SlideShare a Scribd company logo
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
vkbZ ,l vks : 9001-2008
ISO: 9001-2008
CIN-U40109MP2001SGC014880, Email-mdtransco.nic.in
STATE LOAD DESPATCH CENTRE, Nayagaon, Rampur, Jabalpur
Telephone: (0761) 2970089 Fax: (0761) 2664343 e-mail sldcmpjbp@gmail.com
No.07-05/REG-201/W&S-DSM/154-A/1965 Jabalpur, dtd:-22/07/2019
As Per Distibrution List
Sub: DSM Account of Wind and Solar Pooling Stations for the month of February, 2019 on the basis of MPERC
(Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of Wind and Solar Generating
Stations) Regulations, 2018.
In pursuance to MPERC (Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of Wind
and Solar Generating Stations) Regulations, 2018, SLDC has prepared the DSM Account of Wind Pooling Stations having
combined installed capacity of 10MW and above and Solar Pooling Stations with an installed capacity of 5MW and above
including Wind and Solar Pooling Stations selling InterState and having combined installed capcity less than 10MW and 5
MW.
The ABT meter data of the following Pooling Stations has not been received by SLDC neither through AMR nor
through mail from concerned Discoms, despite repeated persuance. As such, the actual generation was replaced with
scheduled generation and accordingly the Deviation Charges of the Pooling Stations are computed by SLDC during the
period of partially missing data.
A) Partial missing data of the Pooling stations:
i. 14.97MW UJAAS-I Rajgarh Biora (3rd
to 28th
February 2019).
ii. 14.97MW UJAAS-II Rajgarh Biora (3rd
to 28th
February 2019).
The Generators / Developers / QCA of the following Pooling stations have not furnished the Forecasting and
Availability data for the month of February 2019 to the SLDC. As such, SLDC has computed the Deviation Charges of these
Pooling Stations considering the Availability and Schedules as “Zero”.
i. 11.95MW Wincon Jaora.
The Generators of the following Pooling stations have not appoitment QCA, therefore the DSM account is issued to
the Developers / Generators for settlement of deviaton charges –
i. 50MW NTPC Ltd. Rajgarh.
ii. 250MW Mandhsaur Solar PV Power Project (Gujarkhedi).
iii. 11.95MW Wincon Jaroa.
iv. 4MW Ramesh Steels.
It is observed that some of the ABT meters installed at the pooling station are not time synchronized; SLDC has
taken up the matter with the Generators / QCA for time synchronization. Some Generators / QCA have intimated that they
have taken up the matter with meter manufacturer for time synchronization; meanwhile they have also furnished the time
sync data, the time sync data furnished by the QCA / Generators has been considered for computation of Deviation
Charges. However, Generators / Developers / QCA of the the following pooling stations have neither responded to SLDC
request not furnished the time sync data, as such, the data recorded in the meters have been considered to compute
Deviation Charges.
- 1 -
Sr.
No.
FEEDER NAME
LOCATION
NAME
LOCATION
VOLTAGE
LEVEL
METER No. QCA NAME
1
33KV
BHADRESH
SUSNER
132KV S/S
SUSNER
Grid S/s End 33 XB593639
REConnect
2
33KV UJAAS-1
AGAR
132KV S/S
AGAR
Grid S/s End 33 MPC59595
REConnect
3
33KV UJAAS-2
AGAR
132KV S/S
AGAR
Grid S/s End 33 MPC59596
REConnect
The ABT meters installed at the following Solar Generating Stations are recording 15 minutes block wise data on
sliding window principal instead of load survey, thus, blockwise data does not match with midnight data recorded by the
meters. The midnight values are correct; this has been confirmed by M/s Secure Meters Ltd. As such, the monthly
midnight data has been distributed in 15 minutes time block as per injection pattern of solar generation and accordingly
the Deviation Charges have been computed.
i. 12MW Avenger solar pvt Ltd. connected at 132KV S/s Suwasara.
ii. 5.1MW Porwal Auto Component at 132KV S/s Makdon.
As per Clause 9.0 of MPERC (Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of Wind
and Solar Generating Stations) Regulations, 2018, payment to the DSM Account shall be made within 10 days from the date
of issue of this statement. DSM Payments are to be made on the basis of this account only and no further invoicing is
required by SLDC. Payment received after 12 days shall attract simple interest @ 0.04% for each day of delay. SLDC shall
pay to the entities entitled to receive payment on account of Deviation Charges within 2 working days of receipt of the
payments in the “State Deviation Pool Account”. The settlement of Deviation Charges shall be done through State Pool
Account maintained by SLDC. The bank account details are as under:
1. Name of the Bank - BANK OF INDIA
2. Branch - CIVIL LINES BRANCH JABALPUR.
3. Title of the Account - MPPTCL SLDC DSM A/C
4. Bank account No - 940220110000263
5. IFS Code - BKID0009402
6. Branch Code - 9402
7. Type of Account - Current Account.
All QCA’s / Generators are requested to pay the Deviation Charges to the above State Pool Account maintained by
SLDC.
The signed copy of the above DSM account alongwith block-wise details are being sent through email. The DSM
account shall be also be made available on SLDC website www.sldcmpindia.com shortly for downloading by QCA. The
verification, if required, can be done at SLDC.
All the QCA’s / Generators are requested to check and verify the State DSM Account and intimate the
discrepancies observed if any within a period of 15 days.
Chief Engineer (LD)
SLDC MPPTCL, Jabalpur
- 2 -
Distribution List
1. The Chief General Manager (Comml-3), Regional Office, MPPMCL, E-4, Arera Colony, Prakash Parisar, Near Bhojpur
Club, Bhopal-462016, M.P. Jabalpur. Email – rajeevkeskar@gmail.com
2. The Chief General Manager (Comml.), MPMKVVCL, Govindpura, Bhopal, Email-ce.commercial@mpmkvvc.com,
3. The Chief Engineer (Comml.), MPPaKVVCL, GPH Compound, Polo Ground, Indore, Email- cecomwz@gmail.com,
4. The Chief Financial Officer, MPPTCL, Jabalpur.
5. The Suptdg Engineer (MT-1), Corporate Office, M.P. Pashchim Kshetra Vidyut Vitaran Co. Ltd., GPH Compound,
Polo Ground, Indore. Email-achal.jain@mpwz.co.in
6. The General Manager (Comml.-III), O/o MD (CZ) MPMKVVCL, Nistha Parisar., MPMKVVCL, Govindpura, Bhopal,
Email-khanooja@gmail.com, mpczc3@gmail.com
7. M/s Malwa Solar Power Generation Pvt Ltd. 4th Floor, Dr. Gopaldas Bhawan, 28, Barakhamba Road, Cannaught
Place, New Delhi – 110001, Fax: 0124-4716120. India. Email:keshav.prasad@ilfsindia.com,
pradeep.chauhan@ilfsindia.com.
8. M/s WAANPEEP Solar Pvt. Ltd., 602, Western Edge-I, Western Express Highway, Borivali (E), Mumbai-400066, Fax:
022-66444400, Email- kamalmarwah@waaneep.com
9. M/s Focal Energy Solar One India Pvt Ltd., 308 Third Floor, Rectangle One Building D-4, Commercial Complex,
Saket, New Delhi -110017, Fax -011-41704901, Email – kvikas@focal_energy.com
10. M/s Focal Renewable Energy Two India Pvt Ltd., 308, third Floor, Rectangle One Building D-4, Commercial
Complex, Saket, New Delhi -110017, Fax -011-41704901, Email – kvikas@focal_energy.com
11. M/s Solar EnrgyCorroration Of India, D-3, First Floor , Wing-a, ReligareBuliding, Distrcit Centre , Saket, New Delhi
110017,Fax-011-71989244, Email – corporate@seci.gov.in
12. M/s Manikaran Analytics Ltd., 2nd Floor, D21, Corporate Park, Sector-21, Dwarika, New Delhi – 110075 , Email –
contactus@manikarananalytics.in,rakesh@manikarananalytics.in, bd.mp@manikarananalytics.in
13. M/s Reconnect Energy Pvt. Ltd. C-301,Nirvana Courtyard, Nirvana Country Sector 50, Gurgaon 122018 H ,Email –
info@reconnectenergy.com, mithun.dubey@reconnectenergy.com,piyush.joshi@reconnectenergy.com
14. M/s Statkraft Markets Private Ltd., 403, 4th Floor, SalconRasvilas Building, Saket District Centre, New Delhi –
110017, Email – anwar.alam@statkraft.com
15. M/s ACME Solar Energy (MP) Private Ltd., Plot No.152, Sector-44, Gurgaon-122002(Haryana), Email –
planthead.khilchipur.solar@acme.in
16. M/s Alfa Infraprop Pvt Ltd., NamanMidtown,’A’ Wing, 21st Floor, Senapati Bapat Marg, Elephinstone Road West,
Mumbai-400013, Email –Sanjay.Shah@alfainfraprop.com
17. M/s Regent Climate Connect Knowledge Solutions Pvt Ltd., Appt. 215, Green Tower Society, Plot 7 C, Sector-23,
Dwarka, New Delhi-110075Email - info@climate-connect.com, Pranav.vohra@climate-connect.com
18. M/s NTPC Ltd., E-1/72, Arera Colony, Bhopal – 462016, M.P. EMAIL:- pbvenkatesh@ntpc.co.in
19. M/s Mandsaur Solar PV Project, NTPC -Shamgarh,dist- Mandsaur, Dimple Chauraha, Garaut Road, In front of Swaraj
Tractor, Shamgarh – 458883.MP, Email – skdutta03@ntpc.co.in, pbvenkatesh@ntpc.co.in
20. M/s M.P. WIND FARM NAGDA HILL, ENERGY TOWER, 64, B-Sector, Kasturba Nagar,Bhopal-462023, Email-
info@cecl.in, windpoweindia@gmail.com,mpwlindia@gmail.com
21. M/s Globus Steel & Power Pvt. Ltd, 308, Third Floor, Rectangle One Building, D-4, Commercial Complex,
Saket N.Delhi-110017, Email: kvikas@focal-energy.com
22. M/s PoineerWincomTamaraiTechpark, 7th Floor, S.P. Plot No. 16-20 and 20A, Thiru Vi Ka Industrial
Etate,Enerring Road, Guindy, Chainai -600032 ,Email-mp@poineerwincom.com
23. M/s Designco Manufacturer & Exporter, LakriFazalpur, Delhi Road, Moradabad-244001, Email:
info@designco-india.com, vivekasthana.79@gmail.com
24. M/s Mittal Processor Pvt. Ltd, 1002-1004, Antriksh Bhawan, 22K. G. Marg, Cannought Place, New Delhi
-110001, email – Mayank.gupta@kreatenergy.com, controlroom@mittalgroup.com – (On
behalf of M/s Ramesh Steels).
25. M/s Vedenjay Power Pvt Ltd., Plot No.4/F/53, Above BOI-Bank, Nai Sadak, Scheme No.78, B Road, Indore-
452010, Email – vedanjaypower@gmail.com
26. M/s Focal Energy Solar One India Pvt. Ltd. Unit No. 601 & 602, 6th
Floor, Tower B, Emaar Digital Greens
Sector 61, Golf Course Ext. Road , Gurgaon 122002
27. M/s Kreate Technologies LLP 1003,10th Floor Anthriksh Bhavan, 22‐ KG Marg, New Delhi 110001 
Email-mithilesh.yadav@kreatetechnologies.com
- 3 -
- 4 -
………
All Figures in `
INTRA STATE
DEVIATION CHARGES
PAYABLE PAYABLE RECEIVABLE
FOCAL ENERGY SOLAR ONE INDIA Pvt. Ltd. 43,338 256,077 - 299,415
40MW_MALWA (IL&FS_Solar) - - 9,415 9,415
Ramesh_Steels_Pachama_Ganj_Basoda - - 36,451 36,451
MANIKARAN ANALYTICS LTD. 6,994,777 - 662,375 6,332,402
ACME SOLAR ENERGY PVT. LTD. 42,250 - - 42,250
ALFA INFRAPROP PVT LTD 11,934 - - 11,934
MANDSAUR_SOLAR_POWER_SOLAR_220_GUJARKHEDI 1,031,293 - - 1,031,293
NTPC_RAJGARH 28,005 - - 28,005
WINCON_W_JAORA_11.95MW 68,765 - - 68,765
RECONNECT ENERGY SOLUTIONS PVT LTD. 30,329,550 - - 30,329,550
REGENT CLIMATE CONNECT KNOWLEDGE SOLUTIONS
PVT. LTD
41,353 - - 41,353
STATKRAFT MARKETS PVT LTD. 2,341,492 - - 2,341,492
KREATE TECHNOLOGIES LLP 19,570 - - 19,570
VEDANJAY POWER 93,792 - - 93,792
TOTAL 41,046,119 256,077 708,241 40,593,955
() RECEIVABLE
Assistant Engineer(LD) Executive Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY
QCA / DEVELOPERS / GENERATOR
NET DSM
RECEIVABLE/PAYABLE
INTER STATE DEVIATION CHARGES
STATE LOAD DESPATCH CENTRE - JABALPUR
QCA WISE SUMMERY REPORT OF DEVIATION CHARGES OF WIND & SOLAR POOLING STATIONS FOR FEBRUARY-2019
DATE SCHEDULE in KWH ACTUAL in KWH
DEVIATION CHARGES in
`
01/02/2019 63,373 61,230 11,797
02/02/2019 58,134 56,172 10,805
03/02/2019 56,974 45,957 60,939
04/02/2019 49,663 38,623 62,469
05/02/2019 48,570 45,335 18,655
06/02/2019 48,448 36,395 69,833
07/02/2019 51,277 64,424 -70,500
08/02/2019 60,177 63,618 -18,914
09/02/2019 61,319 67,811 -35,691
10/02/2019 65,338 67,025 -9,267
11/02/2019 59,687 65,457 -31,448
12/02/2019 63,522 59,603 21,573
13/02/2019 54,469 32,359 129,866
14/02/2019 49,542 55,590 -31,580
15/02/2019 58,167 59,119 -5,226
16/02/2019 59,391 66,021 -36,439
17/02/2019 62,349 68,262 -32,346
18/02/2019 52,586 20,272 198,829
19/02/2019 58,385 63,169 -26,237
20/02/2019 59,323 63,530 -23,125
21/02/2019 59,424 61,939 -13,822
22/02/2019 59,298 62,485 -17,518
23/02/2019 58,960 47,176 69,536
24/02/2019 54,053 57,806 -20,149
25/02/2019 58,852 63,291 -22,160
26/02/2019 60,640 59,586 6,448
27/02/2019 59,577 61,595 -10,842
28/02/2019 58,443 68,791 -56,891
TOTAL 1,609,941 1,582,641 198,595
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
NAME OF POOLING STATION :- M/s FOCAL RENEWABLE ENERGY TWO INDIA PVT. LTD.
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :-MANIKARAN
DATE SCHEDULE in KWH ACTUAL in KWH
DEVIATION CHARGES in
`
01/02/2019 101,718 105,242 -19,371
02/02/2019 107,147 96,931 56,201
03/02/2019 100,049 81,111 104,171
04/02/2019 81,438 69,174 67,772
05/02/2019 61,366 80,866 -104,806
06/02/2019 75,328 66,197 50,999
07/02/2019 85,392 110,042 -130,384
08/02/2019 111,445 108,575 15,795
09/02/2019 109,623 115,541 -32,537
10/02/2019 115,788 114,228 8,589
11/02/2019 113,162 112,080 5,962
12/02/2019 111,568 103,393 44,982
13/02/2019 83,069 59,962 128,894
14/02/2019 80,917 102,748 -114,160
15/02/2019 110,263 106,293 21,846
16/02/2019 112,487 117,749 -28,930
17/02/2019 120,765 122,230 -8,047
18/02/2019 87,903 40,161 290,361
19/02/2019 102,089 114,665 -67,364
20/02/2019 105,754 114,789 -48,776
21/02/2019 114,667 111,249 18,812
22/02/2019 114,136 113,160 5,378
23/02/2019 115,990 86,303 172,316
24/02/2019 82,504 105,726 -125,103
25/02/2019 113,987 116,301 -11,407
26/02/2019 113,493 110,069 19,223
27/02/2019 113,218 112,649 4,653
28/02/2019 112,027 124,573 -68,992
TOTAL 2,857,293 2,822,007 256,077
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
NAME OF POOLING STATION :- M/s FOCAL ENERGY SOLAR ONE INDIA PVT. LTD.
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :-FOCAL ENERGY SOLAR ONE INDIA PVT. LTD.
DATE SCHEDULE in KWH ACTUAL in KWH
DEVIATION CHARGES in
`
01/02/2019 270,453 243,416 148,714
02/02/2019 266,217 237,564 158,239
03/02/2019 215,116 192,720 123,258
04/02/2019 202,376 171,336 176,055
05/02/2019 183,172 192,752 -52,676
06/02/2019 197,494 178,436 107,955
07/02/2019 212,976 253,362 -218,195
08/02/2019 233,243 268,766 -195,337
09/02/2019 247,124 284,974 -206,989
10/02/2019 259,329 275,870 -90,567
11/02/2019 270,273 274,474 -23,095
12/02/2019 264,911 252,104 70,447
13/02/2019 216,852 128,432 515,288
14/02/2019 212,904 215,334 -11,878
15/02/2019 239,118 248,224 -50,071
16/02/2019 239,118 278,472 -216,019
17/02/2019 261,237 289,966 -157,924
18/02/2019 193,510 97,708 577,514
19/02/2019 256,714 268,596 -65,342
20/02/2019 256,714 271,848 -83,228
21/02/2019 256,714 257,124 -2,246
22/02/2019 256,714 275,650 -104,139
23/02/2019 242,259 245,534 -16,442
24/02/2019 240,425 235,690 30,166
25/02/2019 257,016 289,306 -177,498
26/02/2019 260,267 268,030 -42,460
27/02/2019 256,049 257,064 -3,880
28/02/2019 256,242 292,438 -199,065
TOTAL 6,724,537 6,745,190 -9,415
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
NAME OF POOLING STATION :- M/s Malwa Solar Power Generation Ltd.(IL and FS)
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- NOT QCA APPOINTMENT
DATE SCHEDULE in KWH ACTUAL in KWH
DEVIATION CHARGES in
`
01/02/2019 296,649 271,040 140,892
02/02/2019 270,187 253,530 91,624
03/02/2019 260,014 233,560 145,537
04/02/2019 256,253 263,780 -41,317
05/02/2019 254,179 260,350 -33,928
06/02/2019 264,455 243,320 117,119
07/02/2019 255,824 309,560 -291,076
08/02/2019 287,038 319,500 -178,531
09/02/2019 304,632 339,490 -191,706
10/02/2019 321,895 332,890 -60,456
11/02/2019 303,120 318,790 -86,176
12/02/2019 306,184 294,730 63,009
13/02/2019 265,549 235,080 169,050
14/02/2019 241,179 244,710 -18,265
15/02/2019 270,206 299,030 -158,518
16/02/2019 287,837 306,810 -104,341
17/02/2019 305,512 348,320 -234,163
18/02/2019 270,258 246,970 136,485
19/02/2019 296,280 314,370 -99,483
20/02/2019 302,001 314,150 -66,811
21/02/2019 285,597 294,990 -50,738
22/02/2019 295,222 329,040 -185,990
23/02/2019 301,214 308,060 -33,720
24/02/2019 229,629 188,200 246,608
25/02/2019 308,754 348,050 -216,117
26/02/2019 304,125 295,300 50,810
27/02/2019 293,421 256,220 222,951
28/02/2019 310,026 345,250 -193,719
TOTAL 7,947,240 8,115,090 -860,970
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
NAME OF POOLING STATION :- M/s WAANEEP Solar Pvt. Ltd
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :-MANIKARAN
DATE SCHEDULE in KWH ACTUAL in KWH
DEVIATION CHARGES in
`
01/02/2019 22,197 20,489 6,230
02/02/2019 20,027 19,855 836
03/02/2019 20,232 17,628 9,484
04/02/2019 20,401 18,786 6,168
05/02/2019 17,719 19,433 -5,696
06/02/2019 19,458 17,619 6,649
07/02/2019 18,340 20,859 -8,560
08/02/2019 17,486 24,335 -23,140
09/02/2019 19,910 24,302 -14,804
10/02/2019 20,461 24,772 -14,814
11/02/2019 20,998 23,690 -9,318
12/02/2019 21,103 21,766 -2,300
13/02/2019 22,266 16,949 19,493
14/02/2019 22,589 16,450 23,408
15/02/2019 17,903 23,018 -16,797
16/02/2019 15,254 23,731 -27,057
17/02/2019 22,369 26,575 -13,290
18/02/2019 22,199 12,850 37,046
19/02/2019 22,672 24,087 -4,598
20/02/2019 14,576 24,064 -31,015
21/02/2019 22,860 22,808 582
22/02/2019 22,860 24,561 -5,584
23/02/2019 23,521 22,351 4,676
24/02/2019 23,760 14,563 35,173
25/02/2019 21,955 25,102 -10,333
26/02/2019 23,341 21,124 9,061
27/02/2019 23,341 20,530 11,499
28/02/2019 21,207 27,303 -19,450
TOTAL 581,005 599,600 -36,451
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
NAME OF POOLING STATION :- Ramesh_Steels_Pachama_Ganj_Basoda
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :-NOT QCA APPOINTMENT
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 133,599 142,533 0
02/02/2019 132,868 140,846 0
03/02/2019 114,368 101,510 3,643
04/02/2019 113,497 121,431 673
05/02/2019 128,404 122,246 731
06/02/2019 119,386 106,332 479
07/02/2019 139,186 158,435 0
08/02/2019 135,614 156,869 22
09/02/2019 146,765 174,349 119
10/02/2019 144,227 170,703 168
11/02/2019 144,695 165,243 0
12/02/2019 137,866 151,717 0
13/02/2019 117,045 92,756 3,325
14/02/2019 118,124 113,786 2,425
15/02/2019 137,887 147,864 206
16/02/2019 140,699 164,996 218
17/02/2019 148,573 175,938 133
18/02/2019 61,499 64,140 10,473
19/02/2019 141,906 161,778 40
20/02/2019 139,408 163,823 0
21/02/2019 133,873 146,267 0
22/02/2019 145,034 165,532 0
23/02/2019 134,679 141,028 1,274
24/02/2019 115,952 132,375 17,800
25/02/2019 147,752 172,978 13
26/02/2019 143,028 158,207 51
27/02/2019 143,801 153,706 457
28/02/2019 155,906 178,735 0
TOTAL 3,715,641 4,046,123 42,250
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- ACME SOLAR ENERGY PVT. LTD.
NAME OF POOLING STATION :- ACME_KHILCHIPUR
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 114,332 100,268 213
02/02/2019 110,671 96,791 51
03/02/2019 105,800 86,838 857
04/02/2019 91,061 85,884 6
05/02/2019 88,989 86,732 0
06/02/2019 88,989 81,866 176
07/02/2019 108,983 117,469 0
08/02/2019 110,443 116,939 102
09/02/2019 110,443 122,663 180
10/02/2019 110,278 121,557 154
11/02/2019 121,085 116,821 0
12/02/2019 121,075 107,815 0
13/02/2019 93,816 74,668 4,163
14/02/2019 90,898 102,106 169
15/02/2019 117,286 114,928 0
16/02/2019 111,085 114,495 0
17/02/2019 111,072 120,249 0
18/02/2019 111,072 120,976 0
19/02/2019 111,072 116,341 0
20/02/2019 111,072 114,403 0
21/02/2019 111,120 110,261 0
22/02/2019 111,072 121,281 0
23/02/2019 111,072 115,189 531
24/02/2019 111,072 100,572 4,279
25/02/2019 111,285 125,550 0
26/02/2019 111,072 124,351 0
27/02/2019 107,618 108,705 1,053
28/02/2019 111,072 127,817 0
TOTAL 3,024,905 3,053,535 11,934
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- ALFA INFRAPROP PVT LTD
NAME OF POOLING STATION :- ALPHA_KUKSHI
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 112,427 115,310 0
02/02/2019 117,965 107,479 0
03/02/2019 106,844 90,372 53
04/02/2019 89,656 77,734 219
05/02/2019 67,136 89,509 3,835
06/02/2019 85,084 70,963 1,596
07/02/2019 98,776 119,873 317
08/02/2019 120,754 118,595 0
09/02/2019 119,558 125,226 0
10/02/2019 123,556 124,731 0
11/02/2019 123,895 120,286 0
12/02/2019 119,033 110,296 143
13/02/2019 88,259 65,043 3,442
14/02/2019 85,230 111,291 2,037
15/02/2019 121,725 116,137 0
16/02/2019 125,555 128,611 0
17/02/2019 128,311 131,695 0
18/02/2019 70,789 31,998 13,822
19/02/2019 116,142 124,108 485
20/02/2019 123,423 124,911 9
21/02/2019 126,773 121,941 0
22/02/2019 127,412 121,953 238
23/02/2019 126,395 97,945 7,962
24/02/2019 97,640 117,884 554
25/02/2019 127,894 124,331 4,298
26/02/2019 124,030 117,121 647
27/02/2019 126,647 117,374 3,681
28/02/2019 123,092 135,536 0
TOTAL 3,124,001 3,058,253 43,338
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- Focal Energy Solar One India Pvt. Ltd.
NAME OF POOLING STATION :- GLOBUS_STEEL_S_SITAMAU_20MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 79,691 71,678 0
02/02/2019 82,238 66,825 217
03/02/2019 76,496 59,336 1,899
04/02/2019 74,766 64,160 0
05/02/2019 67,117 65,854 12
06/02/2019 62,794 57,960 1,010
07/02/2019 75,636 71,111 0
08/02/2019 85,672 82,513 0
09/02/2019 86,180 86,506 0
10/02/2019 87,117 84,305 0
11/02/2019 83,277 81,732 0
12/02/2019 84,045 77,234 0
13/02/2019 77,740 59,223 1,708
14/02/2019 70,470 59,944 434
15/02/2019 74,557 79,293 0
16/02/2019 86,520 82,200 0
17/02/2019 87,591 92,812 0
18/02/2019 66,666 45,629 8,151
19/02/2019 83,561 84,476 0
20/02/2019 83,034 83,061 0
21/02/2019 73,172 78,835 182
22/02/2019 83,505 85,835 0
23/02/2019 86,218 77,107 2,291
24/02/2019 41,415 48,608 1,085
25/02/2019 89,119 88,668 0
26/02/2019 74,749 80,219 286
27/02/2019 72,788 65,931 2,295
28/02/2019 91,093 93,943 0
TOTAL 2,187,227 2,074,998 19,570
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- KREATE TECHNOLOGIES
NAME OF POOLING STATION :- Made_Easy_Education__SIMCON_EASTMAN_
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 50,757 40,131 6,543
02/02/2019 64,780 50,628 885
03/02/2019 62,373 60,258 2,238
04/02/2019 53,265 22,707 1,325
05/02/2019 45,760 17,457 1,967
06/02/2019 38,068 33,845 1,800
07/02/2019 122,809 117,093 11,873
08/02/2019 46,604 17,513 890
09/02/2019 42,303 20,588 7
10/02/2019 42,881 28,500 1,808
11/02/2019 59,475 48,814 2,189
12/02/2019 55,920 39,823 1,405
13/02/2019 53,359 16,037 739
14/02/2019 53,661 46,226 2,221
15/02/2019 51,148 32,753 1,733
16/02/2019 48,895 28,913 567
17/02/2019 33,784 780 0
18/02/2019 56,961 47,673 10,211
19/02/2019 55,199 32,482 2,122
20/02/2019 43,280 9,551 0
21/02/2019 58,060 61,487 2,587
22/02/2019 44,119 22,468 1,442
23/02/2019 52,176 37,891 761
24/02/2019 51,046 36,174 2,398
25/02/2019 55,962 49,248 5,616
26/02/2019 79,667 71,028 5,826
27/02/2019 47,369 29,429 881
28/02/2019 42,213 40,904 4,891
TOTAL 1,511,894 1,060,401 74,925
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- SUZLON_IV_W_JAORA_13.5MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 67,510 63,882 0
02/02/2019 61,719 57,990 0
03/02/2019 59,944 54,000 481
04/02/2019 64,877 61,886 0
05/02/2019 63,198 60,300 0
06/02/2019 61,404 56,980 66
07/02/2019 62,878 70,140 0
08/02/2019 63,992 71,060 0
09/02/2019 66,694 77,424 0
10/02/2019 72,480 76,108 0
11/02/2019 74,879 72,468 0
12/02/2019 71,424 67,140 0
13/02/2019 58,983 55,052 119
14/02/2019 52,346 57,264 15
15/02/2019 66,405 35,876 28,710
16/02/2019 68,426 71,268 0
17/02/2019 69,637 80,066 0
18/02/2019 62,946 56,190 1,967
19/02/2019 69,206 72,250 0
20/02/2019 75,403 72,262 0
21/02/2019 67,578 68,450 0
22/02/2019 70,038 76,010 0
23/02/2019 72,628 71,476 272
24/02/2019 55,389 48,356 1,895
25/02/2019 70,867 80,170 0
26/02/2019 67,387 71,708 0
27/02/2019 65,055 58,650 1,207
28/02/2019 71,347 79,912 0
TOTAL 1,854,640 1,844,338 34,732
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- M&B_ICHHAWAR-II
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 44,336 29,616 2,201
02/02/2019 76,332 80,231 2,490
03/02/2019 56,939 44,945 661
04/02/2019 48,489 19,880 1,211
05/02/2019 43,356 41,125 1,294
06/02/2019 38,577 49,336 12,944
07/02/2019 130,901 145,834 7,592
08/02/2019 46,904 16,724 2,085
09/02/2019 43,416 36,949 96
10/02/2019 40,621 19,952 0
11/02/2019 45,721 43,980 1,669
12/02/2019 56,623 45,300 1,675
13/02/2019 47,641 31,397 2,173
14/02/2019 47,087 52,848 951
15/02/2019 52,911 56,949 13,511
16/02/2019 50,081 55,672 16,577
17/02/2019 31,646 6,460 0
18/02/2019 37,412 29,354 80
19/02/2019 46,483 27,802 356
20/02/2019 37,769 24,336 1,300
21/02/2019 75,498 101,170 10,347
22/02/2019 61,869 70,123 9,603
23/02/2019 51,366 54,426 1,685
24/02/2019 52,964 24,466 6,147
25/02/2019 52,898 46,409 7,844
26/02/2019 70,027 69,975 15,472
27/02/2019 24,315 15,669 1,011
28/02/2019 36,323 40,472 2,414
TOTAL 1,448,505 1,281,400 123,389
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- WIND WORLD AGAR-I
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 54,053 33,902 6,028
02/02/2019 59,753 48,915 313
03/02/2019 64,576 56,951 1,322
04/02/2019 42,610 25,413 0
05/02/2019 43,726 15,863 560
06/02/2019 39,237 27,908 3,275
07/02/2019 107,649 99,599 12,990
08/02/2019 48,018 14,675 1,290
09/02/2019 39,356 21,788 248
10/02/2019 41,889 27,616 368
11/02/2019 51,767 49,588 1,197
12/02/2019 54,683 37,030 1,016
13/02/2019 40,370 15,171 420
14/02/2019 58,797 34,725 2,277
15/02/2019 50,753 31,113 4,244
16/02/2019 50,496 29,135 436
17/02/2019 32,706 1,483 0
18/02/2019 49,267 44,288 2,746
19/02/2019 54,389 26,692 3,924
20/02/2019 38,985 6,571 28
21/02/2019 65,413 59,449 617
22/02/2019 44,024 20,815 1,074
23/02/2019 49,976 39,301 704
24/02/2019 47,456 31,562 745
25/02/2019 62,267 43,683 3,742
26/02/2019 78,732 62,611 4,907
27/02/2019 51,445 35,012 2,637
28/02/2019 41,790 42,943 5,828
TOTAL 1,464,183 983,802 62,936
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- SUZLON_V_W_JAORA_12MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 288,271 271,830 14
02/02/2019 280,616 257,390 1,006
03/02/2019 258,647 225,460 8,690
04/02/2019 264,830 251,780 123
05/02/2019 273,093 244,750 3,743
06/02/2019 264,875 244,090 3,180
07/02/2019 293,023 330,630 3,990
08/02/2019 307,794 338,610 0
09/02/2019 321,826 361,320 0
10/02/2019 342,907 348,310 0
11/02/2019 334,082 327,430 0
12/02/2019 299,807 273,770 1,328
13/02/2019 283,119 195,140 30,017
14/02/2019 265,904 259,550 0
15/02/2019 276,792 301,380 0
16/02/2019 304,544 322,580 0
17/02/2019 319,672 356,940 328
18/02/2019 334,021 348,720 0
19/02/2019 318,980 340,150 0
20/02/2019 298,343 306,270 0
21/02/2019 293,145 301,620 0
22/02/2019 293,017 323,080 0
23/02/2019 308,951 322,780 989
24/02/2019 224,275 260,060 20,388
25/02/2019 332,936 375,120 0
26/02/2019 341,845 350,990 0
27/02/2019 317,377 318,310 6,957
28/02/2019 341,702 375,050 0
TOTAL 8,384,394 8,533,110 80,753
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- SKY_POWER_SOLAR_132_CHHEGAON
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 192,162 115,676 541
02/02/2019 324,145 384,294 9,233
03/02/2019 266,004 211,259 52
04/02/2019 193,306 153,769 0
05/02/2019 210,816 216,205 2,267
06/02/2019 217,573 265,117 8,557
07/02/2019 327,808 377,159 5,700
08/02/2019 237,215 193,336 2,245
09/02/2019 253,390 253,790 300
10/02/2019 214,784 152,994 1,324
11/02/2019 242,096 231,956 115
12/02/2019 225,282 195,490 3,756
13/02/2019 259,110 229,578 992
14/02/2019 202,984 137,432 2,687
15/02/2019 258,519 183,997 4,031
16/02/2019 237,238 206,241 2,922
17/02/2019 237,238 111,782 1,090
18/02/2019 146,594 81,226 852
19/02/2019 210,867 130,252 927
20/02/2019 197,806 83,167 0
21/02/2019 283,964 274,948 477
22/02/2019 214,170 121,109 437
23/02/2019 232,194 177,448 0
24/02/2019 236,957 220,815 8,226
25/02/2019 352,501 326,335 4,275
26/02/2019 366,594 362,443 26,640
27/02/2019 346,198 331,460 6,700
28/02/2019 223,368 226,834 10,819
TOTAL 6,910,883 5,956,112 105,165
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- WIND_WORLD_III_WIND_132_CHAPDA
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 91,106 100,549 22,406
02/02/2019 261,931 310,884 13,781
03/02/2019 231,648 259,535 37,960
04/02/2019 196,752 156,049 10,645
05/02/2019 97,141 105,264 13,298
06/02/2019 85,277 97,006 22,540
07/02/2019 377,348 418,216 16,639
