Saurav Bose is seeking a senior level position as an Executive Manager in wire and rope industries. He has 7 years of experience in steel wire and rope industries, currently working as an Assistant Manager of Production at Phoenix Conveyor Belt India (P) Ltd. in West Bengal, India. He is proficient in AutoCAD, MS Office, and SAP software. Previously he has worked at Usha Martin Industries and Ramasarup Nirman wire in various production roles. He has a B.Tech in Mechanical Engineering and has undergone extensive training in wire drawing, stranding, and closing machine operations.
1. SOURAV BOSE
C/O.Lt.Dipak Ch. Bose
East Vivekananda Polly, Sanghati More,
Siliguri, West Bengal, India
MOB: +91-9007537860
E-mail-sauravb13@gmail.com
OBJECTIVE:
Aspiring for senior level assessment in Wire and Rope industries as an Executive Manager
with a growth oriented organisation.
SUMMERY:
Dynamic Professional with 07 years of experience about Steel WWiirree aanndd RRooppee
IInndduussttrriieess.Presently associate with PPhhooeenniixx CCoonnvveeyyoorr BBeelltt IInnddiiaa ((PP)) LLttdd,, aatt KKaallyyaannii,, iinn
WWeesstt BBeennggaall,, IInnddiiaa,, ssuubbssiiddiiaarryy GGrroouupp ooff CCoonnttiinneennttaall,, GGeerrmmaannyy as an Assistant Manager-
Production.
COMPUTER SKILLS:
Well versed with Windows 2000/XP/VISTA/ Windows 7,8 and 8.1, AutoCAD(2014-
2015), MS Office (Excel, Word, and PowerPoint), SAP version 7300.3.9.1084
ORGANIZATION SCAN:
CCoommppaannyy NNaammee:: PPhhooeenniixx CCoonnvveeyyoorr BBeelltt IInnddiiaa ((PP)) LLttdd,, UUnniitt-- 22 ((BBaacc kkwwaarrdd IInntteeggrraall ppllaanntt ooff
CCoonnvveeyyoorr BBeelltt UUnniitt)),, aatt KKaallyyaannii,, iinn WWeesstt BBeennggaall,, IInnddiiaa,, SSuubbssiiddiiaarryy GGrroouupp ooff CCoonnttiinneennttaall--
CCoonnttiitteecchh,, GGeerrmmaannyy..
PPrroodduuccttss && iittss aapppplliiccaattiioonn::
11.. HHiigghh CCaarrbboonn HHoott DDiipp GGaallvvaanniizzeedd SStteeeell CCaabbllee UUsseedd aass rreeiinnffoorrcc eemmeenntt mmaatteerriiaall ffoorr SStteeeell
CCoorrdd CCoonnvveeyyoorr BBeelltt..
Designation: Assistant Manager Production.
Duration: Aug, 2013 to till date.
PPHHAASSEE--0011 ((FFOORR 11000000 MMTT)) PPrroojjeecctt DDeettaaiillss::
From Aug, 2013 to March, 2014 Involved in various project of Steel Cable Manufacturing Unit’s
machine(Like-Wet wire drawing, Stranding & Closing Machineries)Installation,Commissining
and 03 weeks of training at Greece ,Europe for learning Machine Operation and from April
2014,officially started the production of 7/7 and 7/19 Steel Cable.
Notables:
Involvement in the installation & commissioning of Steel cable manufacturing
Machineries like
Wet Wire Drawing,
Stranding &
Closing Machines
Involved in Various Utility Lines Set-up and Installation, Like;
Emulsion Pump House(For the Lubrication Chamber Of Wet Wire Drawing Machine
Section)
Cooling Tower
2. 500 KVA D.G and
Compressor Unit
Acquisition of knowledge from –machine supplier for the proper operations of the
installed Machines at In-house Plant.
Involved in IGBC Green factory Building Rating system in a Team.
Production Job Responsibility:
Production Planning and execution to the shop floor level.
WIP data collection on regular shift wise.
Scrap report monitoring.
Awareness of engineering codes and standards; ISO – 9001:2008 procedures.
Rectification and correction of NC (Non-confirmed) material to the process.
Regular Monitoring of major inspection area of WWD Emulsion Temp. Log Book, Die
draft schedule, Lay length and diameters of Strands and Ropes.
Material Indent through SAP version 7300.3.9.1084
Implementation of 5s in to the shop floor and fine tuning.
Regular used tools and tackles updating.
Vendor development for local tools and tackles availability.
Production Report (MIS) card preparation & finally report to H.O.D
PREVIOUS ASSIGNMENTS:
Company Name :USHA MMAARRTTIINN IINNDDSS.. LLTTDD..,, Steel Wire and Rope Division,, SSuubbssiiddiiaarryy
GGrroouupp ooff GGuussttaavv WWoollff,, GGeerrmmaannyy..
PPrroodduuccttss && iittss aapppplliiccaattiioonn::
11.. HHiigghh CCaarrbboonn HHoott DDiipp GGaallvvaanniizzeedd SStteeeell CCaabbllee ffoorr SStteeeell CCoorrdd CCoonnvveeyyoorr BBeelltt aapppplliicc aattiioonn..
