SlideShare a Scribd company logo
HOW DO YOU TAKE YOUR PEX
PROGRAM TO THE NEXT LEVEL?
Public
PART I – THE LEADERSHIP
PARADOX
2 Copyright © i-nexus. All rights reserved
3 Copyright © i-nexus. All rights reserved
• #1 Lack of Management Buy-in
• #2 Lack of Tangible Results from Pilot
• #3 Lack of Quality Resources (Belts)
• #4 Lack of Benefit Quantification
• #5 Lack of Effective Coaching
TOP 5 OBSTACLES TO SUCCESSFUL PEX DEPLOYMENT
4 Copyright © i-nexus. All rights reserved
REALITY IS DIFFERENT…
No Pilot -
Straight to
Deployment
11%
Pilot
Abandoned
35%
Still in 'Pilot'
Mode
23%
Transitioned to
Broader
Deployment
31%
Survey of 120 PEX
“Deployments” – Position 2 Years From Launch
Pilot Defined As:
• <30 Projects
• Limited Scope (1-2 Divisions)
• Run by First/Second Wave
...More than 50% of PEX Pilots Are Not Successful!!
5 Copyright © i-nexus. All rights reserved
NEED TO UNDERSTAND WHAT REALLY MOTIVATES LEADERS…
6 Copyright © i-nexus. All rights reserved
THREE DRIVERS OF MANAGEMENT BUY-IN…
Cause Problem Pain
Root Cause Cause Problem Symptom Pain Consequence
Lack of
Management
Buy-in to the
Process
Excellence
(PEX)
Program
Not Interested
Managers Cannot
See the Direct
Linkage Between
Projects and Their
Personal
Objectives
Not Convinced
Managers Do Not
Believe PEX Will
Deliver the Result
They Need in the
Time They Have
Not Motivated
Managers Choose
to Prioritise
Business as Usual
Delivery Over
Driving
Improvement
Projects
Project Selection
is Not
Systematically
Driven by
Performance-
Expectation Gaps
in the Outcomes
Managers Are
Responsible For
Managers Have
Not Personally
Experienced
‘Proof’ of the
Power of Formal
PEX Tools on a
Problem They See
As Similar
The
Consequences For
Not Delivering
Against Business
As Usual Targets
Are Greater Than
The
Consequences on
Not Delivering
Improvement
Projects
Managers Don’t
Address Project
Road-blocks
Managers Don’t
Make Time For
Project Reviews
Managers Don’t
Provide Enough (or
the Right) Resources
to Projects
Managers See the
PEX Initiative as
the Deployment
Leaders Program
Managers
Behaviour Does
Not Reinforce PEX
Principles
Managers Short-
circuit Formal PEX
Approach With
Unsustainable
Actions
Managers Don’t
Ultimately Take
Actions Needs to
Liberate Tangible
Benefits
Projects Take
Longer to Do Than
They Should
Less Projects Are
Successful Than
They Should Be
Tangible Project
Benefits Are Lower
Than They Should Be
Deployment Leaders
Spend Time and
Energy
Compensating for
Unsupportive
Management
Behaviour
Deployment Leaders
Spend Time and
Energy Pushing PEX
Up the Management
Agenda
Tangible Program
Results are
Substantially Lower
Than They Could
Be
Rate of Program
Expansion is
Eroded As
Deployment
Leader’s Time and
Energy is Sapped
Keeping PEX on
Agenda
PEX Program Stalls
and Ultimately Fails
7 Copyright © i-nexus. All rights reserved
PUSH DRIVEN OPEX PROGRAMS ARE HARD TO SUSTAIN….
Initiative Fatigue
Quarterly Pressure
For Results (Urgent
vs. Important)
Misalignment With
Immediate Operational
Priorities
Lack of WIIFM
Inconsistent Executive
Behaviour
Will/Belief of
Deployment
Leader/Sponsoring
Executives
Power of LSS
Methodologies to
Deliver Tangible
Results
Well Publicised
Results of
Successful
Organisations
8 Copyright © i-nexus. All rights reserved
AVOIDING THE URGENT NOT IMPORTANT TRAP IS DIFFICULT
IMPORTANT
URGENT
URGENT
NOT
IMPORTANT
URGENT
AND
IMPORTANT
NOT
URGENT
NOT
IMPORTANT
IMPORTANT
NOT
URGENT
LOW HIGH
LOWHIGH
5%
10%70%
15%
9 Copyright © i-nexus. All rights reserved
LEADERS FACE CONFLICTING FORCES…
The Whirlwind Goals
or The Day Job New Activities
URGENT IMPORTANT
10 Copyright © i-nexus. All rights reserved
ONE KEY IS MAKING HARD CHOICES…
# of Breakthrough Objectives
(In Parallel With the Whirlwind) 2-3 4-10 10-20
# of Resulting Programs 32-48 64-160 176-320
# of Breakthroughs
Successfully Achieved 2-3 1-2 0
11 Copyright © i-nexus. All rights reserved
BEWILDERING RANGE OF ADVICE AND TOOLS….
PART II – THE POWER OF AN
INTEGRATED BUSINESS
“EXECUTION” SYSTEM
12 Copyright © i-nexus. All rights reserved
13 Copyright © i-nexus. All rights reserved
WHAT DO THESE ORGANISATIONS HAVE IN COMMON….?
14 Copyright © i-nexus. All rights reserved
AND THESE….?
John S Stroup
Lawrence Kingsley
15 Copyright © i-nexus. All rights reserved
THE EVOLUTION OF THE PRODUCTION SYSTEM…
Production
System
Breadth and Depth of “System”
BusinessImpactof“System”
Run and Improve the Business
• Lean/Daily Management
• CI Culture
• Respect for People
• Long Term Philosophy
Typified by Toyota
Business
System
+ Transform the Business
+ Hoshin Kanri/Strategy A3s
+ Systematic Approach to Innovation
+ Systematic Approach to Growth
+ Systematic Approach to Leadership
Typified by Danaher
PART III – USING HOSHIN TO
ALIGN PEX TO SUPPORT
“TRANSFORM THE BUSINESS”
16 Copyright © i-nexus. All rights reserved
17 Copyright © i-nexus. All rights reserved
THE RISE OF HOSHIN PLANNING….
Hoshin Planning is a systematic and disciplined process to align, communicate
and execute strategy by focusing on those few breakthrough objectives that
give you competitive advantage.
18 Copyright © i-nexus. All rights reserved
THE HOSHIN PLANING PROCESS….
1. Establish Vision
2.
Develop 3-5 Year Breakthrough
Objectives
3.
4.
5. Implement Annual Objectives
6. Monthly Review
7. Annual Review
P
D
C
A
Reflection
Hoshin Process
in Concept
Develop Annual
Objectives
Deploy Annual
Objectives
Catch-ball
Planning
19 Copyright © i-nexus. All rights reserved
THE A3-X (X-MATRIX) – ONE PAGE STRATEGIC PLAN
20 Copyright © i-nexus. All rights reserved
ROTATE TO CASCADE TO THE POINT OF ACTION…
21 Copyright © i-nexus. All rights reserved
BOWLING CHART AND COUNTERMEASURES KEEP FOCUS
22 Copyright © i-nexus. All rights reserved
HOSHIN ENSURES LEADERS ARE MOTIVATED TO DRIVE STRATEGIC PEX
ACTIVITY
Hoshin helps leaders
understand the logic
that connects
improvement actions
to business outcomes
Hoshin helps create
the consensus that the
selected actions are
likely to deliver the
outcomes that leaders
seek
Hoshin makes it easier
to reward leaders for
the achievement of
strategic goals
PART IV – USING MAAR TO ALIGN
PEX TO SUPPORT
“RUN AND IMPROVE THE BUSINESS”
23 Copyright © i-nexus. All rights reserved
24 Copyright © i-nexus. All rights reserved
THE IMPORTANCE OF DAILY MANAGEMENT TO HOLD THE GAINS…
