatlands Assessment
Overview of the Global Peatlands Assessment
 
Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...
 
Climate Change All over the World .pptx
Climate Change All over the World  .pptxClimate Change All over the World  .pptx
Climate Change All over the World .pptx
 
ENVIRONMENT~ Renewable Energy Sources and their future prospects.
ENVIRONMENT~ Renewable Energy Sources and their future prospects.ENVIRONMENT~ Renewable Energy Sources and their future prospects.
ENVIRONMENT~ Renewable Energy Sources and their future prospects.
 
Recycling and Disposal on SWM Raymond Einyu pptx
Recycling and Disposal on SWM Raymond Einyu pptxRecycling and Disposal on SWM Raymond Einyu pptx
Recycling and Disposal on SWM Raymond Einyu pptx
 
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
 
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
 
Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Improving the Management of Peatlands and the Capacities of Stakeholders in I...Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Improving the Management of Peatlands and the Capacities of Stakeholders in I...
 
Peatland Management in Indonesia, Science to Policy and Knowledge Education
Peatland Management in Indonesia, Science to Policy and Knowledge EducationPeatland Management in Indonesia, Science to Policy and Knowledge Education
Peatland Management in Indonesia, Science to Policy and Knowledge Education
 
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
 
Epcon is One of the World's leading Manufacturing Companies.
Epcon is One of the World's leading Manufacturing Companies.Epcon is One of the World's leading Manufacturing Companies.
Epcon is One of the World's leading Manufacturing Companies.
 

