HOIST. Forearm vertical, forefinger
pointing up, move hand in small
horizontal circles.
LOWER. Arm extended downward,
forefinger pointing down, move
hand in small horizontal circles.
USE MAIN HOIST. Tap fist on head;
then use regular signals.
STANDARD HAND SIGNALS FOR
CONTROLLING CRANE OPERATIONS
01 ConPal Dewalt 7/8/05 3:50 PM Page 58
EPC of JIC Cooling Plant 098-C58
USE WHIPLINE. Tap elbow with
one hand; then use regular signals.
RAISE BOOM. Arm extended,
fingers closed, thumb pointing
upward.
LOWER BOOM. Arm extended,
fingers closed, thumb pointing
down.
STANDARD HAND SIGNALS FOR
CONTROLLING CRANE OPERATIONS (cont.)
01 ConPal Dewalt 7/8/05 3:50 PM Page 59
EPC of JIC Cooling Plant 098-C58
STANDARD HAND SIGNALS FOR
CONTROLLING CRANE OPERATIONS (cont.)
MOVE SLOWLY. One hand
gives motion signal, other
hand motionless in front of
hand giving the motion signal.
RAISE THE BOOM AND LOWER
THE LOAD. Arm extended, thumb
pointing up, flex fingers in and out.
LOWER THE BOOM AND
RAISE THE LOAD. Arm extended,
thumb pointing down, flex fingers
in and out.
01 ConPal Dewalt 7/8/05 3:50 PM Page 60
EPC of JIC Cooling Plant 098-C58
STANDARD HAND SIGNALS FOR
CONTROLLING CRANE OPERATIONS (cont.)
SWING. Arm extended, point
with finger in direction of swing.
STOP. Arm extended, palm
down, hold.
EMERGENCY STOP. Arm
extended, palm down, move
hand rapidly right and left.
01 ConPal Dewalt 7/8/05 3:50 PM Page 61
EPC of JIC Cooling Plant 098-C58
STANDARD HAND SIGNALS FOR
CONTROLLING CRANE OPERATIONS (cont.)
TRAVEL. Arm extended forward,
hand open and slightly raised,
pushing motion in direction of travel.
EXTEND BOOM. Both fists in
front of body with thumbs pointing
outward.
RETRACT BOOM. Both fists in
front of body with thumbs pointing
toward each other.
01 ConPal Dewalt 7/8/05 3:50 PM Page 62
EPC of JIC Cooling Plant 098-C58

Standard hand signals for controlling crane operations Rigging Information, Rigger, Crane Rigging Training , Information

  • 1.
    HOIST. Forearm vertical,forefinger pointing up, move hand in small horizontal circles. LOWER. Arm extended downward, forefinger pointing down, move hand in small horizontal circles. USE MAIN HOIST. Tap fist on head; then use regular signals. STANDARD HAND SIGNALS FOR CONTROLLING CRANE OPERATIONS 01 ConPal Dewalt 7/8/05 3:50 PM Page 58 EPC of JIC Cooling Plant 098-C58
  • 2.
    USE WHIPLINE. Tapelbow with one hand; then use regular signals. RAISE BOOM. Arm extended, fingers closed, thumb pointing upward. LOWER BOOM. Arm extended, fingers closed, thumb pointing down. STANDARD HAND SIGNALS FOR CONTROLLING CRANE OPERATIONS (cont.) 01 ConPal Dewalt 7/8/05 3:50 PM Page 59 EPC of JIC Cooling Plant 098-C58
  • 3.
    STANDARD HAND SIGNALSFOR CONTROLLING CRANE OPERATIONS (cont.) MOVE SLOWLY. One hand gives motion signal, other hand motionless in front of hand giving the motion signal. RAISE THE BOOM AND LOWER THE LOAD. Arm extended, thumb pointing up, flex fingers in and out. LOWER THE BOOM AND RAISE THE LOAD. Arm extended, thumb pointing down, flex fingers in and out. 01 ConPal Dewalt 7/8/05 3:50 PM Page 60 EPC of JIC Cooling Plant 098-C58
  • 4.
    STANDARD HAND SIGNALSFOR CONTROLLING CRANE OPERATIONS (cont.) SWING. Arm extended, point with finger in direction of swing. STOP. Arm extended, palm down, hold. EMERGENCY STOP. Arm extended, palm down, move hand rapidly right and left. 01 ConPal Dewalt 7/8/05 3:50 PM Page 61 EPC of JIC Cooling Plant 098-C58
  • 5.
    STANDARD HAND SIGNALSFOR CONTROLLING CRANE OPERATIONS (cont.) TRAVEL. Arm extended forward, hand open and slightly raised, pushing motion in direction of travel. EXTEND BOOM. Both fists in front of body with thumbs pointing outward. RETRACT BOOM. Both fists in front of body with thumbs pointing toward each other. 01 ConPal Dewalt 7/8/05 3:50 PM Page 62 EPC of JIC Cooling Plant 098-C58