SlideShare a Scribd company logo
SOURAV BOSE
C/O.Lt.Dipak Ch. Bose
East Vivekananda Polly, Sanghati More,
Siliguri, West Bengal, India
MOB: +91-9007537860
E-mail-sauravb13@gmail.com
OBJECTIVE:
Aspiring for senior level assessment in Wire and Rope industries as an Executive Manager
with a growth oriented organisation.
SUMMERY:
Dynamic Professional with 07 years of experience about Steel WWiirree aanndd RRooppee
IInndduussttrriieess.Presently associate with PPhhooeenniixx CCoonnvveeyyoorr BBeelltt IInnddiiaa ((PP)) LLttdd,, aatt KKaallyyaannii,, iinn
WWeesstt BBeennggaall,, IInnddiiaa,, ssuubbssiiddiiaarryy GGrroouupp ooff CCoonnttiinneennttaall,, GGeerrmmaannyy as an Assistant Manager-
Production.
COMPUTER SKILLS:
 Well versed with Windows 2000/XP/VISTA/ Windows 7,8 and 8.1, AutoCAD(2014-
2015), MS Office (Excel, Word, and PowerPoint), SAP version 7300.3.9.1084
ORGANIZATION SCAN:
CCoommppaannyy NNaammee:: PPhhooeenniixx CCoonnvveeyyoorr BBeelltt IInnddiiaa ((PP)) LLttdd,, UUnniitt-- 22 ((BBaacc kkwwaarrdd IInntteeggrraall ppllaanntt ooff
CCoonnvveeyyoorr BBeelltt UUnniitt)),, aatt KKaallyyaannii,, iinn WWeesstt BBeennggaall,, IInnddiiaa,, SSuubbssiiddiiaarryy GGrroouupp ooff CCoonnttiinneennttaall--
CCoonnttiitteecchh,, GGeerrmmaannyy..
PPrroodduuccttss && iittss aapppplliiccaattiioonn::
11.. HHiigghh CCaarrbboonn HHoott DDiipp GGaallvvaanniizzeedd SStteeeell CCaabbllee UUsseedd aass rreeiinnffoorrcc eemmeenntt mmaatteerriiaall ffoorr SStteeeell
CCoorrdd CCoonnvveeyyoorr BBeelltt..
Designation: Assistant Manager Production.
Duration: Aug, 2013 to till date.
PPHHAASSEE--0011 ((FFOORR 11000000 MMTT)) PPrroojjeecctt DDeettaaiillss::
From Aug, 2013 to March, 2014 Involved in various project of Steel Cable Manufacturing Unit’s
machine(Like-Wet wire drawing, Stranding & Closing Machineries)Installation,Commissining
and 03 weeks of training at Greece ,Europe for learning Machine Operation and from April
2014,officially started the production of 7/7 and 7/19 Steel Cable.
Notables:
 Involvement in the installation & commissioning of Steel cable manufacturing
Machineries like
 Wet Wire Drawing,
 Stranding &
 Closing Machines
 Involved in Various Utility Lines Set-up and Installation, Like;
 Emulsion Pump House(For the Lubrication Chamber Of Wet Wire Drawing Machine
Section)
 Cooling Tower
 500 KVA D.G and
 Compressor Unit
 Acquisition of knowledge from –machine supplier for the proper operations of the
installed Machines at In-house Plant.
 Involved in IGBC Green factory Building Rating system in a Team.
Production Job Responsibility:
 Production Planning and execution to the shop floor level.
 WIP data collection on regular shift wise.
 Scrap report monitoring.
 Awareness of engineering codes and standards; ISO – 9001:2008 procedures.
 Rectification and correction of NC (Non-confirmed) material to the process.
 Regular Monitoring of major inspection area of WWD Emulsion Temp. Log Book, Die
draft schedule, Lay length and diameters of Strands and Ropes.
 Material Indent through SAP version 7300.3.9.1084
 Implementation of 5s in to the shop floor and fine tuning.
 Regular used tools and tackles updating.
 Vendor development for local tools and tackles availability.
 Production Report (MIS) card preparation & finally report to H.O.D
PREVIOUS ASSIGNMENTS:
Company Name :USHA MMAARRTTIINN IINNDDSS.. LLTTDD..,, Steel Wire and Rope Division,, SSuubbssiiddiiaarryy
GGrroouupp ooff GGuussttaavv WWoollff,, GGeerrmmaannyy..
PPrroodduuccttss && iittss aapppplliiccaattiioonn::
11.. HHiigghh CCaarrbboonn HHoott DDiipp GGaallvvaanniizzeedd SStteeeell CCaabbllee ffoorr SStteeeell CCoorrdd CCoonnvveeyyoorr BBeelltt aapppplliicc aattiioonn..
