ETALON TECHNOLOGIES is a leading provider of diversified Engineering Services, IT
Services and BPO Services. The company helps customers in the Aerospace &
Defense, Transportation, Power Generation, Civil Engineering, Oil & Gas, Marine,
FMCG, Industrial, Electronic & Telecom, Education & Publishing, Banking & Finance,
Healthcare & Insurance, Chemical, Petroleum & Pharmaceuticals and Public Sectors
& Government verticals to cut product development costs, shorten lead times,
extend capacity and maximize engineering resources availability by providing support
across the complete product life cycle from Design Automation, Modeling & Drafting,
Legacy Conversion, Engineering Analysis, Manufacturing Engineering, Plant Design
Engineering, Re-engineering, Value Engineering, Embedded Solutions, Technical
Publication, ERP, Multi Media, Web Technology, Quality Consulting, Testing Services,
Information Management Services, Quality Management Services, Voice and Non-
Voice. Through our Global Product Development framework and our on-site/off-
shore/on-shore models, we leverage our local presence and global reach to support
globalization initiatives for our customers.

Etalon Technologies is providing End-To-End Engineering solutions to our customers.
Our capabilities are highly efficient to please our customers by taking care of Total
Product Life Cycle Management.

Our Capabilities, years of experience have given us to serve the present industrial
requirements in providing Engineering Solutions and Manufacturing support to our
customers globally.

By all these and Quality Management System (QMS) we lived up to our client’s
demands of quality workmanship and stringent time schedules. With these strengths,
combined with our considerable technical human resource, we expect to be a
formidable competitor in the high growth market, we have chosen to serve.




© Etalon Technologies                                              www.etalongroup.org
Domains:
   Aerospace & Defense
   Transportation
   Power Generation
   Industrial
   Civil Engineering
   Oil & Gas
   Marine
   FMCG
   Electronic & Telecom
   Healthcare
   Chemical, Petroleum & Pharmaceuticals
   Public Sectors & Government




© Etalon Technologies                       www.etalongroup.org
Services:
   Design Automation
   Modeling and Drafting
   Engineering Analysis
   Plant Design Engineering
   Reverse Engineering
   Manufacturing Engineering
   Civil Engineering
   Technical Publication
   Embedded Solutions
   Value Engineering


Tools Capability:
CAD:
Auto CAD, Catia, Unigraphics, CADDS, Co-Create, Ideas, Imageware, MicroStation, PDS,
ProEngineer, Solid Works, Stru CAD, Unigraphics, X Steel.
CAE:
Ansys, LS / Dyna, Math CAD, Matlab, MoldFlow, Nastran, Patran, STAAD, STAR-CD.
CAM:
CATIA, ProEngineer, Solid Works, UG CAM, Delcam, Mastercam.
Modeling & Meshing:
ANSA, HyperMesh, ICEM –CFD, MSC Patran, Pro-Star.




© Etalon Technologies                                                      www.etalongroup.org
Aerospace & Defense:
We specialized in both civil and defense aerospace industries. We work on design
and development of systems and subsystems of
   Structures                 Interiors
   Engines                    Ground support equipments 
   Ancillaries                Electrical systems

We help our customers to improve quality of supply, reduce time to market, grow
capacity, increase revenue-generation life, reduce cost of product development, and
enhance sustenance engineering.


    Design & Development                       Engineering Analysis
      Design support                            Fatigue analysis
      Solid modeling and drafting               Damage tolerances and fracture analysis
      Surface modeling                          CFD
      Assembly modeling                         Dynamic analysis
      Cost modeling                             Kinematic analysis
      Structure modeling                        Analysis test co-relation
      System and subsystem design               Reliability analysis
                                                 Thermo-mechanical analysis
                                                 Stress justification reports

    Manufacturing Engineering                   Technical Publication
      CNC/CMM programming                       Aircraft maintenance manual
      Casting, forging and fabrication          Component maintenance manual
       engineering                               Engine manual
      Process planning                          Acceptance and test procedure
      Production planning                       Service bulletins
      Production management                     SGML conversion
      Prototyping                               Structural repair manual
      Re-engineering                            Qualification test reports
      Tooling design
      Vendor qualification and management
      APQP process

Embedded Solutions: Application software development, automated test equipments, control
automation, embedded software development, hardware development, simulation s/w development,
independent verification and validation.