25 Copyright © i-nexus. All rights reserved
TRANSITION FROM “TRANSFORM THE BUSINESS” TO “RUN AND IMPROVE
THE BUSINESS”
26 Copyright © i-nexus. All rights reserved
THE KEY IS CHANGING THE WAY MANAGERS REVIEW
PERFORMANCE…
Identify
Actions
Review
Performance
Review
Actions
Do
Actions
Predominantly Lagging KPIs
Inconsistent Inputs
Based on Gut Feel
Poorly Scoped Actions
Ready, Fire, Aim
Little Formalisation
Last Minute Scramble
Focus on % Complete
Traditional
Management
Review Cycle
Identify
Actions
Review
Performance
Review
Actions
Do
Actions
New
Management
Review Cycle
Simple, Consistent and Visual
Approach to Review of
Operational Performance
Systematic Identification
of Actions Based on
Primary Failure Modes
Chose and Consistently
Apply the Right
Best Practice Methodologies
Focus on Whether
the Actions have
Moved the Dials
27 Copyright © i-nexus. All rights reserved
WE HAVE TO SHIFT ATTENTION FROM MANY LAGGING TO VITAL
FEW LEADING INDICATORS…
From Lagging Measures of Outcome...
To Leading Indicators of Process Capability...
Outcomes
Process
Driver
Process
Driver
Process
Driver
Y=f(x)
• P&L and BS Impact
• Efficiency
• Productivity
• Cost/Output
• Speed/Cycle Time
• Waste
• Yield/Defects
• Timeliness
0
20
40
60
80
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
• Monthly Averages
• Periodic Commentary
0
10
20
30
40
50
60
70
80
90
100
UCL
LCL
• Control Charts - Variation
• Individual/Sample Data
• Trend/Special Cause
28 Copyright © i-nexus. All rights reserved
NEED A FACILITATED (CAUSE_EFFECT ANALSIS) WORSHOP TO
IDENTIFY VITAL FEW VALUE DRIVERS…
© i-solutions Global
Ltd. 2008
Slide Number 28
Business
Outcomes
Operational
Outcomes
Process
Outcomes
BA C D E
Speed
Roll Through Yield
SLA
Adherence
Complaints
Volume
produced
Rework Backlogs
Cycle
Time
Process
Yield
Productivity
Profitabilit
y
Customer
Satisfaction/
Retention
Leading Indicators
Raw/Event Data
Process Frequency
Lagging Indicators
Aggregate Data
Periodic Reporting
Process
29 Copyright © i-nexus. All rights reserved
THE MAAR CHART LINKS IMPROVEMENT TO OPERATIONAL KPIS…
SIMPLE TO LEARN AND UNDERSTAND…
Dry Lot Release Date
IndividualValue
28-O
ct-03
20-O
ct-03
11-O
ct-03
01-O
ct-03
21-Sep-03
11-Sep-03
02-Sep-03
24-Aug-03
15-Aug-03
07-Aug-03
01-Aug-03
100
90
80
70
60
50
40
30
_
X=61.35
UCL=92.19
LCL=30.51
1 2
Control Chart of Total Yield
Phased Introduction of new
insert design and new algorithm/
illusmination levels and
camera orientation.
Cause Action Owner Due Status
A Reduce
instances of A
PTD Jan
B Remove
instances of B
ABC Feb
Measure Analyse
Action
Review
Fault Resolution Cycle Time Analysis of Root Causes
Action Planning/ProgressValidation of Improvement
A B C D
R
C
J F M A M J J A S O N
A 10 21 16 18 0 0 0 0 0
B 18 23 24 16 2 9 0 2 6
30 Copyright © i-nexus. All rights reserved
EXTERNAL FACILITATION IS USEFUL TO DEVELOP FAILURE MODE
ANALYSIS
Dry Lot Release Date
IndividualValue
28-O
ct-03
20-O
ct-03
11-O
ct-03
01-O
ct-03
21-Sep-03
11-Sep-03
02-Sep-03
24-Aug-03
15-Aug-03
07-Aug-03
01-Aug-03
100
90
80
70
60
50
40
30
_
X=61.35
UCL=92.19
LCL=30.51
1 2
Control Chart of Total Yield
Phased Introduction of new
insert design and new algorithm/
illusmination levels and
camera orientation.
Cause Action Owner Due Status
A Reduce
instances of A
PTD Jan
B Remove
instances of B
ABC Feb
Measure Analyse
Action
Review
On-time Delivery Analysis of Root Causes
Action Planning/ProgressValidation of Improvement
A B C D
R
C
J F M A M J J A S O N
A 10 21 16 18 0 0 0 0 0
B 18 23 24 16 2 9 0 2 6
31 Copyright © i-nexus. All rights reserved
MAAR SHIFTS OWNERSHIP FOR IMPROVEMENT TO THE
LINE…
Dry Lot Release Date
IndividualValue
28-O
ct-03
20-O
ct-03
11-O
ct-03
01-O
ct-03
21-Sep-03
11-Sep-03
02-Sep-03
24-Aug-03
15-Aug-03
07-Aug-03
01-Aug-03
100
90
80
70
60
50
40
30
_
X=61.35
UCL=92.19
LCL=30.51
1 2
Control Chart of Total Yield
Phased Introduction of new
insert design and new algorithm/
illusmination levels and
camera orientation.
Cause Action Owner Due Status
A Reduce
instances of A
PTD Jan
B Remove
instances of B
ABC Feb
Measure Analyse
Action
Review
On-time Delivery Analysis of Root Causes
Action Planning/ProgressValidation of Improvement
A B C D
R
C
J F M A M J J A S O N
A 10 21 16 18 0 0 0 0 0
B 18 23 24 16 2 9 0 2 6
• Focus on Moving the Dial
Not Just % Complete on
Action
• Focus on Elimination of Root
Cause Not Just Alleviation of
Symptom
32 Copyright © i-nexus. All rights reserved
MAAR PROCESS CAN BE FULLY DEPLOYED IN 6 MONTHS…
Dry Lot Release Date
IndividualValue
28-O
ct-03
20-O
ct-03
11-O
ct-03
01-O
ct-03
21-Sep-03
11-Sep-03
02-Sep-03
24-Aug-03
15-Aug-03
07-Aug-03
01-Aug-03
100
90
80
70
60
50
40
30
_
X=61.35
UCL=92.19
LCL=30.51
1 2
Control Chart of Total Yield
Phased Introduction of new
insert design and new algorithm/
illusmination levels and
camera orientation.
Mode Action Lead Due Status
A DMAIC Project to
Reduce A
PTD Sep
B Just Do It Action to
Impact B
ABC Jun
Measure Analyse
Action
Review
Transaction Fulfilment Cycle Time Analysis of Failure Modes
Action Planning/ProgressValidation of Improvement
A B C D
Mode J F M A M J
A 10 21 16 18 12 15
B 18 23 24 16 12 2
Month 1
• Clarify Ownership
• Clarify Operational
Definitions/Targets
• Establish Y Measure Data
Collection Process
• Train MAAR Owners
Month 2/3
• Identify and Codify
Potential Failure Modes
• Extend Data Collection
System
• Analyse Failure Modes &
Identify Process Drivers
Month 4/5
• Scope and Prioritise
Actions/Estimate Impact
• Coach MAAR/Action
Owners
• Execute Actions
Month 6
• Review Effectiveness of
Actions
• Assess if Sufficient Actions
Underway to Close Gaps
• Review Data Collection/
Operational Definition
PART IV – BUILDING YOUR
BUSINESS SYSTEM
33 Copyright © i-nexus. All rights reserved
34 Copyright © i-nexus. All rights reserved
THE TRADITIONAL APPROACH TO STRATEGY EXECUTION….
•Grow Sales of New
Product
•Customer Focus
•Invest in China
•Improve employee
satisfaction
The Off-site Strategy Day(s)
Unclear
Accountabilities
Poorly Defined
Goals
.ppt deck
The Ivory Tower Exercise
Funding
Constraints
Give me
your numbers...
I need to include
some contingency...
Way too much!
Cut by 25%!
If I don’t
include it I’ll
lose it...
The Budget Dance
It’s close enough for
Military work...

