Road Safety Audits and Inspection for HDBRTS Professional Work at
EMBARQ
Road Safety audit is a systematic method of checking the safety aspects of new
road projects in order to detect potential safety hazards before the road is opened to
traffic.
Road safety inspection is defined as a systematic review of an existing road with
the intention to identifying conditions of potential hazard to road users.
Purpose:
 To carry out a systematic road safety audit of a section of the Hubli Dharwad BRT
corridor to identify issues of potential hazard for all road users.
 The kerbs at the edge of the
BRT lanes terminate before
the pedestrian crossings.
 The junction is not uniform and
misaligned which can lead to
safety issues.
 Lack of uniform carriageway
will promote overtaking
maneuvers at the junction by
smaller vehicles.
Problem
Recommendations
 Install a small refuge with
bollards to protect pedestrians
waiting to cross.
 BRT lane should be aligned in
a uniform manner.
 It is also recommended to
provide a uniform carriage-
way.
 The width of the BRT kerb is
reduced from one-meter to
0.3-meter
 The kerbs at the edge of the
BRT lanes terminate before
the pedestrian crossings.
 Lack of uniform carriageway
will promote overtaking
maneuvers at the junction by
smaller vehicles.
Problem
Recommendations
 Continue a one-meter BRT
kerb upto pedestrian crossing
 Install a small refuge with
bollards to protect pedestrians
waiting to cross.
 It is also recommended to
provide a uniform carriage-
way.
My Role in this Project:
 Conducted a road safety audits for Hubli Dharwad BRT corridor (about 22 km).
 Prepared conceptual diagrams as showed some of pictures below.
P
O
R
T
F
O
L
I
O
F
O
R
T
R
A
N
S
P
O
R
T
P
L
A
N
N
E
R
J
O
B
PLANNING FOR EQUAL STREETS Professional Work at
EMBARQ
Aim: Equal Streets is a sustained community movement, in order to provision of
better and safer walking and cycling infrastructure in our city.
My Role in this Project:
 Prepared base map for Equal Streets
 Conducted several site-visits
 Conducted detailed road inventory survey
 Proposed traffic and transit re-routing plans
 Ensured access for emergency vehicles
 Proposed parking management plan
 Prepared a proposed signage map for in and around the vicinity of equal streets
loop.
 Prepared numerous conceptual maps to engage various stakeholders
 Conducted several meetings with various stakeholders to get implemented
 Identifying new stakeholders
 Prepared permanent street design solution for Equal Streets
 Prepared visuals for proposed design
 Participating in weekly Equal Streets group meetings
 Preparing plans for Equal Streets expansion
 Conducting site-visits for Equal Streets Expansion
 Etc….
Objectives:
 To organize a weekly program, every Sunday morning, where a section of public
roads are closed for motorized transport, and open to all forms of non-motorized
transport and community social-recreational activities
 To use this program as a platform to build community & government engagement
to address the urgent transportation concerns for our city, such as road safety,
deteriorating air quality, traffic congestion, physical inactivity & sedentary
lifestyles, (especially for our children), lack of public space
 To translate this support into positive change on the ground, by partnering with
civic authorities on the implementation of demonstrable projects
Location Map
Conceptual Design
Traffic Management Plan
NormalSundays
EqualStreetsSundays
Public Space
P
O
R
T
F
O
L
I
O
F
O
R
T
R
A
N
S
P
O
R
T
P
L
A
N
N
E
R
J
O
B
EQUAL STREETS DESIGN
Professional Work at
EMBARQ
P
O
R
T
F
O
L
I
O
F
O
R
T
R
A
N
S
P
O
R
T
P
L
A
N
N
E
R
J
O
B
EQUAL STREETS DESIGN VIEWS
Professional Work at
EMBARQ
Creative cul-de-sacs at junction Mid-block parking
Street view at mid-block
P
O
R
T
F
O
L
I
O
F
O
R
T
R
A
N
S
P
O
R
T
P
L
A
N
N
E
R
J
O
B
INFOGRAPHIC CHALLENGE
Also available at http://embarqindiahub.org/sites/default/files/infographics/Kanika-Gola.jpg
P
O
R
T
F
O
L
I
O
F
O
R
T
R
A
N
S
P
O
R
T
P
L
A
N
N
E
R
J
O
B
INFOGRAPHIC CHALLENGE
Also available at http://embarqindiahub.org/sites/default/files/infographics/Naresh-Kuruba.jpg
P
O
R
T
F
O
L
I
O
F
O
R
T
R
A
N
S
P
O
R
T
P
L
A
N
N
E
R
J
O
B
 Space for buses to turn around
 Space for buses to park
 Circulation to ensure that buses
move and park quickly and safely
Study Area: Location Map
Relationship between “Road
hierarchy and Bus route”
(conceptual diagram)
Bus Terminal Study for BEST
Aim: To understand the effects of infrastructure on bus operations and
services, this study focuses on terminal infrastructure in Mumbai city.
Objectives:
 To identify the existing bus route network and assess route
coverage and service frequencies;
 To determine the gaps in the terminal network, using planning tools
such as Geographic Information Systems (GIS) mapping and to identify
potential locations for terminals; and
 To estimate the impact of a terminal on bus operations and services.
Study Methodology
93% of the Island area is
covered within walkable
distance, i.e. 500m
75% of the area is covered
with high frequency bus
