06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 1 of 31]
1
Metalman Micro Turners Plant-1
IATF 16949:2016 & ISO 14001: 2015 & EHS
45001:2018
Certified Company
PLOT NO 17&15, SECTOR 9
IIE, SIDCUL INDUSTRIAL AREA ,PANTNAGAR
WELCOME
TO
ThirdBAL/BAVA Kaizen Competition (2023-24)
06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 2 of 31]
Introduction & Products
Overview
Frame Assembly
Frame
Swing Arm
Silencer
Products
06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 3 of 31]
Kaizen Theme
Company name
Team Members
BAL/BAVA KAIZEN COMPETITION
Q3 (Oct-Dec’ 2023)
Flexibility Improvement
Metalman Micro Turners, P’ Nagar
S.No. Name Role
1 Mr. Sunil Kandpal Leader
2 Mr. Abhishek Nathani Member
3 Mr. Prem Member
06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 4 of 31]
Why
Flexibility
High
Investment
for new
Robots & M/C
Space
Constraint
A big
challenge for
company to
offer a wide
variety of
products to
it’s customer
A big
challenge to
rapidly
increase the
production
level
Business
Development
Theme-Background
06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 5 of 31]
KMI,KEI & KPI Linkage with The Kaizen Theme
PLANT VISION/MISSION
KMI(Key Management
Indicators
KEI(Key Effectiveness
Indicators)
KPI(Key Performance
indicators)
Pillar
Vision
Increase Production
OEE Improvement
Equipment Failure Loss
Reduction
PM/KK/QM/DM/JH
To be first choice of customers,
suppliers, employees and stake
holders.
Setup Down Time
Reduction
Tool Change Loss Reduction
Mission
Startup Loss Reduction
(Flexibility Improvement)
Achieve operational excellence by
enhancing plant productivity
through all employee team work,
low cost manufacturing, on time
delivery to customer, high level
quality adherence.
Minnor Stoppages and
Idling Loss Reduction
Speed Loss Reduction
Defects and Rework Loss
Reduction
Production/Hr
Improvement
Line Organization Loss
Reduction
DM/KK
Business Development
Flexibility Improvements on
Line
DM/KK/QM
06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 6 of 31]
Approach
Level of
Flexibility
Definition
Development
stage
Product
Level
Common Parts
Level 1
Common parts between different
family of products
DFM
Level 2
Common parts within a product
family
DFM
Common
Dimensions
Level 3
Common location, resting, clamping
& orientation
DFM
Process
Level
Common Tooling's Level 4
Cells capable to manufacture
uncommon component
Process planning
Quick Change Level 5
Cells capable to manufacture
uncommon component with Faster
Set-up Change
Process planning
Approach
06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 7 of 31]
Methodology
1-Product wise Mapping for
Flexibility Improvement
2-Stage wise Mapping of
Selected Line for Setup Loss
3-Observe/Record All the
Activity with Time
4.1-Internal to External
Activities
4.2-ECRS 4.3-Series to Parallel
5-Result &
Benefits
6-Effectiveness
Monitoring
7-HD &
Sustenance
Actions
4.4-NVA Elimination
06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 8 of 31]
1-Mapping of All Product’s Line
FY2018
1-Platina BS4
2-Pulsar K1 BS4
3-K19 BS4
4-K1R BS4
FY2020
1-K1R BS6
2-K1 BS6
3-K19 BS6
4-Platina BS4
5-Pulsar K1 BS4
6-K19 C
7-K1R BS4
S.No. Product No. of Lines Models
1 Frame 4 7
2 Silencer 1 1
Mapping of finding the scope for flexibility improvement:-
Model at 2018 Capacity (Nos/Day) Model at 2020
K1 BS4 900 K19 BS4 / K1 BS4/K19 BS6 / K1 BS6
K19/K19C BS4 700 K1 BS6 / K19 BS6/K19C
Platina BS4 700 Platina BS6
K1R BS4 700 K1R BS4 / K1R BS6
06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 9 of 31]
Model Flexibility ×
Platina Frame BS6
K19C/K19 BS6/K1 BS6
K1R Frame BS4
K1R Frame BS6
K1 Frame BS4
Model Flexibility
Model Flexibility √
Model Flexibility √
Line-1
Line-2
Line-3
Line-4
Status of Frame Lines
Due to high demand and multiple
variant models of pulsar family, we
selected line no. 4 to make it
flexible line for meeting customer
need.
√
K1 Frame BS6
K19 Frame BS4
K19 Frame BS6
06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 10 of 31]
40.0
35.0
10.0 10.0
58.0
20.0
0
10
20
30
40
50
60
70
F-30/40 F-50/60 F-65/70 F-90/100 F-120/130 F-150/160
Frame K19 OBD/K1 OBD to K1 BS4, K19 BS4
Maximum Setup
time 58 Min.
Min.
2-Stage wise Mapping (Understanding of Problem)
Setup time / Occ.
Target -10 Min.
Changing elements in 4M 1T from K1OBD/K19 OBD to K1 BS4 & K19 BS4
Setup
time/Occ.
Stage 4M&T change K1 OBD/K19 OBD K1 BS4 K19 BS4
Material - - -
Method (Robot Programing) - - -
Tool (Fixture Unit) - - -
Material - √ √
Method (Robot Programing) - √ √
Tool (Fixture Unit) - √ √
Material - √ √
Method (Robot Programing) - √ √
Tool (Fixture Unit) - - -
Material - √ √
Method (Robot Programing) - √ √
Tool (Fixture Unit) - - -
Material - - -
Method (Robot Programing) - - -
Tool (Fixture Unit) - - -
Material - √ √
Method (Robot Programing) - √ √
Tool (Fixture Unit) - - -
Material - √ √
Method (Robot Programing) - √ √
Tool (Fixture Unit) - √ √
Material - √ √
Method (Robot Programing) - √ √
Tool (Fixture Unit) - √ √
Material - - -
Method (Robot Programing) - - -
Tool (Fixture Unit) - - -
F-150/160
F-170
F-30/40
F-50/60
F-65/70
F-80
F-90/100
F-120/130
F-10/20
Flexibility Level-5
erial - √ √
hod (Robot Programing) - √ √
