(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
Muhammad talha cv
1. Muhammad Talha
ELECTRICAL ENGINEER
EXPERIENCE
EDUCATION
2015 - 2019 B.E Electrical Engineering
Mehran UET jamshoro
CGPA : 3.75 / 4.00
PEC Registration No. ELECT/82587
Karachi
One year experience in HVDC
Converter station at Matiari.
Energetic individual intrigued in
utilizing technical skills for
accomplishing the objective and
developing the best performance in
the organization.
Committed to work as a
collaborative and a positive team
member and purposed to employ my
diverse skill set for the advancement
of the organization.
ABOUT ME
CONTACT
talhaaslam579@gmail.com
0303-2376294
Model colony, Malir, Karachi
Soft Skills
Positive attitude, punctual, self-
confidence and cooperative.
Self-motivated as a team player
delivering results under pressure.
Analytical and problem solving skills
can easily adopt with different
nationality.
CERTIFICATIONS &
ACHIEVEMENTS
Presented a Research Paper in "5th
International conference RTCSE'2020(
University of Hawaii, USA )"
Energy Audit By Schneider Electric
Short Circuit Studies by Power Projects
Participated in “IEEEP
SYMPOSIUM19”.
Trainee Engineer - Electrical
Pak Matiari-Lahore Transmission Company (pvt.)
Ltd (HVDC CET Project).
Matiari, Sindh
Responsibilities
Ensuring safe and reliable operation of power
complex and managing the complex load, 500KV
grid voltage, 50Hz frequency as demanded by
NPCC.
Document commissioning processes, performance
results and start-up reports for Operation and
Maintenance team (O&M)
Monitoring overall equipment effectiveness (OEE)
and do the needful to action improve OEE.
Maintaining the various records such as monthly
operating reviews, oil/winding temperature of
Reactors/Transformer, DGA, daily log sheets etc.
Maintaining daily, weekly and monthly reports of
the converter station activities.
Performed the Switching operation with the
coordination of NPCC and RCC.
Performed Preventive maintenance using thermal
imaging camera, DGA etc.
Involved in Installation and Testing of Power
Transformer (35/11 KV).
Witnessed the AC commissioning tests and DC
commissioning at Matiari converter station.
Supervising all ongoing work at yard and line.
Understood the IEC standards and knowledge of
company safety policies to ensure a safe working
environment.
Thoroughly studied primary diagrams of electrical
equipment and secondary diagram of control and
protection.
03/2020 - Present