Manufacture and service generators, power management systems and transformers.
Celebrating 140 years, up to 1.100 MVA, 2 & 4 poles
BRUSH HQ, UK
-2 Pole Generators
-Transformers
-PMS / Control Systems
-Aftermarket Support
BRUSH HMA, Netherlands
-4 Pole BRUSH Generators
-3rd
Party Generators
-Aftermarket Support
BRUSH SEM, Plzen CZ
-2 Pole Generators
-Hydrogen & Air Cooled
-Skoda Factory
-Aftermarket Support
- Evandro Bulling / Jefferson Joeicemir – BRUSH employees Americas
Motivation to this presentation….
Procurement chain
© BRUSH Group
End User
* Energy business
* Business plan
* Own the project
* Operates
* Sell electricity
* Engineer
* Procurement
* Construction
EPC
Main
component
A
Main
component
B
Turbine
Manufacturer
Generator
manufacturer
Buy via commodity teams
to maximize profit
As effect
© BRUSH Group
Stone, G. C., et al. "Recent problems experienced with motor and generator
windings." Petroleum and Chemical Industry Conference, 2009. PCIC 2009. 2009
Record of Conference Papers-Industry Applications Society 56th Annual. IEEE, 2009.
1962 to
2010 over
16 folds
As effect
© BRUSH Group
Generator
manufacturer
End User
* Reduced conductor sections
* Reduced insulation thickness
* Reduced steel
* Reduced manufacturing time
* Spec and no more philosophy
* Less efficiency
* Higher maintenance cost
* More unplanned outages
* Higher OPEX
* Less performance
Turbine
Manufacturer
The Challenge – How to maximise OPEX and CAPEX ?
© BRUSH Group
- Temperature of windings
- Insulation class
- Rotor construction
- Power Factor influence
- Line and Neutral Cubicle
- Generator efficiency
- Temperature of windings
- Insulation class
- Rotor construction
- Power Factor influence
- Line and Neutral Cubicle
- Generator efficiency
SELECTING THE PROPER GENERATORSELECTING THE PROPER GENERATOR
What is the importance of maximum cooler inlet
water temperature?
Generator Output vs. Coolant Temperature
Inlet water and output – DAX GENERATORS
Coolant Inlet Temperature - °C
© BRUSH Group
58MW
When one say insulation F and F/F, is there any
difference ?
Are there different rotor constructions and any
consequence on performance
ONE PIECE FORGED SHAFTONE PIECE FORGED SHAFT
- Less vibration
- Less heating
- Less vibration
- Less heating
Test bay ( mm/s)
0.5 – 0.9 1.3 – 1.5
Temperature delta in Celsius
About 10 to 15 degrees
What is the power factor influence by selecting a
generator?
POWER FACTOR – A MECHANICAL ANALOGY
ELECTRICAL DESIGN – DAX GENERATORS
© BRUSH Group
Glass–Cables
Foam
Cos
ϕ
Beer
Power Factor Selection
© BRUSH Group
© BRUSH Group
Where we install the line and neutral cubicle?
Q5
Can generator efficiency influence projects
payback time? What is a typical generator
efficiency?
© BRUSH Group
© BRUSH Group
100MW, 2 poles, 13.8 kV,
inlet Water 30C, Insulation F/B, FP 0.85
Example 1 50USD/MWh
Example 2 70USD/MWh
Output
(MW)
Efficiency
(%)
Available
(MW)
8000h/year
Mwh
Example 1
50USD/Mwh
Example 2
70USD/Mwh
100 0.96 96 768*103
USD 38.4*106
USD 53.76*106
100 0.98 98 784*103
USD 39.2*106
USD 54.88*106
Saving 800 KUSD 1120 KUSD
Summary – How to maximise OPEX and CAPEX ?
© BRUSH Group
- Correct inlet water
temperature
- Insulation F/B
- Forged shaft construction
- Correct Power factor
- Line & Neutral Cubicle
attached to generator
- Efficiency of at least 98%
- Correct inlet water
temperature
- Insulation F/B
- Forged shaft construction
- Correct Power factor
- Line & Neutral Cubicle
attached to generator
- Efficiency of at least 98%
SELECTING THE PROPER GENERATORSELECTING THE PROPER GENERATOR
End User
- 30 and over operational life
years
- 10 – 20% saving on
maintenance
- 50 - 200 KUSD saving on
installation costs
- Efficiency savings that may
guarantee generator
payback in less than 2y
- 30 and over operational life
years
- 10 – 20% saving on
maintenance
- 50 - 200 KUSD saving on
installation costs
- Efficiency savings that may
guarantee generator
payback in less than 2y
Thank you for your time and attention.
Any questions?

