In 2013, Norman saw increased development activity including new residential and commercial construction. The city continued infrastructure projects and saw higher permit valuations compared to 2012. Voters approved funding to upgrade the city's wastewater treatment plant to accommodate growth. Looking ahead, Norman is working to ensure long-term water supply reliability in light of declining aquifer yields and new EPA regulations for Lake Thunderbird water quality. The city is developing a strategic water plan and will submit compliance plans to reduce pollutants entering the lake.
Tim Broeder
Marcie Nolan
Jo Sesodia
Bob Daniels
The Sunshine State will always experience growth, whether rapid or slow. This growth will continue to drain the cheap and easy water resources of the State. This session will provide an overview of how three local governments have completely redesigned their long range planning program to incorporate potable water issues into their comprehensive and current plans. The
determination of demand, the single utility provider structure, and the costs of these infrastructure projects will be discussed. For local planners, the need and ability to implement long range plans through collaboration between the utility engineer and the planner will be stressed.
CH2M Hill, environmental Engineering firm, presents "Value of an Integrated Planning Approach for Euclid." For the City of Euclid sewer utility, an Integrated Planning approach can address EPA stormwater issues with economic, environmental, and social benefits.
CH2M Hill, environmental Engineering firm, highlights the Integrated Planning Approach for the Onondaga County, NY sewer utility. In reference to the proposed Integrated Planning approach to stormwater abatement in Euclid Ohio.
Rocky Run Tributary at Dulles Access Road Stream Restoration ProjectFairfax County
Restore up to 1,200 feet of stream within the wooded dry pond footprint.
Stabilize streambed and banks
Reduce sediment and nutrient inputs into stream
Improve habitat
Reduce long-term maintenance of pond
Consider water quality enhancements and a litter collection system in the open pond area
Maintain close coordination with stakeholders
Tim Broeder
Marcie Nolan
Jo Sesodia
Bob Daniels
The Sunshine State will always experience growth, whether rapid or slow. This growth will continue to drain the cheap and easy water resources of the State. This session will provide an overview of how three local governments have completely redesigned their long range planning program to incorporate potable water issues into their comprehensive and current plans. The
determination of demand, the single utility provider structure, and the costs of these infrastructure projects will be discussed. For local planners, the need and ability to implement long range plans through collaboration between the utility engineer and the planner will be stressed.
CH2M Hill, environmental Engineering firm, presents "Value of an Integrated Planning Approach for Euclid." For the City of Euclid sewer utility, an Integrated Planning approach can address EPA stormwater issues with economic, environmental, and social benefits.
CH2M Hill, environmental Engineering firm, highlights the Integrated Planning Approach for the Onondaga County, NY sewer utility. In reference to the proposed Integrated Planning approach to stormwater abatement in Euclid Ohio.
Rocky Run Tributary at Dulles Access Road Stream Restoration ProjectFairfax County
Restore up to 1,200 feet of stream within the wooded dry pond footprint.
Stabilize streambed and banks
Reduce sediment and nutrient inputs into stream
Improve habitat
Reduce long-term maintenance of pond
Consider water quality enhancements and a litter collection system in the open pond area
Maintain close coordination with stakeholders
Halla Razak, Director of Public Utilities for the City of San Diego presented to the League of California Cities, San Diego Division on October 13, 2014.
Restore ~4,000 feet by returning the form and function of the channel to dynamic equilibrium and improve the ecological processes of the riparian corridor.
The Harbor Brook CSO 018 Constructed Wetlands Pilot Treatment System Project serves the dual purposes of treating CSO 018 overflows currently discharged into Harbor Brook while also acting as a demonstration project to test the effectiveness of three types of constructed treatment wetland systems.
Paul Spring Branch at Sherwood Hall Stream Restoration ProjectFairfax County
The plan is to return the form and function of the channel to dynamic equilibrium and improve the ecological processes of the riparian corridor within the constraints of the developed landscape.
