page 1 of 7
SPIROS TSOUMANIS
Panormou 71-73, Athens Greece
Tel: 0030 2106997683, Mob: 00306944636157,Email:redhellas@gmail.com
Date of birth: 25/06/1969
Nationality: Greek
EDUCATION-QUALIFICATIONS
 BSc in Electrical and Mechanical Engineering, Democritus Technical University of Thrace, Greece
1990-1995
 Member of the Technical Chamber of Greece (T.E.E) in 1996.
 Member of Pan-Hellenic Association of Electrical and Mechanical Engineers (P.S.D.M-H) in 1996.
 Certifications from Greek Ministry of Public Works.
- B class Electromechanical works.
- B class Industry-Energy field.
 Mechanical Works Construction Licence (from Industry Department)
 Electrical Works Construction Licence (from Industry Department)
 Languages: Greek (native), English (fluent).
 Computer Skills: Excellent command of Oracle Primavera P6 and Microsoft Office tools 2010
(word, excel, outlook, project, power point).
CAREER SUMMARY - KEY ASSIGNMENTS
 Qualified Electrical and Mechanical Engineer with eighteen (18) years of experience in small and
large scale infrastructure projects (Metro, Hotels, Hospitals, Industrial Units, Office buildings, block of
flats etc.)
 Concrete experience in Metro Construction (eight stations-Tunnels and Depot), working for four
(4) years in close supervision of the MEP Works, from the concrete until the commissioning phase
of the project.
 Presently working as a MEP Manager on behalf of my own company carrying out mostly private
projects.
 Worked as a MEP Manager (and co-founder) in the contracting company Epios s.a for 5 years carrying
out mostly private projects.
 Worked as a site engineer in the company Gas Center carrying out gas installations at industrial units.
STRONG PERSONAL SKILLS
 Interpersonal and organizational skills and problem solving abilities regarding both site works
(construction methods, site tests etc.), and project management (budget/time schedule/ claims etc.).
 Fostering a forward thinking and be a team player with collaborative approach constantly giving
input and feedback that improves the entire operation.
 Focusing on detail but at the same time see the big picture.
 Excellent ability to visualize the whole project from the beginning to the end in short time.
 Ability to make my viewpoints clear and obvious for all levels of people.
 Able to accomplish tasks under restrained time frame and tight cost schedules of large scale
projects to meet tight deadlines and goals.
 Ability to act as a liaison between Client and Construction Contractors.
 Ability to participate in top management decision making of large scale MEP projects.
 Willingness and ability to travel.
DUTIES-RESPONSIBILITIES AS A MEP MAMAGER
TENDER PREPARATION
 Tender dossier preparation. Responsible for preparation of all necessary tenders’ documents and cost
estimation-analysis for submitting financial bids.
 Coordinating with sub-contractors and suppliers-vendors for complete tender submission. Analyzing-
page 2 of 7
negotiating the quotations and assessing the technical proposals for the most competitive prices.
 Ensuring full compliance with employer requirements prior to issue tender.
 Providing the essential link between estimating, design teams, construction and commercial partners.
DESIGN DEPARTMENT
 Coordinating with drawing offices to prioritize the production of (shop, co-ordination, single line riser,
schematics and builders work) drawings and provide design input into site drawings to comply with
consultant’s comments.
 Ongoing reviews of shop drawings and material submittals as prepared by the designers for
construction prior to the execution at site.
 Assisting in preparation of Work Method Statement and execution procedures as per specifications and
standard norms and submitting to Consultant for approval.
 Development of engineering logs.
 Monitoring of design process regarding compliance with design time schedule, managing day-to-day
operational aspects.
 Ensuring that any variations and instructions received from the client are incorporated into the latest
construction drawings.
PLANNING DEPARTMENT
 Assisting the planning department in planning the project execution works (developing detailed/precise
CPM schedules for all MEP installation activities, including cost and resource loading) and monitor the
progress by conducting regular meetings with the project team.
 Controlling shop drawings tracking log and materials procurement tracking.
 Preparation of daily & weekly program based on one month look ahead program.
 Analyzing project delays and taking remedial action to drive the project in order to achieve hand over
schedule.
 Preparing manpower planning in regard to productivity issues.
 Providing inputs to Planning Department for preparation of work.
 Controlling document flows: reviewing resource reports like (manpower histograms, plant
and machinery schedule) and ascertain adequacy of resources deployed for timely completion of the
project. Managing time claims, extension of time (EOT).
 Controlling the key milestones of civil Disciplines that directly affect the MEP works.
STUDY OF THE CONTRACT
 Reviewing of work scope and project specifications for identification of ambiguities in specifications and
suggesting required intervention by Project Manager. Detailed study of contract in order to focus on
certain paragraphs that could affect the development of the work (Claims etc.).
