SlideShare a Scribd company logo
1 of 4
ANKUR SHUKLA
Contact No…+919935512225,9454084376
Email –ankur.shukla792@gmail.com
Objective:-
Looking for a long lasting relationship with a company that would utilize my technical
knowledge and leadership qualities, giving me opportunities to learn and grow with the
company
Total
Experience-:
Total Experience of 2 Yrs in Telecom Industry.
Organization-:
Bharti Infratel Ltd.
Location- Lucknow (UPE)
Tenure 1st
july2013 to till date
Designation Quality engineer(Sr.Executive) in Technical function(electrical)
Responsibilitie
s
Key Activities handled during role of Senior Executive-Quality Engineer:
 Responsible for high quality assurance for Electrical Equipment
like IPMS, PIU, SMPS, BB & EB AT work and maintaining a very
good standard of installation and commissioning of all the assets
at site to improve the overall quality.
 Conduct periodic Quality inspections for Electrical & Civil works
done for the New built Sites & Upgraded sites as per given
guidelines and checklist provided.
 Responsibility to clear Punch points along with Deployment team
within SLA and declare FAT before declaring RFI sites
 To verify Measurement report sheet as per the BIL BOQs.
 Train Vendors to improve the quality of electrical and civil work
to increase FTR ratio.
 Regular feedback (Daily & Weekly) to Site progress and issues, if
any.
 Carry out other Site inspections, Surveys and Audits as per
requirements by technical and other departments.
• Special projects:
 Also associated with the P7 projects like DCFCU, DCDG, Variable-
ACDG, Solar Panel installation, BB-hybrid and Li-ion batteries and
other energy saving initiatives, including their installation,
commissioning and the operation to ensure the high quality work at
the site.
• Pre-dispatch inspection
 Associated with the PDI of the refurbished DG sets(10kVA,
15kVA,25kVA ,30 kVA) by testing them on various parameters like
load testing, alarm testing, frequency testing, etc.
 Also responsible for the PDI of the refurbished transformers at
vendors warehouse by doing their open circuit, short circuit, DVDF,
HV and oil and ratio tests.
• Responsible for the load testing at the site, done with the help of the power
analyser to study the active load variation during the day and night.
• Maintenance/Testing
 Maintenance of LT,HT Panel also done with Testing Knowledge
about the power generation& distribution 66kv to 33kV,33kV to
11kV
 Testing of Transformer efficiency ,HV,LV ,Regulation &losses 5kva
to up 30 kVA,
Responsibilitie
s
Key Activities handled duing GET:
• 1 month training under the Deployment function.
 Tech process, Project creation, MRN, RFI and CIT closure
• 1 month training under the SCM function.
 Tech process, warehouse management, scrap management.
 Mini project on installation of DCEM and ALARM BOXES at RBSC sites
• 1 month training under the technical function(planning & quality).
 Tech process, BOQs creation, feasibility checking, oracle database work.
• 3 months training under the O&M function.
• PROJECTS:
 Integration of total 16 Alarms including 4 Critical alarms and their
operation at sites
 RH & Metering compliance.
Achievements
• DAILY WORK MANAGEMENT:
 Review productivity, efficiency &quality target Vs actual on daily basis to keep
tab on progress & take necessary action if required.
• TEAM LEADER:
 Motivating the team of workers to achieve targets & draw out suggestions,
circle quality activities. Creating and sustaining an environment that fosters
development opportunities & motivate high performance level.
• PRODUCTIVITY & QUALITY IMPROVEMENT:
 Method study for the purpose of elimination of waste.
Interpersonal
skills
 Good problem solving ability and analytical skills to solve any problem
efficiently.
 Confident, determined & always try to do the work with perfection.
 Leadership skills having ability to motivate team
 Adaptable to any situation
 Interested in gaining experience from all walks of life and implementing them in a
creative manner to achieve something new.
Qualification
Details
Degree with Branch College/university Percentage
Bachelor of Technology in BIET JHANSI(GBTU) 76%
Electrical Engg.
12th
std. SGRR Public School Hardoi 82%
10th
std. SGRR Public School Hardoi 88%
Academic
trainingand
projects
Project:-Automatic street lighting control through vehicle presence sensors
Seminar:-Wireless power transmission through SPS technology
Training:- 4 weeks industrial training at Pariccha Thermal Power Plant, Jhansi(U.P.)
Extra-
curricullar
activities
 Executive member of the college technical committee FEEE.
 Organizer of the college tech-fest Techzion’12 and Techzion’13.
 Executive member of the Fine Arts And Hobbies council of the college
 Participated in the inter-college project competition.
 Actively co-ordinated various college events.
Achievements
 Scholarship holder from Army welfare education society in 10th
and 12th
std.
 Winner of the college event “Photography”.
 1st
runner-up of the college ramp show “PANACHE”.
 Qualified GATE’13 with good score.
Hobbies
 Playing badminton, football and cricket.
 Reading novels and comics
 Watching movies.
 Listening to music.
Personal
Details &
ContactNo,s
Permanent Address
06,North Aloo Thok
Bhatta Purwa kotwali road
Hardoi(U.P.), 241001.
 Father’s Name- Mr. Munna Lal Shukla
 Marital Status- UNMARRIED
 Date of Birth – 22ND
JULY,91
 Language known- English, Hindi
Date ANKUR SHUKLA
Place