service, i.e. <=10 min
 # Depots: 7
 # Terminals: 52
 Fleet size: 960
 # Routes: 135
 Avg. passengers per
day: 8.5 lakh
Professional Work at
EMBARQ
Identifying Bus Route Network Study Highlights
Route Coverage
Service
Frequencies
At A Glance
Analysis
Terminal Influences
Dadar- Parel belt is
identified as a serious need
of terminal infrastructure
Nine potential locations
were identified based on
terminal gaps and where
many routes merge/diverge
 Route number: 63
 Route span: 15.5 kms
 # of stations: 34
 Running time: 90 min
 Journey speed:11.3 km/hr
 Total # of Boardings/
Alightings: 236
 High # of alightings are
at Lower Parel Station
Potential Terminals Transit Demand
Design Considerations
Terminal Design Impact on operations
Impact for passengers
Impact on operations:
 If the route-63 is broken up into two
shorter routes, it would save 690 vehicle
kilometers per day, while maintaining the
same headway, # trips and fleet size.
Impact for passengers
 The splitting the route can improve
frequency from 13 mins to 7 mins (Route
A-C) and 6 mins (Route C-B). This
increase in frequency can be operated by
maintaining the same vehicle utilization
and fleet size
P
O
R
T
F
O
L
I
O
F
O
R
T
R
A
N
S
P
O
R
T
P
L
A
N
N
E
R
J
O
B
Survey location
Factorsaffectinguseofbicycle
Bike & Ride (B&R): Integrating Bicycles and Public
Transport
Aim: applicability and acceptability of B&R services in
case of Ahmedabad city.
Componentsofintegration
Objectives:
 To review the various components of integration
 To identify the factors affecting use of bicycle
 To identify the potential demand (B&R) services
 To identify the cost efficiency of the “B&R” system.
Research Methodology
61% of trips are within walkable egress distance
Economical travel distance is >4 kms
Effective catchment area is upto 1.25 kms
Travel distance wise acceptance
Mode shift due to B&R System
Cost efficiency (EIRR) of the system within period of 20 years is 20.1%
Masters Research Work
Criteria for study area
selection
Station typology
Residential land use
Population density
Working pop. density
Student pop. Density
Income
Bicycle ownership
P
O
R
T
F
O
L
I
O
F
O
R
T
R
A
N
S
P
O
R
T
P
L
A
N
N
E
R
J
O
B
Travel Demand Modelling
Aim: to recommend the most suitable solution to both private (auto)
and public transport based on travel demand for the city of XYZ.
Base year: 2013 Future year: 2018
Study area at a glance
Name of the city: XYZ
Area: 584. 29 sq. kms
No. of zones: 5
Internal TAZ’s: 140
External TAZ’s: 14
Network type: Radial
Road length: 32695.71 km
PT service type: Destination based
No. of routes: 127
Parameters for comparison
Auto Assignment
Vehicle kms.
Vehicle hrs.
Volume capacity (V/C) ratio
Length of links (>1 V/C ratio) in kms
Transit Assignment
Passenger kms.
Passenger hrs.
Load factors
Boarding, alighting and transfers
Building Scenario
1. Do nothing
2. Given transit lines
3. Do something
4. Do maximum
Given transit lines
Public transport measures:
Added transit lines
Do minimum
Auto measures:
I. Road widening
II. Missing links
Public transport measure:
I. Added transit stops
II. Changed headway based on max.
volume and bus capacity
Do something
Auto measures
I. Missing links
II. Road widening
Transit measures
I. Express high capacity bus system
II. Deleted parallel routes
Land Use Map
Road Network
Results
Future Travel Demand
Auto Demand Transit Demand
Auto Measures Volume Capacity Ratio
Transit Measures Facility Design Identification
Transit demand
• Passenger kms:
1,23,445.9
• Passenger hrs:
6,960.1
Auto demand
• Vehicle kms:
16,95,259
• Vehicle hrs:
68,426.91
Base
Year Transit demand
• Passenger kms:
2,05,010.1
• Passenger hrs:
11,435.1
Auto demand
• Vehicle kms:
19,12,142
• Vehicle hrs:
85,142.4
Future
Year
Given
transitlines
Passenger kms: -
20,828.4
Passenger hrs: 99.1
Do
minimum
Passenger kms: 843.3
Passenger hrs: 955.2
Vehicle kms: 485
Vehicle hrs: 3,536.11
Do
something
Passenger kms: -
1,583.3
Passenger hrs: 1,364.8
Vehicle kms: 42,538
Vehicle hrs: 9,236.99
M. Plan (III Sem) Work
Transit Network
P
O
R
T
F
O
L
I
O
F
O
R
T
R
A
N
S
P
O
R
T
P
L
A
N
N
E
R
J
O
B
M. Plan (I Sem) WorkJunction Design of Vijay Cross Roads, Navaragpura, Ahmedabad
P
O
R
T
F
O
L
I
O
F
O
R
T
R
A
N
S
P
O
R
T
P
L
A
N
N
E
R
J
O
B
Area Planning Lab M. Plan (I Sem) Work
P
O
R
T
F
O
L
I
O
F
O
R
T
R
A
N
S
P
O
R
T
P
L
A
N
N
E
R
J
O
B
INTERNSHIP
Project name: Revision of Master Plan for Rajahmundry Municipal Corporation
limits with 5KM Vicinity.
Client : Commissioner; Rajahmundry Municipal Corporation
Rajahmundry Town at a Glance:
Extent of Corporation area : 44.5 Sq. kms
Vicinity : 5 kms (12 villages)
Total Extent : 88.5 Sq. kms
Population (2011 Provisional) : 3,43,903
Density :17,288/km2
No. of Households : 94,994
No. of Wards : 50
Project Period
Start : Date / Month / Year :01/01/11
Completion Date :Ongoing
My Role in the Project:
Preparation of broad land use map of Rajahmundry with area of 88.5 sq. Kms.
On site Supervision for conducting diff. surveys, these surveys are
i. Land use survey
ii. Household survey
iii. Road inventory survey
Updating Land use of Rajahmundry Master Plan
