QSB2813 – Software Application 
Software Application for Quantity Surveying 
AUG Semester 2014 
Submission Date: 14th October 2013 
Name Student ID 
Yam Yih Hwan 0305861 
Low Rong Tzuoo 0304924 
Ng Jun Keat 0314368 
Dixon Cheong 0310356 
Adrian Ng Kar Chun 0314516
Nomitech is a leading niche software company specializing in Cost Estimating solutions. Their 
founders are engineers with real life industry experience and they deliver practical, innovative, 
state of the art cost estimating software which is rapidly becoming the future standard for 
estimating. 
Our Cost Estimating solution, CostOS is specifically designed for companies that want to 
increase their competitiveness by responding to modern estimating challenges more quickly, 
with less effort, more accuracy, less risk, and with an increased level of confidence. 
They recognize that the cost estimating process is at the core of every project related company. 
CostOS is a mission critical system which allows you to value engineer and differentiate your 
s olution whils t me eting your clie nts’ re quirements. It allows you to win more work. 
At Nomitech, they are passionate about success, and they measure their success by the success of 
their clients. They work closely with each of their customers to build mutual trust and ensure 
that the clients get the most from their capabilities and maximum value from their 
investment with them. 
Their client base is rapidly increasing by word of mouth as a result of their reputation. They have 
also gained the respect of large software organizations like Oracle, who recommend CostOS as 
their preferred partner solution for Construction, EPC and Oil & Gas clients, on a global scale. 
They continually invest in new ideas, technologies and approaches to estimating, in order to 
address the challenges of the industries they serve. 
2
Function / Advantages: 
CostOS’ powerful parametric engine, if combined with BIM, enables the quick and accurate 
pricing of ‘le s s than fully-de taile d’ BIM models. Moreover, it allows design optimisation and 
quick identification of most appropriate materials and construction methods. Intelligent, 
parameter-driven assemblies can be built and applied to BIM elements. With CostOS BIM 
technology, it really is a case of ‘what you see is what you estimate’. As model elements are 
selected and measured, CostOS ensures that no item is missed. CostOS has take-off 
capabilities to suit every occasion. Costs also has a unique function take-off capability. 
Functions can calculate additional information from simple measurements. This can be from 
2D geometrical shapes, 3D geometrical shapes or indeed structural members. For example, 
by measuring the length of a steel section, mathematical equations can calculate the weight and 
the surface area. Or say the volume of a sphere together with its surface area. 
CostOS BIM Estimating makes full use of all the benefits you can get by using the 3D model of 
your project. Its embedded 3D viewer allows you to navigate easily through it and autoselect 
entities. The quantity takeoff of your project (Architectural, Structural, Mechanical, and HVAC, 
Electrical etc.) can be massively accelerated and the accuracy you can achieve is 
unprecedented. You can also create your Bill of Quantities directly on your 3D model and 
see how it is built up while your estimate progresses. CostOS works with open standards and thus 
it supports all major designing systems. You do not have to buy any of these systems, unless you 
want to make the designer’s work, as CostOS will provide you with the visualization of the 
model. CostOS’s system recognition allows you to work on mechanical models 
with unbeatable accuracy and speed. More importantly while working directly on the 3D model 
you can identify omissions or mistakes of the design and amend your estimate accordingly. 
3
Glodon Software Company Limited was found in China Beijing 1998 year. It is the leader of the 
information industry in Chinese construction field. Glodon Software offers the construction 
project field most valuable information products and professional services to promote the 
development of information in the construction industry. Glodon owns independent 
intellectual property rights on its main products and technologies, and establishes an effective 
research and development management system. 
Now, Glodon has more than 20 core technologies, over 100 pieces of software copyright, and 9 
patents. Glodon 3D graphics technology, BIM solution, cloud computing technology, and 
management platform are very advanced. Besides that, Glodon employs more than 3000 
employees, with the number of corporate users exceeding 100,000, of which there are nearly 
400,000 direct users of cost series products, accounting for 53% of China's domestic market. 
Glodon products have been applied in-depth in many remarkable construction projects, like the 
Bird's Nest, China National Grand Theatre, Shanghai Disney, Shanghai Tower and Guangzhou 
East Tower, winning very high praise from the clients. 
There are three products that under Glodon Software Company which are Glodon Takeoff for 
Rebar (TRB), Glodon Takeoff for Mechanical and Electrical (TME), and Glodon Takeoff 
for Architecture and Structure (TAS). 
4
Glodon Takeoff for Rebar (TRB) 
Glodon Takeoff for Rebar, also known as TRB, is a suite of quantity calculation software 
based on the Building Information Modelling (BIM) technology, which is embedded with 
groundbreaking 3-dimensional measurement and calculation rules, including British 
Standards and Uniform Building By-Law. TRB enables the users to perform quantity taking-off 
from electronic drawings and images with immediate 3D visualization effect and shows 
accurate results for each component in real time. There shall be less data and formulae input by 
the user are needed in calculation of the quantity. Thus, the accuracy level of the result is higher 
with minimal undesirable careless mistakes. 
Now available for: Singapore, Malaysia, Hong Kong, Macao, Taiwan, Indonesia, Thailand and 
India. 
Features and Key Functions 
 BIM-base measurement software 
 Built-in calculation setting based on British Standards and Uniform Building Bye-Law 
 Interchangeable calculation mode between Tendering Mode and Prefabrication Mode to 
5 
address different requirements 
 Import 3D model from TAS to calculate rebar quantities 
 Produce 3D model from by identifying CAD entities 
 User-friendly interface 
 Produce Rebar Schedule for fabricator on site 
 Calculation result with detail breakdown 
 Various reporting format
Glodon Takeoff for Mechanical and Electrical (TME) 
Glodon Takeoff for Mechanical and Electrical known as TME, it provides multiple quantity 
surveying modes such as quantity surveying by importing CAD drawing, quantity surveying 
by drawing input, quantity surveying by single element input and quantity surveying by table 
input, as well as applies such functions and methods as 3D computing technology, quick 
processing of quantity change , automatic circuit identification for wire conduits , automatic 
searching of start point for cable bridges and automatic identification of wind pipes to 
thoroughly address complicated manual statistics, difficult auditing, low efficiency and other 
problems cost personnel face in tendering and bidding, in process quantity calculation and 
quantity check in settlement. 
Now Available for: Singapore and Malaysia. 
Features and Key Functions 
 The number, length and area are easy to calculate and read 
 The number of devices can be easy to read, and all devices of the same specifications will 
6 
be generated simply by clicking a button 
 Accessories can be identified by multiple logos, and different elements can be 
intelligently differentiated 
 Complicated pipelines can be calculated quickly and efficiently, and simply clicking a 
button will generate all pipelines of the same model 
 Area identification enables modeling range to be controlled and adjusted
Glodon Takeoff for Architecture and Structure (TAS) 
Glodon Takeoff for Architecture and Structure known as TAS, it is embedded with 
Commonwealth of England calculation rules, enabling users to quickly build a 3D time -cost 
model. There are a series of processing method and function such as: 3D modeling, processing 
change, estimating rebar content, addressing quantity survey, quantity calculation involved 
in tendering and bidding and element quantity calculation in the settlement stage. It is simple, 
helpful and accurate quantity calculation software. 
Now available for: Singapore, Malaysia, Hong Kong, Macao, Taiwan, Indonesia, Thailand, India, 
UK and Philippines. 
Features and Key Functions 
 Open functions, easy to operate 
 Open elevation, which enables easy processing of buildings with complex structures 
7 
such as staggered floor, mezzanine floor and skipped floor 
 Open location, which enables manual tracing, fast location, and convenient modeling 
 Open rules, which enable adjustments of calculation rules and special options of 
calculation settings based on actual projects to meet all quantity surveying requirements
Innovaya applications are meant to support team work from design to construction. The 
software benefits can be fully realized when it's used in a team, whether virtually or in the same 
company. With this goal in mind, our technologies are developed with two principles which is the 
project data must be shared and exchanged by all of our applications. Little altering of design 
data or reentering should be needed. We intend to offer various applications with features that suit 
for different needs and different user types or companies. Whether you are a design firm, a 
contractor, a design-build, or an owner organization, you will find Innovaya applications useful 
for your AEC projects. For example, the users who find Innovaya software beneficial include are 
BIM designers, engineers, and 3D modelers, Project Coordinators, Project and Construction 
Managers or subcontractors Estimators and cost database experts , Schedulers and Owners. 
8
Innovaya Visual BIM 
Interactive 3D Visualization 
With the robust 3D functions, users of Visual BIM can enjoy the best performance for 3D 
building model navigation. Easy-to-use 3D user interface controls enable the user to do real-time 
walk-through and to examine object details. The 3D objects are interactive and selectable. 
Features such as tracking camera positions dynamically and virtual tours are also useful for 
making highly impressive project presentations for clients. 
Dynamic Visibility Controls for 3D Objects 
A building information model (BIM) in 3D representation is essentially an enclosed structure. 
This makes it difficult to view the details of all of the objects in a model. However, Innovaya 
Visual BIM organizes the objects by their building sections as well as component types. Then the 
visibility and transparency of these objects can be adjusted easily using visibility controls. 
