For updated information, please visit www.ibef.org September 2017
STEEL
Table of Content
Executive Summary……………….….…….3
Advantage India…………………..….……..4
Market Overview …………………….……..6
Recent Trends and Strategies …….……..17
Growth Drivers…………………….............22
Opportunities…….……….......……………30
Industry Associations……………....……...36
Success Stories……………....……………33
Useful Information……….......…………….38
For updated information, please visit www.ibef.orgSteel3
EXECUTIVE SUMMARY
 Total finished steel production in India has increased at a CAGR of 5.45 per cent during FY12–17, with
country’s steel production reaching to 97.385 million tonnes per annum (MTPA) in FY17.
 The country became the 2nd largest crude steel producer in 2017, as large public and private sector players
strengthen steel production capacity in view of rising demand.
 Moreover, capacity has increased to 126 million tonnes (MT) in FY17, which is 3.3 per cent more than FY16,
while in the coming ten years the country is anticipated to produce 300 MT of steel
2rd largest producer of
crude steel
Source: World Steel Association, Ministry of Steel, Aranca Research
 India’s comparatively low per capita steel consumption and expected growth in consumption due to growing
infrastructure construction, automobile and railways sectors has offered scope for growth
 National Mineral Development Corporation is expected to increase the iron ore production 75 million tonnes
per annum (MTPA) until 2021 indicating new opportunities in the sector
 Domestic players’ investments in expanding and upgrading manufacturing facilities are expected to reduce
reliance on imports. In addition, the entry of international players would provide benefits in terms of capital
resources, technical know how and more competitive industry dynamics
Note: 1) April-December 2015 MTPA – Million Tonnes Per Annum
Strong growth
opportunities
Rising domestic and
international investments
Steel
ADVANTAGE INDIA
For updated information, please visit www.ibef.orgSteel5
ADVANTAGE INDIA
 Demand would be supported by growth in
the domestic market
 Infrastructure, oil and gas and automotives
would drive the growth of the industry
 Lower per capita consumption compared to
international average
 Steel production in India is forecast to double
by 2031, with growth rate expected to go
above 10 per cent in FY18
 To achieve steel capacity build-up of 300
million tonnes per annum (MTPA) by 2025,
India would need to invest US$ 210 billion
over the next decade
 301 MoUs have been signed with various
states for planned capacity of about 486.7
MT.
 Ministry of Steel plans to set up Steel
Research and Technology Mission in India
to promote R&D activities in the sector
 As of 2017, India is the world’s 2rd largest
producer of crude steel (up from 8th in
2003);
 Easy availability of low-cost manpower
and presence of abundant iron ore
reserves make India competitive in the
global set up
 100 per cent FDI through the automatic
route is allowed . Large infrastructure
projects in the PPP mode are being formed
 National Steel Policy (NSP) implemented to
encourage the industry to reach global
benchmarks
 Policy clarity and stability expected in
respect of mining leases and forest
clearances
 20 per cent safeguard duty on steel imports
ADVANTAGE
INDIA
Source: Metallurgical and Materials Engineering Division Board, Aranca Research
Notes: FDI - Foreign Direct Investment, MT - Million Tonnes, E- Estimated
MoUs - Memorandum of Understanding, 2016E - Estimated figure for the year 2016; These estimates are from Data monitor, PPP - Public-Private Partnership
Steel
MARKET OVERVIEW
For updated information, please visit www.ibef.orgSteel7
EVOLUTION OF THE INDIAN INSURANCE SECTOR
Notes(1): TISCO - Tata Iron and Steel Company; IISC - Indian Iron and Steel Company; SAIL - Steel Authority of India Ltd;
1907-18 1923-48 1973-921954-64 2015-171993-2014
 Production of steel started in
India (TISCO was setup in 1907)
 IISC was set up in 1918 to
compete with TISCO
 Hindustan Steel Ltd and Bokaro Steel Ltd
were setup in 1954 and 1964, respectively
 In the early 1990s, the public sector
dominated steel production
 Private players were in downstream
production mainly producing finished steel
using crude steel products
 Foreign players began entering the Indian steel
market
 No license requirement for capacity creation
 Imposition of export duty on iron ore, to focus more
on catering growing domestic demand
 Decontrol of domestic steel prices
 Launch of Scheme for promotion of Research and
Development in Iron and Steel sector
 Mysore Iron and Steel Company
was set up in 1923
 According to the new Industrial
Policy Statement (1948), new
ventures were only undertaken by
the central government
 SAIL was created in 1973 as a holding company
to oversee most of India's iron and steel
production
 In 1989, SAIL acquired Vivesvata Iron and Steel
Ltd
 In 1993, the government set plans in motion to
partially privatise SAIL
 In 2017, India ranked as the 2nd
largest crude steel producer in the
world, leaving behind United States.
 The total finished steel production of
TISCO in FY17(1) stood at 83.10
MT.
 During FY17, 8.24 MT of steel was
exported from India.
For updated information, please visit www.ibef.orgSteel8
STRUCTURE OF THE STEEL SECTOR
Source: Report on Indian steel industry by Competition Commission of India, Aranca Research
Steel
Form Composition End use
Liquid Steel Crude Steel
Finished
Steel
Alloy Non-alloy
Steel
Structural Steel
Ingots
Semis
Flat
Non-flat
Stainless
Silicon
electrical
High
Speed
Low
carbon
Steel
Medium
carbon
Steel
High
Carbon
Steel
Construction Steel
Rail Steel
For updated information, please visit www.ibef.orgSteel9
STEEL PRODUCTION IN INDIA HAS BEEN GROWING
AT A FAST PACE
53.68
57.81
61.94
64.92
71.77
71.87
78.91
16.99 16.48 16.48 16.77
17.21 17.92
18.48
0
20
40
60
80
100
120
FY11 FY12 FY13 FY14 FY15 FY16 FY17
Private Sector Public Sector
Source: Ministry of Steel Annual Report
 In FY17, crude steel production in India was 97.42 MT, with the total
crude steel production growing at a CAGR of 5.49 per cent over the
last 6 years.
 The steel sector contributes over 2 per cent to the GDP of the nation
and provides 20 lakh jobs in the country.
 During April-August 2017, crude steel production in India stood at
41.05 MT.
 As of March 2017, the capacity utilisation of steel producers is set to
increase with strong export demand and signs of revival in domestic
sales. Companies like JSW and Essar Steel have experienced a
sharp increase in steel manufacturing in the last 2 months
 Steel manufacturing output of India is expected to increase to 128.6
MT by 2021, accelerating the country’s share of global steel
production from 5.4 per cent in 2017 to 7.7 per cent by 2021.
Total crude steel production (million tonnes)
Total finished steel production (million tonnes)
55.37
63.18
68.86
74.24
79.34
78.00
63.22
13.25
12.52
12.82
13.44 12.83 12.97
10.74
0
20
40
60
80
100
FY11 FY12 FY13 FY14 FY15 FY16 FY17
Private Sector Public Sector
Notes: FY - Indian Financial Year (April – March), MT - Million Tonnes, CAGR - Compound Annual Growth Rate; (1) - April to January 2017 ,
Figures mentioned are as per latest data available
For updated information, please visit www.ibef.orgSteel10
SHARES IN PRODUCTION: SAIL AND TATA LEAD THE
WAY
Source: Ministry of Steel Annual Report 2016-17, Aranca Research
 Total proposed crude steel capacity during 2016-172 by the private
investors is expected to rise by 76.8 MT
 As of FY17(1), SAIL dominated India’s steel sector, with the company
accounting for 11.47 per cent of country’s finished steel production
and 14.8 per cent of country’s crude steel production.. During
FY17(1), Tata Steel accounted for 10.84 per cent of finished steel
production and 11.72 per cent of the country’s crude steel production
 In January 2017, Indian government inaugurated Universal Rail Mill
(URM) worth US$ 178.49 million at SAIL’s Bhilai steel plant. The
production of the world’s longest single rail of 130 meters from the
new URM also commenced in the new mill
Notes: RINL - Rashtriya Ispat Nigam Limited, (1) - April to December 2016; (2) – Provisional; Figures mentioned are as per latest data available
India’s crude steel market share by production – FY171
India’s finished steel market share by production – FY171
14.80%
11.72%
4.04%
69.45%
SAIL
TATA
RINIL
OTHERS
11.47%
10.84%
3.05%
53.96%
SAIL
TATA
RINIL
OTHERS
For updated information, please visit www.ibef.orgSteel11
GROWTH IN MARKET VALUE OF THE INDIAN STEEL
SECTOR HAS ALSO BEEN STRONG
 The sector has benefitted from the hike in prices and production,
especially since the beginning of the millennium
 Over 2007–16(E), the sector’s market value is estimated to have
posted a strong CAGR of 18.7 per cent
Market value of the Indian steel sector (US$ billion)
30.1
43
36.5
46.8
57.8
81
87.9
95.30
0
20
40
60
80
100
120
FY07 FY08 FY09 FY10 FY11 FY14 FY15E FY16E
CAGR 18.7%
Source: Ministry of External Affairs, Aranca Research
Note: E - Estimates
For updated information, please visit www.ibef.orgSteel12
52.1
52.4
59.3
66.4
71
73.5
74.1
76.99
81.52
83.9
0
10
20
30
40
50
60
70
80
90
FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17
DEMAND HAS OUTPACED SUPPLY OVER THE LAST
FIVE YEARS
 Total consumption of steel was 83.9 MT in FY17 as compared to
81.5 MT in FY16.
 Driven by rising infrastructure development and growing demand for
automotives, steel consumption is expected to reach 104 MT by
2017
 It is expected that consumption per capita would increase supported
by rapid growth in the industrial sector and rising infra expenditure
projects in railways, roads and highways, etc.