More Related Content

What's hot

product_overview - 4pgs
product_overview - 4pgsproduct_overview - 4pgs
product_overview - 4pgsJim Milbaugh
 
0.75hp solar pump
0.75hp solar pump 0.75hp solar pump
0.75hp solar pump
GauravVerma495
 
Cyclo agitator concentric drives cycloidal reduction gear box
Cyclo agitator concentric drives cycloidal reduction gear boxCyclo agitator concentric drives cycloidal reduction gear box
Cyclo agitator concentric drives cycloidal reduction gear box
Lance Shi NER GROUP
 
Eco-Tech low RPM generators
Eco-Tech low RPM generatorsEco-Tech low RPM generators
Eco-Tech low RPM generators
Eco-Tech Alternators
 
High gain resonant switched-capacitor cell-based dcdc converter for offshore ...
High gain resonant switched-capacitor cell-based dcdc converter for offshore ...High gain resonant switched-capacitor cell-based dcdc converter for offshore ...
High gain resonant switched-capacitor cell-based dcdc converter for offshore ...
LeMeniz Infotech
 
Gear column gear box, column gearboxes, column shaft gearbox
Gear column gear box, column gearboxes, column shaft gearboxGear column gear box, column gearboxes, column shaft gearbox
Gear column gear box, column gearboxes, column shaft gearbox
Lance Shi NER GROUP
 
Pedal operated power generation system
Pedal operated power generation systemPedal operated power generation system
Pedal operated power generation system
AJAYKANOJIA6
 
Ultra fast ev charging
Ultra fast ev chargingUltra fast ev charging
Ultra fast ev charging
Artem52
 
Km83 quadra hacksaw four side hacksaw - haxa (wecompress)
Km83 quadra hacksaw   four side hacksaw - haxa (wecompress)Km83 quadra hacksaw   four side hacksaw - haxa (wecompress)
Km83 quadra hacksaw four side hacksaw - haxa (wecompress)
1000kv technologies
 

What's hot (11)

product_overview - 4pgs
product_overview - 4pgsproduct_overview - 4pgs
product_overview - 4pgs
 
0.75hp solar pump
0.75hp solar pump 0.75hp solar pump
0.75hp solar pump
 
Cyclo agitator concentric drives cycloidal reduction gear box
Cyclo agitator concentric drives cycloidal reduction gear boxCyclo agitator concentric drives cycloidal reduction gear box
Cyclo agitator concentric drives cycloidal reduction gear box
 
Eco-Tech low RPM generators
Eco-Tech low RPM generatorsEco-Tech low RPM generators
Eco-Tech low RPM generators
 
2016 PP HH-5500 rental fleet
2016 PP HH-5500 rental fleet2016 PP HH-5500 rental fleet
2016 PP HH-5500 rental fleet
 
High gain resonant switched-capacitor cell-based dcdc converter for offshore ...
High gain resonant switched-capacitor cell-based dcdc converter for offshore ...High gain resonant switched-capacitor cell-based dcdc converter for offshore ...
High gain resonant switched-capacitor cell-based dcdc converter for offshore ...
 
Gear column gear box, column gearboxes, column shaft gearbox
Gear column gear box, column gearboxes, column shaft gearboxGear column gear box, column gearboxes, column shaft gearbox
Gear column gear box, column gearboxes, column shaft gearbox
 
Pedal operated power generation system
Pedal operated power generation systemPedal operated power generation system
Pedal operated power generation system
 
Ultra fast ev charging
Ultra fast ev chargingUltra fast ev charging
Ultra fast ev charging
 
