Using Process Benchmarking to Leverage Best Practices
  in the Establishment of a Functional and Dynamic
  Balanced Scorecard-based Performance Measurement
  System: Abu Dhabi Sewerage Services Company
  Demonstrates How Benchmarking Can Assist
  Organizational Excellence.

Mr. Zillay Ahmed, Abu Dhabi Sewerage Services Company, PO 108801, Abu Dhabi, UAE:

    Mr. David Main, AECOM Canada Ltd., 3292 Production Way, Burnaby, BC, Canada:

                          Ms. Kathy Davies Murphy, City of Calgary, Alberta, Canada:

                                  Ms. Linda Petelka, Region of Peel, Ontario Canada:
Agenda

 Introduction
 UAE and ADSSC
 ADSSC Approach
 Strategic Planning
 Performance Management
 Benchmarking Project highlights
Q&A
United Arab Emirates - UAE

 Contents of your slide
UAE Facts

 December 2, 1971 formation of UAE
 86,000 square Kms total UAE area
    87% area part of Abu Dhabi Emirate
    Home of 200 Islands
 Oil discovered in 1958
       9% of world’s total oil reserves,
        estimated at 98 billion barrels
       5% of world’s total gas reserves,
        estimated at 5.8 trillion cubic meter
 International visibility:
       Abu Dhabi Investment Authority a US $
        875 billion fund - World’s largest SWF
       US $ 7.5 billion ADIA bailout of Citibank
       US $ 400 million Abu Dhabi purchase of
        Manchester City Football Club
       Burj Khalifa world’s longest tower
       Masdar City, US $ 22 billion carbon
        neutral city
ADSSC Background
 ADSSC established in June 2005. Owned by the Government of Abu Dhabi

 Services include: waste water collection, treatment and disposal

 125 million gallons of waste water collected, transported and treated daily

 90 million gallons of treated water supplied for horticulture daily. 100% re-use
  by 2012

 Over US $ 2 billion Capital Investment Projects (CIP) underway

 Sewer tunnel project (STEP); 41 kms length, up to 5.5 m in diameter,
  commissioning planned for 2014, with an initial average flow capacity of
  800,000 cubic metes per day and eventually 1.6 million cubic meters by 2030

 ADSSC currently services 1.3 million inhabitants, after completion of its CIP will
  serve a population base of 1.7 million
ADSSC Assets

 Contents of your slide
ADSSC Integrated Excellence Approach
Strategic Planning and Performance Management
     – Current scenario
    Inputs to Strategic                                5 - Year Strategic                                      2 - Year Business
    Business Planning                                  Planning                                                Planning

                                                       EC/ADWEA Weightings
                                                                                                               Div/ Dept Mission Statements &
Govt. Directives
• Abu Dhabi Policy Agenda                                                                                      Objectives
• Plan Abu Dhabi 2030                                  ADSSC Vision , Mission, Values and                      • Minimum 3 objectives
• ADAEP Framework                                      SWOT
• Performance Contract with ADWEA/EC
• Economic Vision 2030
• Surface Transport Master Plan
                                                       Priority Area Weightings                                Objectives Weightings

Regulations
• RSB license conditions, PIS and PCR
requirements                                           Target Statements & Weightings
• EAD requirements for EHSMS                                                                                   Div./Dept. Plans
                                                                                                               • Multiple plans for each objective
                                                                                                               • Weightings for plans of each objectives
                                                       Key Performance Indicators (KPIs) ,                     • MPP+IT+CAPEX/OPEX+RACI+PI
ADSSC Existing Inputs                                  Weightings & RACI
• Improvement Projects (WSAA
   Benchmarks)
• Wastewater collection Benchmarks from
   Canadian Consortium                                 Corporate Initiatives/ programs,                        Business Plan Review
• Others benchmarks (OWSC, PA)
• Corporate & Processes Risks
                                                       CAPEX/OPEX and RACI                                     Meetings (BPRMs)
• Improvement initiatives prioritization




