This document provides guidelines and protocols for site inspections of circulating fluidized bed boilers. It discusses the components and systems of CFB boilers, including the flue gas stream, solid stream, water-steam circuit, economizer, evaporators, and super-heaters. It also covers boiler degradation mechanisms, condition assessment methods, and guidelines for inspecting both external and internal boiler components and settings. Safety considerations for inspections are also included. Templates for inspection forms are provided.
Piping components, materials, codes and standards part 1- pipeAlireza Niakani
The course is focused on four areas: piping components, pipe materials and manufacture, sizes, codes and standards. Applicable piping codes for oil and gas facilities (ISO, B31.3, B31.4, B31.8, etc.), pipe sizing calculations, pipe installation, and materials selection are an integral part of the course. The emphasis is on proper material selection and specification of piping systems.
This short document promotes creating presentations using Haiku Deck, a tool for making slideshows. It encourages the reader to get started making their own Haiku Deck presentation and sharing it on SlideShare. In just one sentence, it pitches the idea of using Haiku Deck to easily create engaging slideshows.
The document outlines the overall quality process for an E.P.&C project. It describes the critical aspects of the quality management system that are important for project delivery, including engineering procedures, design documents, inspections, procurement, and handover documents. It provides flowcharts that describe key processes like design and development planning, calculations workflow, data sheet preparation, materials requisition, engineering and procurement interface, and traceability philosophy. The quality process is aimed at ensuring compliance and delivering the project according to specifications, schedule and budget.
The document discusses an industrial training for two individuals, Ranvir Desai and Amol Dudhate, at Thermax Ltd. It covers topics like piping and instrumentation diagrams (P&IDs), instrument tags, types of valves, boiler equipment including the feedwater system, deaerators, economizers, drum, and superheaters. It also discusses instrument specifications, indexes, location symbols, and important boiler safety interlocks.
Industrial boilers are closed vessels made of steel used to generate steam by combusting fuels like coal. They are classified based on their orientation (vertical or horizontal), firing method (internally or externally fired), and tube configuration (fire tube or water tube). Common fire tube boiler types include vertical simple cross tube boilers, Cochran boilers, and Lancashire boilers used in small industries. Water tube boilers like Babcock & Wilcox and Stirling boilers are used in large power plants due to their ability to operate at high pressures and capacities. Boilers require safety devices, controls, and accessories to operate efficiently and safely.
The document discusses key issues faced in Engineering, Procurement, and Construction (EPC) projects and provides recommendations to address them. It summarizes EPC capabilities, project lifecycle, and common issues around quantity variation, drawings delays, constructability, procurement delays, and monitoring of critical items. Root cause analyses are presented for key issues. Recommendations are provided around talent retention, standardization, coordination, vendor management, approvals processes, and quality assurance to minimize variations and delays.
Piping components, materials, codes and standards part 1- pipeAlireza Niakani
The course is focused on four areas: piping components, pipe materials and manufacture, sizes, codes and standards. Applicable piping codes for oil and gas facilities (ISO, B31.3, B31.4, B31.8, etc.), pipe sizing calculations, pipe installation, and materials selection are an integral part of the course. The emphasis is on proper material selection and specification of piping systems.
This short document promotes creating presentations using Haiku Deck, a tool for making slideshows. It encourages the reader to get started making their own Haiku Deck presentation and sharing it on SlideShare. In just one sentence, it pitches the idea of using Haiku Deck to easily create engaging slideshows.
The document outlines the overall quality process for an E.P.&C project. It describes the critical aspects of the quality management system that are important for project delivery, including engineering procedures, design documents, inspections, procurement, and handover documents. It provides flowcharts that describe key processes like design and development planning, calculations workflow, data sheet preparation, materials requisition, engineering and procurement interface, and traceability philosophy. The quality process is aimed at ensuring compliance and delivering the project according to specifications, schedule and budget.
The document discusses an industrial training for two individuals, Ranvir Desai and Amol Dudhate, at Thermax Ltd. It covers topics like piping and instrumentation diagrams (P&IDs), instrument tags, types of valves, boiler equipment including the feedwater system, deaerators, economizers, drum, and superheaters. It also discusses instrument specifications, indexes, location symbols, and important boiler safety interlocks.
Industrial boilers are closed vessels made of steel used to generate steam by combusting fuels like coal. They are classified based on their orientation (vertical or horizontal), firing method (internally or externally fired), and tube configuration (fire tube or water tube). Common fire tube boiler types include vertical simple cross tube boilers, Cochran boilers, and Lancashire boilers used in small industries. Water tube boilers like Babcock & Wilcox and Stirling boilers are used in large power plants due to their ability to operate at high pressures and capacities. Boilers require safety devices, controls, and accessories to operate efficiently and safely.
The document discusses key issues faced in Engineering, Procurement, and Construction (EPC) projects and provides recommendations to address them. It summarizes EPC capabilities, project lifecycle, and common issues around quantity variation, drawings delays, constructability, procurement delays, and monitoring of critical items. Root cause analyses are presented for key issues. Recommendations are provided around talent retention, standardization, coordination, vendor management, approvals processes, and quality assurance to minimize variations and delays.
The document presents the Aqua Swift Solutions technical proposal. It introduces the twin problems of flooding and water scarcity in Africa and outlines a solution called the Aqua Swift Solution. The solution involves a pump called the Super Power Pump that requires no electricity or fuel to operate. It then details the four parts of the Aqua Swift Solution - water sourcing, pumping, treatment and storage, and supply. These parts involve using rubber dams and a hydraulic elevator dam to source water, the Super Power Pump to pump water without electricity, treatment processes, storage, and distribution of water. The proposal aims to solve flooding while providing year-round water supply using this zero-cost pump.
1. The document discusses the post-operational chemical cleaning of boiler tubes at an NTPC power plant in India. Scale buildup reduces efficiency and can damage boiler tubes.
2. Analysis found scale densities above recommended limits, requiring a two-stage chemical cleaning process. This involves mechanical cleaning, then using alkaline solutions, inhibited acid, and rinses to remove scale compounds like copper oxide and iron oxide.
3. The cleaning proposal circulates solutions through the boiler and monitors samples to ensure scale is fully removed without damaging metal surfaces. Upon completion, the boiler will be more efficient and protected from future scale problems.
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...Mark Mitchell
This document discusses ASME codes and quality assurance standards for nuclear facility construction. It provides an introduction to ASME codes and standards development processes, as well as an overview of major international nuclear quality assurance standards like ASME NQA-1, ISO 9001, and IAEA GS-R-3. The ASME Section III code and quality assurance requirements for nuclear components are described. Comparisons are made between the different quality standards.
The document discusses different types of steam boilers, their classifications and components. It describes how boilers are classified based on the position of hot gases and water, method of firing, steam pressure, and water circulation method. It also discusses boiler mountings and accessories. Boiler mountings include safety devices like safety valves, pressure gauges, and fusible plugs. Boiler accessories that improve efficiency include water heating devices, superheaters, economizers, air preheaters, feed pumps and injectors.
The Bonner Program aims to support student development through meaningful service placements, training, and reflection. The program expects students to grow in their knowledge, skills, and ability to create positive change during and after college. Students explore issues through immersive community experiences and deepen their commitment to service over time, taking on more sophisticated roles. Student development also occurs through cornerstone activities, exchanges with other programs, skills training, and reflection.
Air compressors
Pump house
Steam header
Feed water System
Operating Parameters
Fuel Gas path
Ash content vs fuel efficiency
Operating alarms
operating instruments on panel
The document summarizes the failure history and root cause analysis of the superheater tubes in two high pressure boilers. The superheater tubes experienced premature failures due to overheating, with surface temperatures reaching 550-600°C. Analysis found the superheater design had too low pressure drop, inadequate steam velocities, and lack of screen tubes. Modifications reduced tube count, implemented a double stage design with attemperation, upgraded metallurgy, and increased pressure drop. The modifications eliminated overheating failures and improved performance.
The document discusses a student project on thermal power plants. It includes:
1) An introduction of the students and professor overseeing the project.
2) The objectives of the project which are to study how power is generated in thermal plants, the components like boilers and causes of boiler tube failures.
3) An outline of topics to be covered like the power generation principle, boilers, failures and case studies.
This document discusses boiler mountings and accessories. It lists the essential boiler mountings that are required for safe operation, including the water level indicator, safety valve, pressure gauge, steam stop valve, feed check valve, and main hole. It then describes boiler accessories, which are not essential but increase efficiency. These accessories include the feed water pump, injector, pressure reducing valve, economizer, air preheater, superheater, steam drier or separator, and steam trap. Each accessory's function is briefly explained.
Devastating grain dust explosions have been recorded for decades as the risk of flour dust ignition is so high. Without adequate controls and safety measures, grain flour explosions have been known to level entire milling facilities and take lives. While mill owners are making the effort to comply with DSEAR and ATEX regulations to ensure their staffs’ safety, the execution of preventive measures has not always been correct. Many milling facilities share common problems when it comes to the installation of protective equipment. In some cases, they inadvertently exclude “fail-safes” where necessary.
This document discusses grain dust explosions, their causes, and how to prevent them. Grain dust explosions can occur when there is a dust cloud at a particular concentration, a minor spark, and a source of oxygen. Sparks can originate from metal-to-metal contact, direct flames, batteries, grain spoilage inside silos, maintenance work, lighting, and electric panels. Regular safety checks of equipment like elevators, conveyors, tunnels, and dust filters can find and address potential spark sources to avoid explosions. Education about dust explosion risks and precautions is important for plant staff.
Development of a Procedure for Making Inspection Plans for Corroding Oil and ...Christine Berner
This document presents a master's thesis that develops a procedure for making inspection plans for corroding oil and gas piping based on Bayesian updating. The thesis aims to provide a systematic method to incorporate inspection results and reduce uncertainty in determining how much piping needs to be inspected. The thesis first provides background on risk management, inspection management using risk-based inspection, and Bayesian updating. It then presents an application example of using Bayesian updating to determine the number of "hot spots" that need to be inspected in a corrosion group to achieve the required confidence in the piping's condition. The strengths and challenges of the Bayesian updating method are also discussed.
Consultation Power Point Presentation - final (1)Deanne Carney
This document discusses the use of lactic acid as a tattoo removal method. It provides information on the company that uses this method, how the treatment is performed using a micro pigmentation machine to abrade the skin and apply lactic acid fluid, and the benefits over laser removal such as fewer expected treatments and no residual ink left in the body. Risks include potential scarring, and proper aftercare with scar cream is emphasized for best results.
mounting and accessories of boiler in eme Pratik Patel
it contain detail of element used in boiler for its working
it also teach the concept of mounting
nd it is helpfull for the student of engineering 1 st year
The document discusses explosion venting requirements for low and high-strength enclosures according to various codes and standards including the Ontario Fire Code, NFPA 68, and the Ministry of Labour. It provides information on definitions of key terms like reduced pressure, static activation pressure, and deflagration index. Examples are given for calculating vent size using different methods in the codes. Factors that affect vent sizing like dust type, enclosure volume, and number of vents are also addressed.
A Brief Introduction to Industrial boiler. And details about Boiler of Monnet Power Company Ltd(2X525 MW) Thermal Power Plant. Details about parts of Boiler, Water & Steam path, Oil Circuit, flue Gas Circuit.
This chapter provides basic requirements for HVAC design at VA facilities, including:
- Deviations from the design manual must be approved by the VA Authority.
- Projects must meet energy reduction targets for new construction and major renovations through life-cycle cost analysis.
- Measurement and verification is required to validate energy savings.
- VA has established standards for specifications, construction procedures, details, design manuals, and other documents that must be followed.
- The VA Hospital Building System modular approach with service zones and functional zones must be considered.
This document provides a basic engineering design guide for the El Palito Refinery Expansion Project in Venezuela. The project involves installing new units and revamping existing units to allow the refinery to process new heavy crude oil blends.
The main process units included are a new atmospheric and vacuum distillation unit with a capacity of 140 thousand barrels per day, revamp of existing distillation units, a new naphtha hydrotreating and continuous catalytic reforming unit, and a new vacuum gas oil hydrotreating unit. The document outlines the engineering procedures, design considerations, and standards to be used for the project.
This document provides design criteria and safety philosophies for the New Inlet Gas Compression Station at the Wafa Desert Plant in Libya. Key points include:
1. Adopting an inherently safe design approach to minimize hazards, risks to personnel, and environmental impacts.
2. Addressing safety in the layout, hazardous area classification, instrumentation and controls, fire and gas detection systems, emergency shutdown systems, fire protection, and other design aspects.
3. Identifying hazards early in the design process to eliminate or mitigate them through inherently safer design techniques.
4. Referencing company specifications, project documents, and international standards to guide the engineering and design work.
The document outlines general safety objectives
This document provides design criteria and safety philosophies for the New Inlet Gas Compression Station at the Wafa Desert Plant in Libya. Key points include:
1. Adopting an inherently safe design approach to minimize hazards and their consequences.
2. Addressing safety in the layout, hazardous area classification, fire and gas detection systems, emergency shutdown systems, fire protection, and more.
3. Identifying hazards early in the design process to eliminate or mitigate them through design choices before construction.
4. Meeting international standards and Mellitah's specifications for safety. The document references over 50 standards and company specifications to guide the safe design.
This document provides design criteria and safety philosophies for the Inlet Gas Compression Station and Wafa Desert Plant in Libya. It outlines objectives to design the facilities to be inherently safe and prevent major accidents through early hazard identification. It covers layout principles that separate hazardous areas, emergency evacuation routes, drainage systems, hazardous area classification, process safety criteria like flare systems, and control and safety systems including emergency shutdown, fire and gas detection, and fire protection. It also addresses personnel health and safety, environmental protection, and management of emissions, soil/groundwater, and waste.
The document provides information about updating the BGC Steel Site Safety Manual, including instructions to remove outdated pages and insert updated pages according to the table provided. It also includes receipt acknowledgement forms to be signed by personnel updating their manual copies. The revision updates sections on the Occupational Safety and Health Act, job safety analyses, hazardous materials, accident reporting, and additional safety topics such as working at heights.