© Etalon Technologies                                                 www.etalongroup.org
Transportation:
We have good experience in automotive (commercial or military), locomotive and
marine industries. We work on:

      Systems and subsystems
      Exteriors
      Interiors
      Chassis

We help our customers to improve quality of supply, reduce time to market, grow
capacity, increase revenue-generation life, reduce cost of product development, and
enhance sustenance engineering.



      Product Design and Modeling               Engineering Analysis
       Concept development                      Stress
       Preliminary and detail design            Thermal and heat transfer analysis
       Product design support                   CFD analysis
       Process atomization and customization    NVH
       CAD modeling                             Crash analysis
       Design Calculation                       Field failure analysis
       Modeling and automation                  Kinematics and dynamics analysis
       Value engineering                        Durability
       Re-engineering

      Manufacturing Engineering                 Engineering Support
       CNC programming                          Legacy data conversion
       CMM programming                          Design standardization
       Process planning                         BOM updation
       Product management                       Trouble shooting
       Rapid prototyping
       Tooling design
       Vendor qualification




© Etalon Technologies                                                  www.etalongroup.org
Power Generation:
We specialized in power generation industries as we have good experience. We work
on design and development of equipments such as:

        Turbines
        Compressors
        Generators
        Accessories

We help to improve quality of supply and productivity, reduce time to market and
cost of product development and to overcome capacity constraints.


    Product Development Plants and                    Customer Application
    Equipments                                         Plant and system outline drawing
        Design and drafting for mechanical, civil,    Product customization for customer
         electrical                                     application
        Design validation structural and dynamic      Detailed bill of material and
         analysis                                       manufacturing drawing
        Thermal and flow analysis                     EPC detailing support
        Design automation                             O&M manuals
        Design optimization                           Design localization
        Value engineering                             Equipment accessory and packaging


    Engineering Support                               Embedded Solutions
        Legacy as-built drawing conversation          System software development
        Upgrade and retrofit engineering              Real time application development
        Document translation                          PLC/HMI/SCADA implementation
        Support start-up                              Board development
        Performance testing, trouble shooting         Prototyping
        Decommissioning                               e-parts solution
                                                       Protection circuit solution

We work on marketing conceptual design, bid and proposal, we support
manufacturing and commissioning.




© Etalon Technologies                                                       www.etalongroup.org
Industrial:
We have good experience in machine tool design, industrial product design and
development and also instrumentation and control industries. We work on

        Concept design and CAD
        FEA (linear/non linear, fatigue, vibration, lifing, structural, static, stiffness)
        Jigs, fixture and tooling design
        Reverse engineering
        Field failure analysis
        Process planning
        NC and CNC programming, validation and verification
        Instrumentation and control engineering
        Rapid prototyping
        Process automation
        Sustenance engineering

We help in improving quality of supply, reducing time to market and cost of product
development.


    Machine Tools                                     Industrial Products
        Special purpose machines                       Motors,       mechanical      enclosures,
        Conveyors and transfer lines                    generators, pumps, pollution equipments,
        Earth moving equipment industry and             mechanical valves, pneumatic valves,
         heavy engineering                               actuators, hand tools, bearings, clamps,
                                                         seals and industrial dryers
    Instrumentation and Controls                      Home Appliances
        Pressure gauges, pressure       switches,      Consumer durables, home appliances,
         sensors, valves, calibrators.                   garden and farm equipment and
                                                         electronic appliances




© Etalon Technologies                                                        www.etalongroup.org
Civil Engineering:
We have good experience in civil engineering domain. Our capabilities extends to

        Infrastructure
        Commercial and residential
        Institutional structures
        Steel structures
        Concrete structures
        Bulk material handling structures
        Façade engineering and HVAC
        Oil & Gas
        Power and industrial plants

We provide quality, cost effective end-to-end solution starting from feasibility study
to preparation of as-built drawings.


