1. Page 1 of 10
CURRICULUM VITAE
PERSONAL INFORMATION
Name : Dwiyanto
Place & date of birth : Jakarta, December 30th, 1980
Nationality : Indonesian
Status : Married
Profession : Offshore Structural Designer
Education : Tehnical High School
Permanent Resident : Jl. Pond Rajeg Gg Swadaya Rt 02/01 No.75
Kel.Pond Rajeg Kec Cibinong Bogor (16914)
E-mail : yanto.dwi11@gmail.com
dwiyanto@isb-eng.com
Phone Mobile : +62 82113875146
KEY EXPERIENCES AND CAPABILITIES
7 years experiences in offshore structural Oil and Gas Industry covering range of
activities,detail design and survey.
A) 1. Topsides Drawing, including :
- Primary and secondary framing plan and section, Deck section and Joint Detail,
Deck lifting padeye details, Flooring and Handrail layout, Deck drain and Hatch
cover, Stairway and ladder detail, Access platform, Swing rope details, Heli deck
and safety net , Bridge/walkway , Vent boom / flare and boom rest, Material Take
Off (MTO).
2. Jacket Drawing, including :
- Jacket framing plan and elevation, Jacket walkway, Jacket mudmat and details,
Jacket lifting padeye and details, Guardian sleeve, Pile make-up and details,
Conductor Make up and details, Conductor guard and details, Boatlanding
Arrangement and details, Riser clamp and details, Anode location and details,
Caisson make-up and details Shim plate, Crown jacket, Material Take Off (MTO).
2. Page 2 of 10
SOFTWARE CAPABILITY :
1. Auto-CAD 2D and 3D
2. PDMS 2D Draft
3. Microsoft Office
4. BOCAD Basic V.22 & V.23
AVAILABILITY : 1 (one) month notice
WORK EXPERIENCE
1. PT. Indonesian Service Bureau
(July 2014-Present)
Position : Structural Desingner
Responsibility : FEED And Detail design
Oct’15 – Present
Client : PetroChina International Jabung Ltd.
Betara Complex Development
Project : Detail Engineering
Jobs Description : -P & I
-PFD
- Mekanik piping
Aug’15 – Sept’ 15
Client : PERTAMINA HULE ENERGY ONSHORE
WEST JAVA (PHE ONWJ)
Project : Subsea IMR 2015
L-Service Well,LLE Well,PB Well,KKA Well,LLF
Well & U-Pro Service
Jobs Description : - Marine Growth (MG) &
Marine Growth Preventer Removal (MGPR)
- Wall Thickness Measurement (UT)
- Confirmatory Grinding and/or Confirmatory flooded
- Unsupported Riser
- Detailed Inspection/Cleaning
3. Page 3 of 10
Mey’15 – Aug’15
Client : KRIS ENERGY (ASIA) LTD.
Bangora Field Onshore Bangladesh Gas Plan
Facilities
Project : Detail Design Engineering for B6 & B7 Well Flow line
(CTR-01)
Jobs Description : - Road Culvert Plan Section & Detail
-Pipe Trench Framing Plan Section & Details
- Demolation Detail & section
Feb’15 – Mey’15
Client : PERTAMINA HULE ENERGY ONSHORE
WEST JAVA (PHE ONWJ)
Project : Subsea IMR 2015
BC Well ,EB Well,EC Well,LB Well,JJA Well,KNA
Well,FFB Well,KKNA Well,KKNB Well,BM & BQ Well
Jobs Description : - Marine Growth (MG) &
Marine Growth Preventer Removal (MGPR)
- Wall Thickness Measurement (UT)
- Confirmatory Grinding and/or Confirmatory flooded
- Unsupported Riser
- Detailed Inspection/Cleaning
Nop’14 – Feb’15
Client : PERTAMINA HULE ENERGY ONSHORE
WEST JAVA (PHE ONWJ)
Project : Installation Engineering for pipeline and structure
IMR Project 014,MM1,MM6,MB1,JJA Monopod
Platform,KNA & MBA Tripod Platform
Jobs Description : - Detail Design speader bar
- Proposed position monopod and tripod platform
- Anode mattress detail
- Detail Design speader bar
- Installation squeances anode mattress
4. Page 4 of 10
Jul’14 – Nop’14
Client : SANTOS (SAMPANG) PTY.LTD
Project : DETAIL ENGINEERING SERVICE FOR
INSTALLATION GAS COMPRESSOR OF OYONG
(SEA GOOD -101)
Sampang madura – Indonesia. (Detail Design)
Jobs Description : - Design Top Side framing plan
- Mud Trough layout
- Connection and Joint details
- Detail Design
2. PT. Technip Indonesia
(December 2012-June 2014)
Position : Structural Desingner
Responsibility : FEED And Detail design
Feb’14 – Present
Client : PETRONAS CARIGALI
Project : PROVISION OF FRONT END ENGINERRING
(FEED) AND ENGINEERING PROCUREMENT
CONSTRUCTION, INSTALATION & COMISSIONING
(EPCIC) OF SK316 DEVELOPMENT PROJECT.
