DHL Operations Management 2014 
Introduction to Company 
 DHL stands for Dalsey, 'Hillblom' and 'Lynn' 
 Founded in 1969 
 Head quarters Germany, Bonn 
 Logistics business 
 In more than 220 countries 
 www.dhl.com 
 World’s largest express company 
 Up to 500,000 employees 
 CEO Frank Appel 
History 
1969 On 25 September, Dalsey, Hillblom and Lynn incorporated DHL. 
Door-to-door express delivery service 
Documents were transported only between San Francisco, and California 
They simultaneously invented the international air express industry. 
MISSION & VISION 
We want to simplify the lives of our customers and We make our customers, employees and 
investors more successful and this will be continued 
We make a positive contribution to the world and we always demonstrate respect when 
achieving our results 
SZABIST Larkana Campus Page 1
DHL Operations Management 2014 
SERVICES OFFERED BY DHL 
Services offered at DHL are categorized as 
 DHL Express 
 DHL Solutions 
 DHL Global Forwarding 
DHL Express 
DHL Express service encompasses domestic, international, logistics, and prepaid services . The 
advantage of prepaid services is that you can enjoy all-inclusive flat-rate prepaid pricing, free 
pickup and a guaranteed delivery by 12 pm of the next business day. And DHL Express is the 
leading global provider of international road-, air- and rail-based courier and express services for 
business and private customers 
DHL Global Forwarding 
It provides a wide range of freight solutions irrespective of weight or dimension. This division 
includes international air and ocean freight as well as European overland transportation services. 
And It offers customized solutions for major logistics projects and comprehensive customs 
services. 
DHL solutions 
The services offered under DHL solutions include supply chain management, warehousing, 
value added services like quality control, reverse and return logistics, outbound fulfillment, 
distribution, and outsourcing. The brand indeed offers a wide range of services to cater to needs 
and requirements. 
DHL Global Mail 
A fast cost-effective way to send mail nationwide – with DHL GLOBAL MAIL BUSINESS, 
there’s no need to run to the post office. On an international level, DHL Global Mail provides 
SZABIST Larkana Campus Page 2
DHL Operations Management 2014 
mail and communication services with direct connections to more than 200 countries around the 
world as well as offering integrated solutions for corporate communications. 
Technology Support 
Wireless sensors and internet technologies 
Active & Passive cooling packaging options 
Exchanging real time information 
Radio Frequency Identification Devices (RFID) 
Automated Identification and traceability from origin to final destination 
Round the clock, real-time visibility into shipments and inventory in motion 
Temperature logging as it moves thru the Supply chain using active RFID 
Temperature Control Range 
Controlled Ambiant: 15 –25 dégrées Drug Transportation –API, Formulations, IPs etc 
Chilled Range: 2 –8 degrees Drug Transpiration –NCEs, IPs, Pharma products 
Frozen Temperature: -80 to -20 degrees (dry ice) Biological samples 
Cryo Temperature (Liquid Nitrogen): -180 degrees Cord Blood Transportation, Storage etc. 
WHAT IS DHL SUPPLY CHAIN? 
DHL Supply Chain offers customized logistics solutions for your entire supply chain. Complete 
perspective from manufacturer/supplier to retailer to consumer enables you to achieve 
operational excellence at every stage. 
Services range from consulting and design, to management and execution. 
SZABIST Larkana Campus Page 3
DHL Operations Management 2014 
DHL Supply Chain has two main businesses: its contract logistics business includes ground-based 
supply chain management services such as warehousing and distribution assembly, 
and just-in-time services. Its freight management business includes airfreight and ocean freight 
forwarding customs brokerage and multimodal services. 
Supply Chain Analysis & Design 
Many customers come to DHL with a business problem, and not necessarily one in their supply 
chain. Through supply chain consulting and network design studies, we help you with the big 
picture; what's working and what can be optimized for improved operational efficiency and 
better customer service. 
