RISK MANAGEMENT
EMCM5103 TOPIC 5
Risk Management
ØRisk
• Uncertain or chance events that planning could not overcome or control.
ØRisk Management
• A proactive attempt to recognize and manage internal events and external
threats that affect the likelihood of a project’s success.
• What can go wrong (risk event).
• How to minimize the risk event’s impact (consequences).
• What can be done before an event occurs (anticipation).
• What to do when an event occurs (contingency plans).
7–3
Risk Management’s Benefits
Ø Minimize management by crisis
Ø Encourage proactive management
Ø Minimize surprises and problems/negative consequences
Ø Gain competitive advantage
Ø Decrease overall probability of project variances
Ø Increase probability of project success
Ø Improves chances of reaching project performance objectives within budget and on time.
Ø Focus on building the right product the first time
Ø Prevent problems from occurring, or if they occur, from escalating/better control in future
DEFINITIONS OF RISK, RISK TOLERANCE
AND UNCERTAINTY
Ø Risk is a very crucial integral part of project management.
Ø Unforeseen that never be static
Ø Projects are prone to risks and often incorporate new techniques and procedures,
and risks have to be identified from the start.
Ø Effect of the uncertainty on objectives.
Ø As the cumulative effect of the probability of uncertain occurrences that may affect
the project objectives.
Ø Uncertain event or condition occurring which can certainly affect project objectives
( positively or negatively)
Ø Unmanaged risks are mostly the primary cause of project failure.
RISK AND UNCERTAINTY
RISK
• is concerned with objective probabilities
• can be assigned a probability value
UNCERTAINTY
• requires consideration of subjective
probabilities
• uncertainty is completely immeasurable
• defined as the sum of the unknown and
unknowable aspects of the project, the
consequences could threaten the achievement
of one or more project goals.
• It is the intangible measure of what is not
known about the project
Uncertainty and risk should not be defined only in terms of threats to
success but also in a broader sense to include having potential
positive outcomes.
Risks = Unfavourable events/outcomes , lack of knowledge of future
events /conditions – negative risks
Opportunities = future events/outcomes that are favourable to a
project - positive risks
2 types of risk
MANAGING UNCERTAINTY
Diagram shows 9 steps of uncertainty management framework
STEP 1&2-
PREPARING THE
PROCESS
STEP 3-7 : Process for
identifying, analysing and
developing measures for
exploiting or controlling
the uncertainty
STEP 8 & 9 : RISK
RESPONSE
-Following up the
uncertainty over
the project life
cycle
RISK TOLERANCE
• Risk tolerance: the specific maximum risk that an organization is willing to take
regarding each relevant risk. Risk target: the optimal level of risk that an organization
wants to take in pursuit of a specific business goal.
• Risk tolerance can be defined accurately if we really understand the manager’s
inclination towards risk-taking of good and bad outcomes.
• It is a subjective notion that is influenced by many circumstantial attitudes towards risk.
• Risk tolerance concerns both the probabilities of inherent risk occurrences taking place
and the resulting impact of those occurrences.
• Risk tolerance is very important in a sense that it leads to more efficient use of
resources because the project team has a better understanding of how much of the
project’s risks should be remedied.
DEVELOPING RISK MANAGEMENT PLAN
ØRisk management plan provides documented guidance for contract risk
management process which includes conducting risk assessment from all
perspectives and other contract activities inclusive of contract risk as well.
ØRisk assessment should be performed at the initial stage during planning as well
as at relevant intervals throughout the project to ascertain potential project
risk impacts with the intent to either remove the risk threat or to plan actions
that reduce the impact in the event of risk occurrences.
RISK ASSESSMENT TECHNIQUES
RISK
ASSESSMENT
TECHNIQUES
CHECKLIST
DELPHI
TECHNIQUE
BRAINSTORM
ING
NOMINAL
GROUP
TECHNIQUE
MONTE
CARLO
SIMULATION
OTHER
During risk assessment, project
team members must also be
careful to differentiate
between describing a risk event
and describing the cause of a
risk event.
This Table describes a few risk
assessment techniques which
are commonly practiced.
RISK ASSESSMENT TECHNIQUES
RISK ASSESSMENT
Risk assessment component can be divided into risk identification and risk analysis.
Generally, the risk management plan documents the risk management process.
The purpose of this practice is to provide the project manager, project team and other
relevant stakeholders with an approach to develop the planning documentation that is
needed to conduct risk management activities across all contract stages.
RISK ASSESSMENT
It should address the following:
(a) The personnel responsible for managing the various aspects of the project and
contract risks;
(b) Specify how the initial risk identification, analysis and prioritisation of output
will be maintained;
(c) State what the specific response strategies are, including any contingency
plans to be implemented; and
(d) Whether a management reserve for such plans will be allocated.
RISK MANAGEMENT PLAN
The risk management plan is usually developed during project planning (planning
phase). The plan and its content can be reviewed and updated throughout the stages or
phases of the contract formation until the project is completed.
However, in the risk management plan, a brief summary of the process that leads to the
contract and references to source the documents will be the main content apart from
risk management process and activities embedded within. In short, the plan should
include a resume of the risk management plan which will define all the scope and areas
in which risk management applies, particularly the risk types to be investigated.
EXAMPLE OF RISK MANAGEMENT PLAN
CONTRACT RISK MANAGEMENT
FRAMEWORK
Successful contract outcomes are more likely to be the result of defining and
managing activities according to a logical and structured contracting process
framework suitable for the proposed activities.
Figure : Risk management framework in contract management
