TOPICS


•   ½ Cent sales tax funded projects
•   Budget
•   Streets
•   Water
½ Cent sales Tax
Projects
Producers Park

• Project Began Summer 2010
• Completed Fall 2011
• Cost: $1,665,000
Meadowcreek Park
(renovation)
• Project began Spring 2010
• Completed Fall 2011
• Cost: $256,000
Love Municipal Pool
(renovation)
• Project Began Spring 2011
• Completed Spring 2012
• Cost: $3,262,000
Rio Vista Park (renovation)

• Project Began Spring 2012
• To be completed Fall 2012
• Cost: $813,900
River Improvements

• Project Began Fall 2011
• Project to be completed Spring 2013
• Cost: $9,300,000
Red Arroyo Trail

• Project to begin Summer 2014
• Project to be complete Summer 2015
• Project Cost: $4,000,000
• Funding Sources:
• Federal ($3,200,000)
• City Half-Cent Sales Taxes and Storm Water Funding
  ($650,000)
• Donations ($150,000)
½ Cent Sales Tax Projects

• Current or Future projects
  – Airport Terminal Rehab
  – Fort Concho
  – 29th Street Sports Complex
  – Fairgrounds (cattle barn)
  – Hickory Water Supply
  – City Auditorium
City Hall

• Construction started August 2010
• Employees Moved in June 2012
• Open House event early October
2012-2013 Budget
Budget Goals


• Modest employee raises
• Street maintenance/Sealcoat
• Property Tax Rate reduction
Budget Goals vs. Resources


• Budget Gap of approximately $751,000
• Proposed to close the gap through cuts
  and targeted fees
Closing the Budget Gap


• Total proposed cuts & reorgs $379,000
• Number of positions cut: 8 full time
  1 part time
Closing the Budget Gap


• Fees vs Taxes
• Proposing fee increases totaling
  $342,000
10 year property tax history
Increased Street Maintenance


• Staff is proposing to triple the street
  sealcoat budget
• Proposed $1,800,000 in sealcoat
Streets
City Streets

– Total lane miles of streets: 1150 miles

– Major Roadways: 283 lane miles

– Residential Streets: 867 lane miles
Street Useful
      Life

– Different street types have different useful lives and
  different routine maintenance needs
– When considering what type of street to construct it
  is important to consider
  1) Initial Capital Cost
  2) Overall Useful Life and
  3) Long Term Maintenance Needs
Street Life Cycle
– Asphalt vs. concrete
– 2/3 of the cost of a roadway is what is
  below the surface; the asphalt surface
  merely protects the investment below it
– The useful life potential of a street is
  fully dependent on it being properly
  maintained
– Impact of reduced maintenance
Street Types
Asphalt Streets
  • Useful life of 25 years of properly maintained
     – Proper maintenance to achieve 25 year useful life
        • Sealcoat – every 8 years (maximum)
        • Mill and Overlay – at 15 years if roadway shows
           signs of major distress (* Residential streets are
           low volume and typically only require sealcoating
           every 8 years)
        • Complete Reconstruction – Approximately every
           25-30 years
        • Major maintenance costs over 75 year period
           (1 mile of 40’ wide street) - $8,000,000.00
Street Types

Roller Compacted Concrete (RCC) Streets
(Grape Creek Road and 50th Street)
   • Useful life approximately 75-100 years
      – Initial cost 5-15% greater
      – Maintenance – no major routine maintenance
         required
      – Major maintenance costs over 75 year period
         (1 mile of 40’ wide street)
         • Asphalt - $8,000,000.00
         • RCC - $1,500,000.00
            (for mill and overlay only if required)
Street
           Reconstruction
–    The City currently has 55 streets listed for reconstruction in its
     Capital Improvements Plan at a cost of approximately $155M
–    Street Construction Methods
    • Roller Compacted Concrete Reconstruction (RCC)
        – Removal of 6 to 8 inches of material and replacement
            with roller compacted concrete
        – Cost per square yard: $175, Useful life: 75-100 years
    • “Full Depth” Reconstruction (Asphalt)
        – Complete removal and replacement of roadway from
            surface to depth of approximately 22 inches
        – Cost per square yard: $150, Useful life: 25 years
Capital Borrowing
      Capacity
• Current capital budget $ 1,756,529


• LESS $250,000 annually for fire truck replacement


• Could use $1,506,529 capital budget for debt
  service


   – Assuming 20 years at 4% we could borrow
     approximately $20,475,000 principal


   – Budget impact?
San Angelo’s Water
Supply
Historical Lake Levels
Ivie Reservoir


123,400




                 75,820
Twin Buttes Reservoir
Lake Nasworthy




     Change in Volume:      1,980 Acre-Feet
     Change in Elevation:   21 Inches
O H Ivie Reservoir
Projected Water Supply w/o Hickory
Projected Supply, Acre-Feet




                                             Month
Twin Buttes South Pool
Pumping
Pipelines to Equalization
Channel
Flow Through Equalization
Channel
Water Flowing Into North Pool
Hickory Project
Update
Well Field Collector Pipelines
• Installation of 50,700 feet of pipe to nine
  wells

• General Contractor:    Price Construction
• Pipeline Sub-Contractor: Darnell & Dickson

• Contract Amount:    $3.8 million


• Project Substantially Complete: May 2012
Well Field Layout
Transmission Pipeline
• 62 miles of 30” pipe from well field to
  San Angelo

• Contractor: Oscar Renda
• Sub-Contractor: S J Louis
• Contract Amount: $39 million
• Contract Completion: July 2013
30” Pipeline Installation
Transmission Pipeline Status




          30”
                PIP
                      EL         STARTING
                           INE
                                   POINT

                                                 PUMP STATION
                 7M
           AS       I
                 OF LES
                   8/1
                       /12
                                   4
                                 AS .5 MI
                                    OF LES
                                       8/1
                                          /1 2
  TOTAL:               62 MILES                   WELL FIELD
  COMPLETED:          11.5 MILES
Well Field-Booster Pump
    Station