Trail Work with Rocks: An Uplifting Experience

  • 1. Trail Work with Rocks: An Uplifting Experience By Guy Hamblen 10 July 2018
  • 2. Intro: Why are we here? • Part of a developing Trail Workshop Series by TKO • Focus on developing TKO team expertise in Trail Rock Work • 8-10 person focus-teams with Rock Work experience • Called into work parties for a specific rock work projects • Some “classroom” discussion but 90% field “hands on” learning • Build trust with Land Managers and Staff personnel
  • 3. Many types of Rock work • Protection for vulnerable trail sections: retaining walls, creek crossings, soggy/wet areas. • Only durable solution for heavy use soggy trail sections (horse or heavy hiker usage) • User protection from dangerous/risky areas. • Aesthetic uses… guide and focal point rocks or structures. • Trail and structure durability and sustainability. For instance, a properly completed rock retaining wall will last for many decades compared to a log crib wall.
  • 4. Broad Classification of Rock Work • Retaining Walls: – Switchback walls (anchor and focal rocks) – Upslope retaining wall, downslope tread support – Guide or gargoyle rocks • Armoring: – Soggy area tread support – Hole fill -> tread support – Seasonal creek swale and french drains – Fords for small creeks – Raised treads: turnpikes • Rock Stairs: Attached and detached • Rock Shaping: splitting, wedge/feathers, bushing
  • 5. Ok…What’s in it for you? • A different trail work experience. 50% a learned skill, 50% art and aesthetics. • A lot of exercise…..different than tread work. • Team work essential. Women are welcome – actually a safer rock team! • Constant team communication necessary. • Lots of skills: rock shopping, fitting, planting, some shaping – a new vocabulary! • Friends, fame, fortune…well, maybe not fortune. • Learn the geology of the Pacific Northwest: become a geology wonk!
  • 6. Safety (You, others near you, visitors) • Always a JHA – “Jobsite Hazard Analysis” briefing • “Never throw a rock away – always save it uphill”. You will always need that rock…sometime • “If you can lift a rock, it’s too small.” • Anybody on the rock team can close the trail/work section for safety reasons • Trails team should always ask for permission to pass through an active rock team section -> safety • A runaway rock could ruin someone’s day -> “Rock Rock”
  • 7. Safety (You, others near you, visitors) • “Brains first, muscles last” • Remember that the two most common injuries in rock work are pinched (or smashed) fingers, smashed toes, and tweaked (or blown out) backs/knees. Both sets of injuries are a result of using muscles first and brains last. High-quality rock work is almost always a methodical, even a tedious task. Safe work is ALWAYS faster than taking time out for a trip to the infirmary.
  • 8. Tools for the Rock Trade • Lots of high-quality, high tensile strength steel rockbars. • Pick mattock, grub hoe, rockbars are the primary work tools. • Eye protection, gloves, and hardhat. Don't even think of swinging a tool at a rock without wearing the required personal protective equipment (PPE). Basalt rock often splinters – think arrowheads! • Rock nets, rock sling, straps—all useful for carrying rocks of various sizes. • Grip hoist and rope puller systems. Many rocks can be dragged into place or removed from the trail. • All sorts of equipment, including rock drills, wedge and feathers, shaping hammers, chisels, and other tools. Lots of advanced techniques.
  • 9. Really nice trail rock… • Initial new trail flagging: 2” of this rock showing • After duffing, 8” showing • “Ok…take it out…..” • 2 hrs later, we have a 30” diameter and a 1200 lb rock! • Now what????
  • 10. Different Techniques for Moving Rocks • Rock nets, web straps, two-person lift, grip hoist, rope pullers, and choker(s) with block and tackle • Skidding a rock safer than rolling a rock which safer than lifting the rock • Rock bar techniques: the Flip, the Pick and Pry, the Waddle, the Row • A runaway rock can be deadly!
  • 11. Remember These 4 Guidelines 1. Bars and Hands, never the two should meet (on a rock)! Only use one or the other when moving a rock, never at the same time. 2. Communication! Especially when working with someone to move a rock, use phrases like “Got it” to let your partner know when things are steady and ready to change. If you are working near the area but not actively involved in the rock moving be aware of your own blood bubble and theirs! 3. Always ask before helping. Do not assume someone needs your help moving a rock. 4. Patience!! Slow and steady is safer
  • 12. Goals for Building Rock Structures • “Simple is best” – Don’t over-engineer a solution • Quality of Work vs Scope of work effort vs project duration tradeoffs • Rock Team participates in the design of the structure • Solutions dependent on the availability of “good” rock
  • 13. Project Objective Tradeoffs Project Duration? Quality of Work Scope of Work Effort 1 2 3 Competing Project Objectives: • Quality of Work • When complete • Scope of Work Effort Project Scenarios Balance these Project objectives: • Scenario 1: “Get it done ASAP” • Scenario 2: “Make it last – Do it right” • Scenario 3: Limit/size the work effort (constrained by resources) Be ready: These objectives will change during the project!
  • 14. Retaining Wall Structures • Complex, demanding work effort, and sophisticated requirements • Actual structure requirements are site specific • Generally two to four layers of rock • Will generally take several days to build • Each rock is “fitted” – 50% of shopped rocks not usable for wall -> backfill • Foundation rocks, tie rocks, cap stones; backfill rocks • Each wall rock is placed and “tested” for stability: min 3 points of contact • Frontside shimming not allowed
  • 15.
  • 16.
  • 17. Original CCC(?) retaining wall on Angels Rest
  • 18. Rock Armoring • Harden the entry/exit of a small drainage crossing • Reinforce the tread mud pothole • Rock turnpikes: tread is a soggy mess (McIver) – Larger rocks for base, medium rocks as fill, crown with crushed • Rock as fill for holes or trail segments (the “grave” at Augspurger) • Raised tread: log turnpikes through a wet area
  • 22. Switchback Rock Requirements • Well-designed switchbacks are complex trail structures • Can have several retaining walls based on site requirements • Tread slopes (in slope, out slope) change in the structure • Hillside hydrology issues; drainage ditches often necessary • Use guide rocks to “steer” the user through the structure
  • 23. 1st Switchback: Angels Rest Decades of cutting the switchback corner. Live roots badly damaged.
  • 24. Plant the anchor rock….
  • 25. Add more rocks for protection
  • 26. Everything is a mess….
  • 28. From the top…better but not done
  • 29. 99% done! Yea Rock Team!
  • 31.
  • 32. 33
  • 33.
  • 34. Washout: From the front From the top: 3 ft depth into tread
  • 35. Further Resources • USFS Trail Construction and Maintenance Notebook (2007 Edition). See https://www.fs.fed.us/t-d/pubs/pdfpubs/pdf07232806/pdf07232806dpi72.pdf • Lightly on the Land: The SCA Trail Building and Maintenance Manual, 2005. Robert Birkby. • PCTA Trails Skills College Courses. See https://www.pcta.org/volunteer/trail-skills- college/trail-skills-college-course-curriculum/ for Powerpoint, Word, and PDF documents. • Natural Surface Trails by Design, by Troy Scott Parker. (2004 Edition). NatureShape, LLC. • Roadside Geology of Washington, by Marli B. Miller (2017 Edition). Mountain Press Publishing, Missoula, MT • Roadside Geology of Oregon, by Marli B. Milller (2014 Edition). Mountain Press Publishing, Missoula, MT • A new Geological Era?, Youtube TED talk by Johan Rockstrom: Let the environment guide our development, https://www.youtube.com/watch?v=RgqtrlixYR4
  • 36. Complexity Type Basic -A Advanced -B Complex -C Certification Levels Retaining Walls Upslope Wall Downslope Wall Modernize or Repair New structure Overlapping/attachedDetached Basic Shaping and Bushing Splitting; wedge & feathers use Tread DrainageArmoring Switchbacks Rock Stairs Rock Shaping