Therefore, object details can be examined thoroughly in 3D view. Visual BIM is a true BIM-based 
application. It not only presents detailed geometry of 3D objects, but also shows the 
detailed properties of every object. 
Support for Effective Team Communication 
Innovaya Visual BIM offers essential functions to assist communication among the project 
members. With tools such as Markup and E-mailing, Visual BIM users can enter comments 
directly onto a snapshot of the 3D design and send it via e-mail to project members. The powerful, 
easy-to-use 3D navigation features are also useful for presenting design-estimating coordination 
issues to the project team. 
9
Innovaya Visual Quantity Takeoff (QTO) 
Automatic Quantity Generation 
Visual Quantity Takeoff can automatically generate complete object quantities directly from a 
design model. This process usually takes several seconds to complete for the entire building 
model, while the same job could take several days using traditional on-screen takeoff or digitizer 
methods. The quantities are extracted based on object types and their dimensions. Quantity 
extraction methods are easily customized and are reusable for multiple projects. Additionally, the 
quantities are all stored by group of objects based on the object property conditions set by the 
user. 
Drag & Drop Quantity Generation 
With Visual Quantity Takeoff, the user can also choose the Drag & Drop Quantity generation 
method to takeoff object quantities. With this approach, the user can select any building section 
(such as a building level), view the objects in 3D, and drag and drop it into the quantity 
generation window. They can use the same drag & drop method to choose a component type, 
such as walls, to takeoff the quantities of a selected building section. During this process, the user 
can also define the most appropriate way to group objects and calculate total quantities. The drag 
& drop quantity generation process can usually improve the productivity of quantity takeoff by at 
least 300%. 
Managed Object Quantities 
The quantities generated are stored in a manageable manner in Visual Quantity Takeoff. For 
example, they are organized by user defined folders, which can be in different classifications such 
as CSI or Uniformat. The quantities can also be sorted by building sections or component types. 
When generated, the quantities are automatically linked with the objects which can be tracked 
and viewed in 3D at any point. This ‘what-you-see-is-what-you-takeoff’ theme provides visual 
confirmation on objects’ quantity takeoff status using different color codes, and it assures the 
completeness of the project quantities taken-off. Each managed quantity group can be assigned a 
unique color code for its 3D objects for easy tracking and identifying objects associated with the 
quantities. Furthermore, the quantities can be saved in a separate file which can be opened in 
Innovaya Visual Estimating for Sage Timberline Assembly and Item takeoffs. 
10
Intelligent Change Management 
Because the quantities generated are automatically associated with the objects, Visual Quantity 
Takeoff can be used effectively for change management. For example, if the design has been 
changed, Visual Quantification can display changed, new, and deleted objects in different colors 
in 3D. There is also a function that allows you to validate the quantities generated previously 
against the new design, and then automatically update those quantities. 
Quantity Reports to MS Excel 
With one-click of mouse button, all of the objects quantities can be exported as reports in MS 
Excel. There is no limitation on how many quantity columns can be generated as in some on-screen 
programs. The quantities in the reports can also be sorted by user defined folders, building 
sections, or component types. Additionally, all object quantity color codes are shown in the MS 
Excel spreadsheet against each quantity group. Along with a snapshot of the color-coded 3D 
object view pasted into MS Excel, these color codes help identify, visually and clearly, what 
objects are used to generate the quantities. Interactive 3D Visualization With our robust true 3D 
engine, users of Visual Quantity Takeoff (QTO) can enjoy the best performance of 3D building 
model navigation. Easy-to-use 3D user interface controls allow estimators to do real-time walk-through 
11 
and to examine object details. The 3D objects are highly interactive and selectable. 
Object visibility and transparency can be adjusted by building section or component type. All 
object properties can be examined. Special object information such as wall layers can also be 
inspected. 
Support for Effective Team Communication 
Visual Quantity Takeoff not only integrates design and cost estimating, it also offers essential 
functions to assist communication between the project members. With tools such as Markup and 
E-mailing, Visual Quantity Takeoff allows the user to enter highlighted comments directly onto a 
snapshot of the 3D design and send it as a picture, via e-mail, to project members. The powerful 
easy-to-use 3D navigation features are also useful for presenting design-estimating coordination 
issues in front of the project team.
Innovaya Visual 4D Stimulation 
Your Vision Shared 
Visual 4D Simulation provides an excellent way to present a progressive project vision. By 
dynamically showing project phases and site logistics in a 3D virtual reality environment, clients 
are impressed and the entire project team works synergistically. Schedulers, project managers, 
superintendents, designers, engineers, estimators and even clients, can expect a shared 
understanding of project status, milestones, responsibilities, and construction plans. Everyone is 
sure to be on the same page at any time with the 4D representation of the project in conjunction 
with traditional schedule GANTT charts. 
Improved Project Coordination 
With Visual 4D Simulation's ability to link any 3D design data in DWG with either MS Project or 
Primavera scheduling tasks and to show projects in 4D, designers, builders and owners can easily 
see how projects are built. This helps everyone to understand the schedule quickly and thoroughly. 
By visualizing how objects in 3D and how they're installed in sequence, many design conflicts 
can be quickly identified. Team based decisions can be made quickly and comfortably with 
Visual Simulation by being able to see the results of seamlessly incorporated design or schedule 
changes, and this process would avoid many physical mock-ups. Showing and communicating 4D 
in resource color codes to subcontractors also help logistical planning and trade coordination, 
therefore avoiding disruptions during construction. 
Optimized Construction Sequencing 
By visualizing color-coded tasks or resources on objects, and their connections to objects, 
schedulers can cross-check tasks against design objects. For instance, an object liked with two 
tasks on the same day shown in a specific color might hint at a potential schedule problem, while 
an unlinked object could indicate a missing task in the schedule. These features help schedulers 
create accurate schedules. Similarly, showing that no tasks are assigned on a certain date on some 
objects may present potential readiness of a work space, which could allow subsequent tasks to 
start earlier, resulting in tighter construction sequencing and project time savings. 
12
What-if Analysis and Change Management 
A change on a task can cause ripple effect changes on other tasks. Visual 4D Simulation's On-demand 
13 
4D feature immediately visualizes the impact of these changes to the objects so that 
different construction scenarios can be analyzed, presented, and discussed allowing the best 
decision to be made based on different project member perspectives. Visual Simulation can also 
seamlessly synchronize changes made on either the schedule or on 4D tasks. Changes made to 
design objects also often cause schedule changes and resource re-assignments. Visual Simulation 
reflects these object and schedule changes in 3D and 4D which allows the project team to address 
issues and adjust construction plans accordingly. 
Analyzing Constructability and Improved Safety 
By showing the building model in 3D at any hierarchical or any system component level and 
presenting the detailed sequences of objects to be installed, Visual Simulation's 4D views clearly 
expose the objects' structural and special constraints. Construction safety can be improved by 
using 4D views. Hazards can be anticipated by visualizing and analyzing the constraints against 
object installation requirements and to see the entire construction site situations. The best 
construction methods can be selected based on a better understanding of these project 
constructability issues. 
Powerful Functions Yet Easy to Use 
With the robust 3D engine, users of Visual Simulation can enjoy the best 3D navigation 
performance. Easy-to-use 3D user interface controls provide capabilities of real-time walk-through 
and examination of object details. Objects linked with tasks can be viewed in 3D by 
clicking on the tasks, while tasks associated with objects are also listed when the objects are 
selected. 4D simulations can be created and viewed in different modes, either with objects 
original colors, or with task or resource color codes. 4D behaviors are automatically adjusted 
according to the construction type of the objects such as new objects, temporary facilities, e.g. 
trailers, temporary parking, and construction equipment, or existing objects to be removed such as 
ground excavation, and so on. The association between objects and tasks can be established easily, 
quickly, and visually.
Vico Office is the first purpose-built construction software that allows users to plug in the BIM 
authoring application of their choice and then perform a constructability analysis , quantity 
takeoff, a model-based schedule, model-based estimate, and on-site production control, all in 
an integrated workflow. This integrated workflow is unique in the commercial construction 
market. With Vico Office, you have a live model - a model where the 3D geometry is integrated 
with the quantities which is integrated with the 4D schedule which is integrated with the 5D 
estimate. This means that when one element of the 3D model changes (let's say the building gets 
a new floor or a new material is chosen for the lobby floor), both the schedule and estimate 
automatically change. The 5D BIM Workflow starts at the creation of a new project and ends 
with reporting and data mining. 
When firms start gearing up for a new project, they add 2D drawings and 3D models to the 
Document Registry for version control and change management. Models can then be published 
to Vico Office from ArchiCAD, Tekla, Revit, AutoCAD Architecture, and/or AutoCAD 
MEP. Or, using special CAD-specific Importers, IFC files, SketchUp files, CAD-Duct files, 
and even 3D DWG files can be used in Vico Office. 
Through Vico Office Document Controller we can quickly recognize changes between 
drawing sets and model versions. Honing in the changes with slider and highlight modes, we 
can cloud and annotate issues, and even start a cross-team discussion or report upon the items in 
question. After the BIM models are completed, we publish, augment, and compare 3D models 
from multiple project stakeholders all within the Vico Office Client. These models can be 
combined in Vico Office. Then we detect any constructability matters in Vico Office 
Constructability Manager and report these matters to the design team for resolution. 