08/02/2019 121,690 44,749 26,237
09/02/2019 136,981 122,858 10,221
10/02/2019 92,194 95,729 12,901
11/02/2019 205,937 251,802 36,897
12/02/2019 282,930 291,278 39,109
13/02/2019 209,236 187,668 42,971
14/02/2019 180,669 226,818 51,802
15/02/2019 168,183 174,501 44,707
16/02/2019 174,362 233,789 51,339
17/02/2019 75,134 6,761 4,478
18/02/2019 90,656 89,737 6,053
19/02/2019 118,620 112,579 4,468
20/02/2019 104,857 157,941 43,637
21/02/2019 316,763 367,770 48,462
22/02/2019 179,323 186,045 33,193
23/02/2019 227,068 227,286 14,634
24/02/2019 106,557 71,553 42,890
25/02/2019 137,187 152,535 22,260
26/02/2019 233,573 240,071 54,345
27/02/2019 94,772 65,695 13,606
28/02/2019 155,722 203,964 48,241
TOTAL 4,753,617 4,958,632 789,720
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- SUZLON_GUJRAT_WIND_33_BADOD
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 344,766 312,910 0
02/02/2019 311,506 312,430 0
03/02/2019 333,737 264,340 5,869
04/02/2019 291,201 279,710 0
05/02/2019 306,901 285,910 0
06/02/2019 293,136 261,110 9,555
07/02/2019 309,179 354,000 1,845
08/02/2019 318,938 363,630 0
09/02/2019 334,019 376,810 7
10/02/2019 361,591 359,810 2,886
11/02/2019 340,908 347,450 1,467
12/02/2019 344,640 339,940 0
13/02/2019 321,766 301,260 275
14/02/2019 205,038 187,690 42,253
15/02/2019 320,573 316,500 945
16/02/2019 330,724 367,540 144
17/02/2019 344,564 375,730 0
18/02/2019 293,625 240,040 18,844
19/02/2019 343,418 357,010 0
20/02/2019 340,927 361,800 40
21/02/2019 327,012 320,440 696
22/02/2019 339,367 360,830 0
23/02/2019 344,567 337,850 6,219
24/02/2019 264,786 243,460 14,288
25/02/2019 333,298 368,360 336
26/02/2019 332,493 333,390 4,380
27/02/2019 322,928 332,730 2,452
28/02/2019 332,274 388,770 2,077
TOTAL 8,987,882 9,051,450 114,578
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- RENEW_CLEAN_SOLAR_132_KOTHIYA
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 30,377 26,678 0
02/02/2019 26,982 25,328 0
03/02/2019 24,488 20,245 1,144
04/02/2019 25,181 24,943 0
05/02/2019 24,216 24,409 4
06/02/2019 22,344 23,251 93
07/02/2019 25,831 29,954 195
08/02/2019 28,390 27,860 2,266
09/02/2019 28,726 31,765 0
10/02/2019 30,008 31,456 0
11/02/2019 28,232 30,506 0
12/02/2019 27,320 28,280 18
13/02/2019 27,014 21,449 1,082
14/02/2019 22,976 25,672 299
15/02/2019 27,333 30,565 192
16/02/2019 28,549 31,593 76
17/02/2019 30,463 34,974 140
18/02/2019 28,002 23,988 2,557
19/02/2019 30,163 31,215 47
20/02/2019 30,540 31,790 0
21/02/2019 28,103 29,289 1
22/02/2019 30,197 32,552 0
23/02/2019 31,648 28,761 1,046
24/02/2019 26,533 21,809 2,447
25/02/2019 31,428 34,667 21
26/02/2019 30,873 31,347 201
27/02/2019 30,231 27,860 1,107
28/02/2019 30,890 35,345 111
TOTAL 787,038 797,551 13,047
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- DESIGNCO_MANF_EXP_1_S_ARNIYAKALA_5MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 60,411 59,971 0
02/02/2019 59,082 58,995 0
03/02/2019 55,311 46,957 0
04/02/2019 45,770 42,367 2,253
05/02/2019 53,509 47,667 267
06/02/2019 53,097 44,908 373
07/02/2019 59,638 63,585 11
08/02/2019 61,031 67,070 0
09/02/2019 66,068 71,203 0
10/02/2019 70,282 69,940 199
11/02/2019 69,504 68,936 0
12/02/2019 67,742 63,196 0
13/02/2019 58,733 32,373 8,224
14/02/2019 52,792 56,507 12
15/02/2019 67,557 63,829 191
16/02/2019 68,186 72,295 0
17/02/2019 69,179 75,156 174
18/02/2019 50,438 25,906 7,460
19/02/2019 65,248 69,752 0
20/02/2019 66,684 70,967 57
21/02/2019 67,221 67,329 0
22/02/2019 66,926 71,817 28
23/02/2019 70,494 66,801 438
24/02/2019 62,005 60,065 2,560
25/02/2019 69,709 75,270 0
26/02/2019 68,346 71,094 0
27/02/2019 68,629 64,735 807
28/02/2019 69,653 74,411 0
TOTAL 1,763,245 1,723,102 23,054
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- M&B_BAROD_II
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 28,470 27,666 0
02/02/2019 28,995 27,150 0
03/02/2019 29,225 19,357 3,640
04/02/2019 28,470 21,507 1,646
05/02/2019 25,700 23,869 15
06/02/2019 21,265 22,802 9
07/02/2019 22,200 31,121 849
08/02/2019 28,400 30,773 0
09/02/2019 28,400 33,508 57
10/02/2019 28,400 32,834 18
11/02/2019 24,550 31,805 681
12/02/2019 24,550 29,468 187
13/02/2019 27,885 18,328 2,804
14/02/2019 30,000 26,071 244
15/02/2019 30,000 25,204 2,740
16/02/2019 30,000 31,664 0
17/02/2019 30,000 34,017 0
18/02/2019 30,000 17,934 6,199
19/02/2019 30,000 31,721 0
20/02/2019 30,000 32,083 0
21/02/2019 30,000 30,158 0
22/02/2019 30,000 32,495 0
23/02/2019 25,534 30,774 182
24/02/2019 25,534 26,197 284
25/02/2019 30,000 34,440 0
26/02/2019 25,534 32,733 425
27/02/2019 30,000 27,713 297
28/02/2019 30,000 35,140 0
TOTAL 783,112 798,532 20,277
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- PORWAL_AUTO_MAKDON
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 62,611 61,735 0
02/02/2019 61,787 56,617 2
03/02/2019 58,447 46,430 677
04/02/2019 45,857 38,891 3,319
05/02/2019 50,233 45,760 60
06/02/2019 46,290 36,867 2,202
07/02/2019 53,422 65,318 1,918
08/02/2019 62,809 64,274 0
09/02/2019 61,691 68,589 31
10/02/2019 65,773 67,538 21
11/02/2019 58,929 65,565 339
12/02/2019 64,461 59,570 107
13/02/2019 53,653 32,295 5,652
14/02/2019 49,313 55,954 475
15/02/2019 58,319 59,188 11
16/02/2019 60,194 66,198 5
17/02/2019 62,943 68,605 167
18/02/2019 48,805 20,232 16,957
19/02/2019 57,936 63,482 353
20/02/2019 59,964 63,929 7
21/02/2019 60,187 62,458 0
22/02/2019 61,014 63,009 0
23/02/2019 60,790 46,845 5,314
24/02/2019 54,561 57,689 331
25/02/2019 61,014 65,275 375
26/02/2019 61,430 59,959 819
27/02/2019 56,940 62,066 225
28/02/2019 60,034 69,361 27
TOTAL 1,619,407 1,593,699 39,394
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- FOCAL_PHOTOVOLTAIC_10MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 43,456 18,134 0
02/02/2019 98,230 70,369 2,845
03/02/2019 83,192 46,307 4,629
04/02/2019 63,101 61,761 579
05/02/2019 43,718 58,314 6,345
06/02/2019 55,640 45,706 403
07/02/2019 85,980 90,613 1,115
08/02/2019 57,461 32,522 532
09/02/2019 52,854 42,718 58
10/02/2019 46,630 40,318 242
11/02/2019 62,741 69,576 2,081
12/02/2019 64,481 57,313 2,234
13/02/2019 69,785 59,275 5,843
14/02/2019 48,359 26,453 1,305
15/02/2019 63,642 40,813 2,352
16/02/2019 70,608 41,733 1,914
17/02/2019 70,608 9,498 17,054
18/02/2019 30,321 13,582 288
19/02/2019 47,344 32,832 394
20/02/2019 42,117 12,554 412
21/02/2019 67,419 74,206 4,837
22/02/2019 59,189 38,969 413
23/02/2019 57,240 28,044 457
24/02/2019 58,061 43,948 541
25/02/2019 60,418 52,309 234
26/02/2019 92,970 69,086 3,171
27/02/2019 67,898 64,052 5,759
28/02/2019 65,234 59,550 5,626
TOTAL 1,728,697 1,300,555 71,663
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- MP_WIND_FARM_NAGDA_HILL_WIND_33_DEWAS
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 109,123 97,276 0
02/02/2019 92,766 94,249 0
03/02/2019 85,904 75,354 0
04/02/2019 78,735 65,338 2,548
05/02/2019 81,409 77,586 68
06/02/2019 74,995 70,747 325
07/02/2019 85,503 100,597 1,170
08/02/2019 98,091 108,088 0
09/02/2019 100,986 114,983 0
10/02/2019 108,329 111,192 202
11/02/2019 104,332 109,562 0
12/02/2019 102,615 98,960 0
13/02/2019 96,554 50,182 14,957
14/02/2019 79,308 83,917 532
15/02/2019 101,213 97,402 0
16/02/2019 107,017 109,996 0
17/02/2019 104,886 114,680 0
18/02/2019 79,070 34,992 17,895
19/02/2019 93,462 105,983 0
20/02/2019 101,804 105,805 0
21/02/2019 97,115 101,083 0
22/02/2019 100,620 108,299 0
23/02/2019 106,410 96,567 629
24/02/2019 90,327 91,103 2,609
25/02/2019 102,250 114,012 0
26/02/2019 109,684 107,246 145
27/02/2019 105,975 95,181 1,834
28/02/2019 108,014 115,049 0
TOTAL 2,706,497 2,655,429 42,914
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- TODAY_CLEAN_SOLAR_33KV_BAROD
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 295,341 284,940 0
02/02/2019 290,087 265,250 146
03/02/2019 261,021 217,460 1,545
04/02/2019 225,439 171,360 11,730
05/02/2019 244,161 212,660 3,761
06/02/2019 216,414 187,130 2,286
07/02/2019 256,203 312,950 7,802
08/02/2019 284,647 308,960 408
09/02/2019 297,421 326,330 393
10/02/2019 313,927 323,590 1,356
11/02/2019 301,498 316,410 385
12/02/2019 308,510 294,120 216
13/02/2019 255,348 163,830 19,129
14/02/2019 246,311 272,840 1,765
15/02/2019 277,081 295,260 0
16/02/2019 296,996 326,470 202
17/02/2019 306,039 338,620 1,231
18/02/2019 220,398 108,950 45,940
19/02/2019 289,062 321,320 1,300
20/02/2019 312,269 326,410 749
21/02/2019 305,011 316,090 113
22/02/2019 305,933 324,390 405
23/02/2019 304,400 235,010 21,574
24/02/2019 247,858 279,890 11,824
25/02/2019 305,933 324,260 8,325
26/02/2019 307,272 316,310 1,019
27/02/2019 292,516 313,160 918
28/02/2019 312,965 355,510 914
TOTAL 7,880,061 7,839,480 145,436
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- SEIL_SITARA_SITAMAU_50MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 50,766 26,592 171
02/02/2019 69,655 68,324 1,284
03/02/2019 53,800 39,338 0
04/02/2019 53,907 26,068 2,747
05/02/2019 44,430 45,117 272
06/02/2019 47,205 45,467 5,762
07/02/2019 137,103 155,176 13,754
08/02/2019 51,334 17,302 1,156
09/02/2019 48,185 33,800 0
10/02/2019 43,411 22,993 0
11/02/2019 49,906 54,559 731
12/02/2019 65,598 59,983 1,857
13/02/2019 57,394 46,855 8,758
14/02/2019 56,449 62,267 865
15/02/2019 63,813 53,175 4,673
16/02/2019 53,169 54,588 3,104
17/02/2019 35,661 6,607 0
18/02/2019 42,483 30,747 188
19/02/2019 57,542 36,850 912
20/02/2019 47,605 42,862 3,814
21/02/2019 95,339 122,275 13,369
22/02/2019 64,356 62,364 5,681
23/02/2019 59,988 45,245 7
24/02/2019 56,508 31,596 5,788
25/02/2019 62,005 51,171 1,668
26/02/2019 89,886 99,020 17,756
27/02/2019 49,078 28,513 2,058
28/02/2019 49,148 37,863 55
TOTAL 1,655,724 1,406,717 96,430
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- WIND_WORLD-II_33_AGAR_15.2MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 41,098 38,950 6
02/02/2019 38,905 28,930 2,562
03/02/2019 30,330 30,330 0
04/02/2019 36,077 36,077 0
05/02/2019 33,847 33,847 0
06/02/2019 31,188 31,188 0
07/02/2019 35,965 35,965 0
08/02/2019 40,180 40,180 0
09/02/2019 42,195 42,195 0
10/02/2019 45,598 45,598 0
11/02/2019 42,420 42,420 0
12/02/2019 40,065 40,065 0
13/02/2019 38,092 38,092 0
14/02/2019 29,909 29,909 0
15/02/2019 42,396 42,396 0
16/02/2019 40,621 40,621 0
17/02/2019 43,519 43,519 0
18/02/2019 37,329 37,329 0
19/02/2019 40,158 40,158 0
20/02/2019 43,079 43,079 0
21/02/2019 40,840 40,840 0
22/02/2019 41,859 41,859 0
23/02/2019 45,096 45,096 0
24/02/2019 37,793 37,793 0
25/02/2019 41,859 41,859 0
26/02/2019 42,340 42,340 0
27/02/2019 41,433 41,433 0
28/02/2019 44,653 44,653 0
TOTAL 1,108,844 1,096,721 2,568
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- UJAAS_II_S_RAJGARH_BIORA_15MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 74,701 68,934 652
02/02/2019 66,014 63,108 1
03/02/2019 63,793 58,966 1,235
04/02/2019 69,258 67,368 0
05/02/2019 68,329 64,048 735
06/02/2019 66,244 61,638 151
07/02/2019 68,124 77,086 5
08/02/2019 73,229 81,384 0
09/02/2019 79,303 86,770 33
10/02/2019 84,971 85,124 74
11/02/2019 83,271 81,728 0
12/02/2019 81,594 76,108 0
13/02/2019 65,360 61,764 744
14/02/2019 56,587 62,946 404
15/02/2019 74,463 38,466 33,741
16/02/2019 74,880 78,042 0
17/02/2019 77,526 88,566 0
18/02/2019 69,908 62,284 3,345
19/02/2019 76,935 79,992 0
20/02/2019 74,945 79,898 0
21/02/2019 74,540 75,880 0
22/02/2019 75,039 83,896 0
23/02/2019 80,297 78,798 91
24/02/2019 56,108 53,268 3,105
25/02/2019 77,550 88,500 0
26/02/2019 74,466 78,970 1
27/02/2019 71,684 66,242 1,125
28/02/2019 76,076 88,994 137
TOTAL 2,035,195 2,038,768 45,579
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- M&B_ICHHAWAR-I
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 52,582 30,421 429
02/02/2019 73,769 73,754 1,489
03/02/2019 53,699 41,559 49
04/02/2019 52,374 23,421 1,703
05/02/2019 46,973 42,103 320
06/02/2019 43,608 43,223 6,402
07/02/2019 140,842 147,690 8,471
08/02/2019 47,993 16,090 200
09/02/2019 46,748 36,233 9
10/02/2019 43,593 22,889 0
11/02/2019 48,417 52,924 1,064
12/02/2019 64,049 58,942 2,352
13/02/2019 56,254 41,423 2,500
14/02/2019 57,169 63,834 877
15/02/2019 64,057 55,828 4,724
16/02/2019 53,664 51,150 2,394
17/02/2019 32,956 6,048 0
18/02/2019 41,369 28,861 61
19/02/2019 56,961 36,343 686
20/02/2019 47,002 37,467 1,005
21/02/2019 90,490 109,751 10,356
22/02/2019 62,953 64,578 7,099
23/02/2019 59,986 49,143 108
24/02/2019 54,985 29,316 5,205
25/02/2019 58,868 47,234 1,547
26/02/2019 90,999 97,854 17,881
27/02/2019 48,976 27,027 2,919
28/02/2019 50,157 36,997 180
TOTAL 1,641,493 1,372,103 80,030
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- WIND_WORLD-III_33_AGAR_14.4MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 56,425 44,684 7,487
02/02/2019 52,615 53,212 108
03/02/2019 51,179 47,066 140
04/02/2019 47,953 47,959 872
05/02/2019 50,049 52,325 38
06/02/2019 47,487 44,625 2,104
07/02/2019 48,260 57,113 1,008
08/02/2019 61,535 67,832 600
09/02/2019 66,132 68,923 0
10/02/2019 67,783 69,633 0
11/02/2019 66,436 65,755 0
12/02/2019 60,764 60,147 0
13/02/2019 53,454 55,225 39
14/02/2019 49,475 51,181 295
15/02/2019 48,808 48,066 978
16/02/2019 60,769 56,720 1,481
17/02/2019 65,848 70,243 155
18/02/2019 55,145 52,831 5,097
19/02/2019 61,301 64,644 8
20/02/2019 59,715 60,702 0
21/02/2019 56,239 58,333 0
22/02/2019 57,664 60,175 117
23/02/2019 56,421 55,040 3,564
24/02/2019 51,644 55,400 3,129
25/02/2019 59,227 67,674 195
26/02/2019 63,276 64,778 0
27/02/2019 59,738 56,515 1,562
28/02/2019 63,373 68,574 0
TOTAL 1,598,715 1,625,375 28,977
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- BHARAT_ELECTRONICS_LTD_OFI_S_ITARSI_10MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 667,200 648,620 73,031
02/02/2019 1,094,156 1,160,920 16,778
03/02/2019 1,120,349 1,103,440 6,459
04/02/2019 777,123 731,880 0
05/02/2019 694,738 421,690 4,048
06/02/2019 692,499 429,420 0
07/02/2019 2,069,022 2,400,110 160,342
08/02/2019 652,102 314,810 4,768
09/02/2019 710,365 640,830 1,438
10/02/2019 632,424 534,730 2,984
11/02/2019 926,886 1,039,860 35,801
12/02/2019 864,306 668,520 527
13/02/2019 758,944 530,930 15,587
14/02/2019 698,846 371,480 15,383
15/02/2019 675,013 458,790 1,126
16/02/2019 695,369 532,300 9,095
17/02/2019 552,760 136,290 0
18/02/2019 778,058 999,740 79,764
19/02/2019 687,397 457,030 2,932
20/02/2019 590,875 226,560 75
21/02/2019 678,738 548,580 0
22/02/2019 664,685 257,960 4,737
23/02/2019 729,506 588,820 1,244
24/02/2019 657,973 404,830 681
25/02/2019 793,478 487,250 20,572
26/02/2019 1,197,377 1,000,900 63,146
27/02/2019 923,352 853,210 44,229
28/02/2019 854,644 1,230,320 333,514
TOTAL 22,838,185 19,179,820 898,261
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- KSHEMA_295.3MW_AMBA
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 67,179 67,627 0
02/02/2019 65,531 66,996 0
03/02/2019 62,376 53,017 0
04/02/2019 51,239 47,831 2,953
05/02/2019 60,371 54,339 336
06/02/2019 58,180 51,018 506
07/02/2019 66,961 71,346 0
08/02/2019 69,019 75,311 0
09/02/2019 73,684 79,816 0
10/02/2019 77,583 77,753 296
11/02/2019 77,418 76,191 0
12/02/2019 74,654 69,171 0
13/02/2019 63,440 34,905 9,036
14/02/2019 57,806 61,946 49
15/02/2019 71,497 69,657 238
16/02/2019 73,035 79,153 0
17/02/2019 73,786 82,051 285
18/02/2019 54,510 27,426 7,252
19/02/2019 71,318 76,010 9
20/02/2019 72,006 77,338 112
21/02/2019 73,178 73,182 0
22/02/2019 72,839 78,135 67
23/02/2019 76,477 71,965 714
24/02/2019 67,825 64,550 2,280
25/02/2019 74,264 82,023 203
26/02/2019 74,188 76,393 0
27/02/2019 73,529 67,852 943
28/02/2019 74,477 78,818 0
TOTAL 1,928,370 1,891,820 25,279
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- M&B_BAROD
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 574,428 324,460 17,149
02/02/2019 1,140,623 1,092,900 53,610
03/02/2019 896,965 734,220 52,031
04/02/2019 715,632 548,530 85,515
05/02/2019 605,495 538,700 1,203
06/02/2019 765,133 550,580 2,481
07/02/2019 1,309,622 1,116,530 125,700
08/02/2019 652,414 520,420 20,049
09/02/2019 607,543 429,160 15,510
10/02/2019 581,802 359,980 0
11/02/2019 868,148 1,020,070 105,209
12/02/2019 816,089 576,260 27,806
13/02/2019 707,839 494,530 4,287
14/02/2019 658,627 636,630 52,827
15/02/2019 925,667 687,260 51,216
16/02/2019 690,119 775,370 200,352
17/02/2019 552,658 212,910 2,683
18/02/2019 415,730 157,710 0
19/02/2019 639,669 434,490 18,448
20/02/2019 490,411 357,330 70,384
21/02/2019 1,375,861 1,343,320 58,250
22/02/2019 744,022 634,680 25,647
23/02/2019 711,377 636,290 23,126
24/02/2019 793,919 723,810 77,550
25/02/2019 1,093,480 1,028,370 206,862
26/02/2019 1,413,676 1,305,780 133,089
27/02/2019 1,580,799 1,187,770 225,042
28/02/2019 983,361 906,920 45,269
TOTAL 23,311,109 19,334,980 1,701,295
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- GAMESHA_SHAJAPUR
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 52,742 19,002 0
02/02/2019 69,607 78,044 617
03/02/2019 64,207 52,508 39
04/02/2019 51,118 32,073 206
05/02/2019 48,348 40,651 306
06/02/2019 44,701 23,901 177
07/02/2019 131,695 142,294 1,558
08/02/2019 46,410 32,354 1,211
09/02/2019 46,859 25,987 0
10/02/2019 43,210 25,654 76
11/02/2019 47,404 43,595 0
12/02/2019 65,302 53,761 96
13/02/2019 43,857 31,262 0
14/02/2019 60,680 55,043 5,229
15/02/2019 64,384 58,682 5,902
16/02/2019 56,315 53,547 1,044
17/02/2019 37,888 12,491 526
18/02/2019 40,564 27,524 18
19/02/2019 54,687 33,315 0
20/02/2019 45,772 27,640 202
21/02/2019 98,895 127,218 5,663
22/02/2019 54,618 65,901 2,272
23/02/2019 61,470 59,042 441
24/02/2019 51,345 29,635 772
25/02/2019 50,255 41,898 1,074
26/02/2019 90,297 100,421 9,116
27/02/2019 51,207 31,940 4,340
28/02/2019 46,795 33,377 485
TOTAL 1,620,632 1,358,760 41,370
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- WIND_WORLD-IV_33_SUSNER_14.4MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 68,795 68,957 28
02/02/2019 65,471 67,102 0
03/02/2019 57,060 51,145 1,014
04/02/2019 63,936 61,801 155
05/02/2019 59,370 62,227 345
06/02/2019 58,448 58,463 83
07/02/2019 62,002 80,724 695
08/02/2019 76,621 76,762 0
09/02/2019 74,325 84,346 558
10/02/2019 81,797 83,846 0
11/02/2019 75,258 81,619 0
12/02/2019 76,428 75,221 207
13/02/2019 61,747 48,734 1,917
14/02/2019 60,887 66,545 283
15/02/2019 69,374 76,483 0
16/02/2019 78,109 80,969 0
17/02/2019 80,280 87,949 0
18/02/2019 68,701 51,819 4,733
19/02/2019 73,281 78,581 196
20/02/2019 75,496 82,226 27
21/02/2019 69,394 75,014 0
22/02/2019 74,556 83,550 0
23/02/2019 77,811 71,983 910
24/02/2019 65,259 58,095 1,792
25/02/2019 76,311 84,015 334
26/02/2019 72,213 81,372 25
27/02/2019 67,300 64,515 1,235
28/02/2019 77,852 88,634 0
TOTAL 1,968,082 2,032,697 14,537
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- UJAAS_33KV_BERCHA
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 801,845 555,620 18,606
02/02/2019 1,642,005 1,530,550 122,995
03/02/2019 1,444,845 949,190 148,920
04/02/2019 972,578 549,010 23,379
05/02/2019 877,207 951,760 5,417
06/02/2019 1,040,854 766,880 2,453
07/02/2019 1,923,228 1,592,700 359,343
08/02/2019 810,154 436,300 49,471
09/02/2019 838,606 666,180 31,510
10/02/2019 887,676 614,090 52,906
11/02/2019 1,560,116 1,630,070 120,914
12/02/2019 1,293,255 1,016,810 133,047
13/02/2019 914,004 503,050 25,905
14/02/2019 863,474 843,120 31,312
15/02/2019 1,026,917 817,870 44,201
16/02/2019 989,482 1,012,460 98,612
17/02/2019 622,541 209,290 5
18/02/2019 613,836 475,080 68,061
19/02/2019 751,655 442,630 5,481
20/02/2019 618,253 626,750 151,979
21/02/2019 1,980,215 2,006,040 89,836
22/02/2019 998,058 883,450 18,315
23/02/2019 1,087,669 896,980 30,518
24/02/2019 804,056 761,890 27,219
25/02/2019 957,914 772,180 48,667
26/02/2019 1,426,866 1,497,060 245,537
27/02/2019 1,261,085 944,290 214,813
28/02/2019 896,728 1,104,870 75,643
TOTAL 29,905,122 25,056,170 2,245,065
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- INOX_200MW_SHAJAPUR
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 72,358 71,860 0
02/02/2019 70,773 49,410 14,468
03/02/2019 58,159 58,159 0
04/02/2019 60,715 60,715 0
05/02/2019 58,425 58,425 0
06/02/2019 56,631 56,631 0
07/02/2019 69,779 69,779 0
08/02/2019 73,193 73,193 0
09/02/2019 75,881 75,881 0
10/02/2019 83,262 83,262 0
11/02/2019 79,923 79,923 0
12/02/2019 72,371 72,371 0
13/02/2019 67,210 67,210 0
14/02/2019 54,823 54,823 0
15/02/2019 76,916 76,916 0
16/02/2019 73,656 73,656 0
17/02/2019 78,987 78,987 0
18/02/2019 64,363 64,363 0
19/02/2019 71,802 71,802 0
20/02/2019 76,627 76,627 0
21/02/2019 72,660 72,660 0
22/02/2019 77,136 77,136 0
23/02/2019 80,539 80,539 0
24/02/2019 67,765 67,765 0
25/02/2019 80,014 80,014 0
26/02/2019 74,969 74,969 0
27/02/2019 76,018 76,018 0
28/02/2019 77,790 77,790 0
TOTAL 2,002,745 1,980,884 14,468
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- UJAAS_I_S_RAJGARH_BIORA_15MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 30,202 22,000 0
02/02/2019 89,374 69,171 595
03/02/2019 58,149 56,290 2,266
04/02/2019 50,241 42,246 328
05/02/2019 52,512 45,559 531
06/02/2019 64,856 55,419 979
07/02/2019 87,568 88,790 5,050
08/02/2019 55,414 48,287 609
09/02/2019 69,620 55,523 609
10/02/2019 46,257 52,161 607
11/02/2019 50,670 70,270 2,425
12/02/2019 58,929 55,291 720
13/02/2019 52,938 53,543 2,872
14/02/2019 42,048 34,417 1,622
15/02/2019 50,505 45,324 558
16/02/2019 45,524 43,668 192
17/02/2019 37,350 24,251 0
18/02/2019 28,557 21,938 4
19/02/2019 42,274 32,205 0
20/02/2019 29,796 22,836 235
21/02/2019 79,786 68,000 346
22/02/2019 43,531 33,550 21
23/02/2019 43,183 38,625 0
24/02/2019 52,627 61,818 3,240
25/02/2019 69,609 76,742 6,065
26/02/2019 63,580 96,651 23,235
27/02/2019 75,206 81,643 2,069
28/02/2019 54,675 61,906 3,757
TOTAL 1,524,981 1,458,124 58,935
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019
NAME OF QCA :- NOT QCA APPOINTMENT
NAME OF POOLING STATION :- WIND_WORLD_II_WIND_33_CHAPDA
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 1,304,080 1,209,400 0
02/02/2019 836,177 1,160,768 97,865
03/02/2019 1,260,619 950,617 10,655
04/02/2019 1,160,790 876,826 12,367
05/02/2019 960,810 870,507 14,336
06/02/2019 866,220 778,355 4,923
07/02/2019 866,840 1,327,646 92,146
08/02/2019 787,950 1,303,855 146,183
09/02/2019 1,237,818 1,256,835 5,336
10/02/2019 1,303,915 1,396,593 0
11/02/2019 1,413,986 1,352,755 0
12/02/2019 1,398,990 1,246,513 2,670
13/02/2019 1,357,490 661,231 277,538
14/02/2019 1,090,053 1,083,095 4,773
15/02/2019 1,245,983 1,220,147 308
16/02/2019 1,398,990 1,370,206 0
17/02/2019 1,222,000 1,426,385 0
18/02/2019 1,088,123 431,660 261,290
19/02/2019 1,219,934 1,280,289 0
20/02/2019 1,097,997 1,339,588 781
21/02/2019 1,219,934 1,263,555 0
22/02/2019 1,344,070 1,334,829 0
23/02/2019 1,294,788 975,299 78,617
24/02/2019 1,337,270 1,205,290 6,182
25/02/2019 1,342,632 1,398,186 0
26/02/2019 1,277,781 1,272,727 29
27/02/2019 1,398,760 1,239,221 15,294
28/02/2019 1,324,144 1,430,526 0
TOTAL 33,658,144 32,662,904 1,031,293
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- NOT QCA APPOINTMENT
NAME OF POOLING STATION :- MANDSAUR_SOLAR_POWER_SOLAR_220_GUJARKHEDI
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 0 1,350 1,519
02/02/2019 0 3,239 3,642
03/02/2019 0 2,846 3,199
04/02/2019 0 3,037 3,409
05/02/2019 0 2,506 2,811
06/02/2019 0 1,234 1,382
07/02/2019 0 8,572 9,638
08/02/2019 0 2,008 2,259
09/02/2019 0 896 1,000
10/02/2019 0 1,278 1,431
11/02/2019 0 3,191 3,590
12/02/2019 0 2,443 2,745
13/02/2019 0 2,275 2,556
14/02/2019 0 1,724 1,941
15/02/2019 0 1,861 2,089
16/02/2019 0 1,600 1,797
17/02/2019 0 318 357
18/02/2019 0 2,491 2,799
19/02/2019 0 2,792 3,134
20/02/2019 0 529 588
21/02/2019 0 1,536 1,722
22/02/2019 0 1,311 1,470
23/02/2019 0 1,163 1,302
24/02/2019 0 1,941 2,182
25/02/2019 0 2,475 2,783
26/02/2019 0 3,002 3,382
27/02/2019 0 2,686 3,018
28/02/2019 0 910 1,020
TOTAL 0 61,214 68,765
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- NOT QCA APPOINTMENT
NAME OF POOLING STATION :- WINCON_W_JAORA_11.95MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 232,500 234,437 0
02/02/2019 228,750 234,942 0
03/02/2019 118,750 124,727 4,151
04/02/2019 206,250 202,213 344
05/02/2019 206,500 203,063 25
06/02/2019 205,500 176,361 1,086
07/02/2019 256,500 268,238 16
08/02/2019 242,000 265,010 27
09/02/2019 255,750 288,673 20
10/02/2019 258,000 277,943 40
11/02/2019 254,250 272,133 20
12/02/2019 232,750 253,412 12
13/02/2019 190,750 149,184 2,260
14/02/2019 151,000 170,952 1,336
15/02/2019 232,750 242,775 25
16/02/2019 257,500 268,574 56
17/02/2019 263,500 292,927 56
18/02/2019 127,000 112,045 10,351
19/02/2019 214,750 252,646 2,736
20/02/2019 244,500 269,180 61
21/02/2019 238,750 249,942 56
22/02/2019 245,750 274,399 85
23/02/2019 224,500 253,451 1,229
24/02/2019 197,500 199,128 2,311
25/02/2019 255,000 287,860 129
26/02/2019 238,750 258,270 373
27/02/2019 225,500 243,860 1,034
28/02/2019 257,500 293,242 166
TOTAL 6,262,500 6,619,587 28,005
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- NOT QCA APPOINTMENT
NAME OF POOLING STATION :- NTPC_RAJGARH
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 79,898 174,933 87,024
02/02/2019 96,158 226,700 79,242
03/02/2019 86,357 187,388 19,085
04/02/2019 78,189 136,736 16,392
05/02/2019 40,925 40,245 418
06/02/2019 88,033 77,624 12,319
07/02/2019 239,778 329,963 67,619
08/02/2019 37,885 58,314 8,993
09/02/2019 59,812 136,635 51,060
10/02/2019 38,152 51,313 0
11/02/2019 84,121 151,877 9,379
12/02/2019 67,837 154,426 19,811
13/02/2019 47,945 106,818 12,220
14/02/2019 106,408 101,043 19,596
15/02/2019 40,728 95,049 16,669
16/02/2019 66,564 82,312 43
17/02/2019 11,156 16,283 0
18/02/2019 53,035 155,570 47,265
19/02/2019 51,212 73,445 13,060
20/02/2019 77,775 62,021 1,113
21/02/2019 91,206 199,358 28,017
22/02/2019 32,787 107,934 19,886
23/02/2019 69,755 97,606 2,430
24/02/2019 26,436 78,370 13,208
25/02/2019 39,178 130,041 37,139
26/02/2019 136,880 188,325 45,093
27/02/2019 96,649 40,976 10,493
28/02/2019 44,391 101,411 24,340
TOTAL 1,989,250 3,362,716 661,914
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- RENEW WIND_ENERGY_MP_TWO_WIND_33_DALODA
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 64,578 73,483 0
02/02/2019 16,739 49,009 0
03/02/2019 44,602 56,273 75
04/02/2019 54,271 53,860 34
05/02/2019 33,861 57,129 0
06/02/2019 103,352 129,354 9,743
07/02/2019 97,534 159,336 27,162
08/02/2019 125,208 180,571 14,910
09/02/2019 154,089 190,556 25,239
10/02/2019 33,428 43,140 404
11/02/2019 34,329 46,252 0
12/02/2019 31,480 47,420 0
13/02/2019 40,140 47,797 0
14/02/2019 63,559 120,393 14,608
15/02/2019 104,770 94,068 3,884
16/02/2019 123,000 103,292 8,801
17/02/2019 68,789 112,827 6,121
18/02/2019 14,280 80,167 38,194
19/02/2019 26,019 89,297 3,853
20/02/2019 74,460 69,485 32
21/02/2019 60,900 156,755 25,812
22/02/2019 90,934 125,548 16,536
23/02/2019 63,587 44,503 11
24/02/2019 148,590 198,785 12,175
25/02/2019 158,020 227,894 45,660
26/02/2019 138,578 237,566 61,800
27/02/2019 232,965 363,373 65,634
28/02/2019 200,001 128,864 41,574
TOTAL 2,402,063 3,286,997 422,262
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- INOX_WIND_132_GUDGAON_28M
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 52,903 43,012 31,053
02/02/2019 52,679 42,105 30,008
03/02/2019 48,006 34,393 25,564
04/02/2019 32,553 31,556 10,597
05/02/2019 44,502 32,506 26,608
06/02/2019 45,262 26,531 18,647
07/02/2019 52,286 48,583 32,893
08/02/2019 56,399 48,015 34,017
09/02/2019 55,905 51,196 35,750
10/02/2019 49,907 50,387 34,349
11/02/2019 55,495 50,389 33,212
12/02/2019 55,884 46,428 31,539
13/02/2019 38,307 24,694 9,904
14/02/2019 48,230 39,123 24,295
15/02/2019 57,027 45,931 32,957
16/02/2019 58,250 51,261 36,405
17/02/2019 58,328 54,899 36,853
