CNPCNP PRODUCTION DEPARTMENT
CNPCNP PRODUCTION DEPARTMENT
Heater inspection and related operations
CNPCNP PRODUCTION DEPARTMENT
CNPCNP PRODUCTION DEPARTMENT
directory
1.Brief introduction of the Heater
2.Inspection points of the Heater
3.Operation of the Heater
4.Heater failure analysis and handling
CNPCNP PRODUCTION DEPARTMENT
1.Brief introduction of the Heater
Function: Increase the temperature of the crude oil, for beter separation..
Pre-haerter : FPF oil heat up to 50 ℃ .
Production heater: heat up to 75 ℃.
Recycle heater: heat up to 70℃.
Fuel:Natural gas.(Pre-heat and stable pressure)
CNPCNP PRODUCTION DEPARTMENT
Process principle :
The fuel gas burned and transfer the heat to the water, and the water
transfer the heat to the crude oil.
1.Brief introduction of the Heater
CNPCNP PRODUCTION DEPARTMENT
Structural features:
It consists of :heating furnace, burner, process piping, valve , instrumentation, gas system,
operation room, liquid collection bag, skid seat and a ladder.
The furnace body is cylindrical, the heating coil is a snake-shaped coil structure.
The burner is an automatic proportional adjustment gas burner, and the natural gas is
filtered and reduced to reach the pressure required for the normal operation.
1.Brief introduction of the Heater
CNPCNP PRODUCTION DEPARTMENT
Process Introduction :
Preheated Heater process
Recyle Heater process
1.Brief introduction of the Heater
CNPCNP PRODUCTION DEPARTMENT
Process Introduction :
Production heater process
1.Brief introduction of the Heater
CNPCNP PRODUCTION DEPARTMENT
2.Inspection points of the Heater
Check : the water level, the pressure, the temperature, medium inlet and outlet
temperature and pressure , exhaust temperature.
CNPCNP PRODUCTION DEPARTMENT
Check the remote instrument , the comparison field instrument.
Check the liquid level of the fuel gas buffer pack the pressure.
Check the burning condition of the burner, observe that the flame jet should be stable,
the furnace chamber should be bright, and keep its parts clean and intact, monitoring
normal.
2.Inspection points of the Heater
CNPCNP PRODUCTION DEPARTMENT
Inspection of production parameters:
Check whether the pressure, temperature and liquid level of the heating furnace are normal。
2.Inspection points of the Heater
CNPCNP PRODUCTION DEPARTMENT
3.Heater related actions
• Prepare before ignition
• Check that the pressure gauges, thermometers, etc. are clean and intact.
• Check whether the thermal insulation protection of the heater body and the connected pipes is in
good condition.
• Check that the burner is in good condition.
• Whether the fuel supply can meet the requirements of the burner operation. When regulating the
pressure, it should be open and scattered so that the gas flow can be adjusted. The pressure after
secondary pressure regulation is 5-20KPa.
• Check whether each valve of each system has leaks and is in good condition.
• Check whether each discharge port on the equipment is closed, and whether the valve that should be
in the closed state is already closed.
• Check the instrumentation and control system to ensure that the system is working properly and that
the primary meter and actuator are in good condition.
CNPCNP PRODUCTION DEPARTMENT
Ignition operation panel introduction
3.Heater related actions
CNPCNP PRODUCTION DEPARTMENT
Ignition procedure (AUTO):
1. Place the main switch A on the burner control panel at position 1 and hit CMF to position 3.
2. Check that the device is not in the locked position (LED B is on) and reset it via the reset button C if
necessary.
3. Confirm that the proportional regulator gives the burner operation allowed command.
4. Check whether the supply pressure is above the minimum standard (indicator E is on).
5. The fan starts, the pre-purge starts, and the test procedure of the gas valve leak monitor begins at
the same time. If there is a leak in the gas valve, the gas tightness monitor will lock and the alarm
light will turn on (above the solenoid valve group). Press the reset on the valve block to reset.
