1. Request
PLN Prepaid
Voucher for
BTS with
Prepaid
Meter by
Branch RTS
2. Request
Approved by
Branch Area
Manager
3. Request
Send to
Branch GA
Staff
4. Request
Verified by
Network
Operation HO
5. Request
Verified by GA
Staff HO
6. Request
Approved by
GA Manager
7. Request
Approved by
VP Network
8. Request
Approved by
Finance Head
9. Request
Approved by
COO
10. Request
Approved by
CFO
11. Finance
Processes &
Approval
12. Branch
Finance
Processes
13. Purchase
PLN Voucher
Branch GA
Staff
14. Branch
RTS Top Up
PLN Voucher
on BTS
15. Branch
Finance
Report &
Settlement to
Finance HO
16. Record
Settlement by
GA Staff HO
17. Monthly
GA Report by
GA Manager
TOP UP PREPAID PLN VOUCHER – CURRENT WORKFLOW
- 17 Activities
7 Approval Processes
2 Verified Processes
TOP UP PREPAID PLN VOUCHER – CURRENT WORKFLOW
Branch Head Office
NETWORKGAFINANCE
Area Mgr Notify Line
Send
Document
1. Request
PLN Prepaid
Voucher for
BTS with
Prepaid Meter
by Branch RTS
2. Request
Recorded by
Branch GA
Staff
3. Request
Verified by Area
Manager
4. Request
Verified by GA
Staff HO
5. Approved by
GA Manager
6. Request
Approved by
Finance Head
7. Request
Approved by
CFO
8. Finance
Processes &
Approval
9. Branch
Finance
Processes
10. Purchase
PLN Voucher
by Branch GA
Staff
11. Branch RTS
Top Up PLN
Voucher on
BTS
12. Branch
Finance Report
& Settlement to
Finance HO
13. Record
Settlement by
GA Staff HO
14. Monthly GA
Report by GA
Manager
TOP UP PREPAID PLN VOUCHER – PROPOSED WORKFLOW
- SIMPLIFY INTO 14 Activities
4 Approval Processes
2 Verified Processes
TOP UP PREPAID PLN VOUCHER – PROPOSED WORKFLOW
Branch Head Office
NETWORKGAFINANCE
Area Mgr Notify Line
Send
Document
1. Penyambungan listrik PLN
Diusulkan agar mengalihkan pekerjaan ini dari vendor / subcon ke team office
masing2 cabang di 8 kota. Sehingga memudahkan Finance melakukan cross-
check dan control, juga Audit Internal atas pengajuan pengeluaran.
2. Pengajuan pembayaran listrik (postpaid & prepaid) ditempatkan pada GA.
Proses yg sdh ada adalah pembayaran listrik postpaid, sedangkan untuk
pembayaran listrik prepaid belum ada sehingga perlu dibuatkan SOP.
Sementara belum ada pengembangan baru selain 8 kota / cabang yg sdh ada,
proses pengurusan penyambungan listrik PLN untuk site BTS baru (umumnya
listrik prabayar) dapat dikerjakan oleh staff GA cabang sehingga menghemat
biaya outsource atau biaya staff admin deployment.
Pelaksanaan ini dapat dikoordinasikan antara RPM (regional project manager)
dgn staff GA dan wewenang tanda tangan dokumen pengajuan dapat
dilimpahkan ke Area Manager masing2 cabang sehingga mempersingkat
proses dan biaya kirim dokumen. Yang perlu diajukan ke kantor pusat adalah
penyediaan biaya penyambungan sesuai penyambungan listrik pada site baru.
Usulan Penyambungan listrik dan Pengajuan Pembayaran Listrik
No Description Unit of
Measure
Cost per 1
site
Target Cost
jika
dikerjakan
Staff GA
Expected
Savings
1 KWH Panel with pole type
D (complete accessories
(padlock, cable duct, etc)
and according to as plan
drawing
1 set Rp8,500,000 to
Rp21,000,000
Rp7,500,000 –
Rp13,000,000
Rp1,000,000 –
Rp8,000,000
2 AC Power cable NYFGBY
4x10mm2
Meter
(according to
length of cable
required from
PLN pole to
KWH at tower
or at roof top of
building)
Rp1,300,000 to
Rp15,000,000
Rp1,300,000 –
Rp8,000,000
Rp0 –
Rp7,000,000
3 Installation and connection
PLN. Outside works
survey, installation and
connection are done by
supplier PLN (AKLI).
1 Time Cost to
Apply for
Electricity
Connection
from PLN
Rp2,500,000 to
Rp30,000,000
Rp1,500,000 –
Rp8,000,000
Rp1,000,000 –
Rp12,000,000
Biaya Penyambungan Listrik BTS di masa Deployment WiMAX yg
ditagihkan oleh Vendor

