Up from the Ooze:
The Evolution of the
                   21St Century
   Transportation Ecosystem
Mankind and the means by which it moves
                                                         Planes
from place to place will continue to evolve              /Rockets




                                         Cars
Eras of
Mobility                        Rail



                        Boats
                                                What is next?
                                                •Autonomous Vehicles
      Human / Animals                           •Sub-orbital
But cars are not going away
However, we will never use them the same way again.

      The Current Paradigm                The New Paradigm
•   Independent Drivers           •   Networked Drivers
•    Independent Vehicles         •   Networked Vehicles
•   Proprietary OEM Systems       •   Open System Architectures
•   Total Driver Control          •   Autonomous vehicles
•   Anarchical system             •   Networked and Centralized
    management (“Everybody            system management
    just be careful out there”)   •   In-vehicle services limited
•   Limited in-vehicle services       only by bandwidth
A New Paradigm Requires a New Ecosystem
                                      Drivers


                    Infrastructure
                                                    OEMs
                      Providers




     Operating                The data generated                In-vehicle
      Systems                                                    Devices
                                by vehicles and
                               drivers will be the
                                  most crucial
    Auto Insurers             component of this                 Network
                                                                Providers

                                    system

                      Financial
                       Services                   Aggregators
                      Providers

                                     Developers
We are entering an accelerated period of change in how
 we travel. The “Cambrian Explosion” of the transportation
 ecosystem is at hand.


                                                                       2025




                                                                2020




                                                  2015

2004 – 07            2010 - 2012   S-Curve Analysis of Software-Mediated Mobility:
                                   ‘From Driver to Captain’
The open system architectures supporting the new transportation
       ecosystem will need programmers and developers

                                              Usage-
                                              based
                                            Insurance     Parking
                                Speed                    Location
                               Warning                     and
                                                         Payment



                 In-vehicle
                                                                     Collision
                   Media
                                                                     Warning
                 Streaming

                                           Transport
                                              Data
                                                                       Road
                   Curve                                             Condition
                                                                      Notices




                                                          Traffic
                              Navigation                 Condition
                                                          Notices
                                             Routing
                                            Assistance
This session will examine:
• What the new transport ecosystem will look
  like
• The role of software and design in supporting
  the new ecosystem
• How open systems will impact the
  development of in-vehicle services
Dual Session

The Futurist               The Researcher
Garry Golden              Richard T. Baker
President                 Research Scientist
Forward Elements, Inc.    Texas Transportation Institute
New York, New York        Austin, Texas

Sx sw int transport ecosystem

  • 1.
    Up from theOoze: The Evolution of the 21St Century Transportation Ecosystem
  • 2.
    Mankind and themeans by which it moves Planes from place to place will continue to evolve /Rockets Cars Eras of Mobility Rail Boats What is next? •Autonomous Vehicles Human / Animals •Sub-orbital
  • 3.
    But cars arenot going away However, we will never use them the same way again. The Current Paradigm The New Paradigm • Independent Drivers • Networked Drivers • Independent Vehicles • Networked Vehicles • Proprietary OEM Systems • Open System Architectures • Total Driver Control • Autonomous vehicles • Anarchical system • Networked and Centralized management (“Everybody system management just be careful out there”) • In-vehicle services limited • Limited in-vehicle services only by bandwidth
  • 4.
    A New ParadigmRequires a New Ecosystem Drivers Infrastructure OEMs Providers Operating The data generated In-vehicle Systems Devices by vehicles and drivers will be the most crucial Auto Insurers component of this Network Providers system Financial Services Aggregators Providers Developers
  • 5.
    We are enteringan accelerated period of change in how we travel. The “Cambrian Explosion” of the transportation ecosystem is at hand. 2025 2020 2015 2004 – 07 2010 - 2012 S-Curve Analysis of Software-Mediated Mobility: ‘From Driver to Captain’
  • 6.
    The open systemarchitectures supporting the new transportation ecosystem will need programmers and developers Usage- based Insurance Parking Speed Location Warning and Payment In-vehicle Collision Media Warning Streaming Transport Data Road Curve Condition Notices Traffic Navigation Condition Notices Routing Assistance
  • 7.
    This session willexamine: • What the new transport ecosystem will look like • The role of software and design in supporting the new ecosystem • How open systems will impact the development of in-vehicle services
  • 8.
    Dual Session The Futurist The Researcher Garry Golden Richard T. Baker President Research Scientist Forward Elements, Inc. Texas Transportation Institute New York, New York Austin, Texas