The document presents the Aqua Swift Solutions technical proposal. It introduces the twin problems of flooding and water scarcity in Africa and outlines a solution called the Aqua Swift Solution. The solution involves a pump called the Super Power Pump that requires no electricity or fuel to operate. It then details the four parts of the Aqua Swift Solution - water sourcing, pumping, treatment and storage, and supply. These parts involve using rubber dams and a hydraulic elevator dam to source water, the Super Power Pump to pump water without electricity, treatment processes, storage, and distribution of water. The proposal aims to solve flooding while providing year-round water supply using this zero-cost pump.
1. The document discusses the post-operational chemical cleaning of boiler tubes at an NTPC power plant in India. Scale buildup reduces efficiency and can damage boiler tubes.
2. Analysis found scale densities above recommended limits, requiring a two-stage chemical cleaning process. This involves mechanical cleaning, then using alkaline solutions, inhibited acid, and rinses to remove scale compounds like copper oxide and iron oxide.
3. The cleaning proposal circulates solutions through the boiler and monitors samples to ensure scale is fully removed without damaging metal surfaces. Upon completion, the boiler will be more efficient and protected from future scale problems.
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...Mark Mitchell
This document discusses ASME codes and quality assurance standards for nuclear facility construction. It provides an introduction to ASME codes and standards development processes, as well as an overview of major international nuclear quality assurance standards like ASME NQA-1, ISO 9001, and IAEA GS-R-3. The ASME Section III code and quality assurance requirements for nuclear components are described. Comparisons are made between the different quality standards.
The document discusses different types of steam boilers, their classifications and components. It describes how boilers are classified based on the position of hot gases and water, method of firing, steam pressure, and water circulation method. It also discusses boiler mountings and accessories. Boiler mountings include safety devices like safety valves, pressure gauges, and fusible plugs. Boiler accessories that improve efficiency include water heating devices, superheaters, economizers, air preheaters, feed pumps and injectors.
The Bonner Program aims to support student development through meaningful service placements, training, and reflection. The program expects students to grow in their knowledge, skills, and ability to create positive change during and after college. Students explore issues through immersive community experiences and deepen their commitment to service over time, taking on more sophisticated roles. Student development also occurs through cornerstone activities, exchanges with other programs, skills training, and reflection.
Air compressors
Pump house
Steam header
Feed water System
Operating Parameters
Fuel Gas path
Ash content vs fuel efficiency
Operating alarms
operating instruments on panel
The document summarizes the failure history and root cause analysis of the superheater tubes in two high pressure boilers. The superheater tubes experienced premature failures due to overheating, with surface temperatures reaching 550-600°C. Analysis found the superheater design had too low pressure drop, inadequate steam velocities, and lack of screen tubes. Modifications reduced tube count, implemented a double stage design with attemperation, upgraded metallurgy, and increased pressure drop. The modifications eliminated overheating failures and improved performance.
The document discusses a student project on thermal power plants. It includes:
1) An introduction of the students and professor overseeing the project.
2) The objectives of the project which are to study how power is generated in thermal plants, the components like boilers and causes of boiler tube failures.
3) An outline of topics to be covered like the power generation principle, boilers, failures and case studies.
This document discusses boiler mountings and accessories. It lists the essential boiler mountings that are required for safe operation, including the water level indicator, safety valve, pressure gauge, steam stop valve, feed check valve, and main hole. It then describes boiler accessories, which are not essential but increase efficiency. These accessories include the feed water pump, injector, pressure reducing valve, economizer, air preheater, superheater, steam drier or separator, and steam trap. Each accessory's function is briefly explained.
Devastating grain dust explosions have been recorded for decades as the risk of flour dust ignition is so high. Without adequate controls and safety measures, grain flour explosions have been known to level entire milling facilities and take lives. While mill owners are making the effort to comply with DSEAR and ATEX regulations to ensure their staffs’ safety, the execution of preventive measures has not always been correct. Many milling facilities share common problems when it comes to the installation of protective equipment. In some cases, they inadvertently exclude “fail-safes” where necessary.
This document discusses grain dust explosions, their causes, and how to prevent them. Grain dust explosions can occur when there is a dust cloud at a particular concentration, a minor spark, and a source of oxygen. Sparks can originate from metal-to-metal contact, direct flames, batteries, grain spoilage inside silos, maintenance work, lighting, and electric panels. Regular safety checks of equipment like elevators, conveyors, tunnels, and dust filters can find and address potential spark sources to avoid explosions. Education about dust explosion risks and precautions is important for plant staff.
Development of a Procedure for Making Inspection Plans for Corroding Oil and ...Christine Berner
This document presents a master's thesis that develops a procedure for making inspection plans for corroding oil and gas piping based on Bayesian updating. The thesis aims to provide a systematic method to incorporate inspection results and reduce uncertainty in determining how much piping needs to be inspected. The thesis first provides background on risk management, inspection management using risk-based inspection, and Bayesian updating. It then presents an application example of using Bayesian updating to determine the number of "hot spots" that need to be inspected in a corrosion group to achieve the required confidence in the piping's condition. The strengths and challenges of the Bayesian updating method are also discussed.
Consultation Power Point Presentation - final (1)Deanne Carney
This document discusses the use of lactic acid as a tattoo removal method. It provides information on the company that uses this method, how the treatment is performed using a micro pigmentation machine to abrade the skin and apply lactic acid fluid, and the benefits over laser removal such as fewer expected treatments and no residual ink left in the body. Risks include potential scarring, and proper aftercare with scar cream is emphasized for best results.
mounting and accessories of boiler in eme Pratik Patel
it contain detail of element used in boiler for its working
it also teach the concept of mounting
nd it is helpfull for the student of engineering 1 st year
The document discusses explosion venting requirements for low and high-strength enclosures according to various codes and standards including the Ontario Fire Code, NFPA 68, and the Ministry of Labour. It provides information on definitions of key terms like reduced pressure, static activation pressure, and deflagration index. Examples are given for calculating vent size using different methods in the codes. Factors that affect vent sizing like dust type, enclosure volume, and number of vents are also addressed.
A Brief Introduction to Industrial boiler. And details about Boiler of Monnet Power Company Ltd(2X525 MW) Thermal Power Plant. Details about parts of Boiler, Water & Steam path, Oil Circuit, flue Gas Circuit.
This chapter provides basic requirements for HVAC design at VA facilities, including:
- Deviations from the design manual must be approved by the VA Authority.
- Projects must meet energy reduction targets for new construction and major renovations through life-cycle cost analysis.
- Measurement and verification is required to validate energy savings.
- VA has established standards for specifications, construction procedures, details, design manuals, and other documents that must be followed.
- The VA Hospital Building System modular approach with service zones and functional zones must be considered.
This document provides a basic engineering design guide for the El Palito Refinery Expansion Project in Venezuela. The project involves installing new units and revamping existing units to allow the refinery to process new heavy crude oil blends.
The main process units included are a new atmospheric and vacuum distillation unit with a capacity of 140 thousand barrels per day, revamp of existing distillation units, a new naphtha hydrotreating and continuous catalytic reforming unit, and a new vacuum gas oil hydrotreating unit. The document outlines the engineering procedures, design considerations, and standards to be used for the project.
This document provides design criteria and safety philosophies for the New Inlet Gas Compression Station at the Wafa Desert Plant in Libya. Key points include:
1. Adopting an inherently safe design approach to minimize hazards, risks to personnel, and environmental impacts.
2. Addressing safety in the layout, hazardous area classification, instrumentation and controls, fire and gas detection systems, emergency shutdown systems, fire protection, and other design aspects.
3. Identifying hazards early in the design process to eliminate or mitigate them through inherently safer design techniques.
4. Referencing company specifications, project documents, and international standards to guide the engineering and design work.
The document outlines general safety objectives
This document provides design criteria and safety philosophies for the New Inlet Gas Compression Station at the Wafa Desert Plant in Libya. Key points include:
1. Adopting an inherently safe design approach to minimize hazards and their consequences.
2. Addressing safety in the layout, hazardous area classification, fire and gas detection systems, emergency shutdown systems, fire protection, and more.
3. Identifying hazards early in the design process to eliminate or mitigate them through design choices before construction.
4. Meeting international standards and Mellitah's specifications for safety. The document references over 50 standards and company specifications to guide the safe design.
This document provides design criteria and safety philosophies for the Inlet Gas Compression Station and Wafa Desert Plant in Libya. It outlines objectives to design the facilities to be inherently safe and prevent major accidents through early hazard identification. It covers layout principles that separate hazardous areas, emergency evacuation routes, drainage systems, hazardous area classification, process safety criteria like flare systems, and control and safety systems including emergency shutdown, fire and gas detection, and fire protection. It also addresses personnel health and safety, environmental protection, and management of emissions, soil/groundwater, and waste.
The document provides information about updating the BGC Steel Site Safety Manual, including instructions to remove outdated pages and insert updated pages according to the table provided. It also includes receipt acknowledgement forms to be signed by personnel updating their manual copies. The revision updates sections on the Occupational Safety and Health Act, job safety analyses, hazardous materials, accident reporting, and additional safety topics such as working at heights.
The document provides information about updating the BGC Steel Site Safety Manual, including instructions to remove outdated pages and insert updated pages according to the table provided. It also includes receipt acknowledgement forms to be signed by personnel updating their manual copies. The revision updates sections on the Occupational Safety and Health Act, job safety analyses, hazardous materials, accident reporting, and additional safety topics such as working at heights.
This document provides guidance for precommissioning and commissioning activities for the Inlet Gas Compression Station Wafa Desert Plant in Libya. It describes the project, which includes four identical compression trains to increase gas pressure from 12.1 to 74 bara. The document outlines precommissioning activities for static equipment, piping, rotating equipment, electrical equipment, instrumentation, and fire and gas systems. Commissioning activities are also described, including procedures for static equipment, piping, vessels, rotating equipment like pumps, compressors and gas turbines, electrical equipment, and instrumentation. The document provides guidance on safety, equipment, scheduling and other aspects of precommissioning and commissioning.
Your signature indicates that the preparation of this file (Edit/Revision) complies with the validation project of the equipment operational requirements of GMP and industrial production process for bin blender....
This document provides a draft code and commentary on ductile detailing of reinforced concrete structures subjected to seismic forces. It includes provisions for flexural members, columns, joints, shear walls, intermediate moment frames, and gravity columns. The document was developed by IIT Kanpur under the GSDMA project on building codes, and is intended as a draft for comment rather than ready for use. It incorporates revisions based on experience from recent earthquakes and research. The commentary provides background on changes from previous codes and references sources that informed the provisions.
This document provides an overview of oil and gas production processes and facilities. It was compiled by Håvard Devold from various sources to serve as an introduction for new engineers. The document describes the main sections of the production process including wellheads, manifolds, separation, compression, and storage. It also covers reservoir characteristics, exploration and drilling, artificial lift methods, and utility systems like control and safety systems. While not a complete technical reference, it aims to give readers an appreciation of the key aspects and design issues involved in upstream oil and gas production.
This document provides guidelines for designing rural substations and is an update to previous guidelines. It contains information to assist in planning, designing, and constructing substations that are safe, reliable, and cost-effective. The document includes chapters on general design considerations, required documentation, and technical specifications. Appendices provide a checklist of typical substation drawings and an outline for a substation design summary report. The purpose is to give borrowers of the United States Department of Agriculture Rural Utilities Service the information needed to properly design rural substations.
Drager Fabius GS Technical Service Manual Rev L (1).pdfJGHFGGHDHD
This document is the service manual for the Fabius GS anesthesia system. It contains information about the system's functions, troubleshooting guides, diagnostic procedures, replacement procedures, adjustment and calibration procedures, and preventative maintenance schedules. The manual is divided into 7 sections that cover topics such as the system's electrical and pneumatic components, how to test and replace parts, and how to perform calibrations and adjustments.
The internship report summarizes Abdul Hadi Chara's 30-day internship at MOL Pakistan's Central Processing Facility and Makori Gas Processing Facility. It provides an overview of the health and safety induction and descriptions of the well heads, valves, processing units and utilities at both facilities. It also includes assignments analyzing differences between compressor types, rich and lean burn engines, and the HVAC system. The report aims to document the knowledge and experience gained during the internship.
AK: Anchorage: Low Impact Development Design Guidance ManualSotirakou964
This document provides guidance for designing low impact development (LID) elements like rain gardens, infiltration trenches, soak-away pits, and filter strips. It discusses evaluating sites for these elements based on soil infiltration rates, groundwater depth, and other factors. Design approaches are presented for each LID element, covering preliminary site evaluation and design considerations, pretreatment where needed, and final design details. Construction and maintenance guidelines are also provided. The overall aim is to help plan and implement LID techniques that reduce stormwater runoff impacts.
Mm inv-goods issuance of bill production materialsFarhat Kiani
This document provides a user training manual for goods issuance of bill production materials in SAP. It details 14 steps for issuing materials from inventory, including searching for and selecting a material, entering quantity, plant, storage location, cost center, and other transaction details. The training manual is for PTCL's implementation of SAP with Siemens Pakistan.
Konica minolta biz hub 163, 211, 220 field service manualPedro A. Uamusse
This service manual provides information for maintenance and troubleshooting of the bizhub 163/211/220 multifunction printers. It describes periodic maintenance procedures including parts replacement schedules and instructions. It also covers trouble codes, mechanical adjustments, and settings that can be configured in Utility and Service modes to customize device functions or diagnose issues.
This document from the EPA discusses nitrogen oxides (NOx) and methods for controlling them. It finds that NOx is formed during high temperature combustion processes and is a precursor for ozone and particulate matter formation. It affects the environment by contributing to smog and acid rain. The document then outlines various methods for controlling NOx emissions from stationary sources, including pollution prevention approaches during combustion and add-on control technologies like selective catalytic reduction. It provides details on the costs and effectiveness of different approaches for various combustion source types. The document concludes that sufficient NOx control methods exist but that further reductions may be needed to meet air quality standards.