 The consumption of real steel has grew at a CAGR of 5.44 per cent
during FY08-FY17
Real consumption of steel (in million tonnes)
CAGR 5.44%
Source: JPC India Steel, Ministry of Steel, Aranca Research
Note: MT - Million Tonnes; FY17(1) – April -December 2017
For updated information, please visit www.ibef.orgSteel13
TRENDS IN IMPORTS AND EXPORTS OF STEEL
 In April - August 2017, consumption of finished steel grew at a rate of
4.4 per cent to reach 35.33MT as against 33.83 MT during the same
period in 2016.
 In order to reduce imports and boost domestic steel manufacturing
industry, the Central Government extended the minimum import
price (MIP) on 19 products, till February 4, 2017. These products
include semi-finished products of iron or non-alloyed steel, flat-rolled
products of different widths, bars and rods
 According to DGFT, the minimum import price (MIP) for these
products would range between US$ 643-752 per tonne
 Indian Government imposed Anti-Dumping Duty on 47 steel products
for five years beginning from August 2016.
 In FY 2016-17, the country’s steel exports has increased by 102.1
per cent year-on-year to 8.24 million tonnes (mt), as compared to
4.07 mt in 2015-16
 In FY 2016-17, the country’s steel imports fell by 36.6 per cent year-
on-year to 7.42 million tonnes (mt), as compared to 11.7 mt in 2015-
16
Steel exports and imports (in million tonnes)
0.9
7.9
5.5
9.3
11.7
7.4
4.6
5.4
6.0
5.6
4.1
8.2
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
FY12
FY13
FY14
FY15
FY16
FY17
Imports Exports
Source: Ministry of Steel, JSPL Presentation, Aranca Research
Note: FY - Indian Financial Year (April - March), DGFT - Directorate General of Foreign Trade
For updated information, please visit www.ibef.orgSteel14
KEY PLAYERS OF THE INDUSTRY
Source: Aranca Research
Company Products
Tata Steel Ltd Finished steel (non-alloy steel)
SAIL Finished steel (non-alloy steel)
JSW Steel Ltd Hot-rolled coils, strips and sheets
Jindal Steel and Power Ltd Iron and steel
Ispat Industries Ltd Hot-rolled coils, strips and sheets
Welspun-Gujarat Stahl Rohren Ltd Tubes and pipes
Bhushan Steel Ltd Cold-rolled coils, strips and sheets
Visa Steel Ltd Ferro Chrome, coke and special steel
For updated information, please visit www.ibef.orgSteel15
KEY STEEL PLANTS IN INDIA
Alloy and special steel plants
under SAIL (Bhadrawati and
Salem); iron and steel plant
at Visvesvaraya
Steel integrated plants
under SAIL (Bhilai, Rourkela,
Bokaro, Durgapur and
Burnpur)
Tata Steel’s largest steel
plant, based in Jamshedpur
RINL steel plant in
Vishakhapatnam
Source: Company websites, Aranca Research
For updated information, please visit www.ibef.orgSteel16
PORTER’S FIVE FORCES FRAMEWORK
Positive Impact
Neutral Impact
Negative Impact
 Low - Aluminium and plastics are being
used in few cases in automotive and other
consumer durable sectors. However, it
still does not pose significant threat to
steel
Threat of Substitutes
 Medium - The steel industry is highly
concentrated, with the top five players
accounting for more than 70 per cent of
the market share
 Steel companies usually compete on the
basis of production capacity, economies
of scale, access to raw material, etc.
Competitive Rivalry
 Medium - Major steel consumption
sectors, such as automobiles, oil and gas,
shipping, consumer durables and power
generation, enjoy high bargaining power
and get favourable bulk deals. Smaller
customers, however, do not enjoy this
benefit
Bargaining Power of Buyers
 Low - Capital intensive, industry players
are large and enjoy economies of scale.
Some have their own mines for sourcing
key raw materials
 Several regulatory clearances required,
including environmental, land acquisition,
etc.
Threat of New Entrants
 Medium - Large integrated companies
have their own mines to source key raw
materials
Bargaining Power of Suppliers
Steel
RECENT TRENDS
AND STRATEGIES
For updated information, please visit www.ibef.orgSteel18
NOTABLE TRENDS IN THE INDIAN STEEL INDUSTRY
… (1/2)
Source: Ministry of Steel, Ministry of Railways, Aranca Research
Notes: MOUs - Memorandum of Understanding, MT - Million Tonnes
 Most of the companies in the industry are undertaking modernisation and expansion of plants to be more cost
efficient. E.g. SAIL has undertaken modernisation and expansion for its 6 plants
 An Inter-Ministerial Group (IMG) functioning under the Ministry of Steel, is monitoring and coordinating major
steel investments across the country
 The production capacity of SAIL is expected to increase from 13 MTPA to 50 MTPA in 2025 with the total
investment of US$ 24.88 Billion
Growing investments
 International Coal Ventures Pvt Ltd, comprising SAIL, RINL, CIL, NTPC and NMDC, set up for acquisition of
coal mines overseas
 The consortium of SAIL and National Fertiliser Ltd. (NFL) has been nominated for revival of Sindri Unit of the
Fertiliser Corporation of India Ltd
 RINL, Vishakhapatnam Steel Plant and the Power Grid Corporation of India Ltd (POWERGRID) signed an
MoU to set up a JV company to manufacture transmission line towers and tower parts including R&D of new
high-end products
 Attracted by the growth potential of the Indian steel industry, several global steel players have been planning
to enter the market
 National Mineral Development Corporation (NMDC) has signed an MoU with Russia’s 3rd largest steelmaker,
Severstal, for a greenfield steel plant in Karnataka
Strategic alliances
Entry of international
companies
For updated information, please visit www.ibef.orgSteel19
NOTABLE TRENDS IN THE INDIAN STEEL INDUSTRY
… (2/2)
Source: Ministry of Steel, Aranca Research
 Indian steel companies have now started benchmarking their facilities and processes against global standards,
to enhance productivity
 These steps are expected to help Indian companies improve raw material and energy consumption as well as
improve compliance with environmental and pollution yardsticks
 Companies are attempting coal gasification and gas-based Direct-Reduced Iron (DRI) production. Other
alternative technologies such as Hlsmelt, Finex and ITmk3 being adopted to produce hot metal
 Ministry of Steel has issued necessary direction to the steel companies to frame a strategy for taking up more
R&D projects by spending at least 1 per cent of their sales turnover on R&D to facilitate technological
innovations in the steel sector.
 Ministry has established a task force to identify the need for technology development and R&D
 Ministry has adopted energy efficiency improvement projects for mills operating with obsolete technologies
 In January 2017, Noamundi iron ore mine of Tata Steel introduced drone technology in mine monitoring
Increased emphasis on
technological innovations
For updated information, please visit www.ibef.orgSteel20
STRATEGIES ADOPTED
Source: CCI, Ministry of External Affairs
 Companies in the steel industry are investing heavily in expanding their capacity. Major public and private
companies, including Tata Steel, SAIL and JSW Steel, are expanding their production capacity. Steel
production is expected to reach 200 mtpa by 2020
 India is the 2nd-largest crude steel producer in the world with production reaching 96 million tonnes in 2016.
 The government has stepped up infrastructure spending from the current 5 per cent of GDP to 10 per cent by
2017and the government has planned to invest US$ 61.8 billion in infrastructure in the Union Budget 2017-18.
Considering 15 per cent as steel component in the total investment, the initiative has a potential to generate an
additional demand for steel of 18.75mtpa
 The Ministry of Steel is encouraging R&D activities by providing financial assistance from Steel Development
Fund (SDF) and Plan Scheme of the Central Government. Furthermore, the government has allowed 100 per
cent FDI through the automatic route in the Indian steel sector
 A long term perspective is to achieve capacity of 300 mtpa by 2025
 SAIL is increasing its production capacity by 60-70 per cent in the last leg of its US$10.79 billion programme.
Capacity expansion
 In the last few years, rapid and stable growth in demand has also prompted domestic entrepreneurs to set up
fresh greenfield projects in different states of the country. Mittal Steel announced two 12 mtpa greenfield steel
projects, 1 each in Jharkhand and Orissa
 As India surges ahead in building infrastructure, investments in steel pave the way ahead
Greenfield projects –
focus on downstream
value-added products
For updated information, please visit www.ibef.orgSteel21
STRATEGIES ADOPTED
Source: CCI, Ministry of External Affairs
 Steel companies are strengthening their position through cross border mergers and acquisitions. The focus is
on improving existing technology to upgrade production process and developing new value added-products.