(Fixture Unit) - - -
erial - - -
hod (Robot Programing) - - -
(Fixture Unit) - - -
erial - √ √
hod (Robot Programing) - √ √
(Fixture Unit) - - -
erial - √ √
hod (Robot Programing) - √ √
(Fixture Unit) - √ √
erial - √ √
hod (Robot Programing) - √ √
(Fixture Unit) - √ √
erial - - -
hod (Robot Programing) - - -
(Fixture Unit) - - -
Material - √ √
Method (Robot Programing) - √ √
Tool (Fixture Unit) - - -
Material - - -
Method (Robot Programing) - - -
Tool (Fixture Unit) - - -
Material - √ √
Method (Robot Programing) - √ √
Tool (Fixture Unit) - - -
Material - √ √
Method (Robot Programing) - √ √
Tool (Fixture Unit) - √ √
Material - √ √
Method (Robot Programing) - √ √
Tool (Fixture Unit) - √ √
Material - - -
Method (Robot Programing) - - -
Tool (Fixture Unit) - - -
F-150/160
F-170
F-65/70
F-80
F-90/100
F-120/130
06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 11 of 31]
3-Observe the Activity (Background)
Before
0 5 10 15 20 25 30 35 40 45 50 55 60
1
Store Person remove old material on line
2
Feed the changeover material on line directly
3
All changeover unit/block carry out from Tool Room
for RR unit & Flap bkt 2 nos
4
Fitter dismantle welding units from fixture, open 4
bolts & 2 nos of dowel from base fixture
5
Fitter remove cylinder pneumatic push fittings
6
Remove old units from fixture & placing new units on
fixture
7
Other model fixture units assembly on fixture 4 bolts
& 2 dowels
8
Fitter placing cylinder pneumatic push fittings
9
Re-teaching done on every joint
10
Check the visual welding defect after Re-teaching
Material
Changeover
External Activities
S.No. Changeover Activities Carried Out Internal/External
Stage-120/130 (Time in Min)
Fixture
Changeover
Welding
Program
Setting
Internal Activities
Total Time 58 min
06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 12 of 31]
3-Background (Fixture Changeover)
Unit For Changeover
Changeover From K1 Bs6 to K1 Bs4
Step 1:
Pneumatic connection
Dismantling For Input
and Output Pipe
Step 3:
Existing Unit Dismantling Dowell
Bolt Dismantling K1 BS6
Step 5:
New Unit
Assembled K1 BS4
Step 6:
Cylinder Pneumatic Fitting
Step 7:
Reed Switch Mtg in Cylinder
Step 8:
Setup Change
Complete
Step 2:
Reed Switch Dismantling from
Cylinder
Total Set up Time From K1
Bs6 to K1 Bs4 :- 23Min
Step 4:
Vacant Unit
06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 13 of 31]
4.1-Internal to External
Activities 4.2-ECRS
4.3-Series to Parallel
4.4-NVA Elimination
4-Brain-storming
06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 14 of 31]
Tackle with Challenges to make the Line Flexible
We need to make the line flexible for new models. We have following challenges which are
given below:-
• Few quantity of
material are kept inside
the cell before the setup
Commonize the material
in both model through
raising DFM
•To reduce Setup Time
through design change
of the fixture’s unit for
quick changeover
• Separate program for
each model (Master) are
made and interlocked
with master call
• Poka Yoke done on
fixture
Man: Wrong part
welding due to
same appearance
of few parts
Method: Setup
loss due to robot
re-teaching after
model changeover.
Material: Feeding
of model wise
material inside the
cell Mix up of
material due to
same appearance
and same profile
Tool: Setup Loss
due to change in
fixture’s unit.
Challenge
Action-1 Action-2
Action-3
Action-4
06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 15 of 31]
Action Taken
S. No. Changeover Before Condition Activity
Total
Time
(Min.)
Action Plan Status
Current
status
(Total
time in
Min.)
1
Material
Changeover
Store person Remove existing Material from line .
Remove
Activity
10
Kept next model
material in plastic bin
(Qty.- 20 Nos) before
setup change
Done 0
2 Feed the changeover Material on Line Directly
Fixed
Activity
3
Fixture
Changeover
All Change-Over Unit/Block carry out from Tool
Room for RR unit & Flap Bkt. 2 nos.
Remove
Activity
10
Stage wise place given
for RR unit & Flap bkt.
Units
Done 0
4
Fitter dismantle welding units from fixture, open 2
nos bolts & 2 nos of Dowell.
Remove
Activity
5
Common Bolting block
designed for easy
bolting for other model
Done 0
5
Fitter removes cylinder pneumatic Connectors &
Reed Switch .
Remove
Activity
5
6
Removing old units from fixture & Placing New
units on fixture. Fixed
Activity
3
Done 8
5
7
Other model Fixture units assembly on fixture 4
Bolts & 2 Dowels
8
Fitter placing cylinder pneumatic push Fittings,
Provide Reed Switch in Cylinder.
Fixed
Activity
5
9
Welding
Program Setting
Re-teaching Done on Every Joint
Fixed
Activity
10
Separate Welding
Programs for each
model Only Master
calling
Done 2
10
Check the Visual Welding defect activity after Re-
teaching
Inspection 5
Total Time - Before 58 min Total Time - After 10 min
Internal
to
External
NVA
elimination
Elimination of 4
& 5 no. activity
and Combine
the base block
06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 18 of 31]
Action
Changeover From K1 Bs6 to K19 Bs6
Step 1:
Units For Changeover
Step 3:
Changing the master block
makes changeover flexible
and easy for different units
Step 2:
Replacing the changeover
block by newly designed
Master Dummy Block.