6. Since the pre-purge stage requires a maximum amount of air, the control device begins to fully
open the servo controller until the maximum opening is reached. This is the start of the pre-purge
phase (36 seconds).
7. At the end of the pre-purge stage, the servo controller reaches the full off position (ignition
position), at which point the ignition transformer starts (I light on).
8. The ignition transformer is turned off after the gas valve is turned on for 2 seconds, and the light I
is extinguished. At this point the burner ignites and the servo controller opens to the fire position.
After 14 seconds, the second stage of operation is entered, and the burner automatically switches to
a large or low fire according to the requirements of the system.
9. When the burner is running in the large/low fire position, it can be displayed by simulating the on-
off of the indicator light G on the panel.
3.Heater related actions
CNPCNP PRODUCTION DEPARTMENT
Adjustment operation:
The burner adjusts the temperature control operation of the heat medium water,
changes the set temperature, press "PGM" to appear "SPI", adjust the up and down
keys to the desired temperature, press "PGM" to determine, press the "EXIT" key to
exit.
3.Heater related actions
CNPCNP PRODUCTION DEPARTMENT
Attention in operation:
• If ignition failure, you need to wait enough time (at least 10 minutes).
• The increasing of the temperature should not be too fast, and should be operated at low load
for a period of time. The temperature rise of the first point furnace should be controlled at
about 60 °C/h to keep dry inside.
• When burning normally, there should be no obvious Spark in the flame, the flame should not
be deflected, and the chimney should not have black smoke.
• During the operation, the burning state of the burner should be observed every day, the length
of the flame and the atomization angle should be observed
3.Heater related actions
CNPCNP PRODUCTION DEPARTMENT
Symptom Cause Processing methods
1.The flame is undetectable
①The air control valve has no opening
②Flame detector failure
③There is no incoming gas on the gas trunk
Before ignition, the gas control valve should opening of 20%-30%.
Check for burner faults.
Inspect the gas system and gas inlet.
2.Chimney have black smoke
①Insufficient amount of air
②The heater is overloaded
Adjust the air regulator and distribute the air reasonably.
Reduce the opening of the gas control valve.
3. The exhaust temperature
is too high
①Flow breaks in the oil pipe inside
②The temperature gauge fails
Immediately stop heater
Report to replace the temperature gauge
4.Heater failure analysis and handling
CNPCNP PRODUCTION DEPARTMENT
4. The pressure is not in the normal range.
①The pressure gauge fails.
②The pipeline condition is abnormal.
Report to change the pressure gauges.
Check processes to eliminate hidden dangers.
5. The medium temperature is continuously too high.
①The pipe flow is reduced.
②The pipe flow interruption.
③The gas control valve fails and the opening
is too large.
Reduce the heater load.
Immediately stop the heater.
Replace the control valve.
6. Efficiency Reduced.
①Changes in the nature of fuel gas.
②Material worse than before.
Overhaul the heater.
Adjust the air and gas ratio.
7. Local overheating on the surface of the heater.
(except near the opening holes in the furnace body)
①The insulation layer falls off.
②Insulation material fails.
③The heater is overloaded.
Repair the insulation layer.
Reduce the load.
8. explosion occurred.
①Ignited several times without carefully
performing the waiting process
When ignition is unsuccessful, must wait 10 minutes
before a second ignition.
9. Leakage of air and water in the valve and pipe.
①The gasket is broken
②Packing loss rings
③The bolts are loose
Stop the heater.
Change the valve and pipe and replace the damaged
gasket or packer, and tighten the bolt.
CNPCNP PRODUCTION DEPARTMENT
The end!
A Better you, A Better World.