18/02/2019 44,586 19,816 14,866
19/02/2019 52,836 50,827 38,279
20/02/2019 56,872 52,193 35,378
21/02/2019 55,648 47,734 30,797
22/02/2019 56,981 52,777 34,618
23/02/2019 54,045 44,350 25,125
24/02/2019 40,374 45,665 25,701
25/02/2019 60,604 54,873 38,477
26/02/2019 58,260 50,974 35,433
27/02/2019 52,230 45,028 30,186
28/02/2019 62,583 55,727 39,626
TOTAL 1,456,942 1,240,973 833,137
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- BHADRESH_SOLAR_33_10MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 72,615 58,068 12,876
02/02/2019 75,831 97,572 4,370
03/02/2019 82,418 98,731 5,199
04/02/2019 55,508 52,288 300
05/02/2019 39,053 27,886 84
06/02/2019 47,030 34,168 233
07/02/2019 111,497 139,480 7,936
08/02/2019 34,996 37,734 5,284
09/02/2019 45,961 47,235 1,095
10/02/2019 43,702 31,508 63
11/02/2019 73,487 81,965 537
12/02/2019 60,525 66,883 2,075
13/02/2019 47,797 43,773 319
14/02/2019 58,921 51,625 1,570
15/02/2019 49,707 49,480 1,485
16/02/2019 56,416 47,941 490
17/02/2019 35,637 11,091 0
18/02/2019 63,615 71,553 6,309
19/02/2019 57,129 56,888 409
20/02/2019 45,213 28,941 16
21/02/2019 87,665 104,426 3,491
22/02/2019 61,304 62,264 2,099
23/02/2019 70,288 70,879 3,211
24/02/2019 46,003 36,698 0
25/02/2019 72,461 76,617 743
26/02/2019 89,778 96,420 14,596
27/02/2019 46,601 28,024 286
28/02/2019 40,321 64,032 11,018
TOTAL 1,671,479 1,674,170 86,094
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- SHANKHESWAR_NAGRI_15MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 96,890 88,388 3,502
02/02/2019 205,554 246,689 17,001
03/02/2019 157,821 184,612 10,334
04/02/2019 128,545 134,081 1,526
05/02/2019 106,422 109,556 6,667
06/02/2019 88,868 76,114 5,798
07/02/2019 264,339 316,395 15,607
08/02/2019 101,682 91,908 4,840
09/02/2019 116,764 143,524 5,355
10/02/2019 110,709 101,587 2,005
11/02/2019 190,513 215,220 16,551
12/02/2019 170,846 168,946 4,265
13/02/2019 130,396 131,857 1,490
14/02/2019 132,322 143,819 6,658
15/02/2019 133,417 135,213 13,395
16/02/2019 189,605 191,762 15,923
17/02/2019 80,271 50,437 0
18/02/2019 90,786 79,556 11,977
19/02/2019 121,577 94,260 2,133
20/02/2019 71,620 88,753 30,663
21/02/2019 254,249 291,357 38,998
22/02/2019 163,987 134,397 4,827
23/02/2019 156,031 163,069 9,828
24/02/2019 143,059 158,549 19,005
25/02/2019 202,758 187,139 3,734
26/02/2019 231,010 235,467 29,850
27/02/2019 227,338 199,089 25,994
28/02/2019 179,138 222,805 34,435
TOTAL 4,246,517 4,384,549 342,361
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- KSHEMA_GHOSLA_30MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 115,847 128,080 42,879
02/02/2019 324,734 524,610 117,918
03/02/2019 308,017 392,550 29,352
04/02/2019 240,191 391,640 57,371
05/02/2019 169,435 207,120 21,717
06/02/2019 165,504 162,880 17,112
07/02/2019 368,220 520,820 103,485
08/02/2019 149,750 152,510 23,340
09/02/2019 186,828 257,290 55,802
10/02/2019 181,799 311,520 53,550
11/02/2019 239,136 425,690 130,347
12/02/2019 265,884 280,910 18,041
13/02/2019 222,959 280,350 50,943
14/02/2019 190,709 108,360 12,994
15/02/2019 151,709 177,220 2,222
16/02/2019 260,481 316,390 73,137
17/02/2019 120,423 92,700 1,967
18/02/2019 180,039 217,700 4,555
19/02/2019 191,079 187,300 5,663
20/02/2019 141,411 94,510 1,791
21/02/2019 195,393 231,180 14,565
22/02/2019 200,907 182,560 8,351
23/02/2019 258,523 308,640 53,951
24/02/2019 273,922 315,070 23,026
25/02/2019 239,476 261,390 35,138
26/02/2019 364,688 424,580 40,935
27/02/2019 306,824 307,150 58,051
28/02/2019 343,648 410,350 111,180
TOTAL 6,357,536 7,671,070 1,169,383
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- SUZLON_GUJ_96.6MW_BADNAGAR
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 20,437 38,934 5,417
02/02/2019 24,807 106,047 45,554
03/02/2019 11,327 47,562 10,729
04/02/2019 1,818 14,143 1,791
05/02/2019 6,983 48,975 14,415
06/02/2019 12,933 39,215 22,576
07/02/2019 61,991 184,297 75,543
08/02/2019 821 8,404 406
09/02/2019 14,449 34,021 3,471
10/02/2019 1,197 18,053 2,277
11/02/2019 13,514 49,420 6,290
12/02/2019 7,975 54,725 11,053
13/02/2019 16,370 29,704 4,067
14/02/2019 11,880 70,034 15,182
15/02/2019 4,694 69,833 45,348
16/02/2019 10,482 58,902 24,213
17/02/2019 1,904 101 0
18/02/2019 3,980 19,016 554
19/02/2019 13,481 31,391 912
20/02/2019 4,157 34,121 9,295
21/02/2019 42,064 131,749 45,559
22/02/2019 8,195 81,344 50,850
23/02/2019 12,112 62,883 16,030
24/02/2019 288 21,226 9,344
25/02/2019 2,555 48,119 17,420
26/02/2019 42,454 115,075 30,987
27/02/2019 43,405 19,818 10,588
28/02/2019 7,457 44,151 15,536
TOTAL 403,730 1,481,263 495,407
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- SUZLON_II_W_SUSNER_15MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 56,035 37,436 2,724
02/02/2019 107,473 173,708 28,990
03/02/2019 92,407 171,849 44,233
04/02/2019 70,536 95,894 3,707
05/02/2019 40,007 27,377 50
06/02/2019 62,463 28,702 6,304
07/02/2019 112,460 152,592 13,823
08/02/2019 37,892 45,815 9,121
09/02/2019 69,095 72,354 6,241
10/02/2019 58,180 71,634 2,947
11/02/2019 75,849 121,331 10,772
12/02/2019 84,432 88,743 6,636
13/02/2019 62,890 57,752 505
14/02/2019 59,709 36,160 895
15/02/2019 40,498 36,832 423
16/02/2019 89,030 98,973 9,877
17/02/2019 36,770 23,583 2,013
18/02/2019 51,408 63,516 4,616
19/02/2019 46,286 31,980 300
20/02/2019 53,282 25,916 2,774
21/02/2019 57,020 41,587 1,395
22/02/2019 36,714 26,561 786
23/02/2019 96,418 115,507 8,635
24/02/2019 49,695 30,290 921
25/02/2019 48,589 41,522 1,670
26/02/2019 83,403 72,040 8,108
27/02/2019 59,213 51,246 3,269
28/02/2019 96,925 131,323 24,143
TOTAL 1,834,679 1,972,223 205,878
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- SUZLON_I_W_SAILANA_14.4MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 78,580 77,304 0
02/02/2019 79,650 73,442 0
03/02/2019 73,310 61,887 124
04/02/2019 56,999 53,257 125
05/02/2019 64,807 60,672 1,084
06/02/2019 61,102 49,596 2,334
07/02/2019 81,119 82,199 0
08/02/2019 86,488 83,181 0
09/02/2019 86,063 88,533 0
10/02/2019 78,740 87,762 27
11/02/2019 84,835 85,124 0
12/02/2019 85,863 77,813 763
13/02/2019 55,012 45,281 1,992
14/02/2019 74,491 74,248 0
15/02/2019 87,022 78,742 0
16/02/2019 89,286 87,124 0
17/02/2019 89,081 89,914 0
18/02/2019 51,341 29,063 4,020
19/02/2019 78,402 84,355 234
20/02/2019 85,382 85,047 0
21/02/2019 86,013 82,959 0
22/02/2019 87,648 83,875 0
23/02/2019 81,997 66,043 3,099
24/02/2019 67,839 78,454 493
25/02/2019 92,159 89,632 0
26/02/2019 87,144 78,829 676
27/02/2019 83,760 82,435 156
28/02/2019 95,960 92,896 0
TOTAL 2,210,093 2,109,667 15,127
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- UJAAS_SOLAR_33KV_SITAMAU-I
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 153,336 155,130 17
02/02/2019 101,392 149,605 35,871
03/02/2019 96,088 121,248 16,882
04/02/2019 78,642 106,918 21,977
05/02/2019 85,930 118,706 26,691
06/02/2019 94,715 108,078 10,555
07/02/2019 104,405 166,404 44,376
08/02/2019 111,667 163,124 34,413
09/02/2019 113,861 170,510 39,090
10/02/2019 109,024 163,730 31,350
11/02/2019 108,919 167,600 41,010
12/02/2019 105,838 159,680 37,879
13/02/2019 77,375 102,026 15,079
14/02/2019 88,549 135,372 44,910
15/02/2019 104,935 152,486 35,933
16/02/2019 116,974 174,871 42,149
17/02/2019 115,130 173,310 41,392
18/02/2019 56,895 53,891 4,499
19/02/2019 111,427 158,801 30,231
20/02/2019 117,385 157,674 18,956
21/02/2019 168,824 158,168 322
22/02/2019 163,344 153,906 473
23/02/2019 157,437 127,654 14,450
24/02/2019 132,412 146,538 3,285
25/02/2019 173,151 173,197 0
26/02/2019 162,372 142,895 5,591
27/02/2019 139,300 144,700 15,639
28/02/2019 181,078 178,043 0
TOTAL 3,330,405 4,084,265 613,020
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- 25MW_WELSPUN_RATANGARH
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 47,439 40,741 0
02/02/2019 47,492 39,783 0
03/02/2019 42,872 30,508 524
04/02/2019 28,958 26,412 11
05/02/2019 35,405 25,779 1,089
06/02/2019 36,944 22,004 3,728
07/02/2019 43,811 36,826 370
08/02/2019 40,341 38,061 1,378
09/02/2019 25,922 41,459 9,499
10/02/2019 25,214 39,930 8,043
11/02/2019 37,212 43,272 5,322
12/02/2019 25,329 39,865 9,474
13/02/2019 19,684 21,192 1,797
14/02/2019 29,646 26,862 14,451
15/02/2019 26,594 39,040 9,190
16/02/2019 26,318 44,578 13,156
17/02/2019 27,133 47,477 13,096
18/02/2019 20,516 16,346 2,269
19/02/2019 24,464 43,821 13,982
20/02/2019 32,836 41,215 7,226
21/02/2019 39,440 38,862 4,440
22/02/2019 38,170 43,945 6,012
23/02/2019 28,317 38,275 5,016
24/02/2019 33,895 37,625 752
25/02/2019 54,730 45,727 175
26/02/2019 52,522 42,553 855
27/02/2019 46,787 37,022 2,896
28/02/2019 56,078 47,239 271
TOTAL 994,069 1,036,419 135,022
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- FSWAI_BTCL_NP_SUSNER
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 49,221 46,616 5,009
02/02/2019 105,693 133,608 6,352
03/02/2019 85,877 90,088 574
04/02/2019 60,744 67,479 5,541
05/02/2019 42,566 49,817 1,541
06/02/2019 79,273 44,407 28,532
07/02/2019 123,668 149,750 4,490
08/02/2019 51,456 33,817 2,490
09/02/2019 59,640 94,793 20,436
10/02/2019 63,634 65,386 4,131
11/02/2019 65,756 81,297 18,495
12/02/2019 60,546 61,780 2,375
13/02/2019 55,381 63,611 2,721
14/02/2019 60,347 41,330 180
15/02/2019 55,545 72,235 643
16/02/2019 85,741 108,769 18,230
17/02/2019 53,711 39,341 0
18/02/2019 36,045 63,626 11,165
19/02/2019 60,723 61,747 17,894
20/02/2019 40,373 28,617 406
21/02/2019 81,809 77,467 7,421
22/02/2019 61,111 61,748 673
23/02/2019 68,131 88,649 8,132
24/02/2019 76,700 93,789 12,697
25/02/2019 82,988 114,170 13,026
26/02/2019 133,107 148,764 6,260
27/02/2019 118,068 121,383 10,363
28/02/2019 108,128 115,381 9,433
TOTAL 2,025,982 2,219,465 219,210
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 9
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- DHAR_RENEWABLE_15MW_DASERA_MAIDAN
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 77,802 65,977 3,109
02/02/2019 109,353 242,274 85,932
03/02/2019 75,750 142,032 33,611
04/02/2019 65,718 136,928 49,645
05/02/2019 87,885 145,312 14,582
06/02/2019 144,488 154,448 36,716
07/02/2019 178,080 305,060 51,380
08/02/2019 86,403 126,735 38,761
09/02/2019 73,173 113,677 5,734
10/02/2019 66,972 91,370 10,162
11/02/2019 70,484 213,750 85,674
12/02/2019 65,770 122,789 20,738
13/02/2019 94,655 143,184 18,719
14/02/2019 116,622 129,434 22,967
15/02/2019 92,916 142,954 17,348
16/02/2019 82,466 151,581 38,501
17/02/2019 63,149 39,123 1,604
18/02/2019 65,927 48,208 4,883
19/02/2019 84,089 101,446 2,106
20/02/2019 73,291 61,862 13,559
21/02/2019 136,380 305,796 80,589
22/02/2019 76,931 161,422 58,315
23/02/2019 73,195 123,694 11,353
24/02/2019 80,687 158,691 52,084
25/02/2019 75,570 243,704 134,692
26/02/2019 226,319 241,179 81,417
27/02/2019 249,008 286,990 39,189
28/02/2019 86,004 180,239 32,021
TOTAL 2,779,087 4,379,859 1,045,391
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- BADONI_POWER_WIND_33_MAXI
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 118,749 138,950 502
02/02/2019 31,653 103,242 0
03/02/2019 68,137 156,409 438
04/02/2019 118,189 146,650 416
05/02/2019 71,904 125,292 0
06/02/2019 174,957 274,410 32,658
07/02/2019 143,982 223,118 22,033
08/02/2019 139,809 304,079 38,986
09/02/2019 186,774 421,862 165,593
10/02/2019 58,121 77,554 555
11/02/2019 73,534 109,308 26
12/02/2019 67,518 133,609 2,271
13/02/2019 89,149 126,589 235
14/02/2019 76,582 241,782 96,777
15/02/2019 153,272 198,193 38,851
16/02/2019 136,485 271,518 13,813
17/02/2019 72,189 200,836 32,691
18/02/2019 21,830 157,248 55,235
19/02/2019 30,140 158,797 14,401
20/02/2019 141,498 163,757 3,417
21/02/2019 103,831 256,695 29,708
22/02/2019 116,058 171,943 14,275
23/02/2019 84,171 115,487 5,219
24/02/2019 208,664 285,084 12,951
25/02/2019 206,852 377,224 85,858
26/02/2019 185,461 329,793 57,872
27/02/2019 351,563 413,848 29,199
28/02/2019 238,676 240,867 8,982
TOTAL 3,469,748 5,924,144 762,962
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- BETUL_WIND_FARM
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 59,839 61,462 24,691
02/02/2019 68,378 76,069 3,150
03/02/2019 77,788 76,080 3,563
04/02/2019 66,406 37,236 1,495
05/02/2019 37,910 20,415 698
06/02/2019 42,795 33,029 670
07/02/2019 96,604 123,990 17,954
08/02/2019 44,241 21,771 911
09/02/2019 50,577 43,215 213
10/02/2019 39,700 34,333 9
11/02/2019 54,627 68,082 4,803
12/02/2019 45,896 50,694 428
13/02/2019 42,897 20,845 329
14/02/2019 57,084 69,534 10,143
15/02/2019 50,209 53,195 3,272
16/02/2019 62,848 57,312 5,022
17/02/2019 31,034 5,251 0
18/02/2019 56,221 71,244 10,726
19/02/2019 45,837 36,525 782
20/02/2019 42,992 32,389 2,805
21/02/2019 80,836 107,871 11,281
22/02/2019 53,222 47,582 3,686
23/02/2019 75,143 70,270 12,372
24/02/2019 39,816 46,724 4,481
25/02/2019 48,640 75,142 22,378
26/02/2019 87,008 79,270 12,314
27/02/2019 60,481 17,658 16,899
28/02/2019 71,182 76,435 19,804
TOTAL 1,590,211 1,513,623 194,879
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- CHOKSI_ENERGY_WIND_33_RIGDOD
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 171,653 138,724 6,687
02/02/2019 35,005 109,039 768
03/02/2019 91,388 157,244 0
04/02/2019 166,687 146,450 15,123
05/02/2019 98,328 121,718 112
06/02/2019 273,214 294,088 75,073
07/02/2019 212,443 191,309 17,600
08/02/2019 207,372 256,635 19,334
09/02/2019 283,579 447,134 212,812
10/02/2019 84,426 57,973 27
11/02/2019 107,441 87,260 778
12/02/2019 88,184 136,779 3,471
13/02/2019 122,061 132,519 233
14/02/2019 169,134 297,105 114,265
15/02/2019 219,063 186,861 86,390
16/02/2019 197,996 158,567 2,550
17/02/2019 103,437 106,834 1,151
18/02/2019 25,443 159,897 72,662
19/02/2019 40,265 106,686 119
20/02/2019 201,803 143,110 24,756
21/02/2019 151,058 329,951 90,684
22/02/2019 171,905 118,400 1,362
23/02/2019 121,773 75,670 8,721
24/02/2019 310,780 341,111 31,015
25/02/2019 327,124 474,042 148,791
26/02/2019 278,862 388,710 110,927
27/02/2019 534,148 453,507 71,018
28/02/2019 347,392 265,942 54,218
TOTAL 5,141,964 5,883,265 1,170,647
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- KUKARU_DEDHPANI_50MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 44,245 17,426 2,063
02/02/2019 84,602 123,797 16,713
03/02/2019 69,883 100,594 7,063
04/02/2019 55,880 69,976 899
05/02/2019 38,132 49,139 970
06/02/2019 64,296 18,156 12,713
07/02/2019 141,690 130,530 30,574
08/02/2019 46,054 29,037 337
09/02/2019 47,262 39,775 333
10/02/2019 41,037 45,450 23
11/02/2019 49,073 67,623 3,447
12/02/2019 52,830 67,313 1,855
13/02/2019 53,893 71,502 680
14/02/2019 75,907 39,883 14,607
15/02/2019 59,191 67,699 10,602
16/02/2019 90,194 107,859 17,295
17/02/2019 34,253 21,337 255
18/02/2019 58,577 60,489 2,999
19/02/2019 64,481 76,956 8,968
20/02/2019 51,752 28,559 189
21/02/2019 65,842 56,617 894
22/02/2019 43,545 68,760 6,394
23/02/2019 94,161 103,189 11,679
24/02/2019 71,797 73,777 3,386
25/02/2019 77,763 80,832 8,594
26/02/2019 112,902 124,774 13,012
27/02/2019 93,667 75,965 5,430
28/02/2019 96,712 102,007 8,074
TOTAL 1,879,621 1,919,021 190,048
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- SUZLON_SANDALA_I_KHACHROD_14.7MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 58,065 55,046 2,490
02/02/2019 66,443 71,801 1,857
03/02/2019 77,805 101,851 6,462
04/02/2019 54,255 51,571 167
05/02/2019 39,395 21,277 625
06/02/2019 63,067 29,837 13,341
07/02/2019 108,711 142,869 6,904
08/02/2019 36,996 27,338 1,992
09/02/2019 42,491 38,283 546
10/02/2019 40,157 25,291 0
11/02/2019 75,129 86,711 1,671
12/02/2019 66,078 69,149 3,930
13/02/2019 56,751 45,213 4,193
14/02/2019 79,620 73,357 14,123
15/02/2019 55,689 55,433 893
16/02/2019 52,949 48,915 652
17/02/2019 35,424 12,182 0
18/02/2019 72,461 85,982 13,891
19/02/2019 65,137 70,839 795
20/02/2019 50,583 43,329 997
21/02/2019 123,599 132,810 1,692
22/02/2019 68,796 74,345 3,496
23/02/2019 79,603 74,569 19,205
24/02/2019 53,209 50,091 164
25/02/2019 91,478 86,019 1,949
26/02/2019 90,701 109,903 7,358
27/02/2019 50,988 28,038 1,004
28/02/2019 38,644 67,854 14,428
TOTAL 1,794,224 1,779,903 124,825
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- SHANKHESWAR_DHAMNAR_15MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 51,710 48,603 2,849
02/02/2019 124,200 157,042 13,657
03/02/2019 115,468 143,466 14,038
04/02/2019 83,777 69,213 2,209
05/02/2019 18,689 21,919 817
06/02/2019 48,244 23,018 6,339
07/02/2019 126,468 159,326 15,987
08/02/2019 29,679 44,517 5,379
09/02/2019 62,966 77,378 11,064
10/02/2019 61,575 69,951 1,087
11/02/2019 91,183 101,570 3,712
12/02/2019 66,129 57,246 1,201
13/02/2019 20,770 37,275 790
14/02/2019 53,434 32,925 2,089
15/02/2019 37,220 32,350 1,436
16/02/2019 89,644 80,754 3,022
17/02/2019 14,606 16,251 870
18/02/2019 8,647 72,838 22,814
19/02/2019 22,744 35,515 7,010
20/02/2019 46,934 20,803 8,760
21/02/2019 56,551 50,643 1,391
22/02/2019 23,005 26,605 2,248
23/02/2019 78,904 101,539 11,170
24/02/2019 23,059 28,284 1,035
25/02/2019 23,554 29,013 998
26/02/2019 84,894 78,375 7,327
27/02/2019 80,994 44,869 11,882
28/02/2019 74,186 129,328 46,699
TOTAL 1,619,234 1,790,616 207,880
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- SUZLON_III_W_SAILANA_14.1MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 21,231 36,338 353
02/02/2019 41,870 189,089 68,350
03/02/2019 22,386 153,904 61,088
04/02/2019 17,710 123,148 31,161
05/02/2019 31,477 114,336 12,387
06/02/2019 53,973 110,095 7,929
07/02/2019 84,935 274,002 72,679
08/02/2019 24,252 84,584 11,527
09/02/2019 32,451 92,863 13,128
10/02/2019 23,384 92,203 12,195
11/02/2019 31,082 215,186 109,208
12/02/2019 19,105 156,414 58,859
13/02/2019 46,029 112,676 11,920
14/02/2019 40,495 114,675 19,148
15/02/2019 26,350 114,800 13,815
16/02/2019 32,006 138,886 38,458
17/02/2019 11,746 48,213 2,724
18/02/2019 14,215 48,911 8,479
19/02/2019 24,512 91,591 4,469
20/02/2019 16,084 54,259 12,832
21/02/2019 63,135 284,648 116,037
22/02/2019 22,989 111,175 27,300
23/02/2019 25,602 106,443 11,465
24/02/2019 15,525 126,755 27,300
25/02/2019 20,524 144,058 48,940
26/02/2019 109,767 221,947 72,325
27/02/2019 136,030 258,204 75,304
28/02/2019 29,450 143,544 39,836
TOTAL 1,038,315 3,762,947 989,216
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- SUDHEER_30MW_BERCHHA
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 20,437 37,833 3,807
02/02/2019 24,807 108,956 48,062
03/02/2019 11,327 53,781 15,399
04/02/2019 1,818 14,639 1,677
05/02/2019 6,983 48,886 13,156
06/02/2019 12,933 44,998 21,666
07/02/2019 61,991 164,492 65,927
08/02/2019 821 12,070 815
09/02/2019 14,449 33,169 4,281
10/02/2019 1,197 22,216 4,342
11/02/2019 13,514 54,836 10,807
12/02/2019 7,975 58,446 12,543
13/02/2019 16,370 30,219 3,504
14/02/2019 11,880 74,819 19,548
15/02/2019 4,694 83,562 60,509
16/02/2019 10,482 63,259 30,897
17/02/2019 1,904 127 0
18/02/2019 3,980 14,752 171
19/02/2019 13,951 32,160 2,566
20/02/2019 4,808 43,385 20,483
21/02/2019 42,064 142,767 58,958
22/02/2019 8,111 87,334 56,146
23/02/2019 12,112 63,857 17,248
24/02/2019 288 20,338 7,625
25/02/2019 2,555 47,846 17,951
26/02/2019 42,454 106,947 25,100
27/02/2019 43,405 18,855 9,769
28/02/2019 7,457 45,051 16,844
TOTAL 404,767 1,529,600 549,801
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- SUZLON_I_W_SUSNER_15MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 16,653 43,130 5,504
02/02/2019 46,742 108,971 15,183
03/02/2019 32,424 62,613 3,030
04/02/2019 30,884 45,211 181
05/02/2019 19,896 51,706 4,502
06/02/2019 60,530 44,424 9,233
07/02/2019 121,833 128,625 10,619
08/02/2019 29,051 37,156 3,498
09/02/2019 32,749 59,189 3,908
10/02/2019 19,516 62,216 8,586
11/02/2019 24,785 81,508 14,038
12/02/2019 19,126 44,009 924
13/02/2019 21,314 47,702 1,255
14/02/2019 54,443 67,648 1,241
15/02/2019 28,317 102,872 31,438
16/02/2019 33,714 85,624 23,073
17/02/2019 7,431 24,801 86
18/02/2019 17,408 77,088 25,975
19/02/2019 32,164 69,514 11,164
20/02/2019 28,645 35,160 441
21/02/2019 52,732 126,066 30,178
22/02/2019 24,367 103,958 40,523
23/02/2019 37,295 101,041 24,813
24/02/2019 27,060 100,008 24,396
25/02/2019 44,220 111,258 30,600
26/02/2019 101,292 130,008 12,579
27/02/2019 117,039 110,324 16,463
28/02/2019 34,051 104,237 37,369
TOTAL 1,115,681 2,166,067 390,800
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- RENEW_WIND_AP4_30MW_KHACHROD
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 62,220 65,250 22,251
02/02/2019 123,756 252,370 101,638
03/02/2019 103,327 183,940 58,475
04/02/2019 88,411 182,080 67,696
05/02/2019 47,409 81,910 4,915
06/02/2019 107,414 75,270 16,172
07/02/2019 172,871 247,080 39,100
08/02/2019 59,900 70,780 12,689
09/02/2019 69,875 136,370 43,714
10/02/2019 72,460 160,790 58,838
11/02/2019 63,306 213,910 140,172
12/02/2019 55,956 125,720 56,034
13/02/2019 57,018 140,000 45,508
14/02/2019 79,272 54,910 5,053
15/02/2019 54,478 84,320 4,517
16/02/2019 76,036 160,270 67,824
17/02/2019 42,810 43,790 1,544
18/02/2019 51,580 103,400 9,144
19/02/2019 59,743 91,280 15,426
20/02/2019 60,369 40,930 590
21/02/2019 76,498 111,830 9,421
22/02/2019 54,295 81,240 16,165
23/02/2019 76,996 144,440 46,692
24/02/2019 64,138 146,490 36,072
25/02/2019 53,880 120,990 38,027
26/02/2019 152,656 201,890 21,192
27/02/2019 198,568 146,480 49,019
28/02/2019 88,774 199,740 98,411
TOTAL 2,274,016 3,667,470 1,086,299
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- SARJAN_25.2MW_BADNAGAR
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 55,610 45,255 1,535
02/02/2019 70,456 72,940 794
03/02/2019 73,746 89,378 2,837
04/02/2019 47,951 50,948 231
05/02/2019 38,071 24,903 16
06/02/2019 44,591 35,101 416
07/02/2019 94,281 119,304 14,469
08/02/2019 35,342 29,468 4,231
09/02/2019 40,622 35,327 152
10/02/2019 42,047 28,873 174
11/02/2019 80,298 88,759 4,433
12/02/2019 62,206 75,377 8,434
13/02/2019 46,429 50,060 1,724
14/02/2019 83,578 69,095 16,268
15/02/2019 53,314 57,132 1,983
16/02/2019 62,310 51,296 5,017
17/02/2019 34,352 11,347 39
18/02/2019 73,231 74,614 9,729
19/02/2019 71,473 72,466 5,609
20/02/2019 49,928 38,151 742
21/02/2019 96,821 117,827 4,737
22/02/2019 59,150 63,010 1,825
23/02/2019 79,497 78,322 3,072
24/02/2019 47,934 42,629 239
25/02/2019 88,203 92,405 495
26/02/2019 102,558 113,970 13,143
27/02/2019 48,163 21,686 378
28/02/2019 43,721 71,290 15,473
TOTAL 1,725,883 1,720,933 118,195
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- GIRIRAJ_AFJALPUR_15MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 47,641 41,244 6,449
02/02/2019 98,037 132,527 16,644
03/02/2019 59,279 62,419 3,859
04/02/2019 35,060 15,332 124
05/02/2019 32,510 56,641 4,466
06/02/2019 59,027 71,176 24,137
07/02/2019 125,176 201,335 36,666
08/02/2019 44,653 20,753 1,712
09/02/2019 45,291 40,847 3,071
10/02/2019 35,145 18,033 69
11/02/2019 41,671 51,810 3,305
12/02/2019 56,934 59,213 7,781
13/02/2019 39,050 29,788 5,441
14/02/2019 48,444 75,885 12,189
15/02/2019 71,111 81,056 14,785
16/02/2019 65,697 69,308 15,114
17/02/2019 35,339 1,139 11
18/02/2019 43,756 30,736 1,197
19/02/2019 43,565 25,930 1,154
20/02/2019 41,116 37,789 11,214
21/02/2019 124,126 147,787 21,052
22/02/2019 96,529 93,465 9,821
23/02/2019 79,637 81,665 15,844
24/02/2019 51,587 35,089 12,120
25/02/2019 55,618 65,733 15,005
26/02/2019 92,985 127,746 26,842
27/02/2019 55,175 36,313 4,761
28/02/2019 44,578 51,515 5,758
TOTAL 1,668,737 1,762,274 280,591
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- SUZLON_III_W_AGAR_15MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 54,653 64,193 21,073
02/02/2019 67,666 78,120 6,713
03/02/2019 75,013 82,734 2,818
04/02/2019 51,153 41,384 130
05/02/2019 39,173 25,363 524
06/02/2019 43,231 41,551 2,354
07/02/2019 90,773 121,419 14,391
08/02/2019 35,479 24,058 438
09/02/2019 41,193 48,411 424
10/02/2019 41,425 39,846 3,501
11/02/2019 77,360 87,271 7,967
12/02/2019 58,876 60,146 2,428
13/02/2019 44,567 32,392 1,258
14/02/2019 63,720 69,422 4,923
15/02/2019 53,860 52,029 4,531
16/02/2019 61,963 49,036 1,141
17/02/2019 36,398 8,421 0
18/02/2019 42,977 82,182 30,999
19/02/2019 70,986 43,109 2,978
20/02/2019 38,618 39,102 3,615
21/02/2019 81,199 97,696 7,552
22/02/2019 58,975 55,171 3,963
23/02/2019 68,172 64,915 910
24/02/2019 47,732 58,481 4,764
25/02/2019 80,212 85,637 17,064
26/02/2019 101,547 83,842 22,045
27/02/2019 57,209 30,955 7,322
28/02/2019 36,767 70,279 14,686
TOTAL 1,620,897 1,637,165 190,512
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- GIRIRAJ_MANDVI_15MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 641,230 623,821 469
02/02/2019 648,484 603,246 1,275
03/02/2019 645,953 498,675 8,194
04/02/2019 576,217 428,564 11,122
05/02/2019 525,643 497,785 5,537
06/02/2019 644,356 442,793 51,078
07/02/2019 650,201 600,529 3,248
08/02/2019 694,484 643,682 0
09/02/2019 693,114 673,421 63
10/02/2019 629,401 642,834 4,107
11/02/2019 679,031 659,731 0
12/02/2019 683,483 623,882 3,364
13/02/2019 496,355 399,728 9,859
14/02/2019 641,066 488,061 18,453
15/02/2019 700,656 620,237 137
16/02/2019 725,315 697,029 2,818
17/02/2019 711,038 689,676 1,319
18/02/2019 384,769 224,821 28,284
19/02/2019 673,321 643,539 3,801
20/02/2019 623,912 648,052 2,089
21/02/2019 243,720 648,460 331,044
22/02/2019 683,516 676,991 0
23/02/2019 659,122 499,450 90,837
24/02/2019 553,097 611,421 7,227
25/02/2019 721,900 701,070 2,228
26/02/2019 318,383 551,707 202,741
27/02/2019 252,640 616,620 288,860
28/02/2019 656,076 728,446 9,278
TOTAL 16,756,483 16,384,271 1,087,432
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- WELSPUN_RATANGARH
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 47,235 35,006 4,124
02/02/2019 86,122 103,371 8,333
03/02/2019 51,586 47,547 898
04/02/2019 28,710 12,215 1
05/02/2019 33,722 44,789 1,444
06/02/2019 48,071 51,476 14,561
07/02/2019 91,874 169,995 31,726
08/02/2019 41,904 16,038 348
09/02/2019 40,012 33,785 1,216
10/02/2019 37,710 15,788 0
11/02/2019 37,432 40,450 5,131
12/02/2019 42,768 43,885 2,563
13/02/2019 36,321 24,549 7,665
14/02/2019 51,323 59,607 6,034
15/02/2019 59,593 74,382 19,923
16/02/2019 55,640 52,258 11,013
17/02/2019 30,766 862 0
18/02/2019 38,807 23,977 1,236
19/02/2019 38,925 18,503 392
20/02/2019 42,341 34,258 12,536
21/02/2019 117,526 126,804 13,856
22/02/2019 77,536 85,572 11,750
23/02/2019 79,464 73,165 13,794
24/02/2019 47,127 27,216 9,465
25/02/2019 44,098 44,785 3,415
26/02/2019 87,761 95,230 12,050
27/02/2019 47,571 29,696 2,449
28/02/2019 43,093 47,039 5,042
TOTAL 1,485,038 1,432,248 200,965
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- SUZLON_IV_W_AGAR_15MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/02/2019 43,605 17,376 1,295
02/02/2019 96,664 125,621 10,805
03/02/2019 83,110 96,150 3,191
04/02/2019 57,926 65,131 339
05/02/2019 39,474 52,662 1,447
06/02/2019 69,831 21,807 13,520
07/02/2019 140,212 146,094 17,646
08/02/2019 50,563 28,527 581
09/02/2019 47,629 39,263 489
10/02/2019 42,536 44,838 419
11/02/2019 48,810 69,895 4,452
12/02/2019 54,629 57,456 787
13/02/2019 61,751 69,611 2,217
14/02/2019 76,515 42,845 13,251
15/02/2019 50,962 56,096 2,043
16/02/2019 85,776 93,229 16,157
17/02/2019 32,058 14,098 0
18/02/2019 62,316 63,667 1,319
19/02/2019 63,897 74,439 2,991
20/02/2019 47,111 24,005 324
21/02/2019 67,297 55,877 830
22/02/2019 48,659 60,863 3,312
23/02/2019 75,491 81,971 12,579
24/02/2019 66,178 62,388 522
25/02/2019 68,569 71,500 5,177
26/02/2019 111,808 122,187 12,353
27/02/2019 88,000 71,567 4,707
28/02/2019 82,444 86,827 6,112
TOTAL 1,863,821 1,815,990 138,865
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019
NAME OF QCA :- RECONNECT
NAME OF POOLING STATION :- SUZLON_SANDALA_II_W_KHACHROD_14.7MW
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019