More Related Content

Viewers also liked

5 g peek from cmcc 20may2013
5 g peek from cmcc 20may20135 g peek from cmcc 20may2013
5 g peek from cmcc 20may2013
Muljati Muli
 
LTE Vision 2020
LTE Vision 2020LTE Vision 2020
LTE Vision 2020
Muljati Muli
 
Mobile lifecycle
Mobile lifecycleMobile lifecycle
Mobile lifecycle
Muljati Muli
 
Business data in Pekanbaru Riau
Business data in Pekanbaru RiauBusiness data in Pekanbaru Riau
Business data in Pekanbaru Riau
Muljati Muli
 
PAYMENT PROCESS FOR BUDGETED STATE SPENDING (Indonesia)
PAYMENT PROCESS FOR BUDGETED STATE SPENDING (Indonesia)PAYMENT PROCESS FOR BUDGETED STATE SPENDING (Indonesia)
PAYMENT PROCESS FOR BUDGETED STATE SPENDING (Indonesia)
Muljati Muli
 
TD LTE MAP GSA
TD LTE MAP GSATD LTE MAP GSA
TD LTE MAP GSA
Muljati Muli
 
Wimax Pakistan Case Study
Wimax Pakistan Case StudyWimax Pakistan Case Study
Wimax Pakistan Case Study
Muljati Muli
 

Viewers also liked (7)

5 g peek from cmcc 20may2013
5 g peek from cmcc 20may20135 g peek from cmcc 20may2013
5 g peek from cmcc 20may2013
 
LTE Vision 2020
LTE Vision 2020LTE Vision 2020
LTE Vision 2020
 
Mobile lifecycle
Mobile lifecycleMobile lifecycle
Mobile lifecycle
 
Business data in Pekanbaru Riau
Business data in Pekanbaru RiauBusiness data in Pekanbaru Riau
Business data in Pekanbaru Riau
 
PAYMENT PROCESS FOR BUDGETED STATE SPENDING (Indonesia)
PAYMENT PROCESS FOR BUDGETED STATE SPENDING (Indonesia)PAYMENT PROCESS FOR BUDGETED STATE SPENDING (Indonesia)
PAYMENT PROCESS FOR BUDGETED STATE SPENDING (Indonesia)
 
TD LTE MAP GSA
TD LTE MAP GSATD LTE MAP GSA
TD LTE MAP GSA
 
Wimax Pakistan Case Study
Wimax Pakistan Case StudyWimax Pakistan Case Study
Wimax Pakistan Case Study
 

Similar to Shorten power application payment request

Presentation on project Initiating Telecom
Presentation on project Initiating TelecomPresentation on project Initiating Telecom
Presentation on project Initiating Telecom
Naveed Daar
 
Service Improvement Plans.pdf
Service Improvement Plans.pdfService Improvement Plans.pdf
Service Improvement Plans.pdf
Boris Berovic
 
Weekly Meeting Presentation
Weekly Meeting PresentationWeekly Meeting Presentation
Weekly Meeting Presentation
Calkee
 
Msedcl aar 2018-19
Msedcl aar 2018-19Msedcl aar 2018-19
Msedcl aar 2018-19
ZahidManiyar
 
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of Febru...
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of Febru...MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of Febru...
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of Febru...
Das A. K.
 