Master Block
for Changeover
Total Set up Time From K1
Bs6 to K1 Bs4 :- 8 Min
06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 19 of 31]
5-Activity of Setup Change (After)
Before
After
0 5 10 15 20 25 30 35 40 45 50 55 60
1
Store Person remove old material on line
2
Feed the changeover material on line directly
3
All changeover unit/block carry out from Tool Room
for RR unit & Flap bkt 2 nos
4
Fitter dismantle welding units from fixture, open 4
bolts & 2 nos of dowel from base fixture
5
Fitter remove cylinder pneumatic push fittings
6
Remove old units from fixture & placing new units on
fixture
7
Other model fixture units assembly on fixture 4 bolts
& 2 dowels
8
Fitter placing cylinder pneumatic push fittings
9
Re-teaching done on every joint
10
Check the visual welding defect after Re-teaching
Material
Changeover
External Activities
S.No. Changeover Activities Carried Out Internal/External
Stage-120/130 (Time in Min)
Fixture
Changeover
Welding
Program
Setting
Internal Activities
Total Time 10 min
Flexibility
Level-4
06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 20 of 31]
1-Receiving of Drawing 2-Process feasibility Study
3A-If Process Feasible
3A-Go For Development
3B-If Process difficult to Feasible
3B-Raise DFM (Difficult
for Manufacturing)
Sharing of Problems for
Part manufacturing
Deviation from Customer
Part develop as per DFM
Methodology for Flexibility Level-4 to 1
Accepted
Not accepted
06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 21 of 31]
Understanding of Problem
Problem:-Main Step fixture changeover time is more at F-60 during changeover from K1
OBD to K19 BS4
Background:-Part (Main Step) profile is common and locating hole’s CD are different
43 mm
46 mm
Setup time from K1 OBD to K19 BS4 is
30 min
06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 22 of 31]
Why-Why Analysis, Root Cause & Kaizen Idea
Why-1
• Setup time is more for main step
Why-2
• Changing in Main step Fixture’s unit
Why-3
• Main Step Bush CD is different from other
model
Root Cause:-Main Step Bush CD is different from other model
Kaizen Idea:- Commonize the bush CD of K1 & K19 model
06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 23 of 31]
Before/After Comparison
Before After
Main Step Bush CD-43 mm in K1 OBD and
46 mm in K19 BS4
Main Step Bush CD-46 mm which is
common in both model K1 OBD & K19
BS4
43 mm
46 mm
46 mm
K1 OBD
K19 BS4
Common Part in both model in
K1 OBD and K19 BS4
Countermeasure:-Commonized the bush CD with dimension 46mm in both model (K1 and K19).
06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 24 of 31]
Theme: To reduce the Setup loss at F-60 Stage in K1 Line Implementation Date
Present Status: Main Step fixture changeover time is more at F-60 during changeover from K1 OBD to K19 BS4 11/07/2023
BEFORE AFTER Result:
ANALYSIS:
W1: Setup time is more for main step
W2: Changing in Main step Fixture’s unit
W3: Main Step Bush CD is different from other model
Kaizen Idea :Commonize the bush CD of K1 & K19
model
Countermeasure : Commonized the bush CD with
dimension 46mm in both model (K1 and K19)
Root Cause :Main Step Bush CD is different from
other model
Benefit: Productivity improved
H.D.: .: NA Sustenance : Check point added in PM Sheet
Kaizen-03
30
0
0
10
20
30
40
Before
After
Fixture unit Setup
Time
100%
Min
43 mm
46 mm
K1
OBD
K19
BS4
46 mm
Flexibility
Level-1
06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 25 of 31]
Results of set-up time activity
40
35
10 10
58
20
3 3 4
7
10
3
0
10
20
30
40
50
60
F-30/40 F-50/60 F-65/70 F-90/100 F-120/130 F-150/160
Frame Pulsar K19 OBD to K1 BS4/K1 BS6/K19 BS4
Before
After
Setup
Time/Occ.
Min.
82% setup
time
reduction
06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 26 of 31]
Results & Benefits
P
Productivity
improved by
25%
Q
Sustain
C
Reduce Improved
D
Timely Improved
M
S
Line-4 Before Flexibility After Flexibility
Models K1 BS4
K1BS4
K19 BS4
K1 BS6
K19 BS6
Capacity/Day 900 1200
Capacity/Month 22500 30000
06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 27 of 31]
Effectiveness Monitoring
Validation Report for RR Unit & flap bkt’s fixture elements Sample Inspection Report for Main Step Bush
06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 28 of 31]
Kaizen Applicability Summary & HD Status
Kaizen Summary at K19 Line
Sr. No. Stage F - 30 F-40 F-50 F - 60 F - 70 F - 80 F - 130 F - 140 F - 150 F - 160 F - 170
1
Place provided for
keeping fixture
elements at
welding stage.
a x a a a a a a x x a
2
Provided common
base for both
models changing
blocks
x x x a x a x a x x x
3
Common parts
between different
family of products
and within a
family of product
x x x a x x x x x x x
Legend: Applicable a Not Applicable x
Horizontal Deployment:-K1R Line
06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 29 of 31]
Sustenance Actions
Point added in PM check Sheet
06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 30 of 31]
Learnings
TEAM
SPIRIT
UNDERSTANDING EACH
OTHER
SKILL
IMPROVED
SELF
CONFIDENCE
LEARNINGS
PROBLEM SOLVING
TECH.
COMPUTER
SKILL
COMMUNICATION
PRESENTATION
SKILL
06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 31 of 31]