• Equip 9 Existing Wells


• Construct 6 mgd Pump Station


• Construct Two 500,000 gallon Tanks


• Install Microwave Telemetry System
Booster Station-Well Field
   Contract
• Contractor: Archer Western
• Contract Amount: $12.85 million
• Notice to Proceed: June 18, 2012
• Substantial Completion: June 2013
Treatment Plant
• Treatment Method Selected:     June
  2012

• 20% Design Status:           August
  2012
• Advertise for Bids:              April
  2013
• Notice to Proceed:               June
  2013
• Substantial Completion:      August
9 mgd usage
2014 - 2018
Cost Estimate to Expand to 9mgd
      Capacity

• Well Field:                                         $10,720,000
   – Five (5) New Wells Drilled, Cased and Equipped
   – Expanded Well Field Access Roads
• Booster Pump Station:                               $260,000
   – Two (2) Additional Pumps and Electrical


• Contingencies:                                      $2,920,000


• Engineering & Construction Mgmt.:                   $2,160,000


• Total:                                          $16,060,000
Future of Water:

•   Hickory Water Supply
•   Tri-City Water
•   Reuse of Water
•   Other options
Keys for the Future:

• Inter-organizational cooperation
• Water supply development
• Awareness of intergovernmental
  fiscal issues
Mayor Alvin New – alvin.new@sanangelotexas.us
Interim City Manager Michael Dane – michael.dane@sanangelotexas.us
325-657-4241

More Related Content

What's hot

Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
Miami-Dade Transportation Planning Organization
 
City Council April 3, 2012 Hickory Aquifer Project Update
City Council April 3, 2012 Hickory Aquifer Project UpdateCity Council April 3, 2012 Hickory Aquifer Project Update
City Council April 3, 2012 Hickory Aquifer Project Update
City of San Angelo Texas
 
Town of Scitutate job story Underground Construction 10-1-15
Town of Scitutate job story Underground Construction 10-1-15Town of Scitutate job story Underground Construction 10-1-15
Town of Scitutate job story Underground Construction 10-1-15
Ryan Johnson
 
Wastewater Master Plan Update
Wastewater Master Plan UpdateWastewater Master Plan Update
Wastewater Master Plan Update
City of College Station
 
Interlocal Agreement with Wellborn SUD
Interlocal Agreement with Wellborn SUDInterlocal Agreement with Wellborn SUD
Interlocal Agreement with Wellborn SUD
City of College Station
 
DS-16-161 Water Reuse Master Plan
DS-16-161 Water Reuse Master PlanDS-16-161 Water Reuse Master Plan
DS-16-161 Water Reuse Master Plan
CityofKilleen
 
Crumb Rubber Life Cycle Cost Assessment (LCCA) Project
Crumb Rubber Life Cycle Cost Assessment (LCCA) ProjectCrumb Rubber Life Cycle Cost Assessment (LCCA) Project
Crumb Rubber Life Cycle Cost Assessment (LCCA) Project
Michael R. Barr
 
City Council January 3, 2012 Hickory update
City Council January 3, 2012 Hickory updateCity Council January 3, 2012 Hickory update
City Council January 3, 2012 Hickory update
City of San Angelo Texas
 
City council june 18, 2013 hickory update
City council june 18, 2013   hickory updateCity council june 18, 2013   hickory update
City council june 18, 2013 hickory update
City of San Angelo Texas
 
Addison Capital Projects Update
Addison Capital Projects UpdateAddison Capital Projects Update
Addison Capital Projects Update
TownofAddison
 
Disinfection System
Disinfection SystemDisinfection System
Pardon Our Dust meeting, March 9, 2016
Pardon Our Dust meeting, March 9, 2016Pardon Our Dust meeting, March 9, 2016
Pardon Our Dust meeting, March 9, 2016
VDOT Northern Virginia
 
Dwirs community impact pres 4 4-13-v3
Dwirs community impact pres 4 4-13-v3Dwirs community impact pres 4 4-13-v3
Dwirs community impact pres 4 4-13-v3
Northeast Ohio Regional Sewer District
 
PIS Uyo - Ring Road Phases I
PIS Uyo - Ring Road Phases IPIS Uyo - Ring Road Phases I
PIS Uyo - Ring Road Phases I
Sven Maedler
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Toronto Public Consultation Unit
 
Dugway Sewer Community Update: April 1, 2014
Dugway Sewer Community Update: April 1, 2014Dugway Sewer Community Update: April 1, 2014
Dugway Sewer Community Update: April 1, 2014
Northeast Ohio Regional Sewer District
 
DWIRS public meeting 2015 March 24
DWIRS public meeting 2015 March 24DWIRS public meeting 2015 March 24
DWIRS public meeting 2015 March 24
Northeast Ohio Regional Sewer District
 
Fairfax Community Leaders Conference
Fairfax Community Leaders ConferenceFairfax Community Leaders Conference
Fairfax Community Leaders Conference
VDOT Northern Virginia
 
CPAC Meeting 9-8-04
CPAC Meeting 9-8-04CPAC Meeting 9-8-04
CPAC Meeting 9-8-04
HartTWI
 
Langley School Pump Station Community Meeting October 22, 2020
Langley School Pump Station Community Meeting October 22, 2020Langley School Pump Station Community Meeting October 22, 2020
Langley School Pump Station Community Meeting October 22, 2020
Fairfax County
 

What's hot (20)

Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
 
City Council April 3, 2012 Hickory Aquifer Project Update
City Council April 3, 2012 Hickory Aquifer Project UpdateCity Council April 3, 2012 Hickory Aquifer Project Update
City Council April 3, 2012 Hickory Aquifer Project Update
 
Town of Scitutate job story Underground Construction 10-1-15
Town of Scitutate job story Underground Construction 10-1-15Town of Scitutate job story Underground Construction 10-1-15
Town of Scitutate job story Underground Construction 10-1-15
 
Wastewater Master Plan Update
Wastewater Master Plan UpdateWastewater Master Plan Update
Wastewater Master Plan Update
 
Interlocal Agreement with Wellborn SUD
Interlocal Agreement with Wellborn SUDInterlocal Agreement with Wellborn SUD
Interlocal Agreement with Wellborn SUD
 
DS-16-161 Water Reuse Master Plan
DS-16-161 Water Reuse Master PlanDS-16-161 Water Reuse Master Plan
DS-16-161 Water Reuse Master Plan
 
