This document summarizes a seminar on top down construction presented at Ajay Kumar Garg Engineering College. The seminar introduced top down construction as an alternative to conventional bottom-up construction for large projects with time or space constraints. It described the methodology of top down construction including installing diaphragm walls and piles, excavating below roof slabs with structural supports, and progressively excavating and constructing underground levels while building above-ground levels simultaneously. Advantages of top down construction are shortened timelines from simultaneous work, more early operational space, and suitability for tall urban buildings. Disadvantages include higher costs and requiring skilled supervision.