Lead Logistics Provider 
At DHL, being Lead Logistics Provider (LLP) means instigating and managing change across 
your entire supply chain, to meet changing business and customer demands. We do this by 
bringing continuous improvement and cost reduction, introducing lean logistics processes and 
optimizing logistics networks. 
DHL Enviro solutions provide a range of solutions, including: 
Waste Management: Global solutions to collect and recycle your waste streams, aiming to 
convert cost into revenue streams and support your ‘zero waste’ targets 
Extended Producer Responsibility: Data collection, physical recycling, and provision of 
evidence to meet complex legislative requirements, allowing you to focus on your core business 
Lead Environmental Partner: Our consultancy and support programmers extend across your 
entire supply chain, from employee engagement to comprehensive network design, to help you 
meet your environmental objectives. 
SZABIST Larkana Campus Page 4
DHL Operations Management 2014 
Procurement Services 
DHL's procurement specialists can deliver substantial cost savings on a wide range of non-core 
products; everything from promotional materials and consumables, to work wear, operational 
spare parts and other goods not-for-resale. By leveraging DHL's global reach and supply chain 
expertise, we can effectively manage the risks associated with global sourcing. 
Raw Materials Warehousing 
Whatever your industry sector, DHL provides raw materials warehousing services to streamline 
the flow of raw materials into your production facility. By understanding your production 
processes and anticipating your business and logistics needs, you can rely on the knowledge and 
expertise of DHL’s people to work with you to provide robust solutions that will drive value for 
your business. 
DHL's raw materials warehousing services complement our materials 
transport solutions, and include: 
 Unloading 
 Sorting, combining and consolidation 
 Storage 
 Order-processing 
 Inventory management and optimization 
 Pick, pack and dispatch 
 In-plant logistics - replenishment (just-in-time and kanban) 
 Customs brokerage and declarations 
 Quality control/QC testing 
 Vendor hubs 
SZABIST Larkana Campus Page 5
DHL Operations Management 2014 
Inbound to Manufacturing (I2M) 
DHL ensures the right components are delivered to the right manufacturing point at the right 
time. Our solutions provide complete end-to-end logistics management of inventories, facilities, 
and labor associated with the inbound flow of materials. 
Our inbound to manufacturing services include: 
 Network, transportation and facility design 
 Supplier management 
 Transport and freight management 
 Customs brokerage 
 Supplier parks 
 Inventory optimization 
 Vendor managed inventory 
 In-plant logistics, including just-in-time and kanban replenishment of raw 
materials/components to manufacturing. 
Finished Goods Warehousing 
Designing and operating a customized warehouse that delivers bottom-line benefits is at the heart 
of all our solutions. By outsourcing your fulfillment to DHL, you can make your people more 
productive, your organization more efficient, and your business more competitive. Our focus on 
operational excellence means you get consistent quality across your fulfillment operations. 
Our finished goods warehouse services include: 
 Warehouse/distribution centre design and consultancy 
 Shared-user and dedicated operations 
 Ambient, chilled, frozen and composite operations 
 Customs/bonded warehousing 
 Rail-connected warehousing 
SZABIST Larkana Campus Page 6
DHL Operations Management 2014 
 Automation and auto-sortation systems 
 Cross-docking 
 Provision of IT solutions (e.g. WMS and interfacing) 
 Inventory management and optimization 
 Receipt and put-away 
 Bar-coding, RFID tagging and labeling 
 Storage 
 Picking (unit, case and pallet), packing and dispatch 
 Value-added services (e.g. labeling and packaging services) 
 Returns processing 
 Recycling of packaging, End-Of-Life (EOL) products and waste materials 
 Re-usable transit equipment management 
Assembly and Packaging Services (Value Added Services) 
DHL finished goods warehousing solutions are not just about holding stock. There are a wide 
range of additional services that we offer as part of an overall solution that can improve the 
performance of your supply chain. 
From sub-assembly, packaging services, customization, postponement, kitting, sequencing to 
pre-retail activities across all industry sectors, we help you reduce costs, reduce inventories, and 
better match supply with demand. 