Eskom - Grid Connectivity
Eskom - Grid ConnectivityEskom - Grid Connectivity
Eskom - Grid Connectivity
Wind Energy Update
 
AIWSP presentation SCM 3 11.09.2018 (1).ppt
AIWSP presentation SCM 3  11.09.2018 (1).pptAIWSP presentation SCM 3  11.09.2018 (1).ppt
AIWSP presentation SCM 3 11.09.2018 (1).ppt
Rajabdeen Amjath
 
Monthly Progress Report No.13 - September 2011
Monthly Progress Report No.13 - September 2011Monthly Progress Report No.13 - September 2011
Monthly Progress Report No.13 - September 2011
Sam Kendall, MSc, BSc Civil Eng., PMP®, MIEAust
 
The minimum voltage tevel for interfacing of NRSE/CPP projects with State Gri...
The minimum voltage tevel for interfacing of NRSE/CPP projects with State Gri...The minimum voltage tevel for interfacing of NRSE/CPP projects with State Gri...
The minimum voltage tevel for interfacing of NRSE/CPP projects with State Gri...
HARTEK POWER
 
Minimum Voltage Level for interfacing of NRSE/CPP Projects with State Grid
Minimum Voltage Level for interfacing of NRSE/CPP Projects with State GridMinimum Voltage Level for interfacing of NRSE/CPP Projects with State Grid
Minimum Voltage Level for interfacing of NRSE/CPP Projects with State Grid
Simarpreet H.Singh
 
Nov 14 - Caltrain Modernization Cost and Schedule Update
Nov 14 - Caltrain Modernization Cost and Schedule UpdateNov 14 - Caltrain Modernization Cost and Schedule Update
Nov 14 - Caltrain Modernization Cost and Schedule Update
Adina Levin
 
Elan Sector-80,service apartments
Elan Sector-80,service apartmentsElan Sector-80,service apartments
Elan Sector-80,service apartments
realagentck
 
Elan Sector-80, 9911123210,NH-8 Gurgaon
Elan Sector-80, 9911123210,NH-8 GurgaonElan Sector-80, 9911123210,NH-8 Gurgaon
Elan Sector-80, 9911123210,NH-8 Gurgaon
realagentck
 
WTTIL-QUIPPO-EB
WTTIL-QUIPPO-EBWTTIL-QUIPPO-EB
WTTIL-QUIPPO-EB
pratyushray
 
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
Harish Sharma
 
Print image 287264076623_20160713_449,355
Print image 287264076623_20160713_449,355Print image 287264076623_20160713_449,355
Print image 287264076623_20160713_449,355
Nicole Preno
 
Power market operation 발표
Power market operation 발표Power market operation 발표
Power market operation 발표
상진 정
 
talhadiploma.doc
talhadiploma.doctalhadiploma.doc
talhadiploma.doc
Mtalha. Sticco Burny
 
PYAY - U schemes undertaken by Government
PYAY - U schemes undertaken by GovernmentPYAY - U schemes undertaken by Government
PYAY - U schemes undertaken by Government
AkshayB54
 
Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...
Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...
Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...
India Water Portal
 

Similar to Shorten power application payment request (20)

Presentation on project Initiating Telecom
Presentation on project Initiating TelecomPresentation on project Initiating Telecom
Presentation on project Initiating Telecom
 
Service Improvement Plans.pdf
Service Improvement Plans.pdfService Improvement Plans.pdf
Service Improvement Plans.pdf
 
Weekly Meeting Presentation
Weekly Meeting PresentationWeekly Meeting Presentation
Weekly Meeting Presentation
 
Msedcl aar 2018-19
Msedcl aar 2018-19Msedcl aar 2018-19
Msedcl aar 2018-19
 
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of Febru...
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of Febru...MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of Febru...
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of Febru...
 
Eskom - Grid Connectivity
Eskom - Grid ConnectivityEskom - Grid Connectivity
Eskom - Grid Connectivity
 
AIWSP presentation SCM 3 11.09.2018 (1).ppt
AIWSP presentation SCM 3  11.09.2018 (1).pptAIWSP presentation SCM 3  11.09.2018 (1).ppt
AIWSP presentation SCM 3 11.09.2018 (1).ppt
 
Monthly Progress Report No.13 - September 2011
Monthly Progress Report No.13 - September 2011Monthly Progress Report No.13 - September 2011
Monthly Progress Report No.13 - September 2011
 
The minimum voltage tevel for interfacing of NRSE/CPP projects with State Gri...
The minimum voltage tevel for interfacing of NRSE/CPP projects with State Gri...The minimum voltage tevel for interfacing of NRSE/CPP projects with State Gri...
The minimum voltage tevel for interfacing of NRSE/CPP projects with State Gri...
 