                                                                                                    Feedback
                                                                                                     Monthly
• ADSSC Master Plan
• Executive feedback and consultation
• ADSSC FSD Business Processes                         Milestones for Initiatives/programs
                                           Feedback
                                           Quarterly




• Integrated Management System of ADSSC                                                                        Consolidated Business Plan of
• Annual Budget
• Existing 5 Year Strategic Plan                                                                               ADSSC
• Existing 2 Year Business Plan
                                                       Consolidated Strategic Plan of
                                                       ADSSC

                                                                                                               Divisions & Departments
                                                       Performance Contract                                    PMS
ADSSC Performance                                                                                              • PIs linked to corporate KPIs.
                                                       • Complete quarterly performance report                 • Monthly management reporting through
Updates                                                  as per performance contract                             BI.
                                                       • Determine data source(s), data reporting              • Defined data source(s), data reporting
                                                         template & frequency.                                    template & frequency
ADSSC Triple-certification
ADSSC Strategy Map 2011-2015
ADSSC Strategic Plan structure
                                                       Priorities




                                              KPIs
                                               and
                                             Targets
    In addition to a number of other
components (including SWOT, KSM and
 Context), the Strategic Plan includes ...

                                              Initiatives and
                                                 Budgets
Strategic Priorities Analysis
KPIs’ and Initiatives – alignment with Priorities
               Priority                                           KPIs                           In Performance Contract?                    Initiatives


                                                                                                           No
                                               % of TIP projects that are behind schedule

                                                                                                           No
                                           CAPEX budget estimation efficiency for TIP Projects                                   Tactical Investment Programme (TIP)

                                                                                                           No
                                                  % TIP CAPEX expenditure variance
    Effective management of Capital
   Investment Programs (TIP & STEP)                                                                        No                  New Network / Tunnel "Strategic Tunnel
                                              % of STEP projects that are behind schedule
                                                                                                                                 Enhancement Programme" (STEP)

                                                                                                           No
                                          CAPEX budget estimation efficiency for STEP Projects

                                                                                                           No
                                                 % STEP CAPEX expenditure variance

 Enhance Customer Centric Capabilities                                                                     No               Customer Care Implementation Programme
                                          % Increase in customer awareness of ADSSC services                                (CCIP)


                                                                                                           No                      Annual Regulatory Requirements

     Ensure Regulatory Compliance              % Compliance with regulatory requirements                                       Recycled Water and Bio-solid Regulations



                                                                                                           No
Enhance Co-ordination With Developers                 % of Satisfied key Developers

                                                                                                           No
Ensure Alignment and Co-ordination with
                                                 % of Satisfied key Government entities
          Government Entities
ADSSC Business Plans structure


                                       Divisional
                                         SWOT
                                        analysis




                                    Divisional Balance
                                        Scorecard:
                                    Objectives, KPIs &
                                           Plans


 In addition to a number of other
  components (including Mission
statement, KSM and Context), the
    Business Plan includes ...

                                         Divisional
                                       Plans` targets
                                         & budgets
Div KPIs’ and Plans – alignment with Objectives
                                                               Business Support Department Scorecard - Overview

             Objective                                           KPI name                               In 5YP?   In PC?                                 Plan Name

                                                         % e-Services implemented                         Y         N
Enable Business Efficiency Through
                                                                                                                           World-class Software Solutions (as per the IT plan)
World Class IT Solutions
                                                  % of IT projects implemented as planned                 Y         N

                                                 # of Top leadership communication sessions               Y         N
Enhance internal and external                                                                                              AD Excellence Award Framework & Communication Plan
Communication Capabilities                                                                                                 (Internal & External)
                                                 % Implementation of communication plan                   Y         N

                                        % Implementation of AD Excellence Award Project (Actual vs.                        AD Excellence Award Framework & Communication Plan
                                                                                                          Y         N
                                                                Planned)                                                   (Internal & External)


                                        % Implementation of Inter Divisional / Departmental SLAs Plan
                                                                                                          Y         N      Organizational Excellence Initiatives
                                                            (Actual vs. Planned)