Version integrada del_manual_de_auditoria_de_cumplimiento-macEdithYucraMamani
This document is the manual for compliance auditing approved by Resolution No. 473-2014-CG of the Comptroller General's Office of the Republic on October 22, 2014. It has been modified by several resolutions to integrate all versions. The manual contains guidelines for all stages of the compliance audit process, including planning, execution, reporting, and closing the audit. It provides standards and methodologies for tasks such as understanding the entity and subject matter, risk assessment, sampling, determining findings, developing recommendations, and quality control. The appendices include templates, forms, and other reference materials to assist auditors in applying the manual.
This thesis describes experimental results from testing different internal designs of down-hole gas separators. The author compares the performance of conventional straight dip tube separators to separators with helical dip tube designs, known as static centrifugal separators. Visual observations showed static centrifugal separators utilized both gravity and induced centrifugal forces for improved gas-liquid separation compared to straight dip tube separators. Testing also examined the effect of increasing separator diameter and dip tube length on performance. Bubble rise experiments provided insights into the viscosity range where test results could be applied. The conclusions identified design guidelines and opportunities for future work to further optimize down-hole gas separator design.
Similar to Site Inspection Guidelines and Protocol (20)
Build the Next Generation of Apps with the Einstein 1 Platform.
Rejoignez Philippe Ozil pour une session de workshops qui vous guidera à travers les détails de la plateforme Einstein 1, l'importance des données pour la création d'applications d'intelligence artificielle et les différents outils et technologies que Salesforce propose pour vous apporter tous les bénéfices de l'IA.
Blood finder application project report (1).pdfKamal Acharya
Blood Finder is an emergency time app where a user can search for the blood banks as
well as the registered blood donors around Mumbai. This application also provide an
opportunity for the user of this application to become a registered donor for this user have
to enroll for the donor request from the application itself. If the admin wish to make user
a registered donor, with some of the formalities with the organization it can be done.
Specialization of this application is that the user will not have to register on sign-in for
searching the blood banks and blood donors it can be just done by installing the
application to the mobile.
The purpose of making this application is to save the user’s time for searching blood of
needed blood group during the time of the emergency.
This is an android application developed in Java and XML with the connectivity of
SQLite database. This application will provide most of basic functionality required for an
emergency time application. All the details of Blood banks and Blood donors are stored
in the database i.e. SQLite.
This application allowed the user to get all the information regarding blood banks and
blood donors such as Name, Number, Address, Blood Group, rather than searching it on
the different websites and wasting the precious time. This application is effective and
user friendly.
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...PriyankaKilaniya
Energy efficiency has been important since the latter part of the last century. The main object of this survey is to determine the energy efficiency knowledge among consumers. Two separate districts in Bangladesh are selected to conduct the survey on households and showrooms about the energy and seller also. The survey uses the data to find some regression equations from which it is easy to predict energy efficiency knowledge. The data is analyzed and calculated based on five important criteria. The initial target was to find some factors that help predict a person's energy efficiency knowledge. From the survey, it is found that the energy efficiency awareness among the people of our country is very low. Relationships between household energy use behaviors are estimated using a unique dataset of about 40 households and 20 showrooms in Bangladesh's Chapainawabganj and Bagerhat districts. Knowledge of energy consumption and energy efficiency technology options is found to be associated with household use of energy conservation practices. Household characteristics also influence household energy use behavior. Younger household cohorts are more likely to adopt energy-efficient technologies and energy conservation practices and place primary importance on energy saving for environmental reasons. Education also influences attitudes toward energy conservation in Bangladesh. Low-education households indicate they primarily save electricity for the environment while high-education households indicate they are motivated by environmental concerns.
Applications of artificial Intelligence in Mechanical Engineering.pdfAtif Razi
Historically, mechanical engineering has relied heavily on human expertise and empirical methods to solve complex problems. With the introduction of computer-aided design (CAD) and finite element analysis (FEA), the field took its first steps towards digitization. These tools allowed engineers to simulate and analyze mechanical systems with greater accuracy and efficiency. However, the sheer volume of data generated by modern engineering systems and the increasing complexity of these systems have necessitated more advanced analytical tools, paving the way for AI.
AI offers the capability to process vast amounts of data, identify patterns, and make predictions with a level of speed and accuracy unattainable by traditional methods. This has profound implications for mechanical engineering, enabling more efficient design processes, predictive maintenance strategies, and optimized manufacturing operations. AI-driven tools can learn from historical data, adapt to new information, and continuously improve their performance, making them invaluable in tackling the multifaceted challenges of modern mechanical engineering.
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...Transcat
Join us for this solutions-based webinar on the tools and techniques for commissioning and maintaining PV Systems. In this session, we'll review the process of building and maintaining a solar array, starting with installation and commissioning, then reviewing operations and maintenance of the system. This course will review insulation resistance testing, I-V curve testing, earth-bond continuity, ground resistance testing, performance tests, visual inspections, ground and arc fault testing procedures, and power quality analysis.
Fluke Solar Application Specialist Will White is presenting on this engaging topic:
Will has worked in the renewable energy industry since 2005, first as an installer for a small east coast solar integrator before adding sales, design, and project management to his skillset. In 2022, Will joined Fluke as a solar application specialist, where he supports their renewable energy testing equipment like IV-curve tracers, electrical meters, and thermal imaging cameras. Experienced in wind power, solar thermal, energy storage, and all scales of PV, Will has primarily focused on residential and small commercial systems. He is passionate about implementing high-quality, code-compliant installation techniques.
Mechatronics is a multidisciplinary field that refers to the skill sets needed in the contemporary, advanced automated manufacturing industry. At the intersection of mechanics, electronics, and computing, mechatronics specialists create simpler, smarter systems. Mechatronics is an essential foundation for the expected growth in automation and manufacturing.
Mechatronics deals with robotics, control systems, and electro-mechanical systems.
Supermarket Management System Project Report.pdfKamal Acharya
Supermarket management is a stand-alone J2EE using Eclipse Juno program.
This project contains all the necessary required information about maintaining
the supermarket billing system.
The core idea of this project to minimize the paper work and centralize the
data. Here all the communication is taken in secure manner. That is, in this
application the information will be stored in client itself. For further security the
data base is stored in the back-end oracle and so no intruders can access it.
Null Bangalore | Pentesters Approach to AWS IAMDivyanshu
#Abstract:
- Learn more about the real-world methods for auditing AWS IAM (Identity and Access Management) as a pentester. So let us proceed with a brief discussion of IAM as well as some typical misconfigurations and their potential exploits in order to reinforce the understanding of IAM security best practices.
- Gain actionable insights into AWS IAM policies and roles, using hands on approach.
#Prerequisites:
- Basic understanding of AWS services and architecture
- Familiarity with cloud security concepts
- Experience using the AWS Management Console or AWS CLI.
- For hands on lab create account on [killercoda.com](https://killercoda.com/cloudsecurity-scenario/)
# Scenario Covered:
- Basics of IAM in AWS
- Implementing IAM Policies with Least Privilege to Manage S3 Bucket
- Objective: Create an S3 bucket with least privilege IAM policy and validate access.
- Steps:
- Create S3 bucket.
- Attach least privilege policy to IAM user.
- Validate access.
- Exploiting IAM PassRole Misconfiguration
-Allows a user to pass a specific IAM role to an AWS service (ec2), typically used for service access delegation. Then exploit PassRole Misconfiguration granting unauthorized access to sensitive resources.
- Objective: Demonstrate how a PassRole misconfiguration can grant unauthorized access.
- Steps:
- Allow user to pass IAM role to EC2.
- Exploit misconfiguration for unauthorized access.
- Access sensitive resources.
- Exploiting IAM AssumeRole Misconfiguration with Overly Permissive Role
- An overly permissive IAM role configuration can lead to privilege escalation by creating a role with administrative privileges and allow a user to assume this role.
- Objective: Show how overly permissive IAM roles can lead to privilege escalation.
- Steps:
- Create role with administrative privileges.
- Allow user to assume the role.
- Perform administrative actions.
- Differentiation between PassRole vs AssumeRole
Try at [killercoda.com](https://killercoda.com/cloudsecurity-scenario/)
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
Site Inspection Guidelines and Protocol
1. AJ2 Synergy Engineers
CFB Boiler Assessment
Site Inspection Guidelines & Protocol
Compiled and Edited
By
José Agustín González
2. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ II
SUMMARY OF DOCUMENT REVISIONS
Rev. Date Revised
Section
Revised
Revision Description
00 21/12/2016 N/A Internal issue of document
00A 30/12/2016 N/A Issued for Internal Review and Edition
00 03/01/2017 N/A
Issued with new file name - FROM:
Inspection.XC-1306.86-M8.CFB.Peru.Rev.00 – TO:
Site.Inspection.XC-1306.86-M8.CFB.Peru.Rev.00
01 05/01/2017 4 & 5
Include missing internal inspection sections and transfer sections previously
included in section 5 onto 4
01A 09/01/2017 N/A Document´s Properties
02 16/01/2017 6
Section 6 Safety added to the document thus improving the site inspection
guidelines
DOCUMENT´S PROPERTIES
Prepared by José Agustín González Engineering & Systems Integration
Reviewed by Alberto Balarezo Construction and Commissioning
Approved by Joel González Morante Planning & Control
Date of Creation Monday, January 16, 2017
Saved Date Wednesday, January 18, 2017
Number of Words 22913 Words
File Name Site.Inspection.XC-1306.86-M8.CFB.Peru.Rev.02
File Size 5882 Kilobytes 6 Megabytes
3. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ III
TABLE OF CONTENT
1 BOILERS INSPECTION ...................................................................................................................................7
2 CIRCULATING FLUIDIZED BED BOILERS.....................................................................................................8
2.1 CFB BOILER GENERAL ARRANGEMENT..............................................................................................9
2.1.1 FLUE GAS STREAM ..............................................................................................................................11
2.1.2 SOLID STREAM .....................................................................................................................................11
2.1.3 WATER – STEAM CIRCUIT...................................................................................................................12
2.1.4 ECONOMIZER .......................................................................................................................................12
2.1.5 EVAPORATORS ....................................................................................................................................13
2.1.6 SUPER-HEATERS AND RE-HEATERS.................................................................................................13
2.2 TYPES OF CFB BOILERS .....................................................................................................................14
2.2.1 BOILERS WITHOUT BUBBLING BED HEAT EXCHANGERS...............................................................15
2.2.2 BOILERS WITH BUBBLING FLUIDIZED BED HEAT EXCHANGER .....................................................16
2.2.3 BOILERS WITH INERTIAL OR IMPACT SEPARATORS.......................................................................16
2.2.4 BOILERS WITH VERTICAL, NONCIRCULAR CYCLONES...................................................................17
2.2.5 OTHER TYPES ......................................................................................................................................17
3 BOILER DEGRADATION MECHANISMS......................................................................................................18
3.1 CORROSION..........................................................................................................................................18
3.2 EROSION ...............................................................................................................................................18
3.3 FATIGUE ................................................................................................................................................18
3.4 OVER-HEATING ....................................................................................................................................19
3.5 HYDROGEN DAMAGE ..........................................................................................................................19
3.6 VIBRATION ............................................................................................................................................19
4 CONDITION ASSESSMENT EXAMINATION METHODS..............................................................................20
4.1 NON-DESTRUCTIVE EXAMINATIONS .................................................................................................22
4.1.1 VISUAL...................................................................................................................................................22
4.1.2 MAGNETIC PARTICLES........................................................................................................................22
4.1.3 LIQUID PENETRANT .............................................................................................................................22
4.1.4 ULTRASONIC.........................................................................................................................................23
4.1.4.1 ULTRASONIC THICKNESS TESTING...............................................................................................23
4.1.4.2 ULTRASONIC OXIDE MEASUREMENT............................................................................................23
4.1.4.3 ULTRASONIC MEASUREMENT OF INTERNAL TUBE DAMAGE ....................................................25
4.1.4.4 IMMERSION ULTRASONIC TESTING...............................................................................................25
4.1.4.5 SHEER WAVE ULTRASONIC TESTING ...........................................................................................25
4.1.4.6 TIME OF FLIGHT DEFRACTION (TOFD) ..........................................................................................26
4.1.5 EDDY CURRENT ...................................................................................................................................26
4.1.6 RADIOGRAPHY .....................................................................................................................................26
4.1.7 NUCLEAR FLUORESCENCE ................................................................................................................27
4.1.8 ELECTROMAGNETIC ACOUSTICS ......................................................................................................27
4. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ IV
4.1.9 ACOUSTICS...........................................................................................................................................29
4.1.10 ACOUSTIC EMISSIONS ....................................................................................................................30
4.1.11 METALLOGRAPHIC REPLICATION..................................................................................................30
4.1.12 STRAIN MEASUREMENT..................................................................................................................30
4.1.13 TEMPERATURE MEASUREMENT....................................................................................................30
4.2 DESTRUCTIVE EXAMINATIONS ..........................................................................................................31
4.2.1 TUBE SAMPLES ....................................................................................................................................31
4.2.2 BOAT SAMPLES ....................................................................................................................................31
4.3 ADVANCES IN NON-DESTRUCTIVE EXAMINATIONS ........................................................................31
5 SITE INSPECTION OF BOILER COMPONENTS AND AUXILIARIES ..........................................................32
5.1 EXTERNAL BOILER INSPECTION........................................................................................................32
5.1.1 LADDERS, STAIRWAYS AND PLATFORMS ........................................................................................32
5.1.1.1 CRACKS.............................................................................................................................................32
5.1.1.2 TIGHTNESS OF BOLTS.....................................................................................................................33
5.1.1.3 CONDITION OF PAINT OR GALVANIZED MATERIAL .....................................................................33
5.1.1.4 WEAR ON LADDER RUNGS AND STAIR TREADS..........................................................................33
5.1.1.5 SECURITY OF HANDRAILS ..............................................................................................................33
5.1.1.6 THE CONDITION OF FLOORING......................................................................................................33
5.1.2 FANS ......................................................................................................................................................33
5.1.3 AIR DUCTS AND FLUE GAS DUCTS....................................................................................................33
5.1.4 SUPPORT STRUCTURE AND BOILER CASING ..................................................................................33
5.1.5 STACK....................................................................................................................................................34
5.1.6 BOILER PIPING .....................................................................................................................................35
5.1.7 INSTRUMENTATION .............................................................................................................................35
5.1.8 PAINT AND INSULATION ......................................................................................................................35
