Surveying on NH21-A and finding accident prone areas and suggesting
preventive measures
Project Undertaken by:
13UME103
13UME104
13UCE006
13UCE026 Project Guide
13UCE027 Er. Girish Sharma
Introduction
Accident
 Causes loss of life
 Causes loss of property
 Can be Controlled by Safe Driving
What we are Doing?
Our work is do find accident prone areas on NH21-A
Baddi to Nalagarh a span of 17 kilometer. The reason
of it being an accident prone area may be technical
or some other reason. Our work is to prepare a
report of accident prone areas and forward it to
NHAI for further correction in these points when
four laning of this work will be done. Along with it
we will also find reduced level of various points by
rise and fall method.
Findings
 Accident Prone Area at RD 19/310m
 Baddi Bye Pass
Reasons for Accident
 No Junction is Provided
 No Traffic Signal is Provided
 Vehicles come from three sides at same side which
leads to traffic congestion and accidents.
Preventive Measures
 Create a circular junction at the by-pass allowing
vehicles to proceed in a proper way.
 Light Signal can not be installed here because it will
reduce accidents but may cause congestion.
Accident Prone Area
 Accident Prone Area at RD 20/105m
 Haripur to Sandholi Road
Reasons For Accident
 Intersection sight distance is not properly provided
 No traffic signal is provided
Preventions
 Establishing traffic signal
 Intersection Sight Distance needs to be corrected
Reduced Levels
 Reduced Levels of various points have been find by
Rise and Fall method
Name RD Reduced
Level
Bus Stand
Baddi(Benchmark)
19/000m 392m
Baddi University 25/275m 375m
Pending Work
 Reduced Level from Kharer to Nalagarh
 Accident Prone Areas found upto Bhud Barrier RD
23/450m
Thank You

More Related Content

Similar to Steel Slag PPT

Similar to Steel Slag PPT (6)

Study of Road Safety Audit in Municipal Area’s
Study of Road Safety Audit in Municipal  Area’sStudy of Road Safety Audit in Municipal  Area’s
Study of Road Safety Audit in Municipal Area’s
 
Renewing of Indonesia Highway Capacity Manual Urbanroad Segment with Traffic ...
Renewing of Indonesia Highway Capacity Manual Urbanroad Segment with Traffic ...Renewing of Indonesia Highway Capacity Manual Urbanroad Segment with Traffic ...
Renewing of Indonesia Highway Capacity Manual Urbanroad Segment with Traffic ...
 
IRJET- GIS based Road Safety Audit of State Highways in Thrissur
IRJET- GIS based Road Safety Audit of State Highways in ThrissurIRJET- GIS based Road Safety Audit of State Highways in Thrissur
IRJET- GIS based Road Safety Audit of State Highways in Thrissur
 
Research on the Model of Sight Distance Triangle in Mountain HighwayIntersect...
Research on the Model of Sight Distance Triangle in Mountain HighwayIntersect...Research on the Model of Sight Distance Triangle in Mountain HighwayIntersect...
Research on the Model of Sight Distance Triangle in Mountain HighwayIntersect...
 
IRJET- Design of Parking Area and Traffic Signal for Moodbidri Town based...
IRJET-  	  Design of Parking Area and Traffic Signal for Moodbidri Town based...IRJET-  	  Design of Parking Area and Traffic Signal for Moodbidri Town based...
IRJET- Design of Parking Area and Traffic Signal for Moodbidri Town based...
 
An Introduction To Road Safety Engineering
An Introduction To Road Safety EngineeringAn Introduction To Road Safety Engineering
An Introduction To Road Safety Engineering
 

Recently uploaded

Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
IJECEIAES
 
Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..
MaherOthman7
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
rahulmanepalli02
 

Recently uploaded (20)

Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
 
Diploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfDiploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdf
 
engineering chemistry power point presentation
engineering chemistry  power point presentationengineering chemistry  power point presentation
engineering chemistry power point presentation
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
 
Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..
 
21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university
 
History of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & ModernizationHistory of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & Modernization
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...
 
Adsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptAdsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) ppt
 
Insurance management system project report.pdf
Insurance management system project report.pdfInsurance management system project report.pdf
Insurance management system project report.pdf
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Students
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailing
 
Artificial Intelligence in due diligence
Artificial Intelligence in due diligenceArtificial Intelligence in due diligence
Artificial Intelligence in due diligence
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded Systems
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.ppt
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
 
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...
 

Steel Slag PPT

  • 1. Surveying on NH21-A and finding accident prone areas and suggesting preventive measures Project Undertaken by: 13UME103 13UME104 13UCE006 13UCE026 Project Guide 13UCE027 Er. Girish Sharma
  • 3.
  • 4. Accident  Causes loss of life  Causes loss of property  Can be Controlled by Safe Driving
  • 5. What we are Doing? Our work is do find accident prone areas on NH21-A Baddi to Nalagarh a span of 17 kilometer. The reason of it being an accident prone area may be technical or some other reason. Our work is to prepare a report of accident prone areas and forward it to NHAI for further correction in these points when four laning of this work will be done. Along with it we will also find reduced level of various points by rise and fall method.
  • 6. Findings  Accident Prone Area at RD 19/310m  Baddi Bye Pass
  • 7. Reasons for Accident  No Junction is Provided  No Traffic Signal is Provided  Vehicles come from three sides at same side which leads to traffic congestion and accidents.
  • 8. Preventive Measures  Create a circular junction at the by-pass allowing vehicles to proceed in a proper way.  Light Signal can not be installed here because it will reduce accidents but may cause congestion.
  • 9. Accident Prone Area  Accident Prone Area at RD 20/105m  Haripur to Sandholi Road
  • 10. Reasons For Accident  Intersection sight distance is not properly provided  No traffic signal is provided
  • 11. Preventions  Establishing traffic signal  Intersection Sight Distance needs to be corrected
  • 12. Reduced Levels  Reduced Levels of various points have been find by Rise and Fall method Name RD Reduced Level Bus Stand Baddi(Benchmark) 19/000m 392m Baddi University 25/275m 375m
  • 13. Pending Work  Reduced Level from Kharer to Nalagarh  Accident Prone Areas found upto Bhud Barrier RD 23/450m