Reverse Logistics 
The key to a successful supply chain is not only planning how to distribute your product, but 
how to bring back both customer returns and obsolete products. Managing returns effectively lets 
you recapture value, reduce write-offs and keep your customers happy. 
Services Include: 
 De-installation of finished goods at the customer's site 
 Returns management, receiving, sorting, verifying and managing returned products 
SZABIST Larkana Campus Page 7
DHL Operations Management 2014 
 Express delivery, exchange of "dead on arrival" products. 
Freight transportation 
A logistics partner big enough to deliver freight of any kind, to any place via air, ocean, road or 
rail, but capable of giving its customers the personal attention they need. 
Ocean freight 
• DHL Global Forwarding’s worldwide network enables door-to-door movement, visibility 
and control of all international ocean freight. 
• DHL Global Forwarding is not only a leading Ocean Freight forwarder but through 
Dammar Lines, our own NVOCC (Non Vessel Operating Common Carrier) we can act as 
your virtual carrier for both LCL and FCL. 
• DHL can consolidate your LCL (Less than Container Load) shipments or arrange for 
your FCL (Full Container Load) needs. 
• DHL’s tracking & tracing system provides full transparency along the entire supply chain 
• DHL Global Forwarding’s worldwide team uses the latest freight forwarding shipping 
tools, which you can rely on to manage your shipments’ specific needs. 
Shipments 
 Full container load 
 Less than container load 
RAIL AND ROAD FREIGHT 
• DHL Freight is your flexible partner for overland transport across Europe, parts of the 
Commonwealth of Independent States (CIS), North Africa and the Middle East. 
• DHL ensure reliable and efficient domestic and international transportation for customers 
of all sizes. 
SZABIST Larkana Campus Page 8
DHL Operations Management 2014 
• Our comprehensive overland transportation service comprises more than 170 road 
terminals in more than 40 countries, over 3,500 weekly international departures, door-to-door 
tariffs and full tracking capability, all supported by customs experts in more than 
275 offices. 
Cold Chain Road Freight 
• DHL COLDCHAIN is a dedicated, fully monitored and temperature controlled service 
for volumes of less than truckload (LTL). 
• It covers the whole of Europe and is designed to meet everything the Life Sciences and 
Health industry requires, in terms of temperature control, security and handling. 
• DHL COLDCHAIN services cover the range of refrigerated (2 – 8° Celsius) as well as 
controlled ambient products (15 – 25° Celsius). 
• Throughout the journey, the temperature of the pharmaceuticals is continuously measured 
and transmitted via GPS. With our state of-the-art IT tools, 
• The customer is pro-actively informed of the status and temperature of all shipments 
during the entire journey. 
• All warehouses and cross docking stations are GDP compliant and specifically equipped 
to guarantee continuous temperature control. 
WAREHOUSE AND DISTRIBUTION 
By understanding your issues and anticipating your business and logistics needs, DHL experts 
provide robust solutions that will drive value for your business. 
Whatever industry sector you operate in, DHL provides dedicated and shared warehousing and 
distribution operations to ensure that you can deliver your service promise to your customers 
worldwide. 
SZABIST Larkana Campus Page 9
DHL Operations Management 2014 
DEDICATED OPREATIONS 
the scale, location or complexity of your business requires a dedicated solution, DHL has the 
people and expertise you need. Starting with a thorough analysis of your specific business 
requirements, our teams design, implement, operate and improve dedicated warehousing and 
distribution operations that deliver value to your business. 
Our services include: 
 Solutions design and analysis - to help you improve your bottom line and stay flexible in 
the face of changing business needs 
 Campus locations offering labor balancing and distribution synergies across sites 
 A range of dedicated and multi-customer transportation solutions to meet your service 
needs 
 Best practice operational processes, controls and management information 
 DePICT project management methodology to reduce risk, cost and time on start ups 
 A strong portfolio of warehouse management systems and interface software to drive 
productivity and enable faster and more reliable startups 
 DMAIC process improvement methodology to drive continuous improvement and adapt 
to your changing needs. 
