01_OUTLINE OF OOFUNATO SITUATION _ Geography

    JAPAN                             OFUNATO _ Prefectura de Iwate




                                            Coordinates: 39°4′N 141°43′E
                                            Country       Japan
                                            Region        Tōhoku
                                            Prefecture    Iwate
                                            Government
                                            – Mayor       Kimiaki Toda
                                            Area
                                            – Total       323.28 km2 (124.8 sq mi)
                                            Time zone     Japan Standard Time (UTC+9)
01_OUTLINE OF OOFUNATO SITUATION _ Tsunami maps
               TSUNAMI AFFECTED AREAS MAP




TSUNAMI DAMAGES MAP
01_OUTLINE OF OOFUNATO SITUATION _ Tsunami




 VERTICAL SLICE THROUGH A                   A. BETWEEN EARTH QUAKES                 B. DURING AN EARTH QUAKE                  C. MINUTES LATER
 SUBDUCTION ZONE                            Stuck to the sub ducting plate, the     An earthquake along a subduction          Part of the tsunami races toward
 One of the many tectonic plates that       overriding plate gets squeezed. Its     zone hap pens when the leading edge       nearby land, growing taller as it
 make up Earth’s outer shell descends, or   leading edge is dragged down, while     of the overriding plate breaks free       comes in to shore. An other part
 “subducts,” under an adjacent plate.       an area behind bulges upward. This      and springs seaward, raising the sea fl   heads across the ocean toward
 This kind of boundary between plates is    movement goes on for decades or         oor and the water above it. This uplift   distant shores.
 called a “subduction zone.” When the       centuries, slowly building up stress.   starts a tsunami. Meanwhile, the
 plates move suddenly in an area where                                              bulge behind the leading edge
 they are usually stuck, an earthquake                                              collapses, thinning the plate and
 happens.                                                                           lowering coastal areas.
01_OUTLINE OF OOFUNATO SITUATION _ Tsunami datas for Oofunato
                                                                   RUNUP HEIGHT - the maximum elevation the wave reaches at
                                                                                          the maximum inundation.
    TSUNAMI RUNUP

                                                              Km




                                                                          above sea level in meters        5 = Runup Height,
    TSUNAMI RUNUP LOCATION EFFECTS                                                                         Post-tsunami
                                                                                                           survey
                                                                                                           measurement




                         4 = EXTREME (~$25 million or more)


    COMMENTS FOR TSUNAMI RUNUP




    REFERENCES FOR TSUNAMI RUNUP
01_OUTLINE OF OOFUNATO SITUATION _ Tsunami effects

    BEFORE                               AFTER
01_OUTLINE OF OOFUNATO SITUATION _ Tsunami effects
http://sertit.ustrasbg.fr/SITE_RMS/2011/05_rms_japan_2011/mid/SERTIT_CHARTER359_P12_japon_ofunato_crise_8k_A1_20110314_fr_
midres.jpg
                                                                                                                             01_OUTLINE OF OOFUNATO SITUATION _ Tsunami effects maps




http://www.tenkai-japan.com/2011/07/09/ofunato-city-proposed-rough-design-of-reconstruction/
01_OUTLINE OF OOFUNATO SITUATION _ Land use cotrol and housing relocation
          Existing High Ground                                            Tsunami Control Forest Cities




          Naturally occurring high ground may be used or modified for     Cities and towns can plan for tsunami control forests between the shore
          vertical tsunami evacuation.                                    and the developed part of town.
          Large open areas on high ground offer easy access for large     The trees of the forest act as a buffer, helping to dissipate the wave
          numbers of people with the added advantage of avoiding the      energy as it washes ashore and filters out large ocean debris. Along the
          possible anxiety of entering a building after an earthquake.    Sanriku Coast of Japan, the spruce tree is favored for their counter
          Existing high ground should be evaluated for the potential of   tsunami groves. Coastal reefs are also protected for their potential to
          wave run up or erosion.                                         decrease the devastating effects of tsunamis.


        Zoning
           Cities can zone low-lying high-risk tsunami areas for open
           space use or if necessary, for large lots. This may decrease
           the amount of people in a high-risk area and/or decrease
           the amount of potential damage or floating debris from a
           tsunami.