 Prepare comparison report between tender documents and IFC- documents in terms of materials
quantities, specifications and scope of work to financial department to claim any variations in project.
 Researching and developing solutions to MEP problems and conflicts through timely and accurate
interpretation of contract documents.
COORDINATION
 Establishment of interfaces coordination with other systems (Structural, Architectural or other
Contractors), or between the various disciplines within the MEP system.
 Working closely with the civil Disciplines for better coordination of civil & MEP works, responsible to
prevent discrepancies between MEP work and the civil work on the site.
 Attending coordination meetings with the sub-contractors and various trades of work.
 Attending the weekly site (progress and technical) meeting with the consultant and the sub- contractors.
 Liaising and attending regular-periodic site meetings with the client and the main contractor to maintain
a healthy relationship throughout the contract’s lifetime.
 Carrying out site inspection on completed works with QA/QC & Consultant in accordance with the
approved shop drawings and attending quality tests.
 Working closely with financial manager and HR department.
 Conducting preparatory coordination design meetings for different MEP activities with the Consultants,
Design group, Subcontractors, and Statutory Authorities.
 Generating and responding to all the contractual correspondences.
 Verifying the co-ordination drawings created by the BIM model between structural, architectural and
electro-mechanical drawings.
 Reviewing and settling claims & commercial (budget / cost) variations in coordination with QA/QS.
page 3 of 7
REPORTS-DOCUMENTS-CORRESPONDENCE
 Preparing weekly and monthly progress reports and report to higher management about any necessary
modifications.
 Updating all the relative project documents and creating logs.
 Submitting monthly data of performance parameters to the management in order to eliminate possible
bottlenecks. Suggesting possible avenues of improving the procedures.
 Handling any claims and counterclaims.
 Generating and responding to all the contractual correspondences.
 Supervising the project progress and/or delays through letters which can be used as
contractual support during disputes.
CONSULTANT
 Preparing and sending for approval all the MEP works engineering submittals (Drawings/Materials
Specs, samples and method of statements).
 Introducing request to consultant for material inspection as per submittals and specification and obtain
test certificates.
 Preparing the necessary (RFI) request for information for any discrepancies found in the construction
documents for the consultant’s review and comments. RFI's requiring design feedback will be directed
to the Designer for response.
 Processing change order (CO) requests and Work Method Statement for certain installations on a
timely basis to insure the prompt flow of information.
 Evaluating the monthly executive report for the MEP team by the Consultant and taking corrective
action
PROCUREMENT DEPARTMENT
 Engaging-full involvement with procurement and planning departments for defining the materials
required (Preparation of procurement plan) to execute the project and provide the purchase requisition-
take off sheets and technical support required to select the proper materials.
 Stock levels: recommendations and management to maintain appropriate levels of necessary
quantities.
 The procurement plant (based on the consultants approved drawings) is submitted early in the
procurement cycle ensuring smooth flow of materials (from local and abroad markets).
 Equipment’s market research and procurement.
 Assistance in purchasing project materials and tools by orders.
 Monitoring and ensuring accuracy of materials and conformity to the project requirements, expenditures
and vendor payments on a regular basis.
 Saving the material budget by performing value engineering, conducting wide market surveys and
properly steering price negotiations.
SUBCONTRACTORS
 Verifying-negotiating and approving subcontractors’/vendors’ payment certificates (after works
measurement- quantity surveying), clarifying remaining claims and variations and forwarding for timely
release of payment.
 Managing and leading MEP subcontractors throughout the duration of the project (from groundbreaking
through commissioning and turnover to owner).
 Reviewing of subcontractor quotations & finalization of work orders.
 Monitoring sub-contractors resource levels, material status and scope of work as well as planning look
ahead working schedules by reporting daily and weekly progress information. Approving all
subcontractors' equipment, prior to installation on site in collaboration with QA/QC.
 Monitoring the system's sub contractor's performance on a daily basis and generating a weekly report a
well as punch lists.
QA/QC and HSE DEPARTMENTS
 Coordinating with the health, safety and environmental manager and ensuring that the project is going
on as per the HSE plan.
 Implementing and enforcing company safety program and practices to create a safe and healthy work
environment.
 Recommending improvements in order to correct/repair site deficiencies, enforcing the quality
assurance program.
page 4 of 7
CORPORATE (IN-HOUSE) HUMAN RESOURCES
 Recruitment of projects manpower, training and making appraisals to deliver upscale services to
clients.
 Ensuring timely submittal of all timesheets for site labor via direct reports.
 Proposing organization chart for the staff required for the execution of the project
 Reorganizing/controlling resources necessary for proper execution of the project.