Now, the coordinated models can once again be compared to the 2D contract documents in Vico 
Office Document Controller as a final accuracy check before prefabrication and installation 
drawings are generated. Now Project Engineers can identify critical points for sleeves, deck 
elevations, key framing locations, hangers and bracings, pipe runs, slab edges, etc. and map 
them in Vico Office Layout Manager. They don't need the original BIM, just the latest version 
of the model inside Vico Office. As soon as we’ve identified the coordination issues, we 
use Vico Office Takeoff Manager to generate construction-caliber quantities. 
14
Now with the quantities, estimators use Vico Office Cost Planner to create multiple iterations of 
the 5D estimate as the models’ level of detail increases. With the estimate in place, we track the 
project budget in Vico Office Cost Explorer, helping the Owner recognize which decisions have 
the most impact on the budget and schedule. Planners also take advantage of these quantities and 
start evaluating the project and creating the optimal combination of location systems for the 
trades in Vico Office LBS Manager. 
By organizing the project locations, an optimal sequencing logic can be applied with Vico Office 
Schedule Planner, the model-based scheduling solution which utilizes flow line theory as 
opposed to traditional CPM. These options can then be analyzed in terms of both cost and 
time. And the Vico Office 4D Manager Schedule presentation helps the GC and subs work 
together to evaluate what-if scenarios and determine the best solution. 
Finally, as the project moves from headquarters out to the field, the team utilizes Vico Office 
Production Controller to monitor and adjust crews as necessary. With real-time inputs for 
actual crew productivity rates, the team has enough warning to avoid trade conflicts and 
cascading delays. Comprehensive construction management reporting is organized in the Vico 
Office Client. Since Vico Office is a database of projects, all fields and their values can be 
accessed with reporting. 
15
Bentley ConstructSim is a powerful virtual construction simulation system for detailed and 
automated workface planning on large projects. ConstructSim provides construction 
management the visibility needed to rapidly and effectively respond to project issues to 
increase productivity, drive down costs and reduce project cycle time, while providing 
improved risk mitigation and team safety. 
Bentley ConstructSim is a revolutionary program that optimizes your project through the 
planning, sequencing, execution and monitoring of construction activities from within a 
virtual plant model. ConstructSim links together project IT systems including: the 3D CAD 
model (all major formats: PDS, PDMS, etc.); schedule; materials management system; project 
controls databases and others to create an integrated virtual environment that is constantly up-to-date. 
This integrated virtual environment enables the following functionality within ConstructSim: 
 Virtual Walk Through 
 4D (3D + time) Schedule Simulations 
 Automated Construction Material Take-Offs 
 Automated Detail Task List Generation 
 Life Cycle Status Tracking (color coding material availability and progress by area, 
system, spool/sheet, piece mark, task, etc.) 
 Pipe and Steel Work Packaging at Weekly Crew Level 
 Generic Work Packs for Other Disciplines (E&I, Civil, Mechanical) that take 
advantage of the database more than the virtual plant model 
 Pipe and Steel Change Order Impact Analysis 
 Tracking of the Design Changes Back to the Model 
 8-Week Look Ahead Planner/Constraint Analysis and Crew Planning 
 Crane and Scaffold Simulation/Crew Density Analysis 
16
The implementation of ConstructSim on your project will improve productivity by providing the 
following benefits: 
 Improved constructability analysis, interactive planning and coordination between 
engineering office and site field office using Virtual Plant Model 
 Visually plan more optimal pipe installation and hydro test work crew packages 
 Streamline material, equipment and sequencing 
 Reduce rework/out-of sequence work 
 Automated task estimates/automate data entry 
 Speed time to start-up by systems tracking 
 Better predictability of where you are on the project 
 Reduce time looking for information via visually monitoring the status of engineering, 
materials and construction execution progress 
Improves Project Management 
In ConstructSim, project teams can visualize and interact with a virtual construction model 
(VCM), visually organizing engineering components into construction work areas (CWAs), 
construction work packages (CWPs), and installation work packages (IWPs). This allows a 
more optimal and granular work breakdown structure to drive engineering, procurement, and 
fabrication based on the sequencing needs of field installation. Visually defining CWAs and 
CWPs provides an unprecedented level of management control over construction planning. 
Construction managers can more easily and accurately plan work priorities and installation 
sequences. 
Quantity Tracking 
ConstructSim represents the future of model-based quantity tracking and earned value 
reporting. Templates can be used to assign milestones with labor estimates onto construction 
quantities and then generate a database of Level 5 work steps for planning and measuring 
progress. Publishing of progress scorecards, material lists, reports, and other documentation into 
IWPs for the crews can be automated. 
17
Construction Status Tracking 
Users can mark and track individual model component or groups to see a color-coded 3D 
image representing construction status. This allows progress to be tracked in near real-time, 
providing a clear overview of complex projects. 
Construction Schedule Animation 
Automatic linking of components and user-defined groups with the schedule provides flexible 
4D schedule visualization. With a clear understanding of the construction path, supervisors can 
maximize safety while meeting schedule requirements. Users can also report estimated and 
earned hours and quantities for measuring progress of the Level 3 schedule via a model-based 
5D cost analysis. Data can be uploaded from subcontractors to monitor and coordinate 
interdependent activities, moving to an X-D construction simulation environment. 
Materials Management 
Improved scheduling is based upon materials currently on-site and estimated arrival dates 
received from procurement in the materials system. Users prioritize material feasibility analysis 
from the detailed sequence of IWPs and eliminate cumbersome data entry through automated 
material reservation requests. Integration with RFID and bar coding systems adds to the ability to 
optimize on-site material management. 
Proactive Management 
ConstructSim improves the acquisition of information from the field before finalizing plans. It 
provides a visual representation of available work and materials, and then manages the 
resource constraints against each work package. ConstructSim dynamic ability to track, 
update, and edit work packages based on constraints helps ensure packages are released to the 
field only when management knows the IWPs can be completed, reducing rework and 
minimizing out-of-sequence work. 
18
Software 
Features 
19 
CostOS Glodon Innovaya Vicosoft Bentley 
Construction 
Management 
report 
- - - √ √ 
4D BIM for 
Scheduling 
- - - √ √ 
Materials 
Management 
- - - - √ 
Quantity 
Takeoff 
√ - √ √ √ 
Connection to 
other software 
√ √ √ - - 
Equipment 
Depreciation 
Estimating 
√ - - - - 
Cost Statistics 
√ - √ - √ 
2D & 3D BIM 
Modeling 
√ √ √ - √ 
4D & 5D 
Estimating 
- - √ √ √ 
5D Modeling - - √ - - 
Online Database 
Resource 
√ - - - -
The best BIM software does not necessarily mean having the most features but also having the 
appropriate features for your job, in this case quantity surveying. Therefore, I would recommend 
Nomite ch’s CostOS. This is so, because the founders are engineers which mean they have many 
years of real life industry experience. They deliver practical, innovative, state of the art cost 
estimating software which is rapidly becoming the future standard for estimating. CostOS can 
help increase their competitiveness by responding to modern estimating challenges more 
quickly, with less effort, more accuracy, less risk, and with an increased level of confidence. 
It can help win more work by allowing you to value engineer and differentiate your solution 
whilst meeting your clients’ requirements. They work closely with each of their customers to 
build mutual trust and ensure that the clients get the most from their capabilities and maximum 
value from their investment with them. Their client base is rapidly increasing by word of mouth 
as a result of their reputation. They have also gained the respect of large software organizations 
like Oracle, who recommend CostOS as their preferred partner solution for Construction, EPC 
and Oil & Gas clients, on a global scale. They continually invest in new ideas, technologies and 
approaches to estimating, in order to address the challenges of the industries they serve. The 
implementation of CostOS on your project will improve productivity by providing the following 
benefits: 
 enables the quick and accurate pricing of ‘less than fully-detailed’ BIM models 
 allows design optimization and quick identification of most appropriate materials and 
20 
construction methods 
 ‘what you see is what you estimate’, CostOS ensures that no item is missed 
 Allows you to measure in 2D shapes, 3D shapes or structural members 
 Quantity takeoff can be massively accelerated and the accuracy you can achieve is 
unprecedented. 
 create your Bill of Quantities directly on your 3D model 
 provide you with the visualization of the model
Preparation / Briefing Stage 
Preparation and Briefing Stage is the process for completing the design and construction of a 
building is often divided into stages. This can be helpful in establishing milestones for the 
submission of progress reports , the preparation of information for approval, client gateways, 
and for making payments. However there is a great deal of ambiguity between the naming of 
stages by different organizations and the definition of what individual stages actually and so it is 
important that appointment documents make it clear specifically what activities fall within which 
stage, and what level of detail is required. During this stage, the marketing and selling of BIM is 
done supported by cost analysis to justify the upfront investment or profit. Some firm may 
provide services of BIM without selling the software to the client. 
21 
Benefits Constraints 
Better outcomes through 
collaboration 
All project partners such as different design 
disciplines, the customer, contractor, specialists 
and supplier are using a single and shared 3D 
model. This means that every one of the 
partners is focused on achieving best value, 
from project inception to eventual 
decommissioning. 