    Modeling and Drafting                      Design
        Engineering and contract drawing        Feasibility
        3- D modeling                           Conceptual and preliminary design
        Concept drawing                         Detailed structural design
        End reaction and load diagrams          Design calculations and loads
        Anchor bolt setting plan drawings       Connection and Misc design
        Erection/field drawings
        Shop drawings
        Rebar details
        Cutting lists
        Estimation
        Material take off

    Engineering Analysis                       Design Automation
        FEA                                     Design automation
        Static analysis                         Lisp programming
        Dynamic/impact analysis                 Development of automated software for
        Stress check                             design & drafting.
        Fracture/fatigue
        Vibration analysis




© Etalon Technologies                                                 www.etalongroup.org
Oil & Gas:
We have good experience in oil & gas industries. We work on design and
development of equipment and related accessories for
    Upstream application:
     Exploration, re-injection, LNG
    Midstream application:
     Pipeline, power generation, sea lines
    Downstream application:
     Petrochemical, fertilizers, refinery

We help to improve quality of supply, reduce cost of product development, enhance
productivity, increase product revenue generation life, overcome capacity constraints
and enhance sustenance engineering.


    Plant Design and Engineering                     Accessories Systems Design
      3D CAD modeling and drafting                   3D CAD modeling and detailing
      Technical bid evaluation                       Skid layout and Study
      Single discipline detail engineering           Piping and layout design
       (piping, mechanical, civil, electrical,        Mechanical structure design
       instrumentation,       process,     project    Design validation ( FEA and CFD)
       management support)                            Instrumentation and controls
      Multi discipline detail engineering            Electrical detailing
      Design validation (FEA and CFD)                Software      engineering    (HMI,   data
      As built documentation                          acquisition software, PLC programming)
      Staffing                                       Hardware engineering (digital, analog and
                                                       I/O design)
                                                      Customized modules

    Product Development and support                  Embedded Solutions
      Concept design                                 complete software development life cycle
      Detailed design                                 right from the requirement capture stage
      Design automation                               till the final certification and sustenance
      Design validation (FEA and CFD)                 stage
      3D & 2D CAD support
      Manufacturing engineering (CNC/CMM
       programming, tooling design, vendor
       qualification and management)
      Technical publication




© Etalon Technologies                                                       www.etalongroup.org
Marine, FMCG, Electronic & Telecom, Healthcare, Chemical,
Petroleum, Pharmaceuticals, Public Sectors & Government:
We have a good experience in Mechanical engineering activities in Marine, FMCG,
Electronic & Telecom, Healthcare, Chemical, Petroleum, Pharmaceuticals, Public
Sectors & Government domain. We work on:
      Design Automation
      Modeling and Drafting
      Engineering Analysis
      Plant Design Engineering
      Reverse Engineering
      Manufacturing Engineering
      Civil Engineering
      Technical Publication




© Etalon Technologies                                         www.etalongroup.org
Etalon Technologies
No. 12, 3rd Cross,
Kusturibainagar, Malleshwaram,
Bangalore 560 003, India.
Tel: +91 80 23562341

www.etalongroup.org


© Etalon Technologies

The information contained in this document is the property of Etalon Technologies and may not be
copied, or disclosed to a third party, or used, for any purpose other than that for which it is
supplied without the permission of Etalon Technologies.