Crumb Rubber Life Cycle Cost Assessment (LCCA) Project
Crumb Rubber Life Cycle Cost Assessment (LCCA) ProjectCrumb Rubber Life Cycle Cost Assessment (LCCA) Project
Crumb Rubber Life Cycle Cost Assessment (LCCA) Project
 
City Council January 3, 2012 Hickory update
City Council January 3, 2012 Hickory updateCity Council January 3, 2012 Hickory update
City Council January 3, 2012 Hickory update
 
City council june 18, 2013 hickory update
City council june 18, 2013   hickory updateCity council june 18, 2013   hickory update
City council june 18, 2013 hickory update
 
Addison Capital Projects Update
Addison Capital Projects UpdateAddison Capital Projects Update
Addison Capital Projects Update
 
Disinfection System
Disinfection SystemDisinfection System
Disinfection System
 
Pardon Our Dust meeting, March 9, 2016
Pardon Our Dust meeting, March 9, 2016Pardon Our Dust meeting, March 9, 2016
Pardon Our Dust meeting, March 9, 2016
 
Dwirs community impact pres 4 4-13-v3
Dwirs community impact pres 4 4-13-v3Dwirs community impact pres 4 4-13-v3
Dwirs community impact pres 4 4-13-v3
 
PIS Uyo - Ring Road Phases I
PIS Uyo - Ring Road Phases IPIS Uyo - Ring Road Phases I
PIS Uyo - Ring Road Phases I
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
 
Dugway Sewer Community Update: April 1, 2014
Dugway Sewer Community Update: April 1, 2014Dugway Sewer Community Update: April 1, 2014
Dugway Sewer Community Update: April 1, 2014
 
DWIRS public meeting 2015 March 24
DWIRS public meeting 2015 March 24DWIRS public meeting 2015 March 24
DWIRS public meeting 2015 March 24
 
Fairfax Community Leaders Conference
Fairfax Community Leaders ConferenceFairfax Community Leaders Conference
Fairfax Community Leaders Conference
 
CPAC Meeting 9-8-04
CPAC Meeting 9-8-04CPAC Meeting 9-8-04
CPAC Meeting 9-8-04
 
Langley School Pump Station Community Meeting October 22, 2020
Langley School Pump Station Community Meeting October 22, 2020Langley School Pump Station Community Meeting October 22, 2020
Langley School Pump Station Community Meeting October 22, 2020
 

Viewers also liked

San Angelo City Council November 6, 2012 Planning Presentation
San Angelo City Council November 6, 2012 Planning Presentation San Angelo City Council November 6, 2012 Planning Presentation
San Angelo City Council November 6, 2012 Planning Presentation
City of San Angelo Texas
 
City Council May 15, 2012 ACAP
City Council May 15, 2012 ACAPCity Council May 15, 2012 ACAP
City Council May 15, 2012 ACAP
City of San Angelo Texas
 
City council december 18, 2012 water utilities late charges
City council december 18, 2012 water utilities late chargesCity council december 18, 2012 water utilities late charges
City council december 18, 2012 water utilities late charges
City of San Angelo Texas
 
City council december 18, 2012 municipal services statement breakdown
City council december 18, 2012 municipal services statement breakdownCity council december 18, 2012 municipal services statement breakdown
City council december 18, 2012 municipal services statement breakdown
City of San Angelo Texas
 
2013.02 gemiusAudience_overview
2013.02 gemiusAudience_overview2013.02 gemiusAudience_overview
2013.02 gemiusAudience_overview
Gemius Ukraine
 
asda
asdaasda
Homework
HomeworkHomework
4ufkfdqg(2)
4ufkfdqg(2)4ufkfdqg(2)
4ufkfdqg(2)
mauxa
 
Steve jobs
Steve jobsSteve jobs
Steve jobs
Celso Garcia
 
رياضيات سابع دليل المعلم
رياضيات سابع دليل المعلمرياضيات سابع دليل المعلم
رياضيات سابع دليل المعلمMosab Qasem
 
Examen fyq1 2ª ev
Examen fyq1 2ª evExamen fyq1 2ª ev
Examen fyq1 2ª ev
rojgutant
 
رياضيات سابع دليل المعلم
رياضيات سابع دليل المعلمرياضيات سابع دليل المعلم
رياضيات سابع دليل المعلمMosab Qasem
 
MandA Advertising
MandA AdvertisingMandA Advertising
MandA Advertising
Antonio Alvarez G
 
Personal proyect ingles
Personal proyect inglesPersonal proyect ingles
Personal proyect ingles
delficrespo
 
Ховд аймаг 5-р цуврал
Ховд аймаг 5-р цувралХовд аймаг 5-р цуврал
Ховд аймаг 5-р цувралGantushig Javkhlan
 
Debate Socialista En El Municipio Sucre
Debate Socialista En El Municipio SucreDebate Socialista En El Municipio Sucre
Debate Socialista En El Municipio Sucre
Francisco Gutierrez
 
Antarctica
AntarcticaAntarctica
Antarctica
favulos
 

Viewers also liked (20)

San Angelo City Council November 6, 2012 Planning Presentation
San Angelo City Council November 6, 2012 Planning Presentation San Angelo City Council November 6, 2012 Planning Presentation
San Angelo City Council November 6, 2012 Planning Presentation
 
City Council May 15, 2012 ACAP
City Council May 15, 2012 ACAPCity Council May 15, 2012 ACAP
City Council May 15, 2012 ACAP
 
City council december 18, 2012 water utilities late charges
City council december 18, 2012 water utilities late chargesCity council december 18, 2012 water utilities late charges
City council december 18, 2012 water utilities late charges
 
City council december 18, 2012 municipal services statement breakdown
City council december 18, 2012 municipal services statement breakdownCity council december 18, 2012 municipal services statement breakdown
City council december 18, 2012 municipal services statement breakdown
 
2013.02 gemiusAudience_overview
2013.02 gemiusAudience_overview2013.02 gemiusAudience_overview
2013.02 gemiusAudience_overview
 
asda
asdaasda
asda
 
Homework
HomeworkHomework
Homework
 
4ufkfdqg(2)
4ufkfdqg(2)4ufkfdqg(2)
4ufkfdqg(2)
 