22.. HHiigghh CCaarrbboonn HHoott DDiipp GGaallvvaanniisseedd SStteeeell RRooppee FFoorr IInnssttaallllaattiioonn ooff SSttaannddiinngg rriiggggiinngg,, ttoowwiinngg
hheewweerrss,, MMoorriinngg LLiinneess ooff SShhiippppiinngg CCoorrppoorraattiioonn..
Designation: Production Engineer.
Duration: Nov, 2009 to July, 2013
Responsibilities:
Shop Floor Production planning
Product standards status analysis and implementation for quality-control.
Ensuring that the production is cost effective.
Being responsible for the selection and maintenance of equipment.
Control of production Target in Shift wise.
Scrap Rejection controls based on daily basis production..
Ensuring that health and safety guidelines are followed.
Co-ordination with internal contractor for different fabrication job.
Reviewing the performance of subordinates.
Reporting to H.O.D
Company Name : RRaammssaarruupp NNiirrmmaann wwiirree,, UUnniitt ooff RRaammssaarruupp IInndduussttrriieess LLTTDD,, aatt
DDuurrggaappuurr,, WWeesstt-- BBeennggaall,,
PPrroodduuccttss && iittss aapppplliiccaattiioonn::
11.. SSeevveenn PPllyy LL..RR..PP..CC SSttrraannddss ((Used as Different Bridge, Roof, Building construction
material).
22.. HHiigghh CCaarrbboonn SSiinnggllee IInnddeenntt WWiirree ((FFoorr MMaaiinnllyy RRaaiillwwaayy SSlleeeeppeerrss uusseedd aass aa
ccoonnssttrruuccttiioonn wwiirree..))
MMaacchhiinnee TTyyppee::
SSttrraaiigghhtt LLiinnee DDrryy WWiirree DDrraawwiinngg MMaacchhiinnee @@ LLiinnee SSppeeeedd ooff 88 mmeetteerr //sseecc oonndd..
3. SSiinnggllee LLiinnee WWiirree rreellaaxxaattiioonn pprree--ssttrreesssseedd MMaacchhiinnee ((CCoovveerriinngg WWiirree DDiiaammeetteerr ffrroomm
22..55 mmmm ttoo 99..00 mmmm)) @@ LLiinnee SSppeeeedd ooff 440000 mmeetteerr // MMiinnuuttee..
SSeevveenn PPllyy LLaaww.. RReellaaxxaattiioonn PPoollee ..CCoonncc rreettee SSttrraannddiinngg MMaacc hhiinnee wwiitthh SSeevveenn BBlloocc kk ×× 11000000
ØØ PPaayy-- ooffff SSppooooll RRoottaattiinngg SSttrraannddiinngg MMaacc hhiinnee @@ 770000 rrppmm mmoottoorr ssppeeeedd..((CCoovveerriinngg SSttrraanndd
DDiiaammeetteerr ffrroomm 88..55mmmm ttoo 1155..22 mmmm))
DDeessiiggnnaattiioonn:: GGrraadduuaattee EEnnggiinneeeerr TT rraaiinneeee ((GG..EE..TT ))
DDuurraattiioonn:: JJuullyy 22000088 ttoo OOcc ttoobbeerr 22000099..
EDUCATION:
B.Tech. (Mechanical Engineering) from Birbhum Institute of Engineering and
Technology under West Bengal University of Technology in 2008 with DGPA of 6.86
Higher Secondary from W.B.C.H.S.E, Tarai High School in 2004 with 58.8%
Secondary from W.B.B.S.E, Baradakanta High School in 2002 with 74.14%
TRAINING DETAILS:
Have done 3 weeks ofSpecial Training on Machine operation of Wet wire drawing (Used For Re-
Drawing ofGalvanised Zinc Coated High carbon Steel wire with cold drawn process),DifferentTypes
of Tubular (Used for Making Strands of Different construction for final Steel Cord) and Closing
machines (For Final ProductofSteel Cord for Conveyor Belts).From Syrma A.E,Under
Imas,Continental,Greece,Europe for the production ofSteel Cord/Rope construction of7/7 or 7/19, By
the JointGroup Of Imas,Continental,Greece,Europe and Phoenix Conveyor Belt India(P)
Ltd,Kalyani,WestBengal, India.
Have done 06 months trainings of Machine operation ofStraight Line Dry Wire Drawing Machine,
Single Line L.R.P.C Line, Seven Ply L.R.P.C Line and High Speed Rewinding Machine Operation. For
L.R.P.C Strands Final Packing From GCR (Machine Supplier From Italy) at Ramsarup Inds.
Have done 05 Weeks ofTraining about “Personal Productivity Programme”, “5S”, “Seven QC
Tools”, “TPM”, “TQM” from UshaMartin Inds.Ltd.
02 days Training about “Safety Behavioural Training” On Phoenix Conveyor BeltIndia (P) Ltd.
PERSONAL DOSSIER:
Date of Birth: 04/05/1985
Languages Known: Hindi, English, and Bengali.