STEVEN LONGMAN
12901 Jefferson Highway #816
Baton Rouge, LA 70816
Telephone: (423) 991-7663
steve7562@gmail.com
SUMMARY
• Experienced in developing project budgets and forecasts, change management, cost control and
project reporting.

• Project Controls Specialist with over 20 years of experience in Government and EPC projects in
nuclear, refinery, power and commercial facilities.

• Front-end and detail engineering and design projects, joint ventures and multiple engineering
offices and execution. 

• Project work has included government, domestic and international facilities, under both lump sum
and cost reimbursable contracts, EVMS, cost control and project reporting.
EXPERIENCE
Sr. Cost Engineer – Project Controls
Responsible for all change management and estimation for multiple projects under an Alliance setup. Prepared
and supervised preparation of cost estimates, budgets, forecasts, commitments, expenditures & progress
reports. Created new reporting procedures and wbs code structure tailored for the alliance. Baton Rouge Tank
Farm Project Controls for Tank Farm refurbishment.
Sr. Cost Engineer – Project Controls
Contracted under System One to SGT (Steam Generating Team), a division of URS Corp. to support change
order management. Responsible for change order research, creation, scope, change estimation, and client
negotiation. Scope was replacement of four steam generators at the Sequoyah Nuclear Power Plant Unit 2 in
Tennessee. Approximate EPC value of project was $130 million.
Sr. Cost Engineer – Project Controls
Baseline restructuring, WBS creation, and Program Management Overview. Responsible for the development,
implementation and maintenance of cost reporting requirements for Site Management and Department of
Energy (DOE). Formulated and validated monthly actual cost reports. Maintained project trend log and
incorporated trends into project forecast. Prepared change control log documentation and updated change
control log. Created monthly cost vs. budget vs. earned reports and assisted multiple project managers with
variance analysis. Incorporated EVMS into government reporting documents.
Jacobs Engineering
Multiple Oil Refinery Projects
(2013 - 2016)
ExxonMobil | Baton Rouge, LA | Beaumont, TX
System One
(2012 – 2013)
TVA Sequoyah Nuclear Site | TN
Fluor Government Group
American Reinvestment and Recovery Act 

(2009 – 2010)
Savannah River Site | Aiken, SC
Scope of the SRNS Recovery Act was Solid Waste Elimination of more than 90% of the plutonium-238 source
term from the old plutonium Fuel Fabrication Facility; Deactivation and decommissioning of two nuclear
materials production reactors and Soil and Ground Water Remediation (remediate the soil & ground water
contaminated with radioactive and hazardous constituents where nuclear fuel assemblies and targets were
manufactured during the Cold War). The ARRA Act was funded at $1.4 billion.
Sr. Cost Engineer – Project Controls
Senior Cost Engineer on multiple projects. Responsible for preparing cost estimates, budgets, forecasts, cash
flow analysis, cost and progress reports for the Client and for Fluor Management. Development and
processing of Change Orders and WBS. The scopes of service for these EPC projects ranged from Appraise
through Define Phase Engineering and into Execute Stage Work. Two major projects were installation of a new
reactor that doubled the volume for the hydrotreating operation and updated the refinery’s flare gas recovery
systems, comprised of compressors, pumps, heat exchangers and water seals to minimize the combustion of
vent gases in the flares. Approximate EPC value of projects was $170 million.
Sr. Cost Engineer IV - Project Controls
Lead Cost Engineer - Prepared and supervised preparation of cost estimates, budgets, forecasts, cost and
progress reports for the Client (BP) and Jacobs Engineering Management. Directly supervised the non-
billables and indirect costs for all projects under the Jacobs/BP Alliance umbrella, which managed over $220
million of EPC projects for the BP Carson Refinery. Developed a system of allocation of costs and revenues for
each of the projects. Prepared monthly revenue, cost and margin analysis and trend reports for Jacobs
Management. Developed, processed and managed change orders and WBS input, updated and analyzed
FLA’s. Developed the BP Alliance Annual Business Plan for Sr. Mgmt.
Lead Project Analyst
Developed work breakdown structure and invoicing requirements for many ICA/Fluor Daniel projects including
power plants based in Mexico and South America. Responsible for over 30 contracts valued at approximately
$500 million. Prepared client invoicing, cost and billing reconciliations. Responsible for final gross margin
reporting. Required international travel. Communicated with client representatives. Equiulon project in Carson,
CA, required client invoicing, cost and billing reconciliations, procurement and commitment reports, and final
gross magin reporting.
EDUCATION
B.S., Business Administration, Illinois State University
Illinois Air National Guard, Headquarters Operations
TVA Badged for Unescorted Nuclear Access/DOE clearance/TWIC card holder
Flour Corporation Project Controls systems including SAP and FD Cost
Jacobs Engineering Project Controls Systems including Oracle
Fluor Daniel
Multiple Oil Refinery Projects 