22.. HHiigghh CCaarrbboonn HHoott DDiipp GGaallvvaanniisseedd SStteeeell RRooppee FFoorr IInnssttaallllaattiioonn ooff SSttaannddiinngg rriiggggiinngg,, ttoowwiinngg
hheewweerrss,, MMoorriinngg LLiinneess ooff SShhiippppiinngg CCoorrppoorraattiioonn..
Designation: Production Engineer.
Duration: Nov, 2009 to July, 2013
Responsibilities:
 Shop Floor Production planning
 Product standards status analysis and implementation for quality-control.
 Ensuring that the production is cost effective.
 Being responsible for the selection and maintenance of equipment.
 Control of production Target in Shift wise.
 Scrap Rejection controls based on daily basis production..
 Ensuring that health and safety guidelines are followed.
 Co-ordination with internal contractor for different fabrication job.
 Reviewing the performance of subordinates.
 Reporting to H.O.D
Company Name : RRaammssaarruupp NNiirrmmaann wwiirree,, UUnniitt ooff RRaammssaarruupp IInndduussttrriieess LLTTDD,, aatt
DDuurrggaappuurr,, WWeesstt-- BBeennggaall,,
PPrroodduuccttss && iittss aapppplliiccaattiioonn::
11.. SSeevveenn PPllyy LL..RR..PP..CC SSttrraannddss ((Used as Different Bridge, Roof, Building construction
material).
22.. HHiigghh CCaarrbboonn SSiinnggllee IInnddeenntt WWiirree ((FFoorr MMaaiinnllyy RRaaiillwwaayy SSlleeeeppeerrss uusseedd aass aa
ccoonnssttrruuccttiioonn wwiirree..))
MMaacchhiinnee TTyyppee::
 SSttrraaiigghhtt LLiinnee DDrryy WWiirree DDrraawwiinngg MMaacchhiinnee @@ LLiinnee SSppeeeedd ooff 88 mmeetteerr //sseecc oonndd..
 SSiinnggllee LLiinnee WWiirree rreellaaxxaattiioonn pprree--ssttrreesssseedd MMaacchhiinnee ((CCoovveerriinngg WWiirree DDiiaammeetteerr ffrroomm
22..55 mmmm ttoo 99..00 mmmm)) @@ LLiinnee SSppeeeedd ooff 440000 mmeetteerr // MMiinnuuttee..
 SSeevveenn PPllyy LLaaww.. RReellaaxxaattiioonn PPoollee ..CCoonncc rreettee SSttrraannddiinngg MMaacc hhiinnee wwiitthh SSeevveenn BBlloocc kk ×× 11000000
ØØ PPaayy-- ooffff SSppooooll RRoottaattiinngg SSttrraannddiinngg MMaacc hhiinnee @@ 770000 rrppmm mmoottoorr ssppeeeedd..((CCoovveerriinngg SSttrraanndd
DDiiaammeetteerr ffrroomm 88..55mmmm ttoo 1155..22 mmmm))
DDeessiiggnnaattiioonn:: GGrraadduuaattee EEnnggiinneeeerr TT rraaiinneeee ((GG..EE..TT ))
DDuurraattiioonn:: JJuullyy 22000088 ttoo OOcc ttoobbeerr 22000099..
EDUCATION:
 B.Tech. (Mechanical Engineering) from Birbhum Institute of Engineering and
Technology under West Bengal University of Technology in 2008 with DGPA of 6.86
 Higher Secondary from W.B.C.H.S.E, Tarai High School in 2004 with 58.8%
 Secondary from W.B.B.S.E, Baradakanta High School in 2002 with 74.14%
TRAINING DETAILS:
 Have done 3 weeks ofSpecial Training on Machine operation of Wet wire drawing (Used For Re-
Drawing ofGalvanised Zinc Coated High carbon Steel wire with cold drawn process),DifferentTypes
of Tubular (Used for Making Strands of Different construction for final Steel Cord) and Closing
machines (For Final ProductofSteel Cord for Conveyor Belts).From Syrma A.E,Under
Imas,Continental,Greece,Europe for the production ofSteel Cord/Rope construction of7/7 or 7/19, By
the JointGroup Of Imas,Continental,Greece,Europe and Phoenix Conveyor Belt India(P)
Ltd,Kalyani,WestBengal, India.
 Have done 06 months trainings of Machine operation ofStraight Line Dry Wire Drawing Machine,
Single Line L.R.P.C Line, Seven Ply L.R.P.C Line and High Speed Rewinding Machine Operation. For
L.R.P.C Strands Final Packing From GCR (Machine Supplier From Italy) at Ramsarup Inds.
 Have done 05 Weeks ofTraining about “Personal Productivity Programme”, “5S”, “Seven QC
Tools”, “TPM”, “TQM” from UshaMartin Inds.Ltd.
 02 days Training about “Safety Behavioural Training” On Phoenix Conveyor BeltIndia (P) Ltd.
PERSONAL DOSSIER:
Date of Birth: 04/05/1985
Languages Known: Hindi, English, and Bengali.