ON SITE SUPERVISION
 Performing site visits on a daily basis and as needed for assimilating all the situation, locating-
forecasting possible future problems, estimating all the critical parameters, analyzing and resolving field
problems, monitoring execution of difficult tasks e.g. erecting heavy equipment, remaining there until
the completion of work.
 Responding appropriately to emergencies issues as they may arise on a daily basis.
 Ensuring secure and safe pathways for cabling, hydraulics, electrical equipment or advising about
technical items e.g. prefabrication-assembly and then erection in particular works.
 Identifying and highlighting possible risk in the project to help in risk management.
 Planning resources allocation and space utilization for new buildings.
LOCAL AUTHORITIES
 Interfacing coordination with Public Realm/Landscape, Roads, Structures and Other Utilities, having
jurisdiction over the project.
 Expediting the knowledge of local authority rules and regulations.
 Obtaining all of the necessary permits from public authorities.
CLOSE-OUT/COMMISSIONING
 Ensuring that all punch-list items are resolved. Preparation of method statement, execution procedure,
testing and commissioning procedure (in cooperation with QA/QC engineer and commissioning
engineer). Preparation of material and equipment list for carrying MEP test activities. Maintaining
calibration records for testing equipment.
 Overseeing the performance tests, fine tuning, and startup-commissioning.
 Preparing the final project closing documents, as built drawings issuing, ensuring the Operations &
Maintenance manuals and handover documents are in line with contract specifications and
requirements.
 Client hand over is satisfactorily concluded and there is no prolongation of project, rectifying all defects
and complaints within the defects liability period.
EMPLOYMENT HISTORY
Jan 2005 – Present Tsoumanis Constructions Ltd.
(Co-founder)
MEP Manager
Employer: Tsoumanis Techniki L.t.d
Project: E/M works
Client: Colgate-Palmolive s.a.as subcontractor to Edrasis-Psalidas s.a
Location: Athens, Attica region, Greece
Project Description: construction of new office block in Athens.
Procurement-Installation-Commissioning of:
 Plumbing (Water supply-Sewage and Drain networks).
 Electrical Installation LV (high-low current).
 HVAC system.
Employer: Tsoumanis Techniki L.t.d
Project: E/M works
Client: Killini’ s new port in Peloponnese as subcontractor to Edrasis-Psalidas s.a
Location: Peloponnese Greece
Project Description: Construction of Pumping station-enabling to supply boats with water.
Procurement-Installation-Commissioning of:
 Pumping station.
 External lighting pillars network.
Employer: Tsoumanis Techniki L.t.d
page 5 of 7
Project: E/M works
Client: (Jewish school in Athens) as subcontractor to Edrasis-Psalidas s.a
Location: Athens, Attica region, Greece.
Project Description: Renovation of the School.
Procurement-Installation-Commissioning of:
 Plumbing (Water supply-Sewage and Drain networks)
 HVAC system
 Fire detection system
 Electrical Installation LV(high-low current)
Employer: Tsoumanis Techniki L.t.d
Project: E/M works, as consultant.
Client: C.T.C L.t.d in Athens
Location: Athens , Greece.
Project Description: construction of new offices 1200 sq.m in area
 Plumbing (Water supply-Sewage and Drain networks)
 HVAC system.
 Fire detection system.
 Electrical Installation LV (high current).
 Electrical Installation (low current-CCTV, BMS, Intrusion alarm system, access control system,
telephone-data etc.)
Employer: Epios s.a-Tsoumanis Techniki L.t.d
Project: E/M works
Client: Petzetakis s.a industrial Unit
Location: Thebes, Boeotia, Central Greece.
Project Description: Construction of the new Plant (production of PE pipes).
 Installation of 8 new production lines (PE-PVC pipes).
 Plumbing (Water supply-Sewage and Drain networks).
 Electrical Installation LV (high-low current).
 Compressed-air network, pumping stations.
 Installation of new bridge crane.
 Permanent workshop of 10-20 technicians-mates executing a plethora of E/M and scheduled
maintenance works, for many years.
Project: E/M works, as consultant.
Client: Hotel Sofia Beach Kos
Location: Kos island, Greece.
Project Description: partial renovation of the Hotel-
 Plumbing (Water supply-Sewage and Drain networks).
 HVAC system.
 Swimming pool maintenance.
 Fire detection system.
 Electrical Installation LV (high-low current).
Employer: Epios s.a-Tsoumanis Techniki L.t.d
Project: E/M works
Client: HENTE s.a
Location: Athens, Attica region, Greece. Subsidiary Company of Athens Park Hotel
Project Description :( construction of all E/M works at its new suites Hotel in Athens-P. Psichiko).
Procurement-Installation-Commissioning of:
 Fire Fighting system.
