Pradhan Mantri Awas Yojana (PMAY-U)
Government of Karnataka
SLNA : Rajiv Gandhi Rural Housing Corporation Ltd.
PROGRESS OF PMAY (U)
Indicators Current Status (No.)
§ Cities Approved 271
§ Demand Survey Completed Completed in 270 ULBs. In BBMP, survey
is under progress
§ Total Demand 19.85 Lakhs (validated 12.18 lakhs)
§ Demand received through Common Service Centre
and Online Application
CSC:2.62 Lakhs & Citizen portal:5.99
Lakhs
§ Cases accepted/rejected
§ Whether HFAPoA Submitted 270 HFAPoA Submitted
§ Whether AIP Submitted 270 AIP will be submitted after
approval of HFAPoA
§ Whether HFAPoA & AIP entered in MIS Will be updated after approval of GoI
§ SLTC/CLTC staffs approved vs. placed SLTC: 10 / 6 & CLTC:128 / 58 (remaining
CLTC specialist recruitment is under process)
Source Received Validated
CSC 2.62 0.62
Citizen 5.99 1.21
Total 8.52 1.83
STATUS OF MANDATORY CONDITIONS
Mandatory conditions Current
Status
§Dispensing the need for separate Non Agricultural (NA) Permission Under Process
§Prepare/amend their Master Plans earmarking land for Affordable Housing Under Process
§Single-window, time bound clearance for layout approval and building
permissions
Completed
§Adopt the approach of deemed building permission and layout approval on
the basis of pre-approved lay outs and building plans.
Under Process
§Amend or legislate existing rent laws on the lines of the Model Tenancy Act. Under Process
§Additional Floor Area Ratio (FAR)/Floor Space Index (FSI)/ Transferable
Development Rights (TDR) and relaxed density norms.
Under Process
INTERFACE WITH MIS
Indicators Current Status (No.)
§Survey entry made (%) 11.23 Lakhs
§Projects approved: 885
§Projects entered (7A/B/C/D) 877
§DUs approved under BLC 95,015
§Beneficiaries attached BLC: 63,859; AHP:49,318
Total:1,13,177
§Houses geo-tagged 33183
§Total fund transferred through DBT (Rs. Lakhs) 226.62 Crs.
§National Electronic Funds Transfer (NEFT) 0.00 Crs.
§PFMS/ DBT 31983 beneficiaries, Rs.214.23 Crs.
§Aadhar Payment Bridge (APB) 4893 beneficiaries
Rs. 12.13 Crs.
PROGRESS OF PROJECTS KARNATAKA
Vertic
als
Houses
Approved
Tendere
d
Work
order
Issued
Grounded/In Progress
Complet
ed
Remark
s
Foundati
on
Lintel Roof Total
§ISSR Nil 0 0 0 0 0 0 0 -
§AHP 2,27,419 185149 24,083 12523 1316 1458
15297
120
§BLC
(New)
95,015 NA NA 7,750 10,185 10,558 27,993 30,653
§BLC
(Enhanc
ement)
Nil 0 0 0 0 0 0 0 -
§Total
3,22,434 1,85,149 24,083 20,273 11,501 12,016 43,290 30,773
§CLSS
No. of loan
sanctioned
2974
PROJECT PROPOSAL BRIEF
Verticals ISSR AHP BLC (New) BLC (E) Remarks
§No. of Projects 0 10 61 0
§No. of DUs 0 9,106 2,835 0
§Project Cost 0 49,357.05 11094.50 0
§Central Share 0 13,659.00 4252.50 0
§State Share 0 13,232.00 5510.40 0
§ULB Share 0 5,546.35 0.00 0
§Beneficiary Share 0 16,919.70 1331.60 0
Verticals
(Rs. Lakhs)
Per Unit Cost Central
Share
State Share ULB Share Benf. Share Completion
Time
§ISSR NA NA NA NA NA NA
§AHP Varies from
4.50-5.00
1.5 1.2 for Gen
2.0 for SC/ST
Infrastructure
only
SC 0.20 to 1.70*
Gen 0.30 – 2.50*
24 months
§BLC-N 3.5 1.5 1.2 for Gen
1.8 for SC/ST
0 0.2 for SC/ST
0.8 for Gen
18 months
* Includes bank loan too
PROJECT PROPOSAL BRIEF
Checklist Status (Y/N)
§Layout plan(as per NBC norms) Attached Yes
§SLAC/SLSMC approval/Minutes submitted Yes
§Land title status (encumbrance free) Yes
§Beneficiary list (BLC) submitted Yes
§No. of Beneficiaries with Aadhar ID BLC: 2,835 AHP:9,106
§No. of Beneficiaries with other Unique ID 0
§No. of Aadhar seeded Bank accounts BLC : 2,835
§Status of physical & social infrastructure BLC: infrastructure already exists
AHP : Basic facilities are proposed
§Implementation plan/Completion period AHP:24 months, BLC:18 months
§Beneficiary consent sought Yes
§ Innovative technology Adopted:
§ Innovative technology is Adopted in the now proposed proposals of
AHP vertical of PMAY:HFA(U)-2022.
§ Details of IEC initiatives:
§ SLNA signed MoU with State Institute for Urban Development (GoK).
SIUD is conducting trainings frequently to officers/ CLTC experts of all
IAs (ULBs, KSDB & BDA).
§ State level training programmes were organized by SLNA to enhance
the capacity and speed up the Beneficiary Attachment/ Geo-Tagging.
BEST PRACTICE/INNOVATION
9
REQUEST TO GoI
1. Release of 1st instalment of GoI’s share 543.82 cr towards projects under PMAY.
2. Request to reconsider projects proposed under Pourakarmika Gruha Bhagya
scheme in convergence with PMAY
3. Approval for Capacity Building Plan -2018-19 & release of 1st instalment Rs.
799.95 lakh under PMAY
4. Approval of UC submitted for Rs. 8022.60 lakh
5. Approval of UC submitted for release of SLTC salary
6. Release of 3rd instalment of Rs. 10647.99 lakh for 17 projects under RAY.
7. Release of interest subsidy under Rajiv Rinn Yojana (Loan amount: Rs. 2187.60
lakh)
Thank You
Snapshots of projects under
PMAY:HFA(U)-2022
PMAY (U) Project of 450 DUs at Sira, Tumakuru
PMAY (U) Project of 1329 DUs at Mysore
PMAY (U) Project of 450 DUs at Madhugiri-AHP
Projects under BLC vertical
Snapshots of projects under RAY
RAY-Tumkur Dibburu 1200
DUs
18
RAY-Tumkur -1200
DUs
Project at Sulikunte, Bangalore
RAY-Gulbarga 1024
DUs
20