                                                                                                                           Execute Corporate Communication Plan
Achieve organizational excellence via
the introduction of best practices                                                                                         Update corporate Risk/RACM and facilitate its prioritization and
organization-wide                                                                                                          implementation


                                                                                                                           Review and update Future State Design (FSDs) Process Framework
                                          % of Organizational Excellence Plans executed as planned        N         N
                                                                                                                           Prepare and issue Sustainability Report

                                                                                                                           Prepare and implement ADSSC Corporate Social Responsibility (CSR)
                                                                                                                           Plan


                                                                                                                           Plan and implement 4 process benchmarking projects
Automation & Reporting Project - ARP

 ARP launched in June 2010 to:
       Effectively implement Strategic Planning & Performance Management
        framework
       Satisfy Abu Dhabi Accountability Authority requirements, i.e., linkage
        between improvement initiatives and risk register
       Ensure satisfactory implementation / integration of benchmarking projects
        outcome and ADSSC Strategy
       Generate intelligent management reports
       Produce Executive Council reports
       Knowledge capture and information sharing
       Prepare ADSSC for future Business Intelligence (B.I) implementation
       Integrate with Executive Council performance reporting tool
 2011 Divisional Performance Review and Reporting will be done via ARP
 2011 Corporate Performance Reviews, monthly & quarterly via ARP
ARP information whiteboard
Benchmarking Project Methodology

 Select suitable ADSSC partners, in this case Region of
  Peel and Calgary Water and benchmark:
    Existing performance management systems
    Implementation approaches
    Scale of deployment
    Technology usage
    Challenges
    Metrics, both tactical and strategic
    Data analysis methodologies
    Reporting & analysis
 Identify best practices
 Document and share final outcomes
Benchmarking Project Preliminary Outcomes

 Best practice identification and implementation by all 3-
  partner entities
 Need for alignment between Metrics (measures), Goals
  (priorities) and Initiatives (projects/plans)
 Segmentation of Metrics into Operational and Strategic
  categories and their linkages to Strategy and Business
  Plans
 Deployment of an integrated technology enabled approach
  for effective performance management
 Implementation of transparent governance approach
 Organization-wide engagement and effective
  communication
Thank you




            Any Questions?




            ZillayAhmed@adssc.ae

More Related Content

What's hot

Corporater at BSC and Strategy Forum - March 2013
Corporater at BSC and Strategy Forum - March 2013Corporater at BSC and Strategy Forum - March 2013
Corporater at BSC and Strategy Forum - March 2013Pedro S. Pereira
 
Framework for a Strategic Priority Council
Framework for a Strategic Priority CouncilFramework for a Strategic Priority Council
Framework for a Strategic Priority CouncilGherda Stephens
 
Balanca Score Card
Balanca Score CardBalanca Score Card
Balanca Score CardNor Fadzleen
 
Balance Scorecard
Balance ScorecardBalance Scorecard
Balance ScorecardSakirin Tam
 
Speaking with facts tq & od project dimensions(1)
Speaking with facts tq & od project dimensions(1)Speaking with facts tq & od project dimensions(1)
Speaking with facts tq & od project dimensions(1)Beth Perez
 
PBB Overview - December 2016
PBB Overview - December 2016PBB Overview - December 2016
PBB Overview - December 2016Malcolm Anthony
 
Rovinsky final
Rovinsky finalRovinsky final
Rovinsky finalNASAPMC
 
Ingoldsby.k.lee.y
Ingoldsby.k.lee.yIngoldsby.k.lee.y
Ingoldsby.k.lee.yNASAPMC
 
Financial Planning/Budgeting Review and Approval Process in SAP BPC NW 7.5 - ...
Financial Planning/Budgeting Review and Approval Process in SAP BPC NW 7.5 - ...Financial Planning/Budgeting Review and Approval Process in SAP BPC NW 7.5 - ...
Financial Planning/Budgeting Review and Approval Process in SAP BPC NW 7.5 - ...Jothi Periasamy
 