  
  
 
 
Divisional President
Functional Heads
Departmental Heads
Middle Managers
Employees
Project
Project
Project
The Ad Hoc Cascade
35 Copyright © i-nexus. All rights reserved
THE STRATEGY EXECUTION MATURITY MODEL…
Level 1
Traditional
Largely financially
driven using
traditional (and
often fragmented)
approaches to
defining strategy,
budgeting, target
setting, executing
and following-up
actions.
Level 2
Disciplined
A more structured
approach to strategic
planning and
follow-up built on a
foundation of strong
project execution and
improvement
disciplines
Basic Execution
Disciplines &
Performance
Management
Framework
Level 3
Aligned
Increasing focus on
top-down/bottom-up
alignment typically via
a more systematic and
collaborative goal
cascade process
and/or by establishing
a cross-functional
enterprise program
office
Increased Focus on
Alignment &
Making Hard
Choices
Creation of a
“feedback loop” that
enables earlier course
correction and
continual “testing” of
strategic assumptions
plus internalisation of
“execution” culture
Level 4
Integrated
Closure of the
“Loop” &
Increasing
Reflection
36 Copyright © i-nexus. All rights reserved
WHERE ARE THE MAJORITY OF GLOBAL 5000 ORGANISATIONS?
Level 1
Traditional
Level 2
Disciplined
Basic Execution
Disciplines &
Performance
Management
Framework
Level 3
Aligned
Increased Focus on
Alignment &
Making Hard
Choices
Level 4
Integrated
Closure of the
“Loop” &
Increasing
Reflection
15 154 31 5
http://www.surveymonkey.com/s/Execution_Maturity_Assessment
7.3% 75% 15.1% 2.4%
37 Copyright © i-nexus. All rights reserved
THE “GO TO” RESOURCE FOR STRATEX BEST PRACTICE…
www.i-nexus.com/stratex-hub
38 Copyright © i-nexus. All rights reserved
PREPARE – CREATE THE CASE TO ACT AND CLARIFY WHAT
MATTERS…
• Capture existing vision/mission/goals
• Build inventory of existing strategic/operational
indicators
• Build inventory of existing strategic/operational
initiatives
• Complete an ‘Execution Maturity Assessment’
• Run ‘Execution Readiness’ (SBU level) workshop:
• Develop shared understanding of current execution
system strengths/weaknesses
• Articulate 2-4 Breakthrough Goals
Prepare
Assess existing
execution capability
and establish
Breakthrough Goals
Align
Focus
management
attention on what
matters
Cascade
Ensure plan is
comprehensive
and executable
Execute
Relentlessly drive
execution and
take action where
needed to stay on
track
Key Output –
Execution Capability Assessment
0
1
2
3
4
5
Clarity of
Business Goals
Alignment of
Personal Goals
Accountability
for Delivery
Alignment of
Action Plans
Robustness of
Project
Management
Effectiveness of
Portfolio
Review
Accuracy of
Impact
Forecasting
Effectiveness of
Execution
Review
39 Copyright © i-nexus. All rights reserved
ALIGN – FOCUS MANAGEMENT ATTENTION ON WHAT MATTERS
MOST…
Prepare
Assess existing
execution capability
and establish
Breakthrough Goals
Align
Focus
management
attention on what
matters
Cascade
Ensure plan is
comprehensive
and executable
Execute
Relentlessly drive
execution and
take action where
needed to stay on
track
• Translate Breakthrough Objectives into Improvement
Priorities and clarify functional Ownership (SBU X-
Matrix)
• Align existing indicators (where possible) as Hoshin
Targets or Operational KPIs
• Identify additional indicators (if required) to ensure
all Improvement Priorities tracked
• Align existing “in-flight” initiatives (where possible)
to Improvement Priorities and estimate projected
impact
• Baseline KPIs and run SBU level alignment and target
setting workshop
Key Output –
Strategic Grid Alignment Assessment
40 Copyright © i-nexus. All rights reserved
CACADE – ENSURE PLAN IS DEPLOYED AND REALISTIC…
Prepare
Assess existing
execution capability
and establish
Breakthrough Goals
Align
Focus
management
attention on what
matters
Cascade
Ensure plan is
comprehensive
and executable
Execute
Relentlessly drive
execution and
take action where
needed to stay on
track
• Cascade Improvement Priorities that are not
addressed by cross-functional initiatives (Develop
individual functional X-Matrices*)
• Align existing indicators (where possible) or scope
new indicators (where necessary)
• Align existing initiatives (where possible) and
estimate projected impact
• Baseline Hoshin Indicators and run functional
alignment and target setting workshops.
• Run catch-ball alignment workshop (SBU Level) to
validate/adjust targets/plan.
Key Output – Functional X
Matrices
41 Copyright © i-nexus. All rights reserved
EXECUTE – RELENTLESSLY DRIVE EXECUTION AND COURSE
CORRECT WHERE NEEDED…
Prepare
Assess existing
execution capability
and establish
Breakthrough Goals
Align
Focus
management
attention on what
matters
Cascade
Ensure plan is
comprehensive
and executable
Execute
Relentlessly drive
execution and
take action where
needed to stay on
track
• Resource and implement Action Plans.
• Implement on-going data collection for Hoshin
indicators and Action Plan progress.
• Set-up and deploy a Monthly Reporting and
Execution Review Cycle.
• Update current and forecast Bowling Charts based
on Project Impact
• Run monthly ‘Execution Reviews’ at functional and
SBU Level focused on Operational Scorecard/MAAR
Charts
• Instigate countermeasures to maintain performance
Key Output –
Actual and Forecast Bowling Chart
42 Copyright © i-nexus. All rights reserved
FINAL QUESTIONS/THOUGHTS?
“It is not the strongest of
the species that survives,
nor the most intelligent, but
the one most responsive to
change.”
Charles Darwin
“There is great power in
knowing where you are
going and passion in
knowing how as an
individual you fit in!”
Anonymous
43 Copyright © i-nexus. All rights reserved
I-NEXUS SOFTWARE BRINGS IT ALL TOGETHER
i-nexus
STRATEGY
EXECUTION
SOFTWARE
Strategic Planning
Strategy Deployment
Performance Review
Portfolio Prioritisation
Program Governance
Project Execution
Daily Management
Operational Review
Benefit Tracking









www.i-nexus.com
One Integrated Cloud Solution to Manage…
Achieve more. Faster. With less effort.
i-nexus suite, George House,
Herald Avenue, Coventry Business
Park,
Coventry, West Midlands, CV5 6UB,
UK
UK: +44 (0)845 607 0061
US: +1 617 701 7343
US (toll free): +1 855-615-1589
info@i-nexus.com
www.i-nexus.com

More Related Content

What's hot

Project Management Essentials
Project Management EssentialsProject Management Essentials
Project Management Essentials
Pushkar Raj Chandna
 
Making the impossible possible
Making the impossible possibleMaking the impossible possible
Making the impossible possible
Glen Alleman
 
Project Success/Failure
Project Success/FailureProject Success/Failure
Project Success/Failure
Peter Salmon
 
ViewPoint - Why Your Projects Are Late
ViewPoint - Why Your Projects Are LateViewPoint - Why Your Projects Are Late
ViewPoint - Why Your Projects Are Late
Pinnacle Strategies
 
Seven habits
Seven habitsSeven habits
Seven habits
Glen Alleman
 
Portfolios, programmes and projects. Delivering one version of the truth: a c...
Portfolios, programmes and projects. Delivering one version of the truth: a c...Portfolios, programmes and projects. Delivering one version of the truth: a c...
Portfolios, programmes and projects. Delivering one version of the truth: a c...
Association for Project Management
 
Why Agile? Why Now? IPMA Forum 2009
Why Agile? Why Now?   IPMA Forum 2009Why Agile? Why Now?   IPMA Forum 2009
Why Agile? Why Now? IPMA Forum 2009
skipangel
 
Seven Habits of a Highly Effective agile project manager
Seven Habits of a Highly Effective agile project managerSeven Habits of a Highly Effective agile project manager
Seven Habits of a Highly Effective agile project manager
Glen Alleman
 
Agile project management is systems management
Agile project management is systems managementAgile project management is systems management
Agile project management is systems management
Glen Alleman
 
Immutable principles of project management (utah pmi)(v1)(no exercise)
Immutable principles of project management (utah pmi)(v1)(no exercise)Immutable principles of project management (utah pmi)(v1)(no exercise)
Immutable principles of project management (utah pmi)(v1)(no exercise)
Glen Alleman
 
Top Ten Reasons Why Projects Fail
Top Ten Reasons Why Projects FailTop Ten Reasons Why Projects Fail
Top Ten Reasons Why Projects Fail
jpstewar
 
Top Five Ideas for Project Management
Top Five Ideas for Project ManagementTop Five Ideas for Project Management
Top Five Ideas for Project Management
John Goodpasture
 