More Related Content

What's hot (20)

Resume GM (2)
Resume GM (2)Resume GM (2)
Resume GM (2)
 
Srikanth Kulkarni CV
Srikanth Kulkarni CVSrikanth Kulkarni CV
Srikanth Kulkarni CV
 
Amit cv
Amit cvAmit cv
Amit cv
 
new updated RESUME
new updated RESUME new updated RESUME
new updated RESUME
 
Amol bakane update rockstar
Amol bakane    update rockstarAmol bakane    update rockstar
Amol bakane update rockstar
 
LALIT_LATEST_RESUME with change
LALIT_LATEST_RESUME with changeLALIT_LATEST_RESUME with change
LALIT_LATEST_RESUME with change
 
srikrishna Shit
srikrishna Shitsrikrishna Shit
srikrishna Shit
 
Facility management in Electircal in shopping mall and high rise buildings
Facility management in Electircal in shopping mall and high rise buildingsFacility management in Electircal in shopping mall and high rise buildings
Facility management in Electircal in shopping mall and high rise buildings
 
Resume_(2)
Resume_(2)Resume_(2)
Resume_(2)
 
Nagappa
NagappaNagappa
Nagappa
 
THOWFIC AHAMED CV
THOWFIC AHAMED CVTHOWFIC AHAMED CV
THOWFIC AHAMED CV
 
CV Bila Bajwa
CV Bila BajwaCV Bila Bajwa
CV Bila Bajwa
 
Resume 02
Resume 02Resume 02
Resume 02
 
heamacv
heamacvheamacv
heamacv
 
Sameh Youssef _Electrical Engineer_CV
Sameh Youssef _Electrical Engineer_CVSameh Youssef _Electrical Engineer_CV
Sameh Youssef _Electrical Engineer_CV
 
MUNISH CV - Copy
MUNISH CV - CopyMUNISH CV - Copy
MUNISH CV - Copy
 
CVHomesh
CVHomeshCVHomesh
CVHomesh
 
My Resume0111
My Resume0111My Resume0111
My Resume0111
 
Engr iqbal Resume ,
Engr  iqbal  Resume ,Engr  iqbal  Resume ,
Engr iqbal Resume ,
 
ahmed amer
ahmed amerahmed amer
ahmed amer
 

Viewers also liked

Questionnair for magazine tables
Questionnair for magazine tablesQuestionnair for magazine tables
Questionnair for magazine tablesSamHill129
 