Pmbok 4th edition chapter 5 - Project Scope Management
Pmbok 4th edition   chapter 5 - Project Scope Management Pmbok 4th edition   chapter 5 - Project Scope Management
Pmbok 4th edition chapter 5 - Project Scope Management Ahmad Maharma, PMP,RMP
 
Ciber Executive Alignment Case Study
Ciber Executive Alignment Case StudyCiber Executive Alignment Case Study
Ciber Executive Alignment Case StudyDStoner
 
Lean Six Sigma Project Management Oct11th2010[ (1)
Lean Six Sigma Project Management Oct11th2010[ (1)Lean Six Sigma Project Management Oct11th2010[ (1)
Lean Six Sigma Project Management Oct11th2010[ (1)Arunima Thakur
 
Consultant Profile - Nedal Alomari
Consultant Profile - Nedal AlomariConsultant Profile - Nedal Alomari
Consultant Profile - Nedal AlomariNedal Alomari
 
01 Ts A Pmg Product Write Up
01 Ts A Pmg Product Write Up01 Ts A Pmg Product Write Up
01 Ts A Pmg Product Write UpStefan Afendoulis
 
Starting a portfolio Quick Guide
Starting a portfolio Quick GuideStarting a portfolio Quick Guide
Starting a portfolio Quick GuideMaven
 
Oracle Innovation Management - driving success through aligned Innovation
Oracle Innovation Management - driving success through aligned InnovationOracle Innovation Management - driving success through aligned Innovation
Oracle Innovation Management - driving success through aligned InnovationFrancois Thierart
 

What's hot (18)

Corporater at BSC and Strategy Forum - March 2013
Corporater at BSC and Strategy Forum - March 2013Corporater at BSC and Strategy Forum - March 2013
Corporater at BSC and Strategy Forum - March 2013
 
Framework for a Strategic Priority Council
Framework for a Strategic Priority CouncilFramework for a Strategic Priority Council
Framework for a Strategic Priority Council
 
Balanca Score Card
Balanca Score CardBalanca Score Card
Balanca Score Card
 
Balance Scorecard
Balance ScorecardBalance Scorecard
Balance Scorecard
 
Speaking with facts tq & od project dimensions(1)
Speaking with facts tq & od project dimensions(1)Speaking with facts tq & od project dimensions(1)
Speaking with facts tq & od project dimensions(1)
 
PBB Overview - December 2016
PBB Overview - December 2016PBB Overview - December 2016
PBB Overview - December 2016
 
Sb 85 Alberta's Competitive Review Presentation
Sb 85 Alberta's Competitive Review PresentationSb 85 Alberta's Competitive Review Presentation
Sb 85 Alberta's Competitive Review Presentation
 
P746
P746P746
P746
 
Rovinsky final
Rovinsky finalRovinsky final
Rovinsky final
 
Ingoldsby.k.lee.y
Ingoldsby.k.lee.yIngoldsby.k.lee.y
Ingoldsby.k.lee.y
 
Financial Planning/Budgeting Review and Approval Process in SAP BPC NW 7.5 - ...
Financial Planning/Budgeting Review and Approval Process in SAP BPC NW 7.5 - ...Financial Planning/Budgeting Review and Approval Process in SAP BPC NW 7.5 - ...
Financial Planning/Budgeting Review and Approval Process in SAP BPC NW 7.5 - ...
 