 In 2014, Arcelor Mittal along with Nippon Steel and Sumitomo Metal Corporation acquired ThyssenKrupp
Steel USA. Notable deals include Essar Global’s acquisition of Canada-based Algoma Steel.
 On 1st August 2016, Kirloskar Ferrous Industries Ltd has announced to acquire pig iron plant of VSL Steels
Ltd. for US$ 23.68 million. Also on 18 August 2016, JSW Steel Ltd. has acquired 74 per cent stake of Praxair
Oxygen Pvt. Ltd. in their joint venture for US$ 36 million
 As on December 01, 2016, JSW Steel, the flagship steel company of JSW Group, entered into a consortium to
acquire 35 per cent stakes of Ilva steel plant, in Italy.
 Tata Steel has executed an agreement with Creative Port Development (CPDPL) for the acquisition of the
majority stakes, i.e., 51 per cent in CPDPL in January 2017
 Italy’s Marcegaglia ArcelorMittal have offered to buy Italy’s troubled Ilva steel plant, for an amount of US$ 2.4
billion and will boost production
 In March 2017, Central Government permitted sale of SAIL’s 3 units including Alloy Steels Plants,
Visvesvaraya Iron and Steel Plant, Salem Steel Plant with the transfer of management in these plants for the
strategic disinvestment.
 ArcelorMittal SA is looking to set up a joint venture (JV) factory in India with state-owned Steel Authority of
India Ltd (SAIL), to manufacture high-end steel products which could be used in defence and satellite
industries.
Mergers and Acquisition
Steel
GROWTH DRIVERS
For updated information, please visit www.ibef.orgSteel23
STRONG DEMAND AND POLICY SUPPORT DRIVING
INVESTMENTS
Growing demand in the
construction industry
Growing demand in the
automotives sector
Rising demand for consumer
durables and capital goods
Growing demand
100 per cent FDI in the steel
sector
Encouragement of sector-based
R&D activities by the
government
Reduced custom duty and other
favourable measures
Policy support
Rising investments from
domestic and foreign players
Increasing number of MoUs
signed to boost investment in
steel
Foreign investment of nearly
US$ 40 billion committed in the
steel sector
Increasing investments
Inviting
Resultingin
Note: FDI - Foreign Direct Investment
For updated information, please visit www.ibef.orgSteel24
CAPITAL GOODS, CONSUMER DURABLES AND
AUTOMOTIVES FURTHER DRIVING STEEL GROWTH
Source: SIAM, JSPL presentation, Corporate Catalyst India, Aranca Research
Notes: E - Estimate; F- Forecast, FY - Indian Financial Year (April - March)
 Over FY05–20F, the consumer durables sector will expand at a
CAGR of 12.54 per cent as growth in disposable income is expected
to result in increase in demand for such products
 The consumer durables market is expected to reach US$ 12.5 billion
in FY16 and is projected to reach US$ 20.6 in FY20
 The capital goods and consumer durables sectors are expected to
grow at 7.5–8.8 per cent over 2012–21
 Automotive production in India expanded at a CAGR of 8.76 per cent
during FY10–17
 Over FY14–21, the automotive sector is projected to rise at a CAGR
of 10.2 per cent
Consumer durables market size (US$ billion)
Total automobile production in India (million units)
3.5
3.8
4.2
4.7
5.2
6.3
7.3
7.30
7.40
9.00
9.70
12.50
20.60
0
5
10
15
20
25
FY05
FY06
FY07
FY08
FY09
FY10
FY11
FY12
FY13
FY14
FY15
FY16
FY20F
CAGR 12.54%
2.36
2.98
3.15
3.23
3.09
3.22
3.41
3.79
0.57
0.76
0.93
0.83
0.7
0.7
0.78
0.81
11.13
14.15
16.31 16.58 17.71
19.45 19.76 20.71
0
5
10
15
20
25
FY10
FY11
FY12
FY13
FY14
FY15
FY16
FY17
Passenger Vehicles Commercial Vehicles Two & Three Wheelers
For updated information, please visit www.ibef.orgSteel25
POLICY SUPPORT AIDING GROWTH IN THE STEEL
SECTOR … (1/2)
Source: Ministry of Steel, Aranca Research
 New National Steel Policy has been formulated by the Ministry of Steel in 2016, which will retain the objectives
included in National Steel Policy (NSP) 2005. It aims at covering broader aspects of steel sector across the
country including environment and facilitation of new steel projects, growth of steel demand in India and raw
materials
 Under the policy, the central government stated that all the government tenders will give preference to
domestically manufactured steel and iron products. Moreover, Indian steel makers importing intermediate
products or raw materials can claim benefits of domestic procurement provision by adding minimum of 15 per
cent value to the product.
 The New steel policy, 2017 aspires to achieve 300MT of steel making capacity by 2030. This would translate
into additional investment of Rs 10 lakh Crore (US$ 156.08 billion) by 2030-31.
 New Steel Policy seeks to increase per capita steel consumption to the level of 160 kgs by 2030 from existing
level of around 60 kg.
National Steel Policy 2017
 A new scheme, ‘The scheme for the promotion of R&D in the iron and steel sector’, has been approved with
budgetary provision of US$ 24.6 million to initiate and implement the provisions of the scheme as per the 11th
Five-Year Plan which has continued in the 12th Five Year Plan
 The development of technology for Cold-Rolled Grain Oriented (CRGO) steel sheets and other value-added
products is also included under the policy purview and is allocated US$ 6.7 million
R&D and innovation
For updated information, please visit www.ibef.orgSteel26
POLICY SUPPORT AIDING GROWTH IN THE STEEL
SECTOR … (2/2)
Source: The Economic Times, Ministry of Steel, Business Standard, Make In India, Aranca Research
 The government hiked the export duty on iron ore to 30 per cent ad valorem on all varieties of iron ore (except
pellets)
Rise in export duty
Reduction in custom duty
on plants and equipment
Push due to Make in India
initiative
 The government has reduced the basic custom duty on the plants and equipments required for initial set up or
expansion of iron ore pellets plants and iron ore beneficiation plants from 7.5/5 per cent to 2.5 per cent
 Customs duty on imported flat-rolled stainless steel products has been increased to 10 per cent from 7.5 per
cent
 Basic customs duty on steel grade dolomite and steel grade limestone is being reduced from 5 per cent to 2.5
per cent. Basic customs duty is being reduced from 10 per cent to 5 per cent on forged steel rings used in the
manufacture of bearings of wind-operated electricity generators
 Going forward, the Make in India initiative and policy decisions taken under it are expected to augment the
country’s steel production capacity and resolve issues related to the mining industry
 100 per cent FDI through the automatic route is allowed in the Indian steel sectorForeign Direct Investment
For updated information, please visit www.ibef.orgSteel27
STEEL SEZs IN INDIA
Source: Formal approvals granted in the Board of Approvals after the SEZ rules coming into force, Special Economic Zones in India website, www.sezindia.nic.in
Developer Location Product
Viraj Profiles Ltd Thane, Maharashtra Stainless steel engineering products
SAIL Salem SEZ Pvt Ltd Salem, Tamil Nadu Steel
Orissa Industrial Infrastructure Development
Corporation
Jaipur, Orissa
Metallurgical-based engineering and
ancillary/downstream industry
Tata Steel Special Economic Zone (TSSEZ) Gopalpur, Odisha Steel and allied downstream industries
For updated information, please visit www.ibef.orgSteel28
THE SECTOR WITNESSED RISING INVESTMENTS IN
THE LAST DECADE
Source: Thomson ONE Banker, “Fact Sheet on Foreign Direct Investment (FDI)”, Department of Industrial Policy and Promotion
Date announced Acquirer name Target name Value of deal (US$ million)
Aug-16 JSW Steel Ltd Praxair Oxygen Pvt. Ltd. 36
Aug-16 Kirloskar Ferrous Industries Ltd VSL Steels Ltd. 23.68
Aug-14 JSW Steel Ltd Welspun Maxsteel Ltd 165.85
Apr-14 JSW Steel Ltd Vallabh Tinplate Pvt Ltd 7.63
Mar-14 Lalitanjali Group Pvt Ltd Centom Industries Ltd -
Dec-13 Venus Insec Pvt Ltd Goodluck Steel Tubes Ltd 23.73
Oct-13 JSW Projects Ltd IST Steel and Power Ltd
Aug-13 Readymade Steel India Ltd Kridhan Infra Solutions Pvt
Jul-13 Swelect Energy Systems Ltd Amex Alloys Pvt Ltd
Apr-13 Metallurgica Siderfoge S.r.l AMW-MGM Forgings Pvt Ltd
Feb-13 Wayzata II Indian Ocean Ltd Ramkrishna Forgings Ltd 51.90
Nov-12 Rabale Engineering India Ltd Pradeep Metals Ltd 6.85
Nov-12 Suncoke Energy Inc Visa Steel Ltd-Coke division
Oct-12 Aum Saw Pipes and Industries Pvt Greenearth Resources 2.77
Cumulative FDI inflows
Period: April 2000 to June 2017
 Sector
• Metallurgical industries US$ 10.39 billion
• Per cent of total FDI inflow 3.03
For updated information, please visit www.ibef.orgSteel29
PLANNED CAPACITY ADDITIONS BY 2017-18
Source: Ministry of Steel Annual Report, Joint Plant Committee
Notes: MTPA - Million Tonnes Per Annum
Company Existing capacity Brownfield expansion Greenfield expansion Total capacity addition
Tata Steel Ltd 12.50 0.4 0 12.59
Essar Steel Ltd 10.00 0 0 10.00
JSW Steel Ltd 18.00 0 0 18.00
Jindal Stainless Limited 1.00 0.15 0 1.15
Jindal Stainless (Hissar) Ltd 0.78 0.08 0 0.86
Bhushan Steel Ltd 5.60 0 0 5.60
Bhushan Power and Steel Ltd 2.50 0 0 2.5
Monnet Ispat and Energy Ltd 1.80 0 0 1.80
Electrosteel Steel 1.88 0 0 1.88
Visa Steel Ltd 0.50 0 0 0.50
Crude steel capacity addition plans up to FY2017-18 (in MTPA) for private sector companies
Steel
OPPORTUNITIES
For updated information, please visit www.ibef.orgSteel31
OPPORTUNITIES … (1/2)
 The automotive industry is
forecasted to grow in size by
US$ 74 billion in 2015 to US$
260-300 billion by 2026
 With increasing capacity
addition in the automotive
industry, demand for steel from
the sector is expected to be
robust
 In 2016, Indian automotive
sector is estimated to be 3rd
largest automotive market, by
volume
Automotive
 The capital goods sector
accounts for 11 per cent of
steel consumption and
expected to increase 14/15 per
cent by 2025-26 and has the
potential to increase in
tonnage and market share
 Corporate India’s capex is
expected to grow and generate
greater demand for steel
Capital goods
 The infrastructure sector
accounts for 9 per cent of steel
consumption and expected to
increase 11 per cent by 2025-
26.