More Related Content

What's hot

Cv ajay parikh
Cv ajay parikhCv ajay parikh
Cv ajay parikh
AJAY PARIKH
 
Resum Epdf
Resum EpdfResum Epdf
Resum Epdf
EdSavage
 
Dennis Revised Resume
Dennis  Revised ResumeDennis  Revised Resume
Dennis Revised ResumeDennis Hayden
 
A.HARISH Curriculum Vitae
A.HARISH Curriculum VitaeA.HARISH Curriculum Vitae
A.HARISH Curriculum VitaeHarish Mano
 
Atul Gangwar Resume
Atul Gangwar ResumeAtul Gangwar Resume
Atul Gangwar Resumeatul gangwar
 
Construction Engineer Piping ,Tower crane - Anoop
Construction Engineer Piping ,Tower crane - AnoopConstruction Engineer Piping ,Tower crane - Anoop
Construction Engineer Piping ,Tower crane - AnoopAnoop Ramachandran
 

What's hot (20)

AJAYKSHARMA
AJAYKSHARMAAJAYKSHARMA
AJAYKSHARMA
 
Feb15 resume1
Feb15 resume1Feb15 resume1
Feb15 resume1
 
Mohd Imran CV
Mohd Imran CVMohd Imran CV
Mohd Imran CV
 
Cv ajay parikh
Cv ajay parikhCv ajay parikh
Cv ajay parikh
 
Amit_Barjibhe - cv
Amit_Barjibhe - cvAmit_Barjibhe - cv
Amit_Barjibhe - cv
 
khaled CV.doc
khaled CV.dockhaled CV.doc
khaled CV.doc
 
Updated Resume 2015
Updated Resume 2015Updated Resume 2015
Updated Resume 2015
 
Resum Epdf
Resum EpdfResum Epdf
Resum Epdf
 
Emad Mohammed CV
Emad Mohammed CVEmad Mohammed CV
Emad Mohammed CV
 
Dennis Revised Resume
Dennis  Revised ResumeDennis  Revised Resume
Dennis Revised Resume
 
S.V.PATIL - CV.
S.V.PATIL - CV.S.V.PATIL - CV.
S.V.PATIL - CV.
 
A.HARISH Curriculum Vitae
A.HARISH Curriculum VitaeA.HARISH Curriculum Vitae
A.HARISH Curriculum Vitae
 
Atul Gangwar Resume
Atul Gangwar ResumeAtul Gangwar Resume
Atul Gangwar Resume
 
Akbar Resume (1)
Akbar Resume (1)Akbar Resume (1)
Akbar Resume (1)
 
VENKADESAN RESUME.
VENKADESAN RESUME.VENKADESAN RESUME.
VENKADESAN RESUME.
 