Minimum Voltage Level for interfacing of NRSE/CPP Projects with State Grid
Minimum Voltage Level for interfacing of NRSE/CPP Projects with State GridMinimum Voltage Level for interfacing of NRSE/CPP Projects with State Grid
Minimum Voltage Level for interfacing of NRSE/CPP Projects with State Grid
 
Nov 14 - Caltrain Modernization Cost and Schedule Update
Nov 14 - Caltrain Modernization Cost and Schedule UpdateNov 14 - Caltrain Modernization Cost and Schedule Update
Nov 14 - Caltrain Modernization Cost and Schedule Update
 
Elan Sector-80,service apartments
Elan Sector-80,service apartmentsElan Sector-80,service apartments
Elan Sector-80,service apartments
 
Elan Sector-80, 9911123210,NH-8 Gurgaon
Elan Sector-80, 9911123210,NH-8 GurgaonElan Sector-80, 9911123210,NH-8 Gurgaon
Elan Sector-80, 9911123210,NH-8 Gurgaon
 
WTTIL-QUIPPO-EB
WTTIL-QUIPPO-EBWTTIL-QUIPPO-EB
WTTIL-QUIPPO-EB
 
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
 
Print image 287264076623_20160713_449,355
Print image 287264076623_20160713_449,355Print image 287264076623_20160713_449,355
Print image 287264076623_20160713_449,355
 
Power market operation 발표
Power market operation 발표Power market operation 발표
Power market operation 발표
 
talhadiploma.doc
talhadiploma.doctalhadiploma.doc
talhadiploma.doc
 
PYAY - U schemes undertaken by Government
PYAY - U schemes undertaken by GovernmentPYAY - U schemes undertaken by Government
PYAY - U schemes undertaken by Government
 
Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...
Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...
Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...
 

More from Muljati Muli

Wimax deployment considerations
Wimax deployment considerationsWimax deployment considerations
Wimax deployment considerations
Muljati Muli
 
Tatacara pengadaan pemerintah
Tatacara pengadaan pemerintahTatacara pengadaan pemerintah
Tatacara pengadaan pemerintah
Muljati Muli
 
Sustaining market through supply chain
Sustaining market through supply chainSustaining market through supply chain
Sustaining market through supply chain
Muljati Muli
 
Lean manufacturing toyota indonesia 2011_2
Lean manufacturing toyota indonesia 2011_2Lean manufacturing toyota indonesia 2011_2
Lean manufacturing toyota indonesia 2011_2
Muljati Muli
 
Fishbone diagram template
Fishbone diagram templateFishbone diagram template
Fishbone diagram template
Muljati Muli
 
Career guide
Career guideCareer guide
Career guide
Muljati Muli
 
Why retail stores fail
Why retail stores failWhy retail stores fail
Why retail stores fail
Muljati Muli
 
Making yourself indispensable
Making yourself indispensableMaking yourself indispensable
Making yourself indispensable
Muljati Muli
 
Deliver presentation like Steve Jobs
Deliver presentation like Steve JobsDeliver presentation like Steve Jobs
Deliver presentation like Steve Jobs
Muljati Muli
 
Indonesia Submarine Cables
Indonesia Submarine CablesIndonesia Submarine Cables
Indonesia Submarine Cables
Muljati Muli
 

More from Muljati Muli (10)

Wimax deployment considerations
Wimax deployment considerationsWimax deployment considerations
Wimax deployment considerations
 
Tatacara pengadaan pemerintah
Tatacara pengadaan pemerintahTatacara pengadaan pemerintah
Tatacara pengadaan pemerintah
 
Sustaining market through supply chain
Sustaining market through supply chainSustaining market through supply chain
Sustaining market through supply chain
 
Lean manufacturing toyota indonesia 2011_2
Lean manufacturing toyota indonesia 2011_2Lean manufacturing toyota indonesia 2011_2
Lean manufacturing toyota indonesia 2011_2
 