More Related Content

Similar to PYAY - U schemes undertaken by Government

T0352 - Al Wajba presentation for the Construction Sequence
T0352 - Al Wajba presentation for the Construction SequenceT0352 - Al Wajba presentation for the Construction Sequence
T0352 - Al Wajba presentation for the Construction Sequence
chethanshivram
 
FOUNDRY PARK PPT_2023.02.24.ppt
FOUNDRY PARK PPT_2023.02.24.pptFOUNDRY PARK PPT_2023.02.24.ppt
FOUNDRY PARK PPT_2023.02.24.ppt
SomSaha1
 
Project on expense booking in the service and stores section of F&A dept. of ...
Project on expense booking in the service and stores section of F&A dept. of ...Project on expense booking in the service and stores section of F&A dept. of ...
Project on expense booking in the service and stores section of F&A dept. of ...
CA Abhimanyu Chakraborty
 
Final_12th_NPC_Minutes_of_the_Meeting.pdf
Final_12th_NPC_Minutes_of_the_Meeting.pdfFinal_12th_NPC_Minutes_of_the_Meeting.pdf
Final_12th_NPC_Minutes_of_the_Meeting.pdf
ssuser4bcf3b
 

Similar to PYAY - U schemes undertaken by Government (20)

FY18 Budget Workshop Day 2
FY18 Budget Workshop Day 2FY18 Budget Workshop Day 2
FY18 Budget Workshop Day 2
 
Solar Rooftop Business in India
Solar Rooftop Business in IndiaSolar Rooftop Business in India
Solar Rooftop Business in India
 