Fairfax County Leigh Meadow Kickoff Presentation January 2016Fairfax County
The Leigh Meadow basin retrofit and stream restoration project will improve watershed conditions, mitigate flooding where possible, reduce erosion and protect infrastructure.
Pike Branch at Ridgeview Park Stream Restoration Oct 2018Fairfax County
This project will restore 2,800 feet of stream in Ridgeview Park and surrounding properties. The streambed and banks will be stabilized to reduce sediment and nutrient inputs into stream system. Improved habitat will provide better ecology.
Peyton Run at Longwood Knolls Community Meeting Oct 1, 2018Fairfax County
This project will restore up to 2,500 feet of stream on Longwood Knolls HOA and Cherry Run section 3 subdivision properties. Sediment and nutrient inputs will be reduced and habitat will be improved.
Springfield Estates Pump Station Gravity Sewer Replacement - Community MeetingFairfax County
Design Phase includes:
Finalize sewer alignment
Manhole locations and material selection
Construction phasing plan
Final restoration for former pump station site/access
Existing utility coordination
Easement acquisition (if applicable)
By-pass water & sewer locations
Temporary service outage plan – water/sewer/gas
Traffic control plans
Phasing
Detour and closure plan
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...Fairfax County
Lake Siltation
Lake Accotink has been dredged three times over the past 40 years.
The most recent dredging was completed in May 2008.
An average of 20,000 CY of sediment is deposited in the lake per year.
The estimated average depth of the lake is less than 4 feet.
Park Master Plan Process
Master Plan began Spring 2016.
5 Public Meetings/Workshops held with Community.
6 Lake Management Options were shared with the public.
90% of public comments favored having the lake.
Board of Supervisors Approval of Funding
BOS approved request to seek funding for up to $30.5 million to proceed with Lake Accotink Dredging in October 2019 .
Halla Razak, Director of Public Utilities for the City of San Diego presented to the League of California Cities, San Diego Division on October 13, 2014.
Restore ~4,000 feet by returning the form and function of the channel to dynamic equilibrium and improve the ecological processes of the riparian corridor.
The Harbor Brook CSO 018 Constructed Wetlands Pilot Treatment System Project serves the dual purposes of treating CSO 018 overflows currently discharged into Harbor Brook while also acting as a demonstration project to test the effectiveness of three types of constructed treatment wetland systems.
Paul Spring Branch at Sherwood Hall Stream Restoration ProjectFairfax County
The plan is to return the form and function of the channel to dynamic equilibrium and improve the ecological processes of the riparian corridor within the constraints of the developed landscape.
Fairfax County Leigh Meadow Kickoff Presentation January 2016Fairfax County
The Leigh Meadow basin retrofit and stream restoration project will improve watershed conditions, mitigate flooding where possible, reduce erosion and protect infrastructure.
Pike Branch at Ridgeview Park Stream Restoration Oct 2018Fairfax County
This project will restore 2,800 feet of stream in Ridgeview Park and surrounding properties. The streambed and banks will be stabilized to reduce sediment and nutrient inputs into stream system. Improved habitat will provide better ecology.
Peyton Run at Longwood Knolls Community Meeting Oct 1, 2018Fairfax County
This project will restore up to 2,500 feet of stream on Longwood Knolls HOA and Cherry Run section 3 subdivision properties. Sediment and nutrient inputs will be reduced and habitat will be improved.
Springfield Estates Pump Station Gravity Sewer Replacement - Community MeetingFairfax County
Design Phase includes:
Finalize sewer alignment
Manhole locations and material selection
Construction phasing plan
Final restoration for former pump station site/access
Existing utility coordination
Easement acquisition (if applicable)
By-pass water & sewer locations
Temporary service outage plan – water/sewer/gas
Traffic control plans
Phasing
Detour and closure plan
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...Fairfax County
Lake Siltation
Lake Accotink has been dredged three times over the past 40 years.