Km83 quadra hacksaw four side hacksaw - haxa (wecompress)
Km83 quadra hacksaw   four side hacksaw - haxa (wecompress)Km83 quadra hacksaw   four side hacksaw - haxa (wecompress)
Km83 quadra hacksaw four side hacksaw - haxa (wecompress)
 
oberseminar2016
oberseminar2016oberseminar2016
oberseminar2016
 

Similar to Stop ripping money - Select the right generator

KBC decision making tool optimal planning scheduling utility
KBC decision making tool optimal planning scheduling utilityKBC decision making tool optimal planning scheduling utility
KBC decision making tool optimal planning scheduling utility
KBC (A Yokogawa Company)
 
Km04 pneumatic based metal sheet cutter (wecompress)
Km04 pneumatic based  metal sheet cutter (wecompress)Km04 pneumatic based  metal sheet cutter (wecompress)
Km04 pneumatic based metal sheet cutter (wecompress)
1000kv technologies
 
"How Gas Engines can help with the Challenges of a Changing Energy System"
"How Gas Engines can help with the Challenges of a Changing Energy System""How Gas Engines can help with the Challenges of a Changing Energy System"
"How Gas Engines can help with the Challenges of a Changing Energy System"
Adam Wray-Summerson
 
PMSM.pdf
PMSM.pdfPMSM.pdf
Doug Clover on New Zealand's Electricity Reforms
Doug Clover on New Zealand's Electricity ReformsDoug Clover on New Zealand's Electricity Reforms
Doug Clover on New Zealand's Electricity Reforms
mhjbnz
 
Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0Raja Ratnam
 
Chris dowe-synergy’s-renewable-energy-integration
Chris dowe-synergy’s-renewable-energy-integrationChris dowe-synergy’s-renewable-energy-integration
Chris dowe-synergy’s-renewable-energy-integration
james hamilton
 
Colongra fact sheet
Colongra fact sheetColongra fact sheet
Colongra fact sheetJens Schulz
 
keppel-2-ka26-combined-cycle-power-plant-singapore
keppel-2-ka26-combined-cycle-power-plant-singaporekeppel-2-ka26-combined-cycle-power-plant-singapore
keppel-2-ka26-combined-cycle-power-plant-singaporeDaniel ANG
 
NCAM_Seminar_Lukas_Skoufa_19-February-2015
NCAM_Seminar_Lukas_Skoufa_19-February-2015NCAM_Seminar_Lukas_Skoufa_19-February-2015
NCAM_Seminar_Lukas_Skoufa_19-February-2015Lucas Skoufa
 
2010 Energy Presentation
2010 Energy Presentation2010 Energy Presentation
2010 Energy Presentation
Chad Blair
 
EC Motors & Controllers March 2016
EC Motors & Controllers March 2016EC Motors & Controllers March 2016
EC Motors & Controllers March 2016Peter Korosec
 
Bnef university solar_wind_bioenergy_geothermal_ccs_energy_smart_technologie
Bnef university solar_wind_bioenergy_geothermal_ccs_energy_smart_technologieBnef university solar_wind_bioenergy_geothermal_ccs_energy_smart_technologie
Bnef university solar_wind_bioenergy_geothermal_ccs_energy_smart_technologieMARIANO ORTULAN
 
Session4 wind turbine services as driving force for know how transfer authore...
Session4 wind turbine services as driving force for know how transfer authore...Session4 wind turbine services as driving force for know how transfer authore...
Session4 wind turbine services as driving force for know how transfer authore...
RCREEE
 
Modern gas-fueled power generation
Modern gas-fueled power generationModern gas-fueled power generation
Modern gas-fueled power generation
Wärtsilä Corporation
 

Similar to Stop ripping money - Select the right generator (20)

EE494_SENIOR_DESIGN_PRESENTATION_2015_V3
EE494_SENIOR_DESIGN_PRESENTATION_2015_V3EE494_SENIOR_DESIGN_PRESENTATION_2015_V3
EE494_SENIOR_DESIGN_PRESENTATION_2015_V3
 
KBC decision making tool optimal planning scheduling utility
KBC decision making tool optimal planning scheduling utilityKBC decision making tool optimal planning scheduling utility
KBC decision making tool optimal planning scheduling utility
 
Km04 pneumatic based metal sheet cutter (wecompress)
Km04 pneumatic based  metal sheet cutter (wecompress)Km04 pneumatic based  metal sheet cutter (wecompress)
Km04 pneumatic based metal sheet cutter (wecompress)
 