                                                                          Large lot zoning creates a lower density of   In low risk areas, sites can be closer
                                                                          land use in high risk areas.                  together.

ATEP ©2006-2010 UAF Geophysical Institute
01_OUTLINE OF OOFUNATO SITUATION _ Land use cotrol and housing relocation
02_STRUCTURE OF PROJECT _ Site Possibility




Site suggestion
for implementing
the temporary
house project



Schools where
people is gather
for emergency
assistance
02_STRUCTURE OF PROJECT _ Site Possibility




Destruction line




Site suggestion in
between the
destroyed and the
preserved areas

Not too far from the
sea for the residents
that depend on the
fishing industry

Integrating the
residents of the
project in the
original city fabric
02_STRUCTURE OF PROJECT _ The concept


  New planned
  residential area
  including community
  centre, community
  gardening, playground
  area, and small scale
  commercial units.




  To promote, keep and
  reestablish human
  relations.

  To promote a good
  environment for mental
  and psychological post-
  catastrophe recovery.
02_STRUCTURE OF PROJECT _ The concept

  Flexible and easy to assemble modular structure. (0,9 m modules).




  Possibility to adapt and improve temporary structure to a permanent one.

  Residential area fully served by services and infrastructure from the municipality, as
  any other city area.
02_STRUCTURE OF PROJECT _ The concept
02_STRUCTURE OF PROJECT _ The concept
02_STRUCTURE OF PROJECT _ The concept
02_STRUCTURE OF PROJECT _ Counterpart and Duration Supply
  Counterpart
        NGO: Implementation of project. Coordination of design,
        planning, assembling and selection of families.

        Government: Support for land selection, service
        provision and maintenance.

         Population: Self organization, participation in design
         decisions and maintenance
   Duration of Supply
                                        month month month month month Month more than
                                          1     2     3     4     5   6- 2 years 2 years
   Design, organization and selection
   of residents
   Logistical Planning
   Receiving material, assembling
   Installation infrastructure
   Assembling community centre
   Official Temporary phase
   Adaptation/ Improvements for
   permanency of residents
02_STRUCTURE OF PROJECT _ Number of Houses and Estimated Cost
  Number of houses
  80 or 96 house units
  (3 typologies: 1, 2 or 3 rooms)

  1 Community Centre with special rooms for meetings and
  basic health and mental care

  Common open areas: garden and playground




   Estimated Cost

   Cost per unit (including infrastructure cost): 30,000 Euros
               96 units: 2,880,000 Euros
   Cost Community Centre: 80,000 Euros

                   Total: 2,960,000 Euros
03_SITE PLAN, PROJECT PLANS, SKETCHES

    Common space                        House units: 3 typologies: 1, 2 or 3 rooms




                                                                    Commercial




 Materials
 Internal panels: 70% wood-based
 panels and rubber produced from
 recycled tires

 External panels: Masonite boards
 with recycled plastic laminate and
 foam insulation
03_SITE PLAN, PROJECT PLANS, SKETCHES




 Materials
 Internal panels: 70% wood-based
 panels and rubber produced from
 recycled tires
                                        Source: Loq-kit
 External panels: Masonite boards
 with recycled plastic laminate and
 foam insulation
03_SITE PLAN, PROJECT PLANS, SKETCHES


                         SERVICE LINE




                                                         kitchen
             kitchen                kitchen
      bathroom               bathroom         bathroom



                              bedroom         bedroom    living room
      bedroom
                              bedroom         bedroom       bedroom
      living room
                               / living
                                room




        24 m2                   27 m2               41 m2
03_SITE PLAN, PROJECT PLANS, SKETCHES
03_SITE PLAN, PROJECT PLANS, SKETCHES
03_SITE PLAN, PROJECT PLANS, SKETCHES
SERVICE LINES_WATER _ELECTRICITY
PRIVATE SERVICES
STAIRS
COMMON SPACE
GREEN
BEAUTIFICATION_GREEN
COMMERCIAL SPACES
04_RESIDENTS SELECTION AND MAINTENANCE PLAN

      Residents organize themselves in                              8 or 9 groups (10 families)
      groups of 9 families                                          selected by lottery

                                                                    Total: 80 or 96 families
                     ELDERS                                         (approximately 300 residents)


                     SPECIAL NEEDS                                                          Objective:
                                                                     To promote community sense,
                                                                             to stimulate community
                      ANY                                              organization and ownership.
                                                              To strength the partnership amongst
                                                                  NGO, residents and government.
                      GOVERNMENT DECISION                             To try to be as fair as possible.