More Related Content

Similar to The Heaters CPF AGADEM FIELD GOUMERI.ppt

All You Need To Know About Furnace Control Boards
All You Need To Know About Furnace Control BoardsAll You Need To Know About Furnace Control Boards
All You Need To Know About Furnace Control BoardsACEHVACPARTS
 
PERFORMANCE ENHANCEMENT OF HOUSEHOLD REFRIGERATOR BY USING TiO2 NANO LUBRICAN...
PERFORMANCE ENHANCEMENT OF HOUSEHOLD REFRIGERATOR BY USING TiO2 NANO LUBRICAN...PERFORMANCE ENHANCEMENT OF HOUSEHOLD REFRIGERATOR BY USING TiO2 NANO LUBRICAN...
PERFORMANCE ENHANCEMENT OF HOUSEHOLD REFRIGERATOR BY USING TiO2 NANO LUBRICAN...Niyas PP
 
BOILER OPERATION PPT.pptx
BOILER OPERATION PPT.pptxBOILER OPERATION PPT.pptx
BOILER OPERATION PPT.pptxSatwikSingh25
 
EC8DE5D2-3B41-4599-8A5D-AB833F9397F5.pdf
EC8DE5D2-3B41-4599-8A5D-AB833F9397F5.pdfEC8DE5D2-3B41-4599-8A5D-AB833F9397F5.pdf
EC8DE5D2-3B41-4599-8A5D-AB833F9397F5.pdfsuryanshsingh836763
 
Module 1 heating - steam (wecompress.com)
Module 1   heating - steam (wecompress.com)Module 1   heating - steam (wecompress.com)
Module 1 heating - steam (wecompress.com)DeepakSingh1807
 
INTERNSHIP (1).pptx
INTERNSHIP (1).pptxINTERNSHIP (1).pptx
INTERNSHIP (1).pptxGoogles3
 
Principle of operation of the vtr regulator valve
Principle of operation of the vtr regulator valvePrinciple of operation of the vtr regulator valve
Principle of operation of the vtr regulator valveBESSEM GHARBI
 
Turbine Start Up.pptx
Turbine Start Up.pptxTurbine Start Up.pptx
Turbine Start Up.pptxssuser0cdaa1
 
Automated kiln control system
Automated kiln control systemAutomated kiln control system
Automated kiln control systemchitmail
 
hummudity test machine.pptx
hummudity test machine.pptxhummudity test machine.pptx
hummudity test machine.pptxTewodrosAtirsaw
 
89912310 boiler-purge-burner-management-system
89912310 boiler-purge-burner-management-system89912310 boiler-purge-burner-management-system
89912310 boiler-purge-burner-management-systemMowaten Masry
 
Throttling calorimeter
Throttling calorimeterThrottling calorimeter
Throttling calorimeterKishan Trivedi
 
49539990 burner-management-system
49539990 burner-management-system49539990 burner-management-system
49539990 burner-management-systemMowaten Masry
 
Final Presentation Mehedei ID-13207016.pptx
Final Presentation Mehedei ID-13207016.pptxFinal Presentation Mehedei ID-13207016.pptx
Final Presentation Mehedei ID-13207016.pptxmehede1
 
Power Plant Simulator Day 3 Part 5
Power Plant Simulator Day 3 Part 5Power Plant Simulator Day 3 Part 5
Power Plant Simulator Day 3 Part 5Manohar Tatwawadi
 

Similar to The Heaters CPF AGADEM FIELD GOUMERI.ppt (20)

All You Need To Know About Furnace Control Boards
All You Need To Know About Furnace Control BoardsAll You Need To Know About Furnace Control Boards
All You Need To Know About Furnace Control Boards
 
PERFORMANCE ENHANCEMENT OF HOUSEHOLD REFRIGERATOR BY USING TiO2 NANO LUBRICAN...
PERFORMANCE ENHANCEMENT OF HOUSEHOLD REFRIGERATOR BY USING TiO2 NANO LUBRICAN...PERFORMANCE ENHANCEMENT OF HOUSEHOLD REFRIGERATOR BY USING TiO2 NANO LUBRICAN...
PERFORMANCE ENHANCEMENT OF HOUSEHOLD REFRIGERATOR BY USING TiO2 NANO LUBRICAN...
 