"How Gas Engines can help with the Challenges of a Changing Energy System"
"How Gas Engines can help with the Challenges of a Changing Energy System""How Gas Engines can help with the Challenges of a Changing Energy System"
"How Gas Engines can help with the Challenges of a Changing Energy System"
 
PMSM.pdf
PMSM.pdfPMSM.pdf
PMSM.pdf
 
Az-Zour
Az-ZourAz-Zour
Az-Zour
 
Carrington
CarringtonCarrington
Carrington
 
Doug Clover on New Zealand's Electricity Reforms
Doug Clover on New Zealand's Electricity ReformsDoug Clover on New Zealand's Electricity Reforms
Doug Clover on New Zealand's Electricity Reforms
 
Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0
 
Chris dowe-synergy’s-renewable-energy-integration
Chris dowe-synergy’s-renewable-energy-integrationChris dowe-synergy’s-renewable-energy-integration
Chris dowe-synergy’s-renewable-energy-integration
 
Colongra fact sheet
Colongra fact sheetColongra fact sheet
Colongra fact sheet
 
keppel-2-ka26-combined-cycle-power-plant-singapore
keppel-2-ka26-combined-cycle-power-plant-singaporekeppel-2-ka26-combined-cycle-power-plant-singapore
keppel-2-ka26-combined-cycle-power-plant-singapore
 
NCAM_Seminar_Lukas_Skoufa_19-February-2015
NCAM_Seminar_Lukas_Skoufa_19-February-2015NCAM_Seminar_Lukas_Skoufa_19-February-2015
NCAM_Seminar_Lukas_Skoufa_19-February-2015
 
2010 Energy Presentation
2010 Energy Presentation2010 Energy Presentation
2010 Energy Presentation
 
MAJOR PROJECT
MAJOR PROJECTMAJOR PROJECT
MAJOR PROJECT
 
Wind power
Wind powerWind power
Wind power
 
EC Motors & Controllers March 2016
EC Motors & Controllers March 2016EC Motors & Controllers March 2016
EC Motors & Controllers March 2016
 
Bnef university solar_wind_bioenergy_geothermal_ccs_energy_smart_technologie
Bnef university solar_wind_bioenergy_geothermal_ccs_energy_smart_technologieBnef university solar_wind_bioenergy_geothermal_ccs_energy_smart_technologie
Bnef university solar_wind_bioenergy_geothermal_ccs_energy_smart_technologie
 
Session4 wind turbine services as driving force for know how transfer authore...
Session4 wind turbine services as driving force for know how transfer authore...Session4 wind turbine services as driving force for know how transfer authore...
Session4 wind turbine services as driving force for know how transfer authore...
 
Modern gas-fueled power generation
Modern gas-fueled power generationModern gas-fueled power generation
Modern gas-fueled power generation
 

Recently uploaded

Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
Norma Mushkat Gaffin
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Lviv Startup Club
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
Ben Wann
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
 
The key differences between the MDR and IVDR in the EU
The key differences between the MDR and IVDR in the EUThe key differences between the MDR and IVDR in the EU
The key differences between the MDR and IVDR in the EU
Allensmith572606
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ofm712785
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta 143
Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta 143Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta 143
Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta 143
bosssp10
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
techboxsqauremedia
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
SynapseIndia
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
Corey Perlman, Social Media Speaker and Consultant
 

Recently uploaded (20)

Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
 
The key differences between the MDR and IVDR in the EU
The key differences between the MDR and IVDR in the EUThe key differences between the MDR and IVDR in the EU
The key differences between the MDR and IVDR in the EU
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta 143
Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta 143Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta 143
Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta 143
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
 