North of Bentulu sarawak – Malaysia.( Detail Design)
8 Legs Jacket (63.550 meter water depth)
Jobs Description : - Design Top Side framing plan
- Mud Trough layout
- Connection and Joint details
- Detail Design jacket 4 legs
Dec’13 – Feb’14
Client : PETRONAS CARIGALI
Project : FEED FOR SEPAT GAS DEVELOPMENT
Terengganu – east Malaysia.( Detail Design)
8 Legs Jacket (63.550 meter water depth)
Job Dessription : - Design Top Side
- Detail Design jacket 4 legs.
5. Page 5 of 10
Apr’12 – Nop’13
Client : PERTAMINA HULU ENERGY (PHE) WMO
Project : Feed Development Project CPP2 Platform,
Madura strait – Indonesia.( Detail Design)
4 Legs Jacket (53.34 meter water depth)
Job Description : - Design Top Side
- Detail Design jacket 4 legs.
Client : PERTAMINA HULU ENERGY (PHE) WMO
Project : Feed Development Project KE-29 Platform,
Madura strait – Indonesia.( Detail Design)
Brace Monopod (56.69 meter water depth)
Job Description : - Design Top Side
- Detail Design jacket brace monopod
Project : Feed Development Project KE-44 Platform,
Madura strait – Indonesia. ( Detail Design).
Brace Monopod (56.69 meter water depth)
Job Description : - Design Top Side
- Design jacket brace monopod
Project : Feed Development Project KE-48 Platform,
Madura strait – Indonesia. ( Detail Design).
Brace Monopod (56.69 meter water depth
Dec’12 –Apr’13
Client : PERTAMINA HULU ENERGY (PHE) WMO
Project : Feed Development Project KE-7 Platform,
Madura strait – Indonesia.( Detail Design)
Brace Monopod (56.69 meter water depth)
Job Description : - Design Top Side
- Detail Design jacket brace monopod
Project : Feed Development Project KE-12 Platform,
Madura strait – Indonesia. ( Detail Design).
Brace Monopod (56.69 meter water depth)
Job Description : - Design Top Side
6. Page 6 of 10
- Design jacket brace monopod
Project : Feed Development Project KE-24 Platform,
Madura strait – Indonesia. ( Detail Design).
Brace Monopod (56.69 meter water depth
3. PT. Bina Rekacipta Utama
(January 2007-December 2012)
Position : Structural designer
Responsibility : FEED And Detail design, Modification As-Built and
Refurbishment offshore platfrom.
Aug’12 – Dec’12
Client : PC KETAPANG II LTD.(PETRONAS)
Project : Engineering, Procurement, construction and
commissioning (EPCC) for BTJT-A
Platform bukit tua Development Project
Three Pod ( 57. 30 meter water depth)
Job Description : - Detail design top side
- Detail design jacket tripod
- Material Take Off (MTO)
Jan’12-Sep 12
Client : PERTAMINA HULU ENERGY (PHE) WMO
Project : Field Development Project KE-38b Platform,
Madura strait – Indonesia.( Detail Design)
Brace Monopod ( 60. 80 meter water depth)
Job Description : - Design Top Side
- Detail Design jacket brace monopod
- Material Take Off (MTO)
Project : Field Development Project KE-39 Platform,
Madura strait – Indonesia. ( Detail Design).
Brace Monopod ( 61, 00 meter water depth)
Job Description : - Design Top Side
- Design jacket brace monopod
- Material Take Off (MTO)
Project : Field Development Project KE-54 Platform,
Madura strait – Indonesia. ( Detail Design).
Brace Monopod ( 62, 48 meter water depth)
7. Page 7 of 10
Job Description : - Design Top Side
- Design jacket brace monopod
- Material Take Off (MTO)
Aug ’11 – Nop’11
Client : CAMAR RESOURCES CANADA, Inc
Project : Re-qualification of WPP Process Platform,
Bawean – Indonesia.
4 Legs Jacket (-216 feet water depth).
Job Descriptions : - Site visit WPP Process Platform,
- As-Built structure WPP Process Platform,
- Redraw on CAD topsides drawing.
Project : Re-qualification of CPP Wellhead Platform,
Bawean – Indonesia.
4 Legs Jacket (-216 feet watere depth).
Job Description : - Site visit to CPP Wellhead Platform,
- As-Built structure CPP Wellhead Platform,
- Redraw on CAD topsides drawing.
April’11 –Aug’11
Client : PERTAMINA HULU ENERGY (PHE) WMO.
Project : Field Development of KE 38B, KE39 And
KE 54 Well platform.