(2007 – 2009)
BP America Inc. | Carson, CA
Jacobs Engineering
Multiple Oil Refinery Projects
(2001 – 2007)
BP America Inc. | Carson, CA
Fluor Daniel
Engineering Projects - ICA/Fluor Daniel - Equilon
(1997 - 2001)
SHELL | Carson, CA

More Related Content

What's hot

Chris Rainey Resume 2016
Chris Rainey Resume 2016Chris Rainey Resume 2016
Chris Rainey Resume 2016Chris Rainey
 
Construction Manager Resume
Construction Manager ResumeConstruction Manager Resume
Construction Manager ResumeJack Dickerson
 
Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015Malcolm Kiper
 
djn Resume 2015_August
djn Resume 2015_Augustdjn Resume 2015_August
djn Resume 2015_AugustDavid Neitsch
 
Resume Alanna Scott - Project Controls Specialist
Resume Alanna Scott - Project Controls SpecialistResume Alanna Scott - Project Controls Specialist
Resume Alanna Scott - Project Controls SpecialistAlanna Scott
 
John P Chan II
John P Chan IIJohn P Chan II
John P Chan IIjohn chan
 
Dallas madson resume2
Dallas madson resume2Dallas madson resume2
Dallas madson resume2
Dallas Madson
 
Rudy Wick Resume
Rudy Wick ResumeRudy Wick Resume
Rudy Wick ResumeRudy Wick
 
Victoria King Resume
Victoria King ResumeVictoria King Resume
Victoria King ResumeVictoria King
 
Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16Mark Koenig
 
Dean Hamilton Estimating Jan 2017
Dean Hamilton Estimating Jan 2017Dean Hamilton Estimating Jan 2017
Dean Hamilton Estimating Jan 2017Dean Hamilton
 
Debra_Turkovic_RESUME May2015
Debra_Turkovic_RESUME May2015Debra_Turkovic_RESUME May2015
Debra_Turkovic_RESUME May2015Debi Turkovic
 
Chuck Shealy ud.resume
Chuck Shealy ud.resumeChuck Shealy ud.resume
Chuck Shealy ud.resumeChuck Shealy
 
Davis Gary 0415 PM-LIR
Davis Gary 0415 PM-LIRDavis Gary 0415 PM-LIR
Davis Gary 0415 PM-LIRGary Davis
 

What's hot (20)

Chris Rainey Resume 2016
Chris Rainey Resume 2016Chris Rainey Resume 2016
Chris Rainey Resume 2016
 
Construction Manager Resume
Construction Manager ResumeConstruction Manager Resume
Construction Manager Resume
 
Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015
 
djn Resume 2015_August
djn Resume 2015_Augustdjn Resume 2015_August
djn Resume 2015_August
 
JM Portfolio 04-2016
JM Portfolio 04-2016JM Portfolio 04-2016
JM Portfolio 04-2016
 
ResumeSteve (9)
ResumeSteve (9)ResumeSteve (9)
ResumeSteve (9)
 
Resume Alanna Scott - Project Controls Specialist
Resume Alanna Scott - Project Controls SpecialistResume Alanna Scott - Project Controls Specialist
Resume Alanna Scott - Project Controls Specialist
 
John P Chan II
John P Chan IIJohn P Chan II
John P Chan II
 
Dallas madson resume2
Dallas madson resume2Dallas madson resume2
Dallas madson resume2
 
Rudy Wick Resume
Rudy Wick ResumeRudy Wick Resume
Rudy Wick Resume
 
Victoria King Resume
Victoria King ResumeVictoria King Resume
Victoria King Resume
 
RakeshShahCV
RakeshShahCVRakeshShahCV
RakeshShahCV
 
Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16
 
Aleksandr Pishchik Resume
Aleksandr Pishchik ResumeAleksandr Pishchik Resume
Aleksandr Pishchik Resume
 
KJGResume2015
KJGResume2015KJGResume2015
KJGResume2015
 
Dean Hamilton Estimating Jan 2017
Dean Hamilton Estimating Jan 2017Dean Hamilton Estimating Jan 2017
Dean Hamilton Estimating Jan 2017
 
Project List 1
Project List 1Project List 1
Project List 1
 
Debra_Turkovic_RESUME May2015
Debra_Turkovic_RESUME May2015Debra_Turkovic_RESUME May2015
Debra_Turkovic_RESUME May2015
 