Steve jobs
Steve jobsSteve jobs
Steve jobs
 
رياضيات سابع دليل المعلم
رياضيات سابع دليل المعلمرياضيات سابع دليل المعلم
رياضيات سابع دليل المعلم
 
Exercicis proposats 8
Exercicis proposats 8Exercicis proposats 8
Exercicis proposats 8
 
1
11
1
 
Examen fyq1 2ª ev
Examen fyq1 2ª evExamen fyq1 2ª ev
Examen fyq1 2ª ev
 
رياضيات سابع دليل المعلم
رياضيات سابع دليل المعلمرياضيات سابع دليل المعلم
رياضيات سابع دليل المعلم
 
MandA Advertising
MandA AdvertisingMandA Advertising
MandA Advertising
 
O caligrama
O caligramaO caligrama
O caligrama
 
Personal proyect ingles
Personal proyect inglesPersonal proyect ingles
Personal proyect ingles
 
Ховд аймаг 5-р цуврал
Ховд аймаг 5-р цувралХовд аймаг 5-р цуврал
Ховд аймаг 5-р цуврал
 
Debate Socialista En El Municipio Sucre
Debate Socialista En El Municipio SucreDebate Socialista En El Municipio Sucre
Debate Socialista En El Municipio Sucre
 
Antarctica
AntarcticaAntarctica
Antarctica
 

Similar to State of the City 2012

Sept 30 2013 council goals presentation - Utilities
Sept 30 2013 council goals presentation - UtilitiesSept 30 2013 council goals presentation - Utilities
Sept 30 2013 council goals presentation - Utilities
CityofEvanston2
 
Alamo Heights CCM 01.08.18 - Item #4 ppt CM Report
Alamo Heights CCM 01.08.18 - Item #4   ppt CM ReportAlamo Heights CCM 01.08.18 - Item #4   ppt CM Report
Alamo Heights CCM 01.08.18 - Item #4 ppt CM Report
ahcitycouncil
 
LTCP meeting 11-16-05
LTCP meeting 11-16-05LTCP meeting 11-16-05
LTCP meeting 11-16-05
HartTWI
 
Case Studies: SWIFT Funds for Municipal Conservation in City of Keller & City...
Case Studies: SWIFT Funds for Municipal Conservation in City of Keller & City...Case Studies: SWIFT Funds for Municipal Conservation in City of Keller & City...
Case Studies: SWIFT Funds for Municipal Conservation in City of Keller & City...
Texas Living Waters Project
 
Town of Franklin: DPW Overview 04/07/21
Town of Franklin: DPW Overview 04/07/21Town of Franklin: DPW Overview 04/07/21
Town of Franklin: DPW Overview 04/07/21
Franklin Matters
 
Three Transformational Projects in Atlanta's Proctor Creek
Three Transformational Projects in Atlanta's Proctor CreekThree Transformational Projects in Atlanta's Proctor Creek
Three Transformational Projects in Atlanta's Proctor Creek
Park Pride
 
WHCRWA Town Hall Meeting 11-10-2014
WHCRWA Town Hall Meeting 11-10-2014WHCRWA Town Hall Meeting 11-10-2014
WHCRWA Town Hall Meeting 11-10-2014
The Texas Network, LLC
 
ccwcd bond public meeting
 ccwcd bond public meeting ccwcd bond public meeting
ccwcd bond public meeting
ccwcd
 
Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015
Northeast Ohio Regional Sewer District
 
Franklin DPW Water Presentation
Franklin DPW Water PresentationFranklin DPW Water Presentation
Franklin DPW Water Presentation
Franklin Matters
 
Fairbank & Oakwood Stations Open House - April 2017
Fairbank & Oakwood Stations Open House - April 2017Fairbank & Oakwood Stations Open House - April 2017
Fairbank & Oakwood Stations Open House - April 2017
Crosstown TO
 
Swc public consultation_pres_170307_final
Swc public consultation_pres_170307_finalSwc public consultation_pres_170307_final
Swc public consultation_pres_170307_final
Toronto Public Consultation Unit
 
City of Toledo Department of Public Utilities Water Rate Presentation to the ...
City of Toledo Department of Public Utilities Water Rate Presentation to the ...City of Toledo Department of Public Utilities Water Rate Presentation to the ...
City of Toledo Department of Public Utilities Water Rate Presentation to the ...
Toledo Regional Chamber of Commerce
 
2014 Economic Summit - City of Norman
2014  Economic Summit - City of Norman2014  Economic Summit - City of Norman
2014 Economic Summit - City of Norman
Norman Economic Development Coalition
 
A New Reservoir Project 30 Years in the Making - Tom Kula and Mike Rickman
A New Reservoir Project 30 Years in the Making - Tom Kula and Mike RickmanA New Reservoir Project 30 Years in the Making - Tom Kula and Mike Rickman
A New Reservoir Project 30 Years in the Making - Tom Kula and Mike Rickman
TWCA
 
1.1 mdwasd update
1.1 mdwasd update1.1 mdwasd update
1.1 mdwasd update
ascemiami-dade
 
Urban Water Management Plan Update
Urban Water Management Plan UpdateUrban Water Management Plan Update
Urban Water Management Plan Update
City of Corona
 
K.1 turkey point units 6 & 7 project
K.1 turkey point units 6 & 7 projectK.1 turkey point units 6 & 7 project
K.1 turkey point units 6 & 7 project
ascemiami-dade
 
Planning of Water Resource Planning Projects
Planning of Water Resource Planning ProjectsPlanning of Water Resource Planning Projects
Planning of Water Resource Planning Projects
DARSHAN MEHTA
 
Turkey Point-6 and Turkey Point-7 Project Overview (May 2013)
Turkey Point-6 and Turkey Point-7 Project Overview (May 2013)Turkey Point-6 and Turkey Point-7 Project Overview (May 2013)
Turkey Point-6 and Turkey Point-7 Project Overview (May 2013)
Andrew Gelston
 

Similar to State of the City 2012 (20)

Sept 30 2013 council goals presentation - Utilities
Sept 30 2013 council goals presentation - UtilitiesSept 30 2013 council goals presentation - Utilities
Sept 30 2013 council goals presentation - Utilities
 
Alamo Heights CCM 01.08.18 - Item #4 ppt CM Report
Alamo Heights CCM 01.08.18 - Item #4   ppt CM ReportAlamo Heights CCM 01.08.18 - Item #4   ppt CM Report
Alamo Heights CCM 01.08.18 - Item #4 ppt CM Report
 
LTCP meeting 11-16-05
LTCP meeting 11-16-05LTCP meeting 11-16-05
LTCP meeting 11-16-05
 
Case Studies: SWIFT Funds for Municipal Conservation in City of Keller & City...
Case Studies: SWIFT Funds for Municipal Conservation in City of Keller & City...Case Studies: SWIFT Funds for Municipal Conservation in City of Keller & City...
Case Studies: SWIFT Funds for Municipal Conservation in City of Keller & City...
 
