 The raison of this presentation is to clarified the
role and the operation of the control valve used for
the cooling system of the turbine FRAME 9E
 The regulating valves used on gas turbines are
valves called Robertshaw brand thermostatic
valves type ° 1010
The advantage of the Robertshaw series-no. 1010 control valves is that
they can be functional without the need for external power.
These valves provide adjustment of the temperature of a liquid or gas
Temperature control is a self-operation.
The capillary tube installed on the valve allows its control it consists of a
pipe, a bellows and a copper probe
The probe contains a thermo sensitive liquid
The temperature variation increases the volume of the internal liquid of
the probe and via the capillary tube the bellows acts to exert pressure on
the membrane
This membrane acts on the axis of the valve and thus change its course
in a bidirectional way
Robertshaw valves offer the advantage of two-way temperature
adjustment
• direct: by the variation of the race via the crank
• Indirect: following the action of the membrane on the axis of the valve
movement of the bellows is countered by an adjustable spring this
regulator controls only in the temperature range indicated on the
nameplate ideally.
the setting should be located in the upper third of the temperature
range .
if the probe is damaging a crank control can be perform to not
stop operation of the valve
1. seamless .
2.bellowscrank.
3.Protection against
overheating.
4. Trim the valve shaft.
5. Intermediate part.
6. robust cast iron
frame.
7. Copper probe.
8. Setpoint adjustment
knob .
9. Capillary tube.
Control valves are sized often smaller than the line size.
An actuator intervention doesn’t remove the role of valves in
the trial.
The control valve must be as close as possible to the measuring
point.
The probe must be installed vertically. special care must be
taken when installing the three-way control valve.
the control valve can be set to control the temperature by identifying the limits of the nominal
temperature range after placing the valve in service and it will take between 20-30 minutes for the
response to be stable.
to raise the temperature it’s necessary to turn the adjustment wheel to right.
To lower the temperature, turn the wheel to the left
the controller has a scale plate to indicate the position of the valve this function is useful for
resetting the setting.
when frequent changes are needed graduation are not in degrees of temperature manual position
the crank mechanism of the valve is provided for manual opening or closing of the control valve
set point F to G thermostatic on scale in this position, the control valves is in thermostatic mode of
temperature changes on the regulator bulb when the manual operation of the valves is desired or
tour operator needed when the cursor is on the mark of the highest or to scale as this would
damage regulator
EXAMPLE CASE after installation and adjustment of the valve vtr1 of the gas turbine frame 9E and
for any useful purpose we have raised the following points: corresponding to the oil temperature
set point of 50 ° with a base load of the gas turbine and an ambient temperature of 17 ° c spring
tension distance 24mm corresponding to the temperature set point of 50 ° auto valve position
open on cooler and open on bypass Manu valve position on auto and emergency stop in case the
capillary bulb bellows system loses its liquid at a position 3 to 4mm from the position of the valve.
valve stem 25 mm from the stuffing box to the coupling nut
note: these references are specific to the this example case used below and can not be taken as
references for the other gas turbine a which are totally different indeed the valve example some
turbine is 2/3 open on cooler and 1/3 open on bypass some other are different what explains its
additional warming compared between GAS TURBINE
Principle of operation of the vtr regulator valve
Principle of operation of the vtr regulator valve
Principle of operation of the vtr regulator valve
Principle of operation of the vtr regulator valve
Principle of operation of the vtr regulator valve

More Related Content

What's hot

Scoop coupling
Scoop couplingScoop coupling
Scoop couplingJISHNU V
 
Relief and safety valves for thermal power plants
Relief and safety valves for thermal power plantsRelief and safety valves for thermal power plants
Relief and safety valves for thermal power plantsSHIVAJI CHOUDHURY
 
Steam Turbine Lube Oil System Protections Using SCADA & PLC
Steam Turbine Lube Oil System Protections Using SCADA & PLCSteam Turbine Lube Oil System Protections Using SCADA & PLC
Steam Turbine Lube Oil System Protections Using SCADA & PLCNilesh Jha
 
example hydrogen seal oil presentation
example hydrogen seal oil presentationexample hydrogen seal oil presentation
example hydrogen seal oil presentationSteve Ford
 
Effect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / MillsEffect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / MillsManohar Tatwawadi
 
GAS TURBINE MAJOR INSPECTION
GAS TURBINE MAJOR INSPECTIONGAS TURBINE MAJOR INSPECTION
GAS TURBINE MAJOR INSPECTIONUzair Ahmad
 
Regenerative feed water heating system
Regenerative feed water heating systemRegenerative feed water heating system
Regenerative feed water heating systemAshrant Dass
 