 Due to such a huge investment
in infrastructure the demand
for long steel products would
increase in the years ahead
Infrastructure
 More and more modern and
private airports are expected to
be set up
 In FY17, passenger traffic at
Indian airports stood at 264.99
million and number of
operational airports stood at 94
in July 2017.
 Development of Tier-II city
airports would sustain
consumption growth
 Estimated steel consumption in
airport building is likely to grow
more than 20 per cent over
next few years
Airports
Source: Make In India, SIAM, Ministry of Steel, Airport Authority of India
Source: Capex – Capital Expenditure, P - Provisional
For updated information, please visit www.ibef.orgSteel32
OPPORTUNITIES … (2/2)
Source: Make In India, Ministry of Power, Aranca Research
 The Dedicated Rail Freight
Corridor (DRFC) network
expansion would be enhanced
in future
 Gauge conversion, setting up
of new lines and electrification
would drive steel demand
 Indian Railways started the
PPP mode of funding and has
already awarded projects
worth around US$ 1.73 billion
during the 1st 7 months (April-
October) of FY16
 In January 2017, Crisil
estimated that the railways
sector could create business
opportunities worth US$ 99.65
billion
Railways
 Oil and gas amongst major
end-user segment accounted
for ~34.4 per cent of primary
energy consumption in FY16
 This would lead to an increase
in demand of steel tubes and
pipes, providing a lucrative
opportunity to the steel
industry
Oil and gas
 The government targets
capacity addition of 100 GW
under the 13th Five-Year Plan
(2017–22)
 Both generation and
transmission capacities would
be enhanced, thereby raising
steel demand from the sector
 Conventional power capacity
addition of 23.98 GW has
registered to be the highest in
FY16
Power
 Rural India is expected to
reach per capita consumption
of 12.11 kg to 14 kg for
finished steel by 2020.
 Policies like Food for Work
Programme (FWP) and Indira
Awaas Yojana, Pradhan Mantri
Gram Sadak Yojana are
driving growing demand for
construction steel in rural India
 In FY16, per capita
consumption of steel in rural
India is estimated at 60 kg,
which is lower in comparison
with the global average of 216
kg
Rural India
Steel
SUCCESS STORIES
For updated information, please visit www.ibef.orgSteel34
JINDAL STEEL AND POWER LTD: REAPING BENEFITS
OF PRUDENT INVESTMENTS … (1/3)
15.80
31.75
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
FY 17 FY 18 E
 Incorporated in 1979, Jindal Steel and Power Ltd. (JSPL) is an
integrated steel producer and the largest coal-based sponge iron
manufacturer in the world. The company has an installed steel
production capacity of 3 MTPA at Raigarh in Chhattisgarh. JSPL is
engaged in manufacturing long products and is specialised in
producing long rails for railways and large sized H-beams as well as
columns for the infrastructure and construction sector
 JSPL also has significant presence across the mining, power
generation and infrastructure sectors
 In March 2017, Jindal Steel has entered into an agreement with
Defence Research and Development Organisation (DRDO), which
would allow the agency to transfer technology facilitating
manufacturing of high-nitrogen steel, for application in defence
sector.
 New and expansion projects include setting up of a 7 MTPA
integrated steel plant in Chhattisgarh, 12 MTPA integrated steel plant
in Jharkhand and a 12.5 MTPA integrated steel plant in Orissa.
 Achievements:
• 2014 - Company has commissioned the billet caster plant with
capacity of 6 MTPA at Angul with record time of 1 year
• 2015 - Company has created history with its Raigarh steel facility
producing 10,000 tonnes of crude steel in a single day
• 2017 – Launched a 6 MTPA integrated steel plant in Odisha.
Visakhapatnam port traffic (million tonnes)Projected crude steel production (million tonnes)
CAGR 41.76%
Source: Ministry of Steel, Company website (www.jindalsteelpower.com), Aranca Research; E- Estimated
For updated information, please visit www.ibef.orgSteel35
JINDAL STEEL AND POWER LTD: REAPING BENEFITS
OF PRUDENT INVESTMENTS … (2/3)
671
816
1,488
1,803
1,596
2,287
3,315
3,007
3,199
3,218
2,813
3,542
103
197
431
438
395
634
818
721
958
910
532
727
0
500
1000
1500
2000
2500
3000
3500
4000
FY06
FY07
FY08
FY09
FY10
FY11
FY12
FY13
FY14
FY15
FY16
FY17
Gross Revenue PBIDT
Visakhapatnam port traffic (million tonnes)Financial growth (US$ million)
0.3
0.2
0.7
1.0
1.2
1.6
1.9
2.1
2.2
2.3
2.5
0.5
0.8
1.4
1.6
2.0
2.3
2.8
3.0
2.9
3.1
3.5
2.8
3.8
4.0
4.2
3.2
4.6
3.27
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
FY06
FY07
FY08
FY09
FY10
FY11
FY12
FY13
FY14
FY15
FY16
FY17
Finished Steel Products Semi - Steel Products Pellets
Visakhapatnam port traffic (million tonnes)Sale of steel (million tonnes)
Source: Company website (www.jindalsteelpower.com)
Note: Company clubs iron and steel segment ‘s performance; PBIDT (Profit Before Interest, Depreciation and Tax)
Steel
KEY INDUSTRY
ASSOCIATIONS
For updated information, please visit www.ibef.orgSteel37
INDUSTRY ASSOCIATIONS
L-22/4, DLF Phase-II
Gurgaon, Haryana –122 002
Phone: 91-124-4375501
Fax: 91-124-4375509
E-mail: nissda@gmail.com
Indian Stainless Steel Development Association
Steel
USEFUL
INFORMATION
For updated information, please visit www.ibef.orgSteel39
GLOSSARY
 CAGR: Compound Annual Growth Rate
 FDI: Foreign Direct Investment
 FY: Indian Financial Year (April to March)
• So FY10 implies April 2009 to March 2010
 JV: Joint Venture
 MoU: Memorandum of Understanding
 MT: Million Tonnes
 MTPA: Million Tonnes Per Annum
 NPAT: Net Profit After Tax
 SEZ: Special Economic Zone
 TMT: Thermo Mechanically Treated
 US$ : US Dollar
 Wherever applicable, numbers have been rounded off to the nearest whole number
For updated information, please visit www.ibef.orgSteel40
EXCHANGE RATES
Year INR Equivalent of one US$
2004–05 44.81
2005–06 44.14
2006–07 45.14
2007–08 40.27
2008–09 46.14
2009–10 47.42
2010–11 45.62
2011–12 46.88
2012–13 54.31
2013–14 60.28
2014-15 61.06
2015-16 65.46
2016-17 67.09
Q1 2017-18 64.46
Year INR Equivalent of one US$
2005 43.98
2006 45.18
2007 41.34
2008 43.62
2009 48.42
2010 45.72
2011 46.85
2012 53.46
2013 58.44
2014 61.03
2015 64.15
2016 67.21
H1 2017 65.73
Exchange Rates (Fiscal Year) Exchange Rates (Calendar Year)
Source: Reserve bank of India, Average for the year
For updated information, please visit www.ibef.orgSteel41
DISCLAIMER
India Brand Equity Foundation (IBEF) engaged Aranca to prepare this presentation and the same has been prepared by Aranca in consultation
with IBEF.