The most recent dredging was completed in May 2008.
An average of 20,000 CY of sediment is deposited in the lake per year.
The estimated average depth of the lake is less than 4 feet.
Park Master Plan Process
Master Plan began Spring 2016.
5 Public Meetings/Workshops held with Community.
6 Lake Management Options were shared with the public.
90% of public comments favored having the lake.
Board of Supervisors Approval of Funding
BOS approved request to seek funding for up to $30.5 million to proceed with Lake Accotink Dredging in October 2019 .
Presentación relacionada con Aduanas, que son, importancia y los impuestos que se cobran en Venezuela, se hace una breve mención de las aduanas a nivel internacional.
Jeff Polenik, Robindale Energy,"Leanor GFCC - A Positive ImpactMichael Hewitt, GISP
Robindale Energy Services, Inc. entered into a Government Financed Construction Contract (GFCC) and contributed to the process of watershed improvements.
Flag Run at Elgar Street Stream Restoration Project - May 24, 2017Fairfax County
The project will restore about 2,900 linear feet of the channel to stabilize the banks and prevent future erosion. A healthy ecosystem will be created by installing native trees and herbaceous plants.
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...Fairfax County
Restore streambed and banks, ~4,500 linear feet
Reduce sediment and nutrient inputs into stream system
Installation of grade control structures, improve/correct channel dimension and alignment
Improve floodplain connectivity and ecological processes
Reduce force and volume of water within the channel during storm and flood events
Naturally process nutrients and sediments on the floodplain and within the streambed
Improve habitat for biological community
Native landscaping
Floodplain wetlands
Streambed and flow diversity
In-stream structures
Protect Infrastructure – Sanitary Sewer Lines
Channel Relocation away from sanitary sewer lines when possible
Armoring channel banks and bottom where relocation is not an option
Long Branch Central Watershed Management Area Project Overview October 26, 2020Fairfax County
Information about development in Fairfax County, major stormwater management project drivers, a functions-based approach to stream restoration and more information about the project is included in the presentation.
Philadelphia Water Department, Green City Clean Waters ProgramNew Jersey Future
This slide deck is from the City of Newark's trip to the Philadelphia to learn from the city's water department's green infrastructure program in September 2017.
Similar to 2014 Economic Summit - City of Norman (20)
Putting the SPARK into Virtual Training.pptxCynthia Clay
This 60-minute webinar, sponsored by Adobe, was delivered for the Training Mag Network. It explored the five elements of SPARK: Storytelling, Purpose, Action, Relationships, and Kudos. Knowing how to tell a well-structured story is key to building long-term memory. Stating a clear purpose that doesn't take away from the discovery learning process is critical. Ensuring that people move from theory to practical application is imperative. Creating strong social learning is the key to commitment and engagement. Validating and affirming participants' comments is the way to create a positive learning environment.
Memorandum Of Association Constitution of Company.pptseri bangash
www.seribangash.com
A Memorandum of Association (MOA) is a legal document that outlines the fundamental principles and objectives upon which a company operates. It serves as the company's charter or constitution and defines the scope of its activities. Here's a detailed note on the MOA:
Contents of Memorandum of Association:
Name Clause: This clause states the name of the company, which should end with words like "Limited" or "Ltd." for a public limited company and "Private Limited" or "Pvt. Ltd." for a private limited company.
https://seribangash.com/article-of-association-is-legal-doc-of-company/
Registered Office Clause: It specifies the location where the company's registered office is situated. This office is where all official communications and notices are sent.