Pmbok 4th edition chapter 5 - Project Scope Management
Pmbok 4th edition   chapter 5 - Project Scope Management Pmbok 4th edition   chapter 5 - Project Scope Management
Pmbok 4th edition chapter 5 - Project Scope Management
 
Ciber Executive Alignment Case Study
Ciber Executive Alignment Case StudyCiber Executive Alignment Case Study
Ciber Executive Alignment Case Study
 
Lean Six Sigma Project Management Oct11th2010[ (1)
Lean Six Sigma Project Management Oct11th2010[ (1)Lean Six Sigma Project Management Oct11th2010[ (1)
Lean Six Sigma Project Management Oct11th2010[ (1)
 
Consultant Profile - Nedal Alomari
Consultant Profile - Nedal AlomariConsultant Profile - Nedal Alomari
Consultant Profile - Nedal Alomari
 
01 Ts A Pmg Product Write Up
01 Ts A Pmg Product Write Up01 Ts A Pmg Product Write Up
01 Ts A Pmg Product Write Up
 
Starting a portfolio Quick Guide
Starting a portfolio Quick GuideStarting a portfolio Quick Guide
Starting a portfolio Quick Guide
 
Oracle Innovation Management - driving success through aligned Innovation
Oracle Innovation Management - driving success through aligned InnovationOracle Innovation Management - driving success through aligned Innovation
Oracle Innovation Management - driving success through aligned Innovation
 

Similar to ZA IWA Valencia Spain presentation

R&D Best Practice Presentation 010111
R&D Best Practice Presentation 010111R&D Best Practice Presentation 010111
R&D Best Practice Presentation 010111John [Frank] Hudman
 
Vladi Fin09 Expert Guide How To Migrate From Bi Ip To Bpc
Vladi Fin09 Expert Guide How To Migrate From Bi Ip To BpcVladi Fin09 Expert Guide How To Migrate From Bi Ip To Bpc
Vladi Fin09 Expert Guide How To Migrate From Bi Ip To BpcLAZAR Consultants LLC
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandraNASAPMC
 
Developing asset management plans
Developing asset management plans   Developing asset management plans
Developing asset management plans OntarioEast
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.garyNASAPMC
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.garyNASAPMC
 
Project Initiation Document
Project Initiation DocumentProject Initiation Document
Project Initiation DocumentDave Angelow
 
Balanced Scorecard for CMMI Implementations - Eduardo Espinheira e Paula Gomes
Balanced Scorecard for CMMI Implementations - Eduardo Espinheira e Paula GomesBalanced Scorecard for CMMI Implementations - Eduardo Espinheira e Paula Gomes
Balanced Scorecard for CMMI Implementations - Eduardo Espinheira e Paula GomesPaula Gomes
 
CMAD Group Workbook 4 Op Model Interim
CMAD Group Workbook 4 Op Model InterimCMAD Group Workbook 4 Op Model Interim
CMAD Group Workbook 4 Op Model InterimAlexander Doré
 
OAUGNYC 2012, Product Spotlight: Oracle Hyperion Profitability & Cost Management
OAUGNYC 2012, Product Spotlight: Oracle Hyperion Profitability & Cost ManagementOAUGNYC 2012, Product Spotlight: Oracle Hyperion Profitability & Cost Management
OAUGNYC 2012, Product Spotlight: Oracle Hyperion Profitability & Cost ManagementRJ Linehan
 
QFH Consulting Capabilities
QFH Consulting CapabilitiesQFH Consulting Capabilities
QFH Consulting CapabilitiesQuinn Harry
 
Install pms in moccis - a proposal
Install pms in moccis - a proposalInstall pms in moccis - a proposal
Install pms in moccis - a proposalHj Arriffin Mansor
 
S&Op Training
S&Op TrainingS&Op Training
S&Op TrainingWajihuddin
 
Gary.humphreys
Gary.humphreysGary.humphreys
Gary.humphreysNASAPMC
 
Khaled Abu AL-Neel Resume
Khaled Abu AL-Neel ResumeKhaled Abu AL-Neel Resume
Khaled Abu AL-Neel ResumeKhaledabualneel
 
NG BB 07 Multi-Generation Project Planning
NG BB 07 Multi-Generation Project PlanningNG BB 07 Multi-Generation Project Planning
NG BB 07 Multi-Generation Project PlanningLeanleaders.org
 
Costco open group - mumbai presentation final
Costco   open group - mumbai presentation finalCostco   open group - mumbai presentation final
Costco open group - mumbai presentation finalShrikant Palkar
 