 Plumbing (Water supply-Sewage and Drain networks)
 HVAC system
 Fire detection system
 Electrical Installation LV(high-low current)
page 6 of 7
 E/M at the surrounding area
Jan 2000 – Dec 2005 Epios s.a. (Co-founder) MEP Manager
Employer: Epios s.a
Project: E/M works
Client: Eurodrip s.a industrial Unit
Location: Oinofita, Boeotia, Central Greece.
Project Description: Construction of the new Plant. as member of consortium of contractors. The leading
company was the Kloukinas-Lappas s.a.
 Plumbing (Water supply-Sewage and Drain networks)
 Fire detection system
 Electrical Installation LV(high current-low current)
 Firefighting system (sprinklers).
 HVAC system
 E/M at the surrounding area.
 Installation of production lines.
Employer: Epios s.a
Project: E/M works
Client: State of Greece-Construction of Elefsina-Stavros-Spata airport motorway, as subcontractor to Alte
s.a.
Location: Athens, Attica region, Greece.
Project Description: E/M works in the Service Control Center in Athens
 Plumbing (Water supply-Sewage and Drain networks)
 HVAC system
 Fire detection system
 Electrical Installation LV (high-low current).
 E/M at the surrounding area.
Employer: Epios s.a
Project: E/M works
Client: State of Greece-Construction of two public schools in Athens (Gerakas and Glika Nera), as
subcontractor to Betanet s.a.
Location: Athens, Attica region, Greece.
Project Description: E/M works.
 Plumbing (Water supply-Sewage and Drain networks)
 HVAC system
 Fire detection system
 Electrical Installation LV (high-low current).
 E/M at the surrounding area.
Employer: Epios s.a
Project: E/M works
Client: Betanet s.a
Location: Oinofita, Boeotia, Central Greece
Project Description: construction of the new plant -E/M works.
 Steam distribution system.
 Plumbing (Water supply-Sewage and Drain networks)
 Electrical Installation LV (high-low current).
 E/M at the surrounding area
Employer: Epios s.a
Project: E/M works
page 7 of 7
Client: Evangelisms General Hospital in Athens, as subcontractor to Alte s.a.
Location: Athens, Attica region, Greece.
Project Description: total renovation at the 9th floor-E/M works
 Plumbing (Water supply-Sewage and Drain networks).
 Maintenance works at the medical gases networks.
 HVAC system.
 Fire detection system.
 Electrical Installation LV (high-low current).
E/M WORKS at the same MEP Disciplines.
Clients:
 Alte s.a construction company (construction of the new offices building in Athens).
 Euromed s.a Private Clinic (E/M works at the Central Offices in Athens).
 Sealed air s.a –Industrial Unit (installation of two new production lines), Oinofita- Boeotia, Central
Greece.
 Olympic Tools s.a Industrial Unit (E/M works at the plant), Oinofita-Boeotia, Central Greece.
 Aluman s.a Industrial Unit (E/M works at the plant), Oinofita-Boeotia, Central Greece.
 Carmyco sa. Industrial Unit (E/M works at the plant), Oinofita- Boeotia, Central Greece.
 Mailis s.a Heavy Industrial Unit (installation of production lines-maintenance works), Oinofita-
Boeotia, Central Greece.
 Mouriadis group (E/M works at the plant) ,as subcontractor
 Private residential complex of 3 marionettes at Pallini (E/M works).
1997 - 2000 Athens Metro Construction Supervisor
Employer: Civil Works Joint Venture Olympic Metro of Athens
Project: Athens Metro Construction
Client: ATTIKO METRO
Location: Athens, Attica region, Greece.
Main project of a total length of 18 km, two lines, Line 2 (Sepolia - Dafni) and Line 3 (Monastiraki - Ethniki
Amyna) was executed by the Olympic Metro JV: a consortium of 23 technical companies from France, Italy,
Germany and Greece.
Position: Supervisor MEP Engineer at eight Stations (Line 2 and Line 3), Tunnels and Depot.
Responsible for the planning, supervision, execution and commissioning of :
At the Stations:
 Fire Fighting system.
 Plumbing (Water supply-Sewage and Drain networks)
 Lighting (cable trays, cables, switchboards, lighting fixtures)
 Fire detection system.
 External networks at the outside areas (plumbing, lighting and public networks)
At the Tunnels:
 The Fire Fighting network, total length 10 km.
At the Depot:
 Installation of the HVAC system.
 Plumbing (exterior Water supply-Sewage and Drain networks) at the surroundings-covered area of the
Depot.
1996 - 1997 Gas Center Ltd Construction Engineer
 Gas Center (Installations of gas networks in industrial units).