Objective Clause: This clause delineates the main objectives for which the company is formed. It's important to define these objectives clearly, as the company cannot undertake activities beyond those mentioned in this clause.
www.seribangash.com
Liability Clause: It outlines the extent of liability of the company's members. In the case of companies limited by shares, the liability of members is limited to the amount unpaid on their shares. For companies limited by guarantee, members' liability is limited to the amount they undertake to contribute if the company is wound up.
https://seribangash.com/promotors-is-person-conceived-formation-company/
Capital Clause: This clause specifies the authorized capital of the company, i.e., the maximum amount of share capital the company is authorized to issue. It also mentions the division of this capital into shares and their respective nominal value.
Association Clause: It simply states that the subscribers wish to form a company and agree to become members of it, in accordance with the terms of the MOA.
Importance of Memorandum of Association:
Legal Requirement: The MOA is a legal requirement for the formation of a company. It must be filed with the Registrar of Companies during the incorporation process.
Constitutional Document: It serves as the company's constitutional document, defining its scope, powers, and limitations.
Protection of Members: It protects the interests of the company's members by clearly defining the objectives and limiting their liability.
External Communication: It provides clarity to external parties, such as investors, creditors, and regulatory authorities, regarding the company's objectives and powers.
https://seribangash.com/difference-public-and-private-company-law/
Binding Authority: The company and its members are bound by the provisions of the MOA. Any action taken beyond its scope may be considered ultra vires (beyond the powers) of the company and therefore void.
Amendment of MOA:
While the MOA lays down the company's fundamental principles, it is not entirely immutable. It can be amended, but only under specific circumstances and in compliance with legal procedures. Amendments typically require shareholder
Digital Transformation and IT Strategy Toolkit and TemplatesAurelien Domont, MBA
This Digital Transformation and IT Strategy Toolkit was created by ex-McKinsey, Deloitte and BCG Management Consultants, after more than 5,000 hours of work. It is considered the world's best & most comprehensive Digital Transformation and IT Strategy Toolkit. It includes all the Frameworks, Best Practices & Templates required to successfully undertake the Digital Transformation of your organization and define a robust IT Strategy.
Editable Toolkit to help you reuse our content: 700 Powerpoint slides | 35 Excel sheets | 84 minutes of Video training
This PowerPoint presentation is only a small preview of our Toolkits. For more details, visit www.domontconsulting.com
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...BBPMedia1
Grote partijen zijn al een tijdje onderweg met retail media. Ondertussen worden in dit domein ook de kansen zichtbaar voor andere spelers in de markt. Maar met die kansen ontstaan ook vragen: Zelf retail media worden of erop adverteren? In welke fase van de funnel past het en hoe integreer je het in een mediaplan? Wat is nu precies het verschil met marketplaces en Programmatic ads? In dit half uur beslechten we de dilemma's en krijg je antwoorden op wanneer het voor jou tijd is om de volgende stap te zetten.
Attending a job Interview for B1 and B2 Englsih learnersErika906060
It is a sample of an interview for a business english class for pre-intermediate and intermediate english students with emphasis on the speking ability.
Cracking the Workplace Discipline Code Main.pptxWorkforce Group
Cultivating and maintaining discipline within teams is a critical differentiator for successful organisations.
Forward-thinking leaders and business managers understand the impact that discipline has on organisational success. A disciplined workforce operates with clarity, focus, and a shared understanding of expectations, ultimately driving better results, optimising productivity, and facilitating seamless collaboration.
Although discipline is not a one-size-fits-all approach, it can help create a work environment that encourages personal growth and accountability rather than solely relying on punitive measures.
In this deck, you will learn the significance of workplace discipline for organisational success. You’ll also learn
• Four (4) workplace discipline methods you should consider
• The best and most practical approach to implementing workplace discipline.
• Three (3) key tips to maintain a disciplined workplace.
What are the main advantages of using HR recruiter services.pdfHumanResourceDimensi1
HR recruiter services offer top talents to companies according to their specific needs. They handle all recruitment tasks from job posting to onboarding and help companies concentrate on their business growth. With their expertise and years of experience, they streamline the hiring process and save time and resources for the company.