5.2 INTERNAL BOILER INSPECTION .........................................................................................................35
5.2.1 SAFE ENTRY .........................................................................................................................................36
5.2.2 REFRACTORY.......................................................................................................................................36
5.2.3 STEAM DRUM........................................................................................................................................37
5.2.4 BOILER TUBING....................................................................................................................................37
5.2.4.1 STEAM-COOLED ...............................................................................................................................37
5.2.4.2 WATER-COOLED...............................................................................................................................38
5.2.5 RISERS ..................................................................................................................................................38
5.2.6 HEADERS ..............................................................................................................................................38
5.2.6.1 HIGH TEMPERATURE.......................................................................................................................38
5.2.6.2 LOW TEMPERATURE........................................................................................................................41
5.2.7 ATTEMPERATORS................................................................................................................................41
5.2.8 HIGH TEMPERATURE PIPING..............................................................................................................43
5.2.8.1 DAMAGE MECHANISMS...................................................................................................................43
5.2.8.2 OVERALL EVALUATION PROGRAM ................................................................................................43
5. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ V
5.2.9 DETAILED EVALUATION PROGRAM ...................................................................................................43
5.2.9.1 Phase I................................................................................................................................................43
5.2.9.2 Phase II...............................................................................................................................................44
5.2.10 TYPICAL FAILURES ..........................................................................................................................45
5.2.11 LOW TEMPERATURE PIPING ..........................................................................................................45
5.2.11.1 TYPICAL FAILURES ......................................................................................................................45
5.2.12 TUBULAR AIR HEATERS ..................................................................................................................46
5.3 BOILER SETTINGS................................................................................................................................46
5.3.1 DESIGN REQUIREMENTS ....................................................................................................................47
5.3.2 TUBE WALL ENCLOSURES..................................................................................................................48
5.3.2.1 MEMBRANE TUBES ..........................................................................................................................48
5.3.2.2 MEMBRANE TUBES WITH REFRACTORY LINING..........................................................................49
5.3.2.3 FLAT STUD TUBE WALLS.................................................................................................................49
5.3.2.4 TANGENT TUBE WALL .....................................................................................................................51
5.3.2.5 FLAT STUD AND TANGENT TUBE WALL UPGRADES ...................................................................52
5.3.3 CASING ENCLOSURES ........................................................................................................................52
5.3.3.1 HOPPER.............................................................................................................................................52
5.3.3.2 WIND-BOX .........................................................................................................................................53
5.3.3.3 TEMPERING GAS PLENUM ..............................................................................................................53
5.3.3.4 PENTHOUSE .....................................................................................................................................53
6 SAFETY..........................................................................................................................................................54
6.1 EXPLOSIONS.........................................................................................................................................54
6.2 IMPLOSIONS .........................................................................................................................................55
7 INSPECTION FORM TEMPLATE ..................................................................................................................56
7.1 EXTERNAL BOILER INSPECTION........................................................................................................58
7.2 INTERNAL BOILER INSPECTION .........................................................................................................83
8 RELIABLE INFORMATION IS KEY TO A RELIABLE ASSESSMENT ...........................................................99
9 CFB Boilers – Reheat and Non-reheat.........................................................................................................100
6. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ VI
TABLE OF FIGURES
Figure 1 – Non-reheat Circulating fluidized bed boiler major components ...............................................................8
Figure 2 – General arrangement of a typical circulating fluidized bed boiler ............................................................9
Figure 3 – Air and feed circuit of a CFB boiler with an external heat exchanger ....................................................10
Figure 4 – Water and Steam circuit of a CFB boiler without an external heat exchanger.......................................12
Figure 5 – Arrangement of a CFB boiler with impact separators ............................................................................14
Figure 6 – CFB boiler with a vertical non-circular cyclone......................................................................................15
Figure 7 – Application of steel, refractory, and expansion joints to a CFB boiler....................................................16
Figure 8 – A novel design of CFB boiler with central multi-entry cyclone ...............................................................17
Figure 9 – Three phase (levels) of boiler damage assessment ..............................................................................21
Figure 10 – Steam side oxide scale on ID surface .................................................................................................24
Figure 11 – Typical ultrasonic signal response.......................................................................................................24
Figure 12 - Sheer wave technique for detecting hydrogen damage .......................................................................26
Figure 13 – Basic principles of EMAT operation.....................................................................................................28
Figure 14 – B&W´s Fast-Scanning Thickness Gage (FST-GAGE®
).......................................................................28
Figure 15 - header locations susceptible of cracking..............................................................................................39
Figure 16 - Steam temperature variation in a header .............................................................................................40
Figure 17 - Super-heater tube leg temperatures vary with load..............................................................................40
Figure 18 - Large ligament cracks on header ID. ...................................................................................................41
Figure 19 - Typical attemperator assembly ............................................................................................................42
Figure 20 - Failed attemperator spray head ...........................................................................................................42
Figure 21 - Acoustic Ranger®
schematic................................................................................................................46
Figure 22 – Membrane wall construction................................................................................................................48
Figure 23 – Fully studded membrane wall..............................................................................................................49
Figure 24 – Flat stud tube wall construction with inner casing shown ....................................................................50
Figure 25 – Tangent tube wall construction with outer casing shown.....................................................................51
Figure 26 – Casing attachment to membrane wall .................................................................................................51
Figure 27 – Tangent tubes with closure rods..........................................................................................................52
Figure 28 – Widely spaced tubes with flat studs and closure bars .........................................................................52
Figure 29 – Tie bar and buck-stay arrangement at corner of furnace.....................................................................55
Figure 30 – CFB Boilers Reheat and Non-reheat.................................................................................................100
7. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 7 de 100
1 BOILERS INSPECTION
Inspections are done to determine the amount of maintenance required to have the equipment operate
properly, until the next turnaround. Boilers should be inspected at least every two years. Inspection
intervals are based on service and experience.
Inspection is not an exact science and requires the use of judgment and experience as well as science.
Records should be reviewed before an inspection, to become thoroughly familiar with the equipment. This
review should result in identifying expected problems and planning areas of emphasis for the planned
inspection. The following records that should be checked are as follows:
1. Original Design Drawings
2. Piping and Instrumentation Diagrams (P&IDs)
3. E & I Single Line Diagrams
4. DCS (Distributed Control System)
5. Boiler Log
6. Maintenance Records
7. Safety Instruction Sheets (SIS)
8. Hydrostatic Test Diagram
9. Previous hydrostatic test results
The original design drawings and the P&IDs provide information on the pressure and temperature of the
original design. The original design drawings indicate inspection points, with notes on inspection
procedures. These drawings also contain notes on how to access equipment. The P&IDs should also
show all pipe sizes, materials of construction, vent and drain locations, and blind. They also provide
material specifications and original thickness of equipment.
The boiler log provides a record of each inspection, maintenance check, and notes on the equipment.
These notes are necessary to prepare for inspection. The maintenance records indicate conditions found
in a previous inspection that required maintenance. The Safety Instruction Sheets (SIS) provides operating
pressure and temperature information, and pressure test targets. It also contains the retirement thickness
on critical piping. The hydraulic test diagram is a line drawing showing blinds, piping layout, and location
of pressure test connections. The test diagram will specify the relief valve size, set pressure, and location.
Previous hydraulic test results indicate problem areas from previous inspections.
8. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 8 de 100
2 CIRCULATING FLUIDIZED BED BOILERS
The circulating fluidized bed (CFB) boiler is a member of the fluidized bed boiler family. It has gained
popularity, especially in the electric power-generation market, for its several practical advantages (Figure
1 – Non-reheat Circulating fluidized bed boiler major components), such as efficient operation and
minimum effect on the environment. Although it entered the market only in the 1980s, CFB technology is
well beyond its initial stage of development. The technology has matured through successful operation in
hundreds of units of capacities ranging from 1 MWe to 340 MWe (until 2005). The problems of the first
generation have been solved and CFB is now considered to be a mature technology for atmospheric-
pressure units. Its design methodology, however, is not as well-established as that of pulverized coal-fired
boilers. Many aspects of its design are still based on rules of thumb. The present chapter describes
different aspects of the circulating fluidized bed boiler including a brief outline of a design approach.
Figure 1 – Non-reheat Circulating fluidized bed boiler major components
9. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 9 de 100
2.1 CFB BOILER GENERAL ARRANGEMENT
A CFB boiler (See Figure 1 – Non-reheat Circulating fluidized bed boiler major components) may be
divided into two sections:
1. The CFB loop and the convective or back-pass section of the boiler (Figure 2 – General arrangement
of a typical circulating fluidized bed boiler). The CFB loop consists of the following items making up
the external solid recirculation system.
1. Furnace or CFB riser
2. Gas–solid separation (cyclone)
3. Solid recycle system (loop-seal)
4. External heat exchanger (optional)
Figure 2 – General arrangement of a typical circulating fluidized bed boiler
Whereas Figure 2 – General arrangement of a typical circulating fluidized bed boiler shows the general
arrangement of a typical CFB boiler without the external heat exchanger; Figure 3 – Air and feed circuit of
a CFB boiler with an external heat exchanger shows the same for one with the heat exchanger.
2. The back-pass is comprised of:
1. Super-heater
2. Re-heater
3. Economizer
4. Air heater
10. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 10 de 100
Figure 3 – Air and feed circuit of a CFB boiler with an external heat exchanger
The following section describes the working of the boiler, tracing the path of air, gas, solids and water
through it.
The primary air fan delivers air at high pressure (10 to 20 kPa). This air is preheated in the air preheater
of the boiler and then enters the furnace through the air distributor grate at the bottom of the furnace.
The secondary air fan delivers air, also preheated in the air preheater, at a relatively low pressure (5 to
15 kPa). It is then injected into the bed through a series of ports located around the periphery of the
furnace and at a height above the lower tapered section of the bed. In some boilers, the secondary air
provides air to the start-up burner as well as to the tertiary air at a still higher level, if needed. The
secondary air fan may also provide air to the fuel feeder to facilitate the smooth flow of fuel into the furnace.
Loop-seal blowers deliver the smallest quantity of air but at the highest pressure. This air directly enters
the loop-seals through air distribution grids. Unlike primary and secondary air, the loop-seal air is not
heated.
11. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 11 de 100
2.1.1 FLUE GAS STREAM
Generally, only one suction fan is used to handle the flue gas in a CFB boiler. This fan, called induced
draft (ID) fan, creates suction in the system to draw flue gas from the boiler and through the dust control
or any other gas emission-control equipment. The suction head of the ID fan is designed to have a
balanced draft in the air/flue gas system with zero (or atmospheric) pressure at the mid or the top section
of the furnace. This helps keep the boiler-house clean and at the same time optimizes the power
consumption by the ID fan.
2.1.2 SOLID STREAM
Fuel from the bunker drops on to a belt or some other type of feeder, which then feeds measured quantities
of fuel into the fuel chute. In most large CFB boilers, the fuel chute feeds the fuel into the loop-seal’s
inclined pipe (Figure 3 – Air and feed circuit of a CFB boiler with an external heat exchanger). Here, the
fuel mixes with hot solids recirculating around the CFB loop, and therefore enters the bed better dispersed.
Other boilers either take the fuel directly into the lower section of the bed through the front wall or use
another conveyor to take it around the furnace for sidewall feeding.
The sorbent is generally finer than the fuel, so it is carried by conveying air and injected into the bed
through several feed injection points. As sorbents react very slowly, the location of their feed points is not
as critical as that for the fast-burning fuel.
The ash or spent sorbent is drained from the boiler through the following points:
1. Bed drain
2. Fly ash collection hopper under the fabric filter or electrostatic precipitator
3. Economizer or back-pass hopper
In some cases, ash is also drained partially from the external heat exchanger. In the case of a coarse bed
drain, the ash is cooled by air or water before it is disposed of. The fly ash, being relatively cold, can be
disposed of without cooling. Its particles are generally smaller than 100 mm with a mean size of 30 mm
and are, therefore, easily carried pneumatically into a fly ash silo, where they are hauled away by truck or
rail wagon as necessary.
The mixture of fuel, ash, and sorbents circulate around the CFB loop. Particles, coarser than the cyclone
cut-off size, are captured in the cyclone and recycled near the base of the furnace. Finer solid residues
like ash or spent sorbents, generated during combustion and desulfurization, escape through the
cyclones. These are collected by the fabric filter or electrostatic precipitator located further downstream.
12. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 12 de 100
2.1.3 WATER – STEAM CIRCUIT
Figure 4 – Water and Steam circuit of a CFB boiler without an external heat exchanger
Figure 4 – Water and Steam circuit of a CFB boiler without an external heat exchanger shows the water–
steam flow circuit through a typical CFB boiler. Here, one can detect the following heat transfer surfaces
in the boiler:
1. Economizer in the back-pass
2. Evaporator in the furnace wall
3. Super-heaters in both the back-pass and furnace
4. Re-heaters in both the back-pass and furnace
A CFB boiler could locate parts of the super-heater and re-heater in an external heat exchanger as shown
in Figure 3 – Air and feed circuit of a CFB boiler with an external heat exchanger.
2.1.4 ECONOMIZER
The boiler feed pump feeds the water into the economizer located in the back-pass or convective section
of the boiler (Figure 4 – Water and Steam circuit of a CFB boiler without an external heat exchanger). The
economizer is a conventional shell-tube heat exchanger that uses the waste heat of the flue gas to preheat
water. The water is forced through the economizer to flow directly to the drum. Water enters the cooler
section and leaves from the hotter upper section of the economizer making it a counter-flow heat
13. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 13 de 100
exchanger. The temperature of the water leaving the economizer is generally kept at least 288C below
the saturation temperature of the water to ensure good circulation. Some high-performance boilers allow
steam formation, but considering the possibility of non-uniform flow distribution between tubes, flow
instabilities and other factors the rise in enthalpy in the economizer should be guided by the following
equation (Stultz and Kitto, 1992):
Equation 1
𝐻2 − 𝐻1 =
2
3
(𝐻𝑓 − 𝐻1)
Where H1, H2, and Hf are enthalpies of water entering the economizer, leaving the economizer and at
saturated condition at the economizer outlet pressure, respectively.