Fishbone diagram template
Fishbone diagram templateFishbone diagram template
Fishbone diagram template
 
Career guide
Career guideCareer guide
Career guide
 
Why retail stores fail
Why retail stores failWhy retail stores fail
Why retail stores fail
 
Making yourself indispensable
Making yourself indispensableMaking yourself indispensable
Making yourself indispensable
 
Deliver presentation like Steve Jobs
Deliver presentation like Steve JobsDeliver presentation like Steve Jobs
Deliver presentation like Steve Jobs
 
Indonesia Submarine Cables
Indonesia Submarine CablesIndonesia Submarine Cables
Indonesia Submarine Cables
 

Recently uploaded

Addiction to Winning Across Diverse Populations.pdf
Addiction to Winning Across Diverse Populations.pdfAddiction to Winning Across Diverse Populations.pdf
Addiction to Winning Across Diverse Populations.pdf
Bill641377
 
Credit-Management seminar for cooperative power point presentation
Credit-Management seminar for cooperative power point presentationCredit-Management seminar for cooperative power point presentation
Credit-Management seminar for cooperative power point presentation
bernanbumatay1
 
Integrity in leadership builds trust by ensuring consistency between words an...
Integrity in leadership builds trust by ensuring consistency between words an...Integrity in leadership builds trust by ensuring consistency between words an...
Integrity in leadership builds trust by ensuring consistency between words an...
Ram V Chary
 
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
William (Bill) H. Bender, FCSI
 
innovation in nursing practice, education and management.pptx
innovation in nursing practice, education and management.pptxinnovation in nursing practice, education and management.pptx
innovation in nursing practice, education and management.pptx
TulsiDhidhi1
 
Enriching engagement with ethical review processes
Enriching engagement with ethical review processesEnriching engagement with ethical review processes
Enriching engagement with ethical review processes
strikingabalance
 
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Dr. Nazrul Islam
 
Credit Management training seminar power point presentation
Credit Management training seminar power point presentationCredit Management training seminar power point presentation
Credit Management training seminar power point presentation
bernanbumatay1
 
Stuart Wilson the teams I have led - 2024
Stuart Wilson the teams I have led - 2024Stuart Wilson the teams I have led - 2024
Stuart Wilson the teams I have led - 2024
stuwilson.co.uk
 
Conflict resololution,role of hr in resolution
Conflict resololution,role of hr in resolutionConflict resololution,role of hr in resolution
Conflict resololution,role of hr in resolution
Dr. Christine Ngari ,Ph.D (HRM)
 
Risk-Management-presentation for cooperatives
Risk-Management-presentation for cooperativesRisk-Management-presentation for cooperatives
Risk-Management-presentation for cooperatives
bernanbumatay1
 
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
dsnow9802
 
Employment Practices Regulation and Multinational Corporations
Employment PracticesRegulation and Multinational CorporationsEmployment PracticesRegulation and Multinational Corporations
Employment Practices Regulation and Multinational Corporations
RoopaTemkar
 
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
tdt5v4b
 
12 steps to transform your organization into the agile org you deserve
12 steps to transform your organization into the agile org you deserve12 steps to transform your organization into the agile org you deserve
12 steps to transform your organization into the agile org you deserve
Pierre E. NEIS
 
The Management Guide: From Projects to Portfolio
The Management Guide: From Projects to PortfolioThe Management Guide: From Projects to Portfolio
The Management Guide: From Projects to Portfolio
Ahmed AbdelMoneim
 
Chart--Time Management.pdf How to time is spent
Chart--Time Management.pdf How to time is spentChart--Time Management.pdf How to time is spent
Chart--Time Management.pdf How to time is spent
spandane
 
Strategy for E-Types - Strategy Formulation.pptx
Strategy for E-Types - Strategy Formulation.pptxStrategy for E-Types - Strategy Formulation.pptx
Strategy for E-Types - Strategy Formulation.pptx
KarthikRaghu8
 
Public Speaking Tips to Help You Be A Strong Leader.pdf
Public Speaking Tips to Help You Be A Strong Leader.pdfPublic Speaking Tips to Help You Be A Strong Leader.pdf
Public Speaking Tips to Help You Be A Strong Leader.pdf
Pinta Partners
 