POWER PLANT SIMULATOR 210 MW
POWER PLANT SIMULATOR 210 MW POWER PLANT SIMULATOR 210 MW
POWER PLANT SIMULATOR 210 MW Manohar Tatwawadi
 
Power Plant Simulator Day 3 Part 5
Power Plant Simulator Day 3 Part 5Power Plant Simulator Day 3 Part 5
Power Plant Simulator Day 3 Part 5Manohar Tatwawadi
 
Boiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & WorkingBoiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & WorkingTahoor Alam Khan
 
Steam turbine introduction & maintenance ppt
Steam turbine introduction & maintenance pptSteam turbine introduction & maintenance ppt
Steam turbine introduction & maintenance pptBiswajit Mohanty
 
steam turbine turbine interlocks for (KWU turbine)
steam turbine turbine interlocks for (KWU turbine)steam turbine turbine interlocks for (KWU turbine)
steam turbine turbine interlocks for (KWU turbine)Billa ParameswaraRao
 
Steam turbine over speed trip systems (6)
Steam turbine over speed trip systems (6)Steam turbine over speed trip systems (6)
Steam turbine over speed trip systems (6)Prem Baboo
 
Boiler Loss of Flame Protection- MFT
Boiler Loss of Flame Protection- MFTBoiler Loss of Flame Protection- MFT
Boiler Loss of Flame Protection- MFTTahoor Alam Khan
 
Frequently asked questions on turbines Part 1
Frequently asked questions on turbines Part 1Frequently asked questions on turbines Part 1
Frequently asked questions on turbines Part 1Manohar Tatwawadi
 
GE Frame 9E Gas Turbine Nandipur Power Project
GE  Frame 9E Gas Turbine Nandipur Power ProjectGE  Frame 9E Gas Turbine Nandipur Power Project
GE Frame 9E Gas Turbine Nandipur Power ProjectZohaib Asif
 

What's hot (20)

Scoop coupling
Scoop couplingScoop coupling
Scoop coupling
 
Relief and safety valves for thermal power plants
Relief and safety valves for thermal power plantsRelief and safety valves for thermal power plants
Relief and safety valves for thermal power plants
 
Steam Turbine Lube Oil System Protections Using SCADA & PLC
Steam Turbine Lube Oil System Protections Using SCADA & PLCSteam Turbine Lube Oil System Protections Using SCADA & PLC
Steam Turbine Lube Oil System Protections Using SCADA & PLC
 
Dry heat losses in boiler
Dry heat losses in boilerDry heat losses in boiler
Dry heat losses in boiler
 
example hydrogen seal oil presentation
example hydrogen seal oil presentationexample hydrogen seal oil presentation
example hydrogen seal oil presentation
 
Effect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / MillsEffect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / Mills
 
GAS TURBINE MAJOR INSPECTION
GAS TURBINE MAJOR INSPECTIONGAS TURBINE MAJOR INSPECTION
GAS TURBINE MAJOR INSPECTION
 
Regenerative feed water heating system
Regenerative feed water heating systemRegenerative feed water heating system
Regenerative feed water heating system
 
POWER PLANT SIMULATOR 210 MW
POWER PLANT SIMULATOR 210 MW POWER PLANT SIMULATOR 210 MW
POWER PLANT SIMULATOR 210 MW
 
Power Plant Simulator Day 3 Part 5
Power Plant Simulator Day 3 Part 5Power Plant Simulator Day 3 Part 5
Power Plant Simulator Day 3 Part 5
 
Boiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & WorkingBoiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & Working
 
Steam turbine introduction & maintenance ppt
Steam turbine introduction & maintenance pptSteam turbine introduction & maintenance ppt
Steam turbine introduction & maintenance ppt
 
steam turbine turbine interlocks for (KWU turbine)
steam turbine turbine interlocks for (KWU turbine)steam turbine turbine interlocks for (KWU turbine)
steam turbine turbine interlocks for (KWU turbine)
 
Steam turbine over speed trip systems (6)
Steam turbine over speed trip systems (6)Steam turbine over speed trip systems (6)
Steam turbine over speed trip systems (6)
 
Gas turbine
Gas turbine Gas turbine
Gas turbine
 
Cmc philosophy
Cmc philosophyCmc philosophy
Cmc philosophy
 
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
 
Boiler Loss of Flame Protection- MFT
Boiler Loss of Flame Protection- MFTBoiler Loss of Flame Protection- MFT
Boiler Loss of Flame Protection- MFT
 
Frequently asked questions on turbines Part 1
Frequently asked questions on turbines Part 1Frequently asked questions on turbines Part 1
Frequently asked questions on turbines Part 1
 