(i) Identify the need of
the contract and the
extent of risk
assessment required.
(ii) Plan the contract
process and set
criteria.
(iii) Develop the type
of contract, conditions
and specifications so
that there is clarity in
risk identification.
(i) Invite and receive
offers:
(ii) Evaluate offers:
(iii) Negotiate and apply
due diligence:
(iv) Finalise and award
the contract.
(i) Manage the
transition:
(ii) Manage the
operation and evaluate
performance:
(iii) Review contract
options (Complete,
extend, renew):
RISK MANAGEMENT PROCESS
Risk management requires a proactive rather than a reactive approach. It is a
preventive process designed to ensure that unpredictability is reduced and any
negative consequences associated with unwanted events are minimised. The risk
management process supports decision-making in all steps of the contracting process
and aims to enhance assurance that the contract has adequate specifications and
terms, the right contractor is chosen and key risks are managed at all stages.
Managing risks in contract management requires an understanding
of two factors:
(a) The risk management process itself; and
(b) How risk management is applied to the contracting process. The
management of risks is required throughout the contracting process because
the nature of risks being managed will differ along the process
Figure: Risk management process
Figure shows the steps that
need to be embedded and
practised in the risk
management process.
The clear boxes indicate that
the process is likely to occur
regularly, while the dotted
lines indicate the possibility
that the contingency planning
might occur.
RISK MANAGEMENT PROCESS
(a) Step 1 Establish the Risk Context
The clarity on internal and external risk context is very crucial in this step as
organisations operate in an environment of risk. The same understanding
and clarity should be applied across all internal processes in the organisation
whilst including contract management. Internal risk context is defined as the
internal environment within which the organisation seeks its objectives
whilst external risk context refers to understanding the external environment
in which the organisation operates to enable the recognition of what
potential risks may exist.
RISK MANAGEMENT PROCESS
(b) Step 2 Risk Identification
The risk management process begins by generating a list of all the possible risks that
have the potential to affect the project. The brainstorming session and other
problem-identifying techniques to identify potential risks have to be pulled together
to ensure this step can be done efficiently.
7–27
The Risk Breakdown Structure (RBS)
FIGURE 7.3
Risk analysis
(c) Step 3 Risk Analysis
Risk analysis, on the other hand, involves developing a clear understanding about
an identified potential risk. In carrying out the analysis, the probability and
impact of the risk will be determined via various techniques.
Documentation of risk analysis can be done in various templates but must be
documented together in a risk management plan.
(d) Step 4 Risk Evaluation
Risk evaluation is actually part of risk analysis as it is a further in-depth analysis to
evaluate the overall risk rating of each risk and to decide which risk poses a higher threat
to the project.
(e) Step 5 Risk Treatment
In this step, the project team explores the options available for the project manager to
reduce the risk profile of each risks identified which will be subsequently monitored.
This step also contains the rating of risks in the risk register which include details of:
(i) The rating of risk probability;
(ii) The impact of the risk;
(iii) The overall risk rating; and
(iv) The scale and weightage that will be applied to all project risks.
Step 6 Contingency Planning
This step involves the use of alternative plans if a possible foreseen risk event
becomes a reality. It represents actions that will reduce or mitigate the negative
impact of the risk event. The contingency plan only materialises after the risk is
recognised and becomes an issue. Contingency planning evaluates alternative
remedies for possible foreseen events before the risk event occurs and selects the
best plan among alternatives.
The Risk Management Process
Step 1: Risk Identification
Generate a list of possible
risks through
brainstorming, problem
identification and risk
profiling.
Macro risks first, then
specific events
Step 2: Risk Assessment
Scenario analysis for
event probability and
impact
Risk assessment matrix
Failure Mode and
Effects Analysis (FMEA)
Probability analysis
Decision trees,
NPV, and PERT
Semiquantitative
scenario analysis
Step 3: Risk Response
Development 1.Mitigating Risk
2.Avoiding Risk
3.Transferring Risk
4. Retaining Risk
Contingency Plan :An alternative
plan that will be used if a possible
foreseen risk event actually
occurs.
Step 4: Risk Response Control
Risk control :
• Execution of the risk response strategy
• Monitoring of triggering events
• Initiating contingency plans
• Watching for new risks
Establishing a Change Management System
• Monitoring, tracking, and reporting risk
• Fostering an open organization environment
• Repeating risk identification/assessment
exercises
• Assigning and documenting responsibility for
managing risk
Risk Response Development
• Mitigating Risk
Reducing the likelihood an adverse event will occur.
impact of adverse event.
• Avoiding Risk
Changing the project plan to eliminate the risk or condition.
• Transferring Risk
Paying a premium to pass the risk to another party.
Build-Own-Operate-Transfer (BOOT) provisions.
• Retaining Risk
Making a conscious decision to accept the risk.
RISK RESPONSE
• Risk response planning phase is to develop suitable responses to the identified risks which
are appropriate, achievable and affordable.
• Risk owners are also allocated accordingly to each risk response.
• This is to be responsible for strategy implementation and for monitoring its effectiveness.
• This significant phase of the risk response planning is very important since a majority of
decisions are taken at this point that will directly affect the risk exposure of the project.
• And critical for this phase to also deal effectively with opportunities in addition to the
threats, if the associated profits, values or benefits are to be realised by the project and
the organisation respectively.
RISK RESPONSE
THANK YOU