SHARED OPERATIONS 
When you need all the benefits of a bespoke solution, the flexibility and cost advantages of 
sharing space, labor, equipment and transportation, and consistently excellent operations, DHL’s 
shared warehousing and distribution solutions will meet your requirements. 
TRANSPORTATION MAMAGEMENT 
Moving products from manufacturing plants to warehouses, between international, national, and 
regional facilities and to distributors, can represent more than half of your total logistics costs. 
Add international sourcing and final distribution to store or end customer, and those costs can 
SZABIST Larkana Campus Page 10
DHL Operations Management 2014 
rocket even higher. Transportation management solutions give you the resources and visibility 
you need, at a cost you can manage. 
Whether we're managing your carriers, creating a dedicated fleet or a mix of the two, we deliver 
high levels of service, reliability and control over your product movement to your customers, 
WAREHOUSE MANAGEMENT SYSTEM 
At DHL we offer a comprehensive suite of capabilities and work with a range of best-in-class 
software partners. Our state-of-the-art systems monitor and control all critical warehouse 
processes. They also provide support for transport and distribution operations and communicate 
with customs and other authorities. Moreover, unlike many of our competitors, our scale means 
we deploy a large number of these systems in any given year, you benefit therefore from this 
unrivalled experience and expertise. 
Warehouse management systems record all events and activities in the receipt, handling and 
storage of products and orders in the warehouse or distribution center, including the location of 
inventory. 
Customers Benefit from: 
 Access to, and influence over, leading-edge supply chain technology 
 Access to best-in-class applications that are platform and database independent – 
facilitating standardized business processes 
 Rapid start-up and reduced risk in global deployment - including project delivery, service 
management, supplier management, - integration and hosting 
 Scalability and repeatability worldwide 
 Unrivalled expertise in interfacing with your stock control, resource planning and 
business information systems 
 Proven, pre-integration with other supply chain partner systems - including visibility and 
control. 
SZABIST Larkana Campus Page 11
DHL Operations Management 2014 
Our Global Coverage 
DHL is the world’s number one contract logistics provider. We have a major contract logistics 
presence in over 60 countries across all regions of the world. With this footprint we leverage: 
 International expertise across industry sectors 
 A commitment to deliver consistently excellent operations in every geography 
 Common processes for project management and continuous improvement. 
Challenges of DHL 
• High customs costs. 
• Slow market. 
• Liberalization and under-developed distribution channels. 
• fragmented markets, 
• political volatility, 
• growing population with limited income, 
• language and communication issues and 
• Large socio-economic divisions within populations. 
SZABIST Larkana Campus Page 12
DHL Operations Management 2014 
SZABIST Larkana Campus Page 13

Supply chain of dhl

  • 1.
    DHL Operations Management2014 Introduction to Company  DHL stands for Dalsey, 'Hillblom' and 'Lynn'  Founded in 1969  Head quarters Germany, Bonn  Logistics business  In more than 220 countries  www.dhl.com  World’s largest express company  Up to 500,000 employees  CEO Frank Appel History 1969 On 25 September, Dalsey, Hillblom and Lynn incorporated DHL. Door-to-door express delivery service Documents were transported only between San Francisco, and California They simultaneously invented the international air express industry. MISSION & VISION We want to simplify the lives of our customers and We make our customers, employees and investors more successful and this will be continued We make a positive contribution to the world and we always demonstrate respect when achieving our results SZABIST Larkana Campus Page 1
  • 2.
    DHL Operations Management2014 SERVICES OFFERED BY DHL Services offered at DHL are categorized as  DHL Express  DHL Solutions  DHL Global Forwarding DHL Express DHL Express service encompasses domestic, international, logistics, and prepaid services . The advantage of prepaid services is that you can enjoy all-inclusive flat-rate prepaid pricing, free pickup and a guaranteed delivery by 12 pm of the next business day. And DHL Express is the leading global provider of international road-, air- and rail-based courier and express services for business and private customers DHL Global Forwarding It provides a wide range of freight solutions irrespective of weight or dimension. This division includes international air and ocean freight as well as European overland transportation services. And It offers customized solutions for major logistics projects and comprehensive customs services. DHL solutions The services offered under DHL solutions include supply chain management, warehousing, value added services like quality control, reverse and return logistics, outbound fulfillment, distribution, and outsourcing. The brand indeed offers a wide range of services to cater to needs and requirements. DHL Global Mail A fast cost-effective way to send mail nationwide – with DHL GLOBAL MAIL BUSINESS, there’s no need to run to the post office. On an international level, DHL Global Mail provides SZABIST Larkana Campus Page 2
  • 3.