Inflexibility in construction costs 
Implementation of BIM QS computer software 
on construction projects may present an idea on 
the total expected construction cost, but it 
might not be accurate. BIM allows the users, 
client and operators to estimate the most 
accurate building cost-to-complete, but it will 
not consider the actual price variation from the 
emerging market, such as metals, petroleum-derivative 
products, high gas prices, and 
other natural disasters affecting manufacturer’s 
plant. 
Improved visualization 
Projects can be visualized as of this stage, 
giving users, clients and operators a rough idea 
of design intended. 
Cost of software 
The cost to obtain any BIM QS computer 
software is very expensive. It is very common 
that newly built companies do not have enough 
capital or money to buy this software to help 
ease their work.
Design Stage 
Schematic Design 
The first step by the design team is referred to as the schematic design phase, in which the 
objective is the development of simple diagrammatic documents delineating room sizes and 
relationships, single line diagrams of all systems (i.e. water mains, electrical risers, etc.), 
preliminary elevation studies of the building exterior. The schematic design will be reviewed 
during frequent meetings with the building committee and FP&C. At the conclusion of this 
design phase, the architect will submit drawings, a project narrative and an estimate of 
construction cost for review and approval by the building committee and appropriate college 
representatives. 
Design Development 
The approved schematic design is then further developed into definitive plans and elevations 
by the design team. Colors, patterns, materials, lighting fixtures and special equipment and 
building elements are selected and reviewed with the building committee. Detailed floor plans, 
sections, elevations and an outline specification defining materials, finishes and systems, as well 
as an updated construction cost estimate, are submitted for review and approval by the building 
committee and appropriate college representatives. 
22
Benefits of using BIM in Design Stage: 
Until the mid-nineteenth century, the general method of design did not change a lot. Engineers 
used simple tools (such as pen, paper and ruler) to describe their buildings. However, with 
advances in mathematics and building materials, the process of design changed and improved 
rapidly. 
With the invention of the computer, 2D CAD as a new drawing tool was adopted completely in 
the AEC industry. SKETCHPAD was first developed by Ivan Sutherland. That was the root of 
CAD. At the beginning, the technology of CAD was not as popular as in modern times. However, 
with the popularization of personal computers, the renowned software company Autodesk 
developed AutoCAD. Suddenly, all the architects in the world started to learn and use this type 
of software to design their project. The technology development form 2D CAD to 4D 
simulation greatly improved the design process. Internet technology and emerging media (such 
as videoconferencing) also strongly influence the development of design tools and literature in 
those fields was reviewed as part of this research. 2D CAD developed into 3D modeling. This 
innovation changed the process of building design and the relationship between the structural 
engineer and the architectural designer. It did not only change the way building designs are 
visualized, but also signaled a paradigm shift in design thinking from pure visualization to 
simulation. 
BIM not only improves the technology itself, also changes the process of design and build. 
From the questionnaire results, all BIM users choose this option as the main benefit of using BIM. 
BIM enables better decisions-making; faster BIM reduces the abstraction and integrates the 
multiple disciplines, including design and documentation. And BIM integrates plans, sections, 
details, graphics, and data in ways not possible in 2D. The period which is spent on the design 
can be cut by about half at half the cost. Moreover, half time at half cost will not just save the 
money; it is also reducing the time to the market. Therefore, using BIM can save the cost of 
design and can benefit from earlier access to the construction market. 
23
Pre-construction Stage 
The construction planning involves the scheduling and sequencing of the model to coordinate 
virtual construction in time and space. The schedule of the anticipated construction progress can 
be integrated to a virtual construction. There are two common scheduling methods that can be 
used to create 4D Building Information Model. These are critical path method (CPM) and line 
of balance. In the Critical Path Method, each activity is listed, linked to another activity, and 
assigned durations. Interdependency of an activity is added as either predecessors or successors to 
another activity. Moreover, the duration of the activities are entered. Based on the dependency 
and duration of the activities, the longest path is defined as the most critical path. The activities 
defined in the longest path are defined as the critical activities. These activities do not have any 
float. In other words, if these activities are not completed within anticipated duration, the total 
duration of the project will be further pushed out. Overall CPM is a commonly used technique 
that helps projects stay within schedule. Line of Balance technique uses location as the basis for 
scheduling. This method is an alternate to the CPM. It is advantageous for repetitive tasks to 
increase labour productivity. In this method, activity durations are based on the available crew 
size and the sequence of the location. Productivity of the labour force can be altered as needed to 
accurately depict the construction schedule. The approach focuses on the locations being 
completed by a trade before the other trade moves in. This reduces the number of 19mobilizations 
and resources. Overall, line of balance is a good scheduling method to plan and monitor repetitive 
tasks during construction progress. The planning through using BIM enhances site utilization, 
space coordination, and product information. 
CAD Measurement 
Modeling with CAD systems offers a number of advantages over traditional drafting methods that 
use rulers, squares, and compasses. For example, designs can be altered without erasing and 
redrawing during preconstruction. CAD systems also offer "zoom" features analogous to a camera 
lens, whereby a designer can magnify certain elements of a model to facilitate inspection. Computer 
models are typically three dimensional and can be rotated on any axis, much as one could rotate an 
actual three dimensional model in one's hand, enabling the designer to gain a fuller sense of the 
object. CAD systems also lend themselves to modeling cutaway drawings, in which the internal 
24
shape of a part is revealed, and to illustrating the spatial relationships among a system of parts. To 
understand CAD it is also useful to understand what CAD cannot do. CAD systems have no means 
of comprehending real-world concepts, such as the nature of the object being designed or the 
function that objects will serve. CAD systems function by their capacity to codify geometrical 
concepts. Thus the design process using CAD involves transferring a designer's idea into a formal 
geometrical model. Other limitations to CAD are being addressed by research and development in 
the field of expert systems. One example of an expert system involves incorporating information 
about the nature of materials their weight, tensile strength, flexibility, and so on into CAD software. 
By including this and other information, the CAD system could then "know" what an expert 
engineer knows when that engineer creates a design. The system could then mimic the engineer's 
thought pattern and actually "create" more of the design. 
Manual Measurement 
Traditional QS practice involved a manual process with drawings received on paper and Quantity 
Surveyors using scale rules to take measurements off the drawings and input them onto a computer 
system for the purposes of creating a Bill of Quantities. Measurement Tools like Dimension Paper, 
Scale Rulers, Standard Method of Measurement and calculator. While accuracy is the primary 
objective, clarity of presentation and communication remain major priorities. A logical approach in 
the taking off will greatly assist subsequent understanding. Technical accuracy in booking 
dimensions should be rigidly observed at all times. Measurements should be made in a logical 
sequence; for example measuring in a clockwise sequence or following room or door numbers. 
Dimensions and calculations should be fully annotated. In preconstruction stage, the operating 
contractor has to develop the conceptual cost estimate before completing the conceptual 
design. The basis for this planning estimate is, the descriptive purpose of the project, general 
design criteria, significant features and components, the methodology, and any other known 
research and development as required. All assumption made within this estimate must be 
documented fore review and concurrence. 
25
Construction Stage 
What Is Construction stage? 
Basically, construction stage commences after the design of the project has been finalised with a 
contractor being appointed to undertake the construction of the facility. This normally covers all 
the works on a site including any specialist tasks which may be carried out by subcontractors or 
equipment suppliers. 
Benefits of using BIM in construction stage 
Synchronization of design and construction planning can be done using tools like simulation of 
construction processes to reveal sources of potential problems. With that, clash detection allows 
for detection of design errors as well as omissions before actual construction. Not only that, cross 
system updates enables faster reaction to design problems or site issues. The BIM model as well 
as objects and families can be used as basis for fabricated components. It also improves 
synchronization of procurement with design as well as construction through the generation of 3D 
models. It also does reduction of wastages and better operation of lean construction techniques. 
The Building Information Model allows us to ask the database questions like "How many cubic 
yards of concrete are in the foundation?" or "How many square feet of this type of plywood?" or 
"How many electrical receptacles of this type are in the project?". The ability to make changes 
easily, even late in the project. This means that late changes to a design may be done with much 
less effort than in the past, and that more options can be explored during the early design process. 
Constraints of using BIM in construction stage 
BIM requires more effort at the front end of a project to establish the initial framework. But the 
settlement is that you are able to extract a much higher quality and greater quantity of information 
from that model. It allows changes to happen easily, so clients may continue to make changes too 
late in the process, and that can influence construction and design costs. BIM results in much 
larger file sizes than traditional CAD systems, and requires higher performing computer hardware 
26
to operate it effectively. Not only that, The use of BIM requires substantial training and as with 
any software program there are costs associated with the software such as purchasing, licensing 
and training. A contractor may need to upgrade its computer system to effectively use the BIM 
software. 
Benefits of using CAD Measurement in construction stage 
The measurement is more accurate as CAD drawings are produce in actual size and thus error in 
quantities due to incorrect scale is eliminated. The measurement course for irregular shape is 
faster and easier. If the irregular area is measured manually, it would need many steps in 
calculating the total area. By using CBMS, the area of irregular shape of a building can easily be 
measured by just clicking the border of the shape. The layering concept in CAD software will 
assist the taker off in viewing and identifying similar items throughout the drawings. For example, 
types of floor finish. Different floor finishes can be separated using various colours or hatch 
patterns and the exact area of the different type of floor finishes is then calculated by clicking on 
the objects. 