More Related Content

Similar to TOPIC5.pdf

Project risk management
Project risk managementProject risk management
Project risk management
BarnatuCoffee
 
Risk 0-risk-guide book for pmi-rmp by amer elbaz
Risk 0-risk-guide book for pmi-rmp by amer elbazRisk 0-risk-guide book for pmi-rmp by amer elbaz
Risk 0-risk-guide book for pmi-rmp by amer elbaz
Mohamed Saeed
 
Templates and ExamplesTEMPLATE RISK MANAGEMENT PLAN FOR .docx
Templates and ExamplesTEMPLATE RISK MANAGEMENT PLAN FOR .docxTemplates and ExamplesTEMPLATE RISK MANAGEMENT PLAN FOR .docx
Templates and ExamplesTEMPLATE RISK MANAGEMENT PLAN FOR .docx
mattinsonjanel
 
Project Management by Mostafa Ewees
Project Management  by Mostafa EweesProject Management  by Mostafa Ewees
Project Management by Mostafa EweesMostafa Ewees
 
Table of Contents Project Outline. …………………………………………………………………….docx
 Table of Contents Project Outline. …………………………………………………………………….docx Table of Contents Project Outline. …………………………………………………………………….docx
Table of Contents Project Outline. …………………………………………………………………….docx
MARRY7
 