Data Verification and Analysis of Rajahmundry H.H Survey Sheets received from
Field Enumerators
In-corporation of approved GTPs in Rajahmundry Master Plan
In-corporation of Approved Layout Plans in Rajahmundry Base map
Collecting of GTPs Maps from DTCP, Hyderabad.
Existing land use Map
B. Plan Work
P
O
R
T
F
O
L
I
O
F
O
R
T
R
A
N
S
P
O
R
T
P
L
A
N
N
E
R
J
O
B
DISSERTATION
 Increased journey times due to increased traffic density and in adequate road capacity.
 In adequate parking and terminal facilities resulting in reduced accessibility.
 Increase in the trip level cost and maintenance.
NEED FOR STUDY Desktop Study
Traffic Management Plan for Core area of Hindupur Town
Objectives
 To study the existing scenario of traffic in Hindupur
 To identify the most congested area of the town
 To identify the traffic problems and deficiencies in the area
 To suggest the improvements in Hindupur study area
Introduction:
 Madurai is the second largest City in Tamilnadu State, having a very old
history of about two thousand six hundred years and is often referred to
as the Athens of East.
 It has three National Highways namely NH-7, NH-45B, NH-49 and state
highways passing through it.
Forecasting the traffic
The traffic volume for the year 2002 and future year 2007 are forecasted
with respect to the 1997 traffic volume taken from the CTTS Report (CTTS
Report, 1997), vehicle growth rate and the sample survey conducted at
different locations.
Diversion of traffic
 The old A.V.Bridge and the newly constructed bridge over the old
Kalpalam causeway play a major role in handling the traffic.
 The old Kalpalam causeway was closed after the construction of the new
bridge
 As a TSM measure, it is decided to divert some of the traffic movement
through the old causeway.
Level of Services
Before Taking TSM Measures After Taking TSM Measures
CONVERTIONOFONEWAY
STREETS
Methodology
B. Plan Work
P
O
R
T
F
O
L
I
O
F
O
R
T
R
A
N
S
P
O
R
T
P
L
A
N
N
E
R
J
O
B
DISSERTATION
CASE STUDY:
Traffic Management Plan for Core area of Hindupur Town
Introduction
 Hindupur is the second biggest town and
Mandal headquarters located in
Anantapur district in Andhra Pradesh,
India.
 The border between Andhra Pradesh and
Karnataka state passes through
Hindupur and Koratagere taluk in
Karnataka.
Location Map
District Anantapur
Name of the ULB Hindupur
Grade Special Grade
Area (Sq. Kms.) 38.16 Sq.KM.
Population 151835
Males 76,625
Females 75,210
Density 3979
Total no. of households (2011) 32,002
No. Of municipal wards 38
General profile
Register Vehicle Data
Level of Service
6 major intersections have been identified
in the study area, These intersections are
having major movement of traffic
Ambedkar Circle
Proposed Map
B. Plan Work
P
O
R
T
F
O
L
I
O
F
O
R
T
R
A
N
S
P
O
R
T
P
L
A
N
N
E
R
J
O
B
Planning ColloquiumPublic Mass Transit Systems- (7th Sem)
 The population in HMDA 9 million. (Source: HMDA Extended Master
Plan 2030.)
 . The average speed is 12km/hr in the core. (Source: Hyd, CDP.)
 A further growth will only worsen mobility issues.
 In Hyderabad,
The average travel distance is 9.2km.
44 out of every 100 commuters travel by public transit systems.
Introduction
A comparison of BRT and MRT in a multi-
professional perspective
Parameters for comparison:
•Ridership.
•Design.
•Economics of transit.
•Mobility.
•Ease of access.
•The Visual Element
•Environmental Impact
BRTS MRTS
Year
Daily
System Pax
Corridor I
pphpd
Daily
System Pax
Corridor I
pphpd
2008 8,54,001 14,441 6,53,862 11,057
2011 9,05,221 15,307 6,93,093 11,720
2021 10,76,042 18,195 8,73,298 14,767
Estimated Ridership
Source: ITDP, 2005
The capital costs include:
• Land Acquisition.
• Infrastructure costs.
• Construction costs.
• VGF (Viability Gap Funding).
Capital cost MRTS BRTS
Company's own estimate 4204 _
ITDP estimate 5170 408
Capital cost/km
Company's capital cost/km estimate 110 _
ITDP capital cost/km estimate 135 17
Year Cost/km Revenue/km Loss/km
1996-97 11.19 10.53 0.64
1997-98 12.19 11.49 0.7
1998-99 12.63 11.58 1.07
1999-00 13.19 12.48 0.71
2000-01 14.62 13.47 1.15
2001-02 15.35 13.18 2.17
Operating Characteristics of APSRTC in Hyderabad
Type Min Max
General Bus 4 22
Metro Express Bus 6 24
AC Bus 10 45
Metro Rail- AC 8 18
Min. & Max. Fares
MRTS BRTS
Speed
(km/h)
Distan
ce
(km)
Minute
s
Speed
(km/h)
Distan
ce
(km)
Minute
s
Walking 4 0.5 7.5 4 0.25 3.8
Waiting _ _ 3 _ _ 2
Riding 34 9.2 16 26 9.2 21
Walking 4 0.5 7.5 4 0.25 3.8
Total time 34 31
Speed BRTS MRTS
Dedicated 3.5m
lane.
Lesser space
available for
pvt. Vehicles.
More ongestion.
Push factor from
pvt. modes of
transport.
Column
requiring 2m
road width.
Better from the
pvt. Vehicles
point of view.
Force of push is
lower.
Flexible Lane
Separators.
Fixed Built
Structures.
Impact on Private Vehicles
Zones Noise level standards BRT MRT
Silence 50 db(D), 40db(N) 55db (D), 40db(N) 60db(D&N)
Commercial 65db(D), 60db(N) 70db (D), 65(N) 75db(D&N)
Industrial 75db(D) , 70db(N) 80db (D) , 70db(N) 85db (D), 75db (N)
Residential 55db(D) & 45db(N) 60db (D), 55db(N) 65db(D&N)
Environmental Impacts
B. Plan Work