    DHL Operations Management2014 mail and communication services with direct connections to more than 200 countries around the world as well as offering integrated solutions for corporate communications. Technology Support Wireless sensors and internet technologies Active & Passive cooling packaging options Exchanging real time information Radio Frequency Identification Devices (RFID) Automated Identification and traceability from origin to final destination Round the clock, real-time visibility into shipments and inventory in motion Temperature logging as it moves thru the Supply chain using active RFID Temperature Control Range Controlled Ambiant: 15 –25 dégrées Drug Transportation –API, Formulations, IPs etc Chilled Range: 2 –8 degrees Drug Transpiration –NCEs, IPs, Pharma products Frozen Temperature: -80 to -20 degrees (dry ice) Biological samples Cryo Temperature (Liquid Nitrogen): -180 degrees Cord Blood Transportation, Storage etc. WHAT IS DHL SUPPLY CHAIN? DHL Supply Chain offers customized logistics solutions for your entire supply chain. Complete perspective from manufacturer/supplier to retailer to consumer enables you to achieve operational excellence at every stage. Services range from consulting and design, to management and execution. SZABIST Larkana Campus Page 3
  • 4.
    DHL Operations Management2014 DHL Supply Chain has two main businesses: its contract logistics business includes ground-based supply chain management services such as warehousing and distribution assembly, and just-in-time services. Its freight management business includes airfreight and ocean freight forwarding customs brokerage and multimodal services. Supply Chain Analysis & Design Many customers come to DHL with a business problem, and not necessarily one in their supply chain. Through supply chain consulting and network design studies, we help you with the big picture; what's working and what can be optimized for improved operational efficiency and better customer service. Lead Logistics Provider At DHL, being Lead Logistics Provider (LLP) means instigating and managing change across your entire supply chain, to meet changing business and customer demands. We do this by bringing continuous improvement and cost reduction, introducing lean logistics processes and optimizing logistics networks. DHL Enviro solutions provide a range of solutions, including: Waste Management: Global solutions to collect and recycle your waste streams, aiming to convert cost into revenue streams and support your ‘zero waste’ targets Extended Producer Responsibility: Data collection, physical recycling, and provision of evidence to meet complex legislative requirements, allowing you to focus on your core business Lead Environmental Partner: Our consultancy and support programmers extend across your entire supply chain, from employee engagement to comprehensive network design, to help you meet your environmental objectives. SZABIST Larkana Campus Page 4
  • 5.
    DHL Operations Management2014 Procurement Services DHL's procurement specialists can deliver substantial cost savings on a wide range of non-core products; everything from promotional materials and consumables, to work wear, operational spare parts and other goods not-for-resale. By leveraging DHL's global reach and supply chain expertise, we can effectively manage the risks associated with global sourcing. Raw Materials Warehousing Whatever your industry sector, DHL provides raw materials warehousing services to streamline the flow of raw materials into your production facility. By understanding your production processes and anticipating your business and logistics needs, you can rely on the knowledge and expertise of DHL’s people to work with you to provide robust solutions that will drive value for your business. DHL's raw materials warehousing services complement our materials transport solutions, and include:  Unloading  Sorting, combining and consolidation  Storage  Order-processing  Inventory management and optimization  Pick, pack and dispatch  In-plant logistics - replenishment (just-in-time and kanban)  Customs brokerage and declarations  Quality control/QC testing  Vendor hubs SZABIST Larkana Campus Page 5
  • 6.