INTERESTS
I deeply admire ancient Greek thinkers-philosophers trying to devote time to study them. Also it is
interesting to me the Oriental thinking relating to tao-buddha and their unconventional-holistic approach of
reality. I spend time to be informed about the social problems and international developments mainly by
using the internet .I humbly endeavour to keep my mind open and unconventional and to be useful. Utilize
my time as efficiently as I can so as to allocate many duties during the day.

SPIROS TSOUMANIS-CV

  • 1.
    page 1 of7 SPIROS TSOUMANIS Panormou 71-73, Athens Greece Tel: 0030 2106997683, Mob: 00306944636157,Email:redhellas@gmail.com Date of birth: 25/06/1969 Nationality: Greek EDUCATION-QUALIFICATIONS  BSc in Electrical and Mechanical Engineering, Democritus Technical University of Thrace, Greece 1990-1995  Member of the Technical Chamber of Greece (T.E.E) in 1996.  Member of Pan-Hellenic Association of Electrical and Mechanical Engineers (P.S.D.M-H) in 1996.  Certifications from Greek Ministry of Public Works. - B class Electromechanical works. - B class Industry-Energy field.  Mechanical Works Construction Licence (from Industry Department)  Electrical Works Construction Licence (from Industry Department)  Languages: Greek (native), English (fluent).  Computer Skills: Excellent command of Oracle Primavera P6 and Microsoft Office tools 2010 (word, excel, outlook, project, power point). CAREER SUMMARY - KEY ASSIGNMENTS  Qualified Electrical and Mechanical Engineer with eighteen (18) years of experience in small and large scale infrastructure projects (Metro, Hotels, Hospitals, Industrial Units, Office buildings, block of flats etc.)  Concrete experience in Metro Construction (eight stations-Tunnels and Depot), working for four (4) years in close supervision of the MEP Works, from the concrete until the commissioning phase of the project.  Presently working as a MEP Manager on behalf of my own company carrying out mostly private projects.  Worked as a MEP Manager (and co-founder) in the contracting company Epios s.a for 5 years carrying out mostly private projects.  Worked as a site engineer in the company Gas Center carrying out gas installations at industrial units. STRONG PERSONAL SKILLS  Interpersonal and organizational skills and problem solving abilities regarding both site works (construction methods, site tests etc.), and project management (budget/time schedule/ claims etc.).  Fostering a forward thinking and be a team player with collaborative approach constantly giving input and feedback that improves the entire operation.  Focusing on detail but at the same time see the big picture.  Excellent ability to visualize the whole project from the beginning to the end in short time.  Ability to make my viewpoints clear and obvious for all levels of people.  Able to accomplish tasks under restrained time frame and tight cost schedules of large scale projects to meet tight deadlines and goals.  Ability to act as a liaison between Client and Construction Contractors.  Ability to participate in top management decision making of large scale MEP projects.  Willingness and ability to travel. DUTIES-RESPONSIBILITIES AS A MEP MAMAGER TENDER PREPARATION  Tender dossier preparation. Responsible for preparation of all necessary tenders’ documents and cost estimation-analysis for submitting financial bids.  Coordinating with sub-contractors and suppliers-vendors for complete tender submission. Analyzing-
  • 2.
    page 2 of7 negotiating the quotations and assessing the technical proposals for the most competitive prices.  Ensuring full compliance with employer requirements prior to issue tender.  Providing the essential link between estimating, design teams, construction and commercial partners. DESIGN DEPARTMENT  Coordinating with drawing offices to prioritize the production of (shop, co-ordination, single line riser, schematics and builders work) drawings and provide design input into site drawings to comply with consultant’s comments.  Ongoing reviews of shop drawings and material submittals as prepared by the designers for construction prior to the execution at site.  Assisting in preparation of Work Method Statement and execution procedures as per specifications and standard norms and submitting to Consultant for approval.  Development of engineering logs.  Monitoring of design process regarding compliance with design time schedule, managing day-to-day operational aspects.  Ensuring that any variations and instructions received from the client are incorporated into the latest construction drawings. PLANNING DEPARTMENT  Assisting the planning department in planning the project execution works (developing detailed/precise CPM schedules for all MEP installation activities, including cost and resource loading) and monitor the progress by conducting regular meetings with the project team.  Controlling shop drawings tracking log and materials procurement tracking.  Preparation of daily & weekly program based on one month look ahead program.  Analyzing project delays and taking remedial action to drive the project in order to achieve hand over schedule.  Preparing manpower planning in regard to productivity issues.  Providing inputs to Planning Department for preparation of work.  Controlling document flows: reviewing resource reports like (manpower histograms, plant and machinery schedule) and ascertain adequacy of resources deployed for timely completion of the project. Managing time claims, extension of time (EOT).  