Resume
ResumeResume
Resume
 
Job History
Job HistoryJob History
Job History
 
Construction Engineer Piping ,Tower crane - Anoop
Construction Engineer Piping ,Tower crane - AnoopConstruction Engineer Piping ,Tower crane - Anoop
Construction Engineer Piping ,Tower crane - Anoop
 
SENTHILKUMAR_resume12-11-2016
SENTHILKUMAR_resume12-11-2016SENTHILKUMAR_resume12-11-2016
SENTHILKUMAR_resume12-11-2016
 
IsaacResume
IsaacResumeIsaacResume
IsaacResume
 

Viewers also liked

K8 akta pendidikan
K8 akta pendidikanK8 akta pendidikan
K8 akta pendidikannormazua
 
Ancillary Task 2
Ancillary Task 2Ancillary Task 2
Ancillary Task 2
marciamediastudies
 
Prezentare ABD Advertising
Prezentare ABD AdvertisingPrezentare ABD Advertising
Prezentare ABD Advertising
Cazac Victor
 
Kidpower 30-skill-challenge
Kidpower 30-skill-challengeKidpower 30-skill-challenge
Kidpower 30-skill-challenge
Ursula Shepherd
 
K3 tonggak pendidikan unesco
K3 tonggak pendidikan unescoK3 tonggak pendidikan unesco
K3 tonggak pendidikan unesconormazua
 
Ahmed Mahmoud C.V 2015
Ahmed Mahmoud C.V 2015Ahmed Mahmoud C.V 2015
Ahmed Mahmoud C.V 2015ahmed khedr
 
Presentacion comunicacion
Presentacion comunicacionPresentacion comunicacion
Presentacion comunicacion
ctropicalis
 
Ancilliary Task Poster
Ancilliary Task  PosterAncilliary Task  Poster
Ancilliary Task Poster
marciamediastudies
 
IN-Service 3-2-16
IN-Service 3-2-16IN-Service 3-2-16
IN-Service 3-2-16Irina Cline
 
Exam advisory 18 s2016
Exam advisory 18 s2016Exam advisory 18 s2016
Exam advisory 18 s2016
Civil Service Exam Info
 
Examination advisory on the november 27,2016 cse ppt in hong kong
Examination advisory on the november 27,2016 cse ppt in hong kongExamination advisory on the november 27,2016 cse ppt in hong kong
Examination advisory on the november 27,2016 cse ppt in hong kong
Civil Service Exam Info
 

Viewers also liked (13)

CV_PrathitChatterjee
CV_PrathitChatterjeeCV_PrathitChatterjee
CV_PrathitChatterjee
 
K8 akta pendidikan
K8 akta pendidikanK8 akta pendidikan
K8 akta pendidikan
 
Ancillary Task 2
Ancillary Task 2Ancillary Task 2
Ancillary Task 2
 
Prezentare ABD Advertising
Prezentare ABD AdvertisingPrezentare ABD Advertising
Prezentare ABD Advertising
 
MCP2009
MCP2009MCP2009
MCP2009
 
Kidpower 30-skill-challenge
Kidpower 30-skill-challengeKidpower 30-skill-challenge
Kidpower 30-skill-challenge
 
K3 tonggak pendidikan unesco
K3 tonggak pendidikan unescoK3 tonggak pendidikan unesco
K3 tonggak pendidikan unesco
 
Ahmed Mahmoud C.V 2015
Ahmed Mahmoud C.V 2015Ahmed Mahmoud C.V 2015
Ahmed Mahmoud C.V 2015
 
Presentacion comunicacion
Presentacion comunicacionPresentacion comunicacion
Presentacion comunicacion
 
Ancilliary Task Poster
Ancilliary Task  PosterAncilliary Task  Poster
Ancilliary Task Poster
 
IN-Service 3-2-16
IN-Service 3-2-16IN-Service 3-2-16
IN-Service 3-2-16
 
Exam advisory 18 s2016
Exam advisory 18 s2016Exam advisory 18 s2016
Exam advisory 18 s2016
 
Examination advisory on the november 27,2016 cse ppt in hong kong
Examination advisory on the november 27,2016 cse ppt in hong kongExamination advisory on the november 27,2016 cse ppt in hong kong
Examination advisory on the november 27,2016 cse ppt in hong kong
 

Similar to sourav_cv

Bharath Kumar Resume
Bharath Kumar ResumeBharath Kumar Resume
Bharath Kumar ResumeBharath Kumar
 
Profile Details (CV)
Profile Details (CV)Profile Details (CV)
Profile Details (CV)
Kunal Saha
 