Packaging and Stability
Packaging and StabilityPackaging and Stability
Packaging and StabilityGeorge Wild
 
Potty train slides
Potty train slidesPotty train slides
Potty train slidesdennisle
 
Comunicado de los gobiernos de Cuba y Estados Unidos
Comunicado de los gobiernos de Cuba y Estados UnidosComunicado de los gobiernos de Cuba y Estados Unidos
Comunicado de los gobiernos de Cuba y Estados UnidosteleSUR TV
 
(마더리스크라운드) 임신 중 천식
(마더리스크라운드) 임신 중 천식(마더리스크라운드) 임신 중 천식
(마더리스크라운드) 임신 중 천식mothersafe
 
Karan swami Intranasal drug-delivery
Karan swami Intranasal drug-deliveryKaran swami Intranasal drug-delivery
Karan swami Intranasal drug-deliveryRahul Dalvi
 
UNICEF-kävelystä uusi idea vapaaehtoisten varainhankintaan
UNICEF-kävelystä uusi idea vapaaehtoisten varainhankintaanUNICEF-kävelystä uusi idea vapaaehtoisten varainhankintaan
UNICEF-kävelystä uusi idea vapaaehtoisten varainhankintaanSuomen UNICEF - UNICEF Finland
 
Power Point Mold
Power Point MoldPower Point Mold
Power Point Moldssage
 
Vasodilators and vasoconstrictors
Vasodilators and vasoconstrictorsVasodilators and vasoconstrictors
Vasodilators and vasoconstrictorsGeorge Wild
 
Mold Presentation
Mold PresentationMold Presentation
Mold Presentationcholo2011
 

Viewers also liked (16)

Questionnair for magazine tables
Questionnair for magazine tablesQuestionnair for magazine tables
Questionnair for magazine tables
 
MECANISMOS DE RECUPERACIÓN DEL ESPACIO PÚBLICO
MECANISMOS DE RECUPERACIÓN DEL ESPACIO PÚBLICOMECANISMOS DE RECUPERACIÓN DEL ESPACIO PÚBLICO
MECANISMOS DE RECUPERACIÓN DEL ESPACIO PÚBLICO
 
Canning
CanningCanning
Canning
 
Packaging and Stability
Packaging and StabilityPackaging and Stability
Packaging and Stability
 
Potty train slides
Potty train slidesPotty train slides
Potty train slides
 
Comunicado de los gobiernos de Cuba y Estados Unidos
Comunicado de los gobiernos de Cuba y Estados UnidosComunicado de los gobiernos de Cuba y Estados Unidos
Comunicado de los gobiernos de Cuba y Estados Unidos
 
(마더리스크라운드) 임신 중 천식
(마더리스크라운드) 임신 중 천식(마더리스크라운드) 임신 중 천식
(마더리스크라운드) 임신 중 천식
 
Karan swami Intranasal drug-delivery
Karan swami Intranasal drug-deliveryKaran swami Intranasal drug-delivery
Karan swami Intranasal drug-delivery
 
UNICEF-kävelystä uusi idea vapaaehtoisten varainhankintaan
UNICEF-kävelystä uusi idea vapaaehtoisten varainhankintaanUNICEF-kävelystä uusi idea vapaaehtoisten varainhankintaan
UNICEF-kävelystä uusi idea vapaaehtoisten varainhankintaan
 
Html 5 pres
Html 5 presHtml 5 pres
Html 5 pres
 
Implants
ImplantsImplants
Implants
 
Subcutaneous mycoses.ppt
Subcutaneous mycoses.pptSubcutaneous mycoses.ppt
Subcutaneous mycoses.ppt
 
Power Point Mold
Power Point MoldPower Point Mold
Power Point Mold
 
Vasodilators and vasoconstrictors
Vasodilators and vasoconstrictorsVasodilators and vasoconstrictors
Vasodilators and vasoconstrictors
 