Controlling the key milestones of civil Disciplines that directly affect the MEP works. STUDY OF THE CONTRACT  Reviewing of work scope and project specifications for identification of ambiguities in specifications and suggesting required intervention by Project Manager. Detailed study of contract in order to focus on certain paragraphs that could affect the development of the work (Claims etc.).  Prepare comparison report between tender documents and IFC- documents in terms of materials quantities, specifications and scope of work to financial department to claim any variations in project.  Researching and developing solutions to MEP problems and conflicts through timely and accurate interpretation of contract documents. COORDINATION  Establishment of interfaces coordination with other systems (Structural, Architectural or other Contractors), or between the various disciplines within the MEP system.  Working closely with the civil Disciplines for better coordination of civil & MEP works, responsible to prevent discrepancies between MEP work and the civil work on the site.  Attending coordination meetings with the sub-contractors and various trades of work.  Attending the weekly site (progress and technical) meeting with the consultant and the sub- contractors.  Liaising and attending regular-periodic site meetings with the client and the main contractor to maintain a healthy relationship throughout the contract’s lifetime.  Carrying out site inspection on completed works with QA/QC & Consultant in accordance with the approved shop drawings and attending quality tests.  Working closely with financial manager and HR department.  Conducting preparatory coordination design meetings for different MEP activities with the Consultants, Design group, Subcontractors, and Statutory Authorities.  Generating and responding to all the contractual correspondences.  Verifying the co-ordination drawings created by the BIM model between structural, architectural and electro-mechanical drawings.  Reviewing and settling claims & commercial (budget / cost) variations in coordination with QA/QS.
  • 3.
    page 3 of7 REPORTS-DOCUMENTS-CORRESPONDENCE  Preparing weekly and monthly progress reports and report to higher management about any necessary modifications.  Updating all the relative project documents and creating logs.  Submitting monthly data of performance parameters to the management in order to eliminate possible bottlenecks. Suggesting possible avenues of improving the procedures.  Handling any claims and counterclaims.  Generating and responding to all the contractual correspondences.  Supervising the project progress and/or delays through letters which can be used as contractual support during disputes. CONSULTANT  Preparing and sending for approval all the MEP works engineering submittals (Drawings/Materials Specs, samples and method of statements).  Introducing request to consultant for material inspection as per submittals and specification and obtain test certificates.  Preparing the necessary (RFI) request for information for any discrepancies found in the construction documents for the consultant’s review and comments. RFI's requiring design feedback will be directed to the Designer for response.  Processing change order (CO) requests and Work Method Statement for certain installations on a timely basis to insure the prompt flow of information.  Evaluating the monthly executive report for the MEP team by the Consultant and taking corrective action PROCUREMENT DEPARTMENT  Engaging-full involvement with procurement and planning departments for defining the materials required (Preparation of procurement plan) to execute the project and provide the purchase requisition- take off sheets and technical support required to select the proper materials.  Stock levels: recommendations and management to maintain appropriate levels of necessary quantities.  The procurement plant (based on the consultants approved drawings) is submitted early in the procurement cycle ensuring smooth flow of materials (from local and abroad markets).  Equipment’s market research and procurement.  Assistance in purchasing project materials and tools by orders.  Monitoring and ensuring accuracy of materials and conformity to the project requirements, expenditures and vendor payments on a regular basis.  Saving the material budget by performing value engineering, conducting wide market surveys and properly steering price negotiations. SUBCONTRACTORS  Verifying-negotiating and approving subcontractors’/vendors’ payment certificates (after works measurement- quantity surveying), clarifying remaining claims and variations and forwarding for timely release of payment.  Managing and leading MEP subcontractors throughout the duration of the project (from groundbreaking through commissioning and turnover to owner).  Reviewing of subcontractor quotations & finalization of work orders.  Monitoring sub-contractors resource levels, material status and scope of work as well as planning look ahead working schedules by reporting daily and weekly progress information. Approving all subcontractors' equipment, prior to installation on site in collaboration with QA/QC.  Monitoring the system's sub contractor's performance on a daily basis and generating a weekly report a well as punch lists. QA/QC and HSE DEPARTMENTS  Coordinating with the health, safety and environmental manager and ensuring that the project is going on as per the HSE plan.  Implementing and enforcing company safety program and practices to create a safe and healthy work environment.  Recommending improvements in order to correct/repair site deficiencies, enforcing the quality assurance program.
