SOP FOR TOTAL POWER FAILURE INCLUDING DCS FAILURE.
BOILER DESK ENGINEER.

1. INFORM AND COORDINATE WITH FIELD OPERATOR FOR LOCAL/FIELD OPERATION.

2. DISTRIBUTE THE C.Ls to EACH BOILER AND INSTRUCT THEM TO

      A).MANUALLY OPEN STARTUP VENT/EMRV FOR DEPRESSURISE THE BOILER.
      B).MANUALLY OPEN CO VENT/PA DUCT VENTS FOR RELEASING GASES.
      C).CLOSE MAIN STEAM STOP VALVE.

3. ENSURE THE PRESSURE DROPPING IN BOILERS FROM MAIN STEAM PRESSURE GAUGES.

4. ENSURE THAT BOTH ID FAN DAMPERS ARE IN OPEN CONDITION.

5. ENSURE THAT BOTH PA & SA FAN DAMPERS ARE IN OPEN CONDITION.

6. ENSURE THAT BED ASH IS NOT DRAINING.

7. CHECK THE WORK DONE BY C.Ls

8. ALL THE MOTORS L.P.B.S. STOP PUSH BUTTON TO BE LOCKED.

9. COORDINATE WITH BOILER & TURBINE OPERATORS FOR TAKING CORRECTIVE ACTION FOR
BOXUP.

10. STOP THE AHP SYSTEM IF THESE ARE IN RUNNING STATE.
TURBINE DESK ENGINEER

  1.  INFORM TO THE TURBINE FIELD OPERATOR THAT TOATL POWER AND DCS FAILED.
  2.  ENSURE THAT ESV GOT CLOSED.
  3.  ENSURE THAT EOP GOT STARTED
  4.  INFORM TO ELECTRICAL ENGINEER THAT TO SWITCH ON BARRING GEAR MOTOR FROM
      FIELD WITH DG SET OTHERWISE ROTATING MANUALLY.
  5. COORDINATE WITH THE FIELD OPERATOR FOR LOCAL OPERATION.
  6. EJECTOR TO BE ISOLATED FROM STEAM & AIR SIDE AND TO BE KEPT IN MANUAL MODE.
  7. GSC STEAM SIDE TO BE CLOSED.
  8. STEAM TO TURBINE GLANDS TO BE ISLOATED.
  9. VACUUM BREAK VALVE TO BE OPENED
  10. ENSURE THE DEAREATOR LEVEL.
  11. CLOSE ALL MOTORISED ISOLATION VALVES MANUALLY AND CLOSE ALL TURBINE
      EXTRACTION MOTORISED VALVES.
  12. OPEN THE ALL TURBINE CASING AND GLAND STEAM DRAINS AND AUXILARAY STEAM
      DRAINS.
  13. MANUALLY CLOSE THE STEAM DUMP MOTORISED VALVE.
  14. CLOSE THE CONDESATE TO DEAERATOR LINE ISOLATION VALVE AFTER CONTROL
      STATION .




AFTER RESUMING THE IMPORT SUPPLY.

BOILER DESK ENGINEER
  1. COORDINATE WITH ELECTRICAL ENGINEER FOR RESTART THE AUXILARIES.
  2. COORDINATE WITH BOILER OPERATOR FOR RESUMING SUPPLY.
  3. TAKE I.D. FANS INTO SERVICE AFTER GETTING CLEARANCE FROM
     ELECTRICAL ENGINEER & MAINTAIN THE DRAFT.
  4. TO START THE INSTRUMENT & SERVICE AIR COMPRESSORS.
  5. TAKE A.C.W. PUMP INTO SERVICE.
  6. TAKE BOILER FEED PUMP INTO SERVICE AND MAINTAIN THE DRUM LEVEL
     AFTER GETTING CLEARANCE.
  7. TO START THE BOILER AS PER OUR STANDARD PROCEDURE.
  8. ENSURE THAT ALL THE EQUIPMENT IN NORMAL CONDITION.
TURBINE DESK ENGINEER

  1. COORDINATE WITH TURBINE OPERATOR FOR RESUMING SUPPLY
     NORMALLY.
  2. AFTER GETTING CLEARANCE FROM ELECTRICAL ENGINEER TO START THE
     AUXILARIES.
  3. ENSURE A.C.W. PUMP IS IN SERVICE.
  4. ENSURE COOLING WATER FLOW FOR LUBE OIL COOLERS AND GENERATOR
     COOLERS.
  5. TO START C.E.P & MAINTAIN NORMAL C.R.T. LEVEL.
  6. TO MAINTAIN NORMAL DEAREATOR LEVEL.
  7. TO START THE TURBINE AS PER OUR STANDARD PROCEDURE.
  8. ENSURE THAT ALL THE EQUIPMENT IN NORMAL CONDITION.