All rights reserved. All copyright in this presentation and related works is solely and exclusively owned by IBEF. The same may not be reproduced,
wholly or in part in any material form (including photocopying or storing it in any medium by electronic means and whether or not transiently or
incidentally to some other use of this presentation), modified or in any manner communicated to any third party except with the written approval
of IBEF.
This presentation is for information purposes only. While due care has been taken during the compilation of this presentation to ensure that the
information is accurate to the best of Aranca and IBEF’s knowledge and belief, the content is not to be construed in any manner whatsoever as a
substitute for professional advice.
Aranca and IBEF neither recommend nor endorse any specific products or services that may have been mentioned in this presentation and nor do
they assume any liability or responsibility for the outcome of decisions taken as a result of any reliance placed on this presentation.
Neither Aranca nor IBEF shall be liable for any direct or indirect damages that may arise due to any act or omission on the part of the user due to any
reliance placed or guidance taken from any portion of this presentation.

Steel Sector Report September 2017

  • 1.
    For updated information,please visit www.ibef.org September 2017 STEEL
  • 2.
    Table of Content ExecutiveSummary……………….….…….3 Advantage India…………………..….……..4 Market Overview …………………….……..6 Recent Trends and Strategies …….……..17 Growth Drivers…………………….............22 Opportunities…….……….......……………30 Industry Associations……………....……...36 Success Stories……………....……………33 Useful Information……….......…………….38
  • 3.
    For updated information,please visit www.ibef.orgSteel3 EXECUTIVE SUMMARY  Total finished steel production in India has increased at a CAGR of 5.45 per cent during FY12–17, with country’s steel production reaching to 97.385 million tonnes per annum (MTPA) in FY17.  The country became the 2nd largest crude steel producer in 2017, as large public and private sector players strengthen steel production capacity in view of rising demand.  Moreover, capacity has increased to 126 million tonnes (MT) in FY17, which is 3.3 per cent more than FY16, while in the coming ten years the country is anticipated to produce 300 MT of steel 2rd largest producer of crude steel Source: World Steel Association, Ministry of Steel, Aranca Research  India’s comparatively low per capita steel consumption and expected growth in consumption due to growing infrastructure construction, automobile and railways sectors has offered scope for growth  National Mineral Development Corporation is expected to increase the iron ore production 75 million tonnes per annum (MTPA) until 2021 indicating new opportunities in the sector  Domestic players’ investments in expanding and upgrading manufacturing facilities are expected to reduce reliance on imports. In addition, the entry of international players would provide benefits in terms of capital resources, technical know how and more competitive industry dynamics Note: 1) April-December 2015 MTPA – Million Tonnes Per Annum Strong growth opportunities Rising domestic and international investments
  • 4.
  • 5.
    For updated information,please visit www.ibef.orgSteel5 ADVANTAGE INDIA  Demand would be supported by growth in the domestic market  Infrastructure, oil and gas and automotives would drive the growth of the industry  Lower per capita consumption compared to international average  Steel production in India is forecast to double by 2031, with growth rate expected to go above 10 per cent in FY18  To achieve steel capacity build-up of 300 million tonnes per annum (MTPA) by 2025, India would need to invest US$ 210 billion over the next decade  301 MoUs have been signed with various states for planned capacity of about 486.7 MT.  Ministry of Steel plans to set up Steel Research and Technology Mission in India to promote R&D activities in the sector  As of 2017, India is the world’s 2rd largest producer of crude steel (up from 8th in 2003);  Easy availability of low-cost manpower and presence of abundant iron ore reserves make India competitive in the global set up  100 per cent FDI through the automatic route is allowed . Large infrastructure projects in the PPP mode are being formed  National Steel Policy (NSP) implemented to encourage the industry to reach global benchmarks  Policy clarity and stability expected in respect of mining leases and forest clearances  20 per cent safeguard duty on steel imports ADVANTAGE INDIA Source: Metallurgical and Materials Engineering Division Board, Aranca Research Notes: FDI - Foreign Direct Investment, MT - Million Tonnes, E- Estimated MoUs - Memorandum of Understanding, 2016E - Estimated figure for the year 2016; These estimates are from Data monitor, PPP - Public-Private Partnership
  • 6.
  • 7.
    For updated information,please visit www.ibef.orgSteel7 EVOLUTION OF THE INDIAN INSURANCE SECTOR Notes(1): TISCO - Tata Iron and Steel Company; IISC - Indian Iron and Steel Company; SAIL - Steel Authority of India Ltd; 1907-18 1923-48 1973-921954-64 2015-171993-2014  Production of steel started in India (TISCO was setup in 1907)  IISC was set up in 1918 to compete with TISCO  Hindustan Steel Ltd and Bokaro Steel Ltd were setup in 1954 and 1964, respectively  In the early 1990s, the public sector dominated steel production  Private players were in downstream production mainly producing finished steel using crude steel products  Foreign players began entering the Indian steel market  No license requirement for capacity creation  Imposition of export duty on iron ore, to focus more on catering growing domestic demand  Decontrol of domestic steel prices  Launch of Scheme for promotion of Research and Development in Iron and Steel sector  Mysore Iron and Steel Company was set up in 1923  According to the new Industrial Policy Statement (1948), new ventures were only undertaken by the central government  SAIL was created in 1973 as a holding company to oversee most of India's iron and steel production  In 1989, SAIL acquired Vivesvata Iron and Steel Ltd  In 1993, the government set plans in motion to partially privatise SAIL  In 2017, India ranked as the 2nd largest crude steel producer in the world, leaving behind United States.  The total finished steel production of TISCO in FY17(1) stood at 83.10 MT.  During FY17, 8.24 MT of steel was exported from India.
  • 8.
    For updated information,please visit www.ibef.orgSteel8 STRUCTURE OF THE STEEL SECTOR Source: Report on Indian steel industry by Competition Commission of India, Aranca Research Steel Form Composition End use Liquid Steel Crude Steel Finished Steel Alloy Non-alloy Steel Structural Steel Ingots Semis Flat Non-flat Stainless Silicon electrical High Speed Low carbon Steel Medium carbon Steel High Carbon Steel Construction Steel Rail Steel
  • 9.
    For updated information,please visit www.ibef.orgSteel9 STEEL PRODUCTION IN INDIA HAS BEEN GROWING AT A FAST PACE 53.68 57.81 61.94 64.92 71.77 71.87 78.91 16.99 16.48 16.48 16.77 17.21 17.92 18.48 0 20 40 60 80 100 120 FY11 FY12 FY13 FY14 FY15 FY16 FY17 Private Sector Public Sector Source: Ministry of Steel Annual Report  In FY17, crude steel production in India was 97.42 MT, with the total crude steel production growing at a CAGR of 5.49 per cent over the last 6 years.  The steel sector contributes over 2 per cent to the GDP of the nation and provides 20 lakh jobs in the country.  During April-August 2017, crude steel production in India stood at 41.05 MT.  As of March 2017, the capacity utilisation of steel producers is set to increase with strong export demand and signs of revival in domestic sales. Companies like JSW and Essar Steel have experienced a sharp increase in steel manufacturing in the last 2 months  Steel manufacturing output of India is expected to increase to 128.6 MT by 2021, accelerating the country’s share of global steel production from 5.4 per cent in 2017 to 7.7 per cent by 2021. Total crude steel production (million tonnes) Total finished steel production (million tonnes) 55.37 63.18 68.86 74.24 79.34 78.00 63.22 13.25 12.52 12.82 13.44 12.83 12.97 10.74 0 20 40 60 80 100 FY11 FY12 FY13 FY14 FY15 FY16 FY17 Private Sector Public Sector Notes: FY - Indian Financial Year (April – March), MT - Million Tonnes, CAGR - Compound Annual Growth Rate; (1) - April to January 2017 , Figures mentioned are as per latest data available
  • 10.
    For updated information,please visit www.ibef.orgSteel10 SHARES IN PRODUCTION: SAIL AND TATA LEAD THE WAY Source: Ministry of Steel Annual Report 2016-17, Aranca Research  Total proposed crude steel capacity during 2016-172 by the private investors is expected to rise by 76.8 MT  As of FY17(1), SAIL dominated India’s steel sector, with the company accounting for 11.47 per cent of country’s finished steel production and 14.8 per cent of country’s crude steel production.. During FY17(1), Tata Steel accounted for 10.84 per cent of finished steel production and 11.72 per cent of the country’s crude steel production  In January 2017, Indian government inaugurated Universal Rail Mill (URM) worth US$ 178.49 million at SAIL’s Bhilai steel plant. The production of the world’s longest single rail of 130 meters from the new URM also commenced in the new mill Notes: RINL - Rashtriya Ispat Nigam Limited, (1) - April to December 2016; (2) – Provisional; Figures mentioned are as per latest data available India’s crude steel market share by production – FY171 India’s finished steel market share by production – FY171 14.80% 11.72% 4.04% 69.45% SAIL TATA RINIL OTHERS 11.47% 10.84% 3.05% 53.96% SAIL TATA RINIL OTHERS
  • 11.