Constraints of using CAD measurement in construction stage 
CAD drawings are not formed using a standard method in layering and also there is no standard 
in naming the layers. This creates problems in finding and searching for the applicable items 
during measurement. As the drawings are 2D, measurement is easily done for unit of measure 
that required 2D only. Quantities that require 3D such as the measure of volume would require 
additional steps in obtaining the quantity. Not only that, the use of CBMS is limited to measuring 
quantities only. 
Benefits of using Manual measurement in construction stage 
All the measurement will be in hand written so it will reduced the risk of loss of information 
where the use of software will have a higher risk in loss of information because if the files are not 
save properly or the computer suddenly spoil, all the information will be gone. The complexity of 
27
using manual measurement is much lower compared to using software where training in need if 
you want to use the software. You can also save a lot of money by using manual measurement 
because it technically doesn’t charge you anything where you need to pay an amount of money 
for the usage of the software. 
Constraints of using Manual measurement in construction stage 
Compared to software, manual measurement can identify error faster than using software because 
manual measurement doesn’t have the system to check error like the software. It also has a slower 
progress compare to the software so it will have the tendency to delay the completion of the 
construction. Generally saying, it is time consuming. It also doesn’t have the 3D, 4D or 5D 
purposes like the software. 
28

Softwareapplicationassignment 141204035809-conversion-gate02

  • 1.
    SCHOOL OF ARCHITECTURE,BUILDING AND DESIGN BACHELOR OF QUANTITY SURVEYING (HONOURS) 1 QSB2813 – Software Application Software Application for Quantity Surveying AUG Semester 2014 Submission Date: 14th October 2013 Name Student ID Yam Yih Hwan 0305861 Low Rong Tzuoo 0304924 Ng Jun Keat 0314368 Dixon Cheong 0310356 Adrian Ng Kar Chun 0314516
  • 2.
    Nomitech is aleading niche software company specializing in Cost Estimating solutions. Their founders are engineers with real life industry experience and they deliver practical, innovative, state of the art cost estimating software which is rapidly becoming the future standard for estimating. Our Cost Estimating solution, CostOS is specifically designed for companies that want to increase their competitiveness by responding to modern estimating challenges more quickly, with less effort, more accuracy, less risk, and with an increased level of confidence. They recognize that the cost estimating process is at the core of every project related company. CostOS is a mission critical system which allows you to value engineer and differentiate your s olution whils t me eting your clie nts’ re quirements. It allows you to win more work. At Nomitech, they are passionate about success, and they measure their success by the success of their clients. They work closely with each of their customers to build mutual trust and ensure that the clients get the most from their capabilities and maximum value from their investment with them. Their client base is rapidly increasing by word of mouth as a result of their reputation. They have also gained the respect of large software organizations like Oracle, who recommend CostOS as their preferred partner solution for Construction, EPC and Oil & Gas clients, on a global scale. They continually invest in new ideas, technologies and approaches to estimating, in order to address the challenges of the industries they serve. 2
  • 3.
    Function / Advantages: CostOS’ powerful parametric engine, if combined with BIM, enables the quick and accurate pricing of ‘le s s than fully-de taile d’ BIM models. Moreover, it allows design optimisation and quick identification of most appropriate materials and construction methods. Intelligent, parameter-driven assemblies can be built and applied to BIM elements. With CostOS BIM technology, it really is a case of ‘what you see is what you estimate’. As model elements are selected and measured, CostOS ensures that no item is missed. CostOS has take-off capabilities to suit every occasion. Costs also has a unique function take-off capability. Functions can calculate additional information from simple measurements. This can be from 2D geometrical shapes, 3D geometrical shapes or indeed structural members. For example, by measuring the length of a steel section, mathematical equations can calculate the weight and the surface area. Or say the volume of a sphere together with its surface area. CostOS BIM Estimating makes full use of all the benefits you can get by using the 3D model of your project. Its embedded 3D viewer allows you to navigate easily through it and autoselect entities. The quantity takeoff of your project (Architectural, Structural, Mechanical, and HVAC, Electrical etc.) can be massively accelerated and the accuracy you can achieve is unprecedented. You can also create your Bill of Quantities directly on your 3D model and see how it is built up while your estimate progresses. CostOS works with open standards and thus it supports all major designing systems. You do not have to buy any of these systems, unless you want to make the designer’s work, as CostOS will provide you with the visualization of the model. CostOS’s system recognition allows you to work on mechanical models with unbeatable accuracy and speed. More importantly while working directly on the 3D model you can identify omissions or mistakes of the design and amend your estimate accordingly. 3
  • 4.
    Glodon Software CompanyLimited was found in China Beijing 1998 year. It is the leader of the information industry in Chinese construction field. Glodon Software offers the construction project field most valuable information products and professional services to promote the development of information in the construction industry. Glodon owns independent intellectual property rights on its main products and technologies, and establishes an effective research and development management system. Now, Glodon has more than 20 core technologies, over 100 pieces of software copyright, and 9 patents. Glodon 3D graphics technology, BIM solution, cloud computing technology, and management platform are very advanced. Besides that, Glodon employs more than 3000 employees, with the number of corporate users exceeding 100,000, of which there are nearly 400,000 direct users of cost series products, accounting for 53% of China's domestic market. Glodon products have been applied in-depth in many remarkable construction projects, like the Bird's Nest, China National Grand Theatre, Shanghai Disney, Shanghai Tower and Guangzhou East Tower, winning very high praise from the clients. There are three products that under Glodon Software Company which are Glodon Takeoff for Rebar (TRB), Glodon Takeoff for Mechanical and Electrical (TME), and Glodon Takeoff for Architecture and Structure (TAS). 4
  • 5.
    Glodon Takeoff forRebar (TRB) Glodon Takeoff for Rebar, also known as TRB, is a suite of quantity calculation software based on the Building Information Modelling (BIM) technology, which is embedded with groundbreaking 3-dimensional measurement and calculation rules, including British Standards and Uniform Building By-Law. TRB enables the users to perform quantity taking-off from electronic drawings and images with immediate 3D visualization effect and shows accurate results for each component in real time. There shall be less data and formulae input by the user are needed in calculation of the quantity. Thus, the accuracy level of the result is higher with minimal undesirable careless mistakes. Now available for: Singapore, Malaysia, Hong Kong, Macao, Taiwan, Indonesia, Thailand and India. Features and Key Functions  BIM-base measurement software  Built-in calculation setting based on British Standards and Uniform Building Bye-Law  Interchangeable calculation mode between Tendering Mode and Prefabrication Mode to 5 address different requirements  Import 3D model from TAS to calculate rebar quantities  Produce 3D model from by identifying CAD entities  User-friendly interface  Produce Rebar Schedule for fabricator on site  Calculation result with detail breakdown  Various reporting format
  • 6.
    Glodon Takeoff forMechanical and Electrical (TME) Glodon Takeoff for Mechanical and Electrical known as TME, it provides multiple quantity surveying modes such as quantity surveying by importing CAD drawing, quantity surveying by drawing input, quantity surveying by single element input and quantity surveying by table input, as well as applies such functions and methods as 3D computing technology, quick processing of quantity change , automatic circuit identification for wire conduits , automatic searching of start point for cable bridges and automatic identification of wind pipes to thoroughly address complicated manual statistics, difficult auditing, low efficiency and other problems cost personnel face in tendering and bidding, in process quantity calculation and quantity check in settlement. Now Available for: Singapore and Malaysia. Features and Key Functions  The number, length and area are easy to calculate and read  The number of devices can be easy to read, and all devices of the same specifications will 6 be generated simply by clicking a button  Accessories can be identified by multiple logos, and different elements can be intelligently differentiated  Complicated pipelines can be calculated quickly and efficiently, and simply clicking a button will generate all pipelines of the same model  Area identification enables modeling range to be controlled and adjusted
  • 7.
    Glodon Takeoff forArchitecture and Structure (TAS) Glodon Takeoff for Architecture and Structure known as TAS, it is embedded with Commonwealth of England calculation rules, enabling users to quickly build a 3D time -cost model. There are a series of processing method and function such as: 3D modeling, processing change, estimating rebar content, addressing quantity survey, quantity calculation involved in tendering and bidding and element quantity calculation in the settlement stage. It is simple, helpful and accurate quantity calculation software. Now available for: Singapore, Malaysia, Hong Kong, Macao, Taiwan, Indonesia, Thailand, India, UK and Philippines. Features and Key Functions  Open functions, easy to operate  Open elevation, which enables easy processing of buildings with complex structures 7 such as staggered floor, mezzanine floor and skipped floor  Open location, which enables manual tracing, fast location, and convenient modeling  Open rules, which enable adjustments of calculation rules and special options of calculation settings based on actual projects to meet all quantity surveying requirements
  • 8.
    Innovaya applications aremeant to support team work from design to construction. The software benefits can be fully realized when it's used in a team, whether virtually or in the same company. With this goal in mind, our technologies are developed with two principles which is the project data must be shared and exchanged by all of our applications. Little altering of design data or reentering should be needed. We intend to offer various applications with features that suit for different needs and different user types or companies. Whether you are a design firm, a contractor, a design-build, or an owner organization, you will find Innovaya applications useful for your AEC projects. For example, the users who find Innovaya software beneficial include are BIM designers, engineers, and 3D modelers, Project Coordinators, Project and Construction Managers or subcontractors Estimators and cost database experts , Schedulers and Owners. 8
  • 9.