BOILER OPERATION PPT.pptx
BOILER OPERATION PPT.pptxBOILER OPERATION PPT.pptx
BOILER OPERATION PPT.pptx
 
EC8DE5D2-3B41-4599-8A5D-AB833F9397F5.pdf
EC8DE5D2-3B41-4599-8A5D-AB833F9397F5.pdfEC8DE5D2-3B41-4599-8A5D-AB833F9397F5.pdf
EC8DE5D2-3B41-4599-8A5D-AB833F9397F5.pdf
 
Turbine operation.pptx
Turbine operation.pptxTurbine operation.pptx
Turbine operation.pptx
 
Module 1 heating - steam (wecompress.com)
Module 1   heating - steam (wecompress.com)Module 1   heating - steam (wecompress.com)
Module 1 heating - steam (wecompress.com)
 
Boiler ppt
Boiler pptBoiler ppt
Boiler ppt
 
Boiler purge
Boiler purge Boiler purge
Boiler purge
 
INTERNSHIP (1).pptx
INTERNSHIP (1).pptxINTERNSHIP (1).pptx
INTERNSHIP (1).pptx
 
Principle of operation of the vtr regulator valve
Principle of operation of the vtr regulator valvePrinciple of operation of the vtr regulator valve
Principle of operation of the vtr regulator valve
 
Steam Boiler Sequence Of Operation
Steam Boiler Sequence Of OperationSteam Boiler Sequence Of Operation
Steam Boiler Sequence Of Operation
 
Turbine Start Up.pptx
Turbine Start Up.pptxTurbine Start Up.pptx
Turbine Start Up.pptx
 
Automated kiln control system
Automated kiln control systemAutomated kiln control system
Automated kiln control system
 
hummudity test machine.pptx
hummudity test machine.pptxhummudity test machine.pptx
hummudity test machine.pptx
 
Kingwei waste oil burner manual
Kingwei waste oil burner manualKingwei waste oil burner manual
Kingwei waste oil burner manual
 
89912310 boiler-purge-burner-management-system
89912310 boiler-purge-burner-management-system89912310 boiler-purge-burner-management-system
89912310 boiler-purge-burner-management-system
 
Throttling calorimeter
Throttling calorimeterThrottling calorimeter
Throttling calorimeter
 
49539990 burner-management-system
49539990 burner-management-system49539990 burner-management-system
49539990 burner-management-system
 
Final Presentation Mehedei ID-13207016.pptx
Final Presentation Mehedei ID-13207016.pptxFinal Presentation Mehedei ID-13207016.pptx
Final Presentation Mehedei ID-13207016.pptx
 
Power Plant Simulator Day 3 Part 5
Power Plant Simulator Day 3 Part 5Power Plant Simulator Day 3 Part 5
Power Plant Simulator Day 3 Part 5
 

More from hicham benkhelifa

More from hicham benkhelifa (8)

Trainee Presentaion-21 - Fire and Gas Detectors.pptx
Trainee Presentaion-21 - Fire and Gas Detectors.pptxTrainee Presentaion-21 - Fire and Gas Detectors.pptx
Trainee Presentaion-21 - Fire and Gas Detectors.pptx
 
enterprise resource planning (erp) systems.ppt
enterprise resource planning (erp) systems.pptenterprise resource planning (erp) systems.ppt
enterprise resource planning (erp) systems.ppt
 
Flowmeter.ppt
Flowmeter.pptFlowmeter.ppt
Flowmeter.ppt
 
Flowmeters22.ppt
Flowmeters22.pptFlowmeters22.ppt
Flowmeters22.ppt
 
Lecture 19 Refinery.pptx
Lecture 19 Refinery.pptxLecture 19 Refinery.pptx
Lecture 19 Refinery.pptx
 
Lecture 15 Metering System.pptx
Lecture 15 Metering System.pptxLecture 15 Metering System.pptx
Lecture 15 Metering System.pptx
 