    For updated information,please visit www.ibef.orgSteel11 GROWTH IN MARKET VALUE OF THE INDIAN STEEL SECTOR HAS ALSO BEEN STRONG  The sector has benefitted from the hike in prices and production, especially since the beginning of the millennium  Over 2007–16(E), the sector’s market value is estimated to have posted a strong CAGR of 18.7 per cent Market value of the Indian steel sector (US$ billion) 30.1 43 36.5 46.8 57.8 81 87.9 95.30 0 20 40 60 80 100 120 FY07 FY08 FY09 FY10 FY11 FY14 FY15E FY16E CAGR 18.7% Source: Ministry of External Affairs, Aranca Research Note: E - Estimates
  • 12.
    For updated information,please visit www.ibef.orgSteel12 52.1 52.4 59.3 66.4 71 73.5 74.1 76.99 81.52 83.9 0 10 20 30 40 50 60 70 80 90 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 DEMAND HAS OUTPACED SUPPLY OVER THE LAST FIVE YEARS  Total consumption of steel was 83.9 MT in FY17 as compared to 81.5 MT in FY16.  Driven by rising infrastructure development and growing demand for automotives, steel consumption is expected to reach 104 MT by 2017  It is expected that consumption per capita would increase supported by rapid growth in the industrial sector and rising infra expenditure projects in railways, roads and highways, etc.  The consumption of real steel has grew at a CAGR of 5.44 per cent during FY08-FY17 Real consumption of steel (in million tonnes) CAGR 5.44% Source: JPC India Steel, Ministry of Steel, Aranca Research Note: MT - Million Tonnes; FY17(1) – April -December 2017
  • 13.
    For updated information,please visit www.ibef.orgSteel13 TRENDS IN IMPORTS AND EXPORTS OF STEEL  In April - August 2017, consumption of finished steel grew at a rate of 4.4 per cent to reach 35.33MT as against 33.83 MT during the same period in 2016.  In order to reduce imports and boost domestic steel manufacturing industry, the Central Government extended the minimum import price (MIP) on 19 products, till February 4, 2017. These products include semi-finished products of iron or non-alloyed steel, flat-rolled products of different widths, bars and rods  According to DGFT, the minimum import price (MIP) for these products would range between US$ 643-752 per tonne  Indian Government imposed Anti-Dumping Duty on 47 steel products for five years beginning from August 2016.  In FY 2016-17, the country’s steel exports has increased by 102.1 per cent year-on-year to 8.24 million tonnes (mt), as compared to 4.07 mt in 2015-16  In FY 2016-17, the country’s steel imports fell by 36.6 per cent year- on-year to 7.42 million tonnes (mt), as compared to 11.7 mt in 2015- 16 Steel exports and imports (in million tonnes) 0.9 7.9 5.5 9.3 11.7 7.4 4.6 5.4 6.0 5.6 4.1 8.2 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 FY12 FY13 FY14 FY15 FY16 FY17 Imports Exports Source: Ministry of Steel, JSPL Presentation, Aranca Research Note: FY - Indian Financial Year (April - March), DGFT - Directorate General of Foreign Trade
  • 14.
    For updated information,please visit www.ibef.orgSteel14 KEY PLAYERS OF THE INDUSTRY Source: Aranca Research Company Products Tata Steel Ltd Finished steel (non-alloy steel) SAIL Finished steel (non-alloy steel) JSW Steel Ltd Hot-rolled coils, strips and sheets Jindal Steel and Power Ltd Iron and steel Ispat Industries Ltd Hot-rolled coils, strips and sheets Welspun-Gujarat Stahl Rohren Ltd Tubes and pipes Bhushan Steel Ltd Cold-rolled coils, strips and sheets Visa Steel Ltd Ferro Chrome, coke and special steel
  • 15.
    For updated information,please visit www.ibef.orgSteel15 KEY STEEL PLANTS IN INDIA Alloy and special steel plants under SAIL (Bhadrawati and Salem); iron and steel plant at Visvesvaraya Steel integrated plants under SAIL (Bhilai, Rourkela, Bokaro, Durgapur and Burnpur) Tata Steel’s largest steel plant, based in Jamshedpur RINL steel plant in Vishakhapatnam Source: Company websites, Aranca Research
  • 16.
    For updated information,please visit www.ibef.orgSteel16 PORTER’S FIVE FORCES FRAMEWORK Positive Impact Neutral Impact Negative Impact  Low - Aluminium and plastics are being used in few cases in automotive and other consumer durable sectors. However, it still does not pose significant threat to steel Threat of Substitutes  Medium - The steel industry is highly concentrated, with the top five players accounting for more than 70 per cent of the market share  Steel companies usually compete on the basis of production capacity, economies of scale, access to raw material, etc. Competitive Rivalry  Medium - Major steel consumption sectors, such as automobiles, oil and gas, shipping, consumer durables and power generation, enjoy high bargaining power and get favourable bulk deals. Smaller customers, however, do not enjoy this benefit Bargaining Power of Buyers  Low - Capital intensive, industry players are large and enjoy economies of scale. Some have their own mines for sourcing key raw materials  Several regulatory clearances required, including environmental, land acquisition, etc. Threat of New Entrants  Medium - Large integrated companies have their own mines to source key raw materials Bargaining Power of Suppliers
  • 17.
  • 18.
    For updated information,please visit www.ibef.orgSteel18 NOTABLE TRENDS IN THE INDIAN STEEL INDUSTRY … (1/2) Source: Ministry of Steel, Ministry of Railways, Aranca Research Notes: MOUs - Memorandum of Understanding, MT - Million Tonnes  Most of the companies in the industry are undertaking modernisation and expansion of plants to be more cost efficient. E.g. SAIL has undertaken modernisation and expansion for its 6 plants  An Inter-Ministerial Group (IMG) functioning under the Ministry of Steel, is monitoring and coordinating major steel investments across the country  The production capacity of SAIL is expected to increase from 13 MTPA to 50 MTPA in 2025 with the total investment of US$ 24.88 Billion Growing investments  International Coal Ventures Pvt Ltd, comprising SAIL, RINL, CIL, NTPC and NMDC, set up for acquisition of coal mines overseas  The consortium of SAIL and National Fertiliser Ltd. (NFL) has been nominated for revival of Sindri Unit of the Fertiliser Corporation of India Ltd  RINL, Vishakhapatnam Steel Plant and the Power Grid Corporation of India Ltd (POWERGRID) signed an MoU to set up a JV company to manufacture transmission line towers and tower parts including R&D of new high-end products  Attracted by the growth potential of the Indian steel industry, several global steel players have been planning to enter the market  National Mineral Development Corporation (NMDC) has signed an MoU with Russia’s 3rd largest steelmaker, Severstal, for a greenfield steel plant in Karnataka Strategic alliances Entry of international companies
  • 19.
    For updated information,please visit www.ibef.orgSteel19 NOTABLE TRENDS IN THE INDIAN STEEL INDUSTRY … (2/2) Source: Ministry of Steel, Aranca Research  Indian steel companies have now started benchmarking their facilities and processes against global standards, to enhance productivity  These steps are expected to help Indian companies improve raw material and energy consumption as well as improve compliance with environmental and pollution yardsticks  Companies are attempting coal gasification and gas-based Direct-Reduced Iron (DRI) production. Other alternative technologies such as Hlsmelt, Finex and ITmk3 being adopted to produce hot metal  Ministry of Steel has issued necessary direction to the steel companies to frame a strategy for taking up more R&D projects by spending at least 1 per cent of their sales turnover on R&D to facilitate technological innovations in the steel sector.  Ministry has established a task force to identify the need for technology development and R&D  Ministry has adopted energy efficiency improvement projects for mills operating with obsolete technologies  In January 2017, Noamundi iron ore mine of Tata Steel introduced drone technology in mine monitoring Increased emphasis on technological innovations
  • 20.
    For updated information,please visit www.ibef.orgSteel20 STRATEGIES ADOPTED Source: CCI, Ministry of External Affairs  Companies in the steel industry are investing heavily in expanding their capacity. Major public and private companies, including Tata Steel, SAIL and JSW Steel, are expanding their production capacity. Steel production is expected to reach 200 mtpa by 2020  India is the 2nd-largest crude steel producer in the world with production reaching 96 million tonnes in 2016.  The government has stepped up infrastructure spending from the current 5 per cent of GDP to 10 per cent by 2017and the government has planned to invest US$ 61.8 billion in infrastructure in the Union Budget 2017-18. Considering 15 per cent as steel component in the total investment, the initiative has a potential to generate an additional demand for steel of 18.75mtpa  The Ministry of Steel is encouraging R&D activities by providing financial assistance from Steel Development Fund (SDF) and Plan Scheme of the Central Government. Furthermore, the government has allowed 100 per cent FDI through the automatic route in the Indian steel sector  A long term perspective is to achieve capacity of 300 mtpa by 2025  SAIL is increasing its production capacity by 60-70 per cent in the last leg of its US$10.79 billion programme. Capacity expansion  In the last few years, rapid and stable growth in demand has also prompted domestic entrepreneurs to set up fresh greenfield projects in different states of the country. Mittal Steel announced two 12 mtpa greenfield steel projects, 1 each in Jharkhand and Orissa  As India surges ahead in building infrastructure, investments in steel pave the way ahead Greenfield projects – focus on downstream value-added products
  • 21.