Power industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistanPower industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistan
 
Performance Audit of GBPWD.pptx
Performance Audit of GBPWD.pptxPerformance Audit of GBPWD.pptx
Performance Audit of GBPWD.pptx
 
PPT_Final_18-02-15
PPT_Final_18-02-15PPT_Final_18-02-15
PPT_Final_18-02-15
 
District Science Centre PPT as on 07-11-2023.pptx
District Science Centre PPT  as on 07-11-2023.pptxDistrict Science Centre PPT  as on 07-11-2023.pptx
District Science Centre PPT as on 07-11-2023.pptx
 
ACCF- PCM19- MM Brief to Client- 26.10.21_At.pptx
ACCF- PCM19- MM Brief to Client- 26.10.21_At.pptxACCF- PCM19- MM Brief to Client- 26.10.21_At.pptx
ACCF- PCM19- MM Brief to Client- 26.10.21_At.pptx
 
T0352 - Al Wajba presentation for the Construction Sequence
T0352 - Al Wajba presentation for the Construction SequenceT0352 - Al Wajba presentation for the Construction Sequence
T0352 - Al Wajba presentation for the Construction Sequence
 
Presentation on project Initiating Telecom
Presentation on project Initiating TelecomPresentation on project Initiating Telecom
Presentation on project Initiating Telecom
 
FOUNDRY PARK PPT_2023.02.24.ppt
FOUNDRY PARK PPT_2023.02.24.pptFOUNDRY PARK PPT_2023.02.24.ppt
FOUNDRY PARK PPT_2023.02.24.ppt
 
Project on expense booking in the service and stores section of F&A dept. of ...
Project on expense booking in the service and stores section of F&A dept. of ...Project on expense booking in the service and stores section of F&A dept. of ...
Project on expense booking in the service and stores section of F&A dept. of ...
 
GCD's - Joint and Regional Planning_Velma Danielson
GCD's - Joint and Regional Planning_Velma DanielsonGCD's - Joint and Regional Planning_Velma Danielson
GCD's - Joint and Regional Planning_Velma Danielson
 
Wb final presentation
Wb final presentationWb final presentation
Wb final presentation
 
Projects Review Report
Projects  Review ReportProjects  Review Report
Projects Review Report
 
City of Cerritos Draft Budget for 2022-23 FY
City of Cerritos Draft Budget for 2022-23 FYCity of Cerritos Draft Budget for 2022-23 FY
City of Cerritos Draft Budget for 2022-23 FY
 
Mahatma Gandhi National Rural Employment Guarantee
Mahatma Gandhi National Rural Employment Guarantee Mahatma Gandhi National Rural Employment Guarantee
Mahatma Gandhi National Rural Employment Guarantee
 
Amrut ppt
Amrut pptAmrut ppt
Amrut ppt
 
Webinar presentation-Planning-7-4-2020.pptx
Webinar presentation-Planning-7-4-2020.pptxWebinar presentation-Planning-7-4-2020.pptx
Webinar presentation-Planning-7-4-2020.pptx
 
Law / NOC on Ground Water Utilization
Law / NOC on Ground Water UtilizationLaw / NOC on Ground Water Utilization
Law / NOC on Ground Water Utilization
 
Final_12th_NPC_Minutes_of_the_Meeting.pdf
Final_12th_NPC_Minutes_of_the_Meeting.pdfFinal_12th_NPC_Minutes_of_the_Meeting.pdf
Final_12th_NPC_Minutes_of_the_Meeting.pdf
 

Recently uploaded

Diamond Harbour \ Russian Call Girls Kolkata | Book 8005736733 Extreme Naught...
Diamond Harbour \ Russian Call Girls Kolkata | Book 8005736733 Extreme Naught...Diamond Harbour \ Russian Call Girls Kolkata | Book 8005736733 Extreme Naught...
Diamond Harbour \ Russian Call Girls Kolkata | Book 8005736733 Extreme Naught...
HyderabadDolls
 
Top profile Call Girls In Indore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Indore [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Indore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Indore [ 7014168258 ] Call Me For Genuine Models We...
gajnagarg
 