    DHL Operations Management2014 Inbound to Manufacturing (I2M) DHL ensures the right components are delivered to the right manufacturing point at the right time. Our solutions provide complete end-to-end logistics management of inventories, facilities, and labor associated with the inbound flow of materials. Our inbound to manufacturing services include:  Network, transportation and facility design  Supplier management  Transport and freight management  Customs brokerage  Supplier parks  Inventory optimization  Vendor managed inventory  In-plant logistics, including just-in-time and kanban replenishment of raw materials/components to manufacturing. Finished Goods Warehousing Designing and operating a customized warehouse that delivers bottom-line benefits is at the heart of all our solutions. By outsourcing your fulfillment to DHL, you can make your people more productive, your organization more efficient, and your business more competitive. Our focus on operational excellence means you get consistent quality across your fulfillment operations. Our finished goods warehouse services include:  Warehouse/distribution centre design and consultancy  Shared-user and dedicated operations  Ambient, chilled, frozen and composite operations  Customs/bonded warehousing  Rail-connected warehousing SZABIST Larkana Campus Page 6
  • 7.
    DHL Operations Management2014  Automation and auto-sortation systems  Cross-docking  Provision of IT solutions (e.g. WMS and interfacing)  Inventory management and optimization  Receipt and put-away  Bar-coding, RFID tagging and labeling  Storage  Picking (unit, case and pallet), packing and dispatch  Value-added services (e.g. labeling and packaging services)  Returns processing  Recycling of packaging, End-Of-Life (EOL) products and waste materials  Re-usable transit equipment management Assembly and Packaging Services (Value Added Services) DHL finished goods warehousing solutions are not just about holding stock. There are a wide range of additional services that we offer as part of an overall solution that can improve the performance of your supply chain. From sub-assembly, packaging services, customization, postponement, kitting, sequencing to pre-retail activities across all industry sectors, we help you reduce costs, reduce inventories, and better match supply with demand. Reverse Logistics The key to a successful supply chain is not only planning how to distribute your product, but how to bring back both customer returns and obsolete products. Managing returns effectively lets you recapture value, reduce write-offs and keep your customers happy. Services Include:  De-installation of finished goods at the customer's site  Returns management, receiving, sorting, verifying and managing returned products SZABIST Larkana Campus Page 7
  • 8.
    DHL Operations Management2014  Express delivery, exchange of "dead on arrival" products. Freight transportation A logistics partner big enough to deliver freight of any kind, to any place via air, ocean, road or rail, but capable of giving its customers the personal attention they need. Ocean freight • DHL Global Forwarding’s worldwide network enables door-to-door movement, visibility and control of all international ocean freight. • DHL Global Forwarding is not only a leading Ocean Freight forwarder but through Dammar Lines, our own NVOCC (Non Vessel Operating Common Carrier) we can act as your virtual carrier for both LCL and FCL. • DHL can consolidate your LCL (Less than Container Load) shipments or arrange for your FCL (Full Container Load) needs. • DHL’s tracking & tracing system provides full transparency along the entire supply chain • DHL Global Forwarding’s worldwide team uses the latest freight forwarding shipping tools, which you can rely on to manage your shipments’ specific needs. Shipments  Full container load  Less than container load RAIL AND ROAD FREIGHT • DHL Freight is your flexible partner for overland transport across Europe, parts of the Commonwealth of Independent States (CIS), North Africa and the Middle East. • DHL ensure reliable and efficient domestic and international transportation for customers of all sizes. SZABIST Larkana Campus Page 8
  • 9.