The water velocity through the economizer is typically in the range of 600 to 800 kg/m2
s and gas velocity
is in the range of 7 to 15 m/s.
2.1.5 EVAPORATORS
In a typical subcritical boiler, the water flows down large-diameter unheated pipes (known as down-
comers) into distributing manifolds called headers. The header distributes water amongst vertical tubes
rising along the walls of the furnace. Water rises through these tubes and hence they are called riser, or
water wall tubes. To make an airtight enclosure around the furnace, these tubes are generally welded
together by means of fins between them in the form of panels.
As the water rises up the tubes it absorbs heat from the furnace, converting part of it into steam. Hot water,
carrying steam bubbles, leaves the top of the water wall panels and is collected in headers, which in turn
carry it to the steam drum. Steam is separated from the water in the drum, which mixes with fresh water
from the economizer and flows down through the down-comer and into the riser for heating again.
Sometimes four walls of the furnace cannot provide sufficient surface area to carry the entire evaporative
load of the boiler. Additional surfaces are provided in the form of wing walls in the furnace (Figure 4 –
Water and Steam circuit of a CFB boiler without an external heat exchanger) or in the form of bank tubes
downstream of the furnace to take this load.
2.1.6 SUPER-HEATERS AND RE-HEATERS
Figure 4 – Water and Steam circuit of a CFB boiler without an external heat exchanger shows the
arrangement of re-heaters and super-heaters in a typical CFB boiler. Saturated steam from the drum flows
through a set of tube panels forming the walls of the back-pass. Then it goes to the omega super-heater
panels inside the furnace. These tubes are formed from a special steel section that, when joined, gives a
flat vertical surface to minimize the erosion potential. The partially-heated steam then rises up through
wing wall tubes as shown (Figure 4 – Water and Steam circuit of a CFB boiler without an external heat
exchanger) and passes through the final super-heater located in the back pass. Such a complex back-
and-forth tube arrangement helps minimize the cost of tubes while minimizing any risk of tube overheating.
Steam temperature can be controlled by spraying water into the steam at appropriate locations.
14. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 14 de 100
Low pressure steam enters the re-heater section immediately upstream of the economizer (Figure 4 –
Water and Steam circuit of a CFB boiler without an external heat exchanger). It then passes through the
final re-heater section upstream of the final super-heater. One may use a bypass valve between the entry
and exit of the re-heater section to control the steam temperature.
2.2 TYPES OF CFB BOILERS
Numerous designs of CFB boilers are available in the market, some of which are more common than
others. The following are four major types of CFB boiler designs:
1. Boilers with vertical, hot cyclones with or without in-furnace heating surfaces (Figure 2 – General
arrangement of a typical circulating fluidized bed boiler)
2. Boilers as above, with bubbling fluidized bed heat exchanger parallel in the CFB loop (Figure 3 – Air
and feed circuit of a CFB boiler with an external heat exchanger)
3. Boilers with impact or inertial-type separators (Figure 5 – Arrangement of a CFB boiler with impact
separators)
4. Boilers with vertical, noncircular, cooled cyclones (Figure 6 – CFB boiler with a vertical non-circular
cyclone)
Figure 5 – Arrangement of a CFB boiler with impact separators
15. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 15 de 100
Figure 6 – CFB boiler with a vertical non-circular cyclone
2.2.1 BOILERS WITHOUT BUBBLING BED HEAT EXCHANGERS
This is the most popular type and belongs to the first generation CFB boilers that entered the market in
the 1980s. The furnace is connected by way of an expansion joint to a thick, refractory-lined, vertical, hot
cyclone, which feeds the collected solids to a loop-seal. The loop-seal returns the solids to the furnace.
Several expansion joints are used at different sections to compensate for the differential expansion
between the cooled furnace and uncooled cyclone-loop-seal circuit as shown by Figure 7 – Application of
steel, refractory, and expansion joints to a CFB boiler. Following types of in-furnace surfaces are used if
needed to meet the demand for required furnace heat absorption:
1. Wing wall (also called platen) (Figure 2 – General arrangement of a typical circulating fluidized bed
boiler)
2. Omega tube panel (Figure 3 – Air and feed circuit of a CFB boiler with an external heat exchanger)
3. Division wall
16. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 16 de 100
Figure 7 – Application of steel, refractory, and expansion joints to a CFB boiler
2.2.2 BOILERS WITH BUBBLING FLUIDIZED BED HEAT EXCHANGER
The flue gas needs to be cooled down to the required temperature (800º to 900º C) before it leaves the
CFB loop. In large boilers (.100 MWe) the furnace walls alone cannot absorb this heat, so additional
surfaces like wing walls are required. Such surfaces do not give the flexibility of control of heat absorption,
which may be required for partial load operation or for burning alternative types of fuel. For this reason, a
bubbling fluidized bed heat exchanger as shown in Figure 3 – Air and feed circuit of a CFB boiler with an
external heat exchanger is used in the CFB loop in this type of boiler. It is placed in parallel to the solid
recycle line between the loop-seal and furnace. A part of the solid stream from the loop-seal is diverted
through the bubbling fluidized bed heat exchanger. Boiler heat-absorbing tubes are located in the fluidized
bed to absorb heat from the hot solids circulating through it. By regulating the amount of solids diverted
through it, solid flow through the heat exchanger is easily controlled. Two type bubbling fluidized beds are
used:
1. External heat exchanger located outside the furnace (Figure 3 – Air and feed circuit of a CFB boiler
with an external heat exchanger)
2. Internal heat exchanger located in the furnace.
2.2.3 BOILERS WITH INERTIAL OR IMPACT SEPARATORS
In order to avoid the high cost of hot cyclones an alternative type of gas–solid separator is used by this
type of CFB boiler as shown in Figure 5 – Arrangement of a CFB boiler with impact separators. Here, the
solids are separated through impact against a row of U-shaped flow barriers. Such separators are located
17. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 17 de 100
partially in the furnace and partially outside it. They are not as efficient as centrifugal-type cyclones, so an
additional multi-clone or other type of gas–solid separator is required downstream of the back-pass. Solids
from these separators are also recycled to the furnace. Compactness is a major feature of such boilers.
2.2.4 BOILERS WITH VERTICAL, NONCIRCULAR CYCLONES
This type of boiler is also known as compact design. Here, a geometric-shaped (square or octagonal)
separator chamber is formed by boiler tubes covered with a thin refractory (Figure 6 – CFB boiler with a
vertical non-circular cyclone). Circular gas exits are located on the roof of these chambers. Gas–solid
suspension from the furnace is made to enter the separator chamber through tangential entry points. Such
entries create horizontal vortices, which separate the solids in the chamber and allow the gas to leave
from the top.
2.2.5 OTHER TYPES
In addition to the above, many of other types of CFB boilers are available in the market and are generally
used in smaller-sized units. An important type is the innovative Cymicq design shown in Figure 8 – A novel
design of CFB boiler with central multi-entry cyclone. Here the gas–solid separator and the standpipe are
located in the center of the furnace, with risers around it. Gas–solid suspension enters the central cyclone
through a number of tangential vanes, forming a vortex. The solids drop into the central standpipe while
gas leaves from the top. The collected solids move to the riser through openings at the bottom of the
standpipe as shown in Figure 8 – A novel design of CFB boiler with central multi-entry cyclone. This design
is very compact and needs less refractory because it makes greatest use of heating surfaces. Large
boilers can be built with multiple central tubes in a rectangular riser chamber.
Figure 8 – A novel design of CFB boiler with central multi-entry cyclone
18. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 18 de 100
3 BOILER DEGRADATION MECHANISMS
3.1 CORROSION
Corrosion occurs inside and outside the tubes, pipes, drums and headers of these lower temperature
components. Internal corrosion is usually associated with the boiler water, contaminants in the water, and
improper chemical cleaning or poor storage procedures. External corrosion can be caused by corrosive
combustion products, a reducing atmosphere in the furnace, moisture between insulation and a
component, and acid formed on components in the colder flue gas zones when the temperature reaches
the acid dew point. Corrosion results in wall metal loss. This wall thinning raises the local stresses of the
component and can lead to leaks or component failure.
Corrosion may also be accelerated by the thermal fatigue stresses associated with startup and shutdown
cycles. Furnace wall tubes, in areas of high structural restraint or high heat flux, often contain internal
longitudinal or external circumferential or longitudinal corrosion fatigue cracks in cycled units.
Corrosion fatigue can occur in the steam drum around rolled tube joints. The residual stresses from the
tube rolling process are additive to the welding and operating pressure stresses. Corrosion from chemical
cleaning and water chemistry upsets acts on this highly stressed area to produce cracking around the seal
weld or the tube hole. Extensive cracking can require drum replacement.
3.2 EROSION
Erosion of boiler components is a function of the percent ash in the fuel, ash composition, and local gas
velocity or soot-blower activity. Changing fuels to a high-ash western United States (U.S.) fuel may lead
to more erosion, slagging and fouling problems.
Changing fuels might also require a change in the lower temperature convection pass elements to
accommodate higher fouling and erosion. The tube wall loss associated with erosion weakens the
component and makes it more likely to fail under normal thermal and pressure stresses. Erosion is
common near soot-blowers; on the leading edges of economizers, super-heaters and re-heaters; and
where there are vortices or around eddies in the flue gas at changes in gas velocity or direction.
Such changes are caused by closely spaced tube surfaces, slag deposits, or other obstructions including
extended surfaces and staggered tube arrangements.
3.3 FATIGUE
The thermal stresses from temperature differentials that develop between components during boiler
startup and shutdown can lead to fatigue cracks. These cracks can develop at tube or pipe bends; at tube-
to-header, pipe-to-drum, fitting-to-tube, and support attachment welds; and at other areas of stress
concentration. Smaller, lower temperature boilers are less prone to fatigue failures because the thermal
differentials are lower and operate over small distances in these units. As unit size and steam temperature
increase, the potential for thermal stresses and the resulting fatigue cracking also rises.
19. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 19 de 100
3.4 OVER-HEATING
Overheating is generally a problem that occurs early in the life of the plant and can often result in tube
ruptures. These problems may go undetected until a tube failure occurs. Overheating attributable to
operation is generally resolved during the early stages of boiler life. Other problems regarding overheating
may be difficult to ascertain, and specialized boiler performance testing is generally required to identify
the source and determine corrective actions.
In spite of these aging mechanisms, low temperature components are normally expected to be replaced
after more than two decades without major overhauls unless the unit burns a corrosive fuel, burns fuel in
a reducing atmosphere, or is improperly operated. When erosion, corrosion, fatigue, or overheating lead
to frequent leaking, failures, or the threat of a major safety related failure, then component repair, redesign,
or replacement is appropriate.
3.5 HYDROGEN DAMAGE
Boilers operating at pressures above 1200 psi (8274 kPa) and 900º F (482º C) final steam temperature
suffer from more complicated aging mechanisms than lower temperature units. These boilers are
generally larger than the low pressure, low temperature units and this increases the likelihood of thermal
fatigue from boiler cycling. The higher pressures and associated higher furnace wall temperatures make
these units more susceptible to water-side corrosion. The high temperatures in combination with any
furnace wall internal deposits may promote hydrogen damage of the furnace tubing in areas of high
corrosion or heavy internal deposits. Severe cases of furnace wall hydrogen damage have forced the
retirement of older units.
3.6 VIBRATION
Excessive vibration can cause failures of the tubes, insulation, casing and supports. These vibrations can
be produced by external rotating equipment, furnace pulsations from the uneven combustion of the fuel,
or turbulence in the flowing streams of air or gas in flues, ducts and tube banks.
Tube walls, flues and ducts are designed to limit vibration during normal operating conditions. In regard
to wall tube vibrations, buck-stays are typically spaced to ensure that the natural frequency of the wall
tubes is greater than or equal to 6 hertz. The moment of inertia of a buckstay must be chosen to ensure
that the buckstay natural frequency is greater than or equal to 3 hertz, based on a simply loaded uniform
beam. Flues, ducts and casings are similarly stiffened by bars or structural shapes to limit vibration. This
stiffening is particularly necessary in sections of flues and ducts where the flow is highly turbulent, as in
the fan discharge connecting piece. Every effort should be made to eliminate the sources of severe
vibration, such as unbalanced rotating equipment, poor combustion and highly turbulent or unbalanced
air or gas flow.
Vibration ties or tube guides are required on some end-supported tube sections. These ties may be
needed if the natural frequencies within the boiler load range are in or near resonance with the vortex
shedding frequency. Stringer tubes are also subject to vibration. This vibration is magnified by long
unsupported stringer tube lengths near the large cavity below the convection pass roof.
20. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 20 de 100
4 CONDITION ASSESSMENT EXAMINATION METHODS
The assessment of accumulated damage, or condition assessment, has a long history in the boiler
industry. Whenever a component was found to contain damage or had failed, engineers asked what
caused the damage and whether other components would fail. These questions typically pertained to
tubing and headers, which caused the majority of downtime. As boiler cycling became more common, the
need for more routine condition assessment increased to avoid component failure and unscheduled
outages.
Condition assessment includes the use of tools or methods in the evaluation of specific components and
then the interpretation of the results to identify:
1. The component’s remaining life and
2. Areas requiring immediate attention.
A boiler component’s damage assessment, typically compared to its design life, is based on accumulated
damage, and can be performed in three phases.
1. PHASE 1
In Phase 1 of the assessment, design and overall operating records are reviewed and interviews are
held with operating personnel.
2. PHASE 2
In Phase 2, nondestructive examinations, stress analysis, verification of dimensions, and operating
parameters are undertaken.