More Related Content

Similar to MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019

New grid connected solar photo voltaic power projects 500 mw capacity under...
New grid connected solar photo voltaic power projects 500   mw capacity under...New grid connected solar photo voltaic power projects 500   mw capacity under...
New grid connected solar photo voltaic power projects 500 mw capacity under...
ank_
 
Msedcl aar 2018-19
Msedcl aar 2018-19Msedcl aar 2018-19
Msedcl aar 2018-19
ZahidManiyar
 
RFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in PunjabRFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in Punjab
Headway Solar
 
Andhra Pradesh solar power policy 2012
Andhra Pradesh solar power policy  2012Andhra Pradesh solar power policy  2012
Andhra Pradesh solar power policy 2012Bakul Haria
 
The minimum voltage tevel for interfacing of NRSE/CPP projects with State Gri...
The minimum voltage tevel for interfacing of NRSE/CPP projects with State Gri...The minimum voltage tevel for interfacing of NRSE/CPP projects with State Gri...
The minimum voltage tevel for interfacing of NRSE/CPP projects with State Gri...
HARTEK POWER
 
Minimum Voltage Level for interfacing of NRSE/CPP Projects with State Grid
Minimum Voltage Level for interfacing of NRSE/CPP Projects with State GridMinimum Voltage Level for interfacing of NRSE/CPP Projects with State Grid
Minimum Voltage Level for interfacing of NRSE/CPP Projects with State Grid
Simarpreet H.Singh
 
Tata Power-DDL Transforming Lives !
Tata Power-DDL Transforming Lives !Tata Power-DDL Transforming Lives !
Tata Power-DDL Transforming Lives !
Tata Power Delhi Distribution Limited
 
Reply to reconnect's defamation notice - One can love it or hate it, but we r...
Reply to reconnect's defamation notice - One can love it or hate it, but we r...Reply to reconnect's defamation notice - One can love it or hate it, but we r...
Reply to reconnect's defamation notice - One can love it or hate it, but we r...
Das A. K.
 
O&M and Troubleshooting Hydro Power Plants
O&M and Troubleshooting Hydro Power PlantsO&M and Troubleshooting Hydro Power Plants
O&M and Troubleshooting Hydro Power Plants
Marcep Inc.
 
Kpcl notification
Kpcl notificationKpcl notification
Kpcl notification
razakustaad
 
CURRICULUM__VITAE_Keshari..
CURRICULUM__VITAE_Keshari..CURRICULUM__VITAE_Keshari..
CURRICULUM__VITAE_Keshari..Keshari Mishra
 
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
Harish Sharma
 
Report its
Report itsReport its
Report its
DivyanshuAgrey
 
WORKSHOP CABLE CAR SHIMLA PRESENTATION FINAL 26 JUN 2014_Dr Toshimanen Ozukum
WORKSHOP CABLE CAR SHIMLA PRESENTATION FINAL 26 JUN 2014_Dr Toshimanen OzukumWORKSHOP CABLE CAR SHIMLA PRESENTATION FINAL 26 JUN 2014_Dr Toshimanen Ozukum
WORKSHOP CABLE CAR SHIMLA PRESENTATION FINAL 26 JUN 2014_Dr Toshimanen Ozukum
IPPAI
 
LPM of Safe Solar Power.pdf
LPM of Safe Solar Power.pdfLPM of Safe Solar Power.pdf
LPM of Safe Solar Power.pdf
ssuser62f0b5
 
K045066265
K045066265K045066265
K045066265
IJERA Editor
 
E, Control & Instrumentation Engineer
E, Control & Instrumentation EngineerE, Control & Instrumentation Engineer
E, Control & Instrumentation Engineer
Satish Tumbare
 

Similar to MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019 (20)

krishnaraj CV1
krishnaraj CV1krishnaraj CV1
krishnaraj CV1
 
New grid connected solar photo voltaic power projects 500 mw capacity under...
New grid connected solar photo voltaic power projects 500   mw capacity under...New grid connected solar photo voltaic power projects 500   mw capacity under...
New grid connected solar photo voltaic power projects 500 mw capacity under...
 
Company profile
Company profileCompany profile
Company profile
 
Msedcl aar 2018-19
Msedcl aar 2018-19Msedcl aar 2018-19
Msedcl aar 2018-19
 
RFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in PunjabRFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in Punjab
 
Andhra Pradesh solar power policy 2012
Andhra Pradesh solar power policy  2012Andhra Pradesh solar power policy  2012
Andhra Pradesh solar power policy 2012
 
The minimum voltage tevel for interfacing of NRSE/CPP projects with State Gri...
The minimum voltage tevel for interfacing of NRSE/CPP projects with State Gri...The minimum voltage tevel for interfacing of NRSE/CPP projects with State Gri...
The minimum voltage tevel for interfacing of NRSE/CPP projects with State Gri...
 
Minimum Voltage Level for interfacing of NRSE/CPP Projects with State Grid
Minimum Voltage Level for interfacing of NRSE/CPP Projects with State GridMinimum Voltage Level for interfacing of NRSE/CPP Projects with State Grid
Minimum Voltage Level for interfacing of NRSE/CPP Projects with State Grid
 
Tata Power-DDL Transforming Lives !
Tata Power-DDL Transforming Lives !Tata Power-DDL Transforming Lives !
Tata Power-DDL Transforming Lives !
 
Reply to reconnect's defamation notice - One can love it or hate it, but we r...
Reply to reconnect's defamation notice - One can love it or hate it, but we r...Reply to reconnect's defamation notice - One can love it or hate it, but we r...
Reply to reconnect's defamation notice - One can love it or hate it, but we r...
 
O&M and Troubleshooting Hydro Power Plants
O&M and Troubleshooting Hydro Power PlantsO&M and Troubleshooting Hydro Power Plants
O&M and Troubleshooting Hydro Power Plants
 
Kpcl notification
Kpcl notificationKpcl notification
Kpcl notification
 
CURRICULUM__VITAE_Keshari..
CURRICULUM__VITAE_Keshari..CURRICULUM__VITAE_Keshari..
CURRICULUM__VITAE_Keshari..
 
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
 
Report its
Report itsReport its
Report its
 
WORKSHOP CABLE CAR SHIMLA PRESENTATION FINAL 26 JUN 2014_Dr Toshimanen Ozukum
WORKSHOP CABLE CAR SHIMLA PRESENTATION FINAL 26 JUN 2014_Dr Toshimanen OzukumWORKSHOP CABLE CAR SHIMLA PRESENTATION FINAL 26 JUN 2014_Dr Toshimanen Ozukum
WORKSHOP CABLE CAR SHIMLA PRESENTATION FINAL 26 JUN 2014_Dr Toshimanen Ozukum
 
LPM of Safe Solar Power.pdf
LPM of Safe Solar Power.pdfLPM of Safe Solar Power.pdf
LPM of Safe Solar Power.pdf
 
K045066265
K045066265K045066265
K045066265
 
E, Control & Instrumentation Engineer
E, Control & Instrumentation EngineerE, Control & Instrumentation Engineer
E, Control & Instrumentation Engineer
 
Akhilesh Kumar-CV
Akhilesh Kumar-CVAkhilesh Kumar-CV
Akhilesh Kumar-CV
 

More from Das A. K.

Rajasthan SLDC - RE DSM Statement -Jan 2020
Rajasthan SLDC - RE DSM Statement -Jan 2020Rajasthan SLDC - RE DSM Statement -Jan 2020
Rajasthan SLDC - RE DSM Statement -Jan 2020
Das A. K.
 
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Das A. K.
 
Rajasthan SLDC - RE DSM Statement -July 2019
Rajasthan SLDC - RE DSM Statement -July 2019Rajasthan SLDC - RE DSM Statement -July 2019
Rajasthan SLDC - RE DSM Statement -July 2019
Das A. K.
 
Rajasthan DSM April 2019
Rajasthan DSM April 2019Rajasthan DSM April 2019
Rajasthan DSM April 2019
Das A. K.
 
Rajasthan DSM May 2019
Rajasthan DSM May 2019Rajasthan DSM May 2019
Rajasthan DSM May 2019
Das A. K.
 
Rajasthan DSM June 2019
Rajasthan DSM June 2019Rajasthan DSM June 2019
Rajasthan DSM June 2019
Das A. K.
 
Actual Penalty and Deviation Settlement Mechanism (DSM) Penalty in Interstate...
Actual Penalty and Deviation Settlement Mechanism (DSM) Penalty in Interstate...Actual Penalty and Deviation Settlement Mechanism (DSM) Penalty in Interstate...
Actual Penalty and Deviation Settlement Mechanism (DSM) Penalty in Interstate...
Das A. K.
 
Statement Showing the RE DSM (Rajasthan SLDC) for the month of November-2019 ...
Statement Showing the RE DSM (Rajasthan SLDC) for the month of November-2019 ...Statement Showing the RE DSM (Rajasthan SLDC) for the month of November-2019 ...
Statement Showing the RE DSM (Rajasthan SLDC) for the month of November-2019 ...
Das A. K.
 
Draft - Rajasthan - SLDC - Deviation Settlement Account (DSM) statement Octob...
Draft - Rajasthan - SLDC - Deviation Settlement Account (DSM) statement Octob...Draft - Rajasthan - SLDC - Deviation Settlement Account (DSM) statement Octob...
Draft - Rajasthan - SLDC - Deviation Settlement Account (DSM) statement Octob...
Das A. K.
 
Gujarat SLDC - STATE DEVIATION SETTLEMENT ACCOUNT FOR THE WEEK 29-Jul-2019 ...
Gujarat SLDC - STATE DEVIATION SETTLEMENT ACCOUNT  FOR THE WEEK  29-Jul-2019 ...Gujarat SLDC - STATE DEVIATION SETTLEMENT ACCOUNT  FOR THE WEEK  29-Jul-2019 ...
Gujarat SLDC - STATE DEVIATION SETTLEMENT ACCOUNT FOR THE WEEK 29-Jul-2019 ...
Das A. K.
 
Adjudication of dispute regarding RERC (Forecasting, Scheduling, Deviation Se...
Adjudication of dispute regarding RERC (Forecasting, Scheduling, Deviation Se...Adjudication of dispute regarding RERC (Forecasting, Scheduling, Deviation Se...
Adjudication of dispute regarding RERC (Forecasting, Scheduling, Deviation Se...
Das A. K.
 
Rajasthan SLDC - Statement Showing the RE DSM for the month of October-2018 Q...
Rajasthan SLDC - Statement Showing the RE DSM for the month of October-2018 Q...Rajasthan SLDC - Statement Showing the RE DSM for the month of October-2018 Q...
Rajasthan SLDC - Statement Showing the RE DSM for the month of October-2018 Q...
Das A. K.
 
Rajasthan SLDC - Statement Showing the RE DSM for the month of November-2018 ...
Rajasthan SLDC - Statement Showing the RE DSM for the month of November-2018 ...Rajasthan SLDC - Statement Showing the RE DSM for the month of November-2018 ...
Rajasthan SLDC - Statement Showing the RE DSM for the month of November-2018 ...
Das A. K.
 
Rajasthan SLDC - Statement Showing the RE DSM for the month of December-2018 ...
Rajasthan SLDC - Statement Showing the RE DSM for the month of December-2018 ...Rajasthan SLDC - Statement Showing the RE DSM for the month of December-2018 ...
Rajasthan SLDC - Statement Showing the RE DSM for the month of December-2018 ...
Das A. K.
 
normalized parametric model for wind turbine power curve
normalized parametric model for wind turbine power curvenormalized parametric model for wind turbine power curve
normalized parametric model for wind turbine power curve
Das A. K.
 
CW / 18587 / 2018 INDIAN WIND POWER ASSOCIATION (RAJASTHAN STATE COUNCIL) Vs....
CW / 18587 / 2018 INDIAN WIND POWER ASSOCIATION (RAJASTHAN STATE COUNCIL) Vs....CW / 18587 / 2018 INDIAN WIND POWER ASSOCIATION (RAJASTHAN STATE COUNCIL) Vs....
CW / 18587 / 2018 INDIAN WIND POWER ASSOCIATION (RAJASTHAN STATE COUNCIL) Vs....
Das A. K.
 
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...
Das A. K.
 
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)
Das A. K.
 
Revised Rajasthan DSM Penalty for September 2018 (uploaded on 1st May 2019)
Revised Rajasthan DSM Penalty for September 2018 (uploaded on 1st May 2019)Revised Rajasthan DSM Penalty for September 2018 (uploaded on 1st May 2019)
Revised Rajasthan DSM Penalty for September 2018 (uploaded on 1st May 2019)
Das A. K.
 
Revised Rajasthan DSM Penalty for June 2018 (uploaded on 1st May 2019)
Revised Rajasthan DSM Penalty for June 2018 (uploaded on 1st May 2019)Revised Rajasthan DSM Penalty for June 2018 (uploaded on 1st May 2019)
Revised Rajasthan DSM Penalty for June 2018 (uploaded on 1st May 2019)
Das A. K.
 

More from Das A. K. (20)

Rajasthan SLDC - RE DSM Statement -Jan 2020
Rajasthan SLDC - RE DSM Statement -Jan 2020Rajasthan SLDC - RE DSM Statement -Jan 2020
Rajasthan SLDC - RE DSM Statement -Jan 2020
 
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
 
Rajasthan SLDC - RE DSM Statement -July 2019
Rajasthan SLDC - RE DSM Statement -July 2019Rajasthan SLDC - RE DSM Statement -July 2019
Rajasthan SLDC - RE DSM Statement -July 2019
 
Rajasthan DSM April 2019
Rajasthan DSM April 2019Rajasthan DSM April 2019
Rajasthan DSM April 2019
 
Rajasthan DSM May 2019
Rajasthan DSM May 2019Rajasthan DSM May 2019
Rajasthan DSM May 2019
 
Rajasthan DSM June 2019
Rajasthan DSM June 2019Rajasthan DSM June 2019
Rajasthan DSM June 2019
 
Actual Penalty and Deviation Settlement Mechanism (DSM) Penalty in Interstate...
Actual Penalty and Deviation Settlement Mechanism (DSM) Penalty in Interstate...Actual Penalty and Deviation Settlement Mechanism (DSM) Penalty in Interstate...
Actual Penalty and Deviation Settlement Mechanism (DSM) Penalty in Interstate...
 