More Related Content

What's hot

Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy
Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS ReddyHyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy
Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS ReddyIPPAI
 
Features of Comprehensive Transportation Plan and Direction
Features of Comprehensive Transportation Plan and DirectionFeatures of Comprehensive Transportation Plan and Direction
Features of Comprehensive Transportation Plan and DirectionAnamhyder1
 
Webinar: Some Observations on BRT in North America… and Elsewhere
Webinar: Some Observations on BRT in North America… and ElsewhereWebinar: Some Observations on BRT in North America… and Elsewhere
Webinar: Some Observations on BRT in North America… and ElsewhereBRTCoE
 
Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK
Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RKStation Accessibility Plan(SAP) for Vijaynagar Metro Station by RK
Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RKRaam Krishna Prakash Jagali
 
Webinar: The flexibility of the bus is both a strength and a weakness in prov...
Webinar: The flexibility of the bus is both a strength and a weakness in prov...Webinar: The flexibility of the bus is both a strength and a weakness in prov...
Webinar: The flexibility of the bus is both a strength and a weakness in prov...BRTCoE
 
[Urban transportation policy program]city paper presentation sebrang perai
[Urban transportation policy program]city paper presentation sebrang perai[Urban transportation policy program]city paper presentation sebrang perai
[Urban transportation policy program]city paper presentation sebrang peraishrdcinfo
 
The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)theijes
 
Theoritical framework
Theoritical frameworkTheoritical framework
Theoritical frameworkIsha Kirti
 
Integrated Public Transport System - Bangalore
Integrated Public Transport System - BangaloreIntegrated Public Transport System - Bangalore
Integrated Public Transport System - BangaloreTehsin Kazi
 
Webinar Session: "BRT in India – a way forward"
Webinar Session: "BRT in India – a way forward"Webinar Session: "BRT in India – a way forward"
Webinar Session: "BRT in India – a way forward"BRTCoE
 
Planning for a Multimodal Transport Interchnage
Planning for a Multimodal Transport InterchnagePlanning for a Multimodal Transport Interchnage
Planning for a Multimodal Transport InterchnageGargee Ghosh
 
Kashyap Pandya - Portfolio of Planning Works
Kashyap Pandya - Portfolio of Planning WorksKashyap Pandya - Portfolio of Planning Works
Kashyap Pandya - Portfolio of Planning WorksKashyapPandya3
 
Hyderabad apac-const-dec13-bro-s
Hyderabad apac-const-dec13-bro-sHyderabad apac-const-dec13-bro-s
Hyderabad apac-const-dec13-bro-sAbi Abagun
 
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...BRTCoE
 

What's hot (20)

Brts
BrtsBrts
Brts
 
Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy
Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS ReddyHyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy
Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy
 
Features of Comprehensive Transportation Plan and Direction
Features of Comprehensive Transportation Plan and DirectionFeatures of Comprehensive Transportation Plan and Direction
Features of Comprehensive Transportation Plan and Direction
 
Webinar: Some Observations on BRT in North America… and Elsewhere
Webinar: Some Observations on BRT in North America… and ElsewhereWebinar: Some Observations on BRT in North America… and Elsewhere
Webinar: Some Observations on BRT in North America… and Elsewhere
 
Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK
Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RKStation Accessibility Plan(SAP) for Vijaynagar Metro Station by RK
Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK
 
Mobility or Accessibility?
Mobility or Accessibility?Mobility or Accessibility?
Mobility or Accessibility?
 
Webinar: The flexibility of the bus is both a strength and a weakness in prov...
Webinar: The flexibility of the bus is both a strength and a weakness in prov...Webinar: The flexibility of the bus is both a strength and a weakness in prov...
Webinar: The flexibility of the bus is both a strength and a weakness in prov...
 