CV - SUNIL VISHWAKARMA
CV - SUNIL VISHWAKARMACV - SUNIL VISHWAKARMA
CV - SUNIL VISHWAKARMA
Sunil Vishwakarma
 
NIKET SONI RESUME UPDATED
NIKET SONI RESUME UPDATEDNIKET SONI RESUME UPDATED
NIKET SONI RESUME UPDATEDNiket Soni
 
Hareshwar dongare cv13.doc
Hareshwar dongare cv13.docHareshwar dongare cv13.doc
Hareshwar dongare cv13.dochkdongare_1967
 
AJAY KUMAR JAISWA NewL
AJAY KUMAR JAISWA NewLAJAY KUMAR JAISWA NewL
AJAY KUMAR JAISWA NewLAjay Jaiswal
 

Similar to sourav_cv (20)

Resume
ResumeResume
Resume
 
Bharath Kumar Resume
Bharath Kumar ResumeBharath Kumar Resume
Bharath Kumar Resume
 
Mohamed Hamed'cv
Mohamed Hamed'cvMohamed Hamed'cv
Mohamed Hamed'cv
 
Girish kumar yadav
Girish kumar yadavGirish kumar yadav
Girish kumar yadav
 
Perumal_CV_PD_Jan 2017
Perumal_CV_PD_Jan 2017Perumal_CV_PD_Jan 2017
Perumal_CV_PD_Jan 2017
 
MUSTAFA SALEM AL ASTALRESUMEEE (2)
MUSTAFA SALEM AL ASTALRESUMEEE (2)MUSTAFA SALEM AL ASTALRESUMEEE (2)
MUSTAFA SALEM AL ASTALRESUMEEE (2)
 
tausif alam resume
tausif alam resumetausif alam resume
tausif alam resume
 
mrityunjay_Tiwari
mrityunjay_Tiwarimrityunjay_Tiwari
mrityunjay_Tiwari
 
Brc Resume
Brc ResumeBrc Resume
Brc Resume
 
Profile Details (CV)
Profile Details (CV)Profile Details (CV)
Profile Details (CV)
 
muthu_kumaran
muthu_kumaranmuthu_kumaran
muthu_kumaran
 
CV - SUNIL VISHWAKARMA
CV - SUNIL VISHWAKARMACV - SUNIL VISHWAKARMA
CV - SUNIL VISHWAKARMA
 
NIKET SONI RESUME UPDATED
NIKET SONI RESUME UPDATEDNIKET SONI RESUME UPDATED
NIKET SONI RESUME UPDATED
 
ketul
ketulketul
ketul
 
RAM CV UPDATED
RAM CV UPDATEDRAM CV UPDATED
RAM CV UPDATED
 
vishal maurya(1)(1)
vishal maurya(1)(1)vishal maurya(1)(1)
vishal maurya(1)(1)
 
resume updated
resume updatedresume updated
resume updated
 
aniket resume (1)
aniket resume (1)aniket resume (1)
aniket resume (1)
 
Hareshwar dongare cv13.doc
Hareshwar dongare cv13.docHareshwar dongare cv13.doc
Hareshwar dongare cv13.doc
 