Stop ripping money - Select the right generator

  • 1. SELECTING THE PROPER GENERATOR ANNUAL CONGRESS OF …. EVANDRO BRULLING - BRUSH JEFFERSON JOEICEMIR – BRUSH
  • 2. Who are BRUSH? Who am I? © BRUSH Group BRUSH Electrical Machines Manufacture and service generators, power management systems and transformers. Celebrating 140 years, up to 1.100 MVA, 2 & 4 poles BRUSH HQ, UK -2 Pole Generators -Transformers -PMS / Control Systems -Aftermarket Support BRUSH HMA, Netherlands -4 Pole BRUSH Generators -3rd Party Generators -Aftermarket Support BRUSH SEM, Plzen CZ -2 Pole Generators -Hydrogen & Air Cooled -Skoda Factory -Aftermarket Support - Evandro Bulling / Jefferson Joeicemir – BRUSH employees Americas
  • 3. Motivation to this presentation….
  • 4. Procurement chain © BRUSH Group End User * Energy business * Business plan * Own the project * Operates * Sell electricity * Engineer * Procurement * Construction EPC Main component A Main component B Turbine Manufacturer Generator manufacturer Buy via commodity teams to maximize profit
  • 5. As effect © BRUSH Group Stone, G. C., et al. "Recent problems experienced with motor and generator windings." Petroleum and Chemical Industry Conference, 2009. PCIC 2009. 2009 Record of Conference Papers-Industry Applications Society 56th Annual. IEEE, 2009. 1962 to 2010 over 16 folds
  • 6. As effect © BRUSH Group Generator manufacturer End User * Reduced conductor sections * Reduced insulation thickness * Reduced steel * Reduced manufacturing time * Spec and no more philosophy * Less efficiency * Higher maintenance cost * More unplanned outages * Higher OPEX * Less performance Turbine Manufacturer
  • 7. The Challenge – How to maximise OPEX and CAPEX ? © BRUSH Group - Temperature of windings - Insulation class - Rotor construction - Power Factor influence - Line and Neutral Cubicle - Generator efficiency - Temperature of windings - Insulation class - Rotor construction - Power Factor influence - Line and Neutral Cubicle - Generator efficiency SELECTING THE PROPER GENERATORSELECTING THE PROPER GENERATOR
  • 8. What is the importance of maximum cooler inlet water temperature?
  • 9. Generator Output vs. Coolant Temperature Inlet water and output – DAX GENERATORS Coolant Inlet Temperature - °C © BRUSH Group 58MW
  • 10. When one say insulation F and F/F, is there any difference ?
  • 11.
  • 12. Are there different rotor constructions and any consequence on performance
  • 13. ONE PIECE FORGED SHAFTONE PIECE FORGED SHAFT - Less vibration - Less heating - Less vibration - Less heating Test bay ( mm/s) 0.5 – 0.9 1.3 – 1.5 Temperature delta in Celsius About 10 to 15 degrees
  • 14. What is the power factor influence by selecting a generator?
  • 15. POWER FACTOR – A MECHANICAL ANALOGY ELECTRICAL DESIGN – DAX GENERATORS © BRUSH Group Glass–Cables Foam Cos ϕ Beer
  • 18. Where we install the line and neutral cubicle? Q5
  • 19.
  • 20. Can generator efficiency influence projects payback time? What is a typical generator efficiency?
  • 22. © BRUSH Group 100MW, 2 poles, 13.8 kV, inlet Water 30C, Insulation F/B, FP 0.85 Example 1 50USD/MWh Example 2 70USD/MWh Output (MW) Efficiency (%) Available (MW) 8000h/year Mwh Example 1 50USD/Mwh Example 2 70USD/Mwh 100 0.96 96 768*103 USD 38.4*106 USD 53.76*106 100 0.98 98 784*103 USD 39.2*106 USD 54.88*106 Saving 800 KUSD 1120 KUSD
  • 23. Summary – How to maximise OPEX and CAPEX ? © BRUSH Group - Correct inlet water temperature - Insulation F/B - Forged shaft construction - Correct Power factor - Line & Neutral Cubicle attached to generator - Efficiency of at least 98% - Correct inlet water temperature - Insulation F/B - Forged shaft construction - Correct Power factor - Line & Neutral Cubicle attached to generator - Efficiency of at least 98% SELECTING THE PROPER GENERATORSELECTING THE PROPER GENERATOR End User - 30 and over operational life years - 10 – 20% saving on maintenance - 50 - 200 KUSD saving on installation costs - Efficiency savings that may guarantee generator payback in less than 2y - 30 and over operational life years - 10 – 20% saving on maintenance - 50 - 200 KUSD saving on installation costs - Efficiency savings that may guarantee generator payback in less than 2y