Skye Residences | Extended Stay Residences Near Toronto Airportmarketingjdass
Experience unparalleled EXTENDED STAY and comfort at Skye Residences located just minutes from Toronto Airport. Discover sophisticated accommodations tailored for discerning travelers.
Website Link :
https://skyeresidences.com/
https://skyeresidences.com/about-us/
https://skyeresidences.com/gallery/
https://skyeresidences.com/rooms/
https://skyeresidences.com/near-by-attractions/
https://skyeresidences.com/commute/
https://skyeresidences.com/contact/
https://skyeresidences.com/queen-suite-with-sofa-bed/
https://skyeresidences.com/queen-suite-with-sofa-bed-and-balcony/
https://skyeresidences.com/queen-suite-with-sofa-bed-accessible/
https://skyeresidences.com/2-bedroom-deluxe-queen-suite-with-sofa-bed/
https://skyeresidences.com/2-bedroom-deluxe-king-queen-suite-with-sofa-bed/
https://skyeresidences.com/2-bedroom-deluxe-queen-suite-with-sofa-bed-accessible/
#Skye Residences Etobicoke, #Skye Residences Near Toronto Airport, #Skye Residences Toronto, #Skye Hotel Toronto, #Skye Hotel Near Toronto Airport, #Hotel Near Toronto Airport, #Near Toronto Airport Accommodation, #Suites Near Toronto Airport, #Etobicoke Suites Near Airport, #Hotel Near Toronto Pearson International Airport, #Toronto Airport Suite Rentals, #Pearson Airport Hotel Suites
What is the TDS Return Filing Due Date for FY 2024-25.pdfseoforlegalpillers
It is crucial for the taxpayers to understand about the TDS Return Filing Due Date, so that they can fulfill your TDS obligations efficiently. Taxpayers can avoid penalties by sticking to the deadlines and by accurate filing of TDS. Timely filing of TDS will make sure about the availability of tax credits. You can also seek the professional guidance of experts like Legal Pillers for timely filing of the TDS Return.
Kseniya Leshchenko: Shared development support service model as the way to ma...Lviv Startup Club
Kseniya Leshchenko: Shared development support service model as the way to make small projects with small budgets profitable for the company (UA)
Kyiv PMDay 2024 Summer
Website – www.pmday.org
Youtube – https://www.youtube.com/startuplviv
FB – https://www.facebook.com/pmdayconference
Unveiling the Secrets How Does Generative AI Work.pdfSam H
At its core, generative artificial intelligence relies on the concept of generative models, which serve as engines that churn out entirely new data resembling their training data. It is like a sculptor who has studied so many forms found in nature and then uses this knowledge to create sculptures from his imagination that have never been seen before anywhere else. If taken to cyberspace, gans work almost the same way.
Discover the innovative and creative projects that highlight my journey throu...dylandmeas
Discover the innovative and creative projects that highlight my journey through Full Sail University. Below, you’ll find a collection of my work showcasing my skills and expertise in digital marketing, event planning, and media production.
Discover the innovative and creative projects that highlight my journey throu...
2014 Economic Summit - City of Norman
1. 2013 Activity
• Retail Market Analysis underway
• Comprehensive Transportation Plan nearing completion
• Increased Development at University North Park
(Residence Inn, Ashley Furniture Store)
• Continued Legacy Park Construction
• 637 lots platted in 2013, compared to 485 lots platted in 2012.
• Total valuation for all construction permitted in 2013 was $217.5 M, compared
to the 2012 value of $213 M.
• 426 single family permits issued in 2013, compared to 414 in 2012.
• Average construction value of single family permits was $224,165 in 2013,
compared to a construction value of $179,750 in 2012.
• Addition of 260 multifamily units in 2013 (total valuation: $10.6 million).
From 2007 -2011, 698 multifamily units were added. 930 units added in 2012.
• Over 1,000 multi-family units are scheduled to be added in 2014 and 2015.