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
vexqp
 
Top profile Call Girls In Chandrapur [ 7014168258 ] Call Me For Genuine Model...
Top profile Call Girls In Chandrapur [ 7014168258 ] Call Me For Genuine Model...Top profile Call Girls In Chandrapur [ 7014168258 ] Call Me For Genuine Model...
Top profile Call Girls In Chandrapur [ 7014168258 ] Call Me For Genuine Model...
gajnagarg
 
Top profile Call Girls In Bihar Sharif [ 7014168258 ] Call Me For Genuine Mod...
Top profile Call Girls In Bihar Sharif [ 7014168258 ] Call Me For Genuine Mod...Top profile Call Girls In Bihar Sharif [ 7014168258 ] Call Me For Genuine Mod...
Top profile Call Girls In Bihar Sharif [ 7014168258 ] Call Me For Genuine Mod...
nirzagarg
 
Top profile Call Girls In Rohtak [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Rohtak [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Rohtak [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Rohtak [ 7014168258 ] Call Me For Genuine Models We...
nirzagarg
 
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
nirzagarg
 
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi ArabiaIn Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
ahmedjiabur940
 
Lake Town / Independent Kolkata Call Girls Phone No 8005736733 Elite Escort S...
Lake Town / Independent Kolkata Call Girls Phone No 8005736733 Elite Escort S...Lake Town / Independent Kolkata Call Girls Phone No 8005736733 Elite Escort S...
Lake Town / Independent Kolkata Call Girls Phone No 8005736733 Elite Escort S...
HyderabadDolls
 
Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...
Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...
Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...
HyderabadDolls
 

Recently uploaded (20)

Diamond Harbour \ Russian Call Girls Kolkata | Book 8005736733 Extreme Naught...
Diamond Harbour \ Russian Call Girls Kolkata | Book 8005736733 Extreme Naught...Diamond Harbour \ Russian Call Girls Kolkata | Book 8005736733 Extreme Naught...
Diamond Harbour \ Russian Call Girls Kolkata | Book 8005736733 Extreme Naught...
 
7. Epi of Chronic respiratory diseases.ppt
7. Epi of Chronic respiratory diseases.ppt7. Epi of Chronic respiratory diseases.ppt
7. Epi of Chronic respiratory diseases.ppt
 
Top profile Call Girls In Indore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Indore [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Indore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Indore [ 7014168258 ] Call Me For Genuine Models We...
 
Predicting HDB Resale Prices - Conducting Linear Regression Analysis With Orange
Predicting HDB Resale Prices - Conducting Linear Regression Analysis With OrangePredicting HDB Resale Prices - Conducting Linear Regression Analysis With Orange
Predicting HDB Resale Prices - Conducting Linear Regression Analysis With Orange
 
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
 
DATA SUMMIT 24 Building Real-Time Pipelines With FLaNK
DATA SUMMIT 24  Building Real-Time Pipelines With FLaNKDATA SUMMIT 24  Building Real-Time Pipelines With FLaNK
DATA SUMMIT 24 Building Real-Time Pipelines With FLaNK
 
Fun all Day Call Girls in Jaipur 9332606886 High Profile Call Girls You Ca...
Fun all Day Call Girls in Jaipur   9332606886  High Profile Call Girls You Ca...Fun all Day Call Girls in Jaipur   9332606886  High Profile Call Girls You Ca...
Fun all Day Call Girls in Jaipur 9332606886 High Profile Call Girls You Ca...
 
Top profile Call Girls In Chandrapur [ 7014168258 ] Call Me For Genuine Model...
Top profile Call Girls In Chandrapur [ 7014168258 ] Call Me For Genuine Model...Top profile Call Girls In Chandrapur [ 7014168258 ] Call Me For Genuine Model...
Top profile Call Girls In Chandrapur [ 7014168258 ] Call Me For Genuine Model...
 
Top profile Call Girls In Bihar Sharif [ 7014168258 ] Call Me For Genuine Mod...
Top profile Call Girls In Bihar Sharif [ 7014168258 ] Call Me For Genuine Mod...Top profile Call Girls In Bihar Sharif [ 7014168258 ] Call Me For Genuine Mod...
Top profile Call Girls In Bihar Sharif [ 7014168258 ] Call Me For Genuine Mod...
 
