SlideShare a Scribd company logo
1 of 26
Knowledge Stations Program


   Overview, 2001 - 2011
 2011 Transformation Project
The Knowledge Stations Program
          The vision
The Program aims to…
• be the mean for giving all Jordanians, regardless
  of age, gender, economic status or geographical
  location, equal access to the digital information
  highway, and equal opportunity to take
  advantage of that access to improve their lives.
• Offer IT and community training programs to
  raise personal and professional opportunities.
The Knowledge Stations Program
      Overview 2001-2011
The Program was …
 • launched in 2001 by a Royal initiative with 18 KSs &
   expanded gradually.
 • Executed by NITC. (previously NIC 1993-2003).
 • Steered and supervised by a Royal Committee chaired by
   Minister of ICT (re-formed 2006) .
 • co-funded by UNDP and KAFD 2001 – 2003 .
 • Funded by KAFD 2003 - 2009.
 • Funded by MoICT 2009 – Present time.
 • Structured in a PMU handling core and support functions.
 • Gave 1.2 ML services and trained 150K citizens
The Knowledge Stations Program
  Transformation Project: April 2011 – March 2012
• Transform the Knowledge Stations from an IT project to a community
  development program.
• Make recommendations for governance and leadership of the Knowledge
  Stations.
• Renovate all aspects of KS internal and external structure, operations and
  relationships.
• Place the Knowledge Stations on a sustainable basis for the future.
• Create a more entrepreneurial approach, with more partnerships and
  initiatives.
• Introduce a continuous programs development model.
• Introduce a Management performance policy.
• Bring forward a multi-year strategic plan, supported by a new business
  model.
The Knowledge Stations Program 2011

The Program now has…
 • 187 KSs equipped with computer labs and hosted by a
   non-for-profit entity under MoUs with NITC.
 • At least one IT instructor contracted by NITC in every
   KS.
 • 17 clusters covering the kingdom, each consisting 8-
   13 KSs. Managed & supervised by 17 Field
   Coordinators.
 • A Program Management Department under NITC OS.
 • Admin, financial, & Technical Support by NITC.
Knowledge Stations Program


      KSs Data
    Slides 7 - 14
Program status: Human Resources
           July 2011
Program status: Human Resources
           July 2011
Annual Budget 1.2 ML*
          expenditure                   expenditure                  expenditure
              2009                         2010                         2011≈
           1,289,475                     1,439,232                    1,500,000

Since 2009 KSs number grew 25% . 15% in 2009 .
In 2009 new salary scale was applied with a total raise 17%
A stable budget of 1.5ml can cover basic expenditure; HR cost 1.3ml covering 202 employees,
Internet 50k, minimum operational 150k (rent & utilities, transportation, maintenance , stationary )
A sustainability Model is required for the future Development of the Program Delivery
Knowledge Stations Program


Details on the Transformation Project
Revival of the Knowledge Stations Program
CIDA Support -DDD Deployment for Democratic Development Expert Resource
                      (April 2011 – March 2012)
                         Project Deliverables


            • Organize Current Setup & Operations; Groundwork
    1



             •Strategic Plan w KPIs
    2



             •Business Model & Financial Plan w KPIs
    3



             •Staff Performance Management System w KPIs
    4
Revival of the Knowledge Stations Program
          CIDA Support -DDD Deployment for Democratic Development Expert Resource
                                             Project Task Guide

Level 1 core functions;   •Provide the means for creating & acquiring Knowledge.
                          • Lead & partner in pro-poor, gender-sensitive, &human-rights based projects & programs.
   Program Goals
                          • Creat & sustain Programs identity

                          • Design/ execute training , capacity building & development programs for underprivilaged
                            communities.
Level 2 core functions;   • Promote & provide access to information & e –services.
                          • Promote & provide awareness of ICT tools employment for personal & community
 Outputs -Objectives
                            development.
                          • Promote & generate Arabic content.


                          • Prepare for Level 2 functions: (1) Strategic & Financial Plans (2) Performance
                            Management System (3) Stabilize current setup & operations; Groundwork
Level 3 core functions;
                               •Organize financial & admin. relationships w hosting entities; capable MoUs.
  Platform & tools             •Management & Field Teams Roles & capacity building.
April 2011– March 2012         •Human & financial resources proper management & integrate Support to NITC
                               •Documentation, processes mapping , Data collection & analysis.


