SWITCHGEAR(220 KV)
SUBSTATION
DHANDARI KALAN-1
BY- GURSIMRAN SINGH( EEE )
ROLL NO.- 1914787
OVERVIEW
 CABLE
 POWER TRANSFORMER
 LIGHTENING ARRESTER
 CIRCUIT BREAKER
 ISOLATOR
 CAPACITOR BANK
 EARTHING
 WAVE TRAP
CABLES
POWER
TRANSFORMER
Principle of operation:
Mutual Inductance
Losses in Transformer:
• Copper Loss
• Core loss
Hysteresis loss
Eddy current loss
POWER TRANSFORMER
220/66KV
DHANDARI KALAN-1
SPECIFICATION OF THE POWER
TRANSFORMER
Manufactured by ABB
Voltage Ratio- 220/66 KV
Class OF/AF Transformer
Rating- 100 MVA
LIGHTENING ARRESTOR ( THYRITE
TYPE)
Thyrite type Lightening
arrester consist of:
Series spark gap
Non- linear resistor
disc in series
(These discs are of
15cm diameter and19
mm thickness)
LIGHTENING ARRESTER INSTALLED AT EACH
PHASE AT 220 KV SUB STATION, DHANDARI
KALAN-1
CIRCUIT BREAKER
Vacuum circuit breaker
Are quenching medium- vacuum
voltage range- 3.3- 33 KV
breaking capacity - 250-2000 MVA
SF6 Circuit Breaker
ARC quenching medium – SF6 gas at 5kg pressure
Voltage range- 3.3- 765 KV
Breaking capacity- 1000- 50,000 MVA
ISOLATOR
Isolators are employed only for isolating
circuit when the current has already
been interrupted.
They operate under no load conditions
and are employed on both the side of
the circuit breaker.
Isolator consist of insulator posts
mounted on a support.
 There are fixed and moving contacts
each made of aluminium.
CAPACITOR BANK
EARTHING AT 220 KV SUB
STATION,
DHANDARI KALAN-1
The earthing system consist of an array of conductors
buried horizontally at the depth of 0.5m Such earthing is
called an earthing grid or earth mat.
The main steps in the design of the earthing grid are as
under:
1.Selection of material and size of the conductor of the
grid.
2. Arrangement of the grid conductors.CC
3. Connections to the grid.
WAVE TRAP
It is the effort to utilize the same transmission line
between two substations for the purpose of
communication.
It does the trapping of high frequency communication
signals.
Itv is relevant in PLCC system for communication
among various sub stations.
The wave trap offers high impedance to the high
frequeny communication signals.
WAVE TRAP INSTALLED AT 220KV SUB
STATION
DHANDARI KALAN-1
THANK YOU

More Related Content

Similar to Switchgear(220 kv) Substation.pptx

400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR
sahid raja khan
 
industrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCLindustrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCL
surendra rawat
 
33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE 33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE
Lalit Kumar
 
Design of substation
Design of substationDesign of substation
Design of substation
SayanSarkar55
 
33kv substation
33kv substation33kv substation
33kv substation
Abhishek Dawachya
 
HIGH VOLTAGE PANEL SWITCHGEAR PRESENTATION
HIGH VOLTAGE PANEL SWITCHGEAR PRESENTATIONHIGH VOLTAGE PANEL SWITCHGEAR PRESENTATION
HIGH VOLTAGE PANEL SWITCHGEAR PRESENTATION
SenthilVenkat2
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
Himansu Pradhan
 
WBSETCL Subhash Gram 220KV Substation Training Report
WBSETCL Subhash Gram 220KV Substation Training ReportWBSETCL Subhash Gram 220KV Substation Training Report
WBSETCL Subhash Gram 220KV Substation Training Report
Arijit Basu
 
A vocational summer training at Jindal Steel and Power Limited
A vocational summer training at Jindal Steel and Power LimitedA vocational summer training at Jindal Steel and Power Limited
A vocational summer training at Jindal Steel and Power Limited
Kishan Gabel
 
220kv-switch-yard-ppt.pptx
220kv-switch-yard-ppt.pptx220kv-switch-yard-ppt.pptx
220kv-switch-yard-ppt.pptx
ssuser1b3e431
 
Nexans high-voltage.pdf
Nexans high-voltage.pdfNexans high-voltage.pdf
Nexans high-voltage.pdf
prse
 
REPORT ON 33/11KV SUBSTATION
REPORT ON 33/11KV SUBSTATION REPORT ON 33/11KV SUBSTATION
REPORT ON 33/11KV SUBSTATION
Ravi Phadtare
 
Internship doc 33 11 kv substation
Internship doc 33 11 kv substation  Internship doc 33 11 kv substation
Internship doc 33 11 kv substation
Madeen Kumar
 
132 KV Grid Station Intern ship training report
132 KV Grid Station Intern ship training report132 KV Grid Station Intern ship training report
132 KV Grid Station Intern ship training report
Muntazir Mehdi
 
Busduct___Busbar.pptx
Busduct___Busbar.pptxBusduct___Busbar.pptx
Busduct___Busbar.pptx
pramod719257
 
Uttar pradesh power corporation limited
Uttar pradesh power corporation limitedUttar pradesh power corporation limited
Uttar pradesh power corporation limited
VSRAGHU
 
220kvgss-180808104033 (1).pdf
220kvgss-180808104033 (1).pdf220kvgss-180808104033 (1).pdf
220kvgss-180808104033 (1).pdf
SinghJi18
 