More Related Content

Similar to Fsfbglexibility Improvement 06.01,24.pdf

2022 Quality Control & Document Design
2022 Quality Control & Document Design2022 Quality Control & Document Design
2022 Quality Control & Document DesignBen Walters
 
GSI Internship Portfolio
GSI Internship PortfolioGSI Internship Portfolio
GSI Internship PortfolioNicole Ripperda
 
Design and Development of Dynamo Testing Machine
Design and Development of Dynamo Testing MachineDesign and Development of Dynamo Testing Machine
Design and Development of Dynamo Testing MachineIRJET Journal
 
A Method for Finding Document Containning Reactionary Viewpoints
A Method for Finding Document Containning Reactionary ViewpointsA Method for Finding Document Containning Reactionary Viewpoints
A Method for Finding Document Containning Reactionary ViewpointsIRJET Journal
 
Process dsign and facility layout
Process dsign and facility layoutProcess dsign and facility layout
Process dsign and facility layoutNsbmUcd
 
IRJET- Finite Element Analysis of Winch Machine for Erection of Transmission ...
IRJET- Finite Element Analysis of Winch Machine for Erection of Transmission ...IRJET- Finite Element Analysis of Winch Machine for Erection of Transmission ...
IRJET- Finite Element Analysis of Winch Machine for Erection of Transmission ...IRJET Journal
 
Zero Defect Competition @ July 22.pptx
Zero Defect Competition  @ July 22.pptxZero Defect Competition  @ July 22.pptx
Zero Defect Competition @ July 22.pptxsonutyagi20
 
IRJET- Design and Development of a Bandsaw Machine Roller Bracket for Wei...
IRJET-  	  Design and Development of a Bandsaw Machine Roller Bracket for Wei...IRJET-  	  Design and Development of a Bandsaw Machine Roller Bracket for Wei...
IRJET- Design and Development of a Bandsaw Machine Roller Bracket for Wei...IRJET Journal
 
Enigma of 'six sigma' for foundry sm es in india
Enigma of 'six sigma' for foundry sm es in indiaEnigma of 'six sigma' for foundry sm es in india
Enigma of 'six sigma' for foundry sm es in indiaDr. Bikram Jit Singh
 
IRJET- Design of Three Spindle Drilling, Spot facing Horizontal SPM for C...
IRJET-  	  Design of Three Spindle Drilling, Spot facing Horizontal SPM for C...IRJET-  	  Design of Three Spindle Drilling, Spot facing Horizontal SPM for C...
IRJET- Design of Three Spindle Drilling, Spot facing Horizontal SPM for C...IRJET Journal
 
Optimization of Tool Path and Process Parameters in Slot Milling using Grey R...
Optimization of Tool Path and Process Parameters in Slot Milling using Grey R...Optimization of Tool Path and Process Parameters in Slot Milling using Grey R...
Optimization of Tool Path and Process Parameters in Slot Milling using Grey R...IRJET Journal
 
IRJET- Productivity Improvement Kaizen of XC-60 Housing
IRJET- Productivity Improvement Kaizen of XC-60 HousingIRJET- Productivity Improvement Kaizen of XC-60 Housing
IRJET- Productivity Improvement Kaizen of XC-60 HousingIRJET Journal
 
IRJET- Productivity Improvement of Assembly Workstation in a Small Scale ...
IRJET-  	  Productivity Improvement of Assembly Workstation in a Small Scale ...IRJET-  	  Productivity Improvement of Assembly Workstation in a Small Scale ...
IRJET- Productivity Improvement of Assembly Workstation in a Small Scale ...IRJET Journal
 
IRJET- Design and Development of Jig and Fixture for Tacho Bracket
IRJET- Design and Development of Jig and Fixture for Tacho BracketIRJET- Design and Development of Jig and Fixture for Tacho Bracket
IRJET- Design and Development of Jig and Fixture for Tacho BracketIRJET Journal
 
IRJET- Effect of Gasoline Exposure on the Mechanical Properties of PLA an...
IRJET-  	  Effect of Gasoline Exposure on the Mechanical Properties of PLA an...IRJET-  	  Effect of Gasoline Exposure on the Mechanical Properties of PLA an...
IRJET- Effect of Gasoline Exposure on the Mechanical Properties of PLA an...IRJET Journal
 
Design of ‘plastic injection mold’ for an ‘air vent bezel’ through flow analy...
Design of ‘plastic injection mold’ for an ‘air vent bezel’ through flow analy...Design of ‘plastic injection mold’ for an ‘air vent bezel’ through flow analy...
Design of ‘plastic injection mold’ for an ‘air vent bezel’ through flow analy...eSAT Journals
 