    Innovaya Visual BIM Interactive 3D Visualization With the robust 3D functions, users of Visual BIM can enjoy the best performance for 3D building model navigation. Easy-to-use 3D user interface controls enable the user to do real-time walk-through and to examine object details. The 3D objects are interactive and selectable. Features such as tracking camera positions dynamically and virtual tours are also useful for making highly impressive project presentations for clients. Dynamic Visibility Controls for 3D Objects A building information model (BIM) in 3D representation is essentially an enclosed structure. This makes it difficult to view the details of all of the objects in a model. However, Innovaya Visual BIM organizes the objects by their building sections as well as component types. Then the visibility and transparency of these objects can be adjusted easily using visibility controls. Therefore, object details can be examined thoroughly in 3D view. Visual BIM is a true BIM-based application. It not only presents detailed geometry of 3D objects, but also shows the detailed properties of every object. Support for Effective Team Communication Innovaya Visual BIM offers essential functions to assist communication among the project members. With tools such as Markup and E-mailing, Visual BIM users can enter comments directly onto a snapshot of the 3D design and send it via e-mail to project members. The powerful, easy-to-use 3D navigation features are also useful for presenting design-estimating coordination issues to the project team. 9
  • 10.
    Innovaya Visual QuantityTakeoff (QTO) Automatic Quantity Generation Visual Quantity Takeoff can automatically generate complete object quantities directly from a design model. This process usually takes several seconds to complete for the entire building model, while the same job could take several days using traditional on-screen takeoff or digitizer methods. The quantities are extracted based on object types and their dimensions. Quantity extraction methods are easily customized and are reusable for multiple projects. Additionally, the quantities are all stored by group of objects based on the object property conditions set by the user. Drag & Drop Quantity Generation With Visual Quantity Takeoff, the user can also choose the Drag & Drop Quantity generation method to takeoff object quantities. With this approach, the user can select any building section (such as a building level), view the objects in 3D, and drag and drop it into the quantity generation window. They can use the same drag & drop method to choose a component type, such as walls, to takeoff the quantities of a selected building section. During this process, the user can also define the most appropriate way to group objects and calculate total quantities. The drag & drop quantity generation process can usually improve the productivity of quantity takeoff by at least 300%. Managed Object Quantities The quantities generated are stored in a manageable manner in Visual Quantity Takeoff. For example, they are organized by user defined folders, which can be in different classifications such as CSI or Uniformat. The quantities can also be sorted by building sections or component types. When generated, the quantities are automatically linked with the objects which can be tracked and viewed in 3D at any point. This ‘what-you-see-is-what-you-takeoff’ theme provides visual confirmation on objects’ quantity takeoff status using different color codes, and it assures the completeness of the project quantities taken-off. Each managed quantity group can be assigned a unique color code for its 3D objects for easy tracking and identifying objects associated with the quantities. Furthermore, the quantities can be saved in a separate file which can be opened in Innovaya Visual Estimating for Sage Timberline Assembly and Item takeoffs. 10
  • 11.
    Intelligent Change Management Because the quantities generated are automatically associated with the objects, Visual Quantity Takeoff can be used effectively for change management. For example, if the design has been changed, Visual Quantification can display changed, new, and deleted objects in different colors in 3D. There is also a function that allows you to validate the quantities generated previously against the new design, and then automatically update those quantities. Quantity Reports to MS Excel With one-click of mouse button, all of the objects quantities can be exported as reports in MS Excel. There is no limitation on how many quantity columns can be generated as in some on-screen programs. The quantities in the reports can also be sorted by user defined folders, building sections, or component types. Additionally, all object quantity color codes are shown in the MS Excel spreadsheet against each quantity group. Along with a snapshot of the color-coded 3D object view pasted into MS Excel, these color codes help identify, visually and clearly, what objects are used to generate the quantities. Interactive 3D Visualization With our robust true 3D engine, users of Visual Quantity Takeoff (QTO) can enjoy the best performance of 3D building model navigation. Easy-to-use 3D user interface controls allow estimators to do real-time walk-through 11 and to examine object details. The 3D objects are highly interactive and selectable. Object visibility and transparency can be adjusted by building section or component type. All object properties can be examined. Special object information such as wall layers can also be inspected. Support for Effective Team Communication Visual Quantity Takeoff not only integrates design and cost estimating, it also offers essential functions to assist communication between the project members. With tools such as Markup and E-mailing, Visual Quantity Takeoff allows the user to enter highlighted comments directly onto a snapshot of the 3D design and send it as a picture, via e-mail, to project members. The powerful easy-to-use 3D navigation features are also useful for presenting design-estimating coordination issues in front of the project team.
  • 12.
    Innovaya Visual 4DStimulation Your Vision Shared Visual 4D Simulation provides an excellent way to present a progressive project vision. By dynamically showing project phases and site logistics in a 3D virtual reality environment, clients are impressed and the entire project team works synergistically. Schedulers, project managers, superintendents, designers, engineers, estimators and even clients, can expect a shared understanding of project status, milestones, responsibilities, and construction plans. Everyone is sure to be on the same page at any time with the 4D representation of the project in conjunction with traditional schedule GANTT charts. Improved Project Coordination With Visual 4D Simulation's ability to link any 3D design data in DWG with either MS Project or Primavera scheduling tasks and to show projects in 4D, designers, builders and owners can easily see how projects are built. This helps everyone to understand the schedule quickly and thoroughly. By visualizing how objects in 3D and how they're installed in sequence, many design conflicts can be quickly identified. Team based decisions can be made quickly and comfortably with Visual Simulation by being able to see the results of seamlessly incorporated design or schedule changes, and this process would avoid many physical mock-ups. Showing and communicating 4D in resource color codes to subcontractors also help logistical planning and trade coordination, therefore avoiding disruptions during construction. Optimized Construction Sequencing By visualizing color-coded tasks or resources on objects, and their connections to objects, schedulers can cross-check tasks against design objects. For instance, an object liked with two tasks on the same day shown in a specific color might hint at a potential schedule problem, while an unlinked object could indicate a missing task in the schedule. These features help schedulers create accurate schedules. Similarly, showing that no tasks are assigned on a certain date on some objects may present potential readiness of a work space, which could allow subsequent tasks to start earlier, resulting in tighter construction sequencing and project time savings. 12
  • 13.
    What-if Analysis andChange Management A change on a task can cause ripple effect changes on other tasks. Visual 4D Simulation's On-demand 13 4D feature immediately visualizes the impact of these changes to the objects so that different construction scenarios can be analyzed, presented, and discussed allowing the best decision to be made based on different project member perspectives. Visual Simulation can also seamlessly synchronize changes made on either the schedule or on 4D tasks. Changes made to design objects also often cause schedule changes and resource re-assignments. Visual Simulation reflects these object and schedule changes in 3D and 4D which allows the project team to address issues and adjust construction plans accordingly. Analyzing Constructability and Improved Safety By showing the building model in 3D at any hierarchical or any system component level and presenting the detailed sequences of objects to be installed, Visual Simulation's 4D views clearly expose the objects' structural and special constraints. Construction safety can be improved by using 4D views. Hazards can be anticipated by visualizing and analyzing the constraints against object installation requirements and to see the entire construction site situations. The best construction methods can be selected based on a better understanding of these project constructability issues. Powerful Functions Yet Easy to Use With the robust 3D engine, users of Visual Simulation can enjoy the best 3D navigation performance. Easy-to-use 3D user interface controls provide capabilities of real-time walk-through and examination of object details. Objects linked with tasks can be viewed in 3D by clicking on the tasks, while tasks associated with objects are also listed when the objects are selected. 4D simulations can be created and viewed in different modes, either with objects original colors, or with task or resource color codes. 4D behaviors are automatically adjusted according to the construction type of the objects such as new objects, temporary facilities, e.g. trailers, temporary parking, and construction equipment, or existing objects to be removed such as ground excavation, and so on. The association between objects and tasks can be established easily, quickly, and visually.
  • 14.
    Vico Office isthe first purpose-built construction software that allows users to plug in the BIM authoring application of their choice and then perform a constructability analysis , quantity takeoff, a model-based schedule, model-based estimate, and on-site production control, all in an integrated workflow. This integrated workflow is unique in the commercial construction market. With Vico Office, you have a live model - a model where the 3D geometry is integrated with the quantities which is integrated with the 4D schedule which is integrated with the 5D estimate. This means that when one element of the 3D model changes (let's say the building gets a new floor or a new material is chosen for the lobby floor), both the schedule and estimate automatically change. The 5D BIM Workflow starts at the creation of a new project and ends with reporting and data mining. When firms start gearing up for a new project, they add 2D drawings and 3D models to the Document Registry for version control and change management. Models can then be published to Vico Office from ArchiCAD, Tekla, Revit, AutoCAD Architecture, and/or AutoCAD MEP. Or, using special CAD-specific Importers, IFC files, SketchUp files, CAD-Duct files, and even 3D DWG files can be used in Vico Office. Through Vico Office Document Controller we can quickly recognize changes between drawing sets and model versions. Honing in the changes with slider and highlight modes, we can cloud and annotate issues, and even start a cross-team discussion or report upon the items in question. After the BIM models are completed, we publish, augment, and compare 3D models from multiple project stakeholders all within the Vico Office Client. These models can be combined in Vico Office. Then we detect any constructability matters in Vico Office Constructability Manager and report these matters to the design team for resolution. Now, the coordinated models can once again be compared to the 2D contract documents in Vico Office Document Controller as a final accuracy check before prefabrication and installation drawings are generated. Now Project Engineers can identify critical points for sleeves, deck elevations, key framing locations, hangers and bracings, pipe runs, slab edges, etc. and map them in Vico Office Layout Manager. They don't need the original BIM, just the latest version of the model inside Vico Office. As soon as we’ve identified the coordination issues, we use Vico Office Takeoff Manager to generate construction-caliber quantities. 14
  • 15.