GE Frame 9E Gas Turbine Nandipur Power Project
GE  Frame 9E Gas Turbine Nandipur Power ProjectGE  Frame 9E Gas Turbine Nandipur Power Project
GE Frame 9E Gas Turbine Nandipur Power Project
 

Similar to Principle of operation of the vtr regulator valve

Boiler doc 07 control self acting
Boiler doc 07   control self actingBoiler doc 07   control self acting
Boiler doc 07 control self actingMars Tsani
 
YALE F876 GDP230DCS LIFT TRUCK Service Repair Manual
YALE F876 GDP230DCS LIFT TRUCK Service Repair ManualYALE F876 GDP230DCS LIFT TRUCK Service Repair Manual
YALE F876 GDP230DCS LIFT TRUCK Service Repair Manualyehnmdm jnkmem
 
YALE F877 GDP300EC LIFT TRUCK Service Repair Manual
YALE F877 GDP300EC LIFT TRUCK Service Repair ManualYALE F877 GDP300EC LIFT TRUCK Service Repair Manual
YALE F877 GDP300EC LIFT TRUCK Service Repair Manualuhsejmkm jksemmd
 
Oil filled transformer accessories - copy
Oil  filled  transformer   accessories - copyOil  filled  transformer   accessories - copy
Oil filled transformer accessories - copyayyadurai SHANMUGAM
 
Thermal Power Plant Simulator Operations Training
Thermal Power Plant Simulator Operations TrainingThermal Power Plant Simulator Operations Training
Thermal Power Plant Simulator Operations TrainingManohar Tatwawadi
 
Presentation on Expansion Devices
Presentation on Expansion DevicesPresentation on Expansion Devices
Presentation on Expansion DevicesVivek Yadav
 
BOILER OPERATION PPT.pptx
BOILER OPERATION PPT.pptxBOILER OPERATION PPT.pptx
BOILER OPERATION PPT.pptxSatwikSingh25
 
anaesthesia Vaporizers tec1 to tec5
anaesthesia Vaporizers tec1 to tec5anaesthesia Vaporizers tec1 to tec5
anaesthesia Vaporizers tec1 to tec5Preeti Loona
 
Solar Work Station SP328
Solar Work Station SP328Solar Work Station SP328
Solar Work Station SP328Jussi Han
 
S3 Flow Control Note
S3 Flow Control NoteS3 Flow Control Note
S3 Flow Control Noteno suhaila
 
R & AC LAB MANNUAL FINAL.docx.pdf
R & AC LAB MANNUAL FINAL.docx.pdfR & AC LAB MANNUAL FINAL.docx.pdf
R & AC LAB MANNUAL FINAL.docx.pdfNandhananRaghuraman
 
The Heaters CPF AGADEM FIELD GOUMERI.ppt
The Heaters CPF AGADEM FIELD GOUMERI.pptThe Heaters CPF AGADEM FIELD GOUMERI.ppt
The Heaters CPF AGADEM FIELD GOUMERI.ppthicham benkhelifa
 

Similar to Principle of operation of the vtr regulator valve (20)

motorised valves
motorised valvesmotorised valves
motorised valves
 
089414 2
089414 2089414 2
089414 2
 
Boiler doc 07 control self acting
Boiler doc 07   control self actingBoiler doc 07   control self acting
Boiler doc 07 control self acting
 
YALE F876 GDP230DCS LIFT TRUCK Service Repair Manual
YALE F876 GDP230DCS LIFT TRUCK Service Repair ManualYALE F876 GDP230DCS LIFT TRUCK Service Repair Manual
YALE F876 GDP230DCS LIFT TRUCK Service Repair Manual
 
YALE F877 GDP300EC LIFT TRUCK Service Repair Manual
YALE F877 GDP300EC LIFT TRUCK Service Repair ManualYALE F877 GDP300EC LIFT TRUCK Service Repair Manual
YALE F877 GDP300EC LIFT TRUCK Service Repair Manual
 
Oil filled transformer accessories - copy
Oil  filled  transformer   accessories - copyOil  filled  transformer   accessories - copy
Oil filled transformer accessories - copy
 
Thermal Power Plant Simulator Operations Training
Thermal Power Plant Simulator Operations TrainingThermal Power Plant Simulator Operations Training
Thermal Power Plant Simulator Operations Training
 
Presentation on Expansion Devices
Presentation on Expansion DevicesPresentation on Expansion Devices
Presentation on Expansion Devices
 
BOILER OPERATION PPT.pptx
BOILER OPERATION PPT.pptxBOILER OPERATION PPT.pptx
BOILER OPERATION PPT.pptx
 
anaesthesia Vaporizers tec1 to tec5
anaesthesia Vaporizers tec1 to tec5anaesthesia Vaporizers tec1 to tec5
anaesthesia Vaporizers tec1 to tec5
 