© Etalon Technologies

Etalon Technologies Engineering Servicess

  • 2.
    ETALON TECHNOLOGIES isa leading provider of diversified Engineering Services, IT Services and BPO Services. The company helps customers in the Aerospace & Defense, Transportation, Power Generation, Civil Engineering, Oil & Gas, Marine, FMCG, Industrial, Electronic & Telecom, Education & Publishing, Banking & Finance, Healthcare & Insurance, Chemical, Petroleum & Pharmaceuticals and Public Sectors & Government verticals to cut product development costs, shorten lead times, extend capacity and maximize engineering resources availability by providing support across the complete product life cycle from Design Automation, Modeling & Drafting, Legacy Conversion, Engineering Analysis, Manufacturing Engineering, Plant Design Engineering, Re-engineering, Value Engineering, Embedded Solutions, Technical Publication, ERP, Multi Media, Web Technology, Quality Consulting, Testing Services, Information Management Services, Quality Management Services, Voice and Non- Voice. Through our Global Product Development framework and our on-site/off- shore/on-shore models, we leverage our local presence and global reach to support globalization initiatives for our customers. Etalon Technologies is providing End-To-End Engineering solutions to our customers. Our capabilities are highly efficient to please our customers by taking care of Total Product Life Cycle Management. Our Capabilities, years of experience have given us to serve the present industrial requirements in providing Engineering Solutions and Manufacturing support to our customers globally. By all these and Quality Management System (QMS) we lived up to our client’s demands of quality workmanship and stringent time schedules. With these strengths, combined with our considerable technical human resource, we expect to be a formidable competitor in the high growth market, we have chosen to serve. © Etalon Technologies www.etalongroup.org
  • 3.
    Domains:  Aerospace & Defense  Transportation  Power Generation  Industrial  Civil Engineering  Oil & Gas  Marine  FMCG  Electronic & Telecom  Healthcare  Chemical, Petroleum & Pharmaceuticals  Public Sectors & Government © Etalon Technologies www.etalongroup.org
  • 4.
    Services:  Design Automation  Modeling and Drafting  Engineering Analysis  Plant Design Engineering  Reverse Engineering  Manufacturing Engineering  Civil Engineering  Technical Publication  Embedded Solutions  Value Engineering Tools Capability: CAD: Auto CAD, Catia, Unigraphics, CADDS, Co-Create, Ideas, Imageware, MicroStation, PDS, ProEngineer, Solid Works, Stru CAD, Unigraphics, X Steel. CAE: Ansys, LS / Dyna, Math CAD, Matlab, MoldFlow, Nastran, Patran, STAAD, STAR-CD. CAM: CATIA, ProEngineer, Solid Works, UG CAM, Delcam, Mastercam. Modeling & Meshing: ANSA, HyperMesh, ICEM –CFD, MSC Patran, Pro-Star. © Etalon Technologies www.etalongroup.org
  • 5.
    Aerospace & Defense: Wespecialized in both civil and defense aerospace industries. We work on design and development of systems and subsystems of  Structures  Interiors  Engines  Ground support equipments   Ancillaries  Electrical systems We help our customers to improve quality of supply, reduce time to market, grow capacity, increase revenue-generation life, reduce cost of product development, and enhance sustenance engineering. Design & Development Engineering Analysis  Design support  Fatigue analysis  Solid modeling and drafting  Damage tolerances and fracture analysis  Surface modeling  CFD  Assembly modeling  Dynamic analysis  Cost modeling  Kinematic analysis  Structure modeling  Analysis test co-relation  System and subsystem design  Reliability analysis  Thermo-mechanical analysis  Stress justification reports Manufacturing Engineering Technical Publication  CNC/CMM programming  Aircraft maintenance manual  Casting, forging and fabrication  Component maintenance manual engineering  Engine manual  Process planning  Acceptance and test procedure  Production planning  Service bulletins  Production management  SGML conversion  Prototyping  Structural repair manual  Re-engineering  Qualification test reports  Tooling design  Vendor qualification and management  APQP process Embedded Solutions: Application software development, automated test equipments, control automation, embedded software development, hardware development, simulation s/w development, independent verification and validation. © Etalon Technologies www.etalongroup.org
  • 6.
    Transportation: We have goodexperience in automotive (commercial or military), locomotive and marine industries. We work on:  Systems and subsystems  Exteriors  Interiors  Chassis We help our customers to improve quality of supply, reduce time to market, grow capacity, increase revenue-generation life, reduce cost of product development, and enhance sustenance engineering. Product Design and Modeling Engineering Analysis  Concept development  Stress  Preliminary and detail design  Thermal and heat transfer analysis  Product design support  CFD analysis  Process atomization and customization  NVH  CAD modeling  Crash analysis  Design Calculation  Field failure analysis  Modeling and automation  Kinematics and dynamics analysis  Value engineering  Durability  Re-engineering Manufacturing Engineering Engineering Support  CNC programming  Legacy data conversion  CMM programming  Design standardization  Process planning  BOM updation  Product management  Trouble shooting  Rapid prototyping  Tooling design  Vendor qualification © Etalon Technologies www.etalongroup.org
  • 7.