    For updated information,please visit www.ibef.orgSteel21 STRATEGIES ADOPTED Source: CCI, Ministry of External Affairs  Steel companies are strengthening their position through cross border mergers and acquisitions. The focus is on improving existing technology to upgrade production process and developing new value added-products.  In 2014, Arcelor Mittal along with Nippon Steel and Sumitomo Metal Corporation acquired ThyssenKrupp Steel USA. Notable deals include Essar Global’s acquisition of Canada-based Algoma Steel.  On 1st August 2016, Kirloskar Ferrous Industries Ltd has announced to acquire pig iron plant of VSL Steels Ltd. for US$ 23.68 million. Also on 18 August 2016, JSW Steel Ltd. has acquired 74 per cent stake of Praxair Oxygen Pvt. Ltd. in their joint venture for US$ 36 million  As on December 01, 2016, JSW Steel, the flagship steel company of JSW Group, entered into a consortium to acquire 35 per cent stakes of Ilva steel plant, in Italy.  Tata Steel has executed an agreement with Creative Port Development (CPDPL) for the acquisition of the majority stakes, i.e., 51 per cent in CPDPL in January 2017  Italy’s Marcegaglia ArcelorMittal have offered to buy Italy’s troubled Ilva steel plant, for an amount of US$ 2.4 billion and will boost production  In March 2017, Central Government permitted sale of SAIL’s 3 units including Alloy Steels Plants, Visvesvaraya Iron and Steel Plant, Salem Steel Plant with the transfer of management in these plants for the strategic disinvestment.  ArcelorMittal SA is looking to set up a joint venture (JV) factory in India with state-owned Steel Authority of India Ltd (SAIL), to manufacture high-end steel products which could be used in defence and satellite industries. Mergers and Acquisition
  • 22.
  • 23.
    For updated information,please visit www.ibef.orgSteel23 STRONG DEMAND AND POLICY SUPPORT DRIVING INVESTMENTS Growing demand in the construction industry Growing demand in the automotives sector Rising demand for consumer durables and capital goods Growing demand 100 per cent FDI in the steel sector Encouragement of sector-based R&D activities by the government Reduced custom duty and other favourable measures Policy support Rising investments from domestic and foreign players Increasing number of MoUs signed to boost investment in steel Foreign investment of nearly US$ 40 billion committed in the steel sector Increasing investments Inviting Resultingin Note: FDI - Foreign Direct Investment
  • 24.
    For updated information,please visit www.ibef.orgSteel24 CAPITAL GOODS, CONSUMER DURABLES AND AUTOMOTIVES FURTHER DRIVING STEEL GROWTH Source: SIAM, JSPL presentation, Corporate Catalyst India, Aranca Research Notes: E - Estimate; F- Forecast, FY - Indian Financial Year (April - March)  Over FY05–20F, the consumer durables sector will expand at a CAGR of 12.54 per cent as growth in disposable income is expected to result in increase in demand for such products  The consumer durables market is expected to reach US$ 12.5 billion in FY16 and is projected to reach US$ 20.6 in FY20  The capital goods and consumer durables sectors are expected to grow at 7.5–8.8 per cent over 2012–21  Automotive production in India expanded at a CAGR of 8.76 per cent during FY10–17  Over FY14–21, the automotive sector is projected to rise at a CAGR of 10.2 per cent Consumer durables market size (US$ billion) Total automobile production in India (million units) 3.5 3.8 4.2 4.7 5.2 6.3 7.3 7.30 7.40 9.00 9.70 12.50 20.60 0 5 10 15 20 25 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY20F CAGR 12.54% 2.36 2.98 3.15 3.23 3.09 3.22 3.41 3.79 0.57 0.76 0.93 0.83 0.7 0.7 0.78 0.81 11.13 14.15 16.31 16.58 17.71 19.45 19.76 20.71 0 5 10 15 20 25 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 Passenger Vehicles Commercial Vehicles Two & Three Wheelers
  • 25.
    For updated information,please visit www.ibef.orgSteel25 POLICY SUPPORT AIDING GROWTH IN THE STEEL SECTOR … (1/2) Source: Ministry of Steel, Aranca Research  New National Steel Policy has been formulated by the Ministry of Steel in 2016, which will retain the objectives included in National Steel Policy (NSP) 2005. It aims at covering broader aspects of steel sector across the country including environment and facilitation of new steel projects, growth of steel demand in India and raw materials  Under the policy, the central government stated that all the government tenders will give preference to domestically manufactured steel and iron products. Moreover, Indian steel makers importing intermediate products or raw materials can claim benefits of domestic procurement provision by adding minimum of 15 per cent value to the product.  The New steel policy, 2017 aspires to achieve 300MT of steel making capacity by 2030. This would translate into additional investment of Rs 10 lakh Crore (US$ 156.08 billion) by 2030-31.  New Steel Policy seeks to increase per capita steel consumption to the level of 160 kgs by 2030 from existing level of around 60 kg. National Steel Policy 2017  A new scheme, ‘The scheme for the promotion of R&D in the iron and steel sector’, has been approved with budgetary provision of US$ 24.6 million to initiate and implement the provisions of the scheme as per the 11th Five-Year Plan which has continued in the 12th Five Year Plan  The development of technology for Cold-Rolled Grain Oriented (CRGO) steel sheets and other value-added products is also included under the policy purview and is allocated US$ 6.7 million R&D and innovation
  • 26.
    For updated information,please visit www.ibef.orgSteel26 POLICY SUPPORT AIDING GROWTH IN THE STEEL SECTOR … (2/2) Source: The Economic Times, Ministry of Steel, Business Standard, Make In India, Aranca Research  The government hiked the export duty on iron ore to 30 per cent ad valorem on all varieties of iron ore (except pellets) Rise in export duty Reduction in custom duty on plants and equipment Push due to Make in India initiative  The government has reduced the basic custom duty on the plants and equipments required for initial set up or expansion of iron ore pellets plants and iron ore beneficiation plants from 7.5/5 per cent to 2.5 per cent  Customs duty on imported flat-rolled stainless steel products has been increased to 10 per cent from 7.5 per cent  Basic customs duty on steel grade dolomite and steel grade limestone is being reduced from 5 per cent to 2.5 per cent. Basic customs duty is being reduced from 10 per cent to 5 per cent on forged steel rings used in the manufacture of bearings of wind-operated electricity generators  Going forward, the Make in India initiative and policy decisions taken under it are expected to augment the country’s steel production capacity and resolve issues related to the mining industry  100 per cent FDI through the automatic route is allowed in the Indian steel sectorForeign Direct Investment
  • 27.
    For updated information,please visit www.ibef.orgSteel27 STEEL SEZs IN INDIA Source: Formal approvals granted in the Board of Approvals after the SEZ rules coming into force, Special Economic Zones in India website, www.sezindia.nic.in Developer Location Product Viraj Profiles Ltd Thane, Maharashtra Stainless steel engineering products SAIL Salem SEZ Pvt Ltd Salem, Tamil Nadu Steel Orissa Industrial Infrastructure Development Corporation Jaipur, Orissa Metallurgical-based engineering and ancillary/downstream industry Tata Steel Special Economic Zone (TSSEZ) Gopalpur, Odisha Steel and allied downstream industries
  • 28.
    For updated information,please visit www.ibef.orgSteel28 THE SECTOR WITNESSED RISING INVESTMENTS IN THE LAST DECADE Source: Thomson ONE Banker, “Fact Sheet on Foreign Direct Investment (FDI)”, Department of Industrial Policy and Promotion Date announced Acquirer name Target name Value of deal (US$ million) Aug-16 JSW Steel Ltd Praxair Oxygen Pvt. Ltd. 36 Aug-16 Kirloskar Ferrous Industries Ltd VSL Steels Ltd. 23.68 Aug-14 JSW Steel Ltd Welspun Maxsteel Ltd 165.85 Apr-14 JSW Steel Ltd Vallabh Tinplate Pvt Ltd 7.63 Mar-14 Lalitanjali Group Pvt Ltd Centom Industries Ltd - Dec-13 Venus Insec Pvt Ltd Goodluck Steel Tubes Ltd 23.73 Oct-13 JSW Projects Ltd IST Steel and Power Ltd Aug-13 Readymade Steel India Ltd Kridhan Infra Solutions Pvt Jul-13 Swelect Energy Systems Ltd Amex Alloys Pvt Ltd Apr-13 Metallurgica Siderfoge S.r.l AMW-MGM Forgings Pvt Ltd Feb-13 Wayzata II Indian Ocean Ltd Ramkrishna Forgings Ltd 51.90 Nov-12 Rabale Engineering India Ltd Pradeep Metals Ltd 6.85 Nov-12 Suncoke Energy Inc Visa Steel Ltd-Coke division Oct-12 Aum Saw Pipes and Industries Pvt Greenearth Resources 2.77 Cumulative FDI inflows Period: April 2000 to June 2017  Sector • Metallurgical industries US$ 10.39 billion • Per cent of total FDI inflow 3.03
  • 29.