20240412-SmartCityIndex-2024-Full-Report.pdf
20240412-SmartCityIndex-2024-Full-Report.pdf20240412-SmartCityIndex-2024-Full-Report.pdf
20240412-SmartCityIndex-2024-Full-Report.pdf
 
Ranking and Scoring Exercises for Research
Ranking and Scoring Exercises for ResearchRanking and Scoring Exercises for Research
Ranking and Scoring Exercises for Research
 
Introduction to Statistics Presentation.pptx
Introduction to Statistics Presentation.pptxIntroduction to Statistics Presentation.pptx
Introduction to Statistics Presentation.pptx
 
Top profile Call Girls In Rohtak [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Rohtak [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Rohtak [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Rohtak [ 7014168258 ] Call Me For Genuine Models We...
 
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
 
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi ArabiaIn Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
 
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptx
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptxRESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptx
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptx
 
Case Study 4 Where the cry of rebellion happen?
Case Study 4 Where the cry of rebellion happen?Case Study 4 Where the cry of rebellion happen?
Case Study 4 Where the cry of rebellion happen?
 
Lake Town / Independent Kolkata Call Girls Phone No 8005736733 Elite Escort S...
Lake Town / Independent Kolkata Call Girls Phone No 8005736733 Elite Escort S...Lake Town / Independent Kolkata Call Girls Phone No 8005736733 Elite Escort S...
Lake Town / Independent Kolkata Call Girls Phone No 8005736733 Elite Escort S...
 
Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...
Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...
Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...
 
Gomti Nagar & best call girls in Lucknow | 9548273370 Independent Escorts & D...
Gomti Nagar & best call girls in Lucknow | 9548273370 Independent Escorts & D...Gomti Nagar & best call girls in Lucknow | 9548273370 Independent Escorts & D...
Gomti Nagar & best call girls in Lucknow | 9548273370 Independent Escorts & D...
 