The Quarterbacks Dilemma
The Quarterbacks Dilemma The Quarterbacks Dilemma
The Quarterbacks Dilemma
Allan Cytryn
 
Visual Project Management webinar handout
Visual Project Management webinar handoutVisual Project Management webinar handout
Visual Project Management webinar handout
Pinnacle Strategies
 
Project governance
Project governanceProject governance
Project governance
suraj arvapally
 
Project management and Success Criteria
Project management and Success Criteria Project management and Success Criteria
Project management and Success Criteria
ujjwal Mania
 
1 b. introduction to project management
1 b. introduction to project management1 b. introduction to project management
1 b. introduction to project management
Dr.R. SELVAM
 
Project management essentials 3 day training program
Project management essentials   3 day training programProject management essentials   3 day training program
Project management essentials 3 day training program
Paramjit Arora
 
Taking the Creep Out of Scope Creep
Taking the Creep Out of Scope CreepTaking the Creep Out of Scope Creep
Taking the Creep Out of Scope Creep
Computer Aid, Inc
 
Essentials of Project Management
Essentials of Project ManagementEssentials of Project Management
Essentials of Project ManagementLiving Online
 

What's hot (20)

Project Management Essentials
Project Management EssentialsProject Management Essentials
Project Management Essentials
 
Making the impossible possible
Making the impossible possibleMaking the impossible possible
Making the impossible possible
 
Project Success/Failure
Project Success/FailureProject Success/Failure
Project Success/Failure
 
ViewPoint - Why Your Projects Are Late
ViewPoint - Why Your Projects Are LateViewPoint - Why Your Projects Are Late
ViewPoint - Why Your Projects Are Late
 
Seven habits
Seven habitsSeven habits
Seven habits
 
Portfolios, programmes and projects. Delivering one version of the truth: a c...
Portfolios, programmes and projects. Delivering one version of the truth: a c...Portfolios, programmes and projects. Delivering one version of the truth: a c...
Portfolios, programmes and projects. Delivering one version of the truth: a c...
 
Why Agile? Why Now? IPMA Forum 2009
Why Agile? Why Now?   IPMA Forum 2009Why Agile? Why Now?   IPMA Forum 2009
Why Agile? Why Now? IPMA Forum 2009
 
Seven Habits of a Highly Effective agile project manager
Seven Habits of a Highly Effective agile project managerSeven Habits of a Highly Effective agile project manager
Seven Habits of a Highly Effective agile project manager
 
Agile project management is systems management
Agile project management is systems managementAgile project management is systems management
Agile project management is systems management
 
Immutable principles of project management (utah pmi)(v1)(no exercise)
Immutable principles of project management (utah pmi)(v1)(no exercise)Immutable principles of project management (utah pmi)(v1)(no exercise)
Immutable principles of project management (utah pmi)(v1)(no exercise)
 
Top Ten Reasons Why Projects Fail
Top Ten Reasons Why Projects FailTop Ten Reasons Why Projects Fail
Top Ten Reasons Why Projects Fail
 
Top Five Ideas for Project Management
Top Five Ideas for Project ManagementTop Five Ideas for Project Management
Top Five Ideas for Project Management
 
The Quarterbacks Dilemma
The Quarterbacks Dilemma The Quarterbacks Dilemma
The Quarterbacks Dilemma
 
Visual Project Management webinar handout
Visual Project Management webinar handoutVisual Project Management webinar handout
Visual Project Management webinar handout
 
Project governance
Project governanceProject governance
Project governance
 
Project management and Success Criteria
Project management and Success Criteria Project management and Success Criteria
Project management and Success Criteria
 
1 b. introduction to project management
1 b. introduction to project management1 b. introduction to project management
1 b. introduction to project management
 
Project management essentials 3 day training program
Project management essentials   3 day training programProject management essentials   3 day training program
Project management essentials 3 day training program
 
Taking the Creep Out of Scope Creep
Taking the Creep Out of Scope CreepTaking the Creep Out of Scope Creep
Taking the Creep Out of Scope Creep
 
Essentials of Project Management
Essentials of Project ManagementEssentials of Project Management
Essentials of Project Management
 

Viewers also liked

Nonprofit Special Events
Nonprofit Special EventsNonprofit Special Events
Nonprofit Special Events
Talisman Associates, Inc.
 
8 LOS Features Credit Unions Need to Stay Competitive
8 LOS Features Credit Unions Need to Stay Competitive  8 LOS Features Credit Unions Need to Stay Competitive
8 LOS Features Credit Unions Need to Stay Competitive
Doxim Inc.
 
Hive social student engagement
Hive social student engagementHive social student engagement
Hive social student engagement
Enterprise Hive
 
Dynasoft TeleFactura Telecom billing
Dynasoft TeleFactura Telecom billingDynasoft TeleFactura Telecom billing
Dynasoft TeleFactura Telecom billing
Dynasoft Limited
 
Why Enterprises Need Custom Billing Solutions?
Why Enterprises Need Custom Billing Solutions?Why Enterprises Need Custom Billing Solutions?
Why Enterprises Need Custom Billing Solutions?
Invoicera Tondon
 
Step Up Business Intelligence
Step Up Business Intelligence Step Up Business Intelligence
Step Up Business Intelligence
Angoss Software Corporation
 
Web 2.0 and the world of global collaboration v2010
Web 2.0 and the world of global collaboration v2010Web 2.0 and the world of global collaboration v2010
Web 2.0 and the world of global collaboration v2010
GroveSite
 
NexJ CDM Overview: Better Understand Customers with NexJ Customer Data Manage...
NexJ CDM Overview: Better Understand Customers with NexJ Customer Data Manage...NexJ CDM Overview: Better Understand Customers with NexJ Customer Data Manage...
NexJ CDM Overview: Better Understand Customers with NexJ Customer Data Manage...
NexJ Systems Inc.
 
Inbound webinar presentation
Inbound webinar presentation Inbound webinar presentation
Inbound webinar presentation
Cordium
 
The Benefits of FileMaker Pro
The Benefits of FileMaker ProThe Benefits of FileMaker Pro
The Benefits of FileMaker Pro
Productive Computing, Inc.
 
Branch Banking in the 21st Century by Capital Banking Solutions
Branch Banking in the 21st Century by Capital Banking SolutionsBranch Banking in the 21st Century by Capital Banking Solutions
Branch Banking in the 21st Century by Capital Banking Solutions
Capital Banking Solutions
 
CRCC Corporate Overview
CRCC Corporate OverviewCRCC Corporate Overview
CRCC Corporate OverviewBrett Payne
 

Viewers also liked (16)

Nonprofit Special Events
Nonprofit Special EventsNonprofit Special Events
Nonprofit Special Events
 
8 LOS Features Credit Unions Need to Stay Competitive
8 LOS Features Credit Unions Need to Stay Competitive  8 LOS Features Credit Unions Need to Stay Competitive
8 LOS Features Credit Unions Need to Stay Competitive
 
Hive social student engagement
Hive social student engagementHive social student engagement
Hive social student engagement
 
Dynasoft TeleFactura Telecom billing
Dynasoft TeleFactura Telecom billingDynasoft TeleFactura Telecom billing
Dynasoft TeleFactura Telecom billing
 
Why Enterprises Need Custom Billing Solutions?
Why Enterprises Need Custom Billing Solutions?Why Enterprises Need Custom Billing Solutions?
Why Enterprises Need Custom Billing Solutions?
 
Step Up Business Intelligence
Step Up Business Intelligence Step Up Business Intelligence
Step Up Business Intelligence
 
09 Ny Brochure
09 Ny Brochure09 Ny Brochure
09 Ny Brochure
 
Web 2.0 and the world of global collaboration v2010
Web 2.0 and the world of global collaboration v2010Web 2.0 and the world of global collaboration v2010
Web 2.0 and the world of global collaboration v2010
 
NexJ CDM Overview: Better Understand Customers with NexJ Customer Data Manage...
NexJ CDM Overview: Better Understand Customers with NexJ Customer Data Manage...NexJ CDM Overview: Better Understand Customers with NexJ Customer Data Manage...
NexJ CDM Overview: Better Understand Customers with NexJ Customer Data Manage...
 