Town of Franklin: DPW Overview 04/07/21
Town of Franklin: DPW Overview 04/07/21Town of Franklin: DPW Overview 04/07/21
Town of Franklin: DPW Overview 04/07/21
 
Three Transformational Projects in Atlanta's Proctor Creek
Three Transformational Projects in Atlanta's Proctor CreekThree Transformational Projects in Atlanta's Proctor Creek
Three Transformational Projects in Atlanta's Proctor Creek
 
WHCRWA Town Hall Meeting 11-10-2014
WHCRWA Town Hall Meeting 11-10-2014WHCRWA Town Hall Meeting 11-10-2014
WHCRWA Town Hall Meeting 11-10-2014
 
ccwcd bond public meeting
 ccwcd bond public meeting ccwcd bond public meeting
ccwcd bond public meeting
 
Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015
 
Franklin DPW Water Presentation
Franklin DPW Water PresentationFranklin DPW Water Presentation
Franklin DPW Water Presentation
 
Fairbank & Oakwood Stations Open House - April 2017
Fairbank & Oakwood Stations Open House - April 2017Fairbank & Oakwood Stations Open House - April 2017
Fairbank & Oakwood Stations Open House - April 2017
 
Swc public consultation_pres_170307_final
Swc public consultation_pres_170307_finalSwc public consultation_pres_170307_final
Swc public consultation_pres_170307_final
 
City of Toledo Department of Public Utilities Water Rate Presentation to the ...
City of Toledo Department of Public Utilities Water Rate Presentation to the ...City of Toledo Department of Public Utilities Water Rate Presentation to the ...
City of Toledo Department of Public Utilities Water Rate Presentation to the ...
 
2014 Economic Summit - City of Norman
2014  Economic Summit - City of Norman2014  Economic Summit - City of Norman
2014 Economic Summit - City of Norman
 
A New Reservoir Project 30 Years in the Making - Tom Kula and Mike Rickman
A New Reservoir Project 30 Years in the Making - Tom Kula and Mike RickmanA New Reservoir Project 30 Years in the Making - Tom Kula and Mike Rickman
A New Reservoir Project 30 Years in the Making - Tom Kula and Mike Rickman
 
1.1 mdwasd update
1.1 mdwasd update1.1 mdwasd update
1.1 mdwasd update
 
Urban Water Management Plan Update
Urban Water Management Plan UpdateUrban Water Management Plan Update
Urban Water Management Plan Update
 
K.1 turkey point units 6 & 7 project
K.1 turkey point units 6 & 7 projectK.1 turkey point units 6 & 7 project
K.1 turkey point units 6 & 7 project
 
Planning of Water Resource Planning Projects
Planning of Water Resource Planning ProjectsPlanning of Water Resource Planning Projects
Planning of Water Resource Planning Projects
 
Turkey Point-6 and Turkey Point-7 Project Overview (May 2013)
Turkey Point-6 and Turkey Point-7 Project Overview (May 2013)Turkey Point-6 and Turkey Point-7 Project Overview (May 2013)
Turkey Point-6 and Turkey Point-7 Project Overview (May 2013)
 

More from City of San Angelo Texas

February 4, 2014 Agenda Packet
February 4, 2014 Agenda PacketFebruary 4, 2014 Agenda Packet
February 4, 2014 Agenda Packet
City of San Angelo Texas
 
January 21, 2014 Agenda packet
January 21, 2014 Agenda packetJanuary 21, 2014 Agenda packet
January 21, 2014 Agenda packet
City of San Angelo Texas
 
City council january 7, 2014 sidewalk agreement
City council january 7, 2014   sidewalk agreementCity council january 7, 2014   sidewalk agreement
City council january 7, 2014 sidewalk agreement
City of San Angelo Texas
 
City council january 7, 2014 bandits presentation
City council january 7, 2014   bandits presentationCity council january 7, 2014   bandits presentation
City council january 7, 2014 bandits presentation
City of San Angelo Texas
 
City council january 7, 2014 river fest
City council january 7, 2014   river festCity council january 7, 2014   river fest
City council january 7, 2014 river fest
City of San Angelo Texas
 
January 7, 2014 Agenda Packet
January 7, 2014 Agenda PacketJanuary 7, 2014 Agenda Packet
January 7, 2014 Agenda Packet
City of San Angelo Texas
 
City council 12 17-13 downtown development plan
City council 12 17-13 downtown development planCity council 12 17-13 downtown development plan
City council 12 17-13 downtown development plan
City of San Angelo Texas
 
City council 12 17-13 planning presentation
City council 12 17-13 planning presentationCity council 12 17-13 planning presentation
City council 12 17-13 planning presentation
City of San Angelo Texas
 
December 17, 2013 Agenda Packet
December 17, 2013 Agenda PacketDecember 17, 2013 Agenda Packet
December 17, 2013 Agenda Packet
City of San Angelo Texas
 
December 3, 2013 Agenda packet
December 3, 2013 Agenda packetDecember 3, 2013 Agenda packet
December 3, 2013 Agenda packet
City of San Angelo Texas
 
City council nov. 19, 2013 san angelo public housing authority
City council nov. 19, 2013   san angelo public housing  authorityCity council nov. 19, 2013   san angelo public housing  authority
City council nov. 19, 2013 san angelo public housing authority
City of San Angelo Texas
 
City council nov. 19, 2013 planning
City council nov. 19, 2013   planningCity council nov. 19, 2013   planning
City council nov. 19, 2013 planning
City of San Angelo Texas
 