Chuck Shealy ud.resume
Chuck Shealy ud.resumeChuck Shealy ud.resume
Chuck Shealy ud.resume
 
Davis Gary 0415 PM-LIR
Davis Gary 0415 PM-LIRDavis Gary 0415 PM-LIR
Davis Gary 0415 PM-LIR
 

Viewers also liked

The Age of Technology
The Age of TechnologyThe Age of Technology
The Age of Technology
sourouge
 
HR Social Media Myths
HR Social Media MythsHR Social Media Myths
HR Social Media Myths
Regional Health
 
7th pre alg -jan11
7th pre alg -jan117th pre alg -jan11
7th pre alg -jan11jdurst65
 
Telos partners bemutatkozunk 2013
Telos partners bemutatkozunk 2013Telos partners bemutatkozunk 2013
Telos partners bemutatkozunk 2013bbalogh75
 
Seed treatment A Lecture By Mr Allah Dad Khan
Seed treatment A Lecture By Mr Allah Dad Khan Seed treatment A Lecture By Mr Allah Dad Khan
Seed treatment A Lecture By Mr Allah Dad Khan
Mr.Allah Dad Khan
 
Noticia de abril
Noticia de abrilNoticia de abril
Noticia de abril
Thestroke
 
Linx Nòrdic 2 La Salle Manlleu 1r ESO 2016
Linx Nòrdic 2 La Salle Manlleu 1r ESO 2016Linx Nòrdic 2 La Salle Manlleu 1r ESO 2016
Linx Nòrdic 2 La Salle Manlleu 1r ESO 2016
Annapujolo
 
A1 Deutsch course certificates
A1 Deutsch course certificatesA1 Deutsch course certificates
A1 Deutsch course certificatesAhsan Malik
 
Argentina: Coyuntura económica, nuevo gobierno y su impacto en los ingresos
Argentina: Coyuntura económica, nuevo gobierno y su impacto en los ingresosArgentina: Coyuntura económica, nuevo gobierno y su impacto en los ingresos
Argentina: Coyuntura económica, nuevo gobierno y su impacto en los ingresos
Instituto Observatório Social
 
2013 SKRIP PENGACARA MAJLIS ANUGERAH CEMERLANG
2013 SKRIP PENGACARA MAJLIS ANUGERAH CEMERLANG 2013 SKRIP PENGACARA MAJLIS ANUGERAH CEMERLANG
2013 SKRIP PENGACARA MAJLIS ANUGERAH CEMERLANG Yusrina Mustama
 

Viewers also liked (13)

The Age of Technology
The Age of TechnologyThe Age of Technology
The Age of Technology
 
HR Social Media Myths
HR Social Media MythsHR Social Media Myths
HR Social Media Myths
 
7th pre alg -jan11
7th pre alg -jan117th pre alg -jan11
7th pre alg -jan11
 
Telos partners bemutatkozunk 2013
Telos partners bemutatkozunk 2013Telos partners bemutatkozunk 2013
Telos partners bemutatkozunk 2013
 
Seed treatment A Lecture By Mr Allah Dad Khan
Seed treatment A Lecture By Mr Allah Dad Khan Seed treatment A Lecture By Mr Allah Dad Khan
Seed treatment A Lecture By Mr Allah Dad Khan
 
Noticia de abril
Noticia de abrilNoticia de abril
Noticia de abril
 
Healthcare costs Presentation
Healthcare costs PresentationHealthcare costs Presentation
Healthcare costs Presentation
 
Linx Nòrdic 2 La Salle Manlleu 1r ESO 2016
Linx Nòrdic 2 La Salle Manlleu 1r ESO 2016Linx Nòrdic 2 La Salle Manlleu 1r ESO 2016
Linx Nòrdic 2 La Salle Manlleu 1r ESO 2016
 
NewBAMindset
NewBAMindsetNewBAMindset
NewBAMindset
 
A1 Deutsch course certificates
A1 Deutsch course certificatesA1 Deutsch course certificates
A1 Deutsch course certificates
 
Argentina: Coyuntura económica, nuevo gobierno y su impacto en los ingresos
Argentina: Coyuntura económica, nuevo gobierno y su impacto en los ingresosArgentina: Coyuntura económica, nuevo gobierno y su impacto en los ingresos
Argentina: Coyuntura económica, nuevo gobierno y su impacto en los ingresos
 
Central Park
Central ParkCentral Park
Central Park
 
2013 SKRIP PENGACARA MAJLIS ANUGERAH CEMERLANG
2013 SKRIP PENGACARA MAJLIS ANUGERAH CEMERLANG 2013 SKRIP PENGACARA MAJLIS ANUGERAH CEMERLANG
2013 SKRIP PENGACARA MAJLIS ANUGERAH CEMERLANG
 