                                                                                     Maintenance:
                                              Each resident is responsible for your own house and
                                                                         immediate surroundings.
                                               The government is responsible for normal services
                                                                       as in other areas of the city.
                                         The NGO can help the community to organize themselves
                                                        and have a elected local leader to manage
                                                          the maintenance of the common areas.
05_POST-PROJECT

                    INTERMEDIATE GOALS
                   Develop sense of community
                   Promote residents’ responsibility
                   Guarantee the sustainable and
                    successful maintenance of the
                    new residential area.




                    LONG-TERM GOALS
                   Attempt to adapt the project for a
                    permanent residential use or
                    transform in other equipment for
                    the city.


                   It is also possible to disassemble
                    the modular structure and rebuild
                    in another site.
Ana Livi, John Holm,
                  Tommaso Sacconi,
                  Flavia Scognamillo




THANK YOU VERY MUCH!

More Related Content

What's hot

Building Economics Cost Plan Report
Building Economics Cost Plan ReportBuilding Economics Cost Plan Report
Building Economics Cost Plan ReportFarah Sham
 
Asian Architecture Case Study Report
Asian Architecture Case Study ReportAsian Architecture Case Study Report
Asian Architecture Case Study ReportGertrude Lee
 
Rethinking Bashundhara Residential Area as a Future City
Rethinking Bashundhara Residential Area as a Future CityRethinking Bashundhara Residential Area as a Future City
Rethinking Bashundhara Residential Area as a Future CitySumaiya Islam
 
Orean Place Vertis North Quezon City
Orean Place Vertis North Quezon CityOrean Place Vertis North Quezon City
Orean Place Vertis North Quezon CityMarifil Ramirez
 
Asakusa Cullture & Tourism Information Center
Asakusa Cullture & Tourism Information CenterAsakusa Cullture & Tourism Information Center
Asakusa Cullture & Tourism Information CenterAndy Heng
 
Johor bahru Site Analysis
Johor bahru Site AnalysisJohor bahru Site Analysis
Johor bahru Site Analysiszerospaces_
 
RO Martinez Architects Portfolio
RO Martinez Architects PortfolioRO Martinez Architects Portfolio
RO Martinez Architects PortfolioRenato Martinez
 
Redefining Malaysian Terrace Residential Architecture by Introducing Passive ...
Redefining Malaysian Terrace Residential Architecture by Introducing Passive ...Redefining Malaysian Terrace Residential Architecture by Introducing Passive ...
Redefining Malaysian Terrace Residential Architecture by Introducing Passive ...Ong Seng Peng Jeff
 
History & culture of Lumut, Perak
History & culture of Lumut, PerakHistory & culture of Lumut, Perak
History & culture of Lumut, PerakEraz
 
Avida Towers Vita in Vertis North Quezon City
Avida Towers Vita in Vertis North Quezon CityAvida Towers Vita in Vertis North Quezon City
Avida Towers Vita in Vertis North Quezon CityJay Vasquez
 
High Park T1 & T2 Presentation (July 10 2016)
High Park T1 & T2 Presentation (July 10 2016)High Park T1 & T2 Presentation (July 10 2016)
High Park T1 & T2 Presentation (July 10 2016)Marifil Ramirez
 
Avida Towers BGC 9th Avenue
Avida Towers BGC 9th AvenueAvida Towers BGC 9th Avenue
Avida Towers BGC 9th AvenueJay Vasquez
 
Johor bahru City Center Site Analysis
Johor bahru City Center Site AnalysisJohor bahru City Center Site Analysis
Johor bahru City Center Site AnalysisJing Fan Koh
 
Little india klang theories report project 2
Little india klang theories report project 2Little india klang theories report project 2
Little india klang theories report project 2yuanks
 