PYAY - U schemes undertaken by Government

  • 1. Pradhan Mantri Awas Yojana (PMAY-U) Government of Karnataka SLNA : Rajiv Gandhi Rural Housing Corporation Ltd.
  • 2. PROGRESS OF PMAY (U) Indicators Current Status (No.) § Cities Approved 271 § Demand Survey Completed Completed in 270 ULBs. In BBMP, survey is under progress § Total Demand 19.85 Lakhs (validated 12.18 lakhs) § Demand received through Common Service Centre and Online Application CSC:2.62 Lakhs & Citizen portal:5.99 Lakhs § Cases accepted/rejected § Whether HFAPoA Submitted 270 HFAPoA Submitted § Whether AIP Submitted 270 AIP will be submitted after approval of HFAPoA § Whether HFAPoA & AIP entered in MIS Will be updated after approval of GoI § SLTC/CLTC staffs approved vs. placed SLTC: 10 / 6 & CLTC:128 / 58 (remaining CLTC specialist recruitment is under process) Source Received Validated CSC 2.62 0.62 Citizen 5.99 1.21 Total 8.52 1.83
  • 3. STATUS OF MANDATORY CONDITIONS Mandatory conditions Current Status §Dispensing the need for separate Non Agricultural (NA) Permission Under Process §Prepare/amend their Master Plans earmarking land for Affordable Housing Under Process §Single-window, time bound clearance for layout approval and building permissions Completed §Adopt the approach of deemed building permission and layout approval on the basis of pre-approved lay outs and building plans. Under Process §Amend or legislate existing rent laws on the lines of the Model Tenancy Act. Under Process §Additional Floor Area Ratio (FAR)/Floor Space Index (FSI)/ Transferable Development Rights (TDR) and relaxed density norms. Under Process
  • 4. INTERFACE WITH MIS Indicators Current Status (No.) §Survey entry made (%) 11.23 Lakhs §Projects approved: 885 §Projects entered (7A/B/C/D) 877 §DUs approved under BLC 95,015 §Beneficiaries attached BLC: 63,859; AHP:49,318 Total:1,13,177 §Houses geo-tagged 33183 §Total fund transferred through DBT (Rs. Lakhs) 226.62 Crs. §National Electronic Funds Transfer (NEFT) 0.00 Crs. §PFMS/ DBT 31983 beneficiaries, Rs.214.23 Crs. §Aadhar Payment Bridge (APB) 4893 beneficiaries Rs. 12.13 Crs.
  • 5. PROGRESS OF PROJECTS KARNATAKA Vertic als Houses Approved Tendere d Work order Issued Grounded/In Progress Complet ed Remark s Foundati on Lintel Roof Total §ISSR Nil 0 0 0 0 0 0 0 - §AHP 2,27,419 185149 24,083 12523 1316 1458 15297 120 §BLC (New) 95,015 NA NA 7,750 10,185 10,558 27,993 30,653 §BLC (Enhanc ement) Nil 0 0 0 0 0 0 0 - §Total 3,22,434 1,85,149 24,083 20,273 11,501 12,016 43,290 30,773 §CLSS No. of loan sanctioned 2974
  • 6. PROJECT PROPOSAL BRIEF Verticals ISSR AHP BLC (New) BLC (E) Remarks §No. of Projects 0 10 61 0 §No. of DUs 0 9,106 2,835 0 §Project Cost 0 49,357.05 11094.50 0 §Central Share 0 13,659.00 4252.50 0 §State Share 0 13,232.00 5510.40 0 §ULB Share 0 5,546.35 0.00 0 §Beneficiary Share 0 16,919.70 1331.60 0 Verticals (Rs. Lakhs) Per Unit Cost Central Share State Share ULB Share Benf. Share Completion Time §ISSR NA NA NA NA NA NA §AHP Varies from 4.50-5.00 1.5 1.2 for Gen 2.0 for SC/ST Infrastructure only SC 0.20 to 1.70* Gen 0.30 – 2.50* 24 months §BLC-N 3.5 1.5 1.2 for Gen 1.8 for SC/ST 0 0.2 for SC/ST 0.8 for Gen 18 months * Includes bank loan too
  • 7. PROJECT PROPOSAL BRIEF Checklist Status (Y/N) §Layout plan(as per NBC norms) Attached Yes §SLAC/SLSMC approval/Minutes submitted Yes §Land title status (encumbrance free) Yes §Beneficiary list (BLC) submitted Yes §No. of Beneficiaries with Aadhar ID BLC: 2,835 AHP:9,106 §No. of Beneficiaries with other Unique ID 0 §No. of Aadhar seeded Bank accounts BLC : 2,835 §Status of physical & social infrastructure BLC: infrastructure already exists AHP : Basic facilities are proposed §Implementation plan/Completion period AHP:24 months, BLC:18 months §Beneficiary consent sought Yes
  • 8. § Innovative technology Adopted: § Innovative technology is Adopted in the now proposed proposals of AHP vertical of PMAY:HFA(U)-2022. § Details of IEC initiatives: § SLNA signed MoU with State Institute for Urban Development (GoK). SIUD is conducting trainings frequently to officers/ CLTC experts of all IAs (ULBs, KSDB & BDA). § State level training programmes were organized by SLNA to enhance the capacity and speed up the Beneficiary Attachment/ Geo-Tagging. BEST PRACTICE/INNOVATION
  • 9. 9 REQUEST TO GoI 1. Release of 1st instalment of GoI’s share 543.82 cr towards projects under PMAY. 2. Request to reconsider projects proposed under Pourakarmika Gruha Bhagya scheme in convergence with PMAY 3. Approval for Capacity Building Plan -2018-19 & release of 1st instalment Rs. 799.95 lakh under PMAY 4. Approval of UC submitted for Rs. 8022.60 lakh 5. Approval of UC submitted for release of SLTC salary 6. Release of 3rd instalment of Rs. 10647.99 lakh for 17 projects under RAY. 7. Release of interest subsidy under Rajiv Rinn Yojana (Loan amount: Rs. 2187.60 lakh)
  • 11. Snapshots of projects under PMAY:HFA(U)-2022
  • 12. PMAY (U) Project of 450 DUs at Sira, Tumakuru
  • 13. PMAY (U) Project of 1329 DUs at Mysore
  • 14. PMAY (U) Project of 450 DUs at Madhugiri-AHP
  • 15. Projects under BLC vertical