Control only.pdf
Control only.pdfControl only.pdf
Control only.pdf
NmnKmr2
 
International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)
inventionjournals
 
Project risk management
Project risk managementProject risk management
Project risk management
Aswin prakash i , Xantus Technologies
 
Lecture 6 Managing risk.pptx
Lecture 6 Managing risk.pptxLecture 6 Managing risk.pptx
Lecture 6 Managing risk.pptx
MehediHasan636262
 
Beyond PMP: Risk Management
Beyond PMP: Risk ManagementBeyond PMP: Risk Management
Beyond PMP: Risk Management
abhinayverma
 
For Ch -6 == Risk Monitoring & Controlling.pptx
For Ch -6 == Risk Monitoring & Controlling.pptxFor Ch -6 == Risk Monitoring & Controlling.pptx
For Ch -6 == Risk Monitoring & Controlling.pptx
AbhinavRJ1
 
Risk management plan tyre recycling plant
Risk management plan  tyre recycling plantRisk management plan  tyre recycling plant
Risk management plan tyre recycling plant
abhishekthakur309
 
Online PMP Training Material for PMP Exam - Risk Management Knowledge Area
Online PMP Training Material for PMP Exam - Risk Management Knowledge AreaOnline PMP Training Material for PMP Exam - Risk Management Knowledge Area
Online PMP Training Material for PMP Exam - Risk Management Knowledge Area
GlobalSkillup
 
Pmi 19 26
Pmi 19 26Pmi 19 26
Pmi 19 26
Nawzad Bilal
 
Risk strategies presentation
Risk strategies presentationRisk strategies presentation
Risk strategies presentation
Raven Morgan
 
Bertrand's Individual Essay
Bertrand's Individual EssayBertrand's Individual Essay
Bertrand's Individual EssayPrince Bertrand
 
Managing Risk as Opportunity
Managing Risk as OpportunityManaging Risk as Opportunity
Managing Risk as Opportunity
Glen Alleman
 
11. Project Risk Management.pptx
11. Project Risk Management.pptx11. Project Risk Management.pptx
11. Project Risk Management.pptx
KamranKhan353531
 
Risk Management Methodologies in Construction Industries
Risk Management Methodologies in Construction IndustriesRisk Management Methodologies in Construction Industries
Risk Management Methodologies in Construction Industries
IRJET Journal
 
Project mngmnt risks3.2
Project mngmnt risks3.2Project mngmnt risks3.2
Project mngmnt risks3.2
Ananya Indrajith
 

Similar to TOPIC5.pdf (20)

Project risk management
Project risk managementProject risk management
Project risk management
 
Risk 0-risk-guide book for pmi-rmp by amer elbaz
Risk 0-risk-guide book for pmi-rmp by amer elbazRisk 0-risk-guide book for pmi-rmp by amer elbaz
Risk 0-risk-guide book for pmi-rmp by amer elbaz
 
Templates and ExamplesTEMPLATE RISK MANAGEMENT PLAN FOR .docx
Templates and ExamplesTEMPLATE RISK MANAGEMENT PLAN FOR .docxTemplates and ExamplesTEMPLATE RISK MANAGEMENT PLAN FOR .docx
Templates and ExamplesTEMPLATE RISK MANAGEMENT PLAN FOR .docx
 
Project Management by Mostafa Ewees
Project Management  by Mostafa EweesProject Management  by Mostafa Ewees
Project Management by Mostafa Ewees
 
Table of Contents Project Outline. …………………………………………………………………….docx
 Table of Contents Project Outline. …………………………………………………………………….docx Table of Contents Project Outline. …………………………………………………………………….docx
Table of Contents Project Outline. …………………………………………………………………….docx
 
Control only.pdf
Control only.pdfControl only.pdf
Control only.pdf
 
International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)
 
Project risk management
Project risk managementProject risk management
Project risk management
 
Lecture 6 Managing risk.pptx
Lecture 6 Managing risk.pptxLecture 6 Managing risk.pptx
Lecture 6 Managing risk.pptx
 
Beyond PMP: Risk Management
Beyond PMP: Risk ManagementBeyond PMP: Risk Management
Beyond PMP: Risk Management
 