East Raya Gardens
East Raya GardensEast Raya Gardens
East Raya Gardensrchrealty
 
The Sequoia Two Serendra
The Sequoia Two SerendraThe Sequoia Two Serendra
The Sequoia Two Serendratowerbookph
 
Singapore's housing policies
Singapore's housing policiesSingapore's housing policies
Singapore's housing policiesAliaa
 
Trump Tower Manila Presentation
Trump Tower Manila PresentationTrump Tower Manila Presentation
Trump Tower Manila Presentationatriaophelcasidsid
 

What's hot (20)

Building Economics Cost Plan Report
Building Economics Cost Plan ReportBuilding Economics Cost Plan Report
Building Economics Cost Plan Report
 
Asian Architecture Case Study Report
Asian Architecture Case Study ReportAsian Architecture Case Study Report
Asian Architecture Case Study Report
 
Rethinking Bashundhara Residential Area as a Future City
Rethinking Bashundhara Residential Area as a Future CityRethinking Bashundhara Residential Area as a Future City
Rethinking Bashundhara Residential Area as a Future City
 
Orean Place Vertis North Quezon City
Orean Place Vertis North Quezon CityOrean Place Vertis North Quezon City
Orean Place Vertis North Quezon City
 
Asakusa Cullture & Tourism Information Center
Asakusa Cullture & Tourism Information CenterAsakusa Cullture & Tourism Information Center
Asakusa Cullture & Tourism Information Center
 
Johor bahru Site Analysis
Johor bahru Site AnalysisJohor bahru Site Analysis
Johor bahru Site Analysis
 
RO Martinez Architects Portfolio
RO Martinez Architects PortfolioRO Martinez Architects Portfolio
RO Martinez Architects Portfolio
 
Ajman Analysis Final
Ajman Analysis FinalAjman Analysis Final
Ajman Analysis Final
 
Redefining Malaysian Terrace Residential Architecture by Introducing Passive ...
Redefining Malaysian Terrace Residential Architecture by Introducing Passive ...Redefining Malaysian Terrace Residential Architecture by Introducing Passive ...
Redefining Malaysian Terrace Residential Architecture by Introducing Passive ...
 
History & culture of Lumut, Perak
History & culture of Lumut, PerakHistory & culture of Lumut, Perak
History & culture of Lumut, Perak
 
Avida Towers Vita in Vertis North Quezon City
Avida Towers Vita in Vertis North Quezon CityAvida Towers Vita in Vertis North Quezon City
Avida Towers Vita in Vertis North Quezon City
 
High Park T1 & T2 Presentation (July 10 2016)
High Park T1 & T2 Presentation (July 10 2016)High Park T1 & T2 Presentation (July 10 2016)
High Park T1 & T2 Presentation (July 10 2016)
 
Avida Towers BGC 9th Avenue
Avida Towers BGC 9th AvenueAvida Towers BGC 9th Avenue
Avida Towers BGC 9th Avenue
 
Johor bahru City Center Site Analysis
Johor bahru City Center Site AnalysisJohor bahru City Center Site Analysis
Johor bahru City Center Site Analysis
 
Little india klang theories report project 2
Little india klang theories report project 2Little india klang theories report project 2
Little india klang theories report project 2
 
East Raya Gardens
East Raya GardensEast Raya Gardens
East Raya Gardens
 
The Sequoia Two Serendra
The Sequoia Two SerendraThe Sequoia Two Serendra
The Sequoia Two Serendra
 
Singapore's housing policies
Singapore's housing policiesSingapore's housing policies
Singapore's housing policies
 
Trump Tower Manila Presentation
Trump Tower Manila PresentationTrump Tower Manila Presentation
Trump Tower Manila Presentation
 
Urban Design project 1
Urban Design project 1Urban Design project 1
Urban Design project 1
 

Viewers also liked

Temporary housing
Temporary housingTemporary housing
Temporary housingjtm6287
 
BridgeStreet Corporate/Temporary Housing
BridgeStreet Corporate/Temporary Housing BridgeStreet Corporate/Temporary Housing
BridgeStreet Corporate/Temporary Housing BridgeStreetColumbus
 
Case study on temporary structure
Case study on temporary structureCase study on temporary structure
Case study on temporary structureNidhi Thigale
 

Viewers also liked (6)