220 kv gss
220 kv gss220 kv gss
220 kv gss
ROSHAN LAL KUMAWAT
 
132 KV GSS CHAMBAL JAIPUR
132 KV GSS CHAMBAL JAIPUR132 KV GSS CHAMBAL JAIPUR
132 KV GSS CHAMBAL JAIPUR
Vaibhav Bhargava
 

Similar to Switchgear(220 kv) Substation.pptx (20)

400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR
 
industrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCLindustrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCL
 
33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE 33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE
 
Chandu
ChanduChandu
Chandu
 
Design of substation
Design of substationDesign of substation
Design of substation
 
33kv substation
33kv substation33kv substation
33kv substation
 
HIGH VOLTAGE PANEL SWITCHGEAR PRESENTATION
HIGH VOLTAGE PANEL SWITCHGEAR PRESENTATIONHIGH VOLTAGE PANEL SWITCHGEAR PRESENTATION
HIGH VOLTAGE PANEL SWITCHGEAR PRESENTATION
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
 
WBSETCL Subhash Gram 220KV Substation Training Report
WBSETCL Subhash Gram 220KV Substation Training ReportWBSETCL Subhash Gram 220KV Substation Training Report
WBSETCL Subhash Gram 220KV Substation Training Report
 
A vocational summer training at Jindal Steel and Power Limited
A vocational summer training at Jindal Steel and Power LimitedA vocational summer training at Jindal Steel and Power Limited
A vocational summer training at Jindal Steel and Power Limited
 
220kv-switch-yard-ppt.pptx
220kv-switch-yard-ppt.pptx220kv-switch-yard-ppt.pptx
220kv-switch-yard-ppt.pptx
 
Nexans high-voltage.pdf
Nexans high-voltage.pdfNexans high-voltage.pdf
Nexans high-voltage.pdf
 
REPORT ON 33/11KV SUBSTATION
REPORT ON 33/11KV SUBSTATION REPORT ON 33/11KV SUBSTATION
REPORT ON 33/11KV SUBSTATION
 
Internship doc 33 11 kv substation
Internship doc 33 11 kv substation  Internship doc 33 11 kv substation
Internship doc 33 11 kv substation
 
132 KV Grid Station Intern ship training report
132 KV Grid Station Intern ship training report132 KV Grid Station Intern ship training report
132 KV Grid Station Intern ship training report
 
Busduct___Busbar.pptx
Busduct___Busbar.pptxBusduct___Busbar.pptx
Busduct___Busbar.pptx
 
Uttar pradesh power corporation limited
Uttar pradesh power corporation limitedUttar pradesh power corporation limited
Uttar pradesh power corporation limited
 
220kvgss-180808104033 (1).pdf
220kvgss-180808104033 (1).pdf220kvgss-180808104033 (1).pdf
220kvgss-180808104033 (1).pdf
 
220 kv gss
220 kv gss220 kv gss
220 kv gss
 
132 KV GSS CHAMBAL JAIPUR
132 KV GSS CHAMBAL JAIPUR132 KV GSS CHAMBAL JAIPUR
132 KV GSS CHAMBAL JAIPUR
 

Recently uploaded

Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 

Recently uploaded (20)

Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 

Switchgear(220 kv) Substation.pptx

  • 1. SWITCHGEAR(220 KV) SUBSTATION DHANDARI KALAN-1 BY- GURSIMRAN SINGH( EEE ) ROLL NO.- 1914787
  • 2. OVERVIEW  CABLE  POWER TRANSFORMER  LIGHTENING ARRESTER  CIRCUIT BREAKER  ISOLATOR  CAPACITOR BANK  EARTHING  WAVE TRAP
  • 4. POWER TRANSFORMER Principle of operation: Mutual Inductance Losses in Transformer: • Copper Loss • Core loss Hysteresis loss Eddy current loss
  • 6. SPECIFICATION OF THE POWER TRANSFORMER Manufactured by ABB Voltage Ratio- 220/66 KV Class OF/AF Transformer Rating- 100 MVA
  • 7. LIGHTENING ARRESTOR ( THYRITE TYPE) Thyrite type Lightening arrester consist of: Series spark gap Non- linear resistor disc in series (These discs are of 15cm diameter and19 mm thickness)
  • 8. LIGHTENING ARRESTER INSTALLED AT EACH PHASE AT 220 KV SUB STATION, DHANDARI KALAN-1
  • 9. CIRCUIT BREAKER Vacuum circuit breaker Are quenching medium- vacuum voltage range- 3.3- 33 KV breaking capacity - 250-2000 MVA SF6 Circuit Breaker ARC quenching medium – SF6 gas at 5kg pressure Voltage range- 3.3- 765 KV Breaking capacity- 1000- 50,000 MVA
  • 10. ISOLATOR Isolators are employed only for isolating circuit when the current has already been interrupted. They operate under no load conditions and are employed on both the side of the circuit breaker. Isolator consist of insulator posts mounted on a support.  There are fixed and moving contacts each made of aluminium.
  • 12. EARTHING AT 220 KV SUB STATION, DHANDARI KALAN-1 The earthing system consist of an array of conductors buried horizontally at the depth of 0.5m Such earthing is called an earthing grid or earth mat. The main steps in the design of the earthing grid are as under: 1.Selection of material and size of the conductor of the grid. 2. Arrangement of the grid conductors.CC 3. Connections to the grid.
  • 13. WAVE TRAP It is the effort to utilize the same transmission line between two substations for the purpose of communication. It does the trapping of high frequency communication signals. Itv is relevant in PLCC system for communication among various sub stations. The wave trap offers high impedance to the high frequeny communication signals.
  • 14. WAVE TRAP INSTALLED AT 220KV SUB STATION DHANDARI KALAN-1