AJAY KUMAR JAISWA NewL
AJAY KUMAR JAISWA NewLAJAY KUMAR JAISWA NewL
AJAY KUMAR JAISWA NewL
 

sourav_cv

  • 1. SOURAV BOSE C/O.Lt.Dipak Ch. Bose East Vivekananda Polly, Sanghati More, Siliguri, West Bengal, India MOB: +91-9007537860 E-mail-sauravb13@gmail.com OBJECTIVE: Aspiring for senior level assessment in Wire and Rope industries as an Executive Manager with a growth oriented organisation. SUMMERY: Dynamic Professional with 07 years of experience about Steel WWiirree aanndd RRooppee IInndduussttrriieess.Presently associate with PPhhooeenniixx CCoonnvveeyyoorr BBeelltt IInnddiiaa ((PP)) LLttdd,, aatt KKaallyyaannii,, iinn WWeesstt BBeennggaall,, IInnddiiaa,, ssuubbssiiddiiaarryy GGrroouupp ooff CCoonnttiinneennttaall,, GGeerrmmaannyy as an Assistant Manager- Production. COMPUTER SKILLS:  Well versed with Windows 2000/XP/VISTA/ Windows 7,8 and 8.1, AutoCAD(2014- 2015), MS Office (Excel, Word, and PowerPoint), SAP version 7300.3.9.1084 ORGANIZATION SCAN: CCoommppaannyy NNaammee:: PPhhooeenniixx CCoonnvveeyyoorr BBeelltt IInnddiiaa ((PP)) LLttdd,, UUnniitt-- 22 ((BBaacc kkwwaarrdd IInntteeggrraall ppllaanntt ooff CCoonnvveeyyoorr BBeelltt UUnniitt)),, aatt KKaallyyaannii,, iinn WWeesstt BBeennggaall,, IInnddiiaa,, SSuubbssiiddiiaarryy GGrroouupp ooff CCoonnttiinneennttaall-- CCoonnttiitteecchh,, GGeerrmmaannyy.. PPrroodduuccttss && iittss aapppplliiccaattiioonn:: 11.. HHiigghh CCaarrbboonn HHoott DDiipp GGaallvvaanniizzeedd SStteeeell CCaabbllee UUsseedd aass rreeiinnffoorrcc eemmeenntt mmaatteerriiaall ffoorr SStteeeell CCoorrdd CCoonnvveeyyoorr BBeelltt.. Designation: Assistant Manager Production. Duration: Aug, 2013 to till date. PPHHAASSEE--0011 ((FFOORR 11000000 MMTT)) PPrroojjeecctt DDeettaaiillss:: From Aug, 2013 to March, 2014 Involved in various project of Steel Cable Manufacturing Unit’s machine(Like-Wet wire drawing, Stranding & Closing Machineries)Installation,Commissining and 03 weeks of training at Greece ,Europe for learning Machine Operation and from April 2014,officially started the production of 7/7 and 7/19 Steel Cable. Notables:  Involvement in the installation & commissioning of Steel cable manufacturing Machineries like  Wet Wire Drawing,  Stranding &  Closing Machines  Involved in Various Utility Lines Set-up and Installation, Like;  Emulsion Pump House(For the Lubrication Chamber Of Wet Wire Drawing Machine Section)  Cooling Tower
  • 2.  500 KVA D.G and  Compressor Unit  Acquisition of knowledge from –machine supplier for the proper operations of the installed Machines at In-house Plant.  Involved in IGBC Green factory Building Rating system in a Team. Production Job Responsibility:  Production Planning and execution to the shop floor level.  WIP data collection on regular shift wise.  Scrap report monitoring.  Awareness of engineering codes and standards; ISO – 9001:2008 procedures.  Rectification and correction of NC (Non-confirmed) material to the process.  Regular Monitoring of major inspection area of WWD Emulsion Temp. Log Book, Die draft schedule, Lay length and diameters of Strands and Ropes.  Material Indent through SAP version 7300.3.9.1084  Implementation of 5s in to the shop floor and fine tuning.  Regular used tools and tackles updating.  Vendor development for local tools and tackles availability.  Production Report (MIS) card preparation & finally report to H.O.D PREVIOUS ASSIGNMENTS: Company Name :USHA MMAARRTTIINN IINNDDSS.. LLTTDD..,, Steel Wire and Rope Division,, SSuubbssiiddiiaarryy GGrroouupp ooff GGuussttaavv WWoollff,, GGeerrmmaannyy.. PPrroodduuccttss && iittss aapppplliiccaattiioonn:: 11.. HHiigghh CCaarrbboonn HHoott DDiipp GGaallvvaanniizzeedd SStteeeell CCaabbllee ffoorr SStteeeell CCoorrdd CCoonnvveeyyoorr BBeelltt aapppplliicc aattiioonn.. 