City council nov. 19, 2013 cosadc budget presentation 11-19-13
City council nov. 19, 2013    cosadc budget presentation 11-19-13City council nov. 19, 2013    cosadc budget presentation 11-19-13
City council nov. 19, 2013 cosadc budget presentation 11-19-13
City of San Angelo Texas
 
City council nov. 19, 2013 cosadc ballot language presentation
City council nov. 19, 2013    cosadc ballot language presentationCity council nov. 19, 2013    cosadc ballot language presentation
City council nov. 19, 2013 cosadc ballot language presentation
City of San Angelo Texas
 
November 19, 2013 Agenda Packet
November 19, 2013 Agenda PacketNovember 19, 2013 Agenda Packet
November 19, 2013 Agenda Packet
City of San Angelo Texas
 
San angelo city council 11 5-13 - west texas water partnership
San angelo city council 11 5-13 - west texas water partnershipSan angelo city council 11 5-13 - west texas water partnership
San angelo city council 11 5-13 - west texas water partnership
City of San Angelo Texas
 
San angelo city council 11 5-13 - wastewater pilot
San angelo city council 11 5-13 - wastewater pilotSan angelo city council 11 5-13 - wastewater pilot
San angelo city council 11 5-13 - wastewater pilot
City of San Angelo Texas
 
San angelo city council 11 5-13 - solid waste collection and operation presen...
San angelo city council 11 5-13 - solid waste collection and operation presen...San angelo city council 11 5-13 - solid waste collection and operation presen...
San angelo city council 11 5-13 - solid waste collection and operation presen...
City of San Angelo Texas
 
San angelo city council 11 5-13 - nasworthy presentation
San angelo city council 11 5-13 - nasworthy presentationSan angelo city council 11 5-13 - nasworthy presentation
San angelo city council 11 5-13 - nasworthy presentation
City of San Angelo Texas
 
San angelo city council 11 5-13 - economic development budget
San angelo city council 11 5-13 - economic development budgetSan angelo city council 11 5-13 - economic development budget
San angelo city council 11 5-13 - economic development budget
City of San Angelo Texas
 

More from City of San Angelo Texas (20)

February 4, 2014 Agenda Packet
February 4, 2014 Agenda PacketFebruary 4, 2014 Agenda Packet
February 4, 2014 Agenda Packet
 
January 21, 2014 Agenda packet
January 21, 2014 Agenda packetJanuary 21, 2014 Agenda packet
January 21, 2014 Agenda packet
 
City council january 7, 2014 sidewalk agreement
City council january 7, 2014   sidewalk agreementCity council january 7, 2014   sidewalk agreement
City council january 7, 2014 sidewalk agreement
 
City council january 7, 2014 bandits presentation
City council january 7, 2014   bandits presentationCity council january 7, 2014   bandits presentation
City council january 7, 2014 bandits presentation
 
City council january 7, 2014 river fest
City council january 7, 2014   river festCity council january 7, 2014   river fest
City council january 7, 2014 river fest
 
January 7, 2014 Agenda Packet
January 7, 2014 Agenda PacketJanuary 7, 2014 Agenda Packet
January 7, 2014 Agenda Packet
 
City council 12 17-13 downtown development plan
City council 12 17-13 downtown development planCity council 12 17-13 downtown development plan
City council 12 17-13 downtown development plan
 
City council 12 17-13 planning presentation
City council 12 17-13 planning presentationCity council 12 17-13 planning presentation
City council 12 17-13 planning presentation
 
December 17, 2013 Agenda Packet
December 17, 2013 Agenda PacketDecember 17, 2013 Agenda Packet
December 17, 2013 Agenda Packet
 
December 3, 2013 Agenda packet
December 3, 2013 Agenda packetDecember 3, 2013 Agenda packet
December 3, 2013 Agenda packet
 
City council nov. 19, 2013 san angelo public housing authority
City council nov. 19, 2013   san angelo public housing  authorityCity council nov. 19, 2013   san angelo public housing  authority
City council nov. 19, 2013 san angelo public housing authority
 
City council nov. 19, 2013 planning
City council nov. 19, 2013   planningCity council nov. 19, 2013   planning
City council nov. 19, 2013 planning
 
City council nov. 19, 2013 cosadc budget presentation 11-19-13
City council nov. 19, 2013    cosadc budget presentation 11-19-13City council nov. 19, 2013    cosadc budget presentation 11-19-13
City council nov. 19, 2013 cosadc budget presentation 11-19-13
 
City council nov. 19, 2013 cosadc ballot language presentation
City council nov. 19, 2013    cosadc ballot language presentationCity council nov. 19, 2013    cosadc ballot language presentation
City council nov. 19, 2013 cosadc ballot language presentation
 
November 19, 2013 Agenda Packet
November 19, 2013 Agenda PacketNovember 19, 2013 Agenda Packet
November 19, 2013 Agenda Packet
 
San angelo city council 11 5-13 - west texas water partnership
San angelo city council 11 5-13 - west texas water partnershipSan angelo city council 11 5-13 - west texas water partnership
San angelo city council 11 5-13 - west texas water partnership
 
San angelo city council 11 5-13 - wastewater pilot
San angelo city council 11 5-13 - wastewater pilotSan angelo city council 11 5-13 - wastewater pilot
San angelo city council 11 5-13 - wastewater pilot
 
San angelo city council 11 5-13 - solid waste collection and operation presen...
San angelo city council 11 5-13 - solid waste collection and operation presen...San angelo city council 11 5-13 - solid waste collection and operation presen...
San angelo city council 11 5-13 - solid waste collection and operation presen...
 