Statement Showing the RE DSM (Rajasthan SLDC) for the month of November-2019 ...
Statement Showing the RE DSM (Rajasthan SLDC) for the month of November-2019 ...Statement Showing the RE DSM (Rajasthan SLDC) for the month of November-2019 ...
Statement Showing the RE DSM (Rajasthan SLDC) for the month of November-2019 ...
 
Draft - Rajasthan - SLDC - Deviation Settlement Account (DSM) statement Octob...
Draft - Rajasthan - SLDC - Deviation Settlement Account (DSM) statement Octob...Draft - Rajasthan - SLDC - Deviation Settlement Account (DSM) statement Octob...
Draft - Rajasthan - SLDC - Deviation Settlement Account (DSM) statement Octob...
 
Gujarat SLDC - STATE DEVIATION SETTLEMENT ACCOUNT FOR THE WEEK 29-Jul-2019 ...
Gujarat SLDC - STATE DEVIATION SETTLEMENT ACCOUNT  FOR THE WEEK  29-Jul-2019 ...Gujarat SLDC - STATE DEVIATION SETTLEMENT ACCOUNT  FOR THE WEEK  29-Jul-2019 ...
Gujarat SLDC - STATE DEVIATION SETTLEMENT ACCOUNT FOR THE WEEK 29-Jul-2019 ...
 
Adjudication of dispute regarding RERC (Forecasting, Scheduling, Deviation Se...
Adjudication of dispute regarding RERC (Forecasting, Scheduling, Deviation Se...Adjudication of dispute regarding RERC (Forecasting, Scheduling, Deviation Se...
Adjudication of dispute regarding RERC (Forecasting, Scheduling, Deviation Se...
 
Rajasthan SLDC - Statement Showing the RE DSM for the month of October-2018 Q...
Rajasthan SLDC - Statement Showing the RE DSM for the month of October-2018 Q...Rajasthan SLDC - Statement Showing the RE DSM for the month of October-2018 Q...
Rajasthan SLDC - Statement Showing the RE DSM for the month of October-2018 Q...
 
Rajasthan SLDC - Statement Showing the RE DSM for the month of November-2018 ...
Rajasthan SLDC - Statement Showing the RE DSM for the month of November-2018 ...Rajasthan SLDC - Statement Showing the RE DSM for the month of November-2018 ...
Rajasthan SLDC - Statement Showing the RE DSM for the month of November-2018 ...
 
Rajasthan SLDC - Statement Showing the RE DSM for the month of December-2018 ...
Rajasthan SLDC - Statement Showing the RE DSM for the month of December-2018 ...Rajasthan SLDC - Statement Showing the RE DSM for the month of December-2018 ...
Rajasthan SLDC - Statement Showing the RE DSM for the month of December-2018 ...
 
normalized parametric model for wind turbine power curve
normalized parametric model for wind turbine power curvenormalized parametric model for wind turbine power curve
normalized parametric model for wind turbine power curve
 
CW / 18587 / 2018 INDIAN WIND POWER ASSOCIATION (RAJASTHAN STATE COUNCIL) Vs....
CW / 18587 / 2018 INDIAN WIND POWER ASSOCIATION (RAJASTHAN STATE COUNCIL) Vs....CW / 18587 / 2018 INDIAN WIND POWER ASSOCIATION (RAJASTHAN STATE COUNCIL) Vs....
CW / 18587 / 2018 INDIAN WIND POWER ASSOCIATION (RAJASTHAN STATE COUNCIL) Vs....
 
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...
 
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)
 
Revised Rajasthan DSM Penalty for September 2018 (uploaded on 1st May 2019)
Revised Rajasthan DSM Penalty for September 2018 (uploaded on 1st May 2019)Revised Rajasthan DSM Penalty for September 2018 (uploaded on 1st May 2019)
Revised Rajasthan DSM Penalty for September 2018 (uploaded on 1st May 2019)
 
Revised Rajasthan DSM Penalty for June 2018 (uploaded on 1st May 2019)
Revised Rajasthan DSM Penalty for June 2018 (uploaded on 1st May 2019)Revised Rajasthan DSM Penalty for June 2018 (uploaded on 1st May 2019)
Revised Rajasthan DSM Penalty for June 2018 (uploaded on 1st May 2019)
 

Recently uploaded

SOCRadar Germany 2024 Threat Landscape Report
SOCRadar Germany 2024 Threat Landscape ReportSOCRadar Germany 2024 Threat Landscape Report
SOCRadar Germany 2024 Threat Landscape Report
SOCRadar
 
Sample_Global Non-invasive Prenatal Testing (NIPT) Market, 2019-2030.pdf
Sample_Global Non-invasive Prenatal Testing (NIPT) Market, 2019-2030.pdfSample_Global Non-invasive Prenatal Testing (NIPT) Market, 2019-2030.pdf
Sample_Global Non-invasive Prenatal Testing (NIPT) Market, 2019-2030.pdf
Linda486226
 
Investigate & Recover / StarCompliance.io / Crypto_Crimes
Investigate & Recover / StarCompliance.io / Crypto_CrimesInvestigate & Recover / StarCompliance.io / Crypto_Crimes
Investigate & Recover / StarCompliance.io / Crypto_Crimes
StarCompliance.io
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单
ewymefz
 
一比一原版(CU毕业证)卡尔顿大学毕业证成绩单
一比一原版(CU毕业证)卡尔顿大学毕业证成绩单一比一原版(CU毕业证)卡尔顿大学毕业证成绩单
一比一原版(CU毕业证)卡尔顿大学毕业证成绩单
yhkoc
 
Opendatabay - Open Data Marketplace.pptx
Opendatabay - Open Data Marketplace.pptxOpendatabay - Open Data Marketplace.pptx
Opendatabay - Open Data Marketplace.pptx
Opendatabay
 
standardisation of garbhpala offhgfffghh
standardisation of garbhpala offhgfffghhstandardisation of garbhpala offhgfffghh
standardisation of garbhpala offhgfffghh
ArpitMalhotra16
 
Chatty Kathy - UNC Bootcamp Final Project Presentation - Final Version - 5.23...
Chatty Kathy - UNC Bootcamp Final Project Presentation - Final Version - 5.23...Chatty Kathy - UNC Bootcamp Final Project Presentation - Final Version - 5.23...
Chatty Kathy - UNC Bootcamp Final Project Presentation - Final Version - 5.23...
John Andrews
 
哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样
哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样
哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样
axoqas
 
一比一原版(UVic毕业证)维多利亚大学毕业证成绩单
一比一原版(UVic毕业证)维多利亚大学毕业证成绩单一比一原版(UVic毕业证)维多利亚大学毕业证成绩单
一比一原版(UVic毕业证)维多利亚大学毕业证成绩单
ukgaet
 
The affect of service quality and online reviews on customer loyalty in the E...
The affect of service quality and online reviews on customer loyalty in the E...The affect of service quality and online reviews on customer loyalty in the E...
The affect of service quality and online reviews on customer loyalty in the E...
jerlynmaetalle
 
一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单
一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单
一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单
ewymefz
 
Criminal IP - Threat Hunting Webinar.pdf
Criminal IP - Threat Hunting Webinar.pdfCriminal IP - Threat Hunting Webinar.pdf
Criminal IP - Threat Hunting Webinar.pdf
Criminal IP
 
Malana- Gimlet Market Analysis (Portfolio 2)
Malana- Gimlet Market Analysis (Portfolio 2)Malana- Gimlet Market Analysis (Portfolio 2)
Malana- Gimlet Market Analysis (Portfolio 2)
TravisMalana
 
一比一原版(CBU毕业证)不列颠海角大学毕业证成绩单
一比一原版(CBU毕业证)不列颠海角大学毕业证成绩单一比一原版(CBU毕业证)不列颠海角大学毕业证成绩单
一比一原版(CBU毕业证)不列颠海角大学毕业证成绩单
nscud
 
一比一原版(NYU毕业证)纽约大学毕业证成绩单
一比一原版(NYU毕业证)纽约大学毕业证成绩单一比一原版(NYU毕业证)纽约大学毕业证成绩单
一比一原版(NYU毕业证)纽约大学毕业证成绩单
ewymefz
 
1.Seydhcuxhxyxhccuuxuxyxyxmisolids 2019.pptx
1.Seydhcuxhxyxhccuuxuxyxyxmisolids 2019.pptx1.Seydhcuxhxyxhccuuxuxyxyxmisolids 2019.pptx
1.Seydhcuxhxyxhccuuxuxyxyxmisolids 2019.pptx
Tiktokethiodaily
 
Best best suvichar in gujarati english meaning of this sentence as Silk road ...
Best best suvichar in gujarati english meaning of this sentence as Silk road ...Best best suvichar in gujarati english meaning of this sentence as Silk road ...
Best best suvichar in gujarati english meaning of this sentence as Silk road ...
AbhimanyuSinha9
 
一比一原版(UofM毕业证)明尼苏达大学毕业证成绩单
一比一原版(UofM毕业证)明尼苏达大学毕业证成绩单一比一原版(UofM毕业证)明尼苏达大学毕业证成绩单
一比一原版(UofM毕业证)明尼苏达大学毕业证成绩单
ewymefz
 
一比一原版(CBU毕业证)卡普顿大学毕业证成绩单
一比一原版(CBU毕业证)卡普顿大学毕业证成绩单一比一原版(CBU毕业证)卡普顿大学毕业证成绩单
一比一原版(CBU毕业证)卡普顿大学毕业证成绩单
nscud
 

Recently uploaded (20)

SOCRadar Germany 2024 Threat Landscape Report
SOCRadar Germany 2024 Threat Landscape ReportSOCRadar Germany 2024 Threat Landscape Report
SOCRadar Germany 2024 Threat Landscape Report
 
Sample_Global Non-invasive Prenatal Testing (NIPT) Market, 2019-2030.pdf
Sample_Global Non-invasive Prenatal Testing (NIPT) Market, 2019-2030.pdfSample_Global Non-invasive Prenatal Testing (NIPT) Market, 2019-2030.pdf
Sample_Global Non-invasive Prenatal Testing (NIPT) Market, 2019-2030.pdf
 
Investigate & Recover / StarCompliance.io / Crypto_Crimes
Investigate & Recover / StarCompliance.io / Crypto_CrimesInvestigate & Recover / StarCompliance.io / Crypto_Crimes
Investigate & Recover / StarCompliance.io / Crypto_Crimes
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单
 
一比一原版(CU毕业证)卡尔顿大学毕业证成绩单
一比一原版(CU毕业证)卡尔顿大学毕业证成绩单一比一原版(CU毕业证)卡尔顿大学毕业证成绩单
一比一原版(CU毕业证)卡尔顿大学毕业证成绩单
 
Opendatabay - Open Data Marketplace.pptx
Opendatabay - Open Data Marketplace.pptxOpendatabay - Open Data Marketplace.pptx
Opendatabay - Open Data Marketplace.pptx
 
standardisation of garbhpala offhgfffghh
standardisation of garbhpala offhgfffghhstandardisation of garbhpala offhgfffghh
standardisation of garbhpala offhgfffghh
 
Chatty Kathy - UNC Bootcamp Final Project Presentation - Final Version - 5.23...
Chatty Kathy - UNC Bootcamp Final Project Presentation - Final Version - 5.23...Chatty Kathy - UNC Bootcamp Final Project Presentation - Final Version - 5.23...
Chatty Kathy - UNC Bootcamp Final Project Presentation - Final Version - 5.23...
 
哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样
哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样
哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样
 
一比一原版(UVic毕业证)维多利亚大学毕业证成绩单
一比一原版(UVic毕业证)维多利亚大学毕业证成绩单一比一原版(UVic毕业证)维多利亚大学毕业证成绩单
一比一原版(UVic毕业证)维多利亚大学毕业证成绩单
 
The affect of service quality and online reviews on customer loyalty in the E...
The affect of service quality and online reviews on customer loyalty in the E...The affect of service quality and online reviews on customer loyalty in the E...
The affect of service quality and online reviews on customer loyalty in the E...
 
一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单
一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单
一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单
 
Criminal IP - Threat Hunting Webinar.pdf
Criminal IP - Threat Hunting Webinar.pdfCriminal IP - Threat Hunting Webinar.pdf
Criminal IP - Threat Hunting Webinar.pdf
 
Malana- Gimlet Market Analysis (Portfolio 2)
Malana- Gimlet Market Analysis (Portfolio 2)Malana- Gimlet Market Analysis (Portfolio 2)
Malana- Gimlet Market Analysis (Portfolio 2)
 
一比一原版(CBU毕业证)不列颠海角大学毕业证成绩单
一比一原版(CBU毕业证)不列颠海角大学毕业证成绩单一比一原版(CBU毕业证)不列颠海角大学毕业证成绩单
一比一原版(CBU毕业证)不列颠海角大学毕业证成绩单
 
一比一原版(NYU毕业证)纽约大学毕业证成绩单
一比一原版(NYU毕业证)纽约大学毕业证成绩单一比一原版(NYU毕业证)纽约大学毕业证成绩单
一比一原版(NYU毕业证)纽约大学毕业证成绩单
 
1.Seydhcuxhxyxhccuuxuxyxyxmisolids 2019.pptx
1.Seydhcuxhxyxhccuuxuxyxyxmisolids 2019.pptx1.Seydhcuxhxyxhccuuxuxyxyxmisolids 2019.pptx
1.Seydhcuxhxyxhccuuxuxyxyxmisolids 2019.pptx
 
Best best suvichar in gujarati english meaning of this sentence as Silk road ...
Best best suvichar in gujarati english meaning of this sentence as Silk road ...Best best suvichar in gujarati english meaning of this sentence as Silk road ...
Best best suvichar in gujarati english meaning of this sentence as Silk road ...
 
一比一原版(UofM毕业证)明尼苏达大学毕业证成绩单
一比一原版(UofM毕业证)明尼苏达大学毕业证成绩单一比一原版(UofM毕业证)明尼苏达大学毕业证成绩单
一比一原版(UofM毕业证)明尼苏达大学毕业证成绩单
 
一比一原版(CBU毕业证)卡普顿大学毕业证成绩单
一比一原版(CBU毕业证)卡普顿大学毕业证成绩单一比一原版(CBU毕业证)卡普顿大学毕业证成绩单
一比一原版(CBU毕业证)卡普顿大学毕业证成绩单
 

MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of February, 2019

  • 1. MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED vkbZ ,l vks : 9001-2008 ISO: 9001-2008 CIN-U40109MP2001SGC014880, Email-mdtransco.nic.in STATE LOAD DESPATCH CENTRE, Nayagaon, Rampur, Jabalpur Telephone: (0761) 2970089 Fax: (0761) 2664343 e-mail sldcmpjbp@gmail.com No.07-05/REG-201/W&S-DSM/154-A/1965 Jabalpur, dtd:-22/07/2019 As Per Distibrution List Sub: DSM Account of Wind and Solar Pooling Stations for the month of February, 2019 on the basis of MPERC (Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of Wind and Solar Generating Stations) Regulations, 2018. In pursuance to MPERC (Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of Wind and Solar Generating Stations) Regulations, 2018, SLDC has prepared the DSM Account of Wind Pooling Stations having combined installed capacity of 10MW and above and Solar Pooling Stations with an installed capacity of 5MW and above including Wind and Solar Pooling Stations selling InterState and having combined installed capcity less than 10MW and 5 MW. The ABT meter data of the following Pooling Stations has not been received by SLDC neither through AMR nor through mail from concerned Discoms, despite repeated persuance. As such, the actual generation was replaced with scheduled generation and accordingly the Deviation Charges of the Pooling Stations are computed by SLDC during the period of partially missing data. A) Partial missing data of the Pooling stations: i. 14.97MW UJAAS-I Rajgarh Biora (3rd to 28th February 2019). ii. 14.97MW UJAAS-II Rajgarh Biora (3rd to 28th February 2019). The Generators / Developers / QCA of the following Pooling stations have not furnished the Forecasting and Availability data for the month of February 2019 to the SLDC. As such, SLDC has computed the Deviation Charges of these Pooling Stations considering the Availability and Schedules as “Zero”. i. 11.95MW Wincon Jaora. The Generators of the following Pooling stations have not appoitment QCA, therefore the DSM account is issued to the Developers / Generators for settlement of deviaton charges – i. 50MW NTPC Ltd. Rajgarh. ii. 250MW Mandhsaur Solar PV Power Project (Gujarkhedi). iii. 11.95MW Wincon Jaroa. iv. 4MW Ramesh Steels. It is observed that some of the ABT meters installed at the pooling station are not time synchronized; SLDC has taken up the matter with the Generators / QCA for time synchronization. Some Generators / QCA have intimated that they have taken up the matter with meter manufacturer for time synchronization; meanwhile they have also furnished the time sync data, the time sync data furnished by the QCA / Generators has been considered for computation of Deviation Charges. However, Generators / Developers / QCA of the the following pooling stations have neither responded to SLDC request not furnished the time sync data, as such, the data recorded in the meters have been considered to compute Deviation Charges. - 1 -
  • 2. Sr. No. FEEDER NAME LOCATION NAME LOCATION VOLTAGE LEVEL METER No. QCA NAME 1 33KV BHADRESH SUSNER 132KV S/S SUSNER Grid S/s End 33 XB593639 REConnect 2 33KV UJAAS-1 AGAR 132KV S/S AGAR Grid S/s End 33 MPC59595 REConnect 3 33KV UJAAS-2 AGAR 132KV S/S AGAR Grid S/s End 33 MPC59596 REConnect The ABT meters installed at the following Solar Generating Stations are recording 15 minutes block wise data on sliding window principal instead of load survey, thus, blockwise data does not match with midnight data recorded by the meters. The midnight values are correct; this has been confirmed by M/s Secure Meters Ltd. As such, the monthly midnight data has been distributed in 15 minutes time block as per injection pattern of solar generation and accordingly the Deviation Charges have been computed. i. 12MW Avenger solar pvt Ltd. connected at 132KV S/s Suwasara. ii. 5.1MW Porwal Auto Component at 132KV S/s Makdon. As per Clause 9.0 of MPERC (Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of Wind and Solar Generating Stations) Regulations, 2018, payment to the DSM Account shall be made within 10 days from the date of issue of this statement. DSM Payments are to be made on the basis of this account only and no further invoicing is required by SLDC. Payment received after 12 days shall attract simple interest @ 0.04% for each day of delay. SLDC shall pay to the entities entitled to receive payment on account of Deviation Charges within 2 working days of receipt of the payments in the “State Deviation Pool Account”. The settlement of Deviation Charges shall be done through State Pool Account maintained by SLDC. The bank account details are as under: 1. Name of the Bank - BANK OF INDIA 2. Branch - CIVIL LINES BRANCH JABALPUR. 3. Title of the Account - MPPTCL SLDC DSM A/C 4. Bank account No - 940220110000263 5. IFS Code - BKID0009402 6. Branch Code - 9402 7. Type of Account - Current Account. All QCA’s / Generators are requested to pay the Deviation Charges to the above State Pool Account maintained by SLDC. The signed copy of the above DSM account alongwith block-wise details are being sent through email. The DSM account shall be also be made available on SLDC website www.sldcmpindia.com shortly for downloading by QCA. The verification, if required, can be done at SLDC. All the QCA’s / Generators are requested to check and verify the State DSM Account and intimate the discrepancies observed if any within a period of 15 days. Chief Engineer (LD) SLDC MPPTCL, Jabalpur - 2 -
  • 3. Distribution List 1. The Chief General Manager (Comml-3), Regional Office, MPPMCL, E-4, Arera Colony, Prakash Parisar, Near Bhojpur Club, Bhopal-462016, M.P. Jabalpur. Email – rajeevkeskar@gmail.com 2. The Chief General Manager (Comml.), MPMKVVCL, Govindpura, Bhopal, Email-ce.commercial@mpmkvvc.com, 3. The Chief Engineer (Comml.), MPPaKVVCL, GPH Compound, Polo Ground, Indore, Email- cecomwz@gmail.com, 4. The Chief Financial Officer, MPPTCL, Jabalpur. 5. The Suptdg Engineer (MT-1), Corporate Office, M.P. Pashchim Kshetra Vidyut Vitaran Co. Ltd., GPH Compound, Polo Ground, Indore. Email-achal.jain@mpwz.co.in 6. The General Manager (Comml.-III), O/o MD (CZ) MPMKVVCL, Nistha Parisar., MPMKVVCL, Govindpura, Bhopal, Email-khanooja@gmail.com, mpczc3@gmail.com 7. M/s Malwa Solar Power Generation Pvt Ltd. 4th Floor, Dr. Gopaldas Bhawan, 28, Barakhamba Road, Cannaught Place, New Delhi – 110001, Fax: 0124-4716120. India. Email:keshav.prasad@ilfsindia.com, pradeep.chauhan@ilfsindia.com. 8. M/s WAANPEEP Solar Pvt. Ltd., 602, Western Edge-I, Western Express Highway, Borivali (E), Mumbai-400066, Fax: 022-66444400, Email- kamalmarwah@waaneep.com 9. M/s Focal Energy Solar One India Pvt Ltd., 308 Third Floor, Rectangle One Building D-4, Commercial Complex, Saket, New Delhi -110017, Fax -011-41704901, Email – kvikas@focal_energy.com 10. M/s Focal Renewable Energy Two India Pvt Ltd., 308, third Floor, Rectangle One Building D-4, Commercial Complex, Saket, New Delhi -110017, Fax -011-41704901, Email – kvikas@focal_energy.com 11. M/s Solar EnrgyCorroration Of India, D-3, First Floor , Wing-a, ReligareBuliding, Distrcit Centre , Saket, New Delhi 110017,Fax-011-71989244, Email – corporate@seci.gov.in 12. M/s Manikaran Analytics Ltd., 2nd Floor, D21, Corporate Park, Sector-21, Dwarika, New Delhi – 110075 , Email – contactus@manikarananalytics.in,rakesh@manikarananalytics.in, bd.mp@manikarananalytics.in 13. M/s Reconnect Energy Pvt. Ltd. C-301,Nirvana Courtyard, Nirvana Country Sector 50, Gurgaon 122018 H ,Email – info@reconnectenergy.com, mithun.dubey@reconnectenergy.com,piyush.joshi@reconnectenergy.com 14. M/s Statkraft Markets Private Ltd., 403, 4th Floor, SalconRasvilas Building, Saket District Centre, New Delhi – 110017, Email – anwar.alam@statkraft.com 15. M/s ACME Solar Energy (MP) Private Ltd., Plot No.152, Sector-44, Gurgaon-122002(Haryana), Email – planthead.khilchipur.solar@acme.in 16. M/s Alfa Infraprop Pvt Ltd., NamanMidtown,’A’ Wing, 21st Floor, Senapati Bapat Marg, Elephinstone Road West, Mumbai-400013, Email –Sanjay.Shah@alfainfraprop.com 17. M/s Regent Climate Connect Knowledge Solutions Pvt Ltd., Appt. 215, Green Tower Society, Plot 7 C, Sector-23, Dwarka, New Delhi-110075Email - info@climate-connect.com, Pranav.vohra@climate-connect.com 18. M/s NTPC Ltd., E-1/72, Arera Colony, Bhopal – 462016, M.P. EMAIL:- pbvenkatesh@ntpc.co.in 19. M/s Mandsaur Solar PV Project, NTPC -Shamgarh,dist- Mandsaur, Dimple Chauraha, Garaut Road, In front of Swaraj Tractor, Shamgarh – 458883.MP, Email – skdutta03@ntpc.co.in, pbvenkatesh@ntpc.co.in 20. M/s M.P. WIND FARM NAGDA HILL, ENERGY TOWER, 64, B-Sector, Kasturba Nagar,Bhopal-462023, Email- info@cecl.in, windpoweindia@gmail.com,mpwlindia@gmail.com 21. M/s Globus Steel & Power Pvt. Ltd, 308, Third Floor, Rectangle One Building, D-4, Commercial Complex, Saket N.Delhi-110017, Email: kvikas@focal-energy.com 22. M/s PoineerWincomTamaraiTechpark, 7th Floor, S.P. Plot No. 16-20 and 20A, Thiru Vi Ka Industrial Etate,Enerring Road, Guindy, Chainai -600032 ,Email-mp@poineerwincom.com 23. M/s Designco Manufacturer & Exporter, LakriFazalpur, Delhi Road, Moradabad-244001, Email: info@designco-india.com, vivekasthana.79@gmail.com 24. M/s Mittal Processor Pvt. Ltd, 1002-1004, Antriksh Bhawan, 22K. G. Marg, Cannought Place, New Delhi -110001, email – Mayank.gupta@kreatenergy.com, controlroom@mittalgroup.com – (On behalf of M/s Ramesh Steels). 25. M/s Vedenjay Power Pvt Ltd., Plot No.4/F/53, Above BOI-Bank, Nai Sadak, Scheme No.78, B Road, Indore- 452010, Email – vedanjaypower@gmail.com 26. M/s Focal Energy Solar One India Pvt. Ltd. Unit No. 601 & 602, 6th Floor, Tower B, Emaar Digital Greens Sector 61, Golf Course Ext. Road , Gurgaon 122002 27. M/s Kreate Technologies LLP 1003,10th Floor Anthriksh Bhavan, 22‐ KG Marg, New Delhi 110001  Email-mithilesh.yadav@kreatetechnologies.com - 3 -
  • 5. All Figures in ` INTRA STATE DEVIATION CHARGES PAYABLE PAYABLE RECEIVABLE FOCAL ENERGY SOLAR ONE INDIA Pvt. Ltd. 43,338 256,077 - 299,415 40MW_MALWA (IL&FS_Solar) - - 9,415 9,415 Ramesh_Steels_Pachama_Ganj_Basoda - - 36,451 36,451 MANIKARAN ANALYTICS LTD. 6,994,777 - 662,375 6,332,402 ACME SOLAR ENERGY PVT. LTD. 42,250 - - 42,250 ALFA INFRAPROP PVT LTD 11,934 - - 11,934 MANDSAUR_SOLAR_POWER_SOLAR_220_GUJARKHEDI 1,031,293 - - 1,031,293 NTPC_RAJGARH 28,005 - - 28,005 WINCON_W_JAORA_11.95MW 68,765 - - 68,765 RECONNECT ENERGY SOLUTIONS PVT LTD. 30,329,550 - - 30,329,550 REGENT CLIMATE CONNECT KNOWLEDGE SOLUTIONS PVT. LTD 41,353 - - 41,353 STATKRAFT MARKETS PVT LTD. 2,341,492 - - 2,341,492 KREATE TECHNOLOGIES LLP 19,570 - - 19,570 VEDANJAY POWER 93,792 - - 93,792 TOTAL 41,046,119 256,077 708,241 40,593,955 () RECEIVABLE Assistant Engineer(LD) Executive Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY QCA / DEVELOPERS / GENERATOR NET DSM RECEIVABLE/PAYABLE INTER STATE DEVIATION CHARGES STATE LOAD DESPATCH CENTRE - JABALPUR QCA WISE SUMMERY REPORT OF DEVIATION CHARGES OF WIND & SOLAR POOLING STATIONS FOR FEBRUARY-2019
  • 6. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 63,373 61,230 11,797 02/02/2019 58,134 56,172 10,805 03/02/2019 56,974 45,957 60,939 04/02/2019 49,663 38,623 62,469 05/02/2019 48,570 45,335 18,655 06/02/2019 48,448 36,395 69,833 07/02/2019 51,277 64,424 -70,500 08/02/2019 60,177 63,618 -18,914 09/02/2019 61,319 67,811 -35,691 10/02/2019 65,338 67,025 -9,267 11/02/2019 59,687 65,457 -31,448 12/02/2019 63,522 59,603 21,573 13/02/2019 54,469 32,359 129,866 14/02/2019 49,542 55,590 -31,580 15/02/2019 58,167 59,119 -5,226 16/02/2019 59,391 66,021 -36,439 17/02/2019 62,349 68,262 -32,346 18/02/2019 52,586 20,272 198,829 19/02/2019 58,385 63,169 -26,237 20/02/2019 59,323 63,530 -23,125 21/02/2019 59,424 61,939 -13,822 22/02/2019 59,298 62,485 -17,518 23/02/2019 58,960 47,176 69,536 24/02/2019 54,053 57,806 -20,149 25/02/2019 58,852 63,291 -22,160 26/02/2019 60,640 59,586 6,448 27/02/2019 59,577 61,595 -10,842 28/02/2019 58,443 68,791 -56,891 TOTAL 1,609,941 1,582,641 198,595 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur NAME OF POOLING STATION :- M/s FOCAL RENEWABLE ENERGY TWO INDIA PVT. LTD. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :-MANIKARAN
  • 7. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 101,718 105,242 -19,371 02/02/2019 107,147 96,931 56,201 03/02/2019 100,049 81,111 104,171 04/02/2019 81,438 69,174 67,772 05/02/2019 61,366 80,866 -104,806 06/02/2019 75,328 66,197 50,999 07/02/2019 85,392 110,042 -130,384 08/02/2019 111,445 108,575 15,795 09/02/2019 109,623 115,541 -32,537 10/02/2019 115,788 114,228 8,589 11/02/2019 113,162 112,080 5,962 12/02/2019 111,568 103,393 44,982 13/02/2019 83,069 59,962 128,894 14/02/2019 80,917 102,748 -114,160 15/02/2019 110,263 106,293 21,846 16/02/2019 112,487 117,749 -28,930 17/02/2019 120,765 122,230 -8,047 18/02/2019 87,903 40,161 290,361 19/02/2019 102,089 114,665 -67,364 20/02/2019 105,754 114,789 -48,776 21/02/2019 114,667 111,249 18,812 22/02/2019 114,136 113,160 5,378 23/02/2019 115,990 86,303 172,316 24/02/2019 82,504 105,726 -125,103 25/02/2019 113,987 116,301 -11,407 26/02/2019 113,493 110,069 19,223 27/02/2019 113,218 112,649 4,653 28/02/2019 112,027 124,573 -68,992 TOTAL 2,857,293 2,822,007 256,077 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur NAME OF POOLING STATION :- M/s FOCAL ENERGY SOLAR ONE INDIA PVT. LTD. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :-FOCAL ENERGY SOLAR ONE INDIA PVT. LTD.
  • 8. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 270,453 243,416 148,714 02/02/2019 266,217 237,564 158,239 03/02/2019 215,116 192,720 123,258 04/02/2019 202,376 171,336 176,055 05/02/2019 183,172 192,752 -52,676 06/02/2019 197,494 178,436 107,955 07/02/2019 212,976 253,362 -218,195 08/02/2019 233,243 268,766 -195,337 09/02/2019 247,124 284,974 -206,989 10/02/2019 259,329 275,870 -90,567 11/02/2019 270,273 274,474 -23,095 12/02/2019 264,911 252,104 70,447 13/02/2019 216,852 128,432 515,288 14/02/2019 212,904 215,334 -11,878 15/02/2019 239,118 248,224 -50,071 16/02/2019 239,118 278,472 -216,019 17/02/2019 261,237 289,966 -157,924 18/02/2019 193,510 97,708 577,514 19/02/2019 256,714 268,596 -65,342 20/02/2019 256,714 271,848 -83,228 21/02/2019 256,714 257,124 -2,246 22/02/2019 256,714 275,650 -104,139 23/02/2019 242,259 245,534 -16,442 24/02/2019 240,425 235,690 30,166 25/02/2019 257,016 289,306 -177,498 26/02/2019 260,267 268,030 -42,460 27/02/2019 256,049 257,064 -3,880 28/02/2019 256,242 292,438 -199,065 TOTAL 6,724,537 6,745,190 -9,415 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur NAME OF POOLING STATION :- M/s Malwa Solar Power Generation Ltd.(IL and FS) STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- NOT QCA APPOINTMENT
  • 9. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 296,649 271,040 140,892 02/02/2019 270,187 253,530 91,624 03/02/2019 260,014 233,560 145,537 04/02/2019 256,253 263,780 -41,317 05/02/2019 254,179 260,350 -33,928 06/02/2019 264,455 243,320 117,119 07/02/2019 255,824 309,560 -291,076 08/02/2019 287,038 319,500 -178,531 09/02/2019 304,632 339,490 -191,706 10/02/2019 321,895 332,890 -60,456 11/02/2019 303,120 318,790 -86,176 12/02/2019 306,184 294,730 63,009 13/02/2019 265,549 235,080 169,050 14/02/2019 241,179 244,710 -18,265 15/02/2019 270,206 299,030 -158,518 16/02/2019 287,837 306,810 -104,341 17/02/2019 305,512 348,320 -234,163 18/02/2019 270,258 246,970 136,485 19/02/2019 296,280 314,370 -99,483 20/02/2019 302,001 314,150 -66,811 21/02/2019 285,597 294,990 -50,738 22/02/2019 295,222 329,040 -185,990 23/02/2019 301,214 308,060 -33,720 24/02/2019 229,629 188,200 246,608 25/02/2019 308,754 348,050 -216,117 26/02/2019 304,125 295,300 50,810 27/02/2019 293,421 256,220 222,951 28/02/2019 310,026 345,250 -193,719 TOTAL 7,947,240 8,115,090 -860,970 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur NAME OF POOLING STATION :- M/s WAANEEP Solar Pvt. Ltd STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :-MANIKARAN
  • 10. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 22,197 20,489 6,230 02/02/2019 20,027 19,855 836 03/02/2019 20,232 17,628 9,484 04/02/2019 20,401 18,786 6,168 05/02/2019 17,719 19,433 -5,696 06/02/2019 19,458 17,619 6,649 07/02/2019 18,340 20,859 -8,560 08/02/2019 17,486 24,335 -23,140 09/02/2019 19,910 24,302 -14,804 10/02/2019 20,461 24,772 -14,814 11/02/2019 20,998 23,690 -9,318 12/02/2019 21,103 21,766 -2,300 13/02/2019 22,266 16,949 19,493 14/02/2019 22,589 16,450 23,408 15/02/2019 17,903 23,018 -16,797 16/02/2019 15,254 23,731 -27,057 17/02/2019 22,369 26,575 -13,290 18/02/2019 22,199 12,850 37,046 19/02/2019 22,672 24,087 -4,598 20/02/2019 14,576 24,064 -31,015 21/02/2019 22,860 22,808 582 22/02/2019 22,860 24,561 -5,584 23/02/2019 23,521 22,351 4,676 24/02/2019 23,760 14,563 35,173 25/02/2019 21,955 25,102 -10,333 26/02/2019 23,341 21,124 9,061 27/02/2019 23,341 20,530 11,499 28/02/2019 21,207 27,303 -19,450 TOTAL 581,005 599,600 -36,451 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur NAME OF POOLING STATION :- Ramesh_Steels_Pachama_Ganj_Basoda STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :-NOT QCA APPOINTMENT
  • 11. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 133,599 142,533 0 02/02/2019 132,868 140,846 0 03/02/2019 114,368 101,510 3,643 04/02/2019 113,497 121,431 673 05/02/2019 128,404 122,246 731 06/02/2019 119,386 106,332 479 07/02/2019 139,186 158,435 0 08/02/2019 135,614 156,869 22 09/02/2019 146,765 174,349 119 10/02/2019 144,227 170,703 168 11/02/2019 144,695 165,243 0 12/02/2019 137,866 151,717 0 13/02/2019 117,045 92,756 3,325 14/02/2019 118,124 113,786 2,425 15/02/2019 137,887 147,864 206 16/02/2019 140,699 164,996 218 17/02/2019 148,573 175,938 133 18/02/2019 61,499 64,140 10,473 19/02/2019 141,906 161,778 40 20/02/2019 139,408 163,823 0 21/02/2019 133,873 146,267 0 22/02/2019 145,034 165,532 0 23/02/2019 134,679 141,028 1,274 24/02/2019 115,952 132,375 17,800 25/02/2019 147,752 172,978 13 26/02/2019 143,028 158,207 51 27/02/2019 143,801 153,706 457 28/02/2019 155,906 178,735 0 TOTAL 3,715,641 4,046,123 42,250 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- ACME SOLAR ENERGY PVT. LTD. NAME OF POOLING STATION :- ACME_KHILCHIPUR
  • 12. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 114,332 100,268 213 02/02/2019 110,671 96,791 51 03/02/2019 105,800 86,838 857 04/02/2019 91,061 85,884 6 05/02/2019 88,989 86,732 0 06/02/2019 88,989 81,866 176 07/02/2019 108,983 117,469 0 08/02/2019 110,443 116,939 102 09/02/2019 110,443 122,663 180 10/02/2019 110,278 121,557 154 11/02/2019 121,085 116,821 0 12/02/2019 121,075 107,815 0 13/02/2019 93,816 74,668 4,163 14/02/2019 90,898 102,106 169 15/02/2019 117,286 114,928 0 16/02/2019 111,085 114,495 0 17/02/2019 111,072 120,249 0 18/02/2019 111,072 120,976 0 19/02/2019 111,072 116,341 0 20/02/2019 111,072 114,403 0 21/02/2019 111,120 110,261 0 22/02/2019 111,072 121,281 0 23/02/2019 111,072 115,189 531 24/02/2019 111,072 100,572 4,279 25/02/2019 111,285 125,550 0 26/02/2019 111,072 124,351 0 27/02/2019 107,618 108,705 1,053 28/02/2019 111,072 127,817 0 TOTAL 3,024,905 3,053,535 11,934 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- ALFA INFRAPROP PVT LTD NAME OF POOLING STATION :- ALPHA_KUKSHI
  • 13. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 112,427 115,310 0 02/02/2019 117,965 107,479 0 03/02/2019 106,844 90,372 53 04/02/2019 89,656 77,734 219 05/02/2019 67,136 89,509 3,835 06/02/2019 85,084 70,963 1,596 07/02/2019 98,776 119,873 317 08/02/2019 120,754 118,595 0 09/02/2019 119,558 125,226 0 10/02/2019 123,556 124,731 0 11/02/2019 123,895 120,286 0 12/02/2019 119,033 110,296 143 13/02/2019 88,259 65,043 3,442 14/02/2019 85,230 111,291 2,037 15/02/2019 121,725 116,137 0 16/02/2019 125,555 128,611 0 17/02/2019 128,311 131,695 0 18/02/2019 70,789 31,998 13,822 19/02/2019 116,142 124,108 485 20/02/2019 123,423 124,911 9 21/02/2019 126,773 121,941 0 22/02/2019 127,412 121,953 238 23/02/2019 126,395 97,945 7,962 24/02/2019 97,640 117,884 554 25/02/2019 127,894 124,331 4,298 26/02/2019 124,030 117,121 647 27/02/2019 126,647 117,374 3,681 28/02/2019 123,092 135,536 0 TOTAL 3,124,001 3,058,253 43,338 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- Focal Energy Solar One India Pvt. Ltd. NAME OF POOLING STATION :- GLOBUS_STEEL_S_SITAMAU_20MW
  • 14. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 79,691 71,678 0 02/02/2019 82,238 66,825 217 03/02/2019 76,496 59,336 1,899 04/02/2019 74,766 64,160 0 05/02/2019 67,117 65,854 12 06/02/2019 62,794 57,960 1,010 07/02/2019 75,636 71,111 0 08/02/2019 85,672 82,513 0 09/02/2019 86,180 86,506 0 10/02/2019 87,117 84,305 0 11/02/2019 83,277 81,732 0 12/02/2019 84,045 77,234 0 13/02/2019 77,740 59,223 1,708 14/02/2019 70,470 59,944 434 15/02/2019 74,557 79,293 0 16/02/2019 86,520 82,200 0 17/02/2019 87,591 92,812 0 18/02/2019 66,666 45,629 8,151 19/02/2019 83,561 84,476 0 20/02/2019 83,034 83,061 0 21/02/2019 73,172 78,835 182 22/02/2019 83,505 85,835 0 23/02/2019 86,218 77,107 2,291 24/02/2019 41,415 48,608 1,085 25/02/2019 89,119 88,668 0 26/02/2019 74,749 80,219 286 27/02/2019 72,788 65,931 2,295 28/02/2019 91,093 93,943 0 TOTAL 2,187,227 2,074,998 19,570 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- KREATE TECHNOLOGIES NAME OF POOLING STATION :- Made_Easy_Education__SIMCON_EASTMAN_
  • 15. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 50,757 40,131 6,543 02/02/2019 64,780 50,628 885 03/02/2019 62,373 60,258 2,238 04/02/2019 53,265 22,707 1,325 05/02/2019 45,760 17,457 1,967 06/02/2019 38,068 33,845 1,800 07/02/2019 122,809 117,093 11,873 08/02/2019 46,604 17,513 890 09/02/2019 42,303 20,588 7 10/02/2019 42,881 28,500 1,808 11/02/2019 59,475 48,814 2,189 12/02/2019 55,920 39,823 1,405 13/02/2019 53,359 16,037 739 14/02/2019 53,661 46,226 2,221 15/02/2019 51,148 32,753 1,733 16/02/2019 48,895 28,913 567 17/02/2019 33,784 780 0 18/02/2019 56,961 47,673 10,211 19/02/2019 55,199 32,482 2,122 20/02/2019 43,280 9,551 0 21/02/2019 58,060 61,487 2,587 22/02/2019 44,119 22,468 1,442 23/02/2019 52,176 37,891 761 24/02/2019 51,046 36,174 2,398 25/02/2019 55,962 49,248 5,616 26/02/2019 79,667 71,028 5,826 27/02/2019 47,369 29,429 881 28/02/2019 42,213 40,904 4,891 TOTAL 1,511,894 1,060,401 74,925 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- SUZLON_IV_W_JAORA_13.5MW
  • 16. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 67,510 63,882 0 02/02/2019 61,719 57,990 0 03/02/2019 59,944 54,000 481 04/02/2019 64,877 61,886 0 05/02/2019 63,198 60,300 0 06/02/2019 61,404 56,980 66 07/02/2019 62,878 70,140 0 08/02/2019 63,992 71,060 0 09/02/2019 66,694 77,424 0 10/02/2019 72,480 76,108 0 11/02/2019 74,879 72,468 0 12/02/2019 71,424 67,140 0 13/02/2019 58,983 55,052 119 14/02/2019 52,346 57,264 15 15/02/2019 66,405 35,876 28,710 16/02/2019 68,426 71,268 0 17/02/2019 69,637 80,066 0 18/02/2019 62,946 56,190 1,967 19/02/2019 69,206 72,250 0 20/02/2019 75,403 72,262 0 21/02/2019 67,578 68,450 0 22/02/2019 70,038 76,010 0 23/02/2019 72,628 71,476 272 24/02/2019 55,389 48,356 1,895 25/02/2019 70,867 80,170 0 26/02/2019 67,387 71,708 0 27/02/2019 65,055 58,650 1,207 28/02/2019 71,347 79,912 0 TOTAL 1,854,640 1,844,338 34,732 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- M&B_ICHHAWAR-II
  • 17. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 44,336 29,616 2,201 02/02/2019 76,332 80,231 2,490 03/02/2019 56,939 44,945 661 04/02/2019 48,489 19,880 1,211 05/02/2019 43,356 41,125 1,294 06/02/2019 38,577 49,336 12,944 07/02/2019 130,901 145,834 7,592 08/02/2019 46,904 16,724 2,085 09/02/2019 43,416 36,949 96 10/02/2019 40,621 19,952 0 11/02/2019 45,721 43,980 1,669 12/02/2019 56,623 45,300 1,675 13/02/2019 47,641 31,397 2,173 14/02/2019 47,087 52,848 951 15/02/2019 52,911 56,949 13,511 16/02/2019 50,081 55,672 16,577 17/02/2019 31,646 6,460 0 18/02/2019 37,412 29,354 80 19/02/2019 46,483 27,802 356 20/02/2019 37,769 24,336 1,300 21/02/2019 75,498 101,170 10,347 22/02/2019 61,869 70,123 9,603 23/02/2019 51,366 54,426 1,685 24/02/2019 52,964 24,466 6,147 25/02/2019 52,898 46,409 7,844 26/02/2019 70,027 69,975 15,472 27/02/2019 24,315 15,669 1,011 28/02/2019 36,323 40,472 2,414 TOTAL 1,448,505 1,281,400 123,389 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- WIND WORLD AGAR-I
  • 18. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 54,053 33,902 6,028 02/02/2019 59,753 48,915 313 03/02/2019 64,576 56,951 1,322 04/02/2019 42,610 25,413 0 05/02/2019 43,726 15,863 560 06/02/2019 39,237 27,908 3,275 07/02/2019 107,649 99,599 12,990 08/02/2019 48,018 14,675 1,290 09/02/2019 39,356 21,788 248 10/02/2019 41,889 27,616 368 11/02/2019 51,767 49,588 1,197 12/02/2019 54,683 37,030 1,016 13/02/2019 40,370 15,171 420 14/02/2019 58,797 34,725 2,277 15/02/2019 50,753 31,113 4,244 16/02/2019 50,496 29,135 436 17/02/2019 32,706 1,483 0 18/02/2019 49,267 44,288 2,746 19/02/2019 54,389 26,692 3,924 20/02/2019 38,985 6,571 28 21/02/2019 65,413 59,449 617 22/02/2019 44,024 20,815 1,074 23/02/2019 49,976 39,301 704 24/02/2019 47,456 31,562 745 25/02/2019 62,267 43,683 3,742 26/02/2019 78,732 62,611 4,907 27/02/2019 51,445 35,012 2,637 28/02/2019 41,790 42,943 5,828 TOTAL 1,464,183 983,802 62,936 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- SUZLON_V_W_JAORA_12MW
  • 19. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 288,271 271,830 14 02/02/2019 280,616 257,390 1,006 03/02/2019 258,647 225,460 8,690 04/02/2019 264,830 251,780 123 05/02/2019 273,093 244,750 3,743 06/02/2019 264,875 244,090 3,180 07/02/2019 293,023 330,630 3,990 08/02/2019 307,794 338,610 0 09/02/2019 321,826 361,320 0 10/02/2019 342,907 348,310 0 11/02/2019 334,082 327,430 0 12/02/2019 299,807 273,770 1,328 13/02/2019 283,119 195,140 30,017 14/02/2019 265,904 259,550 0 15/02/2019 276,792 301,380 0 16/02/2019 304,544 322,580 0 17/02/2019 319,672 356,940 328 18/02/2019 334,021 348,720 0 19/02/2019 318,980 340,150 0 20/02/2019 298,343 306,270 0 21/02/2019 293,145 301,620 0 22/02/2019 293,017 323,080 0 23/02/2019 308,951 322,780 989 24/02/2019 224,275 260,060 20,388 25/02/2019 332,936 375,120 0 26/02/2019 341,845 350,990 0 27/02/2019 317,377 318,310 6,957 28/02/2019 341,702 375,050 0 TOTAL 8,384,394 8,533,110 80,753 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- SKY_POWER_SOLAR_132_CHHEGAON
  • 20. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 192,162 115,676 541 02/02/2019 324,145 384,294 9,233 03/02/2019 266,004 211,259 52 04/02/2019 193,306 153,769 0 05/02/2019 210,816 216,205 2,267 06/02/2019 217,573 265,117 8,557 07/02/2019 327,808 377,159 5,700 08/02/2019 237,215 193,336 2,245 09/02/2019 253,390 253,790 300 10/02/2019 214,784 152,994 1,324 11/02/2019 242,096 231,956 115 12/02/2019 225,282 195,490 3,756 13/02/2019 259,110 229,578 992 14/02/2019 202,984 137,432 2,687 15/02/2019 258,519 183,997 4,031 16/02/2019 237,238 206,241 2,922 17/02/2019 237,238 111,782 1,090 18/02/2019 146,594 81,226 852 19/02/2019 210,867 130,252 927 20/02/2019 197,806 83,167 0 21/02/2019 283,964 274,948 477 22/02/2019 214,170 121,109 437 23/02/2019 232,194 177,448 0 24/02/2019 236,957 220,815 8,226 25/02/2019 352,501 326,335 4,275 26/02/2019 366,594 362,443 26,640 27/02/2019 346,198 331,460 6,700 28/02/2019 223,368 226,834 10,819 TOTAL 6,910,883 5,956,112 105,165 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- WIND_WORLD_III_WIND_132_CHAPDA