For Ch -6 == Risk Monitoring & Controlling.pptx
For Ch -6 == Risk Monitoring & Controlling.pptxFor Ch -6 == Risk Monitoring & Controlling.pptx
For Ch -6 == Risk Monitoring & Controlling.pptx
 
Risk management plan tyre recycling plant
Risk management plan  tyre recycling plantRisk management plan  tyre recycling plant
Risk management plan tyre recycling plant
 
Online PMP Training Material for PMP Exam - Risk Management Knowledge Area
Online PMP Training Material for PMP Exam - Risk Management Knowledge AreaOnline PMP Training Material for PMP Exam - Risk Management Knowledge Area
Online PMP Training Material for PMP Exam - Risk Management Knowledge Area
 
Pmi 19 26
Pmi 19 26Pmi 19 26
Pmi 19 26
 
Risk strategies presentation
Risk strategies presentationRisk strategies presentation
Risk strategies presentation
 
Bertrand's Individual Essay
Bertrand's Individual EssayBertrand's Individual Essay
Bertrand's Individual Essay
 
Managing Risk as Opportunity
Managing Risk as OpportunityManaging Risk as Opportunity
Managing Risk as Opportunity
 
11. Project Risk Management.pptx
11. Project Risk Management.pptx11. Project Risk Management.pptx
11. Project Risk Management.pptx
 
Risk Management Methodologies in Construction Industries
Risk Management Methodologies in Construction IndustriesRisk Management Methodologies in Construction Industries
Risk Management Methodologies in Construction Industries
 
Project mngmnt risks3.2
Project mngmnt risks3.2Project mngmnt risks3.2
Project mngmnt risks3.2
 

More from HASMANIRA

Contract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment StructureContract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment Structure
HASMANIRA
 
International Project Management - Core Concept and Theory of Projects
International Project Management - Core Concept and Theory of ProjectsInternational Project Management - Core Concept and Theory of Projects
International Project Management - Core Concept and Theory of Projects
HASMANIRA
 
OSHConstructionLecture_Legal Requirements .pdf
OSHConstructionLecture_Legal Requirements .pdfOSHConstructionLecture_Legal Requirements .pdf
OSHConstructionLecture_Legal Requirements .pdf
HASMANIRA
 
topic9.pdf
topic9.pdftopic9.pdf
topic9.pdf
HASMANIRA
 
TOPIC8.pdf
TOPIC8.pdfTOPIC8.pdf
TOPIC8.pdf
HASMANIRA
 
TOPIC6.pdf
TOPIC6.pdfTOPIC6.pdf
TOPIC6.pdf
HASMANIRA
 
TOPIC7.pdf
TOPIC7.pdfTOPIC7.pdf
TOPIC7.pdf
HASMANIRA
 
TOPIC3.pdf
TOPIC3.pdfTOPIC3.pdf
TOPIC3.pdf
HASMANIRA
 
TOPIC2.pdf
TOPIC2.pdfTOPIC2.pdf
TOPIC2.pdf
HASMANIRA
 
TOPIC1.pdf
TOPIC1.pdfTOPIC1.pdf
TOPIC1.pdf
HASMANIRA
 

More from HASMANIRA (10)

Contract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment StructureContract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment Structure
 
International Project Management - Core Concept and Theory of Projects
International Project Management - Core Concept and Theory of ProjectsInternational Project Management - Core Concept and Theory of Projects
International Project Management - Core Concept and Theory of Projects
 
OSHConstructionLecture_Legal Requirements .pdf
OSHConstructionLecture_Legal Requirements .pdfOSHConstructionLecture_Legal Requirements .pdf
OSHConstructionLecture_Legal Requirements .pdf
 
topic9.pdf
topic9.pdftopic9.pdf
topic9.pdf
 
TOPIC8.pdf
TOPIC8.pdfTOPIC8.pdf
TOPIC8.pdf
 
TOPIC6.pdf
TOPIC6.pdfTOPIC6.pdf
TOPIC6.pdf
 
TOPIC7.pdf
TOPIC7.pdfTOPIC7.pdf
TOPIC7.pdf
 
TOPIC3.pdf
TOPIC3.pdfTOPIC3.pdf
TOPIC3.pdf
 
TOPIC2.pdf
TOPIC2.pdfTOPIC2.pdf
TOPIC2.pdf
 
TOPIC1.pdf
TOPIC1.pdfTOPIC1.pdf
TOPIC1.pdf
 

Recently uploaded

Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
Vivekanand Anglo Vedic Academy
 