San angelo city council 11 5-13 - nasworthy presentation
San angelo city council 11 5-13 - nasworthy presentationSan angelo city council 11 5-13 - nasworthy presentation
San angelo city council 11 5-13 - nasworthy presentation
 
San angelo city council 11 5-13 - economic development budget
San angelo city council 11 5-13 - economic development budgetSan angelo city council 11 5-13 - economic development budget
San angelo city council 11 5-13 - economic development budget
 

Recently uploaded

Innovation Management Frameworks: Your Guide to Creativity & Innovation
Innovation Management Frameworks: Your Guide to Creativity & InnovationInnovation Management Frameworks: Your Guide to Creativity & Innovation
Innovation Management Frameworks: Your Guide to Creativity & Innovation
Operational Excellence Consulting
 
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
AnnySerafinaLove
 
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your TasteZodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
my Pandit
 
Presentation by Herman Kienhuis (Curiosity VC) on Investing in AI for ABS Alu...
Presentation by Herman Kienhuis (Curiosity VC) on Investing in AI for ABS Alu...Presentation by Herman Kienhuis (Curiosity VC) on Investing in AI for ABS Alu...
Presentation by Herman Kienhuis (Curiosity VC) on Investing in AI for ABS Alu...
Herman Kienhuis
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
my Pandit
 
The Genesis of BriansClub.cm Famous Dark WEb Platform
The Genesis of BriansClub.cm Famous Dark WEb PlatformThe Genesis of BriansClub.cm Famous Dark WEb Platform
The Genesis of BriansClub.cm Famous Dark WEb Platform
SabaaSudozai
 
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
Lacey Max
 
Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024
Adnet Communications
 
How HR Search Helps in Company Success.pdf
How HR Search Helps in Company Success.pdfHow HR Search Helps in Company Success.pdf
How HR Search Helps in Company Success.pdf
HumanResourceDimensi1
 
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
Garments ERP Software in Bangladesh _ Pridesys IT Ltd.pdf
Garments ERP Software in Bangladesh _ Pridesys IT Ltd.pdfGarments ERP Software in Bangladesh _ Pridesys IT Ltd.pdf
Garments ERP Software in Bangladesh _ Pridesys IT Ltd.pdf
Pridesys IT Ltd.
 
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Kalyan Satta Matka Guessing Matka Result Main Bazar chart
 
Call8328958814 satta matka Kalyan result satta guessing
Call8328958814 satta matka Kalyan result satta guessingCall8328958814 satta matka Kalyan result satta guessing
Call8328958814 satta matka Kalyan result satta guessing
➑➌➋➑➒➎➑➑➊➍
 
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Stone Art Hub
 
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
taqyea
 
How to Buy an Engagement Ring.pcffbhfbfghfhptx
How to Buy an Engagement Ring.pcffbhfbfghfhptxHow to Buy an Engagement Ring.pcffbhfbfghfhptx
How to Buy an Engagement Ring.pcffbhfbfghfhptx
Charleston Alexander
 
Part 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 SlowdownPart 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 Slowdown
jeffkluth1
 
Industrial Tech SW: Category Renewal and Creation
Industrial Tech SW:  Category Renewal and CreationIndustrial Tech SW:  Category Renewal and Creation
Industrial Tech SW: Category Renewal and Creation
Christian Dahlen
 
DearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUniDearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUni
katiejasper96
 

Recently uploaded (20)

Innovation Management Frameworks: Your Guide to Creativity & Innovation
Innovation Management Frameworks: Your Guide to Creativity & InnovationInnovation Management Frameworks: Your Guide to Creativity & Innovation
Innovation Management Frameworks: Your Guide to Creativity & Innovation
 
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
 
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your TasteZodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
 
Presentation by Herman Kienhuis (Curiosity VC) on Investing in AI for ABS Alu...
Presentation by Herman Kienhuis (Curiosity VC) on Investing in AI for ABS Alu...Presentation by Herman Kienhuis (Curiosity VC) on Investing in AI for ABS Alu...
Presentation by Herman Kienhuis (Curiosity VC) on Investing in AI for ABS Alu...
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
 
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
 
The Genesis of BriansClub.cm Famous Dark WEb Platform
The Genesis of BriansClub.cm Famous Dark WEb PlatformThe Genesis of BriansClub.cm Famous Dark WEb Platform
The Genesis of BriansClub.cm Famous Dark WEb Platform
 
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
 
Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024
 
How HR Search Helps in Company Success.pdf
How HR Search Helps in Company Success.pdfHow HR Search Helps in Company Success.pdf
How HR Search Helps in Company Success.pdf
 
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
 
Garments ERP Software in Bangladesh _ Pridesys IT Ltd.pdf
Garments ERP Software in Bangladesh _ Pridesys IT Ltd.pdfGarments ERP Software in Bangladesh _ Pridesys IT Ltd.pdf
Garments ERP Software in Bangladesh _ Pridesys IT Ltd.pdf
 
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
 
Call8328958814 satta matka Kalyan result satta guessing
Call8328958814 satta matka Kalyan result satta guessingCall8328958814 satta matka Kalyan result satta guessing
Call8328958814 satta matka Kalyan result satta guessing
 
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
 
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
 
How to Buy an Engagement Ring.pcffbhfbfghfhptx
How to Buy an Engagement Ring.pcffbhfbfghfhptxHow to Buy an Engagement Ring.pcffbhfbfghfhptx
How to Buy an Engagement Ring.pcffbhfbfghfhptx
 
Part 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 SlowdownPart 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 Slowdown
 
Industrial Tech SW: Category Renewal and Creation
Industrial Tech SW:  Category Renewal and CreationIndustrial Tech SW:  Category Renewal and Creation
Industrial Tech SW: Category Renewal and Creation
 
DearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUniDearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUni
 