    Now with thequantities, estimators use Vico Office Cost Planner to create multiple iterations of the 5D estimate as the models’ level of detail increases. With the estimate in place, we track the project budget in Vico Office Cost Explorer, helping the Owner recognize which decisions have the most impact on the budget and schedule. Planners also take advantage of these quantities and start evaluating the project and creating the optimal combination of location systems for the trades in Vico Office LBS Manager. By organizing the project locations, an optimal sequencing logic can be applied with Vico Office Schedule Planner, the model-based scheduling solution which utilizes flow line theory as opposed to traditional CPM. These options can then be analyzed in terms of both cost and time. And the Vico Office 4D Manager Schedule presentation helps the GC and subs work together to evaluate what-if scenarios and determine the best solution. Finally, as the project moves from headquarters out to the field, the team utilizes Vico Office Production Controller to monitor and adjust crews as necessary. With real-time inputs for actual crew productivity rates, the team has enough warning to avoid trade conflicts and cascading delays. Comprehensive construction management reporting is organized in the Vico Office Client. Since Vico Office is a database of projects, all fields and their values can be accessed with reporting. 15
  • 16.
    Bentley ConstructSim isa powerful virtual construction simulation system for detailed and automated workface planning on large projects. ConstructSim provides construction management the visibility needed to rapidly and effectively respond to project issues to increase productivity, drive down costs and reduce project cycle time, while providing improved risk mitigation and team safety. Bentley ConstructSim is a revolutionary program that optimizes your project through the planning, sequencing, execution and monitoring of construction activities from within a virtual plant model. ConstructSim links together project IT systems including: the 3D CAD model (all major formats: PDS, PDMS, etc.); schedule; materials management system; project controls databases and others to create an integrated virtual environment that is constantly up-to-date. This integrated virtual environment enables the following functionality within ConstructSim:  Virtual Walk Through  4D (3D + time) Schedule Simulations  Automated Construction Material Take-Offs  Automated Detail Task List Generation  Life Cycle Status Tracking (color coding material availability and progress by area, system, spool/sheet, piece mark, task, etc.)  Pipe and Steel Work Packaging at Weekly Crew Level  Generic Work Packs for Other Disciplines (E&I, Civil, Mechanical) that take advantage of the database more than the virtual plant model  Pipe and Steel Change Order Impact Analysis  Tracking of the Design Changes Back to the Model  8-Week Look Ahead Planner/Constraint Analysis and Crew Planning  Crane and Scaffold Simulation/Crew Density Analysis 16
  • 17.
    The implementation ofConstructSim on your project will improve productivity by providing the following benefits:  Improved constructability analysis, interactive planning and coordination between engineering office and site field office using Virtual Plant Model  Visually plan more optimal pipe installation and hydro test work crew packages  Streamline material, equipment and sequencing  Reduce rework/out-of sequence work  Automated task estimates/automate data entry  Speed time to start-up by systems tracking  Better predictability of where you are on the project  Reduce time looking for information via visually monitoring the status of engineering, materials and construction execution progress Improves Project Management In ConstructSim, project teams can visualize and interact with a virtual construction model (VCM), visually organizing engineering components into construction work areas (CWAs), construction work packages (CWPs), and installation work packages (IWPs). This allows a more optimal and granular work breakdown structure to drive engineering, procurement, and fabrication based on the sequencing needs of field installation. Visually defining CWAs and CWPs provides an unprecedented level of management control over construction planning. Construction managers can more easily and accurately plan work priorities and installation sequences. Quantity Tracking ConstructSim represents the future of model-based quantity tracking and earned value reporting. Templates can be used to assign milestones with labor estimates onto construction quantities and then generate a database of Level 5 work steps for planning and measuring progress. Publishing of progress scorecards, material lists, reports, and other documentation into IWPs for the crews can be automated. 17
  • 18.
    Construction Status Tracking Users can mark and track individual model component or groups to see a color-coded 3D image representing construction status. This allows progress to be tracked in near real-time, providing a clear overview of complex projects. Construction Schedule Animation Automatic linking of components and user-defined groups with the schedule provides flexible 4D schedule visualization. With a clear understanding of the construction path, supervisors can maximize safety while meeting schedule requirements. Users can also report estimated and earned hours and quantities for measuring progress of the Level 3 schedule via a model-based 5D cost analysis. Data can be uploaded from subcontractors to monitor and coordinate interdependent activities, moving to an X-D construction simulation environment. Materials Management Improved scheduling is based upon materials currently on-site and estimated arrival dates received from procurement in the materials system. Users prioritize material feasibility analysis from the detailed sequence of IWPs and eliminate cumbersome data entry through automated material reservation requests. Integration with RFID and bar coding systems adds to the ability to optimize on-site material management. Proactive Management ConstructSim improves the acquisition of information from the field before finalizing plans. It provides a visual representation of available work and materials, and then manages the resource constraints against each work package. ConstructSim dynamic ability to track, update, and edit work packages based on constraints helps ensure packages are released to the field only when management knows the IWPs can be completed, reducing rework and minimizing out-of-sequence work. 18
  • 19.
    Software Features 19 CostOS Glodon Innovaya Vicosoft Bentley Construction Management report - - - √ √ 4D BIM for Scheduling - - - √ √ Materials Management - - - - √ Quantity Takeoff √ - √ √ √ Connection to other software √ √ √ - - Equipment Depreciation Estimating √ - - - - Cost Statistics √ - √ - √ 2D & 3D BIM Modeling √ √ √ - √ 4D & 5D Estimating - - √ √ √ 5D Modeling - - √ - - Online Database Resource √ - - - -
  • 20.
    The best BIMsoftware does not necessarily mean having the most features but also having the appropriate features for your job, in this case quantity surveying. Therefore, I would recommend Nomite ch’s CostOS. This is so, because the founders are engineers which mean they have many years of real life industry experience. They deliver practical, innovative, state of the art cost estimating software which is rapidly becoming the future standard for estimating. CostOS can help increase their competitiveness by responding to modern estimating challenges more quickly, with less effort, more accuracy, less risk, and with an increased level of confidence. It can help win more work by allowing you to value engineer and differentiate your solution whilst meeting your clients’ requirements. They work closely with each of their customers to build mutual trust and ensure that the clients get the most from their capabilities and maximum value from their investment with them. Their client base is rapidly increasing by word of mouth as a result of their reputation. They have also gained the respect of large software organizations like Oracle, who recommend CostOS as their preferred partner solution for Construction, EPC and Oil & Gas clients, on a global scale. They continually invest in new ideas, technologies and approaches to estimating, in order to address the challenges of the industries they serve. The implementation of CostOS on your project will improve productivity by providing the following benefits:  enables the quick and accurate pricing of ‘less than fully-detailed’ BIM models  allows design optimization and quick identification of most appropriate materials and 20 construction methods  ‘what you see is what you estimate’, CostOS ensures that no item is missed  Allows you to measure in 2D shapes, 3D shapes or structural members  Quantity takeoff can be massively accelerated and the accuracy you can achieve is unprecedented.  create your Bill of Quantities directly on your 3D model  provide you with the visualization of the model
  • 21.
    Preparation / BriefingStage Preparation and Briefing Stage is the process for completing the design and construction of a building is often divided into stages. This can be helpful in establishing milestones for the submission of progress reports , the preparation of information for approval, client gateways, and for making payments. However there is a great deal of ambiguity between the naming of stages by different organizations and the definition of what individual stages actually and so it is important that appointment documents make it clear specifically what activities fall within which stage, and what level of detail is required. During this stage, the marketing and selling of BIM is done supported by cost analysis to justify the upfront investment or profit. Some firm may provide services of BIM without selling the software to the client. 21 Benefits Constraints Better outcomes through collaboration All project partners such as different design disciplines, the customer, contractor, specialists and supplier are using a single and shared 3D model. This means that every one of the partners is focused on achieving best value, from project inception to eventual decommissioning. Inflexibility in construction costs Implementation of BIM QS computer software on construction projects may present an idea on the total expected construction cost, but it might not be accurate. BIM allows the users, client and operators to estimate the most accurate building cost-to-complete, but it will not consider the actual price variation from the emerging market, such as metals, petroleum-derivative products, high gas prices, and other natural disasters affecting manufacturer’s plant. Improved visualization Projects can be visualized as of this stage, giving users, clients and operators a rough idea of design intended. Cost of software The cost to obtain any BIM QS computer software is very expensive. It is very common that newly built companies do not have enough capital or money to buy this software to help ease their work.
  • 22.