[Urban transportation policy program]city paper presentation sebrang perai
[Urban transportation policy program]city paper presentation sebrang perai[Urban transportation policy program]city paper presentation sebrang perai
[Urban transportation policy program]city paper presentation sebrang perai
 
BRT in China: A brief review
BRT in China: A brief reviewBRT in China: A brief review
BRT in China: A brief review
 
The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)
 
Theoritical framework
Theoritical frameworkTheoritical framework
Theoritical framework
 
Integrated Public Transport System - Bangalore
Integrated Public Transport System - BangaloreIntegrated Public Transport System - Bangalore
Integrated Public Transport System - Bangalore
 
Webinar Session: "BRT in India – a way forward"
Webinar Session: "BRT in India – a way forward"Webinar Session: "BRT in India – a way forward"
Webinar Session: "BRT in India – a way forward"
 
Planning for a Multimodal Transport Interchnage
Planning for a Multimodal Transport InterchnagePlanning for a Multimodal Transport Interchnage
Planning for a Multimodal Transport Interchnage
 
BUS PROCUREMENT
BUS PROCUREMENTBUS PROCUREMENT
BUS PROCUREMENT
 
Kashyap Pandya - Portfolio of Planning Works
Kashyap Pandya - Portfolio of Planning WorksKashyap Pandya - Portfolio of Planning Works
Kashyap Pandya - Portfolio of Planning Works
 
Pimpri-Chinchwad Municipal Corporation BRTS Project
Pimpri-Chinchwad Municipal Corporation BRTS ProjectPimpri-Chinchwad Municipal Corporation BRTS Project
Pimpri-Chinchwad Municipal Corporation BRTS Project
 
Hyderabad apac-const-dec13-bro-s
Hyderabad apac-const-dec13-bro-sHyderabad apac-const-dec13-bro-s
Hyderabad apac-const-dec13-bro-s
 
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
 
Tackling future urban mobility demand in singapore
Tackling future urban mobility demand in singaporeTackling future urban mobility demand in singapore
Tackling future urban mobility demand in singapore
 

Similar to My Portfolio

SimCap Louisiana Educational Meeting #1 Slides
SimCap Louisiana Educational Meeting #1 SlidesSimCap Louisiana Educational Meeting #1 Slides
SimCap Louisiana Educational Meeting #1 SlidesChristopher Melson
 
Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...EditorIJAERD
 
Sustainable Transportation and Mobility in Jordan and Germany
Sustainable Transportation and Mobility in Jordan and GermanySustainable Transportation and Mobility in Jordan and Germany
Sustainable Transportation and Mobility in Jordan and GermanyYazid Hamoda
 
Resume Bharadwaj
Resume Bharadwaj Resume Bharadwaj
Resume Bharadwaj Bharadwaj B
 
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVIA STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVIIRJET Journal
 
Brad Strader - downtown transportation
Brad Strader - downtown transportationBrad Strader - downtown transportation
Brad Strader - downtown transportationsenecasuccess
 
Ppp for public bicycle sharing and parking management in kharghar navi mumbai...
Ppp for public bicycle sharing and parking management in kharghar navi mumbai...Ppp for public bicycle sharing and parking management in kharghar navi mumbai...
Ppp for public bicycle sharing and parking management in kharghar navi mumbai...Avinash Shabade
 
Resume Bharadwaj
Resume Bharadwaj Resume Bharadwaj
Resume Bharadwaj Bharadwaj B
 
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...IRJET Journal
 
A Critical Review on Planning & Designing Complete Intersections
A Critical Review on Planning & Designing Complete IntersectionsA Critical Review on Planning & Designing Complete Intersections
A Critical Review on Planning & Designing Complete IntersectionsIRJET Journal
 
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...IRJET Journal
 
Sustainable Transportation and Mobility in Jordan and Germany
Sustainable Transportation and Mobility in Jordan and GermanySustainable Transportation and Mobility in Jordan and Germany
Sustainable Transportation and Mobility in Jordan and GermanyYazid Hamoda
 
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...IRJET Journal
 
origin and destination survey research papeer
origin and destination survey research papeerorigin and destination survey research papeer
origin and destination survey research papeerAdmeff Construction
 
Pedestrians safety assessment & sidewalk quality study in a city
Pedestrians safety assessment & sidewalk quality study in a cityPedestrians safety assessment & sidewalk quality study in a city
Pedestrians safety assessment & sidewalk quality study in a cityAnkit Singh
 

Similar to My Portfolio (20)

Design of expressway
Design of expresswayDesign of expressway
Design of expressway
 
SimCap Louisiana Educational Meeting #1 Slides
SimCap Louisiana Educational Meeting #1 SlidesSimCap Louisiana Educational Meeting #1 Slides
SimCap Louisiana Educational Meeting #1 Slides
 
Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...
 
Sustainable Transportation and Mobility in Jordan and Germany
Sustainable Transportation and Mobility in Jordan and GermanySustainable Transportation and Mobility in Jordan and Germany
Sustainable Transportation and Mobility in Jordan and Germany
 
Resume Bharadwaj
Resume Bharadwaj Resume Bharadwaj
Resume Bharadwaj
 
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVIA STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
 
Brad Strader - downtown transportation
Brad Strader - downtown transportationBrad Strader - downtown transportation
Brad Strader - downtown transportation
 
Ppp for public bicycle sharing and parking management in kharghar navi mumbai...
Ppp for public bicycle sharing and parking management in kharghar navi mumbai...Ppp for public bicycle sharing and parking management in kharghar navi mumbai...
Ppp for public bicycle sharing and parking management in kharghar navi mumbai...
 