Ganpati Kumar Choudhary Indian Ethos PPT.pptx
Ganpati Kumar Choudhary Indian Ethos PPT.pptxGanpati Kumar Choudhary Indian Ethos PPT.pptx
Ganpati Kumar Choudhary Indian Ethos PPT.pptx
GanpatiKumarChoudhar
 

Recently uploaded (20)

Addiction to Winning Across Diverse Populations.pdf
Addiction to Winning Across Diverse Populations.pdfAddiction to Winning Across Diverse Populations.pdf
Addiction to Winning Across Diverse Populations.pdf
 
Credit-Management seminar for cooperative power point presentation
Credit-Management seminar for cooperative power point presentationCredit-Management seminar for cooperative power point presentation
Credit-Management seminar for cooperative power point presentation
 
Integrity in leadership builds trust by ensuring consistency between words an...
Integrity in leadership builds trust by ensuring consistency between words an...Integrity in leadership builds trust by ensuring consistency between words an...
Integrity in leadership builds trust by ensuring consistency between words an...
 
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
 
innovation in nursing practice, education and management.pptx
innovation in nursing practice, education and management.pptxinnovation in nursing practice, education and management.pptx
innovation in nursing practice, education and management.pptx
 
Enriching engagement with ethical review processes
Enriching engagement with ethical review processesEnriching engagement with ethical review processes
Enriching engagement with ethical review processes
 
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
 
Credit Management training seminar power point presentation
Credit Management training seminar power point presentationCredit Management training seminar power point presentation
Credit Management training seminar power point presentation
 
Stuart Wilson the teams I have led - 2024
Stuart Wilson the teams I have led - 2024Stuart Wilson the teams I have led - 2024
Stuart Wilson the teams I have led - 2024
 
Conflict resololution,role of hr in resolution
Conflict resololution,role of hr in resolutionConflict resololution,role of hr in resolution
Conflict resololution,role of hr in resolution
 
Risk-Management-presentation for cooperatives
Risk-Management-presentation for cooperativesRisk-Management-presentation for cooperatives
Risk-Management-presentation for cooperatives
 
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
 
Employment Practices Regulation and Multinational Corporations
Employment PracticesRegulation and Multinational CorporationsEmployment PracticesRegulation and Multinational Corporations
Employment Practices Regulation and Multinational Corporations
 
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
 
12 steps to transform your organization into the agile org you deserve
12 steps to transform your organization into the agile org you deserve12 steps to transform your organization into the agile org you deserve
12 steps to transform your organization into the agile org you deserve
 
The Management Guide: From Projects to Portfolio
The Management Guide: From Projects to PortfolioThe Management Guide: From Projects to Portfolio
The Management Guide: From Projects to Portfolio
 
Chart--Time Management.pdf How to time is spent
Chart--Time Management.pdf How to time is spentChart--Time Management.pdf How to time is spent
Chart--Time Management.pdf How to time is spent
 
Strategy for E-Types - Strategy Formulation.pptx
Strategy for E-Types - Strategy Formulation.pptxStrategy for E-Types - Strategy Formulation.pptx
Strategy for E-Types - Strategy Formulation.pptx
 
Public Speaking Tips to Help You Be A Strong Leader.pdf
Public Speaking Tips to Help You Be A Strong Leader.pdfPublic Speaking Tips to Help You Be A Strong Leader.pdf
Public Speaking Tips to Help You Be A Strong Leader.pdf
 
Ganpati Kumar Choudhary Indian Ethos PPT.pptx
Ganpati Kumar Choudhary Indian Ethos PPT.pptxGanpati Kumar Choudhary Indian Ethos PPT.pptx
Ganpati Kumar Choudhary Indian Ethos PPT.pptx
 