Similar to Steven Longman Resume 2016

Brian Nicholls resume 2016-08-11
Brian Nicholls resume   2016-08-11Brian Nicholls resume   2016-08-11
Brian Nicholls resume 2016-08-11
Brian Nicholls
 
Resume R_McCray FEB 2016
Resume R_McCray FEB 2016Resume R_McCray FEB 2016
Resume R_McCray FEB 2016Robert McCray
 
William Power Resume
William Power ResumeWilliam Power Resume
William Power ResumeWilliam Power
 
Dwayne Davis resume June 2016
Dwayne Davis resume June 2016Dwayne Davis resume June 2016
Dwayne Davis resume June 2016Dwayne Davis
 
B Nicholls resume 2016-07-17
B Nicholls resume   2016-07-17B Nicholls resume   2016-07-17
B Nicholls resume 2016-07-17
Brian Nicholls
 
Personal_Resume_11_2013
Personal_Resume_11_2013Personal_Resume_11_2013
Personal_Resume_11_2013Stephen Ciulla
 
Resume lois 12-2015
Resume lois 12-2015Resume lois 12-2015
Resume lois 12-2015
Lois Gasparetti-Buckman
 
Cv master english 30-01-18 v.1
Cv   master english 30-01-18 v.1Cv   master english 30-01-18 v.1
Cv master english 30-01-18 v.1
Ricardo F. Trenard
 
CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerSankar Sundaram PMP
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
Sankar Sundaram PMP
 
David Beck Resume
David Beck ResumeDavid Beck Resume
David Beck ResumeDavid Beck
 
Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Aew Sanmai
 

Similar to Steven Longman Resume 2016 (20)

Brian Nicholls resume 2016-08-11
Brian Nicholls resume   2016-08-11Brian Nicholls resume   2016-08-11
Brian Nicholls resume 2016-08-11
 
Daniel Andrescavage
Daniel AndrescavageDaniel Andrescavage
Daniel Andrescavage
 
Resume R_McCray FEB 2016
Resume R_McCray FEB 2016Resume R_McCray FEB 2016
Resume R_McCray FEB 2016
 
William Power Resume
William Power ResumeWilliam Power Resume
William Power Resume
 
Dwayne Davis resume June 2016
Dwayne Davis resume June 2016Dwayne Davis resume June 2016
Dwayne Davis resume June 2016
 
Word Doc CV
Word Doc CVWord Doc CV
Word Doc CV
 
B Nicholls resume 2016-07-17
B Nicholls resume   2016-07-17B Nicholls resume   2016-07-17
B Nicholls resume 2016-07-17
 
CV-NOEL KURTZIOUS-SENIOR PROJECT MANAGER-ENGINEER - Copy
CV-NOEL KURTZIOUS-SENIOR PROJECT MANAGER-ENGINEER - CopyCV-NOEL KURTZIOUS-SENIOR PROJECT MANAGER-ENGINEER - Copy
CV-NOEL KURTZIOUS-SENIOR PROJECT MANAGER-ENGINEER - Copy
 
Resume3
Resume3Resume3
Resume3
 
Personal_Resume_11_2013
Personal_Resume_11_2013Personal_Resume_11_2013
Personal_Resume_11_2013
 
Resume_Lois-12-2015
Resume_Lois-12-2015Resume_Lois-12-2015
Resume_Lois-12-2015
 
Resume lois 12-2015
Resume lois 12-2015Resume lois 12-2015
Resume lois 12-2015
 
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
 
Cv master english 30-01-18 v.1
Cv   master english 30-01-18 v.1Cv   master english 30-01-18 v.1
Cv master english 30-01-18 v.1
 
CraigMcDermottPDF2
CraigMcDermottPDF2CraigMcDermottPDF2
CraigMcDermottPDF2
 
CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning Engineer
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
 