  • 21. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 91,106 100,549 22,406 02/02/2019 261,931 310,884 13,781 03/02/2019 231,648 259,535 37,960 04/02/2019 196,752 156,049 10,645 05/02/2019 97,141 105,264 13,298 06/02/2019 85,277 97,006 22,540 07/02/2019 377,348 418,216 16,639 08/02/2019 121,690 44,749 26,237 09/02/2019 136,981 122,858 10,221 10/02/2019 92,194 95,729 12,901 11/02/2019 205,937 251,802 36,897 12/02/2019 282,930 291,278 39,109 13/02/2019 209,236 187,668 42,971 14/02/2019 180,669 226,818 51,802 15/02/2019 168,183 174,501 44,707 16/02/2019 174,362 233,789 51,339 17/02/2019 75,134 6,761 4,478 18/02/2019 90,656 89,737 6,053 19/02/2019 118,620 112,579 4,468 20/02/2019 104,857 157,941 43,637 21/02/2019 316,763 367,770 48,462 22/02/2019 179,323 186,045 33,193 23/02/2019 227,068 227,286 14,634 24/02/2019 106,557 71,553 42,890 25/02/2019 137,187 152,535 22,260 26/02/2019 233,573 240,071 54,345 27/02/2019 94,772 65,695 13,606 28/02/2019 155,722 203,964 48,241 TOTAL 4,753,617 4,958,632 789,720 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- SUZLON_GUJRAT_WIND_33_BADOD
  • 22. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 344,766 312,910 0 02/02/2019 311,506 312,430 0 03/02/2019 333,737 264,340 5,869 04/02/2019 291,201 279,710 0 05/02/2019 306,901 285,910 0 06/02/2019 293,136 261,110 9,555 07/02/2019 309,179 354,000 1,845 08/02/2019 318,938 363,630 0 09/02/2019 334,019 376,810 7 10/02/2019 361,591 359,810 2,886 11/02/2019 340,908 347,450 1,467 12/02/2019 344,640 339,940 0 13/02/2019 321,766 301,260 275 14/02/2019 205,038 187,690 42,253 15/02/2019 320,573 316,500 945 16/02/2019 330,724 367,540 144 17/02/2019 344,564 375,730 0 18/02/2019 293,625 240,040 18,844 19/02/2019 343,418 357,010 0 20/02/2019 340,927 361,800 40 21/02/2019 327,012 320,440 696 22/02/2019 339,367 360,830 0 23/02/2019 344,567 337,850 6,219 24/02/2019 264,786 243,460 14,288 25/02/2019 333,298 368,360 336 26/02/2019 332,493 333,390 4,380 27/02/2019 322,928 332,730 2,452 28/02/2019 332,274 388,770 2,077 TOTAL 8,987,882 9,051,450 114,578 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- RENEW_CLEAN_SOLAR_132_KOTHIYA
  • 23. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 30,377 26,678 0 02/02/2019 26,982 25,328 0 03/02/2019 24,488 20,245 1,144 04/02/2019 25,181 24,943 0 05/02/2019 24,216 24,409 4 06/02/2019 22,344 23,251 93 07/02/2019 25,831 29,954 195 08/02/2019 28,390 27,860 2,266 09/02/2019 28,726 31,765 0 10/02/2019 30,008 31,456 0 11/02/2019 28,232 30,506 0 12/02/2019 27,320 28,280 18 13/02/2019 27,014 21,449 1,082 14/02/2019 22,976 25,672 299 15/02/2019 27,333 30,565 192 16/02/2019 28,549 31,593 76 17/02/2019 30,463 34,974 140 18/02/2019 28,002 23,988 2,557 19/02/2019 30,163 31,215 47 20/02/2019 30,540 31,790 0 21/02/2019 28,103 29,289 1 22/02/2019 30,197 32,552 0 23/02/2019 31,648 28,761 1,046 24/02/2019 26,533 21,809 2,447 25/02/2019 31,428 34,667 21 26/02/2019 30,873 31,347 201 27/02/2019 30,231 27,860 1,107 28/02/2019 30,890 35,345 111 TOTAL 787,038 797,551 13,047 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- DESIGNCO_MANF_EXP_1_S_ARNIYAKALA_5MW
  • 24. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 60,411 59,971 0 02/02/2019 59,082 58,995 0 03/02/2019 55,311 46,957 0 04/02/2019 45,770 42,367 2,253 05/02/2019 53,509 47,667 267 06/02/2019 53,097 44,908 373 07/02/2019 59,638 63,585 11 08/02/2019 61,031 67,070 0 09/02/2019 66,068 71,203 0 10/02/2019 70,282 69,940 199 11/02/2019 69,504 68,936 0 12/02/2019 67,742 63,196 0 13/02/2019 58,733 32,373 8,224 14/02/2019 52,792 56,507 12 15/02/2019 67,557 63,829 191 16/02/2019 68,186 72,295 0 17/02/2019 69,179 75,156 174 18/02/2019 50,438 25,906 7,460 19/02/2019 65,248 69,752 0 20/02/2019 66,684 70,967 57 21/02/2019 67,221 67,329 0 22/02/2019 66,926 71,817 28 23/02/2019 70,494 66,801 438 24/02/2019 62,005 60,065 2,560 25/02/2019 69,709 75,270 0 26/02/2019 68,346 71,094 0 27/02/2019 68,629 64,735 807 28/02/2019 69,653 74,411 0 TOTAL 1,763,245 1,723,102 23,054 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- M&B_BAROD_II
  • 25. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 28,470 27,666 0 02/02/2019 28,995 27,150 0 03/02/2019 29,225 19,357 3,640 04/02/2019 28,470 21,507 1,646 05/02/2019 25,700 23,869 15 06/02/2019 21,265 22,802 9 07/02/2019 22,200 31,121 849 08/02/2019 28,400 30,773 0 09/02/2019 28,400 33,508 57 10/02/2019 28,400 32,834 18 11/02/2019 24,550 31,805 681 12/02/2019 24,550 29,468 187 13/02/2019 27,885 18,328 2,804 14/02/2019 30,000 26,071 244 15/02/2019 30,000 25,204 2,740 16/02/2019 30,000 31,664 0 17/02/2019 30,000 34,017 0 18/02/2019 30,000 17,934 6,199 19/02/2019 30,000 31,721 0 20/02/2019 30,000 32,083 0 21/02/2019 30,000 30,158 0 22/02/2019 30,000 32,495 0 23/02/2019 25,534 30,774 182 24/02/2019 25,534 26,197 284 25/02/2019 30,000 34,440 0 26/02/2019 25,534 32,733 425 27/02/2019 30,000 27,713 297 28/02/2019 30,000 35,140 0 TOTAL 783,112 798,532 20,277 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- PORWAL_AUTO_MAKDON
  • 26. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 62,611 61,735 0 02/02/2019 61,787 56,617 2 03/02/2019 58,447 46,430 677 04/02/2019 45,857 38,891 3,319 05/02/2019 50,233 45,760 60 06/02/2019 46,290 36,867 2,202 07/02/2019 53,422 65,318 1,918 08/02/2019 62,809 64,274 0 09/02/2019 61,691 68,589 31 10/02/2019 65,773 67,538 21 11/02/2019 58,929 65,565 339 12/02/2019 64,461 59,570 107 13/02/2019 53,653 32,295 5,652 14/02/2019 49,313 55,954 475 15/02/2019 58,319 59,188 11 16/02/2019 60,194 66,198 5 17/02/2019 62,943 68,605 167 18/02/2019 48,805 20,232 16,957 19/02/2019 57,936 63,482 353 20/02/2019 59,964 63,929 7 21/02/2019 60,187 62,458 0 22/02/2019 61,014 63,009 0 23/02/2019 60,790 46,845 5,314 24/02/2019 54,561 57,689 331 25/02/2019 61,014 65,275 375 26/02/2019 61,430 59,959 819 27/02/2019 56,940 62,066 225 28/02/2019 60,034 69,361 27 TOTAL 1,619,407 1,593,699 39,394 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- FOCAL_PHOTOVOLTAIC_10MW
  • 27. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 43,456 18,134 0 02/02/2019 98,230 70,369 2,845 03/02/2019 83,192 46,307 4,629 04/02/2019 63,101 61,761 579 05/02/2019 43,718 58,314 6,345 06/02/2019 55,640 45,706 403 07/02/2019 85,980 90,613 1,115 08/02/2019 57,461 32,522 532 09/02/2019 52,854 42,718 58 10/02/2019 46,630 40,318 242 11/02/2019 62,741 69,576 2,081 12/02/2019 64,481 57,313 2,234 13/02/2019 69,785 59,275 5,843 14/02/2019 48,359 26,453 1,305 15/02/2019 63,642 40,813 2,352 16/02/2019 70,608 41,733 1,914 17/02/2019 70,608 9,498 17,054 18/02/2019 30,321 13,582 288 19/02/2019 47,344 32,832 394 20/02/2019 42,117 12,554 412 21/02/2019 67,419 74,206 4,837 22/02/2019 59,189 38,969 413 23/02/2019 57,240 28,044 457 24/02/2019 58,061 43,948 541 25/02/2019 60,418 52,309 234 26/02/2019 92,970 69,086 3,171 27/02/2019 67,898 64,052 5,759 28/02/2019 65,234 59,550 5,626 TOTAL 1,728,697 1,300,555 71,663 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- MP_WIND_FARM_NAGDA_HILL_WIND_33_DEWAS
  • 28. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 109,123 97,276 0 02/02/2019 92,766 94,249 0 03/02/2019 85,904 75,354 0 04/02/2019 78,735 65,338 2,548 05/02/2019 81,409 77,586 68 06/02/2019 74,995 70,747 325 07/02/2019 85,503 100,597 1,170 08/02/2019 98,091 108,088 0 09/02/2019 100,986 114,983 0 10/02/2019 108,329 111,192 202 11/02/2019 104,332 109,562 0 12/02/2019 102,615 98,960 0 13/02/2019 96,554 50,182 14,957 14/02/2019 79,308 83,917 532 15/02/2019 101,213 97,402 0 16/02/2019 107,017 109,996 0 17/02/2019 104,886 114,680 0 18/02/2019 79,070 34,992 17,895 19/02/2019 93,462 105,983 0 20/02/2019 101,804 105,805 0 21/02/2019 97,115 101,083 0 22/02/2019 100,620 108,299 0 23/02/2019 106,410 96,567 629 24/02/2019 90,327 91,103 2,609 25/02/2019 102,250 114,012 0 26/02/2019 109,684 107,246 145 27/02/2019 105,975 95,181 1,834 28/02/2019 108,014 115,049 0 TOTAL 2,706,497 2,655,429 42,914 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- TODAY_CLEAN_SOLAR_33KV_BAROD
  • 29. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 295,341 284,940 0 02/02/2019 290,087 265,250 146 03/02/2019 261,021 217,460 1,545 04/02/2019 225,439 171,360 11,730 05/02/2019 244,161 212,660 3,761 06/02/2019 216,414 187,130 2,286 07/02/2019 256,203 312,950 7,802 08/02/2019 284,647 308,960 408 09/02/2019 297,421 326,330 393 10/02/2019 313,927 323,590 1,356 11/02/2019 301,498 316,410 385 12/02/2019 308,510 294,120 216 13/02/2019 255,348 163,830 19,129 14/02/2019 246,311 272,840 1,765 15/02/2019 277,081 295,260 0 16/02/2019 296,996 326,470 202 17/02/2019 306,039 338,620 1,231 18/02/2019 220,398 108,950 45,940 19/02/2019 289,062 321,320 1,300 20/02/2019 312,269 326,410 749 21/02/2019 305,011 316,090 113 22/02/2019 305,933 324,390 405 23/02/2019 304,400 235,010 21,574 24/02/2019 247,858 279,890 11,824 25/02/2019 305,933 324,260 8,325 26/02/2019 307,272 316,310 1,019 27/02/2019 292,516 313,160 918 28/02/2019 312,965 355,510 914 TOTAL 7,880,061 7,839,480 145,436 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- SEIL_SITARA_SITAMAU_50MW
  • 30. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 50,766 26,592 171 02/02/2019 69,655 68,324 1,284 03/02/2019 53,800 39,338 0 04/02/2019 53,907 26,068 2,747 05/02/2019 44,430 45,117 272 06/02/2019 47,205 45,467 5,762 07/02/2019 137,103 155,176 13,754 08/02/2019 51,334 17,302 1,156 09/02/2019 48,185 33,800 0 10/02/2019 43,411 22,993 0 11/02/2019 49,906 54,559 731 12/02/2019 65,598 59,983 1,857 13/02/2019 57,394 46,855 8,758 14/02/2019 56,449 62,267 865 15/02/2019 63,813 53,175 4,673 16/02/2019 53,169 54,588 3,104 17/02/2019 35,661 6,607 0 18/02/2019 42,483 30,747 188 19/02/2019 57,542 36,850 912 20/02/2019 47,605 42,862 3,814 21/02/2019 95,339 122,275 13,369 22/02/2019 64,356 62,364 5,681 23/02/2019 59,988 45,245 7 24/02/2019 56,508 31,596 5,788 25/02/2019 62,005 51,171 1,668 26/02/2019 89,886 99,020 17,756 27/02/2019 49,078 28,513 2,058 28/02/2019 49,148 37,863 55 TOTAL 1,655,724 1,406,717 96,430 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- WIND_WORLD-II_33_AGAR_15.2MW
  • 31. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 41,098 38,950 6 02/02/2019 38,905 28,930 2,562 03/02/2019 30,330 30,330 0 04/02/2019 36,077 36,077 0 05/02/2019 33,847 33,847 0 06/02/2019 31,188 31,188 0 07/02/2019 35,965 35,965 0 08/02/2019 40,180 40,180 0 09/02/2019 42,195 42,195 0 10/02/2019 45,598 45,598 0 11/02/2019 42,420 42,420 0 12/02/2019 40,065 40,065 0 13/02/2019 38,092 38,092 0 14/02/2019 29,909 29,909 0 15/02/2019 42,396 42,396 0 16/02/2019 40,621 40,621 0 17/02/2019 43,519 43,519 0 18/02/2019 37,329 37,329 0 19/02/2019 40,158 40,158 0 20/02/2019 43,079 43,079 0 21/02/2019 40,840 40,840 0 22/02/2019 41,859 41,859 0 23/02/2019 45,096 45,096 0 24/02/2019 37,793 37,793 0 25/02/2019 41,859 41,859 0 26/02/2019 42,340 42,340 0 27/02/2019 41,433 41,433 0 28/02/2019 44,653 44,653 0 TOTAL 1,108,844 1,096,721 2,568 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- UJAAS_II_S_RAJGARH_BIORA_15MW
  • 32. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 74,701 68,934 652 02/02/2019 66,014 63,108 1 03/02/2019 63,793 58,966 1,235 04/02/2019 69,258 67,368 0 05/02/2019 68,329 64,048 735 06/02/2019 66,244 61,638 151 07/02/2019 68,124 77,086 5 08/02/2019 73,229 81,384 0 09/02/2019 79,303 86,770 33 10/02/2019 84,971 85,124 74 11/02/2019 83,271 81,728 0 12/02/2019 81,594 76,108 0 13/02/2019 65,360 61,764 744 14/02/2019 56,587 62,946 404 15/02/2019 74,463 38,466 33,741 16/02/2019 74,880 78,042 0 17/02/2019 77,526 88,566 0 18/02/2019 69,908 62,284 3,345 19/02/2019 76,935 79,992 0 20/02/2019 74,945 79,898 0 21/02/2019 74,540 75,880 0 22/02/2019 75,039 83,896 0 23/02/2019 80,297 78,798 91 24/02/2019 56,108 53,268 3,105 25/02/2019 77,550 88,500 0 26/02/2019 74,466 78,970 1 27/02/2019 71,684 66,242 1,125 28/02/2019 76,076 88,994 137 TOTAL 2,035,195 2,038,768 45,579 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- M&B_ICHHAWAR-I
  • 33. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 52,582 30,421 429 02/02/2019 73,769 73,754 1,489 03/02/2019 53,699 41,559 49 04/02/2019 52,374 23,421 1,703 05/02/2019 46,973 42,103 320 06/02/2019 43,608 43,223 6,402 07/02/2019 140,842 147,690 8,471 08/02/2019 47,993 16,090 200 09/02/2019 46,748 36,233 9 10/02/2019 43,593 22,889 0 11/02/2019 48,417 52,924 1,064 12/02/2019 64,049 58,942 2,352 13/02/2019 56,254 41,423 2,500 14/02/2019 57,169 63,834 877 15/02/2019 64,057 55,828 4,724 16/02/2019 53,664 51,150 2,394 17/02/2019 32,956 6,048 0 18/02/2019 41,369 28,861 61 19/02/2019 56,961 36,343 686 20/02/2019 47,002 37,467 1,005 21/02/2019 90,490 109,751 10,356 22/02/2019 62,953 64,578 7,099 23/02/2019 59,986 49,143 108 24/02/2019 54,985 29,316 5,205 25/02/2019 58,868 47,234 1,547 26/02/2019 90,999 97,854 17,881 27/02/2019 48,976 27,027 2,919 28/02/2019 50,157 36,997 180 TOTAL 1,641,493 1,372,103 80,030 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- WIND_WORLD-III_33_AGAR_14.4MW
  • 34. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 56,425 44,684 7,487 02/02/2019 52,615 53,212 108 03/02/2019 51,179 47,066 140 04/02/2019 47,953 47,959 872 05/02/2019 50,049 52,325 38 06/02/2019 47,487 44,625 2,104 07/02/2019 48,260 57,113 1,008 08/02/2019 61,535 67,832 600 09/02/2019 66,132 68,923 0 10/02/2019 67,783 69,633 0 11/02/2019 66,436 65,755 0 12/02/2019 60,764 60,147 0 13/02/2019 53,454 55,225 39 14/02/2019 49,475 51,181 295 15/02/2019 48,808 48,066 978 16/02/2019 60,769 56,720 1,481 17/02/2019 65,848 70,243 155 18/02/2019 55,145 52,831 5,097 19/02/2019 61,301 64,644 8 20/02/2019 59,715 60,702 0 21/02/2019 56,239 58,333 0 22/02/2019 57,664 60,175 117 23/02/2019 56,421 55,040 3,564 24/02/2019 51,644 55,400 3,129 25/02/2019 59,227 67,674 195 26/02/2019 63,276 64,778 0 27/02/2019 59,738 56,515 1,562 28/02/2019 63,373 68,574 0 TOTAL 1,598,715 1,625,375 28,977 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- BHARAT_ELECTRONICS_LTD_OFI_S_ITARSI_10MW
  • 35. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 667,200 648,620 73,031 02/02/2019 1,094,156 1,160,920 16,778 03/02/2019 1,120,349 1,103,440 6,459 04/02/2019 777,123 731,880 0 05/02/2019 694,738 421,690 4,048 06/02/2019 692,499 429,420 0 07/02/2019 2,069,022 2,400,110 160,342 08/02/2019 652,102 314,810 4,768 09/02/2019 710,365 640,830 1,438 10/02/2019 632,424 534,730 2,984 11/02/2019 926,886 1,039,860 35,801 12/02/2019 864,306 668,520 527 13/02/2019 758,944 530,930 15,587 14/02/2019 698,846 371,480 15,383 15/02/2019 675,013 458,790 1,126 16/02/2019 695,369 532,300 9,095 17/02/2019 552,760 136,290 0 18/02/2019 778,058 999,740 79,764 19/02/2019 687,397 457,030 2,932 20/02/2019 590,875 226,560 75 21/02/2019 678,738 548,580 0 22/02/2019 664,685 257,960 4,737 23/02/2019 729,506 588,820 1,244 24/02/2019 657,973 404,830 681 25/02/2019 793,478 487,250 20,572 26/02/2019 1,197,377 1,000,900 63,146 27/02/2019 923,352 853,210 44,229 28/02/2019 854,644 1,230,320 333,514 TOTAL 22,838,185 19,179,820 898,261 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- KSHEMA_295.3MW_AMBA
  • 36. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 67,179 67,627 0 02/02/2019 65,531 66,996 0 03/02/2019 62,376 53,017 0 04/02/2019 51,239 47,831 2,953 05/02/2019 60,371 54,339 336 06/02/2019 58,180 51,018 506 07/02/2019 66,961 71,346 0 08/02/2019 69,019 75,311 0 09/02/2019 73,684 79,816 0 10/02/2019 77,583 77,753 296 11/02/2019 77,418 76,191 0 12/02/2019 74,654 69,171 0 13/02/2019 63,440 34,905 9,036 14/02/2019 57,806 61,946 49 15/02/2019 71,497 69,657 238 16/02/2019 73,035 79,153 0 17/02/2019 73,786 82,051 285 18/02/2019 54,510 27,426 7,252 19/02/2019 71,318 76,010 9 20/02/2019 72,006 77,338 112 21/02/2019 73,178 73,182 0 22/02/2019 72,839 78,135 67 23/02/2019 76,477 71,965 714 24/02/2019 67,825 64,550 2,280 25/02/2019 74,264 82,023 203 26/02/2019 74,188 76,393 0 27/02/2019 73,529 67,852 943 28/02/2019 74,477 78,818 0 TOTAL 1,928,370 1,891,820 25,279 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- M&B_BAROD
  • 37. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 574,428 324,460 17,149 02/02/2019 1,140,623 1,092,900 53,610 03/02/2019 896,965 734,220 52,031 04/02/2019 715,632 548,530 85,515 05/02/2019 605,495 538,700 1,203 06/02/2019 765,133 550,580 2,481 07/02/2019 1,309,622 1,116,530 125,700 08/02/2019 652,414 520,420 20,049 09/02/2019 607,543 429,160 15,510 10/02/2019 581,802 359,980 0 11/02/2019 868,148 1,020,070 105,209 12/02/2019 816,089 576,260 27,806 13/02/2019 707,839 494,530 4,287 14/02/2019 658,627 636,630 52,827 15/02/2019 925,667 687,260 51,216 16/02/2019 690,119 775,370 200,352 17/02/2019 552,658 212,910 2,683 18/02/2019 415,730 157,710 0 19/02/2019 639,669 434,490 18,448 20/02/2019 490,411 357,330 70,384 21/02/2019 1,375,861 1,343,320 58,250 22/02/2019 744,022 634,680 25,647 23/02/2019 711,377 636,290 23,126 24/02/2019 793,919 723,810 77,550 25/02/2019 1,093,480 1,028,370 206,862 26/02/2019 1,413,676 1,305,780 133,089 27/02/2019 1,580,799 1,187,770 225,042 28/02/2019 983,361 906,920 45,269 TOTAL 23,311,109 19,334,980 1,701,295 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- GAMESHA_SHAJAPUR
  • 38. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 52,742 19,002 0 02/02/2019 69,607 78,044 617 03/02/2019 64,207 52,508 39 04/02/2019 51,118 32,073 206 05/02/2019 48,348 40,651 306 06/02/2019 44,701 23,901 177 07/02/2019 131,695 142,294 1,558 08/02/2019 46,410 32,354 1,211 09/02/2019 46,859 25,987 0 10/02/2019 43,210 25,654 76 11/02/2019 47,404 43,595 0 12/02/2019 65,302 53,761 96 13/02/2019 43,857 31,262 0 14/02/2019 60,680 55,043 5,229 15/02/2019 64,384 58,682 5,902 16/02/2019 56,315 53,547 1,044 17/02/2019 37,888 12,491 526 18/02/2019 40,564 27,524 18 19/02/2019 54,687 33,315 0 20/02/2019 45,772 27,640 202 21/02/2019 98,895 127,218 5,663 22/02/2019 54,618 65,901 2,272 23/02/2019 61,470 59,042 441 24/02/2019 51,345 29,635 772 25/02/2019 50,255 41,898 1,074 26/02/2019 90,297 100,421 9,116 27/02/2019 51,207 31,940 4,340 28/02/2019 46,795 33,377 485 TOTAL 1,620,632 1,358,760 41,370 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- WIND_WORLD-IV_33_SUSNER_14.4MW
  • 39. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 68,795 68,957 28 02/02/2019 65,471 67,102 0 03/02/2019 57,060 51,145 1,014 04/02/2019 63,936 61,801 155 05/02/2019 59,370 62,227 345 06/02/2019 58,448 58,463 83 07/02/2019 62,002 80,724 695 08/02/2019 76,621 76,762 0 09/02/2019 74,325 84,346 558 10/02/2019 81,797 83,846 0 11/02/2019 75,258 81,619 0 12/02/2019 76,428 75,221 207 13/02/2019 61,747 48,734 1,917 14/02/2019 60,887 66,545 283 15/02/2019 69,374 76,483 0 16/02/2019 78,109 80,969 0 17/02/2019 80,280 87,949 0 18/02/2019 68,701 51,819 4,733 19/02/2019 73,281 78,581 196 20/02/2019 75,496 82,226 27 21/02/2019 69,394 75,014 0 22/02/2019 74,556 83,550 0 23/02/2019 77,811 71,983 910 24/02/2019 65,259 58,095 1,792 25/02/2019 76,311 84,015 334 26/02/2019 72,213 81,372 25 27/02/2019 67,300 64,515 1,235 28/02/2019 77,852 88,634 0 TOTAL 1,968,082 2,032,697 14,537 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- UJAAS_33KV_BERCHA
  • 40. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 801,845 555,620 18,606 02/02/2019 1,642,005 1,530,550 122,995 03/02/2019 1,444,845 949,190 148,920 04/02/2019 972,578 549,010 23,379 05/02/2019 877,207 951,760 5,417 06/02/2019 1,040,854 766,880 2,453 07/02/2019 1,923,228 1,592,700 359,343 08/02/2019 810,154 436,300 49,471 09/02/2019 838,606 666,180 31,510 10/02/2019 887,676 614,090 52,906 11/02/2019 1,560,116 1,630,070 120,914 12/02/2019 1,293,255 1,016,810 133,047 13/02/2019 914,004 503,050 25,905 14/02/2019 863,474 843,120 31,312 15/02/2019 1,026,917 817,870 44,201 16/02/2019 989,482 1,012,460 98,612 17/02/2019 622,541 209,290 5 18/02/2019 613,836 475,080 68,061 19/02/2019 751,655 442,630 5,481 20/02/2019 618,253 626,750 151,979 21/02/2019 1,980,215 2,006,040 89,836 22/02/2019 998,058 883,450 18,315 23/02/2019 1,087,669 896,980 30,518 24/02/2019 804,056 761,890 27,219 25/02/2019 957,914 772,180 48,667 26/02/2019 1,426,866 1,497,060 245,537 27/02/2019 1,261,085 944,290 214,813 28/02/2019 896,728 1,104,870 75,643 TOTAL 29,905,122 25,056,170 2,245,065 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- INOX_200MW_SHAJAPUR
  • 41. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 72,358 71,860 0 02/02/2019 70,773 49,410 14,468 03/02/2019 58,159 58,159 0 04/02/2019 60,715 60,715 0 05/02/2019 58,425 58,425 0 06/02/2019 56,631 56,631 0 07/02/2019 69,779 69,779 0 08/02/2019 73,193 73,193 0 09/02/2019 75,881 75,881 0 10/02/2019 83,262 83,262 0 11/02/2019 79,923 79,923 0 12/02/2019 72,371 72,371 0 13/02/2019 67,210 67,210 0 14/02/2019 54,823 54,823 0 15/02/2019 76,916 76,916 0 16/02/2019 73,656 73,656 0 17/02/2019 78,987 78,987 0 18/02/2019 64,363 64,363 0 19/02/2019 71,802 71,802 0 20/02/2019 76,627 76,627 0 21/02/2019 72,660 72,660 0 22/02/2019 77,136 77,136 0 23/02/2019 80,539 80,539 0 24/02/2019 67,765 67,765 0 25/02/2019 80,014 80,014 0 26/02/2019 74,969 74,969 0 27/02/2019 76,018 76,018 0 28/02/2019 77,790 77,790 0 TOTAL 2,002,745 1,980,884 14,468 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- UJAAS_I_S_RAJGARH_BIORA_15MW
  • 42. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 30,202 22,000 0 02/02/2019 89,374 69,171 595 03/02/2019 58,149 56,290 2,266 04/02/2019 50,241 42,246 328 05/02/2019 52,512 45,559 531 06/02/2019 64,856 55,419 979 07/02/2019 87,568 88,790 5,050 08/02/2019 55,414 48,287 609 09/02/2019 69,620 55,523 609 10/02/2019 46,257 52,161 607 11/02/2019 50,670 70,270 2,425 12/02/2019 58,929 55,291 720 13/02/2019 52,938 53,543 2,872 14/02/2019 42,048 34,417 1,622 15/02/2019 50,505 45,324 558 16/02/2019 45,524 43,668 192 17/02/2019 37,350 24,251 0 18/02/2019 28,557 21,938 4 19/02/2019 42,274 32,205 0 20/02/2019 29,796 22,836 235 21/02/2019 79,786 68,000 346 22/02/2019 43,531 33,550 21 23/02/2019 43,183 38,625 0 24/02/2019 52,627 61,818 3,240 25/02/2019 69,609 76,742 6,065 26/02/2019 63,580 96,651 23,235 27/02/2019 75,206 81,643 2,069 28/02/2019 54,675 61,906 3,757 TOTAL 1,524,981 1,458,124 58,935 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF FEBRUARY-2019 NAME OF QCA :- NOT QCA APPOINTMENT NAME OF POOLING STATION :- WIND_WORLD_II_WIND_33_CHAPDA
  • 43. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 1,304,080 1,209,400 0 02/02/2019 836,177 1,160,768 97,865 03/02/2019 1,260,619 950,617 10,655 04/02/2019 1,160,790 876,826 12,367 05/02/2019 960,810 870,507 14,336 06/02/2019 866,220 778,355 4,923 07/02/2019 866,840 1,327,646 92,146 08/02/2019 787,950 1,303,855 146,183 09/02/2019 1,237,818 1,256,835 5,336 10/02/2019 1,303,915 1,396,593 0 11/02/2019 1,413,986 1,352,755 0 12/02/2019 1,398,990 1,246,513 2,670 13/02/2019 1,357,490 661,231 277,538 14/02/2019 1,090,053 1,083,095 4,773 15/02/2019 1,245,983 1,220,147 308 16/02/2019 1,398,990 1,370,206 0 17/02/2019 1,222,000 1,426,385 0 18/02/2019 1,088,123 431,660 261,290 19/02/2019 1,219,934 1,280,289 0 20/02/2019 1,097,997 1,339,588 781 21/02/2019 1,219,934 1,263,555 0 22/02/2019 1,344,070 1,334,829 0 23/02/2019 1,294,788 975,299 78,617 24/02/2019 1,337,270 1,205,290 6,182 25/02/2019 1,342,632 1,398,186 0 26/02/2019 1,277,781 1,272,727 29 27/02/2019 1,398,760 1,239,221 15,294 28/02/2019 1,324,144 1,430,526 0 TOTAL 33,658,144 32,662,904 1,031,293 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- NOT QCA APPOINTMENT NAME OF POOLING STATION :- MANDSAUR_SOLAR_POWER_SOLAR_220_GUJARKHEDI
  • 44. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 0 1,350 1,519 02/02/2019 0 3,239 3,642 03/02/2019 0 2,846 3,199 04/02/2019 0 3,037 3,409 05/02/2019 0 2,506 2,811 06/02/2019 0 1,234 1,382 07/02/2019 0 8,572 9,638 08/02/2019 0 2,008 2,259 09/02/2019 0 896 1,000 10/02/2019 0 1,278 1,431 11/02/2019 0 3,191 3,590 12/02/2019 0 2,443 2,745 13/02/2019 0 2,275 2,556 14/02/2019 0 1,724 1,941 15/02/2019 0 1,861 2,089 16/02/2019 0 1,600 1,797 17/02/2019 0 318 357 18/02/2019 0 2,491 2,799 19/02/2019 0 2,792 3,134 20/02/2019 0 529 588 21/02/2019 0 1,536 1,722 22/02/2019 0 1,311 1,470 23/02/2019 0 1,163 1,302 24/02/2019 0 1,941 2,182 25/02/2019 0 2,475 2,783 26/02/2019 0 3,002 3,382 27/02/2019 0 2,686 3,018 28/02/2019 0 910 1,020 TOTAL 0 61,214 68,765 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- NOT QCA APPOINTMENT NAME OF POOLING STATION :- WINCON_W_JAORA_11.95MW
  • 45. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 232,500 234,437 0 02/02/2019 228,750 234,942 0 03/02/2019 118,750 124,727 4,151 04/02/2019 206,250 202,213 344 05/02/2019 206,500 203,063 25 06/02/2019 205,500 176,361 1,086 07/02/2019 256,500 268,238 16 08/02/2019 242,000 265,010 27 09/02/2019 255,750 288,673 20 10/02/2019 258,000 277,943 40 11/02/2019 254,250 272,133 20 12/02/2019 232,750 253,412 12 13/02/2019 190,750 149,184 2,260 14/02/2019 151,000 170,952 1,336 15/02/2019 232,750 242,775 25 16/02/2019 257,500 268,574 56 17/02/2019 263,500 292,927 56 18/02/2019 127,000 112,045 10,351 19/02/2019 214,750 252,646 2,736 20/02/2019 244,500 269,180 61 21/02/2019 238,750 249,942 56 22/02/2019 245,750 274,399 85 23/02/2019 224,500 253,451 1,229 24/02/2019 197,500 199,128 2,311 25/02/2019 255,000 287,860 129 26/02/2019 238,750 258,270 373 27/02/2019 225,500 243,860 1,034 28/02/2019 257,500 293,242 166 TOTAL 6,262,500 6,619,587 28,005 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- NOT QCA APPOINTMENT NAME OF POOLING STATION :- NTPC_RAJGARH
  • 46. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 79,898 174,933 87,024 02/02/2019 96,158 226,700 79,242 03/02/2019 86,357 187,388 19,085 04/02/2019 78,189 136,736 16,392 05/02/2019 40,925 40,245 418 06/02/2019 88,033 77,624 12,319 07/02/2019 239,778 329,963 67,619 08/02/2019 37,885 58,314 8,993 09/02/2019 59,812 136,635 51,060 10/02/2019 38,152 51,313 0 11/02/2019 84,121 151,877 9,379 12/02/2019 67,837 154,426 19,811 13/02/2019 47,945 106,818 12,220 14/02/2019 106,408 101,043 19,596 15/02/2019 40,728 95,049 16,669 16/02/2019 66,564 82,312 43 17/02/2019 11,156 16,283 0 18/02/2019 53,035 155,570 47,265 19/02/2019 51,212 73,445 13,060 20/02/2019 77,775 62,021 1,113 21/02/2019 91,206 199,358 28,017 22/02/2019 32,787 107,934 19,886 23/02/2019 69,755 97,606 2,430 24/02/2019 26,436 78,370 13,208 25/02/2019 39,178 130,041 37,139 26/02/2019 136,880 188,325 45,093 27/02/2019 96,649 40,976 10,493 28/02/2019 44,391 101,411 24,340 TOTAL 1,989,250 3,362,716 661,914 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- RENEW WIND_ENERGY_MP_TWO_WIND_33_DALODA
  • 47. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 64,578 73,483 0 02/02/2019 16,739 49,009 0 03/02/2019 44,602 56,273 75 04/02/2019 54,271 53,860 34 05/02/2019 33,861 57,129 0 06/02/2019 103,352 129,354 9,743 07/02/2019 97,534 159,336 27,162 08/02/2019 125,208 180,571 14,910 09/02/2019 154,089 190,556 25,239 10/02/2019 33,428 43,140 404 11/02/2019 34,329 46,252 0 12/02/2019 31,480 47,420 0 13/02/2019 40,140 47,797 0 14/02/2019 63,559 120,393 14,608 15/02/2019 104,770 94,068 3,884 16/02/2019 123,000 103,292 8,801 17/02/2019 68,789 112,827 6,121 18/02/2019 14,280 80,167 38,194 19/02/2019 26,019 89,297 3,853 20/02/2019 74,460 69,485 32 21/02/2019 60,900 156,755 25,812 22/02/2019 90,934 125,548 16,536 23/02/2019 63,587 44,503 11 24/02/2019 148,590 198,785 12,175 25/02/2019 158,020 227,894 45,660 26/02/2019 138,578 237,566 61,800 27/02/2019 232,965 363,373 65,634 28/02/2019 200,001 128,864 41,574 TOTAL 2,402,063 3,286,997 422,262 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- INOX_WIND_132_GUDGAON_28M
  • 48. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 52,903 43,012 31,053 02/02/2019 52,679 42,105 30,008 03/02/2019 48,006 34,393 25,564 04/02/2019 32,553 31,556 10,597 05/02/2019 44,502 32,506 26,608 06/02/2019 45,262 26,531 18,647 07/02/2019 52,286 48,583 32,893 08/02/2019 56,399 48,015 34,017 09/02/2019 55,905 51,196 35,750 10/02/2019 49,907 50,387 34,349 11/02/2019 55,495 50,389 33,212 12/02/2019 55,884 46,428 31,539 13/02/2019 38,307 24,694 9,904 14/02/2019 48,230 39,123 24,295 15/02/2019 57,027 45,931 32,957 16/02/2019 58,250 51,261 36,405 17/02/2019 58,328 54,899 36,853 18/02/2019 44,586 19,816 14,866 19/02/2019 52,836 50,827 38,279 20/02/2019 56,872 52,193 35,378 21/02/2019 55,648 47,734 30,797 22/02/2019 56,981 52,777 34,618 23/02/2019 54,045 44,350 25,125 24/02/2019 40,374 45,665 25,701 25/02/2019 60,604 54,873 38,477 26/02/2019 58,260 50,974 35,433 27/02/2019 52,230 45,028 30,186 28/02/2019 62,583 55,727 39,626 TOTAL 1,456,942 1,240,973 833,137 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- BHADRESH_SOLAR_33_10MW