Skeleton for EPMO roll out for large enterprises
Skeleton for EPMO roll out for large enterprises Skeleton for EPMO roll out for large enterprises
Skeleton for EPMO roll out for large enterprises Ghayas Mansoor
 
AVATA S&OP / IBP Express
AVATA S&OP / IBP ExpressAVATA S&OP / IBP Express
AVATA S&OP / IBP ExpressAVATA
 

Similar to ZA IWA Valencia Spain presentation (20)

R&D Best Practice Presentation 010111
R&D Best Practice Presentation 010111R&D Best Practice Presentation 010111
R&D Best Practice Presentation 010111
 
Vladi Fin09 Expert Guide How To Migrate From Bi Ip To Bpc
Vladi Fin09 Expert Guide How To Migrate From Bi Ip To BpcVladi Fin09 Expert Guide How To Migrate From Bi Ip To Bpc
Vladi Fin09 Expert Guide How To Migrate From Bi Ip To Bpc
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
 
Developing asset management plans
Developing asset management plans   Developing asset management plans
Developing asset management plans
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.gary
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.gary
 
Project Initiation Document
Project Initiation DocumentProject Initiation Document
Project Initiation Document
 
Balanced Scorecard for CMMI Implementations - Eduardo Espinheira e Paula Gomes
Balanced Scorecard for CMMI Implementations - Eduardo Espinheira e Paula GomesBalanced Scorecard for CMMI Implementations - Eduardo Espinheira e Paula Gomes
Balanced Scorecard for CMMI Implementations - Eduardo Espinheira e Paula Gomes
 
CMAD Group Workbook 4 Op Model Interim
CMAD Group Workbook 4 Op Model InterimCMAD Group Workbook 4 Op Model Interim
CMAD Group Workbook 4 Op Model Interim
 
OAUGNYC 2012, Product Spotlight: Oracle Hyperion Profitability & Cost Management
OAUGNYC 2012, Product Spotlight: Oracle Hyperion Profitability & Cost ManagementOAUGNYC 2012, Product Spotlight: Oracle Hyperion Profitability & Cost Management
OAUGNYC 2012, Product Spotlight: Oracle Hyperion Profitability & Cost Management
 
QFH Consulting Capabilities
QFH Consulting CapabilitiesQFH Consulting Capabilities
QFH Consulting Capabilities
 
Install pms in moccis - a proposal
Install pms in moccis - a proposalInstall pms in moccis - a proposal
Install pms in moccis - a proposal
 
ISP
ISPISP
ISP
 
S&Op Training
S&Op TrainingS&Op Training
S&Op Training
 
Gary.humphreys
Gary.humphreysGary.humphreys
Gary.humphreys
 
Khaled Abu AL-Neel Resume
Khaled Abu AL-Neel ResumeKhaled Abu AL-Neel Resume
Khaled Abu AL-Neel Resume
 
NG BB 07 Multi-Generation Project Planning
NG BB 07 Multi-Generation Project PlanningNG BB 07 Multi-Generation Project Planning
NG BB 07 Multi-Generation Project Planning
 
Costco open group - mumbai presentation final
Costco   open group - mumbai presentation finalCostco   open group - mumbai presentation final
Costco open group - mumbai presentation final
 
Skeleton for EPMO roll out for large enterprises
Skeleton for EPMO roll out for large enterprises Skeleton for EPMO roll out for large enterprises
Skeleton for EPMO roll out for large enterprises
 
AVATA S&OP / IBP Express
AVATA S&OP / IBP ExpressAVATA S&OP / IBP Express
AVATA S&OP / IBP Express
 