Jackson Associates Research Competencies 2013
Jackson Associates Research Competencies 2013Jackson Associates Research Competencies 2013
Jackson Associates Research Competencies 2013
 
Inbound webinar presentation
Inbound webinar presentation Inbound webinar presentation
Inbound webinar presentation
 
CRM on Demand India ,
CRM on Demand India , CRM on Demand India ,
CRM on Demand India ,
 
Slideshow
SlideshowSlideshow
Slideshow
 
The Benefits of FileMaker Pro
The Benefits of FileMaker ProThe Benefits of FileMaker Pro
The Benefits of FileMaker Pro
 
Branch Banking in the 21st Century by Capital Banking Solutions
Branch Banking in the 21st Century by Capital Banking SolutionsBranch Banking in the 21st Century by Capital Banking Solutions
Branch Banking in the 21st Century by Capital Banking Solutions
 
CRCC Corporate Overview
CRCC Corporate OverviewCRCC Corporate Overview
CRCC Corporate Overview
 

Similar to Taking your pex program to the next level pex webinar july 2016

Best Practices in Financial Planning and Analysis | 2013 Business Analytics S...
Best Practices in Financial Planning and Analysis | 2013 Business Analytics S...Best Practices in Financial Planning and Analysis | 2013 Business Analytics S...
Best Practices in Financial Planning and Analysis | 2013 Business Analytics S...
Cartegraph
 
PMP ERP
PMP ERPPMP ERP
Strategic Planning: Eight Steps To Implementation
Strategic Planning: Eight Steps To ImplementationStrategic Planning: Eight Steps To Implementation
Strategic Planning: Eight Steps To Implementation
Operational Excellence Consulting
 
Six Sigma Exec Overview of project.ppt
Six Sigma Exec Overview of   project.pptSix Sigma Exec Overview of   project.ppt
Six Sigma Exec Overview of project.ppt
Rahulyadav421393
 
Integrated Performance Management Scorecard
Integrated Performance Management ScorecardIntegrated Performance Management Scorecard
Integrated Performance Management ScorecardSaravanan Veeraiyan
 
Presentation KCPMI 2016 PDD Days Portfolio Balance
Presentation   KCPMI 2016 PDD Days Portfolio BalancePresentation   KCPMI 2016 PDD Days Portfolio Balance
Presentation KCPMI 2016 PDD Days Portfolio Balance
Ron Montgomery
 
Measuring_HR_ROI-1.pdf
Measuring_HR_ROI-1.pdfMeasuring_HR_ROI-1.pdf
Measuring_HR_ROI-1.pdf
HarmanSingh510326
 
UMT_PMI-ATL Governance Agility_Final
UMT_PMI-ATL Governance Agility_FinalUMT_PMI-ATL Governance Agility_Final
UMT_PMI-ATL Governance Agility_FinalLudvic Baquie
 
Better Project Selection using Hoshin Planning and Balanced Scorecards
Better Project Selection using Hoshin Planning and Balanced ScorecardsBetter Project Selection using Hoshin Planning and Balanced Scorecards
Better Project Selection using Hoshin Planning and Balanced Scorecards
Grant Crow
 
Data Center Transformation Program Planning and Design
Data Center Transformation Program Planning and DesignData Center Transformation Program Planning and Design
Data Center Transformation Program Planning and Design
Joseph Schwartz
 
Maksym Vyshnivetskyi: PMO KPIs ( UA ).
Maksym  Vyshnivetskyi:  PMO KPIs ( UA ).Maksym  Vyshnivetskyi:  PMO KPIs ( UA ).
Maksym Vyshnivetskyi: PMO KPIs ( UA ).
Lviv Startup Club
 
Loughridge Transformations' Webinar: Process Model - Begin with Basics
Loughridge Transformations' Webinar: Process Model - Begin with BasicsLoughridge Transformations' Webinar: Process Model - Begin with Basics
Loughridge Transformations' Webinar: Process Model - Begin with Basics
Jennifer Loughridge
 
If you dont know where you are going any road will do visioning for impleme...
If you dont know where you are going any road will do   visioning for impleme...If you dont know where you are going any road will do   visioning for impleme...
If you dont know where you are going any road will do visioning for impleme...p6academy
 
Matinée PMI - Why so many technology projects failing
Matinée PMI - Why so many technology projects failingMatinée PMI - Why so many technology projects failing
Matinée PMI - Why so many technology projects failing
PMI-Montréal
 
3 Habits of Highly Productive Organizations
3 Habits of Highly Productive Organizations3 Habits of Highly Productive Organizations
3 Habits of Highly Productive Organizations
Human Capital Media
 
An Overview of Scenario Planning - Introduction, Overview and Examples
An Overview of Scenario Planning - Introduction, Overview and ExamplesAn Overview of Scenario Planning - Introduction, Overview and Examples
An Overview of Scenario Planning - Introduction, Overview and Examples
Axiom EPM
 
Approach for transformation kickoff
Approach for transformation kickoffApproach for transformation kickoff
Approach for transformation kickoff
Brian Maguire
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"
David Pedreno
 
Using Earned Value Management Concepts to Improve Commercial Project Performance
Using Earned Value Management Concepts to Improve Commercial Project PerformanceUsing Earned Value Management Concepts to Improve Commercial Project Performance
Using Earned Value Management Concepts to Improve Commercial Project Performance
LewisFowlerLLC
 

Similar to Taking your pex program to the next level pex webinar july 2016 (20)

Best Practices in Financial Planning and Analysis | 2013 Business Analytics S...
Best Practices in Financial Planning and Analysis | 2013 Business Analytics S...Best Practices in Financial Planning and Analysis | 2013 Business Analytics S...
Best Practices in Financial Planning and Analysis | 2013 Business Analytics S...
 
PMP ERP
PMP ERPPMP ERP
PMP ERP
 
Strategic Planning: Eight Steps To Implementation
Strategic Planning: Eight Steps To ImplementationStrategic Planning: Eight Steps To Implementation
Strategic Planning: Eight Steps To Implementation
 
Six Sigma Exec Overview of project.ppt
Six Sigma Exec Overview of   project.pptSix Sigma Exec Overview of   project.ppt
Six Sigma Exec Overview of project.ppt
 
Integrated Performance Management Scorecard
Integrated Performance Management ScorecardIntegrated Performance Management Scorecard
Integrated Performance Management Scorecard
 
Presentation KCPMI 2016 PDD Days Portfolio Balance
Presentation   KCPMI 2016 PDD Days Portfolio BalancePresentation   KCPMI 2016 PDD Days Portfolio Balance
Presentation KCPMI 2016 PDD Days Portfolio Balance
 
Measuring_HR_ROI-1.pdf
Measuring_HR_ROI-1.pdfMeasuring_HR_ROI-1.pdf
Measuring_HR_ROI-1.pdf
 
UMT_PMI-ATL Governance Agility_Final
UMT_PMI-ATL Governance Agility_FinalUMT_PMI-ATL Governance Agility_Final
UMT_PMI-ATL Governance Agility_Final
 
Better Project Selection using Hoshin Planning and Balanced Scorecards
Better Project Selection using Hoshin Planning and Balanced ScorecardsBetter Project Selection using Hoshin Planning and Balanced Scorecards
Better Project Selection using Hoshin Planning and Balanced Scorecards
 
Data Center Transformation Program Planning and Design
Data Center Transformation Program Planning and DesignData Center Transformation Program Planning and Design
Data Center Transformation Program Planning and Design
 
Maksym Vyshnivetskyi: PMO KPIs ( UA ).
Maksym  Vyshnivetskyi:  PMO KPIs ( UA ).Maksym  Vyshnivetskyi:  PMO KPIs ( UA ).
Maksym Vyshnivetskyi: PMO KPIs ( UA ).
 
Loughridge Transformations' Webinar: Process Model - Begin with Basics
Loughridge Transformations' Webinar: Process Model - Begin with BasicsLoughridge Transformations' Webinar: Process Model - Begin with Basics
Loughridge Transformations' Webinar: Process Model - Begin with Basics
 
If you dont know where you are going any road will do visioning for impleme...
If you dont know where you are going any road will do   visioning for impleme...If you dont know where you are going any road will do   visioning for impleme...
If you dont know where you are going any road will do visioning for impleme...
 