Mold Presentation
Mold PresentationMold Presentation
Mold Presentation
 
Vasoactive drugs
Vasoactive drugsVasoactive drugs
Vasoactive drugs
 

Similar to ANKUR SHUKLA'S CONTACT AND CAREER SUMMARY

Similar to ANKUR SHUKLA'S CONTACT AND CAREER SUMMARY (20)

Resume-Prajval
Resume-PrajvalResume-Prajval
Resume-Prajval
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
Curriculum vitae 3.2
Curriculum vitae 3.2Curriculum vitae 3.2
Curriculum vitae 3.2
 
dhanaraj
dhanarajdhanaraj
dhanaraj
 
Er_Manish_Patel (CV)
Er_Manish_Patel (CV)Er_Manish_Patel (CV)
Er_Manish_Patel (CV)
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
 
Narender Kumar resume1
Narender Kumar  resume1Narender Kumar  resume1
Narender Kumar resume1
 
Sharath_CV
Sharath_CVSharath_CV
Sharath_CV
 
ASIT CV
ASIT CVASIT CV
ASIT CV
 
Resume Power project planning & maintenance.
Resume Power project planning & maintenance.Resume Power project planning & maintenance.
Resume Power project planning & maintenance.
 
Resume
ResumeResume
Resume
 
CV-Ulysses Bustillo
CV-Ulysses BustilloCV-Ulysses Bustillo
CV-Ulysses Bustillo
 
Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)
 
Malikjan Resume New
Malikjan Resume NewMalikjan Resume New
Malikjan Resume New
 
CV-VP-KEMYA
CV-VP-KEMYACV-VP-KEMYA
CV-VP-KEMYA
 
HEMM machine & Mining Service. Machine Architecture, servicing & robust opera...
HEMM machine & Mining Service. Machine Architecture, servicing & robust opera...HEMM machine & Mining Service. Machine Architecture, servicing & robust opera...
HEMM machine & Mining Service. Machine Architecture, servicing & robust opera...
 
Vineeth biodata
Vineeth biodataVineeth biodata
Vineeth biodata
 
ENGINEER MUHAMMED ZAFAR SHAH 2
ENGINEER MUHAMMED ZAFAR SHAH 2ENGINEER MUHAMMED ZAFAR SHAH 2
ENGINEER MUHAMMED ZAFAR SHAH 2
 
Resume (Umar AKbar)
Resume (Umar AKbar)Resume (Umar AKbar)
Resume (Umar AKbar)
 