Manufacturing of Toggle Jack
Manufacturing of Toggle JackManufacturing of Toggle Jack
Manufacturing of Toggle JackIRJET Journal
 

Similar to Fsfbglexibility Improvement 06.01,24.pdf (20)

CIM Report
CIM ReportCIM Report
CIM Report
 
2022 Quality Control & Document Design
2022 Quality Control & Document Design2022 Quality Control & Document Design
2022 Quality Control & Document Design
 
GSI Internship Portfolio
GSI Internship PortfolioGSI Internship Portfolio
GSI Internship Portfolio
 
Design and Development of Dynamo Testing Machine
Design and Development of Dynamo Testing MachineDesign and Development of Dynamo Testing Machine
Design and Development of Dynamo Testing Machine
 
A Method for Finding Document Containning Reactionary Viewpoints
A Method for Finding Document Containning Reactionary ViewpointsA Method for Finding Document Containning Reactionary Viewpoints
A Method for Finding Document Containning Reactionary Viewpoints
 
Process dsign and facility layout
Process dsign and facility layoutProcess dsign and facility layout
Process dsign and facility layout
 
IRJET- Finite Element Analysis of Winch Machine for Erection of Transmission ...
IRJET- Finite Element Analysis of Winch Machine for Erection of Transmission ...IRJET- Finite Element Analysis of Winch Machine for Erection of Transmission ...
IRJET- Finite Element Analysis of Winch Machine for Erection of Transmission ...
 
Zero Defect Competition @ July 22.pptx
Zero Defect Competition  @ July 22.pptxZero Defect Competition  @ July 22.pptx
Zero Defect Competition @ July 22.pptx
 
PCA Specimen Entry Form
PCA Specimen Entry FormPCA Specimen Entry Form
PCA Specimen Entry Form
 
IRJET- Design and Development of a Bandsaw Machine Roller Bracket for Wei...
IRJET-  	  Design and Development of a Bandsaw Machine Roller Bracket for Wei...IRJET-  	  Design and Development of a Bandsaw Machine Roller Bracket for Wei...
IRJET- Design and Development of a Bandsaw Machine Roller Bracket for Wei...
 
Enigma of 'six sigma' for foundry sm es in india
Enigma of 'six sigma' for foundry sm es in indiaEnigma of 'six sigma' for foundry sm es in india
Enigma of 'six sigma' for foundry sm es in india
 
IRJET- Design of Three Spindle Drilling, Spot facing Horizontal SPM for C...
IRJET-  	  Design of Three Spindle Drilling, Spot facing Horizontal SPM for C...IRJET-  	  Design of Three Spindle Drilling, Spot facing Horizontal SPM for C...
IRJET- Design of Three Spindle Drilling, Spot facing Horizontal SPM for C...
 
Optimization of Tool Path and Process Parameters in Slot Milling using Grey R...
Optimization of Tool Path and Process Parameters in Slot Milling using Grey R...Optimization of Tool Path and Process Parameters in Slot Milling using Grey R...
Optimization of Tool Path and Process Parameters in Slot Milling using Grey R...
 
IRJET- Productivity Improvement Kaizen of XC-60 Housing
IRJET- Productivity Improvement Kaizen of XC-60 HousingIRJET- Productivity Improvement Kaizen of XC-60 Housing
IRJET- Productivity Improvement Kaizen of XC-60 Housing
 
IRJET- Productivity Improvement of Assembly Workstation in a Small Scale ...
IRJET-  	  Productivity Improvement of Assembly Workstation in a Small Scale ...IRJET-  	  Productivity Improvement of Assembly Workstation in a Small Scale ...
IRJET- Productivity Improvement of Assembly Workstation in a Small Scale ...
 
IRJET- Design and Development of Jig and Fixture for Tacho Bracket
IRJET- Design and Development of Jig and Fixture for Tacho BracketIRJET- Design and Development of Jig and Fixture for Tacho Bracket
IRJET- Design and Development of Jig and Fixture for Tacho Bracket
 
IRJET- Effect of Gasoline Exposure on the Mechanical Properties of PLA an...
IRJET-  	  Effect of Gasoline Exposure on the Mechanical Properties of PLA an...IRJET-  	  Effect of Gasoline Exposure on the Mechanical Properties of PLA an...
IRJET- Effect of Gasoline Exposure on the Mechanical Properties of PLA an...
 
Design of ‘plastic injection mold’ for an ‘air vent bezel’ through flow analy...
Design of ‘plastic injection mold’ for an ‘air vent bezel’ through flow analy...Design of ‘plastic injection mold’ for an ‘air vent bezel’ through flow analy...
Design of ‘plastic injection mold’ for an ‘air vent bezel’ through flow analy...
 