Matinée PMI - Why so many technology projects failing
Matinée PMI - Why so many technology projects failingMatinée PMI - Why so many technology projects failing
Matinée PMI - Why so many technology projects failing
 
3 Habits of Highly Productive Organizations
3 Habits of Highly Productive Organizations3 Habits of Highly Productive Organizations
3 Habits of Highly Productive Organizations
 
An Overview of Scenario Planning - Introduction, Overview and Examples
An Overview of Scenario Planning - Introduction, Overview and ExamplesAn Overview of Scenario Planning - Introduction, Overview and Examples
An Overview of Scenario Planning - Introduction, Overview and Examples
 
Approach for transformation kickoff
Approach for transformation kickoffApproach for transformation kickoff
Approach for transformation kickoff
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"
 
Using Earned Value Management Concepts to Improve Commercial Project Performance
Using Earned Value Management Concepts to Improve Commercial Project PerformanceUsing Earned Value Management Concepts to Improve Commercial Project Performance
Using Earned Value Management Concepts to Improve Commercial Project Performance
 
Program Management Office (PMO)
Program Management Office (PMO)Program Management Office (PMO)
Program Management Office (PMO)
 

More from i-nexus

Strategy Deployment brochure
Strategy Deployment brochureStrategy Deployment brochure
Strategy Deployment brochure
i-nexus
 
Operational Excellence brochure
Operational Excellence brochureOperational Excellence brochure
Operational Excellence brochure
i-nexus
 
Project prioritization becomes more strategic
Project prioritization becomes more strategicProject prioritization becomes more strategic
Project prioritization becomes more strategic
i-nexus
 
PIMM overview whitepaper
PIMM overview whitepaperPIMM overview whitepaper
PIMM overview whitepaper
i-nexus
 
Getting six sigma into the DNA of your organisation
Getting six sigma into the DNA of your organisationGetting six sigma into the DNA of your organisation
Getting six sigma into the DNA of your organisation
i-nexus
 
Give Me an Hour and i will triple your ROI
Give Me an Hour and i will triple your ROIGive Me an Hour and i will triple your ROI
Give Me an Hour and i will triple your ROI
i-nexus
 
i-nexus Case Study at Novartis
i-nexus Case Study at Novartisi-nexus Case Study at Novartis
i-nexus Case Study at Novartis
i-nexus
 

More from i-nexus (7)

Strategy Deployment brochure
Strategy Deployment brochureStrategy Deployment brochure
Strategy Deployment brochure
 
Operational Excellence brochure
Operational Excellence brochureOperational Excellence brochure
Operational Excellence brochure
 
Project prioritization becomes more strategic
Project prioritization becomes more strategicProject prioritization becomes more strategic
Project prioritization becomes more strategic
 
PIMM overview whitepaper
PIMM overview whitepaperPIMM overview whitepaper
PIMM overview whitepaper
 
Getting six sigma into the DNA of your organisation
Getting six sigma into the DNA of your organisationGetting six sigma into the DNA of your organisation
Getting six sigma into the DNA of your organisation
 
Give Me an Hour and i will triple your ROI
Give Me an Hour and i will triple your ROIGive Me an Hour and i will triple your ROI
Give Me an Hour and i will triple your ROI
 
i-nexus Case Study at Novartis
i-nexus Case Study at Novartisi-nexus Case Study at Novartis
i-nexus Case Study at Novartis
 

Recently uploaded

Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).pptENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
zechu97
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
SynapseIndia
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
balatucanapplelovely
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
uae taxgpt
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
Aurelien Domont, MBA
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
Erika906060
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
HumanResourceDimensi1
 

Recently uploaded (20)

Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).pptENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 