Lecture 18 Transport.pptx
Lecture 18 Transport.pptxLecture 18 Transport.pptx
Lecture 18 Transport.pptx
 
6.Corrosion.ppt
6.Corrosion.ppt6.Corrosion.ppt
6.Corrosion.ppt
 

Recently uploaded

BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptxPoojaSen20
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 

Recently uploaded (20)

TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptx
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 

The Heaters CPF AGADEM FIELD GOUMERI.ppt

  • 1. CNPCNP PRODUCTION DEPARTMENT CNPCNP PRODUCTION DEPARTMENT Heater inspection and related operations
  • 2. CNPCNP PRODUCTION DEPARTMENT CNPCNP PRODUCTION DEPARTMENT directory 1.Brief introduction of the Heater 2.Inspection points of the Heater 3.Operation of the Heater 4.Heater failure analysis and handling
  • 3. CNPCNP PRODUCTION DEPARTMENT 1.Brief introduction of the Heater Function: Increase the temperature of the crude oil, for beter separation.. Pre-haerter : FPF oil heat up to 50 ℃ . Production heater: heat up to 75 ℃. Recycle heater: heat up to 70℃. Fuel:Natural gas.(Pre-heat and stable pressure)
  • 4. CNPCNP PRODUCTION DEPARTMENT Process principle : The fuel gas burned and transfer the heat to the water, and the water transfer the heat to the crude oil. 1.Brief introduction of the Heater
  • 5. CNPCNP PRODUCTION DEPARTMENT Structural features: It consists of :heating furnace, burner, process piping, valve , instrumentation, gas system, operation room, liquid collection bag, skid seat and a ladder. The furnace body is cylindrical, the heating coil is a snake-shaped coil structure. The burner is an automatic proportional adjustment gas burner, and the natural gas is filtered and reduced to reach the pressure required for the normal operation. 1.Brief introduction of the Heater
  • 6. CNPCNP PRODUCTION DEPARTMENT Process Introduction : Preheated Heater process Recyle Heater process 1.Brief introduction of the Heater
  • 7. CNPCNP PRODUCTION DEPARTMENT Process Introduction : Production heater process 1.Brief introduction of the Heater
  • 8. CNPCNP PRODUCTION DEPARTMENT 2.Inspection points of the Heater Check : the water level, the pressure, the temperature, medium inlet and outlet temperature and pressure , exhaust temperature.
  • 9. CNPCNP PRODUCTION DEPARTMENT Check the remote instrument , the comparison field instrument. Check the liquid level of the fuel gas buffer pack the pressure. Check the burning condition of the burner, observe that the flame jet should be stable, the furnace chamber should be bright, and keep its parts clean and intact, monitoring normal. 2.Inspection points of the Heater
  • 10. CNPCNP PRODUCTION DEPARTMENT Inspection of production parameters: Check whether the pressure, temperature and liquid level of the heating furnace are normal。 2.Inspection points of the Heater
  • 11. CNPCNP PRODUCTION DEPARTMENT 3.Heater related actions • Prepare before ignition • Check that the pressure gauges, thermometers, etc. are clean and intact. • Check whether the thermal insulation protection of the heater body and the connected pipes is in good condition. • Check that the burner is in good condition. • Whether the fuel supply can meet the requirements of the burner operation. When regulating the pressure, it should be open and scattered so that the gas flow can be adjusted. The pressure after secondary pressure regulation is 5-20KPa. • Check whether each valve of each system has leaks and is in good condition. • Check whether each discharge port on the equipment is closed, and whether the valve that should be in the closed state is already closed. • Check the instrumentation and control system to ensure that the system is working properly and that the primary meter and actuator are in good condition.
  • 12. CNPCNP PRODUCTION DEPARTMENT Ignition operation panel introduction 3.Heater related actions
