The document summarizes evaluations of a 4-day technical report writing course held from May 26-29, 2008 in Ahmadi, Kuwait with 14 evaluators. Overall, participants highly rated the program topics (avg 4.07-4.21), instructor (avg 4.46), training materials (avg 4.33), methods and audiovisuals (avg 4.31), schedule (avg 4.29), facilities (avg 4.44), and organization/supervision (avg 4.64). Participants felt the program would help them do their jobs better and was a good learning experience (avg 4.33).