Taking your pex program to the next level pex webinar july 2016

  • 1. HOW DO YOU TAKE YOUR PEX PROGRAM TO THE NEXT LEVEL? Public
  • 2. PART I – THE LEADERSHIP PARADOX 2 Copyright © i-nexus. All rights reserved
  • 3. 3 Copyright © i-nexus. All rights reserved • #1 Lack of Management Buy-in • #2 Lack of Tangible Results from Pilot • #3 Lack of Quality Resources (Belts) • #4 Lack of Benefit Quantification • #5 Lack of Effective Coaching TOP 5 OBSTACLES TO SUCCESSFUL PEX DEPLOYMENT
  • 4. 4 Copyright © i-nexus. All rights reserved REALITY IS DIFFERENT… No Pilot - Straight to Deployment 11% Pilot Abandoned 35% Still in 'Pilot' Mode 23% Transitioned to Broader Deployment 31% Survey of 120 PEX “Deployments” – Position 2 Years From Launch Pilot Defined As: • <30 Projects • Limited Scope (1-2 Divisions) • Run by First/Second Wave ...More than 50% of PEX Pilots Are Not Successful!!
  • 5. 5 Copyright © i-nexus. All rights reserved NEED TO UNDERSTAND WHAT REALLY MOTIVATES LEADERS…
  • 6. 6 Copyright © i-nexus. All rights reserved THREE DRIVERS OF MANAGEMENT BUY-IN… Cause Problem Pain Root Cause Cause Problem Symptom Pain Consequence Lack of Management Buy-in to the Process Excellence (PEX) Program Not Interested Managers Cannot See the Direct Linkage Between Projects and Their Personal Objectives Not Convinced Managers Do Not Believe PEX Will Deliver the Result They Need in the Time They Have Not Motivated Managers Choose to Prioritise Business as Usual Delivery Over Driving Improvement Projects Project Selection is Not Systematically Driven by Performance- Expectation Gaps in the Outcomes Managers Are Responsible For Managers Have Not Personally Experienced ‘Proof’ of the Power of Formal PEX Tools on a Problem They See As Similar The Consequences For Not Delivering Against Business As Usual Targets Are Greater Than The Consequences on Not Delivering Improvement Projects Managers Don’t Address Project Road-blocks Managers Don’t Make Time For Project Reviews Managers Don’t Provide Enough (or the Right) Resources to Projects Managers See the PEX Initiative as the Deployment Leaders Program Managers Behaviour Does Not Reinforce PEX Principles Managers Short- circuit Formal PEX Approach With Unsustainable Actions Managers Don’t Ultimately Take Actions Needs to Liberate Tangible Benefits Projects Take Longer to Do Than They Should Less Projects Are Successful Than They Should Be Tangible Project Benefits Are Lower Than They Should Be Deployment Leaders Spend Time and Energy Compensating for Unsupportive Management Behaviour Deployment Leaders Spend Time and Energy Pushing PEX Up the Management Agenda Tangible Program Results are Substantially Lower Than They Could Be Rate of Program Expansion is Eroded As Deployment Leader’s Time and Energy is Sapped Keeping PEX on Agenda PEX Program Stalls and Ultimately Fails
  • 7. 7 Copyright © i-nexus. All rights reserved PUSH DRIVEN OPEX PROGRAMS ARE HARD TO SUSTAIN…. Initiative Fatigue Quarterly Pressure For Results (Urgent vs. Important) Misalignment With Immediate Operational Priorities Lack of WIIFM Inconsistent Executive Behaviour Will/Belief of Deployment Leader/Sponsoring Executives Power of LSS Methodologies to Deliver Tangible Results Well Publicised Results of Successful Organisations
  • 8. 8 Copyright © i-nexus. All rights reserved AVOIDING THE URGENT NOT IMPORTANT TRAP IS DIFFICULT IMPORTANT URGENT URGENT NOT IMPORTANT URGENT AND IMPORTANT NOT URGENT NOT IMPORTANT IMPORTANT NOT URGENT LOW HIGH LOWHIGH 5% 10%70% 15%
  • 9. 9 Copyright © i-nexus. All rights reserved LEADERS FACE CONFLICTING FORCES… The Whirlwind Goals or The Day Job New Activities URGENT IMPORTANT
  • 10. 10 Copyright © i-nexus. All rights reserved ONE KEY IS MAKING HARD CHOICES… # of Breakthrough Objectives (In Parallel With the Whirlwind) 2-3 4-10 10-20 # of Resulting Programs 32-48 64-160 176-320 # of Breakthroughs Successfully Achieved 2-3 1-2 0
  • 11. 11 Copyright © i-nexus. All rights reserved BEWILDERING RANGE OF ADVICE AND TOOLS….
  • 12. PART II – THE POWER OF AN INTEGRATED BUSINESS “EXECUTION” SYSTEM 12 Copyright © i-nexus. All rights reserved
  • 13. 13 Copyright © i-nexus. All rights reserved WHAT DO THESE ORGANISATIONS HAVE IN COMMON….?
  • 14. 14 Copyright © i-nexus. All rights reserved AND THESE….? John S Stroup Lawrence Kingsley
  • 15. 15 Copyright © i-nexus. All rights reserved THE EVOLUTION OF THE PRODUCTION SYSTEM… Production System Breadth and Depth of “System” BusinessImpactof“System” Run and Improve the Business • Lean/Daily Management • CI Culture • Respect for People • Long Term Philosophy Typified by Toyota Business System + Transform the Business + Hoshin Kanri/Strategy A3s + Systematic Approach to Innovation + Systematic Approach to Growth + Systematic Approach to Leadership Typified by Danaher
  • 16. PART III – USING HOSHIN TO ALIGN PEX TO SUPPORT “TRANSFORM THE BUSINESS” 16 Copyright © i-nexus. All rights reserved
  • 17. 17 Copyright © i-nexus. All rights reserved THE RISE OF HOSHIN PLANNING…. Hoshin Planning is a systematic and disciplined process to align, communicate and execute strategy by focusing on those few breakthrough objectives that give you competitive advantage.
  • 18. 18 Copyright © i-nexus. All rights reserved THE HOSHIN PLANING PROCESS…. 1. Establish Vision 2. Develop 3-5 Year Breakthrough Objectives 3. 4. 5. Implement Annual Objectives 6. Monthly Review 7. Annual Review P D C A Reflection Hoshin Process in Concept Develop Annual Objectives Deploy Annual Objectives Catch-ball Planning
  • 19. 19 Copyright © i-nexus. All rights reserved THE A3-X (X-MATRIX) – ONE PAGE STRATEGIC PLAN
  • 20. 20 Copyright © i-nexus. All rights reserved ROTATE TO CASCADE TO THE POINT OF ACTION…
  • 21. 21 Copyright © i-nexus. All rights reserved BOWLING CHART AND COUNTERMEASURES KEEP FOCUS
  • 22. 22 Copyright © i-nexus. All rights reserved HOSHIN ENSURES LEADERS ARE MOTIVATED TO DRIVE STRATEGIC PEX ACTIVITY Hoshin helps leaders understand the logic that connects improvement actions to business outcomes Hoshin helps create the consensus that the selected actions are likely to deliver the outcomes that leaders seek Hoshin makes it easier to reward leaders for the achievement of strategic goals
  • 23. PART IV – USING MAAR TO ALIGN PEX TO SUPPORT “RUN AND IMPROVE THE BUSINESS” 23 Copyright © i-nexus. All rights reserved
  • 24. 24 Copyright © i-nexus. All rights reserved THE IMPORTANCE OF DAILY MANAGEMENT TO HOLD THE GAINS…
  • 25. 25 Copyright © i-nexus. All rights reserved TRANSITION FROM “TRANSFORM THE BUSINESS” TO “RUN AND IMPROVE THE BUSINESS”
  • 26. 26 Copyright © i-nexus. All rights reserved THE KEY IS CHANGING THE WAY MANAGERS REVIEW PERFORMANCE… Identify Actions Review Performance Review Actions Do Actions Predominantly Lagging KPIs Inconsistent Inputs Based on Gut Feel Poorly Scoped Actions Ready, Fire, Aim Little Formalisation Last Minute Scramble Focus on % Complete Traditional Management Review Cycle Identify Actions Review Performance Review Actions Do Actions New Management Review Cycle Simple, Consistent and Visual Approach to Review of Operational Performance Systematic Identification of Actions Based on Primary Failure Modes Chose and Consistently Apply the Right Best Practice Methodologies Focus on Whether the Actions have Moved the Dials
  • 27. 27 Copyright © i-nexus. All rights reserved WE HAVE TO SHIFT ATTENTION FROM MANY LAGGING TO VITAL FEW LEADING INDICATORS… From Lagging Measures of Outcome... To Leading Indicators of Process Capability... Outcomes Process Driver Process Driver Process Driver Y=f(x) • P&L and BS Impact • Efficiency • Productivity • Cost/Output • Speed/Cycle Time • Waste • Yield/Defects • Timeliness 0 20 40 60 80 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec • Monthly Averages • Periodic Commentary 0 10 20 30 40 50 60 70 80 90 100 UCL LCL • Control Charts - Variation • Individual/Sample Data • Trend/Special Cause
  • 28. 28 Copyright © i-nexus. All rights reserved NEED A FACILITATED (CAUSE_EFFECT ANALSIS) WORSHOP TO IDENTIFY VITAL FEW VALUE DRIVERS… © i-solutions Global Ltd. 2008 Slide Number 28 Business Outcomes Operational Outcomes Process Outcomes BA C D E Speed Roll Through Yield SLA Adherence Complaints Volume produced Rework Backlogs Cycle Time Process Yield Productivity Profitabilit y Customer Satisfaction/ Retention Leading Indicators Raw/Event Data Process Frequency Lagging Indicators Aggregate Data Periodic Reporting Process
  • 29. 29 Copyright © i-nexus. All rights reserved THE MAAR CHART LINKS IMPROVEMENT TO OPERATIONAL KPIS… SIMPLE TO LEARN AND UNDERSTAND… Dry Lot Release Date IndividualValue 28-O ct-03 20-O ct-03 11-O ct-03 01-O ct-03 21-Sep-03 11-Sep-03 02-Sep-03 24-Aug-03 15-Aug-03 07-Aug-03 01-Aug-03 100 90 80 70 60 50 40 30 _ X=61.35 UCL=92.19 LCL=30.51 1 2 Control Chart of Total Yield Phased Introduction of new insert design and new algorithm/ illusmination levels and camera orientation. Cause Action Owner Due Status A Reduce instances of A PTD Jan B Remove instances of B ABC Feb Measure Analyse Action Review Fault Resolution Cycle Time Analysis of Root Causes Action Planning/ProgressValidation of Improvement A B C D R C J F M A M J J A S O N A 10 21 16 18 0 0 0 0 0 B 18 23 24 16 2 9 0 2 6