Resume Bharadwaj
Resume Bharadwaj Resume Bharadwaj
Resume Bharadwaj
 
Addressing Safety Through Design for Dindoshi Terminal (Draft)
Addressing Safety Through Design for Dindoshi Terminal (Draft)Addressing Safety Through Design for Dindoshi Terminal (Draft)
Addressing Safety Through Design for Dindoshi Terminal (Draft)
 
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
 
A Critical Review on Planning & Designing Complete Intersections
A Critical Review on Planning & Designing Complete IntersectionsA Critical Review on Planning & Designing Complete Intersections
A Critical Review on Planning & Designing Complete Intersections
 
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
 
Sustainable Transportation and Mobility in Jordan and Germany
Sustainable Transportation and Mobility in Jordan and GermanySustainable Transportation and Mobility in Jordan and Germany
Sustainable Transportation and Mobility in Jordan and Germany
 
Traffic engineering
Traffic engineeringTraffic engineering
Traffic engineering
 
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
 
SEM 1 PRESENTATION
SEM 1 PRESENTATIONSEM 1 PRESENTATION
SEM 1 PRESENTATION
 
origin and destination survey research papeer
origin and destination survey research papeerorigin and destination survey research papeer
origin and destination survey research papeer
 
Pedestrians safety assessment & sidewalk quality study in a city
Pedestrians safety assessment & sidewalk quality study in a cityPedestrians safety assessment & sidewalk quality study in a city
Pedestrians safety assessment & sidewalk quality study in a city
 