3. PHASE 3
If required, the more complex Phase 3 includes finite element analysis, operational testing and
evaluation, and material properties measurement. (Figure 9 – Three phase (levels) of boiler damage
assessment).
The major boiler components must be examined by nondestructive and destructive tests (See Figure 1 –
Non-reheat Circulating fluidized bed boiler major components).
21. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 21 de 100
Figure 9 – Three phase (levels) of boiler damage assessment
(Courtesy of the Electric Power Research Institute).
RL: Remaining life of component predicted by
evaluation
DL: Desired life of component (derived by unit
objective)
Assemble Historical
Records
¿Is key
information
Missing?
¿Is RL >= DL?
Establish
Re-Evaluation
Period
YES
NO
Additional
Information
(Generally
Inspection
Results)
¿Is RL >= DL?
Establish
Re-Inspection
Period
YES
¿Economically
Justified?
NO
Cost
Evaluation
Level III
LEVEL III
Additional
Information
(Sampling,
Analysis,
Inspection)
YES
Level II
Methods
calculate
RL and DL
LEVEL II
Level III
Calculate
RL and DL
¿Is RL >= DL?
LEVEL III
NO
Establish
Re-Inspection
Period
¿Establish
Re-Evaluation &
Re-Inspection
Period?
YES
Establish
Re-Evaluation /
Re-Inspection
Period
YES
Establish
Re-Evaluation
Period
¿Establish
Re-Inspection
Period?
NO
NO
YES
Root Cause Analysis NO
Understand Root
Cause of Damage
Mitigation of
Driving Force
Choice of
Repair/Replace
Refurbish
Components
Level I
Methods
NO
Yes
22. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 22 de 100
4.1 NON-DESTRUCTIVE EXAMINATIONS
Most nondestructive examination (NDE) methods for fossil fuel-fired plants have been in use for many
years, although new methods are being developed for major components. Nondestructive testing does
not damage the component.
The NDE methods used in evaluating electric utility power stations and industrial process plants include:
1. Visual,
2. Magnetic particle,
3. Liquid penetrant,
4. Ultrasonic,
5. Eddy current,
6. Radiography,
7. Nuclear fluorescence,
8. Electromagnetic acoustics,
9. Acoustic emissions,
10. Metallographic replication,
11. Strain measurement, and
12. Temperature measurement.
4.1.1 VISUAL
Whether the inspected component is subject to mechanical wear, chemical attack, or damage from
thermal stress, visual examination can detect and identify some of the damage. Visual inspection is
enhanced by lighting, magnification, mirrors, and optical equipment such as borescopes, fiberscopes and
binoculars.
4.1.2 MAGNETIC PARTICLES
Magnetic particle testing (MT) and wet fluorescent magnetic particle testing (WFMT) detect surface and
near surface flaws. Because a magnetic field must be imparted to the test piece, these tests are only
applicable to ferromagnetic materials. The choice between these techniques generally depends on the
geometry of the component and the required sensitivity. For typical power plant applications, one of two
methods is used:
1. The component is indirectly magnetized using an electromagnetic yoke with alternating current (AC)
2. The part is directly magnetized by prods driven by AC or direct current (DC).
In magnetic particle testing, any discontinuity disrupts the lines of magnetic force passing through the test
area creating a leakage field. Iron particles applied to the area accumulate along the lines of magnetic
force. Any leakage field created by a discontinuity is easily identified by the pattern of the iron particles.
Dry magnetic particle testing is performed using a dry medium composed of colored iron particles that are
dusted onto the magnetized area. In areas where a dry medium is ineffective, such as in testing overhead
components or the inside surfaces of pressure vessels, the wet fluorescent method is more effective. With
this method, fluorescent ferromagnetic particles are suspended in a liquid medium such as kerosene. The
liquid-borne particles adhere to the test area. Because the particles are fluorescent, they are highly visible
when viewed under an ultraviolet light.
4.1.3 LIQUID PENETRANT
Liquid penetrant testing (PT) detects surface cracking in a component. PT is not dependent on the
magnetic properties of the material and is less dependent on component geometry. It is used by The
23. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 23 de 100
Babcock & Wilcox Company (B&W) in limited access areas such as tube stub welds on high temperature
headers which are generally closely spaced. PT detects surface flaws by capillary action of the liquid dye
penetrant and is only effective where the discontinuity is open to the component surface. Following proper
surface cleaning the liquid dye is applied. The penetrant is left on the test area for about ten minutes to
allow it to penetrate the discontinuity. A cleaner is used to remove excess penetrant and the area is
allowed to dry. A developer is then sprayed onto the surface. Any dye that has been drawn into the surface
at a crack bleeds into the developer by reverse capillary action and becomes highly visible.
4.1.4 ULTRASONIC
Ultrasonic testing (UT) is the fastest developing technology for nondestructive testing of pressure
components. Numerous specialized UT methods have been developed. A piezoelectric transducer is
placed in contact with the test material, causing disturbances in the interatomic spacings and inducing an
elastic sound wave that moves through the material. The ultrasonic wave is reflected by any discontinuity
it encounters as it passes through the material. The reflected wave is received back at the transducer and
is displayed on an oscilloscope.
4.1.4.1 ULTRASONIC THICKNESS TESTING
Ultrasonic thickness testing (UTT) is the most basic ultrasonic technology. A common cause of pressure
part failure is the loss of material due to oxidation, corrosion or erosion. UTT is relatively fast and is used
extensively for measuring wall thicknesses of tubes or piping. The surface of the component must first be
thoroughly cleaned. Because ultrasonic waves do not pass through air, a couplant such as glycerine, a
water soluble gel, is brushed onto the surface. The transducer is then positioned onto the component
surface within the couplant. A high frequency (2 to 5 MHz) signal is transmitted by the transducer and
passes through the metal. UTT is performed using a longitudinal wave which travels perpendicular to the
contacted surface. Because the travel time for the reflected wave varies with distance, the metal thickness
is determined by the signal displacement, as shown on the oscilloscope screen (Figure 10 – Steam side
oxide scale on ID surface).
4.1.4.2 ULTRASONIC OXIDE MEASUREMENT
In the mid-1980s, B&W developed an ultrasonic technique specifically to evaluate high temperature tubing
found in super-heaters and re-heaters. This NDE method, called the Nondestructive Oxide Thickness
Inspection Service (NOTIS®
), measures the oxide layer on the internal surfaces of high temperature tubes.
The test is generally applicable to low alloy steels because these materials are commonly used in outlet
sections of the super-heater and re-heater.
Low alloy steels grow an oxide layer on their internal surfaces when exposed to high temperatures for
long time periods (Figure 11 – Typical ultrasonic signal response). The NOTIS test is not applicable to
stainless steels because they do not develop a measurable oxide layer.
24. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 24 de 100
Figure 10 – Steam side oxide scale on ID surface
Figure 11 – Typical ultrasonic signal response
The technique used for NOTIS testing is similar to UTT; the major difference between the two is the
frequency range of the ultrasonic signal. A much higher frequency is necessary to differentiate the
interface between the oxide layer and inside diameter (ID) surface of the tube. Using data obtained from
this NOTIS testing, tube remaining creep life can also be calculated as discussed later in Analysis
techniques. NOTIS and UTT are methods in which the transducer is placed in contact with the tube using
a couplant gel. Because of the high sensitivity of the NOTIS method, it is less tolerant of rough tube
surfaces or poor surface preparation.
25. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 25 de 100
4.1.4.3 ULTRASONIC MEASUREMENT OF INTERNAL TUBE DAMAGE
Several ultrasonic methods have been investigated for detecting damage within boiler tubes. All
techniques use contact UT where a transducer is placed on the outside diameter (OD) or tube surface
using a couplant, and an ultrasonic signal is transmitted through the material. The techniques can be
categorized by type of signal evaluation: backscatter, the evaluation of UT wave scatter when reflected
by damaged material; attenuation, the evaluation of UT signal loss associated with transmission through
damaged material; and velocity, the measurement and comparison of UT wave velocity through the tube
material.
When a longitudinal wave passes through a tube, part of the signal is not reflected to the receiver if it
encounters damaged material. The damaged areas reflect part of the wave at various angles,
backscattering the reflected signal. The loss of wave amplitude that is received back at the transducer is
then used to evaluate the degree of damage.
Damage in the tube can also be assessed by evaluating the loss of signal amplitude (attenuation) as a
shear wave is transmitted through the tube wall. The technique uses a fixture with two transducers
mounted at angles to each other. One unit transmits a shear wave into the tube and the second transducer,
the receiver, picks up the signal as the wave is reflected from the tube ID. A drop in signal amplitude
indicates damage in the tube wall.
This technology is the basis of the B&W patented Furnace wall Hydrogen damage Nondestructive
Examination Service (FHyNES®
) test method (Figure 12 - Sheer wave technique for detecting hydrogen
damage). The velocity test method uses either longitudinal or shear ultrasonic waves. As a wave passes
through a chordal section of tube with hydrogen damage, there is a measurable decrease in velocity.
Because the signal is not reflected from the tube inside surface, ultrasonic velocity measurement is not
affected by damage to the inside of the tube and therefore specifically detects hydrogen damage.
4.1.4.4 IMMERSION ULTRASONIC TESTING
In immersion ultrasonic testing, the part is placed in a water bath which acts as the couplant. B&W uses
a form of immersion UT for tube wall thickness measurements. In two-drum industrial power boilers,
process recovery boilers and some utility power generation boilers, most of the tubes in the convective
bank between the drums are inaccessible for conventional contact UTT measurements. For these
applications, an ultrasonic test probe was developed which is inserted into the tubes from the steam drum;
it measures the wall thickness from inside the tubes. As the probe is withdrawn in measured increments,
the transducers measure the tube wall thicknesses. A limitation of this technique is that the ID surface of
the tubes must be relatively clean.
4.1.4.5 SHEER WAVE ULTRASONIC TESTING
This is a contact ultrasonic technique in which a shear wave is directed at an angle into the test material.
Angles of 45º and 60º (deg) (0.79 and 1.05 rad) are typically used for defect detection and weld
assessment. The entire weld must be inspected for a quality examination.
26. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 26 de 100
Figure 12 - Sheer wave technique for detecting hydrogen damage
4.1.4.6 TIME OF FLIGHT DEFRACTION (TOFD)
TOFD is an ultrasonic technique that relies on the diffraction of ultrasonic energies from defects in the
component being tested. The primary application is weld inspection on piping, pressure vessels, and
tanks. TOFD is an automated inspection that uses a pitch-catch arrangement with two probes, one on
each side of the weld. The weld material is saturated with angled longitudinal waves to inspect for
discontinuities. Because the time separation of the diffracted waves is directly related to flaw size (height),
TOFD can detect both the flaw and allow estimation of the flaw size.
4.1.5 EDDY CURRENT
Measuring the effects of induced eddy currents on the primary or driving electromagnetic field is the basis
of eddy current testing. The electromagnetic induction needed for eddy current testing is created by using
an alternating current. This develops the electromagnetic field necessary to produce eddy currents in a
test piece.
Eddy current testing is applicable to any materials that conduct electricity and can be performed on
magnetic and nonmagnetic materials. The test is therefore applicable to all metals encountered in power
station condition assessment work.
Parameters affecting eddy current testing include the resistivity, conductivity, and magnetic permeability
of the test material; the frequency of the current producing the eddy currents; and the geometry and
thickness of the component being tested.
4.1.6 RADIOGRAPHY
Radiography testing (RT) is the most common NDE method used during field erection of a boiler.
Radiography is also valuable in condition assessments of piping. As x-rays and gamma rays pass through
27. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 27 de 100
a material, some of the rays are absorbed. Absorption depends upon material thickness and density.
When the rays passing through an object are exposed to a special film, an image of the object is produced
due to the partial absorption of the rays.
In practical terms, a radioactive source is placed on one side of a component such as a pipe, at a weld,
and a film is placed on the opposite side. If x-rays are directed through the weld and there is a void within
the weld, more rays pass through this void and reach the film, producing a darker image at that point. By
examining the radiographic films, the weld integrity can be determined. During the field erection of a boiler
and power station, thousands of tube and pipe welds are made and radiographed.
The major disadvantage of radiography is the harmful effect of excessive exposure to the radioactive rays.
RT is also limited in its ability to provide the orientation and depth of an indication.
4.1.7 NUCLEAR FLUORESCENCE
The primary use of this testing in condition assessment is the verification of alloy materials in high
temperature piping systems. When certain elements are exposed to an external source of x-rays they
fluoresce (emit) additional x-rays that vary in energy level. This fluorescence is characteristic of the key
alloys common to high temperature piping and headers. Chromium and molybdenum are the key elements
measured. The nuclear alloy analyzer is a portable instrument that contains a low level source of x-rays.
A point on the surface of the pipe is exposed to x-rays emitted from the analyzer. As the source x-rays
interact with the atoms of the metal, the alloys emit x-rays back to the analyzer. Within the detector system
of the analyzer, the fluoresced x-rays are separated into discrete energy regions. By measuring the x-ray
intensity in each energy region, the elemental composition is also determined.
4.1.8 ELECTROMAGNETIC ACOUSTICS
Electromagnetic acoustics combine two nondestructive testing sciences, ultrasonics (UT) and
electromagnetic induction. This technology uses an electromagnetic acoustic transducer (EMAT) to
generate high frequency sound waves in materials, similar to conventional ultrasonics. Conventional UT
transducers used for field testing convert electrical impulses to mechanical pulses by use of piezoelectric
crystals. These crystals must be coupled to the test piece through a fluid couplant. For electrically
conductive materials, ultrasonic waves can be produced by electromagnetic acoustic wave generation. 5
In contrast to conventional contact UT where a mechanical pulse is coupled to the material, the acoustic
wave is produced by the interaction of two magnetic sources. The first magnetic source modulates a time-
dependent magnetic field by electromagnetic induction as in eddy current testing. A second constant
magnetic field provided by an AC or DC driven electromagnet or a permanent magnet is positioned near
the first field. The interaction of these two fields generates a force, called the Lorentz force, in the direction
perpendicular to the two other fields. This Lorentz force interacts with the material to produce a shock
wave analogous to an ultrasonic pulse, eliminating the need for a couplant.