PG thesis
PG thesisPG thesis
PG thesis
 
Manufacturing of Toggle Jack
Manufacturing of Toggle JackManufacturing of Toggle Jack
Manufacturing of Toggle Jack
 

Recently uploaded

0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdftbatkhuu1
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...Suhani Kapoor
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 

Recently uploaded (20)

0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdf
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 

Fsfbglexibility Improvement 06.01,24.pdf

  • 1. 06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 1 of 31] 1 Metalman Micro Turners Plant-1 IATF 16949:2016 & ISO 14001: 2015 & EHS 45001:2018 Certified Company PLOT NO 17&15, SECTOR 9 IIE, SIDCUL INDUSTRIAL AREA ,PANTNAGAR WELCOME TO ThirdBAL/BAVA Kaizen Competition (2023-24)
  • 2. 06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 2 of 31] Introduction & Products Overview Frame Assembly Frame Swing Arm Silencer Products
  • 3. 06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 3 of 31] Kaizen Theme Company name Team Members BAL/BAVA KAIZEN COMPETITION Q3 (Oct-Dec’ 2023) Flexibility Improvement Metalman Micro Turners, P’ Nagar S.No. Name Role 1 Mr. Sunil Kandpal Leader 2 Mr. Abhishek Nathani Member 3 Mr. Prem Member
  • 4. 06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 4 of 31] Why Flexibility High Investment for new Robots & M/C Space Constraint A big challenge for company to offer a wide variety of products to it’s customer A big challenge to rapidly increase the production level Business Development Theme-Background
  • 5. 06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 5 of 31] KMI,KEI & KPI Linkage with The Kaizen Theme PLANT VISION/MISSION KMI(Key Management Indicators KEI(Key Effectiveness Indicators) KPI(Key Performance indicators) Pillar Vision Increase Production OEE Improvement Equipment Failure Loss Reduction PM/KK/QM/DM/JH To be first choice of customers, suppliers, employees and stake holders. Setup Down Time Reduction Tool Change Loss Reduction Mission Startup Loss Reduction (Flexibility Improvement) Achieve operational excellence by enhancing plant productivity through all employee team work, low cost manufacturing, on time delivery to customer, high level quality adherence. Minnor Stoppages and Idling Loss Reduction Speed Loss Reduction Defects and Rework Loss Reduction Production/Hr Improvement Line Organization Loss Reduction DM/KK Business Development Flexibility Improvements on Line DM/KK/QM
  • 6. 06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 6 of 31] Approach Level of Flexibility Definition Development stage Product Level Common Parts Level 1 Common parts between different family of products DFM Level 2 Common parts within a product family DFM Common Dimensions Level 3 Common location, resting, clamping & orientation DFM Process Level Common Tooling's Level 4 Cells capable to manufacture uncommon component Process planning Quick Change Level 5 Cells capable to manufacture uncommon component with Faster Set-up Change Process planning Approach
  • 7. 06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 7 of 31] Methodology 1-Product wise Mapping for Flexibility Improvement 2-Stage wise Mapping of Selected Line for Setup Loss 3-Observe/Record All the Activity with Time 4.1-Internal to External Activities 4.2-ECRS 4.3-Series to Parallel 5-Result & Benefits 6-Effectiveness Monitoring 7-HD & Sustenance Actions 4.4-NVA Elimination
  • 8. 06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 8 of 31] 1-Mapping of All Product’s Line FY2018 1-Platina BS4 2-Pulsar K1 BS4 3-K19 BS4 4-K1R BS4 FY2020 1-K1R BS6 2-K1 BS6 3-K19 BS6 4-Platina BS4 5-Pulsar K1 BS4 6-K19 C 7-K1R BS4 S.No. Product No. of Lines Models 1 Frame 4 7 2 Silencer 1 1 Mapping of finding the scope for flexibility improvement:- Model at 2018 Capacity (Nos/Day) Model at 2020 K1 BS4 900 K19 BS4 / K1 BS4/K19 BS6 / K1 BS6 K19/K19C BS4 700 K1 BS6 / K19 BS6/K19C Platina BS4 700 Platina BS6 K1R BS4 700 K1R BS4 / K1R BS6
  • 9. 06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 9 of 31] Model Flexibility × Platina Frame BS6 K19C/K19 BS6/K1 BS6 K1R Frame BS4 K1R Frame BS6 K1 Frame BS4 Model Flexibility Model Flexibility √ Model Flexibility √ Line-1 Line-2 Line-3 Line-4 Status of Frame Lines Due to high demand and multiple variant models of pulsar family, we selected line no. 4 to make it flexible line for meeting customer need. √ K1 Frame BS6 K19 Frame BS4 K19 Frame BS6
  • 10. 06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 10 of 31] 40.0 35.0 10.0 10.0 58.0 20.0 0 10 20 30 40 50 60 70 F-30/40 F-50/60 F-65/70 F-90/100 F-120/130 F-150/160 Frame K19 OBD/K1 OBD to K1 BS4, K19 BS4 Maximum Setup time 58 Min. Min. 2-Stage wise Mapping (Understanding of Problem) Setup time / Occ. Target -10 Min. Changing elements in 4M 1T from K1OBD/K19 OBD to K1 BS4 & K19 BS4 Setup time/Occ. Stage 4M&T change K1 OBD/K19 OBD K1 BS4 K19 BS4 Material - - - Method (Robot Programing) - - - Tool (Fixture Unit) - - - Material - √ √ Method (Robot Programing) - √ √ Tool (Fixture Unit) - √ √ Material - √ √ Method (Robot Programing) - √ √ Tool (Fixture Unit) - - - Material - √ √ Method (Robot Programing) - √ √ Tool (Fixture Unit) - - - Material - - - Method (Robot Programing) - - - Tool (Fixture Unit) - - - Material - √ √ Method (Robot Programing) - √ √ Tool (Fixture