22.. HHiigghh CCaarrbboonn HHoott DDiipp GGaallvvaanniisseedd SStteeeell RRooppee FFoorr IInnssttaallllaattiioonn ooff SSttaannddiinngg rriiggggiinngg,, ttoowwiinngg hheewweerrss,, MMoorriinngg LLiinneess ooff SShhiippppiinngg CCoorrppoorraattiioonn.. Designation: Production Engineer. Duration: Nov, 2009 to July, 2013 Responsibilities:  Shop Floor Production planning  Product standards status analysis and implementation for quality-control.  Ensuring that the production is cost effective.  Being responsible for the selection and maintenance of equipment.  Control of production Target in Shift wise.  Scrap Rejection controls based on daily basis production..  Ensuring that health and safety guidelines are followed.  Co-ordination with internal contractor for different fabrication job.  Reviewing the performance of subordinates.  Reporting to H.O.D Company Name : RRaammssaarruupp NNiirrmmaann wwiirree,, UUnniitt ooff RRaammssaarruupp IInndduussttrriieess LLTTDD,, aatt DDuurrggaappuurr,, WWeesstt-- BBeennggaall,, PPrroodduuccttss && iittss aapppplliiccaattiioonn:: 11.. SSeevveenn PPllyy LL..RR..PP..CC SSttrraannddss ((Used as Different Bridge, Roof, Building construction material). 22.. HHiigghh CCaarrbboonn SSiinnggllee IInnddeenntt WWiirree ((FFoorr MMaaiinnllyy RRaaiillwwaayy SSlleeeeppeerrss uusseedd aass aa ccoonnssttrruuccttiioonn wwiirree..)) MMaacchhiinnee TTyyppee::  SSttrraaiigghhtt LLiinnee DDrryy WWiirree DDrraawwiinngg MMaacchhiinnee @@ LLiinnee SSppeeeedd ooff 88 mmeetteerr //sseecc oonndd..
  • 3.  SSiinnggllee LLiinnee WWiirree rreellaaxxaattiioonn pprree--ssttrreesssseedd MMaacchhiinnee ((CCoovveerriinngg WWiirree DDiiaammeetteerr ffrroomm 22..55 mmmm ttoo 99..00 mmmm)) @@ LLiinnee SSppeeeedd ooff 440000 mmeetteerr // MMiinnuuttee..  SSeevveenn PPllyy LLaaww.. RReellaaxxaattiioonn PPoollee ..CCoonncc rreettee SSttrraannddiinngg MMaacc hhiinnee wwiitthh SSeevveenn BBlloocc kk ×× 11000000 ØØ PPaayy-- ooffff SSppooooll RRoottaattiinngg SSttrraannddiinngg MMaacc hhiinnee @@ 770000 rrppmm mmoottoorr ssppeeeedd..((CCoovveerriinngg SSttrraanndd DDiiaammeetteerr ffrroomm 88..55mmmm ttoo 1155..22 mmmm)) DDeessiiggnnaattiioonn:: GGrraadduuaattee EEnnggiinneeeerr TT rraaiinneeee ((GG..EE..TT )) DDuurraattiioonn:: JJuullyy 22000088 ttoo OOcc ttoobbeerr 22000099.. EDUCATION:  B.Tech. (Mechanical Engineering) from Birbhum Institute of Engineering and Technology under West Bengal University of Technology in 2008 with DGPA of 6.86  Higher Secondary from W.B.C.H.S.E, Tarai High School in 2004 with 58.8%  Secondary from W.B.B.S.E, Baradakanta High School in 2002 with 74.14% TRAINING DETAILS:  Have done 3 weeks ofSpecial Training on Machine operation of Wet wire drawing (Used For Re- Drawing ofGalvanised Zinc Coated High carbon Steel wire with cold drawn process),DifferentTypes of Tubular (Used for Making Strands of Different construction for final Steel Cord) and Closing machines (For Final ProductofSteel Cord for Conveyor Belts).From Syrma A.E,Under Imas,Continental,Greece,Europe for the production ofSteel Cord/Rope construction of7/7 or 7/19, By the JointGroup Of Imas,Continental,Greece,Europe and Phoenix Conveyor Belt India(P) Ltd,Kalyani,WestBengal, India.  Have done 06 months trainings of Machine operation ofStraight Line Dry Wire Drawing Machine, Single Line L.R.P.C Line, Seven Ply L.R.P.C Line and High Speed Rewinding Machine Operation. For L.R.P.C Strands Final Packing From GCR (Machine Supplier From Italy) at Ramsarup Inds.  Have done 05 Weeks ofTraining about “Personal Productivity Programme”, “5S”, “Seven QC Tools”, “TPM”, “TQM” from UshaMartin Inds.Ltd.  02 days Training about “Safety Behavioural Training” On Phoenix Conveyor BeltIndia (P) Ltd. PERSONAL DOSSIER: Date of Birth: 04/05/1985 Languages Known: Hindi, English, and Bengali.