  • 30. 30 Copyright © i-nexus. All rights reserved EXTERNAL FACILITATION IS USEFUL TO DEVELOP FAILURE MODE ANALYSIS Dry Lot Release Date IndividualValue 28-O ct-03 20-O ct-03 11-O ct-03 01-O ct-03 21-Sep-03 11-Sep-03 02-Sep-03 24-Aug-03 15-Aug-03 07-Aug-03 01-Aug-03 100 90 80 70 60 50 40 30 _ X=61.35 UCL=92.19 LCL=30.51 1 2 Control Chart of Total Yield Phased Introduction of new insert design and new algorithm/ illusmination levels and camera orientation. Cause Action Owner Due Status A Reduce instances of A PTD Jan B Remove instances of B ABC Feb Measure Analyse Action Review On-time Delivery Analysis of Root Causes Action Planning/ProgressValidation of Improvement A B C D R C J F M A M J J A S O N A 10 21 16 18 0 0 0 0 0 B 18 23 24 16 2 9 0 2 6
  • 31. 31 Copyright © i-nexus. All rights reserved MAAR SHIFTS OWNERSHIP FOR IMPROVEMENT TO THE LINE… Dry Lot Release Date IndividualValue 28-O ct-03 20-O ct-03 11-O ct-03 01-O ct-03 21-Sep-03 11-Sep-03 02-Sep-03 24-Aug-03 15-Aug-03 07-Aug-03 01-Aug-03 100 90 80 70 60 50 40 30 _ X=61.35 UCL=92.19 LCL=30.51 1 2 Control Chart of Total Yield Phased Introduction of new insert design and new algorithm/ illusmination levels and camera orientation. Cause Action Owner Due Status A Reduce instances of A PTD Jan B Remove instances of B ABC Feb Measure Analyse Action Review On-time Delivery Analysis of Root Causes Action Planning/ProgressValidation of Improvement A B C D R C J F M A M J J A S O N A 10 21 16 18 0 0 0 0 0 B 18 23 24 16 2 9 0 2 6 • Focus on Moving the Dial Not Just % Complete on Action • Focus on Elimination of Root Cause Not Just Alleviation of Symptom
  • 32. 32 Copyright © i-nexus. All rights reserved MAAR PROCESS CAN BE FULLY DEPLOYED IN 6 MONTHS… Dry Lot Release Date IndividualValue 28-O ct-03 20-O ct-03 11-O ct-03 01-O ct-03 21-Sep-03 11-Sep-03 02-Sep-03 24-Aug-03 15-Aug-03 07-Aug-03 01-Aug-03 100 90 80 70 60 50 40 30 _ X=61.35 UCL=92.19 LCL=30.51 1 2 Control Chart of Total Yield Phased Introduction of new insert design and new algorithm/ illusmination levels and camera orientation. Mode Action Lead Due Status A DMAIC Project to Reduce A PTD Sep B Just Do It Action to Impact B ABC Jun Measure Analyse Action Review Transaction Fulfilment Cycle Time Analysis of Failure Modes Action Planning/ProgressValidation of Improvement A B C D Mode J F M A M J A 10 21 16 18 12 15 B 18 23 24 16 12 2 Month 1 • Clarify Ownership • Clarify Operational Definitions/Targets • Establish Y Measure Data Collection Process • Train MAAR Owners Month 2/3 • Identify and Codify Potential Failure Modes • Extend Data Collection System • Analyse Failure Modes & Identify Process Drivers Month 4/5 • Scope and Prioritise Actions/Estimate Impact • Coach MAAR/Action Owners • Execute Actions Month 6 • Review Effectiveness of Actions • Assess if Sufficient Actions Underway to Close Gaps • Review Data Collection/ Operational Definition
  • 33. PART IV – BUILDING YOUR BUSINESS SYSTEM 33 Copyright © i-nexus. All rights reserved
  • 34. 34 Copyright © i-nexus. All rights reserved THE TRADITIONAL APPROACH TO STRATEGY EXECUTION…. •Grow Sales of New Product •Customer Focus •Invest in China •Improve employee satisfaction The Off-site Strategy Day(s) Unclear Accountabilities Poorly Defined Goals .ppt deck The Ivory Tower Exercise Funding Constraints Give me your numbers... I need to include some contingency... Way too much! Cut by 25%! If I don’t include it I’ll lose it... The Budget Dance It’s close enough for Military work...            Divisional President Functional Heads Departmental Heads Middle Managers Employees Project Project Project The Ad Hoc Cascade
  • 35. 35 Copyright © i-nexus. All rights reserved THE STRATEGY EXECUTION MATURITY MODEL… Level 1 Traditional Largely financially driven using traditional (and often fragmented) approaches to defining strategy, budgeting, target setting, executing and following-up actions. Level 2 Disciplined A more structured approach to strategic planning and follow-up built on a foundation of strong project execution and improvement disciplines Basic Execution Disciplines & Performance Management Framework Level 3 Aligned Increasing focus on top-down/bottom-up alignment typically via a more systematic and collaborative goal cascade process and/or by establishing a cross-functional enterprise program office Increased Focus on Alignment & Making Hard Choices Creation of a “feedback loop” that enables earlier course correction and continual “testing” of strategic assumptions plus internalisation of “execution” culture Level 4 Integrated Closure of the “Loop” & Increasing Reflection
  • 36. 36 Copyright © i-nexus. All rights reserved WHERE ARE THE MAJORITY OF GLOBAL 5000 ORGANISATIONS? Level 1 Traditional Level 2 Disciplined Basic Execution Disciplines & Performance Management Framework Level 3 Aligned Increased Focus on Alignment & Making Hard Choices Level 4 Integrated Closure of the “Loop” & Increasing Reflection 15 154 31 5 http://www.surveymonkey.com/s/Execution_Maturity_Assessment 7.3% 75% 15.1% 2.4%
  • 37. 37 Copyright © i-nexus. All rights reserved THE “GO TO” RESOURCE FOR STRATEX BEST PRACTICE… www.i-nexus.com/stratex-hub
  • 38. 38 Copyright © i-nexus. All rights reserved PREPARE – CREATE THE CASE TO ACT AND CLARIFY WHAT MATTERS… • Capture existing vision/mission/goals • Build inventory of existing strategic/operational indicators • Build inventory of existing strategic/operational initiatives • Complete an ‘Execution Maturity Assessment’ • Run ‘Execution Readiness’ (SBU level) workshop: • Develop shared understanding of current execution system strengths/weaknesses • Articulate 2-4 Breakthrough Goals Prepare Assess existing execution capability and establish Breakthrough Goals Align Focus management attention on what matters Cascade Ensure plan is comprehensive and executable Execute Relentlessly drive execution and take action where needed to stay on track Key Output – Execution Capability Assessment 0 1 2 3 4 5 Clarity of Business Goals Alignment of Personal Goals Accountability for Delivery Alignment of Action Plans Robustness of Project Management Effectiveness of Portfolio Review Accuracy of Impact Forecasting Effectiveness of Execution Review
  • 39. 39 Copyright © i-nexus. All rights reserved ALIGN – FOCUS MANAGEMENT ATTENTION ON WHAT MATTERS MOST… Prepare Assess existing execution capability and establish Breakthrough Goals Align Focus management attention on what matters Cascade Ensure plan is comprehensive and executable Execute Relentlessly drive execution and take action where needed to stay on track • Translate Breakthrough Objectives into Improvement Priorities and clarify functional Ownership (SBU X- Matrix) • Align existing indicators (where possible) as Hoshin Targets or Operational KPIs • Identify additional indicators (if required) to ensure all Improvement Priorities tracked • Align existing “in-flight” initiatives (where possible) to Improvement Priorities and estimate projected impact • Baseline KPIs and run SBU level alignment and target setting workshop Key Output – Strategic Grid Alignment Assessment
  • 40. 40 Copyright © i-nexus. All rights reserved CACADE – ENSURE PLAN IS DEPLOYED AND REALISTIC… Prepare Assess existing execution capability and establish Breakthrough Goals Align Focus management attention on what matters Cascade Ensure plan is comprehensive and executable Execute Relentlessly drive execution and take action where needed to stay on track • Cascade Improvement Priorities that are not addressed by cross-functional initiatives (Develop individual functional X-Matrices*) • Align existing indicators (where possible) or scope new indicators (where necessary) • Align existing initiatives (where possible) and estimate projected impact • Baseline Hoshin Indicators and run functional alignment and target setting workshops. • Run catch-ball alignment workshop (SBU Level) to validate/adjust targets/plan. Key Output – Functional X Matrices
  • 41. 41 Copyright © i-nexus. All rights reserved EXECUTE – RELENTLESSLY DRIVE EXECUTION AND COURSE CORRECT WHERE NEEDED… Prepare Assess existing execution capability and establish Breakthrough Goals Align Focus management attention on what matters Cascade Ensure plan is comprehensive and executable Execute Relentlessly drive execution and take action where needed to stay on track • Resource and implement Action Plans. • Implement on-going data collection for Hoshin indicators and Action Plan progress. • Set-up and deploy a Monthly Reporting and Execution Review Cycle. • Update current and forecast Bowling Charts based on Project Impact • Run monthly ‘Execution Reviews’ at functional and SBU Level focused on Operational Scorecard/MAAR Charts • Instigate countermeasures to maintain performance Key Output – Actual and Forecast Bowling Chart
  • 42. 42 Copyright © i-nexus. All rights reserved FINAL QUESTIONS/THOUGHTS? “It is not the strongest of the species that survives, nor the most intelligent, but the one most responsive to change.” Charles Darwin “There is great power in knowing where you are going and passion in knowing how as an individual you fit in!” Anonymous
  • 43. 43 Copyright © i-nexus. All rights reserved I-NEXUS SOFTWARE BRINGS IT ALL TOGETHER i-nexus STRATEGY EXECUTION SOFTWARE Strategic Planning Strategy Deployment Performance Review Portfolio Prioritisation Program Governance Project Execution Daily Management Operational Review Benefit Tracking          www.i-nexus.com One Integrated Cloud Solution to Manage…
  • 44. Achieve more. Faster. With less effort. i-nexus suite, George House, Herald Avenue, Coventry Business Park, Coventry, West Midlands, CV5 6UB, UK UK: +44 (0)845 607 0061 US: +1 617 701 7343 US (toll free): +1 855-615-1589 info@i-nexus.com www.i-nexus.com