    DHL Operations Management2014 • Our comprehensive overland transportation service comprises more than 170 road terminals in more than 40 countries, over 3,500 weekly international departures, door-to-door tariffs and full tracking capability, all supported by customs experts in more than 275 offices. Cold Chain Road Freight • DHL COLDCHAIN is a dedicated, fully monitored and temperature controlled service for volumes of less than truckload (LTL). • It covers the whole of Europe and is designed to meet everything the Life Sciences and Health industry requires, in terms of temperature control, security and handling. • DHL COLDCHAIN services cover the range of refrigerated (2 – 8° Celsius) as well as controlled ambient products (15 – 25° Celsius). • Throughout the journey, the temperature of the pharmaceuticals is continuously measured and transmitted via GPS. With our state of-the-art IT tools, • The customer is pro-actively informed of the status and temperature of all shipments during the entire journey. • All warehouses and cross docking stations are GDP compliant and specifically equipped to guarantee continuous temperature control. WAREHOUSE AND DISTRIBUTION By understanding your issues and anticipating your business and logistics needs, DHL experts provide robust solutions that will drive value for your business. Whatever industry sector you operate in, DHL provides dedicated and shared warehousing and distribution operations to ensure that you can deliver your service promise to your customers worldwide. SZABIST Larkana Campus Page 9
  • 10.
    DHL Operations Management2014 DEDICATED OPREATIONS the scale, location or complexity of your business requires a dedicated solution, DHL has the people and expertise you need. Starting with a thorough analysis of your specific business requirements, our teams design, implement, operate and improve dedicated warehousing and distribution operations that deliver value to your business. Our services include:  Solutions design and analysis - to help you improve your bottom line and stay flexible in the face of changing business needs  Campus locations offering labor balancing and distribution synergies across sites  A range of dedicated and multi-customer transportation solutions to meet your service needs  Best practice operational processes, controls and management information  DePICT project management methodology to reduce risk, cost and time on start ups  A strong portfolio of warehouse management systems and interface software to drive productivity and enable faster and more reliable startups  DMAIC process improvement methodology to drive continuous improvement and adapt to your changing needs. SHARED OPERATIONS When you need all the benefits of a bespoke solution, the flexibility and cost advantages of sharing space, labor, equipment and transportation, and consistently excellent operations, DHL’s shared warehousing and distribution solutions will meet your requirements. TRANSPORTATION MAMAGEMENT Moving products from manufacturing plants to warehouses, between international, national, and regional facilities and to distributors, can represent more than half of your total logistics costs. Add international sourcing and final distribution to store or end customer, and those costs can SZABIST Larkana Campus Page 10
  • 11.
    DHL Operations Management2014 rocket even higher. Transportation management solutions give you the resources and visibility you need, at a cost you can manage. Whether we're managing your carriers, creating a dedicated fleet or a mix of the two, we deliver high levels of service, reliability and control over your product movement to your customers, WAREHOUSE MANAGEMENT SYSTEM At DHL we offer a comprehensive suite of capabilities and work with a range of best-in-class software partners. Our state-of-the-art systems monitor and control all critical warehouse processes. They also provide support for transport and distribution operations and communicate with customs and other authorities. Moreover, unlike many of our competitors, our scale means we deploy a large number of these systems in any given year, you benefit therefore from this unrivalled experience and expertise. Warehouse management systems record all events and activities in the receipt, handling and storage of products and orders in the warehouse or distribution center, including the location of inventory. Customers Benefit from:  Access to, and influence over, leading-edge supply chain technology  Access to best-in-class applications that are platform and database independent – facilitating standardized business processes  Rapid start-up and reduced risk in global deployment - including project delivery, service management, supplier management, - integration and hosting  Scalability and repeatability worldwide  Unrivalled expertise in interfacing with your stock control, resource planning and business information systems  Proven, pre-integration with other supply chain partner systems - including visibility and control. SZABIST Larkana Campus Page 11
  • 12.
    DHL Operations Management2014 Our Global Coverage DHL is the world’s number one contract logistics provider. We have a major contract logistics presence in over 60 countries across all regions of the world. With this footprint we leverage:  International expertise across industry sectors  A commitment to deliver consistently excellent operations in every geography  Common processes for project management and continuous improvement. Challenges of DHL • High customs costs. • Slow market. • Liberalization and under-developed distribution channels. • fragmented markets, • political volatility, • growing population with limited income, • language and communication issues and • Large socio-economic divisions within populations. SZABIST Larkana Campus Page 12
  • 13.
    DHL Operations Management2014 SZABIST Larkana Campus Page 13