  • 49. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 72,615 58,068 12,876 02/02/2019 75,831 97,572 4,370 03/02/2019 82,418 98,731 5,199 04/02/2019 55,508 52,288 300 05/02/2019 39,053 27,886 84 06/02/2019 47,030 34,168 233 07/02/2019 111,497 139,480 7,936 08/02/2019 34,996 37,734 5,284 09/02/2019 45,961 47,235 1,095 10/02/2019 43,702 31,508 63 11/02/2019 73,487 81,965 537 12/02/2019 60,525 66,883 2,075 13/02/2019 47,797 43,773 319 14/02/2019 58,921 51,625 1,570 15/02/2019 49,707 49,480 1,485 16/02/2019 56,416 47,941 490 17/02/2019 35,637 11,091 0 18/02/2019 63,615 71,553 6,309 19/02/2019 57,129 56,888 409 20/02/2019 45,213 28,941 16 21/02/2019 87,665 104,426 3,491 22/02/2019 61,304 62,264 2,099 23/02/2019 70,288 70,879 3,211 24/02/2019 46,003 36,698 0 25/02/2019 72,461 76,617 743 26/02/2019 89,778 96,420 14,596 27/02/2019 46,601 28,024 286 28/02/2019 40,321 64,032 11,018 TOTAL 1,671,479 1,674,170 86,094 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- SHANKHESWAR_NAGRI_15MW
  • 50. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 96,890 88,388 3,502 02/02/2019 205,554 246,689 17,001 03/02/2019 157,821 184,612 10,334 04/02/2019 128,545 134,081 1,526 05/02/2019 106,422 109,556 6,667 06/02/2019 88,868 76,114 5,798 07/02/2019 264,339 316,395 15,607 08/02/2019 101,682 91,908 4,840 09/02/2019 116,764 143,524 5,355 10/02/2019 110,709 101,587 2,005 11/02/2019 190,513 215,220 16,551 12/02/2019 170,846 168,946 4,265 13/02/2019 130,396 131,857 1,490 14/02/2019 132,322 143,819 6,658 15/02/2019 133,417 135,213 13,395 16/02/2019 189,605 191,762 15,923 17/02/2019 80,271 50,437 0 18/02/2019 90,786 79,556 11,977 19/02/2019 121,577 94,260 2,133 20/02/2019 71,620 88,753 30,663 21/02/2019 254,249 291,357 38,998 22/02/2019 163,987 134,397 4,827 23/02/2019 156,031 163,069 9,828 24/02/2019 143,059 158,549 19,005 25/02/2019 202,758 187,139 3,734 26/02/2019 231,010 235,467 29,850 27/02/2019 227,338 199,089 25,994 28/02/2019 179,138 222,805 34,435 TOTAL 4,246,517 4,384,549 342,361 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- KSHEMA_GHOSLA_30MW
  • 51. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 115,847 128,080 42,879 02/02/2019 324,734 524,610 117,918 03/02/2019 308,017 392,550 29,352 04/02/2019 240,191 391,640 57,371 05/02/2019 169,435 207,120 21,717 06/02/2019 165,504 162,880 17,112 07/02/2019 368,220 520,820 103,485 08/02/2019 149,750 152,510 23,340 09/02/2019 186,828 257,290 55,802 10/02/2019 181,799 311,520 53,550 11/02/2019 239,136 425,690 130,347 12/02/2019 265,884 280,910 18,041 13/02/2019 222,959 280,350 50,943 14/02/2019 190,709 108,360 12,994 15/02/2019 151,709 177,220 2,222 16/02/2019 260,481 316,390 73,137 17/02/2019 120,423 92,700 1,967 18/02/2019 180,039 217,700 4,555 19/02/2019 191,079 187,300 5,663 20/02/2019 141,411 94,510 1,791 21/02/2019 195,393 231,180 14,565 22/02/2019 200,907 182,560 8,351 23/02/2019 258,523 308,640 53,951 24/02/2019 273,922 315,070 23,026 25/02/2019 239,476 261,390 35,138 26/02/2019 364,688 424,580 40,935 27/02/2019 306,824 307,150 58,051 28/02/2019 343,648 410,350 111,180 TOTAL 6,357,536 7,671,070 1,169,383 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- SUZLON_GUJ_96.6MW_BADNAGAR
  • 52. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 20,437 38,934 5,417 02/02/2019 24,807 106,047 45,554 03/02/2019 11,327 47,562 10,729 04/02/2019 1,818 14,143 1,791 05/02/2019 6,983 48,975 14,415 06/02/2019 12,933 39,215 22,576 07/02/2019 61,991 184,297 75,543 08/02/2019 821 8,404 406 09/02/2019 14,449 34,021 3,471 10/02/2019 1,197 18,053 2,277 11/02/2019 13,514 49,420 6,290 12/02/2019 7,975 54,725 11,053 13/02/2019 16,370 29,704 4,067 14/02/2019 11,880 70,034 15,182 15/02/2019 4,694 69,833 45,348 16/02/2019 10,482 58,902 24,213 17/02/2019 1,904 101 0 18/02/2019 3,980 19,016 554 19/02/2019 13,481 31,391 912 20/02/2019 4,157 34,121 9,295 21/02/2019 42,064 131,749 45,559 22/02/2019 8,195 81,344 50,850 23/02/2019 12,112 62,883 16,030 24/02/2019 288 21,226 9,344 25/02/2019 2,555 48,119 17,420 26/02/2019 42,454 115,075 30,987 27/02/2019 43,405 19,818 10,588 28/02/2019 7,457 44,151 15,536 TOTAL 403,730 1,481,263 495,407 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- SUZLON_II_W_SUSNER_15MW
  • 53. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 56,035 37,436 2,724 02/02/2019 107,473 173,708 28,990 03/02/2019 92,407 171,849 44,233 04/02/2019 70,536 95,894 3,707 05/02/2019 40,007 27,377 50 06/02/2019 62,463 28,702 6,304 07/02/2019 112,460 152,592 13,823 08/02/2019 37,892 45,815 9,121 09/02/2019 69,095 72,354 6,241 10/02/2019 58,180 71,634 2,947 11/02/2019 75,849 121,331 10,772 12/02/2019 84,432 88,743 6,636 13/02/2019 62,890 57,752 505 14/02/2019 59,709 36,160 895 15/02/2019 40,498 36,832 423 16/02/2019 89,030 98,973 9,877 17/02/2019 36,770 23,583 2,013 18/02/2019 51,408 63,516 4,616 19/02/2019 46,286 31,980 300 20/02/2019 53,282 25,916 2,774 21/02/2019 57,020 41,587 1,395 22/02/2019 36,714 26,561 786 23/02/2019 96,418 115,507 8,635 24/02/2019 49,695 30,290 921 25/02/2019 48,589 41,522 1,670 26/02/2019 83,403 72,040 8,108 27/02/2019 59,213 51,246 3,269 28/02/2019 96,925 131,323 24,143 TOTAL 1,834,679 1,972,223 205,878 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- SUZLON_I_W_SAILANA_14.4MW
  • 54. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 78,580 77,304 0 02/02/2019 79,650 73,442 0 03/02/2019 73,310 61,887 124 04/02/2019 56,999 53,257 125 05/02/2019 64,807 60,672 1,084 06/02/2019 61,102 49,596 2,334 07/02/2019 81,119 82,199 0 08/02/2019 86,488 83,181 0 09/02/2019 86,063 88,533 0 10/02/2019 78,740 87,762 27 11/02/2019 84,835 85,124 0 12/02/2019 85,863 77,813 763 13/02/2019 55,012 45,281 1,992 14/02/2019 74,491 74,248 0 15/02/2019 87,022 78,742 0 16/02/2019 89,286 87,124 0 17/02/2019 89,081 89,914 0 18/02/2019 51,341 29,063 4,020 19/02/2019 78,402 84,355 234 20/02/2019 85,382 85,047 0 21/02/2019 86,013 82,959 0 22/02/2019 87,648 83,875 0 23/02/2019 81,997 66,043 3,099 24/02/2019 67,839 78,454 493 25/02/2019 92,159 89,632 0 26/02/2019 87,144 78,829 676 27/02/2019 83,760 82,435 156 28/02/2019 95,960 92,896 0 TOTAL 2,210,093 2,109,667 15,127 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- UJAAS_SOLAR_33KV_SITAMAU-I
  • 55. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 153,336 155,130 17 02/02/2019 101,392 149,605 35,871 03/02/2019 96,088 121,248 16,882 04/02/2019 78,642 106,918 21,977 05/02/2019 85,930 118,706 26,691 06/02/2019 94,715 108,078 10,555 07/02/2019 104,405 166,404 44,376 08/02/2019 111,667 163,124 34,413 09/02/2019 113,861 170,510 39,090 10/02/2019 109,024 163,730 31,350 11/02/2019 108,919 167,600 41,010 12/02/2019 105,838 159,680 37,879 13/02/2019 77,375 102,026 15,079 14/02/2019 88,549 135,372 44,910 15/02/2019 104,935 152,486 35,933 16/02/2019 116,974 174,871 42,149 17/02/2019 115,130 173,310 41,392 18/02/2019 56,895 53,891 4,499 19/02/2019 111,427 158,801 30,231 20/02/2019 117,385 157,674 18,956 21/02/2019 168,824 158,168 322 22/02/2019 163,344 153,906 473 23/02/2019 157,437 127,654 14,450 24/02/2019 132,412 146,538 3,285 25/02/2019 173,151 173,197 0 26/02/2019 162,372 142,895 5,591 27/02/2019 139,300 144,700 15,639 28/02/2019 181,078 178,043 0 TOTAL 3,330,405 4,084,265 613,020 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- 25MW_WELSPUN_RATANGARH
  • 56. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 47,439 40,741 0 02/02/2019 47,492 39,783 0 03/02/2019 42,872 30,508 524 04/02/2019 28,958 26,412 11 05/02/2019 35,405 25,779 1,089 06/02/2019 36,944 22,004 3,728 07/02/2019 43,811 36,826 370 08/02/2019 40,341 38,061 1,378 09/02/2019 25,922 41,459 9,499 10/02/2019 25,214 39,930 8,043 11/02/2019 37,212 43,272 5,322 12/02/2019 25,329 39,865 9,474 13/02/2019 19,684 21,192 1,797 14/02/2019 29,646 26,862 14,451 15/02/2019 26,594 39,040 9,190 16/02/2019 26,318 44,578 13,156 17/02/2019 27,133 47,477 13,096 18/02/2019 20,516 16,346 2,269 19/02/2019 24,464 43,821 13,982 20/02/2019 32,836 41,215 7,226 21/02/2019 39,440 38,862 4,440 22/02/2019 38,170 43,945 6,012 23/02/2019 28,317 38,275 5,016 24/02/2019 33,895 37,625 752 25/02/2019 54,730 45,727 175 26/02/2019 52,522 42,553 855 27/02/2019 46,787 37,022 2,896 28/02/2019 56,078 47,239 271 TOTAL 994,069 1,036,419 135,022 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- FSWAI_BTCL_NP_SUSNER
  • 57. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 49,221 46,616 5,009 02/02/2019 105,693 133,608 6,352 03/02/2019 85,877 90,088 574 04/02/2019 60,744 67,479 5,541 05/02/2019 42,566 49,817 1,541 06/02/2019 79,273 44,407 28,532 07/02/2019 123,668 149,750 4,490 08/02/2019 51,456 33,817 2,490 09/02/2019 59,640 94,793 20,436 10/02/2019 63,634 65,386 4,131 11/02/2019 65,756 81,297 18,495 12/02/2019 60,546 61,780 2,375 13/02/2019 55,381 63,611 2,721 14/02/2019 60,347 41,330 180 15/02/2019 55,545 72,235 643 16/02/2019 85,741 108,769 18,230 17/02/2019 53,711 39,341 0 18/02/2019 36,045 63,626 11,165 19/02/2019 60,723 61,747 17,894 20/02/2019 40,373 28,617 406 21/02/2019 81,809 77,467 7,421 22/02/2019 61,111 61,748 673 23/02/2019 68,131 88,649 8,132 24/02/2019 76,700 93,789 12,697 25/02/2019 82,988 114,170 13,026 26/02/2019 133,107 148,764 6,260 27/02/2019 118,068 121,383 10,363 28/02/2019 108,128 115,381 9,433 TOTAL 2,025,982 2,219,465 219,210 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 9 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- DHAR_RENEWABLE_15MW_DASERA_MAIDAN
  • 58. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 77,802 65,977 3,109 02/02/2019 109,353 242,274 85,932 03/02/2019 75,750 142,032 33,611 04/02/2019 65,718 136,928 49,645 05/02/2019 87,885 145,312 14,582 06/02/2019 144,488 154,448 36,716 07/02/2019 178,080 305,060 51,380 08/02/2019 86,403 126,735 38,761 09/02/2019 73,173 113,677 5,734 10/02/2019 66,972 91,370 10,162 11/02/2019 70,484 213,750 85,674 12/02/2019 65,770 122,789 20,738 13/02/2019 94,655 143,184 18,719 14/02/2019 116,622 129,434 22,967 15/02/2019 92,916 142,954 17,348 16/02/2019 82,466 151,581 38,501 17/02/2019 63,149 39,123 1,604 18/02/2019 65,927 48,208 4,883 19/02/2019 84,089 101,446 2,106 20/02/2019 73,291 61,862 13,559 21/02/2019 136,380 305,796 80,589 22/02/2019 76,931 161,422 58,315 23/02/2019 73,195 123,694 11,353 24/02/2019 80,687 158,691 52,084 25/02/2019 75,570 243,704 134,692 26/02/2019 226,319 241,179 81,417 27/02/2019 249,008 286,990 39,189 28/02/2019 86,004 180,239 32,021 TOTAL 2,779,087 4,379,859 1,045,391 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- BADONI_POWER_WIND_33_MAXI
  • 59. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 118,749 138,950 502 02/02/2019 31,653 103,242 0 03/02/2019 68,137 156,409 438 04/02/2019 118,189 146,650 416 05/02/2019 71,904 125,292 0 06/02/2019 174,957 274,410 32,658 07/02/2019 143,982 223,118 22,033 08/02/2019 139,809 304,079 38,986 09/02/2019 186,774 421,862 165,593 10/02/2019 58,121 77,554 555 11/02/2019 73,534 109,308 26 12/02/2019 67,518 133,609 2,271 13/02/2019 89,149 126,589 235 14/02/2019 76,582 241,782 96,777 15/02/2019 153,272 198,193 38,851 16/02/2019 136,485 271,518 13,813 17/02/2019 72,189 200,836 32,691 18/02/2019 21,830 157,248 55,235 19/02/2019 30,140 158,797 14,401 20/02/2019 141,498 163,757 3,417 21/02/2019 103,831 256,695 29,708 22/02/2019 116,058 171,943 14,275 23/02/2019 84,171 115,487 5,219 24/02/2019 208,664 285,084 12,951 25/02/2019 206,852 377,224 85,858 26/02/2019 185,461 329,793 57,872 27/02/2019 351,563 413,848 29,199 28/02/2019 238,676 240,867 8,982 TOTAL 3,469,748 5,924,144 762,962 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- BETUL_WIND_FARM
  • 60. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 59,839 61,462 24,691 02/02/2019 68,378 76,069 3,150 03/02/2019 77,788 76,080 3,563 04/02/2019 66,406 37,236 1,495 05/02/2019 37,910 20,415 698 06/02/2019 42,795 33,029 670 07/02/2019 96,604 123,990 17,954 08/02/2019 44,241 21,771 911 09/02/2019 50,577 43,215 213 10/02/2019 39,700 34,333 9 11/02/2019 54,627 68,082 4,803 12/02/2019 45,896 50,694 428 13/02/2019 42,897 20,845 329 14/02/2019 57,084 69,534 10,143 15/02/2019 50,209 53,195 3,272 16/02/2019 62,848 57,312 5,022 17/02/2019 31,034 5,251 0 18/02/2019 56,221 71,244 10,726 19/02/2019 45,837 36,525 782 20/02/2019 42,992 32,389 2,805 21/02/2019 80,836 107,871 11,281 22/02/2019 53,222 47,582 3,686 23/02/2019 75,143 70,270 12,372 24/02/2019 39,816 46,724 4,481 25/02/2019 48,640 75,142 22,378 26/02/2019 87,008 79,270 12,314 27/02/2019 60,481 17,658 16,899 28/02/2019 71,182 76,435 19,804 TOTAL 1,590,211 1,513,623 194,879 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- CHOKSI_ENERGY_WIND_33_RIGDOD
  • 61. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 171,653 138,724 6,687 02/02/2019 35,005 109,039 768 03/02/2019 91,388 157,244 0 04/02/2019 166,687 146,450 15,123 05/02/2019 98,328 121,718 112 06/02/2019 273,214 294,088 75,073 07/02/2019 212,443 191,309 17,600 08/02/2019 207,372 256,635 19,334 09/02/2019 283,579 447,134 212,812 10/02/2019 84,426 57,973 27 11/02/2019 107,441 87,260 778 12/02/2019 88,184 136,779 3,471 13/02/2019 122,061 132,519 233 14/02/2019 169,134 297,105 114,265 15/02/2019 219,063 186,861 86,390 16/02/2019 197,996 158,567 2,550 17/02/2019 103,437 106,834 1,151 18/02/2019 25,443 159,897 72,662 19/02/2019 40,265 106,686 119 20/02/2019 201,803 143,110 24,756 21/02/2019 151,058 329,951 90,684 22/02/2019 171,905 118,400 1,362 23/02/2019 121,773 75,670 8,721 24/02/2019 310,780 341,111 31,015 25/02/2019 327,124 474,042 148,791 26/02/2019 278,862 388,710 110,927 27/02/2019 534,148 453,507 71,018 28/02/2019 347,392 265,942 54,218 TOTAL 5,141,964 5,883,265 1,170,647 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- KUKARU_DEDHPANI_50MW
  • 62. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 44,245 17,426 2,063 02/02/2019 84,602 123,797 16,713 03/02/2019 69,883 100,594 7,063 04/02/2019 55,880 69,976 899 05/02/2019 38,132 49,139 970 06/02/2019 64,296 18,156 12,713 07/02/2019 141,690 130,530 30,574 08/02/2019 46,054 29,037 337 09/02/2019 47,262 39,775 333 10/02/2019 41,037 45,450 23 11/02/2019 49,073 67,623 3,447 12/02/2019 52,830 67,313 1,855 13/02/2019 53,893 71,502 680 14/02/2019 75,907 39,883 14,607 15/02/2019 59,191 67,699 10,602 16/02/2019 90,194 107,859 17,295 17/02/2019 34,253 21,337 255 18/02/2019 58,577 60,489 2,999 19/02/2019 64,481 76,956 8,968 20/02/2019 51,752 28,559 189 21/02/2019 65,842 56,617 894 22/02/2019 43,545 68,760 6,394 23/02/2019 94,161 103,189 11,679 24/02/2019 71,797 73,777 3,386 25/02/2019 77,763 80,832 8,594 26/02/2019 112,902 124,774 13,012 27/02/2019 93,667 75,965 5,430 28/02/2019 96,712 102,007 8,074 TOTAL 1,879,621 1,919,021 190,048 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- SUZLON_SANDALA_I_KHACHROD_14.7MW
  • 63. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 58,065 55,046 2,490 02/02/2019 66,443 71,801 1,857 03/02/2019 77,805 101,851 6,462 04/02/2019 54,255 51,571 167 05/02/2019 39,395 21,277 625 06/02/2019 63,067 29,837 13,341 07/02/2019 108,711 142,869 6,904 08/02/2019 36,996 27,338 1,992 09/02/2019 42,491 38,283 546 10/02/2019 40,157 25,291 0 11/02/2019 75,129 86,711 1,671 12/02/2019 66,078 69,149 3,930 13/02/2019 56,751 45,213 4,193 14/02/2019 79,620 73,357 14,123 15/02/2019 55,689 55,433 893 16/02/2019 52,949 48,915 652 17/02/2019 35,424 12,182 0 18/02/2019 72,461 85,982 13,891 19/02/2019 65,137 70,839 795 20/02/2019 50,583 43,329 997 21/02/2019 123,599 132,810 1,692 22/02/2019 68,796 74,345 3,496 23/02/2019 79,603 74,569 19,205 24/02/2019 53,209 50,091 164 25/02/2019 91,478 86,019 1,949 26/02/2019 90,701 109,903 7,358 27/02/2019 50,988 28,038 1,004 28/02/2019 38,644 67,854 14,428 TOTAL 1,794,224 1,779,903 124,825 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- SHANKHESWAR_DHAMNAR_15MW
  • 64. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 51,710 48,603 2,849 02/02/2019 124,200 157,042 13,657 03/02/2019 115,468 143,466 14,038 04/02/2019 83,777 69,213 2,209 05/02/2019 18,689 21,919 817 06/02/2019 48,244 23,018 6,339 07/02/2019 126,468 159,326 15,987 08/02/2019 29,679 44,517 5,379 09/02/2019 62,966 77,378 11,064 10/02/2019 61,575 69,951 1,087 11/02/2019 91,183 101,570 3,712 12/02/2019 66,129 57,246 1,201 13/02/2019 20,770 37,275 790 14/02/2019 53,434 32,925 2,089 15/02/2019 37,220 32,350 1,436 16/02/2019 89,644 80,754 3,022 17/02/2019 14,606 16,251 870 18/02/2019 8,647 72,838 22,814 19/02/2019 22,744 35,515 7,010 20/02/2019 46,934 20,803 8,760 21/02/2019 56,551 50,643 1,391 22/02/2019 23,005 26,605 2,248 23/02/2019 78,904 101,539 11,170 24/02/2019 23,059 28,284 1,035 25/02/2019 23,554 29,013 998 26/02/2019 84,894 78,375 7,327 27/02/2019 80,994 44,869 11,882 28/02/2019 74,186 129,328 46,699 TOTAL 1,619,234 1,790,616 207,880 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- SUZLON_III_W_SAILANA_14.1MW
  • 65. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 21,231 36,338 353 02/02/2019 41,870 189,089 68,350 03/02/2019 22,386 153,904 61,088 04/02/2019 17,710 123,148 31,161 05/02/2019 31,477 114,336 12,387 06/02/2019 53,973 110,095 7,929 07/02/2019 84,935 274,002 72,679 08/02/2019 24,252 84,584 11,527 09/02/2019 32,451 92,863 13,128 10/02/2019 23,384 92,203 12,195 11/02/2019 31,082 215,186 109,208 12/02/2019 19,105 156,414 58,859 13/02/2019 46,029 112,676 11,920 14/02/2019 40,495 114,675 19,148 15/02/2019 26,350 114,800 13,815 16/02/2019 32,006 138,886 38,458 17/02/2019 11,746 48,213 2,724 18/02/2019 14,215 48,911 8,479 19/02/2019 24,512 91,591 4,469 20/02/2019 16,084 54,259 12,832 21/02/2019 63,135 284,648 116,037 22/02/2019 22,989 111,175 27,300 23/02/2019 25,602 106,443 11,465 24/02/2019 15,525 126,755 27,300 25/02/2019 20,524 144,058 48,940 26/02/2019 109,767 221,947 72,325 27/02/2019 136,030 258,204 75,304 28/02/2019 29,450 143,544 39,836 TOTAL 1,038,315 3,762,947 989,216 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- SUDHEER_30MW_BERCHHA
  • 66. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 20,437 37,833 3,807 02/02/2019 24,807 108,956 48,062 03/02/2019 11,327 53,781 15,399 04/02/2019 1,818 14,639 1,677 05/02/2019 6,983 48,886 13,156 06/02/2019 12,933 44,998 21,666 07/02/2019 61,991 164,492 65,927 08/02/2019 821 12,070 815 09/02/2019 14,449 33,169 4,281 10/02/2019 1,197 22,216 4,342 11/02/2019 13,514 54,836 10,807 12/02/2019 7,975 58,446 12,543 13/02/2019 16,370 30,219 3,504 14/02/2019 11,880 74,819 19,548 15/02/2019 4,694 83,562 60,509 16/02/2019 10,482 63,259 30,897 17/02/2019 1,904 127 0 18/02/2019 3,980 14,752 171 19/02/2019 13,951 32,160 2,566 20/02/2019 4,808 43,385 20,483 21/02/2019 42,064 142,767 58,958 22/02/2019 8,111 87,334 56,146 23/02/2019 12,112 63,857 17,248 24/02/2019 288 20,338 7,625 25/02/2019 2,555 47,846 17,951 26/02/2019 42,454 106,947 25,100 27/02/2019 43,405 18,855 9,769 28/02/2019 7,457 45,051 16,844 TOTAL 404,767 1,529,600 549,801 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- SUZLON_I_W_SUSNER_15MW
  • 67. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 16,653 43,130 5,504 02/02/2019 46,742 108,971 15,183 03/02/2019 32,424 62,613 3,030 04/02/2019 30,884 45,211 181 05/02/2019 19,896 51,706 4,502 06/02/2019 60,530 44,424 9,233 07/02/2019 121,833 128,625 10,619 08/02/2019 29,051 37,156 3,498 09/02/2019 32,749 59,189 3,908 10/02/2019 19,516 62,216 8,586 11/02/2019 24,785 81,508 14,038 12/02/2019 19,126 44,009 924 13/02/2019 21,314 47,702 1,255 14/02/2019 54,443 67,648 1,241 15/02/2019 28,317 102,872 31,438 16/02/2019 33,714 85,624 23,073 17/02/2019 7,431 24,801 86 18/02/2019 17,408 77,088 25,975 19/02/2019 32,164 69,514 11,164 20/02/2019 28,645 35,160 441 21/02/2019 52,732 126,066 30,178 22/02/2019 24,367 103,958 40,523 23/02/2019 37,295 101,041 24,813 24/02/2019 27,060 100,008 24,396 25/02/2019 44,220 111,258 30,600 26/02/2019 101,292 130,008 12,579 27/02/2019 117,039 110,324 16,463 28/02/2019 34,051 104,237 37,369 TOTAL 1,115,681 2,166,067 390,800 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- RENEW_WIND_AP4_30MW_KHACHROD
  • 68. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 62,220 65,250 22,251 02/02/2019 123,756 252,370 101,638 03/02/2019 103,327 183,940 58,475 04/02/2019 88,411 182,080 67,696 05/02/2019 47,409 81,910 4,915 06/02/2019 107,414 75,270 16,172 07/02/2019 172,871 247,080 39,100 08/02/2019 59,900 70,780 12,689 09/02/2019 69,875 136,370 43,714 10/02/2019 72,460 160,790 58,838 11/02/2019 63,306 213,910 140,172 12/02/2019 55,956 125,720 56,034 13/02/2019 57,018 140,000 45,508 14/02/2019 79,272 54,910 5,053 15/02/2019 54,478 84,320 4,517 16/02/2019 76,036 160,270 67,824 17/02/2019 42,810 43,790 1,544 18/02/2019 51,580 103,400 9,144 19/02/2019 59,743 91,280 15,426 20/02/2019 60,369 40,930 590 21/02/2019 76,498 111,830 9,421 22/02/2019 54,295 81,240 16,165 23/02/2019 76,996 144,440 46,692 24/02/2019 64,138 146,490 36,072 25/02/2019 53,880 120,990 38,027 26/02/2019 152,656 201,890 21,192 27/02/2019 198,568 146,480 49,019 28/02/2019 88,774 199,740 98,411 TOTAL 2,274,016 3,667,470 1,086,299 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- SARJAN_25.2MW_BADNAGAR
  • 69. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 55,610 45,255 1,535 02/02/2019 70,456 72,940 794 03/02/2019 73,746 89,378 2,837 04/02/2019 47,951 50,948 231 05/02/2019 38,071 24,903 16 06/02/2019 44,591 35,101 416 07/02/2019 94,281 119,304 14,469 08/02/2019 35,342 29,468 4,231 09/02/2019 40,622 35,327 152 10/02/2019 42,047 28,873 174 11/02/2019 80,298 88,759 4,433 12/02/2019 62,206 75,377 8,434 13/02/2019 46,429 50,060 1,724 14/02/2019 83,578 69,095 16,268 15/02/2019 53,314 57,132 1,983 16/02/2019 62,310 51,296 5,017 17/02/2019 34,352 11,347 39 18/02/2019 73,231 74,614 9,729 19/02/2019 71,473 72,466 5,609 20/02/2019 49,928 38,151 742 21/02/2019 96,821 117,827 4,737 22/02/2019 59,150 63,010 1,825 23/02/2019 79,497 78,322 3,072 24/02/2019 47,934 42,629 239 25/02/2019 88,203 92,405 495 26/02/2019 102,558 113,970 13,143 27/02/2019 48,163 21,686 378 28/02/2019 43,721 71,290 15,473 TOTAL 1,725,883 1,720,933 118,195 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- GIRIRAJ_AFJALPUR_15MW
  • 70. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 47,641 41,244 6,449 02/02/2019 98,037 132,527 16,644 03/02/2019 59,279 62,419 3,859 04/02/2019 35,060 15,332 124 05/02/2019 32,510 56,641 4,466 06/02/2019 59,027 71,176 24,137 07/02/2019 125,176 201,335 36,666 08/02/2019 44,653 20,753 1,712 09/02/2019 45,291 40,847 3,071 10/02/2019 35,145 18,033 69 11/02/2019 41,671 51,810 3,305 12/02/2019 56,934 59,213 7,781 13/02/2019 39,050 29,788 5,441 14/02/2019 48,444 75,885 12,189 15/02/2019 71,111 81,056 14,785 16/02/2019 65,697 69,308 15,114 17/02/2019 35,339 1,139 11 18/02/2019 43,756 30,736 1,197 19/02/2019 43,565 25,930 1,154 20/02/2019 41,116 37,789 11,214 21/02/2019 124,126 147,787 21,052 22/02/2019 96,529 93,465 9,821 23/02/2019 79,637 81,665 15,844 24/02/2019 51,587 35,089 12,120 25/02/2019 55,618 65,733 15,005 26/02/2019 92,985 127,746 26,842 27/02/2019 55,175 36,313 4,761 28/02/2019 44,578 51,515 5,758 TOTAL 1,668,737 1,762,274 280,591 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- SUZLON_III_W_AGAR_15MW
  • 71. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 54,653 64,193 21,073 02/02/2019 67,666 78,120 6,713 03/02/2019 75,013 82,734 2,818 04/02/2019 51,153 41,384 130 05/02/2019 39,173 25,363 524 06/02/2019 43,231 41,551 2,354 07/02/2019 90,773 121,419 14,391 08/02/2019 35,479 24,058 438 09/02/2019 41,193 48,411 424 10/02/2019 41,425 39,846 3,501 11/02/2019 77,360 87,271 7,967 12/02/2019 58,876 60,146 2,428 13/02/2019 44,567 32,392 1,258 14/02/2019 63,720 69,422 4,923 15/02/2019 53,860 52,029 4,531 16/02/2019 61,963 49,036 1,141 17/02/2019 36,398 8,421 0 18/02/2019 42,977 82,182 30,999 19/02/2019 70,986 43,109 2,978 20/02/2019 38,618 39,102 3,615 21/02/2019 81,199 97,696 7,552 22/02/2019 58,975 55,171 3,963 23/02/2019 68,172 64,915 910 24/02/2019 47,732 58,481 4,764 25/02/2019 80,212 85,637 17,064 26/02/2019 101,547 83,842 22,045 27/02/2019 57,209 30,955 7,322 28/02/2019 36,767 70,279 14,686 TOTAL 1,620,897 1,637,165 190,512 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- GIRIRAJ_MANDVI_15MW
  • 72. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 641,230 623,821 469 02/02/2019 648,484 603,246 1,275 03/02/2019 645,953 498,675 8,194 04/02/2019 576,217 428,564 11,122 05/02/2019 525,643 497,785 5,537 06/02/2019 644,356 442,793 51,078 07/02/2019 650,201 600,529 3,248 08/02/2019 694,484 643,682 0 09/02/2019 693,114 673,421 63 10/02/2019 629,401 642,834 4,107 11/02/2019 679,031 659,731 0 12/02/2019 683,483 623,882 3,364 13/02/2019 496,355 399,728 9,859 14/02/2019 641,066 488,061 18,453 15/02/2019 700,656 620,237 137 16/02/2019 725,315 697,029 2,818 17/02/2019 711,038 689,676 1,319 18/02/2019 384,769 224,821 28,284 19/02/2019 673,321 643,539 3,801 20/02/2019 623,912 648,052 2,089 21/02/2019 243,720 648,460 331,044 22/02/2019 683,516 676,991 0 23/02/2019 659,122 499,450 90,837 24/02/2019 553,097 611,421 7,227 25/02/2019 721,900 701,070 2,228 26/02/2019 318,383 551,707 202,741 27/02/2019 252,640 616,620 288,860 28/02/2019 656,076 728,446 9,278 TOTAL 16,756,483 16,384,271 1,087,432 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- WELSPUN_RATANGARH
  • 73. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 47,235 35,006 4,124 02/02/2019 86,122 103,371 8,333 03/02/2019 51,586 47,547 898 04/02/2019 28,710 12,215 1 05/02/2019 33,722 44,789 1,444 06/02/2019 48,071 51,476 14,561 07/02/2019 91,874 169,995 31,726 08/02/2019 41,904 16,038 348 09/02/2019 40,012 33,785 1,216 10/02/2019 37,710 15,788 0 11/02/2019 37,432 40,450 5,131 12/02/2019 42,768 43,885 2,563 13/02/2019 36,321 24,549 7,665 14/02/2019 51,323 59,607 6,034 15/02/2019 59,593 74,382 19,923 16/02/2019 55,640 52,258 11,013 17/02/2019 30,766 862 0 18/02/2019 38,807 23,977 1,236 19/02/2019 38,925 18,503 392 20/02/2019 42,341 34,258 12,536 21/02/2019 117,526 126,804 13,856 22/02/2019 77,536 85,572 11,750 23/02/2019 79,464 73,165 13,794 24/02/2019 47,127 27,216 9,465 25/02/2019 44,098 44,785 3,415 26/02/2019 87,761 95,230 12,050 27/02/2019 47,571 29,696 2,449 28/02/2019 43,093 47,039 5,042 TOTAL 1,485,038 1,432,248 200,965 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- SUZLON_IV_W_AGAR_15MW
  • 74. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/02/2019 43,605 17,376 1,295 02/02/2019 96,664 125,621 10,805 03/02/2019 83,110 96,150 3,191 04/02/2019 57,926 65,131 339 05/02/2019 39,474 52,662 1,447 06/02/2019 69,831 21,807 13,520 07/02/2019 140,212 146,094 17,646 08/02/2019 50,563 28,527 581 09/02/2019 47,629 39,263 489 10/02/2019 42,536 44,838 419 11/02/2019 48,810 69,895 4,452 12/02/2019 54,629 57,456 787 13/02/2019 61,751 69,611 2,217 14/02/2019 76,515 42,845 13,251 15/02/2019 50,962 56,096 2,043 16/02/2019 85,776 93,229 16,157 17/02/2019 32,058 14,098 0 18/02/2019 62,316 63,667 1,319 19/02/2019 63,897 74,439 2,991 20/02/2019 47,111 24,005 324 21/02/2019 67,297 55,877 830 22/02/2019 48,659 60,863 3,312 23/02/2019 75,491 81,971 12,579 24/02/2019 66,178 62,388 522 25/02/2019 68,569 71,500 5,177 26/02/2019 111,808 122,187 12,353 27/02/2019 88,000 71,567 4,707 28/02/2019 82,444 86,827 6,112 TOTAL 1,863,821 1,815,990 138,865 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF February-2019 NAME OF QCA :- RECONNECT NAME OF POOLING STATION :- SUZLON_SANDALA_II_W_KHACHROD_14.7MW