Temporary housing
Temporary housingTemporary housing
Temporary housing
 
BridgeStreet Corporate/Temporary Housing
BridgeStreet Corporate/Temporary Housing BridgeStreet Corporate/Temporary Housing
BridgeStreet Corporate/Temporary Housing
 
Group no 9
Group no 9Group no 9
Group no 9
 
Case study on temporary structure
Case study on temporary structureCase study on temporary structure
Case study on temporary structure
 
Temporary works
Temporary worksTemporary works
Temporary works
 
Space frames
Space framesSpace frames
Space frames
 

Similar to Temporary housing proposal group b

Recoveryplanning group a
Recoveryplanning group aRecoveryplanning group a
Recoveryplanning group aMasahiro Sawada
 
OECD Workshop: Learning from crises and fostering the continuous improvement...
 OECD Workshop: Learning from crises and fostering the continuous improvement... OECD Workshop: Learning from crises and fostering the continuous improvement...
OECD Workshop: Learning from crises and fostering the continuous improvement...OECD Governance
 
EQECAT Briefing: Understanding the M9 Tohoku Pacific Offshore Earthquake
EQECAT Briefing: Understanding the M9 Tohoku Pacific Offshore EarthquakeEQECAT Briefing: Understanding the M9 Tohoku Pacific Offshore Earthquake
EQECAT Briefing: Understanding the M9 Tohoku Pacific Offshore EarthquakeEQECAT, Inc.
 
THE BEST TSUNAMI PRESENTATION
THE BEST TSUNAMI PRESENTATIONTHE BEST TSUNAMI PRESENTATION
THE BEST TSUNAMI PRESENTATIONBms Sachan
 
How tsunami warning_system_in_the_indian_ocean
How tsunami warning_system_in_the_indian_oceanHow tsunami warning_system_in_the_indian_ocean
How tsunami warning_system_in_the_indian_oceans1180046
 
Pacific Tsunami Warning Center: Introduction to Tsunamis and PTWC Operations
Pacific Tsunami Warning Center: Introduction to Tsunamis and PTWC OperationsPacific Tsunami Warning Center: Introduction to Tsunamis and PTWC Operations
Pacific Tsunami Warning Center: Introduction to Tsunamis and PTWC OperationsBrian Shiro
 
Humanities-Natural disasters
Humanities-Natural disastersHumanities-Natural disasters
Humanities-Natural disastersphillipsamsuddin
 
PPT on 10th disaster management
PPT on 10th disaster managementPPT on 10th disaster management
PPT on 10th disaster managementAniruddha Kawade
 
Integrated Science M4 Tsunamis
Integrated Science M4 TsunamisIntegrated Science M4 Tsunamis
Integrated Science M4 TsunamiseLearningJa
 
The tsunami; its mechanisms, socioeconomic and environmental impacts mike mukuwa
The tsunami; its mechanisms, socioeconomic and environmental impacts mike mukuwaThe tsunami; its mechanisms, socioeconomic and environmental impacts mike mukuwa
The tsunami; its mechanisms, socioeconomic and environmental impacts mike mukuwaMikeMukuwa
 

Similar to Temporary housing proposal group b (20)

Recoveryplanning group a
Recoveryplanning group aRecoveryplanning group a
Recoveryplanning group a
 
OECD Workshop: Learning from crises and fostering the continuous improvement...
 OECD Workshop: Learning from crises and fostering the continuous improvement... OECD Workshop: Learning from crises and fostering the continuous improvement...
OECD Workshop: Learning from crises and fostering the continuous improvement...
 
Tsunami
Tsunami Tsunami
Tsunami
 
Tsunami
Tsunami Tsunami
Tsunami
 
Earthquake Hazard.ppt
Earthquake Hazard.pptEarthquake Hazard.ppt
Earthquake Hazard.ppt
 
DRRM for schools
DRRM for schoolsDRRM for schools
DRRM for schools
 
EQECAT Briefing: Understanding the M9 Tohoku Pacific Offshore Earthquake
EQECAT Briefing: Understanding the M9 Tohoku Pacific Offshore EarthquakeEQECAT Briefing: Understanding the M9 Tohoku Pacific Offshore Earthquake
EQECAT Briefing: Understanding the M9 Tohoku Pacific Offshore Earthquake
 