2. 2013 Activity
• All 2012 Bond Projects (valued at almost $90 million) are currently
under contract for design
• 7 of the 8 projects have plans submitted to ODOT for review
• Including:
- W. Main Street Bridge - 12th SE (Cedar Lane - Hwy 9)
- Lindsey St. (24th SW to Berry) - 24th Ave SE (Lindsey – Robinson)
- Franklin Road Bridge - Cedar Lane (12th to ½ mi. east of 24th Ave.)
- 36th NW (Tecumseh - Indian Hills) - East Alameda Street Project
• Cedar Lane from 12th SE to 24th Ave. will be bid in March 2014
• Reconstruction of Main St. Overpass (estimated completion Summer 2014)
• Reconstruction of S. Hwy 9 Overpass (estimated completion June 2015)
• Reconstruction of Lindsey Street Overpass (beginning in late 2015)
3. Greatest Recent Accomplishment
Voter Approval of Funding for Additional Wastewater Reclamation
Plant Improvements
• Approved by the Norman residents (76% approval) in November 2013
Use of Funds from Rate Increase for Essential Upgrades
• Regulatory Driven
- new State environmental regulations
• Operation and Maintenance Needs
- replace outdated equipment and facility repairs
- including odor control
• Capacity Upgrades
- expansion of treatment capacity at the South Water Reclamation facility as
anticipated by the 2001 Wastewater Master Plan
- increase from 12 million gallons per day (MGD) to 17 MGD
• $63.1 million in improvements funded with a combination of available funds
and revenue bonds
• Improvements anticipated to begin in Summer 2014
4. Upcoming Challenges
Issues Facing Norman’s Future Water Supply and Water Quality
• Current yield of Lake Thunderbird may be reduced
• Garber-Wellington aquifer yield may be reduced
• Based on expected demand, there may be a shortfall of over 15 mgd in 2060
• Total Maximum Daily Load (TMDL) Compliance
Changes Since Norman’s 2001 Water Supply Plan
● Arsenic Rule ● Additional Ground Water Rules ● Lake Thunderbird Safe Yield ● Chromium VI
● Technological Improvements ● Reuse Regulations ● Conservation
Criteria for Detailed Evaluations
● Affordability ● Long-Term Supply Reliability ● Phasing Potential ● Timely Implementation & Certainty
● Efficient Use of Water Resources ● Environmental Stewardship ● Treated Water Quality Aesthetics
● Community Values (Recreation, Aesthetics, and Property Rights)
Addressing Future Water Needs
• City is nearing finalization of a Strategic Water Supply Plan Update
• Fourteen (14) portfolio options were evaluated in the plan.
• Three (3)options from plan are being recommended:
- Maximizing Local Sources & Lake Thunderbird Augmentation (indirect potable use)
- Partnership with Oklahoma City for Raw Water
- New Groundwater wells & Lake Thunderbird Augmentation
5. Upcoming Challenges
Addressing TMDL Regulations and Requirements
• Effective November2013, the Oklahoma Department of
Environmental Quality (DEQ) completed a Total Maximum Daily Load (TMDL)
study of Lake Thunderbird.
• TMDL study determines limits of pollution (total suspended solids,
chlorophyll –a, nitrogen & phosphorus) amounts a water body can receive
without violating water quality standards.
• Results of the study concluded that Compliance and Implementation plans
should be developed to determine best management practices designed to
reduce pollutants in the next 20 years and show sustained progress toward
reduction in daily amounts of total pollutants entering Lake Thunderbird.
• TMDL Compliance Plan will be submitted to ODEQ within 24 months of EPA’s
approval of TMDL (November 2015)
• Implementation of TMDL Monitoring Plan (individual City or coordinated regional
plan) within 36 months of EPA’s approval of TMDL (November 2016)
• Promotion of LID development, increased public outreach and education could
also be used to help in reducing pollutants & establishing a cleaner water source