ZA IWA Valencia Spain presentation

  • 1. Using Process Benchmarking to Leverage Best Practices in the Establishment of a Functional and Dynamic Balanced Scorecard-based Performance Measurement System: Abu Dhabi Sewerage Services Company Demonstrates How Benchmarking Can Assist Organizational Excellence. Mr. Zillay Ahmed, Abu Dhabi Sewerage Services Company, PO 108801, Abu Dhabi, UAE: Mr. David Main, AECOM Canada Ltd., 3292 Production Way, Burnaby, BC, Canada: Ms. Kathy Davies Murphy, City of Calgary, Alberta, Canada: Ms. Linda Petelka, Region of Peel, Ontario Canada:
  • 2. Agenda  Introduction  UAE and ADSSC  ADSSC Approach  Strategic Planning  Performance Management  Benchmarking Project highlights Q&A
  • 3. United Arab Emirates - UAE  Contents of your slide
  • 4. UAE Facts  December 2, 1971 formation of UAE  86,000 square Kms total UAE area  87% area part of Abu Dhabi Emirate  Home of 200 Islands  Oil discovered in 1958  9% of world’s total oil reserves, estimated at 98 billion barrels  5% of world’s total gas reserves, estimated at 5.8 trillion cubic meter  International visibility:  Abu Dhabi Investment Authority a US $ 875 billion fund - World’s largest SWF  US $ 7.5 billion ADIA bailout of Citibank  US $ 400 million Abu Dhabi purchase of Manchester City Football Club  Burj Khalifa world’s longest tower  Masdar City, US $ 22 billion carbon neutral city
  • 5. ADSSC Background  ADSSC established in June 2005. Owned by the Government of Abu Dhabi  Services include: waste water collection, treatment and disposal  125 million gallons of waste water collected, transported and treated daily  90 million gallons of treated water supplied for horticulture daily. 100% re-use by 2012  Over US $ 2 billion Capital Investment Projects (CIP) underway  Sewer tunnel project (STEP); 41 kms length, up to 5.5 m in diameter, commissioning planned for 2014, with an initial average flow capacity of 800,000 cubic metes per day and eventually 1.6 million cubic meters by 2030  ADSSC currently services 1.3 million inhabitants, after completion of its CIP will serve a population base of 1.7 million
  • 8. Strategic Planning and Performance Management – Current scenario Inputs to Strategic 5 - Year Strategic 2 - Year Business Business Planning Planning Planning EC/ADWEA Weightings Div/ Dept Mission Statements & Govt. Directives • Abu Dhabi Policy Agenda Objectives • Plan Abu Dhabi 2030 ADSSC Vision , Mission, Values and • Minimum 3 objectives • ADAEP Framework SWOT • Performance Contract with ADWEA/EC • Economic Vision 2030 • Surface Transport Master Plan Priority Area Weightings Objectives Weightings Regulations • RSB license conditions, PIS and PCR requirements Target Statements & Weightings • EAD requirements for EHSMS Div./Dept. Plans • Multiple plans for each objective • Weightings for plans of each objectives Key Performance Indicators (KPIs) , • MPP+IT+CAPEX/OPEX+RACI+PI ADSSC Existing Inputs Weightings & RACI • Improvement Projects (WSAA Benchmarks) • Wastewater collection Benchmarks from Canadian Consortium Corporate Initiatives/ programs, Business Plan Review • Others benchmarks (OWSC, PA) • Corporate & Processes Risks CAPEX/OPEX and RACI Meetings (BPRMs) • Improvement initiatives prioritization Feedback Monthly • ADSSC Master Plan • Executive feedback and consultation • ADSSC FSD Business Processes Milestones for Initiatives/programs Feedback Quarterly • Integrated Management System of ADSSC Consolidated Business Plan of • Annual Budget • Existing 5 Year Strategic Plan ADSSC • Existing 2 Year Business Plan Consolidated Strategic Plan of ADSSC Divisions & Departments Performance Contract PMS ADSSC Performance • PIs linked to corporate KPIs. • Complete quarterly performance report • Monthly management reporting through Updates as per performance contract BI. • Determine data source(s), data reporting • Defined data source(s), data reporting template & frequency. template & frequency
  • 10. ADSSC Strategy Map 2011-2015
  • 11. ADSSC Strategic Plan structure Priorities KPIs and Targets In addition to a number of other components (including SWOT, KSM and Context), the Strategic Plan includes ... Initiatives and Budgets