Disaster management
Disaster managementDisaster management
Disaster management
 
THE BEST TSUNAMI PRESENTATION
THE BEST TSUNAMI PRESENTATIONTHE BEST TSUNAMI PRESENTATION
THE BEST TSUNAMI PRESENTATION
 
How tsunami warning_system_in_the_indian_ocean
How tsunami warning_system_in_the_indian_oceanHow tsunami warning_system_in_the_indian_ocean
How tsunami warning_system_in_the_indian_ocean
 
Pacific Tsunami Warning Center: Introduction to Tsunamis and PTWC Operations
Pacific Tsunami Warning Center: Introduction to Tsunamis and PTWC OperationsPacific Tsunami Warning Center: Introduction to Tsunamis and PTWC Operations
Pacific Tsunami Warning Center: Introduction to Tsunamis and PTWC Operations
 
Humanities-Natural disasters
Humanities-Natural disastersHumanities-Natural disasters
Humanities-Natural disasters
 
PPT on 10th disaster management
PPT on 10th disaster managementPPT on 10th disaster management
PPT on 10th disaster management
 
Integrated Science M4 Tsunamis
Integrated Science M4 TsunamisIntegrated Science M4 Tsunamis
Integrated Science M4 Tsunamis
 
DM (UNIT-1) (1).pptx
DM (UNIT-1) (1).pptxDM (UNIT-1) (1).pptx
DM (UNIT-1) (1).pptx
 
The tsunami; its mechanisms, socioeconomic and environmental impacts mike mukuwa
The tsunami; its mechanisms, socioeconomic and environmental impacts mike mukuwaThe tsunami; its mechanisms, socioeconomic and environmental impacts mike mukuwa
The tsunami; its mechanisms, socioeconomic and environmental impacts mike mukuwa
 
SDRRM for Teachers 2
SDRRM for Teachers 2SDRRM for Teachers 2
SDRRM for Teachers 2
 
Climate change
Climate change Climate change
Climate change
 
Disaster management
Disaster managementDisaster management
Disaster management
 
Essay Earthquake
Essay EarthquakeEssay Earthquake
Essay Earthquake
 

More from Masahiro Sawada

Temporary housing proposal group a
Temporary housing proposal group aTemporary housing proposal group a
Temporary housing proposal group aMasahiro Sawada
 
Recoveryplanning group d
Recoveryplanning group dRecoveryplanning group d
Recoveryplanning group dMasahiro Sawada
 
Recoveryplanning group c
Recoveryplanning group cRecoveryplanning group c
Recoveryplanning group cMasahiro Sawada
 
Recoveryplanning group b
Recoveryplanning group bRecoveryplanning group b
Recoveryplanning group bMasahiro Sawada
 
Temporary housing proposal group d
Temporary housing proposal group dTemporary housing proposal group d
Temporary housing proposal group dMasahiro Sawada
 
Temporary housing proposal group c
Temporary housing proposal group cTemporary housing proposal group c
Temporary housing proposal group cMasahiro Sawada
 

More from Masahiro Sawada (6)

Temporary housing proposal group a
Temporary housing proposal group aTemporary housing proposal group a
Temporary housing proposal group a
 
Recoveryplanning group d
Recoveryplanning group dRecoveryplanning group d
Recoveryplanning group d
 
Recoveryplanning group c
Recoveryplanning group cRecoveryplanning group c
Recoveryplanning group c
 
Recoveryplanning group b
Recoveryplanning group bRecoveryplanning group b
Recoveryplanning group b
 
Temporary housing proposal group d
Temporary housing proposal group dTemporary housing proposal group d
Temporary housing proposal group d
 
Temporary housing proposal group c
Temporary housing proposal group cTemporary housing proposal group c
Temporary housing proposal group c
 

Recently uploaded

WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAndikSusilo4
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 

Recently uploaded (20)

WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & Application
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 