  • 13. CNPCNP PRODUCTION DEPARTMENT Ignition procedure (AUTO): 1. Place the main switch A on the burner control panel at position 1 and hit CMF to position 3. 2. Check that the device is not in the locked position (LED B is on) and reset it via the reset button C if necessary. 3. Confirm that the proportional regulator gives the burner operation allowed command. 4. Check whether the supply pressure is above the minimum standard (indicator E is on). 5. The fan starts, the pre-purge starts, and the test procedure of the gas valve leak monitor begins at the same time. If there is a leak in the gas valve, the gas tightness monitor will lock and the alarm light will turn on (above the solenoid valve group). Press the reset on the valve block to reset. 6. Since the pre-purge stage requires a maximum amount of air, the control device begins to fully open the servo controller until the maximum opening is reached. This is the start of the pre-purge phase (36 seconds). 7. At the end of the pre-purge stage, the servo controller reaches the full off position (ignition position), at which point the ignition transformer starts (I light on). 8. The ignition transformer is turned off after the gas valve is turned on for 2 seconds, and the light I is extinguished. At this point the burner ignites and the servo controller opens to the fire position. After 14 seconds, the second stage of operation is entered, and the burner automatically switches to a large or low fire according to the requirements of the system. 9. When the burner is running in the large/low fire position, it can be displayed by simulating the on- off of the indicator light G on the panel. 3.Heater related actions
  • 14. CNPCNP PRODUCTION DEPARTMENT Adjustment operation: The burner adjusts the temperature control operation of the heat medium water, changes the set temperature, press "PGM" to appear "SPI", adjust the up and down keys to the desired temperature, press "PGM" to determine, press the "EXIT" key to exit. 3.Heater related actions
  • 15. CNPCNP PRODUCTION DEPARTMENT Attention in operation: • If ignition failure, you need to wait enough time (at least 10 minutes). • The increasing of the temperature should not be too fast, and should be operated at low load for a period of time. The temperature rise of the first point furnace should be controlled at about 60 °C/h to keep dry inside. • When burning normally, there should be no obvious Spark in the flame, the flame should not be deflected, and the chimney should not have black smoke. • During the operation, the burning state of the burner should be observed every day, the length of the flame and the atomization angle should be observed 3.Heater related actions
  • 16. CNPCNP PRODUCTION DEPARTMENT Symptom Cause Processing methods 1.The flame is undetectable ①The air control valve has no opening ②Flame detector failure ③There is no incoming gas on the gas trunk Before ignition, the gas control valve should opening of 20%-30%. Check for burner faults. Inspect the gas system and gas inlet. 2.Chimney have black smoke ①Insufficient amount of air ②The heater is overloaded Adjust the air regulator and distribute the air reasonably. Reduce the opening of the gas control valve. 3. The exhaust temperature is too high ①Flow breaks in the oil pipe inside ②The temperature gauge fails Immediately stop heater Report to replace the temperature gauge 4.Heater failure analysis and handling
  • 17. CNPCNP PRODUCTION DEPARTMENT 4. The pressure is not in the normal range. ①The pressure gauge fails. ②The pipeline condition is abnormal. Report to change the pressure gauges. Check processes to eliminate hidden dangers. 5. The medium temperature is continuously too high. ①The pipe flow is reduced. ②The pipe flow interruption. ③The gas control valve fails and the opening is too large. Reduce the heater load. Immediately stop the heater. Replace the control valve. 6. Efficiency Reduced. ①Changes in the nature of fuel gas. ②Material worse than before. Overhaul the heater. Adjust the air and gas ratio. 7. Local overheating on the surface of the heater. (except near the opening holes in the furnace body) ①The insulation layer falls off. ②Insulation material fails. ③The heater is overloaded. Repair the insulation layer. Reduce the load. 8. explosion occurred. ①Ignited several times without carefully performing the waiting process When ignition is unsuccessful, must wait 10 minutes before a second ignition. 9. Leakage of air and water in the valve and pipe. ①The gasket is broken ②Packing loss rings ③The bolts are loose Stop the heater. Change the valve and pipe and replace the damaged gasket or packer, and tighten the bolt.