Unit) - - - Material - √ √ Method (Robot Programing) - √ √ Tool (Fixture Unit) - √ √ Material - √ √ Method (Robot Programing) - √ √ Tool (Fixture Unit) - √ √ Material - - - Method (Robot Programing) - - - Tool (Fixture Unit) - - - F-150/160 F-170 F-30/40 F-50/60 F-65/70 F-80 F-90/100 F-120/130 F-10/20 Flexibility Level-5 erial - √ √ hod (Robot Programing) - √ √ (Fixture Unit) - - - erial - - - hod (Robot Programing) - - - (Fixture Unit) - - - erial - √ √ hod (Robot Programing) - √ √ (Fixture Unit) - - - erial - √ √ hod (Robot Programing) - √ √ (Fixture Unit) - √ √ erial - √ √ hod (Robot Programing) - √ √ (Fixture Unit) - √ √ erial - - - hod (Robot Programing) - - - (Fixture Unit) - - - Material - √ √ Method (Robot Programing) - √ √ Tool (Fixture Unit) - - - Material - - - Method (Robot Programing) - - - Tool (Fixture Unit) - - - Material - √ √ Method (Robot Programing) - √ √ Tool (Fixture Unit) - - - Material - √ √ Method (Robot Programing) - √ √ Tool (Fixture Unit) - √ √ Material - √ √ Method (Robot Programing) - √ √ Tool (Fixture Unit) - √ √ Material - - - Method (Robot Programing) - - - Tool (Fixture Unit) - - - F-150/160 F-170 F-65/70 F-80 F-90/100 F-120/130
  • 11. 06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 11 of 31] 3-Observe the Activity (Background) Before 0 5 10 15 20 25 30 35 40 45 50 55 60 1 Store Person remove old material on line 2 Feed the changeover material on line directly 3 All changeover unit/block carry out from Tool Room for RR unit & Flap bkt 2 nos 4 Fitter dismantle welding units from fixture, open 4 bolts & 2 nos of dowel from base fixture 5 Fitter remove cylinder pneumatic push fittings 6 Remove old units from fixture & placing new units on fixture 7 Other model fixture units assembly on fixture 4 bolts & 2 dowels 8 Fitter placing cylinder pneumatic push fittings 9 Re-teaching done on every joint 10 Check the visual welding defect after Re-teaching Material Changeover External Activities S.No. Changeover Activities Carried Out Internal/External Stage-120/130 (Time in Min) Fixture Changeover Welding Program Setting Internal Activities Total Time 58 min
  • 12. 06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 12 of 31] 3-Background (Fixture Changeover) Unit For Changeover Changeover From K1 Bs6 to K1 Bs4 Step 1: Pneumatic connection Dismantling For Input and Output Pipe Step 3: Existing Unit Dismantling Dowell Bolt Dismantling K1 BS6 Step 5: New Unit Assembled K1 BS4 Step 6: Cylinder Pneumatic Fitting Step 7: Reed Switch Mtg in Cylinder Step 8: Setup Change Complete Step 2: Reed Switch Dismantling from Cylinder Total Set up Time From K1 Bs6 to K1 Bs4 :- 23Min Step 4: Vacant Unit
  • 13. 06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 13 of 31] 4.1-Internal to External Activities 4.2-ECRS 4.3-Series to Parallel 4.4-NVA Elimination 4-Brain-storming
  • 14. 06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 14 of 31] Tackle with Challenges to make the Line Flexible We need to make the line flexible for new models. We have following challenges which are given below:- • Few quantity of material are kept inside the cell before the setup Commonize the material in both model through raising DFM •To reduce Setup Time through design change of the fixture’s unit for quick changeover • Separate program for each model (Master) are made and interlocked with master call • Poka Yoke done on fixture Man: Wrong part welding due to same appearance of few parts Method: Setup loss due to robot re-teaching after model changeover. Material: Feeding of model wise material inside the cell Mix up of material due to same appearance and same profile Tool: Setup Loss due to change in fixture’s unit. Challenge Action-1 Action-2 Action-3 Action-4
  • 15. 06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 15 of 31] Action Taken S. No. Changeover Before Condition Activity Total Time (Min.) Action Plan Status Current status (Total time in Min.) 1 Material Changeover Store person Remove existing Material from line . Remove Activity 10 Kept next model material in plastic bin (Qty.- 20 Nos) before setup change Done 0 2 Feed the changeover Material on Line Directly Fixed Activity 3 Fixture Changeover All Change-Over Unit/Block carry out from Tool Room for RR unit & Flap Bkt. 2 nos. Remove Activity 10 Stage wise place given for RR unit & Flap bkt. Units Done 0 4 Fitter dismantle welding units from fixture, open 2 nos bolts & 2 nos of Dowell. Remove Activity 5 Common Bolting block designed for easy bolting for other model Done 0 5 Fitter removes cylinder pneumatic Connectors & Reed Switch . Remove Activity 5 6 Removing old units from fixture & Placing New units on fixture. Fixed Activity 3 Done 8 5 7 Other model Fixture units assembly on fixture 4 Bolts & 2 Dowels 8 Fitter placing cylinder pneumatic push Fittings, Provide Reed Switch in Cylinder. Fixed Activity 5 9 Welding Program Setting Re-teaching Done on Every Joint Fixed Activity 10 Separate Welding Programs for each model Only Master calling Done 2 10 Check the Visual Welding defect activity after Re- teaching Inspection 5 Total Time - Before 58 min Total Time - After 10 min Internal to External NVA elimination Elimination of 4 & 5 no. activity and Combine the base block