Temporary housing proposal group b

  • 1. KATSUSHIKA HOKUSAI, THE GREAT WAVE OFF KANAGAWA TEMPORARY HOUSING FOR OOFUNATO Ana Livi, John Holm, Tommaso Sacconi, Flavia Scognamillo
  • 2. 01_OUTLINE OF OOFUNATO SITUATION _ Geography JAPAN OFUNATO _ Prefectura de Iwate Coordinates: 39°4′N 141°43′E Country Japan Region Tōhoku Prefecture Iwate Government – Mayor Kimiaki Toda Area – Total 323.28 km2 (124.8 sq mi) Time zone Japan Standard Time (UTC+9)
  • 3. 01_OUTLINE OF OOFUNATO SITUATION _ Tsunami maps TSUNAMI AFFECTED AREAS MAP TSUNAMI DAMAGES MAP
  • 4. 01_OUTLINE OF OOFUNATO SITUATION _ Tsunami VERTICAL SLICE THROUGH A A. BETWEEN EARTH QUAKES B. DURING AN EARTH QUAKE C. MINUTES LATER SUBDUCTION ZONE Stuck to the sub ducting plate, the An earthquake along a subduction Part of the tsunami races toward One of the many tectonic plates that overriding plate gets squeezed. Its zone hap pens when the leading edge nearby land, growing taller as it make up Earth’s outer shell descends, or leading edge is dragged down, while of the overriding plate breaks free comes in to shore. An other part “subducts,” under an adjacent plate. an area behind bulges upward. This and springs seaward, raising the sea fl heads across the ocean toward This kind of boundary between plates is movement goes on for decades or oor and the water above it. This uplift distant shores. called a “subduction zone.” When the centuries, slowly building up stress. starts a tsunami. Meanwhile, the plates move suddenly in an area where bulge behind the leading edge they are usually stuck, an earthquake collapses, thinning the plate and happens. lowering coastal areas.
  • 5. 01_OUTLINE OF OOFUNATO SITUATION _ Tsunami datas for Oofunato RUNUP HEIGHT - the maximum elevation the wave reaches at the maximum inundation. TSUNAMI RUNUP Km above sea level in meters 5 = Runup Height, TSUNAMI RUNUP LOCATION EFFECTS Post-tsunami survey measurement 4 = EXTREME (~$25 million or more) COMMENTS FOR TSUNAMI RUNUP REFERENCES FOR TSUNAMI RUNUP
  • 6. 01_OUTLINE OF OOFUNATO SITUATION _ Tsunami effects BEFORE AFTER
  • 7. 01_OUTLINE OF OOFUNATO SITUATION _ Tsunami effects
  • 8. http://sertit.ustrasbg.fr/SITE_RMS/2011/05_rms_japan_2011/mid/SERTIT_CHARTER359_P12_japon_ofunato_crise_8k_A1_20110314_fr_ midres.jpg 01_OUTLINE OF OOFUNATO SITUATION _ Tsunami effects maps http://www.tenkai-japan.com/2011/07/09/ofunato-city-proposed-rough-design-of-reconstruction/
  • 9. 01_OUTLINE OF OOFUNATO SITUATION _ Land use cotrol and housing relocation Existing High Ground Tsunami Control Forest Cities Naturally occurring high ground may be used or modified for Cities and towns can plan for tsunami control forests between the shore vertical tsunami evacuation. and the developed part of town. Large open areas on high ground offer easy access for large The trees of the forest act as a buffer, helping to dissipate the wave numbers of people with the added advantage of avoiding the energy as it washes ashore and filters out large ocean debris. Along the possible anxiety of entering a building after an earthquake. Sanriku Coast of Japan, the spruce tree is favored for their counter Existing high ground should be evaluated for the potential of tsunami groves. Coastal reefs are also protected for their potential to wave run up or erosion. decrease the devastating effects of tsunamis. Zoning Cities can zone low-lying high-risk tsunami areas for open space use or if necessary, for large lots. This may decrease the amount of people in a high-risk area and/or decrease the amount of potential damage or floating debris from a tsunami. Large lot zoning creates a lower density of In low risk areas, sites can be closer land use in high risk areas. together. ATEP ©2006-2010 UAF Geophysical Institute
  • 10. 01_OUTLINE OF OOFUNATO SITUATION _ Land use cotrol and housing relocation
  • 11. 02_STRUCTURE OF PROJECT _ Site Possibility Site suggestion for implementing the temporary house project Schools where people is gather for emergency assistance