Fish and Chips - have they had their chips
Fish and Chips - have they had their chipsFish and Chips - have they had their chips
Fish and Chips - have they had their chips
GeoBlogs
 
Basic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersBasic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumers
PedroFerreira53928
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
kaushalkr1407
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
BhavyaRajput3
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
siemaillard
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
Delapenabediema
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
Anna Sz.
 
How to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERPHow to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERP
Celine George
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
MysoreMuleSoftMeetup
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
Introduction to Quality Improvement Essentials
Introduction to Quality Improvement EssentialsIntroduction to Quality Improvement Essentials
Introduction to Quality Improvement Essentials
Excellence Foundation for South Sudan
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
siemaillard
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
Jisc
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
RaedMohamed3
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
MIRIAMSALINAS13
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
Pavel ( NSTU)
 

Recently uploaded (20)

Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
 
Fish and Chips - have they had their chips
Fish and Chips - have they had their chipsFish and Chips - have they had their chips
Fish and Chips - have they had their chips
 
Basic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersBasic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumers
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
 
How to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERPHow to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERP
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
Introduction to Quality Improvement Essentials
Introduction to Quality Improvement EssentialsIntroduction to Quality Improvement Essentials
Introduction to Quality Improvement Essentials
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 

TOPIC5.pdf

  • 2. Risk Management ØRisk • Uncertain or chance events that planning could not overcome or control. ØRisk Management • A proactive attempt to recognize and manage internal events and external threats that affect the likelihood of a project’s success. • What can go wrong (risk event). • How to minimize the risk event’s impact (consequences). • What can be done before an event occurs (anticipation). • What to do when an event occurs (contingency plans).
  • 3. 7–3 Risk Management’s Benefits Ø Minimize management by crisis Ø Encourage proactive management Ø Minimize surprises and problems/negative consequences Ø Gain competitive advantage Ø Decrease overall probability of project variances Ø Increase probability of project success Ø Improves chances of reaching project performance objectives within budget and on time. Ø Focus on building the right product the first time Ø Prevent problems from occurring, or if they occur, from escalating/better control in future
  • 4. DEFINITIONS OF RISK, RISK TOLERANCE AND UNCERTAINTY Ø Risk is a very crucial integral part of project management. Ø Unforeseen that never be static Ø Projects are prone to risks and often incorporate new techniques and procedures, and risks have to be identified from the start. Ø Effect of the uncertainty on objectives. Ø As the cumulative effect of the probability of uncertain occurrences that may affect the project objectives. Ø Uncertain event or condition occurring which can certainly affect project objectives ( positively or negatively) Ø Unmanaged risks are mostly the primary cause of project failure.
  • 5. RISK AND UNCERTAINTY RISK • is concerned with objective probabilities • can be assigned a probability value UNCERTAINTY • requires consideration of subjective probabilities • uncertainty is completely immeasurable • defined as the sum of the unknown and unknowable aspects of the project, the consequences could threaten the achievement of one or more project goals. • It is the intangible measure of what is not known about the project
  • 6. Uncertainty and risk should not be defined only in terms of threats to success but also in a broader sense to include having potential positive outcomes. Risks = Unfavourable events/outcomes , lack of knowledge of future events /conditions – negative risks Opportunities = future events/outcomes that are favourable to a project - positive risks 2 types of risk
  • 7. MANAGING UNCERTAINTY Diagram shows 9 steps of uncertainty management framework STEP 1&2- PREPARING THE PROCESS STEP 3-7 : Process for identifying, analysing and developing measures for exploiting or controlling the uncertainty STEP 8 & 9 : RISK RESPONSE -Following up the uncertainty over the project life cycle