David Beck Resume
David Beck ResumeDavid Beck Resume
David Beck Resume
 
Roberto Guevara-CV
Roberto Guevara-CVRoberto Guevara-CV
Roberto Guevara-CV
 
Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16
 

Steven Longman Resume 2016

  • 1. STEVEN LONGMAN 12901 Jefferson Highway #816 Baton Rouge, LA 70816 Telephone: (423) 991-7663 steve7562@gmail.com SUMMARY • Experienced in developing project budgets and forecasts, change management, cost control and project reporting.
 • Project Controls Specialist with over 20 years of experience in Government and EPC projects in nuclear, refinery, power and commercial facilities.
 • Front-end and detail engineering and design projects, joint ventures and multiple engineering offices and execution. 
 • Project work has included government, domestic and international facilities, under both lump sum and cost reimbursable contracts, EVMS, cost control and project reporting. EXPERIENCE Sr. Cost Engineer – Project Controls Responsible for all change management and estimation for multiple projects under an Alliance setup. Prepared and supervised preparation of cost estimates, budgets, forecasts, commitments, expenditures & progress reports. Created new reporting procedures and wbs code structure tailored for the alliance. Baton Rouge Tank Farm Project Controls for Tank Farm refurbishment. Sr. Cost Engineer – Project Controls Contracted under System One to SGT (Steam Generating Team), a division of URS Corp. to support change order management. Responsible for change order research, creation, scope, change estimation, and client negotiation. Scope was replacement of four steam generators at the Sequoyah Nuclear Power Plant Unit 2 in Tennessee. Approximate EPC value of project was $130 million. Sr. Cost Engineer – Project Controls Baseline restructuring, WBS creation, and Program Management Overview. Responsible for the development, implementation and maintenance of cost reporting requirements for Site Management and Department of Energy (DOE). Formulated and validated monthly actual cost reports. Maintained project trend log and incorporated trends into project forecast. Prepared change control log documentation and updated change control log. Created monthly cost vs. budget vs. earned reports and assisted multiple project managers with variance analysis. Incorporated EVMS into government reporting documents. Jacobs Engineering Multiple Oil Refinery Projects (2013 - 2016) ExxonMobil | Baton Rouge, LA | Beaumont, TX System One (2012 – 2013) TVA Sequoyah Nuclear Site | TN Fluor Government Group American Reinvestment and Recovery Act 
 (2009 – 2010) Savannah River Site | Aiken, SC
  • 2. Scope of the SRNS Recovery Act was Solid Waste Elimination of more than 90% of the plutonium-238 source term from the old plutonium Fuel Fabrication Facility; Deactivation and decommissioning of two nuclear materials production reactors and Soil and Ground Water Remediation (remediate the soil & ground water contaminated with radioactive and hazardous constituents where nuclear fuel assemblies and targets were manufactured during the Cold War). The ARRA Act was funded at $1.4 billion. Sr. Cost Engineer – Project Controls Senior Cost Engineer on multiple projects. Responsible for preparing cost estimates, budgets, forecasts, cash flow analysis, cost and progress reports for the Client and for Fluor Management. Development and processing of Change Orders and WBS. The scopes of service for these EPC projects ranged from Appraise through Define Phase Engineering and into Execute Stage Work. Two major projects were installation of a new reactor that doubled the volume for the hydrotreating operation and updated the refinery’s flare gas recovery systems, comprised of compressors, pumps, heat exchangers and water seals to minimize the combustion of vent gases in the flares. Approximate EPC value of projects was $170 million. Sr. Cost Engineer IV - Project Controls Lead Cost Engineer - Prepared and supervised preparation of cost estimates, budgets, forecasts, cost and progress reports for the Client (BP) and Jacobs Engineering Management. Directly supervised the non- billables and indirect costs for all projects under the Jacobs/BP Alliance umbrella, which managed over $220 million of EPC projects for the BP Carson Refinery. Developed a system of allocation of costs and revenues for each of the projects. Prepared monthly revenue, cost and margin analysis and trend reports for Jacobs Management. Developed, processed and managed change orders and WBS input, updated and analyzed FLA’s. Developed the BP Alliance Annual Business Plan for Sr. Mgmt. Lead Project Analyst Developed work breakdown structure and invoicing requirements for many ICA/Fluor Daniel projects including power plants based in Mexico and South America. Responsible for over 30 contracts valued at approximately $500 million. Prepared client invoicing, cost and billing reconciliations. Responsible for final gross margin reporting. Required international travel. Communicated with client representatives. Equiulon project in Carson, CA, required client invoicing, cost and billing reconciliations, procurement and commitment reports, and final gross magin reporting. EDUCATION B.S., Business Administration, Illinois State University Illinois Air National Guard, Headquarters Operations TVA Badged for Unescorted Nuclear Access/DOE clearance/TWIC card holder Flour Corporation Project Controls systems including SAP and FD Cost Jacobs Engineering Project Controls Systems including Oracle Fluor Daniel Multiple Oil Refinery Projects 
 (2007 – 2009) BP America Inc. | Carson, CA Jacobs Engineering Multiple Oil Refinery Projects (2001 – 2007) BP America Inc. | Carson, CA Fluor Daniel Engineering Projects - ICA/Fluor Daniel - Equilon (1997 - 2001) SHELL | Carson, CA