  • 12. 02_STRUCTURE OF PROJECT _ Site Possibility Destruction line Site suggestion in between the destroyed and the preserved areas Not too far from the sea for the residents that depend on the fishing industry Integrating the residents of the project in the original city fabric
  • 13. 02_STRUCTURE OF PROJECT _ The concept New planned residential area including community centre, community gardening, playground area, and small scale commercial units. To promote, keep and reestablish human relations. To promote a good environment for mental and psychological post- catastrophe recovery.
  • 14. 02_STRUCTURE OF PROJECT _ The concept Flexible and easy to assemble modular structure. (0,9 m modules). Possibility to adapt and improve temporary structure to a permanent one. Residential area fully served by services and infrastructure from the municipality, as any other city area.
  • 15. 02_STRUCTURE OF PROJECT _ The concept
  • 16. 02_STRUCTURE OF PROJECT _ The concept
  • 17. 02_STRUCTURE OF PROJECT _ The concept
  • 18. 02_STRUCTURE OF PROJECT _ Counterpart and Duration Supply Counterpart NGO: Implementation of project. Coordination of design, planning, assembling and selection of families. Government: Support for land selection, service provision and maintenance. Population: Self organization, participation in design decisions and maintenance Duration of Supply month month month month month Month more than 1 2 3 4 5 6- 2 years 2 years Design, organization and selection of residents Logistical Planning Receiving material, assembling Installation infrastructure Assembling community centre Official Temporary phase Adaptation/ Improvements for permanency of residents
  • 19. 02_STRUCTURE OF PROJECT _ Number of Houses and Estimated Cost Number of houses 80 or 96 house units (3 typologies: 1, 2 or 3 rooms) 1 Community Centre with special rooms for meetings and basic health and mental care Common open areas: garden and playground Estimated Cost Cost per unit (including infrastructure cost): 30,000 Euros 96 units: 2,880,000 Euros Cost Community Centre: 80,000 Euros Total: 2,960,000 Euros
  • 20. 03_SITE PLAN, PROJECT PLANS, SKETCHES Common space House units: 3 typologies: 1, 2 or 3 rooms Commercial Materials Internal panels: 70% wood-based panels and rubber produced from recycled tires External panels: Masonite boards with recycled plastic laminate and foam insulation
  • 21. 03_SITE PLAN, PROJECT PLANS, SKETCHES Materials Internal panels: 70% wood-based panels and rubber produced from recycled tires Source: Loq-kit External panels: Masonite boards with recycled plastic laminate and foam insulation
  • 22. 03_SITE PLAN, PROJECT PLANS, SKETCHES SERVICE LINE kitchen kitchen kitchen bathroom bathroom bathroom bedroom bedroom living room bedroom bedroom bedroom bedroom living room / living room 24 m2 27 m2 41 m2
  • 23. 03_SITE PLAN, PROJECT PLANS, SKETCHES
  • 24. 03_SITE PLAN, PROJECT PLANS, SKETCHES
  • 25. 03_SITE PLAN, PROJECT PLANS, SKETCHES
  • 26. SERVICE LINES_WATER _ELECTRICITY PRIVATE SERVICES STAIRS COMMON SPACE
  • 28. 04_RESIDENTS SELECTION AND MAINTENANCE PLAN Residents organize themselves in 8 or 9 groups (10 families) groups of 9 families selected by lottery Total: 80 or 96 families ELDERS (approximately 300 residents) SPECIAL NEEDS Objective: To promote community sense, to stimulate community ANY organization and ownership. To strength the partnership amongst NGO, residents and government. GOVERNMENT DECISION To try to be as fair as possible. Maintenance: Each resident is responsible for your own house and immediate surroundings. The government is responsible for normal services as in other areas of the city. The NGO can help the community to organize themselves and have a elected local leader to manage the maintenance of the common areas.
  • 29. 05_POST-PROJECT INTERMEDIATE GOALS  Develop sense of community  Promote residents’ responsibility  Guarantee the sustainable and successful maintenance of the new residential area. LONG-TERM GOALS  Attempt to adapt the project for a permanent residential use or transform in other equipment for the city.  It is also possible to disassemble the modular structure and rebuild in another site.