    Design Stage SchematicDesign The first step by the design team is referred to as the schematic design phase, in which the objective is the development of simple diagrammatic documents delineating room sizes and relationships, single line diagrams of all systems (i.e. water mains, electrical risers, etc.), preliminary elevation studies of the building exterior. The schematic design will be reviewed during frequent meetings with the building committee and FP&C. At the conclusion of this design phase, the architect will submit drawings, a project narrative and an estimate of construction cost for review and approval by the building committee and appropriate college representatives. Design Development The approved schematic design is then further developed into definitive plans and elevations by the design team. Colors, patterns, materials, lighting fixtures and special equipment and building elements are selected and reviewed with the building committee. Detailed floor plans, sections, elevations and an outline specification defining materials, finishes and systems, as well as an updated construction cost estimate, are submitted for review and approval by the building committee and appropriate college representatives. 22
  • 23.
    Benefits of usingBIM in Design Stage: Until the mid-nineteenth century, the general method of design did not change a lot. Engineers used simple tools (such as pen, paper and ruler) to describe their buildings. However, with advances in mathematics and building materials, the process of design changed and improved rapidly. With the invention of the computer, 2D CAD as a new drawing tool was adopted completely in the AEC industry. SKETCHPAD was first developed by Ivan Sutherland. That was the root of CAD. At the beginning, the technology of CAD was not as popular as in modern times. However, with the popularization of personal computers, the renowned software company Autodesk developed AutoCAD. Suddenly, all the architects in the world started to learn and use this type of software to design their project. The technology development form 2D CAD to 4D simulation greatly improved the design process. Internet technology and emerging media (such as videoconferencing) also strongly influence the development of design tools and literature in those fields was reviewed as part of this research. 2D CAD developed into 3D modeling. This innovation changed the process of building design and the relationship between the structural engineer and the architectural designer. It did not only change the way building designs are visualized, but also signaled a paradigm shift in design thinking from pure visualization to simulation. BIM not only improves the technology itself, also changes the process of design and build. From the questionnaire results, all BIM users choose this option as the main benefit of using BIM. BIM enables better decisions-making; faster BIM reduces the abstraction and integrates the multiple disciplines, including design and documentation. And BIM integrates plans, sections, details, graphics, and data in ways not possible in 2D. The period which is spent on the design can be cut by about half at half the cost. Moreover, half time at half cost will not just save the money; it is also reducing the time to the market. Therefore, using BIM can save the cost of design and can benefit from earlier access to the construction market. 23
  • 24.
    Pre-construction Stage Theconstruction planning involves the scheduling and sequencing of the model to coordinate virtual construction in time and space. The schedule of the anticipated construction progress can be integrated to a virtual construction. There are two common scheduling methods that can be used to create 4D Building Information Model. These are critical path method (CPM) and line of balance. In the Critical Path Method, each activity is listed, linked to another activity, and assigned durations. Interdependency of an activity is added as either predecessors or successors to another activity. Moreover, the duration of the activities are entered. Based on the dependency and duration of the activities, the longest path is defined as the most critical path. The activities defined in the longest path are defined as the critical activities. These activities do not have any float. In other words, if these activities are not completed within anticipated duration, the total duration of the project will be further pushed out. Overall CPM is a commonly used technique that helps projects stay within schedule. Line of Balance technique uses location as the basis for scheduling. This method is an alternate to the CPM. It is advantageous for repetitive tasks to increase labour productivity. In this method, activity durations are based on the available crew size and the sequence of the location. Productivity of the labour force can be altered as needed to accurately depict the construction schedule. The approach focuses on the locations being completed by a trade before the other trade moves in. This reduces the number of 19mobilizations and resources. Overall, line of balance is a good scheduling method to plan and monitor repetitive tasks during construction progress. The planning through using BIM enhances site utilization, space coordination, and product information. CAD Measurement Modeling with CAD systems offers a number of advantages over traditional drafting methods that use rulers, squares, and compasses. For example, designs can be altered without erasing and redrawing during preconstruction. CAD systems also offer "zoom" features analogous to a camera lens, whereby a designer can magnify certain elements of a model to facilitate inspection. Computer models are typically three dimensional and can be rotated on any axis, much as one could rotate an actual three dimensional model in one's hand, enabling the designer to gain a fuller sense of the object. CAD systems also lend themselves to modeling cutaway drawings, in which the internal 24
  • 25.
    shape of apart is revealed, and to illustrating the spatial relationships among a system of parts. To understand CAD it is also useful to understand what CAD cannot do. CAD systems have no means of comprehending real-world concepts, such as the nature of the object being designed or the function that objects will serve. CAD systems function by their capacity to codify geometrical concepts. Thus the design process using CAD involves transferring a designer's idea into a formal geometrical model. Other limitations to CAD are being addressed by research and development in the field of expert systems. One example of an expert system involves incorporating information about the nature of materials their weight, tensile strength, flexibility, and so on into CAD software. By including this and other information, the CAD system could then "know" what an expert engineer knows when that engineer creates a design. The system could then mimic the engineer's thought pattern and actually "create" more of the design. Manual Measurement Traditional QS practice involved a manual process with drawings received on paper and Quantity Surveyors using scale rules to take measurements off the drawings and input them onto a computer system for the purposes of creating a Bill of Quantities. Measurement Tools like Dimension Paper, Scale Rulers, Standard Method of Measurement and calculator. While accuracy is the primary objective, clarity of presentation and communication remain major priorities. A logical approach in the taking off will greatly assist subsequent understanding. Technical accuracy in booking dimensions should be rigidly observed at all times. Measurements should be made in a logical sequence; for example measuring in a clockwise sequence or following room or door numbers. Dimensions and calculations should be fully annotated. In preconstruction stage, the operating contractor has to develop the conceptual cost estimate before completing the conceptual design. The basis for this planning estimate is, the descriptive purpose of the project, general design criteria, significant features and components, the methodology, and any other known research and development as required. All assumption made within this estimate must be documented fore review and concurrence. 25
  • 26.
    Construction Stage WhatIs Construction stage? Basically, construction stage commences after the design of the project has been finalised with a contractor being appointed to undertake the construction of the facility. This normally covers all the works on a site including any specialist tasks which may be carried out by subcontractors or equipment suppliers. Benefits of using BIM in construction stage Synchronization of design and construction planning can be done using tools like simulation of construction processes to reveal sources of potential problems. With that, clash detection allows for detection of design errors as well as omissions before actual construction. Not only that, cross system updates enables faster reaction to design problems or site issues. The BIM model as well as objects and families can be used as basis for fabricated components. It also improves synchronization of procurement with design as well as construction through the generation of 3D models. It also does reduction of wastages and better operation of lean construction techniques. The Building Information Model allows us to ask the database questions like "How many cubic yards of concrete are in the foundation?" or "How many square feet of this type of plywood?" or "How many electrical receptacles of this type are in the project?". The ability to make changes easily, even late in the project. This means that late changes to a design may be done with much less effort than in the past, and that more options can be explored during the early design process. Constraints of using BIM in construction stage BIM requires more effort at the front end of a project to establish the initial framework. But the settlement is that you are able to extract a much higher quality and greater quantity of information from that model. It allows changes to happen easily, so clients may continue to make changes too late in the process, and that can influence construction and design costs. BIM results in much larger file sizes than traditional CAD systems, and requires higher performing computer hardware 26
  • 27.
    to operate iteffectively. Not only that, The use of BIM requires substantial training and as with any software program there are costs associated with the software such as purchasing, licensing and training. A contractor may need to upgrade its computer system to effectively use the BIM software. Benefits of using CAD Measurement in construction stage The measurement is more accurate as CAD drawings are produce in actual size and thus error in quantities due to incorrect scale is eliminated. The measurement course for irregular shape is faster and easier. If the irregular area is measured manually, it would need many steps in calculating the total area. By using CBMS, the area of irregular shape of a building can easily be measured by just clicking the border of the shape. The layering concept in CAD software will assist the taker off in viewing and identifying similar items throughout the drawings. For example, types of floor finish. Different floor finishes can be separated using various colours or hatch patterns and the exact area of the different type of floor finishes is then calculated by clicking on the objects. Constraints of using CAD measurement in construction stage CAD drawings are not formed using a standard method in layering and also there is no standard in naming the layers. This creates problems in finding and searching for the applicable items during measurement. As the drawings are 2D, measurement is easily done for unit of measure that required 2D only. Quantities that require 3D such as the measure of volume would require additional steps in obtaining the quantity. Not only that, the use of CBMS is limited to measuring quantities only. Benefits of using Manual measurement in construction stage All the measurement will be in hand written so it will reduced the risk of loss of information where the use of software will have a higher risk in loss of information because if the files are not save properly or the computer suddenly spoil, all the information will be gone. The complexity of 27
  • 28.
    using manual measurementis much lower compared to using software where training in need if you want to use the software. You can also save a lot of money by using manual measurement because it technically doesn’t charge you anything where you need to pay an amount of money for the usage of the software. Constraints of using Manual measurement in construction stage Compared to software, manual measurement can identify error faster than using software because manual measurement doesn’t have the system to check error like the software. It also has a slower progress compare to the software so it will have the tendency to delay the completion of the construction. Generally saying, it is time consuming. It also doesn’t have the 3D, 4D or 5D purposes like the software. 28