Curso refrigeración comercial y domestica
Curso refrigeración comercial y domesticaCurso refrigeración comercial y domestica
Curso refrigeración comercial y domestica
 
Solar Work Station SP328
Solar Work Station SP328Solar Work Station SP328
Solar Work Station SP328
 
S3 Flow Control Note
S3 Flow Control NoteS3 Flow Control Note
S3 Flow Control Note
 
R & AC LAB MANNUAL FINAL.docx.pdf
R & AC LAB MANNUAL FINAL.docx.pdfR & AC LAB MANNUAL FINAL.docx.pdf
R & AC LAB MANNUAL FINAL.docx.pdf
 
Model 8.1-pressure control
Model 8.1-pressure controlModel 8.1-pressure control
Model 8.1-pressure control
 
Gas street
Gas streetGas street
Gas street
 
Boiler ppt
Boiler pptBoiler ppt
Boiler ppt
 
Turbine operation.pptx
Turbine operation.pptxTurbine operation.pptx
Turbine operation.pptx
 
The Heaters CPF AGADEM FIELD GOUMERI.ppt
The Heaters CPF AGADEM FIELD GOUMERI.pptThe Heaters CPF AGADEM FIELD GOUMERI.ppt
The Heaters CPF AGADEM FIELD GOUMERI.ppt
 
Boiler Mountings
Boiler MountingsBoiler Mountings
Boiler Mountings
 

Recently uploaded

GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Recently uploaded (20)

GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 

Principle of operation of the vtr regulator valve

  • 1.
  • 2.  The raison of this presentation is to clarified the role and the operation of the control valve used for the cooling system of the turbine FRAME 9E  The regulating valves used on gas turbines are valves called Robertshaw brand thermostatic valves type ° 1010
  • 3. The advantage of the Robertshaw series-no. 1010 control valves is that they can be functional without the need for external power. These valves provide adjustment of the temperature of a liquid or gas Temperature control is a self-operation. The capillary tube installed on the valve allows its control it consists of a pipe, a bellows and a copper probe The probe contains a thermo sensitive liquid The temperature variation increases the volume of the internal liquid of the probe and via the capillary tube the bellows acts to exert pressure on the membrane This membrane acts on the axis of the valve and thus change its course in a bidirectional way Robertshaw valves offer the advantage of two-way temperature adjustment • direct: by the variation of the race via the crank • Indirect: following the action of the membrane on the axis of the valve
  • 4. movement of the bellows is countered by an adjustable spring this regulator controls only in the temperature range indicated on the nameplate ideally. the setting should be located in the upper third of the temperature range . if the probe is damaging a crank control can be perform to not stop operation of the valve
  • 5. 1. seamless . 2.bellowscrank. 3.Protection against overheating. 4. Trim the valve shaft. 5. Intermediate part. 6. robust cast iron frame. 7. Copper probe. 8. Setpoint adjustment knob . 9. Capillary tube.
  • 6. Control valves are sized often smaller than the line size. An actuator intervention doesn’t remove the role of valves in the trial. The control valve must be as close as possible to the measuring point. The probe must be installed vertically. special care must be taken when installing the three-way control valve.
  • 7.
  • 8.
  • 9. the control valve can be set to control the temperature by identifying the limits of the nominal temperature range after placing the valve in service and it will take between 20-30 minutes for the response to be stable. to raise the temperature it’s necessary to turn the adjustment wheel to right. To lower the temperature, turn the wheel to the left the controller has a scale plate to indicate the position of the valve this function is useful for resetting the setting. when frequent changes are needed graduation are not in degrees of temperature manual position the crank mechanism of the valve is provided for manual opening or closing of the control valve set point F to G thermostatic on scale in this position, the control valves is in thermostatic mode of temperature changes on the regulator bulb when the manual operation of the valves is desired or tour operator needed when the cursor is on the mark of the highest or to scale as this would damage regulator EXAMPLE CASE after installation and adjustment of the valve vtr1 of the gas turbine frame 9E and for any useful purpose we have raised the following points: corresponding to the oil temperature set point of 50 ° with a base load of the gas turbine and an ambient temperature of 17 ° c spring tension distance 24mm corresponding to the temperature set point of 50 ° auto valve position open on cooler and open on bypass Manu valve position on auto and emergency stop in case the capillary bulb bellows system loses its liquid at a position 3 to 4mm from the position of the valve. valve stem 25 mm from the stuffing box to the coupling nut note: these references are specific to the this example case used below and can not be taken as references for the other gas turbine a which are totally different indeed the valve example some turbine is 2/3 open on cooler and 1/3 open on bypass some other are different what explains its additional warming compared between GAS TURBINE