                          • Support core functions & redundant operations; Administrative, Technical, HR & financial.
 Support functions;
                          • Audit & documentation.
 Integrated into NITC     • Legal / government regulation adherence
Groundwork: Organization
                    • Reassign staff to program core functions in working teams setup -Done
  Program           • Management team; key staff to utilize existing experiences & back crucial decisions -Done
 Management         • Confirm Coordinators, expand & define role & tasks , and regroup field clusters-Done
 Department         • Issue Operations Guide with full Processes and work path mapping –Done
                    • Integrate Support Functions /staff into NITC Support Departments & divisions. On going

Regulate Official
    Status           •Employ governing body regulations. Done

                     • Organize financial issues with hosting agencies. Pending new MoU
   Financial         • Budget shortage and KSs revenue spending authorization approvals. Pending (MoICT)
                     • Audit: first stage under process – 2nd stage January

                     • Define trainer role & tasks. Done
      HR            • Solve “Interns”/“temp” trainers situation and adhere to gov. hiring policy . Done
                     • Create new Salary scale to close gaps and limit raises. *
                     • Needs mapping . Done
   E-system          • KSs Database. done
                     • Employ solutions to improve competence & productivity . under process -40% complete

 KSs Technical       • Donors & HA contribution. on-going; secured 15 KSs . 25KSs expected in Jan-March.
 development         • NITC - No Budget available
Groundwork: Development
                     • Unify / prepare offered courses content/ curricula - Done
knowledge team
                     • Minimum training on courses offered currently - plan in place to launched Dec.
  & Programs
 Development         • Capacity building: delivery, tech. & community programs design, Identifying /attracting
                       beneficiaries & knowledge sharing skills. Qualification survey Done. Budget restriction
                     • Adjust working hours – Proposal ready
 Availability of     • Introduce part-time non-employee system for afternoons- Proposal under process
    Service          • Devise course fees system suitable for targeted communities. Done
                     • Devise Exemption system for deserving groups . Done
                     • Widen the platform of the program and strengthen the pillars (organization) to absorb
 Stakeholders          heavy national partnerships – ongoing ; launching 3 projects (IC3-Internet smart user-Chance
 /Partnerships        4 children) April 2012
                     • Conference with stallholders & potential partners

                     • User Survey. Under process, launch Jan.
     Public
                     • Local publicity campaigns. - June
 Interaction &
  Promotion          • A proposal for “marketing strategy and tactical communication plan” was submitted
                       upon recommendation from KAFD with possibility of funding.

   Financial         • Reach understanding with hosting agencies to (adopt a business model / share
Sustainability *       burden from revenue for development) – Pending new MoU and RC decision

                     •Goals: Access to Information , capacity building , Knowledge Building
Restore priorities
                     •Values: communities & citizens vs. instructors & hosting agencies
New OS
                              Management Team
                                  Director
                   Development Team leader
                   Field Ops Team leader
                   Ops Team leader




Development Team           Field Operations Team   Central Operations Team *
    Head + 3                      Head + 3                 Head + 6




                             Field Coordinators
                                 17 Clusters




                                  Trainers
                          170 Knowledge Stations
Offered Work Skills Courses
      & Fees System
محطات المعرفة الأردنية
محطات المعرفة الأردنية
محطات المعرفة الأردنية
محطات المعرفة الأردنية
محطات المعرفة الأردنية

More Related Content

What's hot

Value of Project Management Trainings
Value of Project Management TrainingsValue of Project Management Trainings
Value of Project Management TrainingsHari Thapliyal
 
Measuring Performance: Linking Money To Mission
Measuring Performance: Linking Money To MissionMeasuring Performance: Linking Money To Mission
Measuring Performance: Linking Money To Mission4Good.org
 
Nasw Oh Chapter Board Orientation1
Nasw Oh Chapter Board Orientation1Nasw Oh Chapter Board Orientation1
Nasw Oh Chapter Board Orientation1Danielle Smith
 
Nasw Chapter Committees
Nasw Chapter CommitteesNasw Chapter Committees
Nasw Chapter CommitteesDanielle Smith
 
Learning & Performance Strategy paper Executive Summary April 2005
Learning & Performance Strategy paper Executive Summary April 2005Learning & Performance Strategy paper Executive Summary April 2005
Learning & Performance Strategy paper Executive Summary April 2005liz lennon
 

What's hot (6)

Table XI DEIB Roadmap
Table XI DEIB RoadmapTable XI DEIB Roadmap
Table XI DEIB Roadmap
 
Value of Project Management Trainings
Value of Project Management TrainingsValue of Project Management Trainings
Value of Project Management Trainings
 
Measuring Performance: Linking Money To Mission
Measuring Performance: Linking Money To MissionMeasuring Performance: Linking Money To Mission
Measuring Performance: Linking Money To Mission
 