More Related Content

Similar to Sop for total_power_failure.[1]

Final Turbine rolling ppt Akshay.pptx
Final Turbine rolling ppt Akshay.pptxFinal Turbine rolling ppt Akshay.pptx
Final Turbine rolling ppt Akshay.pptx
BhimarajuKanireddy
 
A guide for firetube boiler testes
A guide for firetube boiler   testesA guide for firetube boiler   testes
A guide for firetube boiler testes
ederpitapeva
 
105 gc6 low n ox
105 gc6 low n ox105 gc6 low n ox
105 gc6 low n ox
Juan Peraza Cuen
 
DRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKS
DRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKSDRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKS
DRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKSMike Brusselers
 
DRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKS
DRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKSDRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKS
DRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKSMike Brusselers
 
Competency Training Evidence for Panel Operator Answers
Competency Training Evidence for Panel Operator AnswersCompetency Training Evidence for Panel Operator Answers
Competency Training Evidence for Panel Operator Answersmark robertson
 
171839416-commissioning-of-hydro-ppt.ppt
171839416-commissioning-of-hydro-ppt.ppt171839416-commissioning-of-hydro-ppt.ppt
171839416-commissioning-of-hydro-ppt.ppt
ssuser9e9be71
 
POWER PLANT SIMULATOR 210 MW
POWER PLANT SIMULATOR 210 MW POWER PLANT SIMULATOR 210 MW
POWER PLANT SIMULATOR 210 MW
Manohar Tatwawadi
 
Wiring diagram krisbow 26 13
Wiring diagram krisbow 26 13Wiring diagram krisbow 26 13
Wiring diagram krisbow 26 13-
 
Thermal Power Plant Simulator Operations Training
Thermal Power Plant Simulator Operations TrainingThermal Power Plant Simulator Operations Training
Thermal Power Plant Simulator Operations Training
Manohar Tatwawadi
 
Summer Internship final reports
Summer Internship final reportsSummer Internship final reports
Summer Internship final reports
vivek srivastava
 
Angel Vacaro Jr. RESUME (Autosaved)
Angel Vacaro Jr. RESUME (Autosaved)Angel Vacaro Jr. RESUME (Autosaved)
Angel Vacaro Jr. RESUME (Autosaved)Angel Jr. Vacaro
 
R & AC LAB MANNUAL FINAL.docx.pdf
R & AC LAB MANNUAL FINAL.docx.pdfR & AC LAB MANNUAL FINAL.docx.pdf
R & AC LAB MANNUAL FINAL.docx.pdf
NandhananRaghuraman
 
Cfbc boiler startup and shutdown
Cfbc boiler startup and shutdownCfbc boiler startup and shutdown
Cfbc boiler startup and shutdown
Ashvani Shukla
 
49539990 burner-management-system
49539990 burner-management-system49539990 burner-management-system
49539990 burner-management-systemMowaten Masry
 
Handling of turbine side emergencies
Handling of turbine side emergenciesHandling of turbine side emergencies
Handling of turbine side emergencies
Manohar Tatwawadi
 
CAMLESS ENGINE
CAMLESS ENGINECAMLESS ENGINE
CAMLESS ENGINE
Y Salman Baig
 
Amardeep jadeja copy.ppt [autosaved]
Amardeep jadeja   copy.ppt [autosaved]Amardeep jadeja   copy.ppt [autosaved]
Amardeep jadeja copy.ppt [autosaved]Amardeep Jadeja
 
LETTER OF AUTHORIZATION
LETTER OF AUTHORIZATIONLETTER OF AUTHORIZATION
LETTER OF AUTHORIZATIONMoiz Akhter
 
Air conditioning system
Air conditioning systemAir conditioning system
Air conditioning systemtercelchile
 

Similar to Sop for total_power_failure.[1] (20)

Final Turbine rolling ppt Akshay.pptx
Final Turbine rolling ppt Akshay.pptxFinal Turbine rolling ppt Akshay.pptx
Final Turbine rolling ppt Akshay.pptx
 
A guide for firetube boiler testes
A guide for firetube boiler   testesA guide for firetube boiler   testes
A guide for firetube boiler testes
 
105 gc6 low n ox
105 gc6 low n ox105 gc6 low n ox
105 gc6 low n ox
 
DRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKS
DRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKSDRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKS
DRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKS
 
DRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKS
DRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKSDRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKS
DRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKS
 