  • 8.
  • 9.
  • 10. RISK TOLERANCE • Risk tolerance: the specific maximum risk that an organization is willing to take regarding each relevant risk. Risk target: the optimal level of risk that an organization wants to take in pursuit of a specific business goal. • Risk tolerance can be defined accurately if we really understand the manager’s inclination towards risk-taking of good and bad outcomes. • It is a subjective notion that is influenced by many circumstantial attitudes towards risk. • Risk tolerance concerns both the probabilities of inherent risk occurrences taking place and the resulting impact of those occurrences. • Risk tolerance is very important in a sense that it leads to more efficient use of resources because the project team has a better understanding of how much of the project’s risks should be remedied.
  • 11. DEVELOPING RISK MANAGEMENT PLAN ØRisk management plan provides documented guidance for contract risk management process which includes conducting risk assessment from all perspectives and other contract activities inclusive of contract risk as well. ØRisk assessment should be performed at the initial stage during planning as well as at relevant intervals throughout the project to ascertain potential project risk impacts with the intent to either remove the risk threat or to plan actions that reduce the impact in the event of risk occurrences.
  • 12. RISK ASSESSMENT TECHNIQUES RISK ASSESSMENT TECHNIQUES CHECKLIST DELPHI TECHNIQUE BRAINSTORM ING NOMINAL GROUP TECHNIQUE MONTE CARLO SIMULATION OTHER During risk assessment, project team members must also be careful to differentiate between describing a risk event and describing the cause of a risk event. This Table describes a few risk assessment techniques which are commonly practiced.
  • 14.
  • 15. RISK ASSESSMENT Risk assessment component can be divided into risk identification and risk analysis. Generally, the risk management plan documents the risk management process. The purpose of this practice is to provide the project manager, project team and other relevant stakeholders with an approach to develop the planning documentation that is needed to conduct risk management activities across all contract stages.
  • 16. RISK ASSESSMENT It should address the following: (a) The personnel responsible for managing the various aspects of the project and contract risks; (b) Specify how the initial risk identification, analysis and prioritisation of output will be maintained; (c) State what the specific response strategies are, including any contingency plans to be implemented; and (d) Whether a management reserve for such plans will be allocated.
  • 17. RISK MANAGEMENT PLAN The risk management plan is usually developed during project planning (planning phase). The plan and its content can be reviewed and updated throughout the stages or phases of the contract formation until the project is completed. However, in the risk management plan, a brief summary of the process that leads to the contract and references to source the documents will be the main content apart from risk management process and activities embedded within. In short, the plan should include a resume of the risk management plan which will define all the scope and areas in which risk management applies, particularly the risk types to be investigated.
  • 18. EXAMPLE OF RISK MANAGEMENT PLAN
  • 19.
  • 20.
  • 21. CONTRACT RISK MANAGEMENT FRAMEWORK Successful contract outcomes are more likely to be the result of defining and managing activities according to a logical and structured contracting process framework suitable for the proposed activities. Figure : Risk management framework in contract management
  • 22. (i) Identify the need of the contract and the extent of risk assessment required. (ii) Plan the contract process and set criteria. (iii) Develop the type of contract, conditions and specifications so that there is clarity in risk identification. (i) Invite and receive offers: (ii) Evaluate offers: (iii) Negotiate and apply due diligence: (iv) Finalise and award the contract. (i) Manage the transition: (ii) Manage the operation and evaluate performance: (iii) Review contract options (Complete, extend, renew):
  • 23. RISK MANAGEMENT PROCESS Risk management requires a proactive rather than a reactive approach. It is a preventive process designed to ensure that unpredictability is reduced and any negative consequences associated with unwanted events are minimised. The risk management process supports decision-making in all steps of the contracting process and aims to enhance assurance that the contract has adequate specifications and terms, the right contractor is chosen and key risks are managed at all stages. Managing risks in contract management requires an understanding of two factors: (a) The risk management process itself; and (b) How risk management is applied to the contracting process. The management of risks is required throughout the contracting process because the nature of risks being managed will differ along the process