Nasw Oh Chapter Board Orientation1
Nasw Oh Chapter Board Orientation1Nasw Oh Chapter Board Orientation1
Nasw Oh Chapter Board Orientation1
 
Nasw Chapter Committees
Nasw Chapter CommitteesNasw Chapter Committees
Nasw Chapter Committees
 
Learning & Performance Strategy paper Executive Summary April 2005
Learning & Performance Strategy paper Executive Summary April 2005Learning & Performance Strategy paper Executive Summary April 2005
Learning & Performance Strategy paper Executive Summary April 2005
 

Similar to محطات المعرفة الأردنية

iTaNGO Workshop Presentation
iTaNGO Workshop Presentation iTaNGO Workshop Presentation
iTaNGO Workshop Presentation iTaNGOproject
 
PMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO CapabilitiesPMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO CapabilitiesErin Jones
 
Q3 strategic projects report
Q3   strategic projects reportQ3   strategic projects report
Q3 strategic projects report647435
 
Q3 strategic projects report
Q3   strategic projects reportQ3   strategic projects report
Q3 strategic projects report647435
 
Sarah_Nee_Ingram_CV_2016
Sarah_Nee_Ingram_CV_2016Sarah_Nee_Ingram_CV_2016
Sarah_Nee_Ingram_CV_2016Sarah Nee
 
Use of Embedded TA to Strengthen HIS in Guinea: Addressing Information Challe...
Use of Embedded TA to Strengthen HIS in Guinea: Addressing Information Challe...Use of Embedded TA to Strengthen HIS in Guinea: Addressing Information Challe...
Use of Embedded TA to Strengthen HIS in Guinea: Addressing Information Challe...MEASURE Evaluation
 
Антон Марюхненко “Kanban @ Scale: Аджайл трансформація в банку” Kharkiv Proje...
Антон Марюхненко “Kanban @ Scale: Аджайл трансформація в банку” Kharkiv Proje...Антон Марюхненко “Kanban @ Scale: Аджайл трансформація в банку” Kharkiv Proje...
Антон Марюхненко “Kanban @ Scale: Аджайл трансформація в банку” Kharkiv Proje...Lviv Startup Club
 
2012.04.05 Learning Sessions 1 - City ArtWorks
2012.04.05 Learning Sessions 1 - City ArtWorks2012.04.05 Learning Sessions 1 - City ArtWorks
2012.04.05 Learning Sessions 1 - City ArtWorksjvielman
 
CV-SAM JAN 2016 - application 1
CV-SAM JAN 2016 - application 1CV-SAM JAN 2016 - application 1
CV-SAM JAN 2016 - application 1Sherrill Moore
 
Sr. Project Manager
Sr. Project ManagerSr. Project Manager
Sr. Project ManagerSanjoy Ghosh
 
Company Profile edit
Company Profile editCompany Profile edit
Company Profile editReuven Pasla
 

Similar to محطات المعرفة الأردنية (20)

RSCVSEP16
RSCVSEP16RSCVSEP16
RSCVSEP16
 
Cedu edco regional seminar
Cedu edco regional seminarCedu edco regional seminar
Cedu edco regional seminar
 
Practical experiences of portfolio management
Practical experiences of portfolio managementPractical experiences of portfolio management
Practical experiences of portfolio management
 
TD Area Plan
TD Area PlanTD Area Plan
TD Area Plan
 
iTaNGO Workshop Presentation
iTaNGO Workshop Presentation iTaNGO Workshop Presentation
iTaNGO Workshop Presentation
 
PMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO CapabilitiesPMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO Capabilities
 
JBM-HH Work Force Town Hall - 19 NOV 15
JBM-HH Work Force Town Hall - 19 NOV 15JBM-HH Work Force Town Hall - 19 NOV 15
JBM-HH Work Force Town Hall - 19 NOV 15
 
Q3 strategic projects report
Q3   strategic projects reportQ3   strategic projects report
Q3 strategic projects report
 
km.ppt
km.pptkm.ppt
km.ppt
 
Q3 strategic projects report
Q3   strategic projects reportQ3   strategic projects report
Q3 strategic projects report
 
PPT Audit Scotland, SIGMA Workshop on Digital Auditing for SAIs, Skopje, Nove...
PPT Audit Scotland, SIGMA Workshop on Digital Auditing for SAIs, Skopje, Nove...PPT Audit Scotland, SIGMA Workshop on Digital Auditing for SAIs, Skopje, Nove...
PPT Audit Scotland, SIGMA Workshop on Digital Auditing for SAIs, Skopje, Nove...
 