    For updated information,please visit www.ibef.orgSteel29 PLANNED CAPACITY ADDITIONS BY 2017-18 Source: Ministry of Steel Annual Report, Joint Plant Committee Notes: MTPA - Million Tonnes Per Annum Company Existing capacity Brownfield expansion Greenfield expansion Total capacity addition Tata Steel Ltd 12.50 0.4 0 12.59 Essar Steel Ltd 10.00 0 0 10.00 JSW Steel Ltd 18.00 0 0 18.00 Jindal Stainless Limited 1.00 0.15 0 1.15 Jindal Stainless (Hissar) Ltd 0.78 0.08 0 0.86 Bhushan Steel Ltd 5.60 0 0 5.60 Bhushan Power and Steel Ltd 2.50 0 0 2.5 Monnet Ispat and Energy Ltd 1.80 0 0 1.80 Electrosteel Steel 1.88 0 0 1.88 Visa Steel Ltd 0.50 0 0 0.50 Crude steel capacity addition plans up to FY2017-18 (in MTPA) for private sector companies
  • 30.
  • 31.
    For updated information,please visit www.ibef.orgSteel31 OPPORTUNITIES … (1/2)  The automotive industry is forecasted to grow in size by US$ 74 billion in 2015 to US$ 260-300 billion by 2026  With increasing capacity addition in the automotive industry, demand for steel from the sector is expected to be robust  In 2016, Indian automotive sector is estimated to be 3rd largest automotive market, by volume Automotive  The capital goods sector accounts for 11 per cent of steel consumption and expected to increase 14/15 per cent by 2025-26 and has the potential to increase in tonnage and market share  Corporate India’s capex is expected to grow and generate greater demand for steel Capital goods  The infrastructure sector accounts for 9 per cent of steel consumption and expected to increase 11 per cent by 2025- 26.  Due to such a huge investment in infrastructure the demand for long steel products would increase in the years ahead Infrastructure  More and more modern and private airports are expected to be set up  In FY17, passenger traffic at Indian airports stood at 264.99 million and number of operational airports stood at 94 in July 2017.  Development of Tier-II city airports would sustain consumption growth  Estimated steel consumption in airport building is likely to grow more than 20 per cent over next few years Airports Source: Make In India, SIAM, Ministry of Steel, Airport Authority of India Source: Capex – Capital Expenditure, P - Provisional
  • 32.
    For updated information,please visit www.ibef.orgSteel32 OPPORTUNITIES … (2/2) Source: Make In India, Ministry of Power, Aranca Research  The Dedicated Rail Freight Corridor (DRFC) network expansion would be enhanced in future  Gauge conversion, setting up of new lines and electrification would drive steel demand  Indian Railways started the PPP mode of funding and has already awarded projects worth around US$ 1.73 billion during the 1st 7 months (April- October) of FY16  In January 2017, Crisil estimated that the railways sector could create business opportunities worth US$ 99.65 billion Railways  Oil and gas amongst major end-user segment accounted for ~34.4 per cent of primary energy consumption in FY16  This would lead to an increase in demand of steel tubes and pipes, providing a lucrative opportunity to the steel industry Oil and gas  The government targets capacity addition of 100 GW under the 13th Five-Year Plan (2017–22)  Both generation and transmission capacities would be enhanced, thereby raising steel demand from the sector  Conventional power capacity addition of 23.98 GW has registered to be the highest in FY16 Power  Rural India is expected to reach per capita consumption of 12.11 kg to 14 kg for finished steel by 2020.  Policies like Food for Work Programme (FWP) and Indira Awaas Yojana, Pradhan Mantri Gram Sadak Yojana are driving growing demand for construction steel in rural India  In FY16, per capita consumption of steel in rural India is estimated at 60 kg, which is lower in comparison with the global average of 216 kg Rural India
  • 33.
  • 34.
    For updated information,please visit www.ibef.orgSteel34 JINDAL STEEL AND POWER LTD: REAPING BENEFITS OF PRUDENT INVESTMENTS … (1/3) 15.80 31.75 0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 FY 17 FY 18 E  Incorporated in 1979, Jindal Steel and Power Ltd. (JSPL) is an integrated steel producer and the largest coal-based sponge iron manufacturer in the world. The company has an installed steel production capacity of 3 MTPA at Raigarh in Chhattisgarh. JSPL is engaged in manufacturing long products and is specialised in producing long rails for railways and large sized H-beams as well as columns for the infrastructure and construction sector  JSPL also has significant presence across the mining, power generation and infrastructure sectors  In March 2017, Jindal Steel has entered into an agreement with Defence Research and Development Organisation (DRDO), which would allow the agency to transfer technology facilitating manufacturing of high-nitrogen steel, for application in defence sector.  New and expansion projects include setting up of a 7 MTPA integrated steel plant in Chhattisgarh, 12 MTPA integrated steel plant in Jharkhand and a 12.5 MTPA integrated steel plant in Orissa.  Achievements: • 2014 - Company has commissioned the billet caster plant with capacity of 6 MTPA at Angul with record time of 1 year • 2015 - Company has created history with its Raigarh steel facility producing 10,000 tonnes of crude steel in a single day • 2017 – Launched a 6 MTPA integrated steel plant in Odisha. Visakhapatnam port traffic (million tonnes)Projected crude steel production (million tonnes) CAGR 41.76% Source: Ministry of Steel, Company website (www.jindalsteelpower.com), Aranca Research; E- Estimated
  • 35.
    For updated information,please visit www.ibef.orgSteel35 JINDAL STEEL AND POWER LTD: REAPING BENEFITS OF PRUDENT INVESTMENTS … (2/3) 671 816 1,488 1,803 1,596 2,287 3,315 3,007 3,199 3,218 2,813 3,542 103 197 431 438 395 634 818 721 958 910 532 727 0 500 1000 1500 2000 2500 3000 3500 4000 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 Gross Revenue PBIDT Visakhapatnam port traffic (million tonnes)Financial growth (US$ million) 0.3 0.2 0.7 1.0 1.2 1.6 1.9 2.1 2.2 2.3 2.5 0.5 0.8 1.4 1.6 2.0 2.3 2.8 3.0 2.9 3.1 3.5 2.8 3.8 4.0 4.2 3.2 4.6 3.27 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 Finished Steel Products Semi - Steel Products Pellets Visakhapatnam port traffic (million tonnes)Sale of steel (million tonnes) Source: Company website (www.jindalsteelpower.com) Note: Company clubs iron and steel segment ‘s performance; PBIDT (Profit Before Interest, Depreciation and Tax)
  • 36.
  • 37.
    For updated information,please visit www.ibef.orgSteel37 INDUSTRY ASSOCIATIONS L-22/4, DLF Phase-II Gurgaon, Haryana –122 002 Phone: 91-124-4375501 Fax: 91-124-4375509 E-mail: nissda@gmail.com Indian Stainless Steel Development Association
  • 38.
  • 39.
    For updated information,please visit www.ibef.orgSteel39 GLOSSARY  CAGR: Compound Annual Growth Rate  FDI: Foreign Direct Investment  FY: Indian Financial Year (April to March) • So FY10 implies April 2009 to March 2010  JV: Joint Venture  MoU: Memorandum of Understanding  MT: Million Tonnes  MTPA: Million Tonnes Per Annum  NPAT: Net Profit After Tax  SEZ: Special Economic Zone  TMT: Thermo Mechanically Treated  US$ : US Dollar  Wherever applicable, numbers have been rounded off to the nearest whole number
  • 40.
    For updated information,please visit www.ibef.orgSteel40 EXCHANGE RATES Year INR Equivalent of one US$ 2004–05 44.81 2005–06 44.14 2006–07 45.14 2007–08 40.27 2008–09 46.14 2009–10 47.42 2010–11 45.62 2011–12 46.88 2012–13 54.31 2013–14 60.28 2014-15 61.06 2015-16 65.46 2016-17 67.09 Q1 2017-18 64.46 Year INR Equivalent of one US$ 2005 43.98 2006 45.18 2007 41.34 2008 43.62 2009 48.42 2010 45.72 2011 46.85 2012 53.46 2013 58.44 2014 61.03 2015 64.15 2016 67.21 H1 2017 65.73 Exchange Rates (Fiscal Year) Exchange Rates (Calendar Year) Source: Reserve bank of India, Average for the year
  • 41.
    For updated information,please visit www.ibef.orgSteel41 DISCLAIMER India Brand Equity Foundation (IBEF) engaged Aranca to prepare this presentation and the same has been prepared by Aranca in consultation with IBEF. All rights reserved. All copyright in this presentation and related works is solely and exclusively owned by IBEF. The same may not be reproduced, wholly or in part in any material form (including photocopying or storing it in any medium by electronic means and whether or not transiently or incidentally to some other use of this presentation), modified or in any manner communicated to any third party except with the written approval of IBEF. This presentation is for information purposes only. While due care has been taken during the compilation of this presentation to ensure that the information is accurate to the best of Aranca and IBEF’s knowledge and belief, the content is not to be construed in any manner whatsoever as a substitute for professional advice. Aranca and IBEF neither recommend nor endorse any specific products or services that may have been mentioned in this presentation and nor do they assume any liability or responsibility for the outcome of decisions taken as a result of any reliance placed on this presentation. Neither Aranca nor IBEF shall be liable for any direct or indirect damages that may arise due to any act or omission on the part of the user due to any reliance placed or guidance taken from any portion of this presentation.