Madura Strait – Indonesia. (FEED Project Design)
Brace Monopod KE 38B Well platform
( - 198 feet water depth),
Brace Monopod KE 39 Well platform
(-201 feet water depth),
Brace Monopod KE 54 Well platform
( - 205 feet water depth).
Job Description : Design Main deck, Design Mezzanine deck, Cellar
deck, Sub cellar deck, Design crane Pedestal, Pile
Make up And Detail, Riser, Conductor Make Up And
details, Boat landing Arrangement and detail
Stairway.
8. Page 8 of 10
Sep’10 – March’11
Client : KODECO ENERGY Co Ltd.
Project : Modification of KE - 38 Well Platform,
Madura Strait – Indonesia.
Brace Monopod (-133 feet water depth)
Job Description : - Additional 9 conductors, Design extension main
deck, mezzanine deck, cellar deck and conductor
guide.
July’10 – Sept’ 10
Client : CNOOC SES Ltd.
South East Sumatra – Indonesia.
Project : Refurbishment & As- Built Cinta C Platform And
Cinta B Well Platform.
8 Legs Jacket (-121 feet water depth),
4 Legs Jacket (-122 feet water depth).
Job Description : - As-Built Structure Cinta C platform, Access
Platform, Redraw on CAD, Prepare Material Take Off
(MTO).
January’10 – Jul’ 10
Client : PREMIER OIL Natuna Sea Ltd.
Project : Phase 4 Compressor Anoa Gas Export (AGX)
Platform, Natuna Sea Block A – Indonesian,
4 Legs Jacket (76 meter water depth).
Job Description : Site visit to Anoa Gas Export (AGX) & Anoa well
platform, Design Access Platform, Lay down Area,
Extension Deck For New Gas Compressor, Monorail.
Sept’09 – Dec’09
Client : PERTAMINA L-PARIGI
Project : Requalification TLC and TLF Well Platform,
Java See – Indonesian.
Tripod (-109 feet water depth)
Job Description : Re-draw on CAD.
Apr’08 – Aug’ 09
Client : KODECO ENERGY Co Ltd.
Project : Modification KE-38 Well Platform,
Madura strait – Indonesian.
9. Page 9 of 10
Brace Monopod (-133 feet water depth)
Job Description : - Additional 5 conductors, Design extension main
deck, cellar deck, mezzanine deck And Design
conductor guide.
Project : Modification of KE - 40 Well Platforms,
Madura Strait – Indonesia.
Brace Monopod (-186 feet water depth).
Job Description : Design extension main deck,cellar deck,
mezzanine deck, Caisson guard, Additional
conductor, ladder, Prepare Material Take Off (MTO).
Apr’08 – May’ 08
Client : BP West Java Ltd.
Project : Modification Boatlanding for subsidence
of Well platform LLA Platform, West Java Sea
Indonesia.
4 Legs Jacket (-89 feet water depth).
Job Description : - Design boatlanding, Prepare Material Take off
(MTO)
Nov’ 07 – March’ 08
Client : PERTAMINA EP
Project : - Re-qualification for Process X-Ray Alfa Platform,
8 Legs Jacket (-111 feet water depth),
Balongan – Indonesia.
- Re-qualification for Well Ray Alfa Platform,
4 Legged Jacket (-109 feet water depth),
Balongan – Indonesia
- Re-qualification for Well X- Ray Delta Platform,
4 Legged Jacket (-111 feet water depth),
Balongan – Indonesia.
- Re-qualification Well Platform X-Ray, X-MA ,
4 Legged Jacket (-90 feet water depth),
Balongan – Indonesia.
10. Page 10 of 10
Job Description : As-Built Structure, Redraw on CAD topsides
drawing.
Project : Re-qualification of Tripod Flare Alfa Platform, tripod
Flare BravoPlatform Balongan - Indonesia
Tripod (-111 feet water depth),Tripod (-99 feet water
depth).
Job Description : As-Built and redraw on CAD.
4. PT. QDC Communication
( May 2007-Oct 2007)
Position : Supervisor Technician Indoor operation
5. PT. MASADA
( Feb 2007 – May 2007)
Position : Supervisor Technician Indoor operation
6. PT. NEXWAVE
( Jan 2006 – Feb 2007)
Position : Supervisor Technician Indoor operation
7. PT. RANGGA DINAMIKA
( Oct 2002 – Dec 2005)
Position : Technician Indoor operation
8. PT. TIARA LILIN INDONESIA
( May 2002 – Sep 2002)
Position : Technician Indoor operation
9. R’SONA MOTOR
( Apr 2001 – May 2002)
Position : Mechanic
REFERENCE
Didih Abdillah
Didih.abdillah@deltaafrik.com
Aris munajad
arism@technip.com
Mulyana yusuf
Mulyana.yusuf@tripatra.com
Dandung kiswajanto
Dandung.kiswajanto@tripatra.com