Figure 13 – Basic principles of EMAT operation; shows the basic principles of EMAT operation. A strong
magnetic field (B) is produced at the surface of the test piece by either a permanent magnet or
electromagnet. Eddy currents (J) are induced in the test material surface. An alternating eddy flow in the
presence of the magnetic field generates a Lorentz force (F) that produces an ultrasonic wave in the
28. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 28 de 100
material. For boiler tubes that are electromagnetically conductive (including alloys such as SA-213T22),
the EMAT technology is ideal.
Figure 13 – Basic principles of EMAT operation
B&W, working with the Electric Power Research Institute (EPRI), developed a nondestructive rapid scan
system to inspect boiler tubes using EMAT technology. This EMAT based system is known as the Fast-
Scanning Thickness Gage (FST-
a continuous measurement of tube wall thickness. (Figure 14 – B&W´s Fast-Scanning Thickness Gage
(FST-GAGE®
)). The system conducts tests at exceptional speeds, allowing scanning of thousands of feet
(m) of boiler tubing in a single shift. To perform an inspection, the FST-GAGE system is manually scanned
along individual boiler tubes. System sampling rates greater than 65 samples per second supports rapid
scanning of tubes. During a scan, the system provides an immediate display of both tube wall thickness
and signal amplitude. At the conclusion of each tube scan, a complete record of the inspection is
electronically stored and is traceable to each boiler tube and position.
Figure 14 – B&W´s Fast-Scanning Thickness Gage (FST-GAGE®
)
EMAT based system can provide continuous measurement of tube wall thickness.
29. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 29 de 100
As with conventional UT, the FST-GAGE system can assess internal tube damage by evaluating the loss
of signal amplitude (attenuation) as a shear wave is transmitted through the tube wall. By monitoring and
indicating signal amplitude, the system can also be used to detect tube damage such as hydrogen
damage, similar to B&W’s patented FHyNES technique. The FST-GAGE has also demonstrated the ability
to detect internal tube pitting, caustic gouging, and under-deposit corrosion.
As with any NDE method, surface preparation is important for effective testing with EMATs. However,
EMAT is not as sensitive to scale as conventional UT since it produces the ultrasonic wave within the
material. Some scales, such as magnetite oxide of uniform thickness, have no detrimental effect on the
signal generation of the EMAT probe. When the plant burns a clean fuel such as natural gas, testing may
be conducted without any special surface cleaning. To protect the coil from damage, surface preparation
will normally be required for boilers firing oil or solid fuels. Some gas-fired units may require surface
cleaning if external buildup or corrosion is present. Grit blasting or water blasting are effective methods of
cleaning larger areas. Smooth metal is the preferred surface to ensure rapid testing.
EMAT technology continues to be applied where its unique properties have advantages over conventional
UT techniques. B&W and EPRI are developing a system for the detection of cracking in boiler tubes
associated with corrosion fatigue. Waterside corrosion fatigue is a serious boiler tube failure mechanism.
The failures usually occur close to attachments such as buckstay welds, wind-box attachment welds, or
membrane welds. The combination of thermal fatigue stresses and corrosion leads to ID-initiated cracking
that is oriented along the tube axis. The EMAT system under development for corrosion fatigue has unique
characteristics that enhance its ability to scan past welds and attachments and scan the full circumference
of the boiler tube. The EMAT equipment uses a tone burst EMAT signal allowing the use of horizontally
polarized shear wave (SH waves) to detect cracking adjacent to external tube attachment welds.
B&W has developed an EMAT application to inspect horizontal banks (i.e., economizer, re-heater) of
tubing within the boiler. Horizontal bank tubing may experience tube failures caused by out of service
corrosion pitting forming aligned voids in the tube ID. The purpose of this EMAT test is to detect the internal
aligned pitting at the lower portion of the horizontal tube internal surface. The test is accomplished by
scanning along the outside of the horizontal tube at either the 3 or 9 o’clock positions with an EMAT
transducer generating a Lamb wave (ultrasonic waves that travel at right angles to the tube surface) which
is focused at the 6 o’clock position on the tube.
B&W has also developed a surface wave EMAT application to show surface indications including axially
oriented cracks in boiler tubes. Conventional surface nondestructive test methods were unsatisfactory
because they lacked adequate sensitivity and had slow production rates for testing on large areas. A tone
burst EMAT technique was developed that uses a bidirectional focused surface wave EMAT that follows
the tube surface circumferentially until the signal is reflected back from a longitudinally orientated OD
crack.
4.1.9 ACOUSTICS
Acoustics refers to the use of transmitted sound waves for nondestructive testing. It is differentiated from
ultrasonics and electromagnetic acoustics in that it features low frequency, audible sound. B&W uses
acoustic technology in testing tubular air heaters. Because the sound waves are low frequency, they can
30. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 30 de 100
only be transmitted through air. A pulse of sound is sent into the air heater tube. As the wave travels along
the tube, it is reflected by holes, blockage or partial obstructions. By evaluating the reflected wave on an
oscilloscope, the type of flaw and its location along the tube can be determined.
4.1.10 ACOUSTIC EMISSIONS
Acoustic emissions (AE) detect subsurface crack growth in pressure vessels. When a structure such as a
pipe is pressurized and heated, the metal experiences mechanical and thermal stresses. Due to the stress
concentration at a defect such as a crack, a small overall stress in the pipe can produce localized yield
and fracture stresses resulting in plastic deformation. These localized yields release bursts of energy or
stress wave emissions that are commonly called acoustic emissions. AE testing uses acoustic transducers
that are positioned along the vessel being monitored. AE signals are received at various transducers on
the vessel. By measuring the time required for the signal to reach each of the transducers, the data can
be interpreted to identify the location of the defect.
4.1.11 METALLOGRAPHIC REPLICATION
Metallographic replication is an in situ test method that enables an image of the metal grain structure to
be nondestructively lifted from a component. Replication is important in evaluating high temperature
headers and piping because it allows the structure to be examined for creep damage. Prior to the use of
replication techniques, it was necessary to remove samples of the material for laboratory analysis. The
replication process involves three steps: grinding, polishing and etching, and replicating. In the first step,
the surface is rough ground then flapper wheel ground with finer grit paper. In the second step, the surface
is polished using increasingly finer grades of diamond paste while intermittently applying a mixture of nitric
acid and methanol in solution. The acid solution preferentially attacks the grain boundaries of the metal.
In the final step, the replica, which is a plastic tape, is prepared by coating one face of the tape with
acetone for softening. The tape is then firmly pressed onto the prepared surface. Following a suitable
drying time, the tape is removed and mounted onto a glass slide for microscopic examination.
4.1.12 STRAIN MEASUREMENT
Strain measurements are obtained nondestructively by using strain gauges. Gauges used for piping
measurements are characterized by an electrical resistance that varies as a function of the applied
mechanical strain. For high temperature components, the gauge is made of an alloy, such as platinum-
tungsten, which can be used at temperatures up to 1200º F (649º C). The gauge is welded to the surface
of the pipe and the strain is measured as the pipe ramps through a temperature-pressure cycle to
operating temperature. Strain gauges used for lower temperature applications such as for analysis of
hanger support rods are made of conventional copper-nickel alloy (constantan). These low temperature
gauges are made of thin foil bonded to a flexible backing and are attached to the test surface by a special
adhesive.
4.1.13 TEMPERATURE MEASUREMENT
Most temperature measurements can be obtained with sheathed thermocouples (TC). In special
applications where temperature gradients are needed such as detailed stress analysis of header
31. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 31 de 100
ligaments, special embedded TCs are used. The embedded unit is constructed by drilling a small hole into
the header. A sheathed TC wire is then inserted and peened in place.
4.2 DESTRUCTIVE EXAMINATIONS
B&W tries to minimize the use of sample analysis because it is generally more expensive to perform
destructive testing. However, for certain components, complete evaluation can only be done by removing
and analyzing test samples. Destructive testing is described for two types of specimens, tube samples
and boat samples.
4.2.1 TUBE SAMPLES
Tubes are the most common destructively tested components. Tube samples are generally removed from
water- and steam-cooled circuits. A relatively large number of samples may be removed for visual
inspections, from which a smaller number are selected for complete laboratory analysis. A tube analysis
usually includes the following:
1. As-received sample photo documentation,
2. Complete visual inspection under magnification,
3. Dimensional evaluation of a ring section removed from the sample,
4. Material verification by spectrographic analysis,
5. Optical metallography, and
6. Material hardness measurement.
On water-wall tubes removed from the boiler furnace, the analysis includes a measurement of the internal
deposit loading [g/ft2
(g/m2
)] and elemental composition of the deposit. On steam-cooled super-heater and
re-heater tubes, the thickness of the high temperature oxide layer is also provided. Specialized tests are
performed as required to provide more in-depth information. Failure analysis is a common example. When
failures occur in which the root cause is not readily known from standard tests, fractography is performed.
Fractography involves examination of the fracture surface using a scanning electron microscope.
4.2.2 BOAT SAMPLES
Boat samples are wedge shaped slices removed from larger components such as headers, piping and
drums. The shape of the cut allows the material to be replaced by welding. Because the repairs usually
require post weld heat treating, the use of boat samples is expensive. In most instances, replication is
adequate for metallographic examination of these components and boat sample removal is not required.
4.3 ADVANCES IN NON-DESTRUCTIVE EXAMINATIONS
Innovative techniques are being developed to replace or enhance existing NDE methods. Some are
becoming viable due to advancements in microprocessor technology. Others are relatively new and may
replace current methods. Advanced techniques include:
1. Infrared scanning.
2. Automated Phased Array UT.
3. Pipe and wall scanners which automatically cover large areas.
32. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 32 de 100
4. Through-insulation radiography.
EMAT technology is being refined and studied for further applications in the NDE field.
5 SITE INSPECTION OF BOILER COMPONENTS AND AUXILIARIES
In Phase 1 of a condition assessment program, interviews of plant personnel and review of historical
maintenance records help identify problem components. These components are targeted for a closer
onsite examination during Phase 2 of the program. Nondestructive and destructive examination methods
can then be used to evaluate the remaining life of the boiler components and its major auxiliaries.
5.1 EXTERNAL BOILER INSPECTION
The external boiler inspection may be conducted when the boiler is operating or shutdown. If possible, an
external inspection should begin before shutdown in order to detect hot spots, leaks, etc. during operation.
An external inspection determines the amount of deterioration and is used to evaluate whether the boiler
is operating safely. The external boiler inspection may be conducted at any time and should include the
following:
1. Ladders, stairways and platforms
2. Air and flue gas ducts
3. Boiler support structure
4. Stack
5. Support structure & boiler casing
6. Boiler piping
7. Instrumentation
8. Safety relief valves
9. Paint and insulation
10. Boiler circulating pumps
11. Vents and drains
5.1.1 LADDERS, STAIRWAYS AND PLATFORMS
This inspection will insure that you can move around the equipment. The primary means of inspection is
visual. Hammering and scraping to remove oxide scales and other corrosion products may also be
necessary. Inspect for the following:
5.1.1.1 CRACKS
Inspect welds and structural steel for cracks. Remove floor plates to inspect supporting structure. Inspect
crevices by picking them with a pointed scraper. Determine if a crack warrants repair or further inspection
via ultrasonic measurements.
33. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 33 de 100
5.1.1.2 TIGHTNESS OF BOLTS
Bolt tightness can be determined by tapping with an inspector’s hammer or by trying the nuts with a
wrench. Note any loose bolts on the inspection sheet. Note any thread wear. Bolts that continue to loosen
up between inspections may indicate a structural fault.
5.1.1.3 CONDITION OF PAINT OR GALVANIZED MATERIAL
5.1.1.4 WEAR ON LADDER RUNGS AND STAIR TREADS.
Inspect depressions carefully because water lying in depressions can cause corrosion. Find loose or
broken parts by tapping with an inspectors hammer
5.1.1.5 SECURITY OF HANDRAILS
Inspect for broken braces, supports, or signs of movement. Inspect anchor points for deterioration.
5.1.1.6 THE CONDITION OF FLOORING
Check for any unsafe conditions. Check for worn flooring that could become slippery. Be especially
observant of any overhangs in and around platforms and ladders that may project into path during use.
5.1.2 FANS
Both forced and induced draft fans should be inspected when a boiler is shutdown. The inspection should
include:
1. Removal and inspection of motor including bearings and lubricant
2. Rotor and rotor blade inspection for loose blades. Examination of coupling and alignment of all parts
3. Inspection of induced draft fans for corrosion
4. Inspection of all dampers for operability and corrosion
5.1.3 AIR DUCTS AND FLUE GAS DUCTS
Inspect ducts for any signs of oxidation and the condition of the painted surfaces while the unit is in
operation. Some breeching and ducts are protected internally by refractory. Discoloration or destruction
of painted surfaces may indicate leakage through the refractory. Inspect the seams and joints for any
indications of cracking and leakage. Hammer testing can indicate thin area in ducting and breeching. Thin
areas may indicate internal corrosion. Check alignment of ducts that may indicate failure of supports or
shifting of equipment. Inspect expansion joints to ascertain their general condition and the presence of
cracks in the thinner, flexible joint material.
5.1.4 SUPPORT STRUCTURE AND BOILER CASING
The support structure includes all beams, columns, and girders that support the boiler as well as
foundations.
Inspect all load carrying structural steel for bending which may indicate weakening due to overloading,
lateral forces, corrosion or overheating due to leaks in the refractory. Inspect structural steel for corrosion.
34. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 34 de 100
Inspect all connections between columns, beams and girders. Visually inspect walls and wall alignment
for any signs of bulging or movement. Inspect walls for signs of hot spots or discoloration that would
indicate refractory problems. (See section 5.3 on page 46).
Foundations are steel reinforced concrete. Inspect the foundation for calcining, settling, cracks, and/or
spalling. One of the main causes of deterioration of the foundation is high temperature. High temperature
may cause calcining and/or cracks. Calcining is the drying out of concrete so that it has very little cohesion.