  • 24. Figure: Risk management process Figure shows the steps that need to be embedded and practised in the risk management process. The clear boxes indicate that the process is likely to occur regularly, while the dotted lines indicate the possibility that the contingency planning might occur.
  • 25. RISK MANAGEMENT PROCESS (a) Step 1 Establish the Risk Context The clarity on internal and external risk context is very crucial in this step as organisations operate in an environment of risk. The same understanding and clarity should be applied across all internal processes in the organisation whilst including contract management. Internal risk context is defined as the internal environment within which the organisation seeks its objectives whilst external risk context refers to understanding the external environment in which the organisation operates to enable the recognition of what potential risks may exist.
  • 26. RISK MANAGEMENT PROCESS (b) Step 2 Risk Identification The risk management process begins by generating a list of all the possible risks that have the potential to affect the project. The brainstorming session and other problem-identifying techniques to identify potential risks have to be pulled together to ensure this step can be done efficiently.
  • 27. 7–27 The Risk Breakdown Structure (RBS) FIGURE 7.3
  • 28. Risk analysis (c) Step 3 Risk Analysis Risk analysis, on the other hand, involves developing a clear understanding about an identified potential risk. In carrying out the analysis, the probability and impact of the risk will be determined via various techniques. Documentation of risk analysis can be done in various templates but must be documented together in a risk management plan.
  • 29. (d) Step 4 Risk Evaluation Risk evaluation is actually part of risk analysis as it is a further in-depth analysis to evaluate the overall risk rating of each risk and to decide which risk poses a higher threat to the project. (e) Step 5 Risk Treatment In this step, the project team explores the options available for the project manager to reduce the risk profile of each risks identified which will be subsequently monitored. This step also contains the rating of risks in the risk register which include details of: (i) The rating of risk probability; (ii) The impact of the risk; (iii) The overall risk rating; and (iv) The scale and weightage that will be applied to all project risks.
  • 30. Step 6 Contingency Planning This step involves the use of alternative plans if a possible foreseen risk event becomes a reality. It represents actions that will reduce or mitigate the negative impact of the risk event. The contingency plan only materialises after the risk is recognised and becomes an issue. Contingency planning evaluates alternative remedies for possible foreseen events before the risk event occurs and selects the best plan among alternatives.
  • 31. The Risk Management Process Step 1: Risk Identification Generate a list of possible risks through brainstorming, problem identification and risk profiling. Macro risks first, then specific events Step 2: Risk Assessment Scenario analysis for event probability and impact Risk assessment matrix Failure Mode and Effects Analysis (FMEA) Probability analysis Decision trees, NPV, and PERT Semiquantitative scenario analysis Step 3: Risk Response Development 1.Mitigating Risk 2.Avoiding Risk 3.Transferring Risk 4. Retaining Risk Contingency Plan :An alternative plan that will be used if a possible foreseen risk event actually occurs. Step 4: Risk Response Control Risk control : • Execution of the risk response strategy • Monitoring of triggering events • Initiating contingency plans • Watching for new risks Establishing a Change Management System • Monitoring, tracking, and reporting risk • Fostering an open organization environment • Repeating risk identification/assessment exercises • Assigning and documenting responsibility for managing risk
  • 32. Risk Response Development • Mitigating Risk Reducing the likelihood an adverse event will occur. impact of adverse event. • Avoiding Risk Changing the project plan to eliminate the risk or condition. • Transferring Risk Paying a premium to pass the risk to another party. Build-Own-Operate-Transfer (BOOT) provisions. • Retaining Risk Making a conscious decision to accept the risk. RISK RESPONSE
  • 33. • Risk response planning phase is to develop suitable responses to the identified risks which are appropriate, achievable and affordable. • Risk owners are also allocated accordingly to each risk response. • This is to be responsible for strategy implementation and for monitoring its effectiveness. • This significant phase of the risk response planning is very important since a majority of decisions are taken at this point that will directly affect the risk exposure of the project. • And critical for this phase to also deal effectively with opportunities in addition to the threats, if the associated profits, values or benefits are to be realised by the project and the organisation respectively. RISK RESPONSE