  • 4.
    page 4 of7 CORPORATE (IN-HOUSE) HUMAN RESOURCES  Recruitment of projects manpower, training and making appraisals to deliver upscale services to clients.  Ensuring timely submittal of all timesheets for site labor via direct reports.  Proposing organization chart for the staff required for the execution of the project  Reorganizing/controlling resources necessary for proper execution of the project. ON SITE SUPERVISION  Performing site visits on a daily basis and as needed for assimilating all the situation, locating- forecasting possible future problems, estimating all the critical parameters, analyzing and resolving field problems, monitoring execution of difficult tasks e.g. erecting heavy equipment, remaining there until the completion of work.  Responding appropriately to emergencies issues as they may arise on a daily basis.  Ensuring secure and safe pathways for cabling, hydraulics, electrical equipment or advising about technical items e.g. prefabrication-assembly and then erection in particular works.  Identifying and highlighting possible risk in the project to help in risk management.  Planning resources allocation and space utilization for new buildings. LOCAL AUTHORITIES  Interfacing coordination with Public Realm/Landscape, Roads, Structures and Other Utilities, having jurisdiction over the project.  Expediting the knowledge of local authority rules and regulations.  Obtaining all of the necessary permits from public authorities. CLOSE-OUT/COMMISSIONING  Ensuring that all punch-list items are resolved. Preparation of method statement, execution procedure, testing and commissioning procedure (in cooperation with QA/QC engineer and commissioning engineer). Preparation of material and equipment list for carrying MEP test activities. Maintaining calibration records for testing equipment.  Overseeing the performance tests, fine tuning, and startup-commissioning.  Preparing the final project closing documents, as built drawings issuing, ensuring the Operations & Maintenance manuals and handover documents are in line with contract specifications and requirements.  Client hand over is satisfactorily concluded and there is no prolongation of project, rectifying all defects and complaints within the defects liability period. EMPLOYMENT HISTORY Jan 2005 – Present Tsoumanis Constructions Ltd. (Co-founder) MEP Manager Employer: Tsoumanis Techniki L.t.d Project: E/M works Client: Colgate-Palmolive s.a.as subcontractor to Edrasis-Psalidas s.a Location: Athens, Attica region, Greece Project Description: construction of new office block in Athens. Procurement-Installation-Commissioning of:  Plumbing (Water supply-Sewage and Drain networks).  Electrical Installation LV (high-low current).  HVAC system. Employer: Tsoumanis Techniki L.t.d Project: E/M works Client: Killini’ s new port in Peloponnese as subcontractor to Edrasis-Psalidas s.a Location: Peloponnese Greece Project Description: Construction of Pumping station-enabling to supply boats with water. Procurement-Installation-Commissioning of:  Pumping station.  External lighting pillars network. Employer: Tsoumanis Techniki L.t.d
  • 5.
    page 5 of7 Project: E/M works Client: (Jewish school in Athens) as subcontractor to Edrasis-Psalidas s.a Location: Athens, Attica region, Greece. Project Description: Renovation of the School. Procurement-Installation-Commissioning of:  Plumbing (Water supply-Sewage and Drain networks)  HVAC system  Fire detection system  Electrical Installation LV(high-low current) Employer: Tsoumanis Techniki L.t.d Project: E/M works, as consultant. Client: C.T.C L.t.d in Athens Location: Athens , Greece. Project Description: construction of new offices 1200 sq.m in area  Plumbing (Water supply-Sewage and Drain networks)  HVAC system.  Fire detection system.  Electrical Installation LV (high current).  Electrical Installation (low current-CCTV, BMS, Intrusion alarm system, access control system, telephone-data etc.) Employer: Epios s.a-Tsoumanis Techniki L.t.d Project: E/M works Client: Petzetakis s.a industrial Unit Location: Thebes, Boeotia, Central Greece. Project Description: Construction of the new Plant (production of PE pipes).  Installation of 8 new production lines (PE-PVC pipes).  Plumbing (Water supply-Sewage and Drain networks).  Electrical Installation LV (high-low current).  Compressed-air network, pumping stations.  Installation of new bridge crane.  Permanent workshop of 10-20 technicians-mates executing a plethora of E/M and scheduled maintenance works, for many years. Project: E/M works, as consultant. Client: Hotel Sofia Beach Kos Location: Kos island, Greece. Project Description: partial renovation of the Hotel-  Plumbing (Water supply-Sewage and Drain networks).  HVAC system.  Swimming pool maintenance.  Fire detection system.  Electrical Installation LV (high-low current). Employer: Epios s.a-Tsoumanis Techniki L.t.d Project: E/M works Client: HENTE s.a Location: Athens, Attica region, Greece. Subsidiary Company of Athens Park Hotel Project Description :( construction of all E/M works at its new suites Hotel in Athens-P. Psichiko). Procurement-Installation-Commissioning of:  Fire Fighting system.  Plumbing (Water supply-Sewage and Drain networks)  HVAC system  Fire detection system  Electrical Installation LV(high-low current)
  • 6.