D04412429
D04412429D04412429
D04412429
 

My Portfolio

  • 1. P O R T F O L I O F O R T R A N S P O R T P L A N N E R J O B Road Safety Audits and Inspection for HDBRTS Professional Work at EMBARQ Road Safety audit is a systematic method of checking the safety aspects of new road projects in order to detect potential safety hazards before the road is opened to traffic. Road safety inspection is defined as a systematic review of an existing road with the intention to identifying conditions of potential hazard to road users. Purpose:  To carry out a systematic road safety audit of a section of the Hubli Dharwad BRT corridor to identify issues of potential hazard for all road users.  The kerbs at the edge of the BRT lanes terminate before the pedestrian crossings.  The junction is not uniform and misaligned which can lead to safety issues.  Lack of uniform carriageway will promote overtaking maneuvers at the junction by smaller vehicles. Problem Recommendations  Install a small refuge with bollards to protect pedestrians waiting to cross.  BRT lane should be aligned in a uniform manner.  It is also recommended to provide a uniform carriage- way.  The width of the BRT kerb is reduced from one-meter to 0.3-meter  The kerbs at the edge of the BRT lanes terminate before the pedestrian crossings.  Lack of uniform carriageway will promote overtaking maneuvers at the junction by smaller vehicles. Problem Recommendations  Continue a one-meter BRT kerb upto pedestrian crossing  Install a small refuge with bollards to protect pedestrians waiting to cross.  It is also recommended to provide a uniform carriage- way. My Role in this Project:  Conducted a road safety audits for Hubli Dharwad BRT corridor (about 22 km).  Prepared conceptual diagrams as showed some of pictures below.
  • 2. P O R T F O L I O F O R T R A N S P O R T P L A N N E R J O B PLANNING FOR EQUAL STREETS Professional Work at EMBARQ Aim: Equal Streets is a sustained community movement, in order to provision of better and safer walking and cycling infrastructure in our city. My Role in this Project:  Prepared base map for Equal Streets  Conducted several site-visits  Conducted detailed road inventory survey  Proposed traffic and transit re-routing plans  Ensured access for emergency vehicles  Proposed parking management plan  Prepared a proposed signage map for in and around the vicinity of equal streets loop.  Prepared numerous conceptual maps to engage various stakeholders  Conducted several meetings with various stakeholders to get implemented  Identifying new stakeholders  Prepared permanent street design solution for Equal Streets  Prepared visuals for proposed design  Participating in weekly Equal Streets group meetings  Preparing plans for Equal Streets expansion  Conducting site-visits for Equal Streets Expansion  Etc…. Objectives:  To organize a weekly program, every Sunday morning, where a section of public roads are closed for motorized transport, and open to all forms of non-motorized transport and community social-recreational activities  To use this program as a platform to build community & government engagement to address the urgent transportation concerns for our city, such as road safety, deteriorating air quality, traffic congestion, physical inactivity & sedentary lifestyles, (especially for our children), lack of public space  To translate this support into positive change on the ground, by partnering with civic authorities on the implementation of demonstrable projects Location Map Conceptual Design Traffic Management Plan NormalSundays EqualStreetsSundays Public Space
  • 4. P O R T F O L I O F O R T R A N S P O R T P L A N N E R J O B EQUAL STREETS DESIGN VIEWS Professional Work at EMBARQ Creative cul-de-sacs at junction Mid-block parking Street view at mid-block
  • 5. P O R T F O L I O F O R T R A N S P O R T P L A N N E R J O B INFOGRAPHIC CHALLENGE Also available at http://embarqindiahub.org/sites/default/files/infographics/Kanika-Gola.jpg
  • 6. P O R T F O L I O F O R T R A N S P O R T P L A N N E R J O B INFOGRAPHIC CHALLENGE Also available at http://embarqindiahub.org/sites/default/files/infographics/Naresh-Kuruba.jpg
  • 7. P O R T F O L I O F O R T R A N S P O R T P L A N N E R J O B  Space for buses to turn around  Space for buses to park  Circulation to ensure that buses move and park quickly and safely Study Area: Location Map Relationship between “Road hierarchy and Bus route” (conceptual diagram) Bus Terminal Study for BEST Aim: To understand the effects of infrastructure on bus operations and services, this study focuses on terminal infrastructure in Mumbai city. Objectives:  To identify the existing bus route network and assess route coverage and service frequencies;  To determine the gaps in the terminal network, using planning tools such as Geographic Information Systems (GIS) mapping and to identify potential locations for terminals; and  To estimate the impact of a terminal on bus operations and services. Study Methodology 93% of the Island area is covered within walkable distance, i.e. 500m 75% of the area is covered with high frequency bus service, i.e. <=10 min  # Depots: 7  # Terminals: 52  Fleet size: 960  # Routes: 135  Avg. passengers per day: 8.5 lakh Professional Work at EMBARQ Identifying Bus Route Network Study Highlights Route Coverage Service Frequencies At A Glance Analysis Terminal Influences Dadar- Parel belt is identified as a serious need of terminal infrastructure Nine potential locations were identified based on terminal gaps and where many routes merge/diverge  Route number: 63  Route span: 15.5 kms  # of stations: 34  Running time: 90 min  Journey speed:11.3 km/hr  Total # of Boardings/ Alightings: 236  High # of alightings are at Lower Parel Station Potential Terminals Transit Demand Design Considerations Terminal Design Impact on operations Impact for passengers Impact on operations:  If the route-63 is broken up into two shorter routes, it would save 690 vehicle kilometers per day, while maintaining the same headway, # trips and fleet size. Impact for passengers  The splitting the route can improve frequency from 13 mins to 7 mins (Route A-C) and 6 mins (Route C-B). This increase in frequency can be operated by maintaining the same vehicle utilization and fleet size
  • 8. P O R T F O L I O F O R T R A N S P O R T P L A N N E R J O B Survey location Factorsaffectinguseofbicycle Bike & Ride (B&R): Integrating Bicycles and Public Transport Aim: applicability and acceptability of B&R services in case of Ahmedabad city. Componentsofintegration Objectives:  To review the various components of integration  To identify the factors affecting use of bicycle  To identify the potential demand (B&R) services  To identify the cost efficiency of the “B&R” system. Research Methodology 61% of trips are within walkable egress distance Economical travel distance is >4 kms Effective catchment area is upto 1.25 kms Travel distance wise acceptance Mode shift due to B&R System Cost efficiency (EIRR) of the system within period of 20 years is 20.1% Masters Research Work Criteria for study area selection Station typology Residential land use Population density Working pop. density Student pop. Density Income Bicycle ownership