State of the City 2012

  • 1. State of the City 2012 Mayor Alvin New & Interim City Manager Michael Dane
  • 2. TOPICS • ½ Cent sales tax funded projects • Budget • Streets • Water
  • 3. ½ Cent sales Tax Projects
  • 4. Producers Park • Project Began Summer 2010 • Completed Fall 2011 • Cost: $1,665,000
  • 5. Meadowcreek Park (renovation) • Project began Spring 2010 • Completed Fall 2011 • Cost: $256,000
  • 6. Love Municipal Pool (renovation) • Project Began Spring 2011 • Completed Spring 2012 • Cost: $3,262,000
  • 7. Rio Vista Park (renovation) • Project Began Spring 2012 • To be completed Fall 2012 • Cost: $813,900
  • 8. River Improvements • Project Began Fall 2011 • Project to be completed Spring 2013 • Cost: $9,300,000
  • 9. Red Arroyo Trail • Project to begin Summer 2014 • Project to be complete Summer 2015 • Project Cost: $4,000,000 • Funding Sources: • Federal ($3,200,000) • City Half-Cent Sales Taxes and Storm Water Funding ($650,000) • Donations ($150,000)
  • 10. ½ Cent Sales Tax Projects • Current or Future projects – Airport Terminal Rehab – Fort Concho – 29th Street Sports Complex – Fairgrounds (cattle barn) – Hickory Water Supply – City Auditorium
  • 11. City Hall • Construction started August 2010 • Employees Moved in June 2012 • Open House event early October
  • 13. Budget Goals • Modest employee raises • Street maintenance/Sealcoat • Property Tax Rate reduction
  • 14. Budget Goals vs. Resources • Budget Gap of approximately $751,000 • Proposed to close the gap through cuts and targeted fees
  • 15. Closing the Budget Gap • Total proposed cuts & reorgs $379,000 • Number of positions cut: 8 full time 1 part time
  • 16. Closing the Budget Gap • Fees vs Taxes • Proposing fee increases totaling $342,000
  • 17. 10 year property tax history
  • 18. Increased Street Maintenance • Staff is proposing to triple the street sealcoat budget • Proposed $1,800,000 in sealcoat
  • 20. City Streets – Total lane miles of streets: 1150 miles – Major Roadways: 283 lane miles – Residential Streets: 867 lane miles
  • 21. Street Useful Life – Different street types have different useful lives and different routine maintenance needs – When considering what type of street to construct it is important to consider 1) Initial Capital Cost 2) Overall Useful Life and 3) Long Term Maintenance Needs
  • 22. Street Life Cycle – Asphalt vs. concrete – 2/3 of the cost of a roadway is what is below the surface; the asphalt surface merely protects the investment below it – The useful life potential of a street is fully dependent on it being properly maintained – Impact of reduced maintenance
  • 23. Street Types Asphalt Streets • Useful life of 25 years of properly maintained – Proper maintenance to achieve 25 year useful life • Sealcoat – every 8 years (maximum) • Mill and Overlay – at 15 years if roadway shows signs of major distress (* Residential streets are low volume and typically only require sealcoating every 8 years) • Complete Reconstruction – Approximately every 25-30 years • Major maintenance costs over 75 year period (1 mile of 40’ wide street) - $8,000,000.00
  • 24. Street Types Roller Compacted Concrete (RCC) Streets (Grape Creek Road and 50th Street) • Useful life approximately 75-100 years – Initial cost 5-15% greater – Maintenance – no major routine maintenance required – Major maintenance costs over 75 year period (1 mile of 40’ wide street) • Asphalt - $8,000,000.00 • RCC - $1,500,000.00 (for mill and overlay only if required)
  • 25. Street Reconstruction – The City currently has 55 streets listed for reconstruction in its Capital Improvements Plan at a cost of approximately $155M – Street Construction Methods • Roller Compacted Concrete Reconstruction (RCC) – Removal of 6 to 8 inches of material and replacement with roller compacted concrete – Cost per square yard: $175, Useful life: 75-100 years • “Full Depth” Reconstruction (Asphalt) – Complete removal and replacement of roadway from surface to depth of approximately 22 inches – Cost per square yard: $150, Useful life: 25 years
  • 26. Capital Borrowing Capacity • Current capital budget $ 1,756,529 • LESS $250,000 annually for fire truck replacement • Could use $1,506,529 capital budget for debt service – Assuming 20 years at 4% we could borrow approximately $20,475,000 principal – Budget impact?
  • 31. Lake Nasworthy Change in Volume: 1,980 Acre-Feet Change in Elevation: 21 Inches
  • 32. O H Ivie Reservoir
  • 33. Projected Water Supply w/o Hickory Projected Supply, Acre-Feet Month
  • 34. Twin Buttes South Pool Pumping
  • 37. Water Flowing Into North Pool
  • 39. Well Field Collector Pipelines • Installation of 50,700 feet of pipe to nine wells • General Contractor: Price Construction • Pipeline Sub-Contractor: Darnell & Dickson • Contract Amount: $3.8 million • Project Substantially Complete: May 2012
  • 41. Transmission Pipeline • 62 miles of 30” pipe from well field to San Angelo • Contractor: Oscar Renda • Sub-Contractor: S J Louis • Contract Amount: $39 million • Contract Completion: July 2013
  • 43. Transmission Pipeline Status 30” PIP EL STARTING INE POINT PUMP STATION 7M AS I OF LES 8/1 /12 4 AS .5 MI OF LES 8/1 /1 2 TOTAL: 62 MILES WELL FIELD COMPLETED: 11.5 MILES
  • 44. Well Field-Booster Pump Station • Equip 9 Existing Wells • Construct 6 mgd Pump Station • Construct Two 500,000 gallon Tanks • Install Microwave Telemetry System
  • 45. Booster Station-Well Field Contract • Contractor: Archer Western • Contract Amount: $12.85 million • Notice to Proceed: June 18, 2012 • Substantial Completion: June 2013
  • 46. Treatment Plant • Treatment Method Selected: June 2012 • 20% Design Status: August 2012 • Advertise for Bids: April 2013 • Notice to Proceed: June 2013 • Substantial Completion: August
  • 47.
  • 49. Cost Estimate to Expand to 9mgd Capacity • Well Field: $10,720,000 – Five (5) New Wells Drilled, Cased and Equipped – Expanded Well Field Access Roads • Booster Pump Station: $260,000 – Two (2) Additional Pumps and Electrical • Contingencies: $2,920,000 • Engineering & Construction Mgmt.: $2,160,000 • Total: $16,060,000
  • 50. Future of Water: • Hickory Water Supply • Tri-City Water • Reuse of Water • Other options
  • 51. Keys for the Future: • Inter-organizational cooperation • Water supply development • Awareness of intergovernmental fiscal issues
  • 52. Mayor Alvin New – alvin.new@sanangelotexas.us Interim City Manager Michael Dane – michael.dane@sanangelotexas.us 325-657-4241

Editor's Notes

  1. NOT A CRISIS Proposed rate 0.7810, decrease of ½ cent City still offers homestead exemption
  2. NOT A CRISIS
  3. Recall there is $1.7 available for capital. There is a water operating impact on streets.