Sarah_Nee_Ingram_CV_2016
Sarah_Nee_Ingram_CV_2016Sarah_Nee_Ingram_CV_2016
Sarah_Nee_Ingram_CV_2016
 
Use of Embedded TA to Strengthen HIS in Guinea: Addressing Information Challe...
Use of Embedded TA to Strengthen HIS in Guinea: Addressing Information Challe...Use of Embedded TA to Strengthen HIS in Guinea: Addressing Information Challe...
Use of Embedded TA to Strengthen HIS in Guinea: Addressing Information Challe...
 
Антон Марюхненко “Kanban @ Scale: Аджайл трансформація в банку” Kharkiv Proje...
Антон Марюхненко “Kanban @ Scale: Аджайл трансформація в банку” Kharkiv Proje...Антон Марюхненко “Kanban @ Scale: Аджайл трансформація в банку” Kharkiv Proje...
Антон Марюхненко “Kanban @ Scale: Аджайл трансформація в банку” Kharkiv Proje...
 
Joydeep PMO Executive resume
Joydeep PMO Executive resumeJoydeep PMO Executive resume
Joydeep PMO Executive resume
 
2012.04.05 Learning Sessions 1 - City ArtWorks
2012.04.05 Learning Sessions 1 - City ArtWorks2012.04.05 Learning Sessions 1 - City ArtWorks
2012.04.05 Learning Sessions 1 - City ArtWorks
 
CV-SAM JAN 2016 - application 1
CV-SAM JAN 2016 - application 1CV-SAM JAN 2016 - application 1
CV-SAM JAN 2016 - application 1
 
Sr. Project Manager
Sr. Project ManagerSr. Project Manager
Sr. Project Manager
 
Company Profile edit
Company Profile editCompany Profile edit
Company Profile edit
 
Bharath_New
Bharath_NewBharath_New
Bharath_New
 

Recently uploaded

Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
Unlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsUnlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsPrecisely
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsHyundai Motor Group
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentationphoebematthew05
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsAndrey Dotsenko
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxnull - The Open Security Community
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
Science&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfScience&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfjimielynbastida
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 

Recently uploaded (20)

Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
Unlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsUnlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power Systems
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
 
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptxVulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort ServiceHot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentation
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
Science&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfScience&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdf
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 