Shorten power application payment request

  • 1. Usulan Simplifikasi Workflow Penyambungan Listrik dan Pengajuan Pembayaran Listrik MID 10 March 2015
  • 2. 1. Request PLN Prepaid Voucher for BTS with Prepaid Meter by Branch RTS 2. Request Approved by Branch Area Manager 3. Request Send to Branch GA Staff 4. Request Verified by Network Operation HO 5. Request Verified by GA Staff HO 6. Request Approved by GA Manager 7. Request Approved by VP Network 8. Request Approved by Finance Head 9. Request Approved by COO 10. Request Approved by CFO 11. Finance Processes & Approval 12. Branch Finance Processes 13. Purchase PLN Voucher Branch GA Staff 14. Branch RTS Top Up PLN Voucher on BTS 15. Branch Finance Report & Settlement to Finance HO 16. Record Settlement by GA Staff HO 17. Monthly GA Report by GA Manager TOP UP PREPAID PLN VOUCHER – CURRENT WORKFLOW - 17 Activities 7 Approval Processes 2 Verified Processes
  • 3. TOP UP PREPAID PLN VOUCHER – CURRENT WORKFLOW Branch Head Office NETWORKGAFINANCE Area Mgr Notify Line Send Document
  • 4. 1. Request PLN Prepaid Voucher for BTS with Prepaid Meter by Branch RTS 2. Request Recorded by Branch GA Staff 3. Request Verified by Area Manager 4. Request Verified by GA Staff HO 5. Approved by GA Manager 6. Request Approved by Finance Head 7. Request Approved by CFO 8. Finance Processes & Approval 9. Branch Finance Processes 10. Purchase PLN Voucher by Branch GA Staff 11. Branch RTS Top Up PLN Voucher on BTS 12. Branch Finance Report & Settlement to Finance HO 13. Record Settlement by GA Staff HO 14. Monthly GA Report by GA Manager TOP UP PREPAID PLN VOUCHER – PROPOSED WORKFLOW - SIMPLIFY INTO 14 Activities 4 Approval Processes 2 Verified Processes
  • 5. TOP UP PREPAID PLN VOUCHER – PROPOSED WORKFLOW Branch Head Office NETWORKGAFINANCE Area Mgr Notify Line Send Document
  • 6. 1. Penyambungan listrik PLN Diusulkan agar mengalihkan pekerjaan ini dari vendor / subcon ke team office masing2 cabang di 8 kota. Sehingga memudahkan Finance melakukan cross- check dan control, juga Audit Internal atas pengajuan pengeluaran. 2. Pengajuan pembayaran listrik (postpaid & prepaid) ditempatkan pada GA. Proses yg sdh ada adalah pembayaran listrik postpaid, sedangkan untuk pembayaran listrik prepaid belum ada sehingga perlu dibuatkan SOP. Sementara belum ada pengembangan baru selain 8 kota / cabang yg sdh ada, proses pengurusan penyambungan listrik PLN untuk site BTS baru (umumnya listrik prabayar) dapat dikerjakan oleh staff GA cabang sehingga menghemat biaya outsource atau biaya staff admin deployment. Pelaksanaan ini dapat dikoordinasikan antara RPM (regional project manager) dgn staff GA dan wewenang tanda tangan dokumen pengajuan dapat dilimpahkan ke Area Manager masing2 cabang sehingga mempersingkat proses dan biaya kirim dokumen. Yang perlu diajukan ke kantor pusat adalah penyediaan biaya penyambungan sesuai penyambungan listrik pada site baru. Usulan Penyambungan listrik dan Pengajuan Pembayaran Listrik
  • 7. No Description Unit of Measure Cost per 1 site Target Cost jika dikerjakan Staff GA Expected Savings 1 KWH Panel with pole type D (complete accessories (padlock, cable duct, etc) and according to as plan drawing 1 set Rp8,500,000 to Rp21,000,000 Rp7,500,000 – Rp13,000,000 Rp1,000,000 – Rp8,000,000 2 AC Power cable NYFGBY 4x10mm2 Meter (according to length of cable required from PLN pole to KWH at tower or at roof top of building) Rp1,300,000 to Rp15,000,000 Rp1,300,000 – Rp8,000,000 Rp0 – Rp7,000,000 3 Installation and connection PLN. Outside works survey, installation and connection are done by supplier PLN (AKLI). 1 Time Cost to Apply for Electricity Connection from PLN Rp2,500,000 to Rp30,000,000 Rp1,500,000 – Rp8,000,000 Rp1,000,000 – Rp12,000,000 Biaya Penyambungan Listrik BTS di masa Deployment WiMAX yg ditagihkan oleh Vendor