  • 16. 06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 18 of 31] Action Changeover From K1 Bs6 to K19 Bs6 Step 1: Units For Changeover Step 3: Changing the master block makes changeover flexible and easy for different units Step 2: Replacing the changeover block by newly designed Master Dummy Block. Master Block for Changeover Total Set up Time From K1 Bs6 to K1 Bs4 :- 8 Min
  • 17. 06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 19 of 31] 5-Activity of Setup Change (After) Before After 0 5 10 15 20 25 30 35 40 45 50 55 60 1 Store Person remove old material on line 2 Feed the changeover material on line directly 3 All changeover unit/block carry out from Tool Room for RR unit & Flap bkt 2 nos 4 Fitter dismantle welding units from fixture, open 4 bolts & 2 nos of dowel from base fixture 5 Fitter remove cylinder pneumatic push fittings 6 Remove old units from fixture & placing new units on fixture 7 Other model fixture units assembly on fixture 4 bolts & 2 dowels 8 Fitter placing cylinder pneumatic push fittings 9 Re-teaching done on every joint 10 Check the visual welding defect after Re-teaching Material Changeover External Activities S.No. Changeover Activities Carried Out Internal/External Stage-120/130 (Time in Min) Fixture Changeover Welding Program Setting Internal Activities Total Time 10 min Flexibility Level-4
  • 18. 06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 20 of 31] 1-Receiving of Drawing 2-Process feasibility Study 3A-If Process Feasible 3A-Go For Development 3B-If Process difficult to Feasible 3B-Raise DFM (Difficult for Manufacturing) Sharing of Problems for Part manufacturing Deviation from Customer Part develop as per DFM Methodology for Flexibility Level-4 to 1 Accepted Not accepted
  • 19. 06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 21 of 31] Understanding of Problem Problem:-Main Step fixture changeover time is more at F-60 during changeover from K1 OBD to K19 BS4 Background:-Part (Main Step) profile is common and locating hole’s CD are different 43 mm 46 mm Setup time from K1 OBD to K19 BS4 is 30 min
  • 20. 06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 22 of 31] Why-Why Analysis, Root Cause & Kaizen Idea Why-1 • Setup time is more for main step Why-2 • Changing in Main step Fixture’s unit Why-3 • Main Step Bush CD is different from other model Root Cause:-Main Step Bush CD is different from other model Kaizen Idea:- Commonize the bush CD of K1 & K19 model
  • 21. 06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 23 of 31] Before/After Comparison Before After Main Step Bush CD-43 mm in K1 OBD and 46 mm in K19 BS4 Main Step Bush CD-46 mm which is common in both model K1 OBD & K19 BS4 43 mm 46 mm 46 mm K1 OBD K19 BS4 Common Part in both model in K1 OBD and K19 BS4 Countermeasure:-Commonized the bush CD with dimension 46mm in both model (K1 and K19).
  • 22. 06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 24 of 31] Theme: To reduce the Setup loss at F-60 Stage in K1 Line Implementation Date Present Status: Main Step fixture changeover time is more at F-60 during changeover from K1 OBD to K19 BS4 11/07/2023 BEFORE AFTER Result: ANALYSIS: W1: Setup time is more for main step W2: Changing in Main step Fixture’s unit W3: Main Step Bush CD is different from other model Kaizen Idea :Commonize the bush CD of K1 & K19 model Countermeasure : Commonized the bush CD with dimension 46mm in both model (K1 and K19) Root Cause :Main Step Bush CD is different from other model Benefit: Productivity improved H.D.: .: NA Sustenance : Check point added in PM Sheet Kaizen-03 30 0 0 10 20 30 40 Before After Fixture unit Setup Time 100% Min 43 mm 46 mm K1 OBD K19 BS4 46 mm Flexibility Level-1
  • 23. 06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 25 of 31] Results of set-up time activity 40 35 10 10 58 20 3 3 4 7 10 3 0 10 20 30 40 50 60 F-30/40 F-50/60 F-65/70 F-90/100 F-120/130 F-150/160 Frame Pulsar K19 OBD to K1 BS4/K1 BS6/K19 BS4 Before After Setup Time/Occ. Min. 82% setup time reduction
  • 24. 06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 26 of 31] Results & Benefits P Productivity improved by 25% Q Sustain C Reduce Improved D Timely Improved M S Line-4 Before Flexibility After Flexibility Models K1 BS4 K1BS4 K19 BS4 K1 BS6 K19 BS6 Capacity/Day 900 1200 Capacity/Month 22500 30000
  • 25. 06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 27 of 31] Effectiveness Monitoring Validation Report for RR Unit & flap bkt’s fixture elements Sample Inspection Report for Main Step Bush
  • 26. 06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 28 of 31] Kaizen Applicability Summary & HD Status Kaizen Summary at K19 Line Sr. No. Stage F - 30 F-40 F-50 F - 60 F - 70 F - 80 F - 130 F - 140 F - 150 F - 160 F - 170 1 Place provided for keeping fixture elements at welding stage. a x a a a a a a x x a 2 Provided common base for both models changing blocks x x x a x a x a x x x 3 Common parts between different family of products and within a family of product x x x a x x x x x x x Legend: Applicable a Not Applicable x Horizontal Deployment:-K1R Line
  • 27. 06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 29 of 31] Sustenance Actions Point added in PM check Sheet
  • 28. 06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 30 of 31] Learnings TEAM SPIRIT UNDERSTANDING EACH OTHER SKILL IMPROVED SELF CONFIDENCE LEARNINGS PROBLEM SOLVING TECH. COMPUTER SKILL COMMUNICATION PRESENTATION SKILL
  • 29. 06.01.2024 BAL/BAVA KAIZEN COMPETITION (Q3 : Oct-Dec’ 2023) Slide No. [ 31 of 31]