  • 13. KPIs’ and Initiatives – alignment with Priorities Priority KPIs In Performance Contract? Initiatives No % of TIP projects that are behind schedule No CAPEX budget estimation efficiency for TIP Projects Tactical Investment Programme (TIP) No % TIP CAPEX expenditure variance Effective management of Capital Investment Programs (TIP & STEP) No New Network / Tunnel "Strategic Tunnel % of STEP projects that are behind schedule Enhancement Programme" (STEP) No CAPEX budget estimation efficiency for STEP Projects No % STEP CAPEX expenditure variance Enhance Customer Centric Capabilities No Customer Care Implementation Programme % Increase in customer awareness of ADSSC services (CCIP) No Annual Regulatory Requirements Ensure Regulatory Compliance % Compliance with regulatory requirements Recycled Water and Bio-solid Regulations No Enhance Co-ordination With Developers % of Satisfied key Developers No Ensure Alignment and Co-ordination with % of Satisfied key Government entities Government Entities
  • 14. ADSSC Business Plans structure Divisional SWOT analysis Divisional Balance Scorecard: Objectives, KPIs & Plans In addition to a number of other components (including Mission statement, KSM and Context), the Business Plan includes ... Divisional Plans` targets & budgets
  • 15. Div KPIs’ and Plans – alignment with Objectives Business Support Department Scorecard - Overview Objective KPI name In 5YP? In PC? Plan Name % e-Services implemented Y N Enable Business Efficiency Through World-class Software Solutions (as per the IT plan) World Class IT Solutions % of IT projects implemented as planned Y N # of Top leadership communication sessions Y N Enhance internal and external AD Excellence Award Framework & Communication Plan Communication Capabilities (Internal & External) % Implementation of communication plan Y N % Implementation of AD Excellence Award Project (Actual vs. AD Excellence Award Framework & Communication Plan Y N Planned) (Internal & External) % Implementation of Inter Divisional / Departmental SLAs Plan Y N Organizational Excellence Initiatives (Actual vs. Planned) Execute Corporate Communication Plan Achieve organizational excellence via the introduction of best practices Update corporate Risk/RACM and facilitate its prioritization and organization-wide implementation Review and update Future State Design (FSDs) Process Framework % of Organizational Excellence Plans executed as planned N N Prepare and issue Sustainability Report Prepare and implement ADSSC Corporate Social Responsibility (CSR) Plan Plan and implement 4 process benchmarking projects
  • 16. Automation & Reporting Project - ARP  ARP launched in June 2010 to:  Effectively implement Strategic Planning & Performance Management framework  Satisfy Abu Dhabi Accountability Authority requirements, i.e., linkage between improvement initiatives and risk register  Ensure satisfactory implementation / integration of benchmarking projects outcome and ADSSC Strategy  Generate intelligent management reports  Produce Executive Council reports  Knowledge capture and information sharing  Prepare ADSSC for future Business Intelligence (B.I) implementation  Integrate with Executive Council performance reporting tool  2011 Divisional Performance Review and Reporting will be done via ARP  2011 Corporate Performance Reviews, monthly & quarterly via ARP
  • 18. Benchmarking Project Methodology  Select suitable ADSSC partners, in this case Region of Peel and Calgary Water and benchmark:  Existing performance management systems  Implementation approaches  Scale of deployment  Technology usage  Challenges  Metrics, both tactical and strategic  Data analysis methodologies  Reporting & analysis  Identify best practices  Document and share final outcomes
  • 19. Benchmarking Project Preliminary Outcomes  Best practice identification and implementation by all 3- partner entities  Need for alignment between Metrics (measures), Goals (priorities) and Initiatives (projects/plans)  Segmentation of Metrics into Operational and Strategic categories and their linkages to Strategy and Business Plans  Deployment of an integrated technology enabled approach for effective performance management  Implementation of transparent governance approach  Organization-wide engagement and effective communication
  • 20. Thank you Any Questions? ZillayAhmed@adssc.ae