Resume - Nanda New
Resume - Nanda NewResume - Nanda New
Resume - Nanda New
 

ANKUR SHUKLA'S CONTACT AND CAREER SUMMARY

  • 1. ANKUR SHUKLA Contact No…+919935512225,9454084376 Email –ankur.shukla792@gmail.com Objective:- Looking for a long lasting relationship with a company that would utilize my technical knowledge and leadership qualities, giving me opportunities to learn and grow with the company Total Experience-: Total Experience of 2 Yrs in Telecom Industry. Organization-: Bharti Infratel Ltd. Location- Lucknow (UPE) Tenure 1st july2013 to till date Designation Quality engineer(Sr.Executive) in Technical function(electrical) Responsibilitie s Key Activities handled during role of Senior Executive-Quality Engineer:  Responsible for high quality assurance for Electrical Equipment like IPMS, PIU, SMPS, BB & EB AT work and maintaining a very good standard of installation and commissioning of all the assets at site to improve the overall quality.  Conduct periodic Quality inspections for Electrical & Civil works done for the New built Sites & Upgraded sites as per given guidelines and checklist provided.  Responsibility to clear Punch points along with Deployment team within SLA and declare FAT before declaring RFI sites  To verify Measurement report sheet as per the BIL BOQs.  Train Vendors to improve the quality of electrical and civil work to increase FTR ratio.  Regular feedback (Daily & Weekly) to Site progress and issues, if any.  Carry out other Site inspections, Surveys and Audits as per requirements by technical and other departments.
  • 2. • Special projects:  Also associated with the P7 projects like DCFCU, DCDG, Variable- ACDG, Solar Panel installation, BB-hybrid and Li-ion batteries and other energy saving initiatives, including their installation, commissioning and the operation to ensure the high quality work at the site. • Pre-dispatch inspection  Associated with the PDI of the refurbished DG sets(10kVA, 15kVA,25kVA ,30 kVA) by testing them on various parameters like load testing, alarm testing, frequency testing, etc.  Also responsible for the PDI of the refurbished transformers at vendors warehouse by doing their open circuit, short circuit, DVDF, HV and oil and ratio tests. • Responsible for the load testing at the site, done with the help of the power analyser to study the active load variation during the day and night. • Maintenance/Testing  Maintenance of LT,HT Panel also done with Testing Knowledge about the power generation& distribution 66kv to 33kV,33kV to 11kV  Testing of Transformer efficiency ,HV,LV ,Regulation &losses 5kva to up 30 kVA, Responsibilitie s Key Activities handled duing GET: • 1 month training under the Deployment function.  Tech process, Project creation, MRN, RFI and CIT closure • 1 month training under the SCM function.  Tech process, warehouse management, scrap management.  Mini project on installation of DCEM and ALARM BOXES at RBSC sites • 1 month training under the technical function(planning & quality).  Tech process, BOQs creation, feasibility checking, oracle database work. • 3 months training under the O&M function. • PROJECTS:  Integration of total 16 Alarms including 4 Critical alarms and their operation at sites  RH & Metering compliance.
  • 3. Achievements • DAILY WORK MANAGEMENT:  Review productivity, efficiency &quality target Vs actual on daily basis to keep tab on progress & take necessary action if required. • TEAM LEADER:  Motivating the team of workers to achieve targets & draw out suggestions, circle quality activities. Creating and sustaining an environment that fosters development opportunities & motivate high performance level. • PRODUCTIVITY & QUALITY IMPROVEMENT:  Method study for the purpose of elimination of waste. Interpersonal skills  Good problem solving ability and analytical skills to solve any problem efficiently.  Confident, determined & always try to do the work with perfection.  Leadership skills having ability to motivate team  Adaptable to any situation  Interested in gaining experience from all walks of life and implementing them in a creative manner to achieve something new. Qualification Details Degree with Branch College/university Percentage Bachelor of Technology in BIET JHANSI(GBTU) 76% Electrical Engg. 12th std. SGRR Public School Hardoi 82% 10th std. SGRR Public School Hardoi 88% Academic trainingand projects Project:-Automatic street lighting control through vehicle presence sensors Seminar:-Wireless power transmission through SPS technology Training:- 4 weeks industrial training at Pariccha Thermal Power Plant, Jhansi(U.P.) Extra- curricullar activities  Executive member of the college technical committee FEEE.  Organizer of the college tech-fest Techzion’12 and Techzion’13.  Executive member of the Fine Arts And Hobbies council of the college  Participated in the inter-college project competition.  Actively co-ordinated various college events. Achievements  Scholarship holder from Army welfare education society in 10th and 12th std.  Winner of the college event “Photography”.  1st runner-up of the college ramp show “PANACHE”.  Qualified GATE’13 with good score.
  • 4. Hobbies  Playing badminton, football and cricket.  Reading novels and comics  Watching movies.  Listening to music. Personal Details & ContactNo,s Permanent Address 06,North Aloo Thok Bhatta Purwa kotwali road Hardoi(U.P.), 241001.  Father’s Name- Mr. Munna Lal Shukla  Marital Status- UNMARRIED  Date of Birth – 22ND JULY,91  Language known- English, Hindi Date ANKUR SHUKLA Place