  • 9. P O R T F O L I O F O R T R A N S P O R T P L A N N E R J O B Travel Demand Modelling Aim: to recommend the most suitable solution to both private (auto) and public transport based on travel demand for the city of XYZ. Base year: 2013 Future year: 2018 Study area at a glance Name of the city: XYZ Area: 584. 29 sq. kms No. of zones: 5 Internal TAZ’s: 140 External TAZ’s: 14 Network type: Radial Road length: 32695.71 km PT service type: Destination based No. of routes: 127 Parameters for comparison Auto Assignment Vehicle kms. Vehicle hrs. Volume capacity (V/C) ratio Length of links (>1 V/C ratio) in kms Transit Assignment Passenger kms. Passenger hrs. Load factors Boarding, alighting and transfers Building Scenario 1. Do nothing 2. Given transit lines 3. Do something 4. Do maximum Given transit lines Public transport measures: Added transit lines Do minimum Auto measures: I. Road widening II. Missing links Public transport measure: I. Added transit stops II. Changed headway based on max. volume and bus capacity Do something Auto measures I. Missing links II. Road widening Transit measures I. Express high capacity bus system II. Deleted parallel routes Land Use Map Road Network Results Future Travel Demand Auto Demand Transit Demand Auto Measures Volume Capacity Ratio Transit Measures Facility Design Identification Transit demand • Passenger kms: 1,23,445.9 • Passenger hrs: 6,960.1 Auto demand • Vehicle kms: 16,95,259 • Vehicle hrs: 68,426.91 Base Year Transit demand • Passenger kms: 2,05,010.1 • Passenger hrs: 11,435.1 Auto demand • Vehicle kms: 19,12,142 • Vehicle hrs: 85,142.4 Future Year Given transitlines Passenger kms: - 20,828.4 Passenger hrs: 99.1 Do minimum Passenger kms: 843.3 Passenger hrs: 955.2 Vehicle kms: 485 Vehicle hrs: 3,536.11 Do something Passenger kms: - 1,583.3 Passenger hrs: 1,364.8 Vehicle kms: 42,538 Vehicle hrs: 9,236.99 M. Plan (III Sem) Work Transit Network
  • 10. P O R T F O L I O F O R T R A N S P O R T P L A N N E R J O B M. Plan (I Sem) WorkJunction Design of Vijay Cross Roads, Navaragpura, Ahmedabad
  • 12. P O R T F O L I O F O R T R A N S P O R T P L A N N E R J O B INTERNSHIP Project name: Revision of Master Plan for Rajahmundry Municipal Corporation limits with 5KM Vicinity. Client : Commissioner; Rajahmundry Municipal Corporation Rajahmundry Town at a Glance: Extent of Corporation area : 44.5 Sq. kms Vicinity : 5 kms (12 villages) Total Extent : 88.5 Sq. kms Population (2011 Provisional) : 3,43,903 Density :17,288/km2 No. of Households : 94,994 No. of Wards : 50 Project Period Start : Date / Month / Year :01/01/11 Completion Date :Ongoing My Role in the Project: Preparation of broad land use map of Rajahmundry with area of 88.5 sq. Kms. On site Supervision for conducting diff. surveys, these surveys are i. Land use survey ii. Household survey iii. Road inventory survey Updating Land use of Rajahmundry Master Plan Data Verification and Analysis of Rajahmundry H.H Survey Sheets received from Field Enumerators In-corporation of approved GTPs in Rajahmundry Master Plan In-corporation of Approved Layout Plans in Rajahmundry Base map Collecting of GTPs Maps from DTCP, Hyderabad. Existing land use Map B. Plan Work
  • 13. P O R T F O L I O F O R T R A N S P O R T P L A N N E R J O B DISSERTATION  Increased journey times due to increased traffic density and in adequate road capacity.  In adequate parking and terminal facilities resulting in reduced accessibility.  Increase in the trip level cost and maintenance. NEED FOR STUDY Desktop Study Traffic Management Plan for Core area of Hindupur Town Objectives  To study the existing scenario of traffic in Hindupur  To identify the most congested area of the town  To identify the traffic problems and deficiencies in the area  To suggest the improvements in Hindupur study area Introduction:  Madurai is the second largest City in Tamilnadu State, having a very old history of about two thousand six hundred years and is often referred to as the Athens of East.  It has three National Highways namely NH-7, NH-45B, NH-49 and state highways passing through it. Forecasting the traffic The traffic volume for the year 2002 and future year 2007 are forecasted with respect to the 1997 traffic volume taken from the CTTS Report (CTTS Report, 1997), vehicle growth rate and the sample survey conducted at different locations. Diversion of traffic  The old A.V.Bridge and the newly constructed bridge over the old Kalpalam causeway play a major role in handling the traffic.  The old Kalpalam causeway was closed after the construction of the new bridge  As a TSM measure, it is decided to divert some of the traffic movement through the old causeway. Level of Services Before Taking TSM Measures After Taking TSM Measures CONVERTIONOFONEWAY STREETS Methodology B. Plan Work
  • 14. P O R T F O L I O F O R T R A N S P O R T P L A N N E R J O B DISSERTATION CASE STUDY: Traffic Management Plan for Core area of Hindupur Town Introduction  Hindupur is the second biggest town and Mandal headquarters located in Anantapur district in Andhra Pradesh, India.  The border between Andhra Pradesh and Karnataka state passes through Hindupur and Koratagere taluk in Karnataka. Location Map District Anantapur Name of the ULB Hindupur Grade Special Grade Area (Sq. Kms.) 38.16 Sq.KM. Population 151835 Males 76,625 Females 75,210 Density 3979 Total no. of households (2011) 32,002 No. Of municipal wards 38 General profile Register Vehicle Data Level of Service 6 major intersections have been identified in the study area, These intersections are having major movement of traffic Ambedkar Circle Proposed Map B. Plan Work
  • 15. P O R T F O L I O F O R T R A N S P O R T P L A N N E R J O B Planning ColloquiumPublic Mass Transit Systems- (7th Sem)  The population in HMDA 9 million. (Source: HMDA Extended Master Plan 2030.)  . The average speed is 12km/hr in the core. (Source: Hyd, CDP.)  A further growth will only worsen mobility issues.  In Hyderabad, The average travel distance is 9.2km. 44 out of every 100 commuters travel by public transit systems. Introduction A comparison of BRT and MRT in a multi- professional perspective Parameters for comparison: •Ridership. •Design. •Economics of transit. •Mobility. •Ease of access. •The Visual Element •Environmental Impact BRTS MRTS Year Daily System Pax Corridor I pphpd Daily System Pax Corridor I pphpd 2008 8,54,001 14,441 6,53,862 11,057 2011 9,05,221 15,307 6,93,093 11,720 2021 10,76,042 18,195 8,73,298 14,767 Estimated Ridership Source: ITDP, 2005 The capital costs include: • Land Acquisition. • Infrastructure costs. • Construction costs. • VGF (Viability Gap Funding). Capital cost MRTS BRTS Company's own estimate 4204 _ ITDP estimate 5170 408 Capital cost/km Company's capital cost/km estimate 110 _ ITDP capital cost/km estimate 135 17 Year Cost/km Revenue/km Loss/km 1996-97 11.19 10.53 0.64 1997-98 12.19 11.49 0.7 1998-99 12.63 11.58 1.07 1999-00 13.19 12.48 0.71 2000-01 14.62 13.47 1.15 2001-02 15.35 13.18 2.17 Operating Characteristics of APSRTC in Hyderabad Type Min Max General Bus 4 22 Metro Express Bus 6 24 AC Bus 10 45 Metro Rail- AC 8 18 Min. & Max. Fares MRTS BRTS Speed (km/h) Distan ce (km) Minute s Speed (km/h) Distan ce (km) Minute s Walking 4 0.5 7.5 4 0.25 3.8 Waiting _ _ 3 _ _ 2 Riding 34 9.2 16 26 9.2 21 Walking 4 0.5 7.5 4 0.25 3.8 Total time 34 31 Speed BRTS MRTS Dedicated 3.5m lane. Lesser space available for pvt. Vehicles. More ongestion. Push factor from pvt. modes of transport. Column requiring 2m road width. Better from the pvt. Vehicles point of view. Force of push is lower. Flexible Lane Separators. Fixed Built Structures. Impact on Private Vehicles Zones Noise level standards BRT MRT Silence 50 db(D), 40db(N) 55db (D), 40db(N) 60db(D&N) Commercial 65db(D), 60db(N) 70db (D), 65(N) 75db(D&N) Industrial 75db(D) , 70db(N) 80db (D) , 70db(N) 85db (D), 75db (N) Residential 55db(D) & 45db(N) 60db (D), 55db(N) 65db(D&N) Environmental Impacts B. Plan Work