    page 6 of7  E/M at the surrounding area Jan 2000 – Dec 2005 Epios s.a. (Co-founder) MEP Manager Employer: Epios s.a Project: E/M works Client: Eurodrip s.a industrial Unit Location: Oinofita, Boeotia, Central Greece. Project Description: Construction of the new Plant. as member of consortium of contractors. The leading company was the Kloukinas-Lappas s.a.  Plumbing (Water supply-Sewage and Drain networks)  Fire detection system  Electrical Installation LV(high current-low current)  Firefighting system (sprinklers).  HVAC system  E/M at the surrounding area.  Installation of production lines. Employer: Epios s.a Project: E/M works Client: State of Greece-Construction of Elefsina-Stavros-Spata airport motorway, as subcontractor to Alte s.a. Location: Athens, Attica region, Greece. Project Description: E/M works in the Service Control Center in Athens  Plumbing (Water supply-Sewage and Drain networks)  HVAC system  Fire detection system  Electrical Installation LV (high-low current).  E/M at the surrounding area. Employer: Epios s.a Project: E/M works Client: State of Greece-Construction of two public schools in Athens (Gerakas and Glika Nera), as subcontractor to Betanet s.a. Location: Athens, Attica region, Greece. Project Description: E/M works.  Plumbing (Water supply-Sewage and Drain networks)  HVAC system  Fire detection system  Electrical Installation LV (high-low current).  E/M at the surrounding area. Employer: Epios s.a Project: E/M works Client: Betanet s.a Location: Oinofita, Boeotia, Central Greece Project Description: construction of the new plant -E/M works.  Steam distribution system.  Plumbing (Water supply-Sewage and Drain networks)  Electrical Installation LV (high-low current).  E/M at the surrounding area Employer: Epios s.a Project: E/M works
  • 7.
    page 7 of7 Client: Evangelisms General Hospital in Athens, as subcontractor to Alte s.a. Location: Athens, Attica region, Greece. Project Description: total renovation at the 9th floor-E/M works  Plumbing (Water supply-Sewage and Drain networks).  Maintenance works at the medical gases networks.  HVAC system.  Fire detection system.  Electrical Installation LV (high-low current). E/M WORKS at the same MEP Disciplines. Clients:  Alte s.a construction company (construction of the new offices building in Athens).  Euromed s.a Private Clinic (E/M works at the Central Offices in Athens).  Sealed air s.a –Industrial Unit (installation of two new production lines), Oinofita- Boeotia, Central Greece.  Olympic Tools s.a Industrial Unit (E/M works at the plant), Oinofita-Boeotia, Central Greece.  Aluman s.a Industrial Unit (E/M works at the plant), Oinofita-Boeotia, Central Greece.  Carmyco sa. Industrial Unit (E/M works at the plant), Oinofita- Boeotia, Central Greece.  Mailis s.a Heavy Industrial Unit (installation of production lines-maintenance works), Oinofita- Boeotia, Central Greece.  Mouriadis group (E/M works at the plant) ,as subcontractor  Private residential complex of 3 marionettes at Pallini (E/M works). 1997 - 2000 Athens Metro Construction Supervisor Employer: Civil Works Joint Venture Olympic Metro of Athens Project: Athens Metro Construction Client: ATTIKO METRO Location: Athens, Attica region, Greece. Main project of a total length of 18 km, two lines, Line 2 (Sepolia - Dafni) and Line 3 (Monastiraki - Ethniki Amyna) was executed by the Olympic Metro JV: a consortium of 23 technical companies from France, Italy, Germany and Greece. Position: Supervisor MEP Engineer at eight Stations (Line 2 and Line 3), Tunnels and Depot. Responsible for the planning, supervision, execution and commissioning of : At the Stations:  Fire Fighting system.  Plumbing (Water supply-Sewage and Drain networks)  Lighting (cable trays, cables, switchboards, lighting fixtures)  Fire detection system.  External networks at the outside areas (plumbing, lighting and public networks) At the Tunnels:  The Fire Fighting network, total length 10 km. At the Depot:  Installation of the HVAC system.  Plumbing (exterior Water supply-Sewage and Drain networks) at the surroundings-covered area of the Depot. 1996 - 1997 Gas Center Ltd Construction Engineer  Gas Center (Installations of gas networks in industrial units). INTERESTS I deeply admire ancient Greek thinkers-philosophers trying to devote time to study them. Also it is interesting to me the Oriental thinking relating to tao-buddha and their unconventional-holistic approach of reality. I spend time to be informed about the social problems and international developments mainly by using the internet .I humbly endeavour to keep my mind open and unconventional and to be useful. Utilize my time as efficiently as I can so as to allocate many duties during the day.