محطات المعرفة الأردنية

  • 1. Knowledge Stations Program Overview, 2001 - 2011 2011 Transformation Project
  • 2. The Knowledge Stations Program The vision The Program aims to… • be the mean for giving all Jordanians, regardless of age, gender, economic status or geographical location, equal access to the digital information highway, and equal opportunity to take advantage of that access to improve their lives. • Offer IT and community training programs to raise personal and professional opportunities.
  • 3. The Knowledge Stations Program Overview 2001-2011 The Program was … • launched in 2001 by a Royal initiative with 18 KSs & expanded gradually. • Executed by NITC. (previously NIC 1993-2003). • Steered and supervised by a Royal Committee chaired by Minister of ICT (re-formed 2006) . • co-funded by UNDP and KAFD 2001 – 2003 . • Funded by KAFD 2003 - 2009. • Funded by MoICT 2009 – Present time. • Structured in a PMU handling core and support functions. • Gave 1.2 ML services and trained 150K citizens
  • 4. The Knowledge Stations Program Transformation Project: April 2011 – March 2012 • Transform the Knowledge Stations from an IT project to a community development program. • Make recommendations for governance and leadership of the Knowledge Stations. • Renovate all aspects of KS internal and external structure, operations and relationships. • Place the Knowledge Stations on a sustainable basis for the future. • Create a more entrepreneurial approach, with more partnerships and initiatives. • Introduce a continuous programs development model. • Introduce a Management performance policy. • Bring forward a multi-year strategic plan, supported by a new business model.
  • 5. The Knowledge Stations Program 2011 The Program now has… • 187 KSs equipped with computer labs and hosted by a non-for-profit entity under MoUs with NITC. • At least one IT instructor contracted by NITC in every KS. • 17 clusters covering the kingdom, each consisting 8- 13 KSs. Managed & supervised by 17 Field Coordinators. • A Program Management Department under NITC OS. • Admin, financial, & Technical Support by NITC.
  • 6. Knowledge Stations Program KSs Data Slides 7 - 14
  • 7.
  • 8.
  • 9.
  • 10.
  • 11. Program status: Human Resources July 2011
  • 12. Program status: Human Resources July 2011
  • 13. Annual Budget 1.2 ML* expenditure expenditure expenditure 2009 2010 2011≈ 1,289,475 1,439,232 1,500,000 Since 2009 KSs number grew 25% . 15% in 2009 . In 2009 new salary scale was applied with a total raise 17% A stable budget of 1.5ml can cover basic expenditure; HR cost 1.3ml covering 202 employees, Internet 50k, minimum operational 150k (rent & utilities, transportation, maintenance , stationary ) A sustainability Model is required for the future Development of the Program Delivery
  • 14.
  • 15. Knowledge Stations Program Details on the Transformation Project
  • 16. Revival of the Knowledge Stations Program CIDA Support -DDD Deployment for Democratic Development Expert Resource (April 2011 – March 2012) Project Deliverables • Organize Current Setup & Operations; Groundwork 1 •Strategic Plan w KPIs 2 •Business Model & Financial Plan w KPIs 3 •Staff Performance Management System w KPIs 4
  • 17. Revival of the Knowledge Stations Program CIDA Support -DDD Deployment for Democratic Development Expert Resource Project Task Guide Level 1 core functions; •Provide the means for creating & acquiring Knowledge. • Lead & partner in pro-poor, gender-sensitive, &human-rights based projects & programs. Program Goals • Creat & sustain Programs identity • Design/ execute training , capacity building & development programs for underprivilaged communities. Level 2 core functions; • Promote & provide access to information & e –services. • Promote & provide awareness of ICT tools employment for personal & community Outputs -Objectives development. • Promote & generate Arabic content. • Prepare for Level 2 functions: (1) Strategic & Financial Plans (2) Performance Management System (3) Stabilize current setup & operations; Groundwork Level 3 core functions; •Organize financial & admin. relationships w hosting entities; capable MoUs. Platform & tools •Management & Field Teams Roles & capacity building. April 2011– March 2012 •Human & financial resources proper management & integrate Support to NITC •Documentation, processes mapping , Data collection & analysis. • Support core functions & redundant operations; Administrative, Technical, HR & financial. Support functions; • Audit & documentation. Integrated into NITC • Legal / government regulation adherence
  • 18. Groundwork: Organization • Reassign staff to program core functions in working teams setup -Done Program • Management team; key staff to utilize existing experiences & back crucial decisions -Done Management • Confirm Coordinators, expand & define role & tasks , and regroup field clusters-Done Department • Issue Operations Guide with full Processes and work path mapping –Done • Integrate Support Functions /staff into NITC Support Departments & divisions. On going Regulate Official Status •Employ governing body regulations. Done • Organize financial issues with hosting agencies. Pending new MoU Financial • Budget shortage and KSs revenue spending authorization approvals. Pending (MoICT) • Audit: first stage under process – 2nd stage January • Define trainer role & tasks. Done HR • Solve “Interns”/“temp” trainers situation and adhere to gov. hiring policy . Done • Create new Salary scale to close gaps and limit raises. * • Needs mapping . Done E-system • KSs Database. done • Employ solutions to improve competence & productivity . under process -40% complete KSs Technical • Donors & HA contribution. on-going; secured 15 KSs . 25KSs expected in Jan-March. development • NITC - No Budget available
  • 19. Groundwork: Development • Unify / prepare offered courses content/ curricula - Done knowledge team • Minimum training on courses offered currently - plan in place to launched Dec. & Programs Development • Capacity building: delivery, tech. & community programs design, Identifying /attracting beneficiaries & knowledge sharing skills. Qualification survey Done. Budget restriction • Adjust working hours – Proposal ready Availability of • Introduce part-time non-employee system for afternoons- Proposal under process Service • Devise course fees system suitable for targeted communities. Done • Devise Exemption system for deserving groups . Done • Widen the platform of the program and strengthen the pillars (organization) to absorb Stakeholders heavy national partnerships – ongoing ; launching 3 projects (IC3-Internet smart user-Chance /Partnerships 4 children) April 2012 • Conference with stallholders & potential partners • User Survey. Under process, launch Jan. Public • Local publicity campaigns. - June Interaction & Promotion • A proposal for “marketing strategy and tactical communication plan” was submitted upon recommendation from KAFD with possibility of funding. Financial • Reach understanding with hosting agencies to (adopt a business model / share Sustainability * burden from revenue for development) – Pending new MoU and RC decision •Goals: Access to Information , capacity building , Knowledge Building Restore priorities •Values: communities & citizens vs. instructors & hosting agencies
  • 20. New OS Management Team Director Development Team leader Field Ops Team leader Ops Team leader Development Team Field Operations Team Central Operations Team * Head + 3 Head + 3 Head + 6 Field Coordinators 17 Clusters Trainers 170 Knowledge Stations
  • 21. Offered Work Skills Courses & Fees System