Locate calcining by chipping at the suspected area with a hammer.
Cracks in concrete may be caused by high temperature, poor design, and/or improper installation
(materials, curing). Cracks provide an entrance for water to corrode the reinforcing steel. When the steel
corrodes, it expands making cracks wider, which results to more corrosion. Spalling can result from
internal corrosion of reinforcing steel and/or overheating.
All foundations settle to some extent. Little or no trouble may be experienced if the settling is small and
evenly distributed. When settlement is noted, examine all pipe connections to the boiler. Inspect all anchor
points for the support structure for indications of excessive stress. Check various points with a bubble
level to find settlement. Spalling is a form of concrete deterioration caused by heat, corrosion of steel or
insufficient thickness of concrete over reinforcement. Major cracks or spalling may indicate the necessity
to removal of a core for testing.
Note all deficiencies on the inspection sheets.
5.1.5 STACK
Stacks have been known to collapse when allowed to deteriorate.
Deposits that accumulate in the stack can be explosive.
Deposits should be removed occasionally.
Inspect brick, concrete, and steel stacks for conditions that may weaken these structures. Use field
glasses to inspect high stacks from the ground. Use infrared temperature measurements to look for hot
spots that would indicate internal refractory problems.
Conduct a thorough hammer testing of the steel stacks. Pay particular attention to the seams, stiffening
rings, lugs, and nozzles. Acids in the flue gas that may condense may attack the upper cool portion of a
stack.
Inspect bolts at the base and at elevated sections for loosening and breakage. Check a loose bolt for
abrasion from movement of the structure. Inspect guy lines for corrosion. Inspect lightning rods and
grounding cables to see that they are securely grounded and not corroded. Guy line connections to the
dead-man at the bottom, and at the top are especially subject to corrosion due to moisture settling retained
around these connections. Guy wires should be replaced at safe intervals, since inspection is impractical
between the dead-man and the top. The electrical resistance of the ground should be less than 25 ohms.
35. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 35 de 100
5.1.6 BOILER PIPING
A leak or failure in a piping system may be a major problem or a minor inconvenience, depending on the
location and service. Study historical records to determine which sections may be approaching retirement
thickness. Inspect all lines including vents, drains, fuel supply lines, steam atomizing lines and fuel
smothering steam piping.
Inspect piping supports, and spring hangers for external corrosion, distortion, damage, settlement or
movement of the foundation.
Inspect for internal corrosion, using ultrasonic testing. X-ray and/or inspect internally when the lines are
opened. Ultrasonic inspection may not detect pitting, which is why internal visual inspection is important.
5.1.7 INSTRUMENTATION
Inspect all lines to instrumentation for leakage. Inspect all control valves for leakage. Verify if any safety
devices or alarms are bypassed. Alarm and shutdown settings should be verified when possible.
Inspect water glasses, since these are extremely important in operating the boiler. Make sure they are
well lit. Have the operator blow down the water gage in a normal manner and observe how the level
returns. A sluggish response may indicate an obstruction in the pipe connections to the boiler.
Check pressure gages in the field against those in the control room. Test the pressure with a test gage.
5.1.8 PAINT AND INSULATION
Visually inspect the condition of the protective coating and/or insulation. Any cracks or openings should
be repaired. Any rust spots and or bulging may indicate corrosion underneath thus, further inspection may
be required. Scrapping paint away from blisters or rust spots often reveals pits in the vessel walls. Measure
the depth of pitting with a pit gage. The most likely spots for paint failure are in crevices, in constantly
moist areas, and at welded seams.
5.2 INTERNAL BOILER INSPECTION
Internal boiler inspection can only be done when the boiler has been shut-down, properly blanked, and
purged. Internal inspection of the boiler may require removal of much of the casing and
insulation/refractory. Boilers should not be entered until entry can be done safely.
Internal boiler inspections are conducted whenever a boiler is shutdown. It is opened to determine the
amount of deterioration, and evaluated if the deterioration affects the safe use of the boiler. The main
types of deterioration are as follows: corrosion, erosion, metallurgical and physical changes, and
mechanical forces. Metallurgical changes include cracking and micro structural changes such as
graphitization, carbide precipitation, inter-granular corrosion, and embrittlement. Mechanical forces
include thermal shock, cyclic temperature changes, vibration, excessive pressure surges, and external
loads.
36. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 36 de 100
5.2.1 SAFE ENTRY
Entry into a boiler is not safe until the following have been done:
1. All fuel supply lines have been blocked in and blinded.
2. The boiler has been purged and tested to be free of fuel and flue gases.
3. Pumps are shut-down and tagged.
4. All feed valves have been blocked, tagged, padlocked and blinded, if necessary. Boiler has been
rained of all liquids. All drain lines and vents are open.
5. Manhole and hand-hole plates have been removed.
6. Boiler has cooled sufficiently for safe entry.
7. An entry permit has been issued.
5.2.2 REFRACTORY
The firebox refractory should be visually inspected for breakage, crumbling, spalling, and open joints.
Leakage of hot gases through the joints when the edges have crumbled, or when the tile or insulating
concrete has fallen out, may expose supporting steel to high metal temperatures, rapid oxidation, and
corrosion.
Fly-ash corrosion may occur, when fly ash and refractory are in contact. Fluxing occurs and produces a
slag that may be fluid at heater operating conditions. Slagging may cause rapid deterioration of hardware,
such as tube hangers. Metal oxides found in fuel oil are the fluxing agents that cause slagging. Spalling
can be caused by overheating, or heating up too fast after a turnaround or after repairs to refractory.
Sagging of refractory would indicate problems with the refractory supports. Overheating or corrosion of
supports usually causes support problems.
External deposits may indicate the need for external water washing. The water washing procedure may
include sealing the refractory with bitumen sealer to prevent water damage of the refractory, and the use
of 0.5% soda ash solution to minimize stress cracking of austenitic steels such as stainless steels. Under
no circumstances should raw water or salt water be used for water washing boilers. The bitumen sealer
will be burned off during normal operation.
Inspect all baffles for condition of baffle and refractory protecting baffles. Inspect the linings of all stacks
and ducts for cracks, wear, and structural soundness. Use ultrasonic measurements to check wall
thickness.
Field experience has demonstrated that corrosive slag in any form should be kept away from the tubes by
a refractory coating. Experience on operating units has proven that the most durable refractories are ram-
type high density formulations. The specific refractory selection may be contingent upon the specific plant
fuel.
Key overall issues to achieve the best potential chance for increased refractory life include:
1. Ensure proper maintenance/application of studs (along with maximizing stud density).
2. Choose the proper refractory for the application (proven positive experience).
3. Use refractory that has not exceeded its shelf life.
37. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 37 de 100
4. Follow proper refractory installation and curing procedures.
5. Follow good Cyclone startup/operation procedures.
Any one of these items done incorrectly can cause early loss of refractory.
5.2.3 STEAM DRUM
The steam drum is the most expensive boiler component and must be included in any comprehensive
condition assessment program. There are two types of steam drums, the all-welded design used
predominantly in electric utilities where the operating pressures exceed 1800 psi (12.4 MPa), and drums
with rolled tubes. The steam drum operates at saturation temperature [less than 700º F (371º C)]. Because
of this relatively low operating temperature, the drum is made of carbon steel and is not subject to
significant creep. Creep is defined as increasing strain at a constant stress over time.
Regardless of drum type, damage is primarily due to internal metal loss. The causes of metal loss include:
corrosion and oxidation, which can occur during extended outages; acid attack; oxygen pitting; and chelant
attack. Damage can also occur from mechanical and thermal stresses on the drum that concentrate at
nozzle and attachment welds. These stresses, most often associated with boilers that are on/off cycled,
can result in crack development. Cyclic operation can lead to drum distortion (humping) and can result in
concentrated stresses at the major support welds, seam welds, and girth welds. The feed-water
penetration area has the greatest thermal differential because incoming feed-water can be several
hundred degrees below drum temperature.
A problem unique to steam drums with rolled tube seats is tube seat wee-page (slight seeping of water
through the rolled joint). If the leak is not stopped, the joint, with its high residual stresses from the tube
rolling operation, can experience caustic embrittlement. In addition, the act of eliminating the tube seat
leak by repeated tube rolling can overstress the drum shell between tube seats and lead to ligament
cracking.
Condition assessment of the steam drum can include visual and fiber optic scope examination, MT, PT,
WFMT, UT and replication.
5.2.4 BOILER TUBING
5.2.4.1 STEAM-COOLED
Steam-cooled tubing is found in the super-heater and reheat super-heater. Both components have tubes
subjected to the effects of metal creep. Creep is a function of temperature, stress and operating time. The
creep life of the super-heater tubes is reduced by higher than expected operating temperature, thermal
cycling, and by other damage mechanisms, such as erosion and corrosion, causing tube wall thinning and
increased stresses. Excessive stresses associated with thermal expansion and mechanical loading can
also occur, leading to tube cracks and leaks independent of the predicted creep life.
Super-heater tubing can also experience erosion, corrosion, and interacting combinations of both.
Condition assessment of the super-heater tubes includes visual inspection, NOTIS, UTT and tube sample
analysis. Problems due to erosion, corrosion, expansion, or excessive temperature can generally be
located by visual examination.
38. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 38 de 100
5.2.4.2 WATER-COOLED
Water-cooled tubes include those of the economizer, boiler (generating) bank and furnace. The convection
pass side wall and screen tubes may also be water-cooled. These tubes operate at or below saturation
temperature and are not subject to significant creep. Modern boilers in electric utilities and many industrial
plants operate at high pressures. Because these boilers are not tolerant of waterside deposits, they must
be chemically cleaned periodically, which results in some tube material loss. Proper water chemistry
control will limit tube inside surface material loss due to ongoing operations and cleaning.
With the exception of creep deformation, the factors that reduce steam-cooled tube life can also act upon
water-cooled tubes. Erosion is most likely to occur on tube outside surfaces in the boiler or economizer
bank from soot-blowing or ash particle impingement. Corrosion of the water-cooled tubes is most common
on internal tube surfaces and results from excessive waterside deposits. Deposit accumulations promote
corrosion, caustic gouging or hydrogen damage.
5.2.5 RISERS
The riser tubes are generally found in the penthouse or over the roof of the boiler. They carry the saturated
steam-water mixture exiting the upper water-wall headers to the steam drum. Condition assessment
includes UTT measurements on non-drainable sections and on the extrados (outside surface) of bends.
When access is available it is advantageous to perform internal visual inspection with a fiber optic or video
probe.
5.2.6 HEADERS
Headers and their associated problems can be grouped according to operating temperature. High
temperature steam-carrying headers are a major concern because they have a finite creep life and their
replacement cost is high. Lower temperature water and steam-cooled headers are not susceptible to creep
but may be damaged by corrosion, erosion, or severe thermal stresses.
5.2.6.1 HIGH TEMPERATURE
The high temperature headers are the super-heater and re-heater outlets that operate at a bulk
temperature of 900º F (482º C) or higher. Headers operating at high temperature experience creep under
normal conditions. The mechanics of creep crack initiation and crack growth are further discussed in the
data analysis section of this chapter. Figure 15 - header locations susceptible of cracking; illustrates the
locations where cracking is most likely to occur on high temperature headers. In addition to material
degradation resulting from creep, high temperature headers can experience thermal and mechanical
fatigue. Creep stresses in combination with thermal fatigue stress lead to failure much sooner than those
resulting from creep alone.
There are three factors influencing creep fatigue in super-heater high temperature headers: combustion,
steam flow and boiler load. Heat distribution within the boiler is not uniform: burner inputs can vary, air
distribution is not uniform, and slagging and fouling can occur. The net effect of these combustion
parameters is variations in heat input to individual super-heater and re-heater tubes. When combined with
steam flow differences between tubes within a bank, significant variations in steam temperature entering
39. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 39 de 100
the header can occur. See Figure 16 - Steam temperature variation in a header. Changes in boiler load
further aggravate the temperature difference between the individual tube legs and the bulk header. As
boiler load increases, the firing rate must increase to maintain pressure. During this transient, the boiler is
temporarily over fired to compensate for the increasing steam flow and decreasing pressure. During load
decreases, the firing rate decreases slightly faster than steam flow in the super-heater with a resulting
decrease in tube outlet temperature relative to that of the bulk header Figure 17 - Super-heater tube leg
temperatures vary with load. As a consequence of these temperature gradients, the header experiences
localized stresses much greater than those associated with steam pressure and can result in large
ligament cracks as shown in Figure 18 - Large ligament cracks on header ID. In addition to the effects of
temperature variations, the external stresses associated with header expansion and piping loads must be
evaluated. Header expansion can cause damage on cycling units resulting in fatigue cracks at support
attachments, torque plates, and tube stub to header welds. Steam piping flexibility can cause excessive
loads to be transmitted to the header outlet nozzle. These stresses result in externally initiated cracks at
the outlet nozzle to header saddle weld.
Figure 15 - header locations susceptible of cracking
Condition assessment of high temperature headers should include a combination of NDE techniques that
are targeted at the welds where cracks are most likely to develop. Creep of the header causes it to swell;
the diameter should be measured at several locations on the header and the outlet nozzle. All major
header welds, including the outlet nozzle, torque plates, support lugs, support plates and circumferential
girth welds, should be examined by MT or PT. A percentage of the stub to header welds should be
examined by PT. Each section of the header should be examined by eddy current or acid etching to locate
the seam if it is not readily apparent. The seam weld is examined for surface indications by MT or PT, and
ultrasonic shear wave testing is performed to locate subsurface flaws. To examine the header for creep
damage, metallographic replication is performed. The last test that should be performed on any high
temperature header is internal examination of at least two tube bore holes. This test is considered the
most effective. Ideally, the evaluation should correspond to the hottest location along the header.
40. AJ2 PROJECT MANAGEMENT
QUALITY SYSTEMS ENGINEERING
Synergy
Engineers
JOSÉ AGUSTÍN GONZÁLEZ Page 40 de 100
Figure 16 - Steam temperature variation in a header
Figure 17 - Super-heater tube leg temperatures vary with load