Competency Training Evidence for Panel Operator Answers
Competency Training Evidence for Panel Operator AnswersCompetency Training Evidence for Panel Operator Answers
Competency Training Evidence for Panel Operator Answers
 
171839416-commissioning-of-hydro-ppt.ppt
171839416-commissioning-of-hydro-ppt.ppt171839416-commissioning-of-hydro-ppt.ppt
171839416-commissioning-of-hydro-ppt.ppt
 
POWER PLANT SIMULATOR 210 MW
POWER PLANT SIMULATOR 210 MW POWER PLANT SIMULATOR 210 MW
POWER PLANT SIMULATOR 210 MW
 
Wiring diagram krisbow 26 13
Wiring diagram krisbow 26 13Wiring diagram krisbow 26 13
Wiring diagram krisbow 26 13
 
Thermal Power Plant Simulator Operations Training
Thermal Power Plant Simulator Operations TrainingThermal Power Plant Simulator Operations Training
Thermal Power Plant Simulator Operations Training
 
Summer Internship final reports
Summer Internship final reportsSummer Internship final reports
Summer Internship final reports
 
Angel Vacaro Jr. RESUME (Autosaved)
Angel Vacaro Jr. RESUME (Autosaved)Angel Vacaro Jr. RESUME (Autosaved)
Angel Vacaro Jr. RESUME (Autosaved)
 
R & AC LAB MANNUAL FINAL.docx.pdf
R & AC LAB MANNUAL FINAL.docx.pdfR & AC LAB MANNUAL FINAL.docx.pdf
R & AC LAB MANNUAL FINAL.docx.pdf
 
Cfbc boiler startup and shutdown
Cfbc boiler startup and shutdownCfbc boiler startup and shutdown
Cfbc boiler startup and shutdown
 
49539990 burner-management-system
49539990 burner-management-system49539990 burner-management-system
49539990 burner-management-system
 
Handling of turbine side emergencies
Handling of turbine side emergenciesHandling of turbine side emergencies
Handling of turbine side emergencies
 
CAMLESS ENGINE
CAMLESS ENGINECAMLESS ENGINE
CAMLESS ENGINE
 
Amardeep jadeja copy.ppt [autosaved]
Amardeep jadeja   copy.ppt [autosaved]Amardeep jadeja   copy.ppt [autosaved]
Amardeep jadeja copy.ppt [autosaved]
 
LETTER OF AUTHORIZATION
LETTER OF AUTHORIZATIONLETTER OF AUTHORIZATION
LETTER OF AUTHORIZATION
 
Air conditioning system
Air conditioning systemAir conditioning system
Air conditioning system
 

Recently uploaded

LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
DanBrown980551
 
Video Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the FutureVideo Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the Future
Alpen-Adria-Universität
 
RESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for studentsRESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for students
KAMESHS29
 
DevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA ConnectDevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA Connect
Kari Kakkonen
 
20240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 202420240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 2024
Matthew Sinclair
 
20240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 202420240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 2024
Matthew Sinclair
 
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
Neo4j
 
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
Neo4j
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
KatiaHIMEUR1
 
Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?
Nexer Digital
 
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
James Anderson
 
Building RAG with self-deployed Milvus vector database and Snowpark Container...
Building RAG with self-deployed Milvus vector database and Snowpark Container...Building RAG with self-deployed Milvus vector database and Snowpark Container...
Building RAG with self-deployed Milvus vector database and Snowpark Container...
Zilliz
 
Essentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FMEEssentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FME
Safe Software
 
Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1
DianaGray10
 
20240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 202420240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 2024
Matthew Sinclair
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Albert Hoitingh
 
National Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practicesNational Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practices
Quotidiano Piemontese
 
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
James Anderson
 
UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6
DianaGray10
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
Adtran
 

Recently uploaded (20)

LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
 
Video Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the FutureVideo Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the Future
 
RESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for studentsRESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for students
 
DevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA ConnectDevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA Connect
 
20240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 202420240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 2024
 
20240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 202420240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 2024
 
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
 
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
 
Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?
 
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
 
Building RAG with self-deployed Milvus vector database and Snowpark Container...
Building RAG with self-deployed Milvus vector database and Snowpark Container...Building RAG with self-deployed Milvus vector database and Snowpark Container...
Building RAG with self-deployed Milvus vector database and Snowpark Container...
 
Essentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FMEEssentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FME
 
Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1
 
20240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 202420240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 2024
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
 
National Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practicesNational Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practices
 
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
 
UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
 

Sop for total_power_failure.[1]

  • 2. SOP FOR TOTAL POWER FAILURE INCLUDING DCS FAILURE. BOILER DESK ENGINEER. 1. INFORM AND COORDINATE WITH FIELD OPERATOR FOR LOCAL/FIELD OPERATION. 2. DISTRIBUTE THE C.Ls to EACH BOILER AND INSTRUCT THEM TO A).MANUALLY OPEN STARTUP VENT/EMRV FOR DEPRESSURISE THE BOILER. B).MANUALLY OPEN CO VENT/PA DUCT VENTS FOR RELEASING GASES. C).CLOSE MAIN STEAM STOP VALVE. 3. ENSURE THE PRESSURE DROPPING IN BOILERS FROM MAIN STEAM PRESSURE GAUGES. 4. ENSURE THAT BOTH ID FAN DAMPERS ARE IN OPEN CONDITION. 5. ENSURE THAT BOTH PA & SA FAN DAMPERS ARE IN OPEN CONDITION. 6. ENSURE THAT BED ASH IS NOT DRAINING. 7. CHECK THE WORK DONE BY C.Ls 8. ALL THE MOTORS L.P.B.S. STOP PUSH BUTTON TO BE LOCKED. 9. COORDINATE WITH BOILER & TURBINE OPERATORS FOR TAKING CORRECTIVE ACTION FOR BOXUP. 10. STOP THE AHP SYSTEM IF THESE ARE IN RUNNING STATE.
  • 3. TURBINE DESK ENGINEER 1. INFORM TO THE TURBINE FIELD OPERATOR THAT TOATL POWER AND DCS FAILED. 2. ENSURE THAT ESV GOT CLOSED. 3. ENSURE THAT EOP GOT STARTED 4. INFORM TO ELECTRICAL ENGINEER THAT TO SWITCH ON BARRING GEAR MOTOR FROM FIELD WITH DG SET OTHERWISE ROTATING MANUALLY. 5. COORDINATE WITH THE FIELD OPERATOR FOR LOCAL OPERATION. 6. EJECTOR TO BE ISOLATED FROM STEAM & AIR SIDE AND TO BE KEPT IN MANUAL MODE. 7. GSC STEAM SIDE TO BE CLOSED. 8. STEAM TO TURBINE GLANDS TO BE ISLOATED. 9. VACUUM BREAK VALVE TO BE OPENED 10. ENSURE THE DEAREATOR LEVEL. 11. CLOSE ALL MOTORISED ISOLATION VALVES MANUALLY AND CLOSE ALL TURBINE EXTRACTION MOTORISED VALVES. 12. OPEN THE ALL TURBINE CASING AND GLAND STEAM DRAINS AND AUXILARAY STEAM DRAINS. 13. MANUALLY CLOSE THE STEAM DUMP MOTORISED VALVE. 14. CLOSE THE CONDESATE TO DEAERATOR LINE ISOLATION VALVE AFTER CONTROL STATION . AFTER RESUMING THE IMPORT SUPPLY. BOILER DESK ENGINEER 1. COORDINATE WITH ELECTRICAL ENGINEER FOR RESTART THE AUXILARIES. 2. COORDINATE WITH BOILER OPERATOR FOR RESUMING SUPPLY. 3. TAKE I.D. FANS INTO SERVICE AFTER GETTING CLEARANCE FROM ELECTRICAL ENGINEER & MAINTAIN THE DRAFT. 4. TO START THE INSTRUMENT & SERVICE AIR COMPRESSORS. 5. TAKE A.C.W. PUMP INTO SERVICE. 6. TAKE BOILER FEED PUMP INTO SERVICE AND MAINTAIN THE DRUM LEVEL AFTER GETTING CLEARANCE. 7. TO START THE BOILER AS PER OUR STANDARD PROCEDURE. 8. ENSURE THAT ALL THE EQUIPMENT IN NORMAL CONDITION.
  • 4. TURBINE DESK ENGINEER 1. COORDINATE WITH TURBINE OPERATOR FOR RESUMING SUPPLY NORMALLY. 2. AFTER GETTING CLEARANCE FROM ELECTRICAL ENGINEER TO START THE AUXILARIES. 3. ENSURE A.C.W. PUMP IS IN SERVICE. 4. ENSURE COOLING WATER FLOW FOR LUBE OIL COOLERS AND GENERATOR COOLERS. 5. TO START C.E.P & MAINTAIN NORMAL C.R.T. LEVEL. 6. TO MAINTAIN NORMAL DEAREATOR LEVEL. 7. TO START THE TURBINE AS PER OUR STANDARD PROCEDURE. 8. ENSURE THAT ALL THE EQUIPMENT IN NORMAL CONDITION.