    Power Generation: We specializedin power generation industries as we have good experience. We work on design and development of equipments such as:  Turbines  Compressors  Generators  Accessories We help to improve quality of supply and productivity, reduce time to market and cost of product development and to overcome capacity constraints. Product Development Plants and Customer Application Equipments  Plant and system outline drawing  Design and drafting for mechanical, civil,  Product customization for customer electrical application  Design validation structural and dynamic  Detailed bill of material and analysis manufacturing drawing  Thermal and flow analysis  EPC detailing support  Design automation  O&M manuals  Design optimization  Design localization  Value engineering  Equipment accessory and packaging Engineering Support Embedded Solutions  Legacy as-built drawing conversation  System software development  Upgrade and retrofit engineering  Real time application development  Document translation  PLC/HMI/SCADA implementation  Support start-up  Board development  Performance testing, trouble shooting  Prototyping  Decommissioning  e-parts solution  Protection circuit solution We work on marketing conceptual design, bid and proposal, we support manufacturing and commissioning. © Etalon Technologies www.etalongroup.org
  • 8.
    Industrial: We have goodexperience in machine tool design, industrial product design and development and also instrumentation and control industries. We work on  Concept design and CAD  FEA (linear/non linear, fatigue, vibration, lifing, structural, static, stiffness)  Jigs, fixture and tooling design  Reverse engineering  Field failure analysis  Process planning  NC and CNC programming, validation and verification  Instrumentation and control engineering  Rapid prototyping  Process automation  Sustenance engineering We help in improving quality of supply, reducing time to market and cost of product development. Machine Tools Industrial Products  Special purpose machines  Motors, mechanical enclosures,  Conveyors and transfer lines generators, pumps, pollution equipments,  Earth moving equipment industry and mechanical valves, pneumatic valves, heavy engineering actuators, hand tools, bearings, clamps, seals and industrial dryers Instrumentation and Controls Home Appliances  Pressure gauges, pressure switches,  Consumer durables, home appliances, sensors, valves, calibrators. garden and farm equipment and electronic appliances © Etalon Technologies www.etalongroup.org
  • 9.
    Civil Engineering: We havegood experience in civil engineering domain. Our capabilities extends to  Infrastructure  Commercial and residential  Institutional structures  Steel structures  Concrete structures  Bulk material handling structures  Façade engineering and HVAC  Oil & Gas  Power and industrial plants We provide quality, cost effective end-to-end solution starting from feasibility study to preparation of as-built drawings. Modeling and Drafting Design  Engineering and contract drawing  Feasibility  3- D modeling  Conceptual and preliminary design  Concept drawing  Detailed structural design  End reaction and load diagrams  Design calculations and loads  Anchor bolt setting plan drawings  Connection and Misc design  Erection/field drawings  Shop drawings  Rebar details  Cutting lists  Estimation  Material take off Engineering Analysis Design Automation  FEA  Design automation  Static analysis  Lisp programming  Dynamic/impact analysis  Development of automated software for  Stress check design & drafting.  Fracture/fatigue  Vibration analysis © Etalon Technologies www.etalongroup.org
  • 10.
    Oil & Gas: Wehave good experience in oil & gas industries. We work on design and development of equipment and related accessories for  Upstream application: Exploration, re-injection, LNG  Midstream application: Pipeline, power generation, sea lines  Downstream application: Petrochemical, fertilizers, refinery We help to improve quality of supply, reduce cost of product development, enhance productivity, increase product revenue generation life, overcome capacity constraints and enhance sustenance engineering. Plant Design and Engineering Accessories Systems Design  3D CAD modeling and drafting  3D CAD modeling and detailing  Technical bid evaluation  Skid layout and Study  Single discipline detail engineering  Piping and layout design (piping, mechanical, civil, electrical,  Mechanical structure design instrumentation, process, project  Design validation ( FEA and CFD) management support)  Instrumentation and controls  Multi discipline detail engineering  Electrical detailing  Design validation (FEA and CFD)  Software engineering (HMI, data  As built documentation acquisition software, PLC programming)  Staffing  Hardware engineering (digital, analog and I/O design)  Customized modules Product Development and support Embedded Solutions  Concept design  complete software development life cycle  Detailed design right from the requirement capture stage  Design automation till the final certification and sustenance  Design validation (FEA and CFD) stage  3D & 2D CAD support  Manufacturing engineering (CNC/CMM programming, tooling design, vendor qualification and management)  Technical publication © Etalon Technologies www.etalongroup.org
  • 11.
    Marine, FMCG, Electronic& Telecom, Healthcare, Chemical, Petroleum, Pharmaceuticals, Public Sectors & Government: We have a good experience in Mechanical engineering activities in Marine, FMCG, Electronic & Telecom, Healthcare, Chemical, Petroleum, Pharmaceuticals, Public Sectors & Government domain. We work on:  Design Automation  Modeling and Drafting  Engineering Analysis  Plant Design Engineering  Reverse Engineering  Manufacturing Engineering  Civil Engineering  Technical Publication © Etalon Technologies www.etalongroup.org
  • 12.
    Etalon Technologies No. 12,3rd Cross, Kusturibainagar, Malleshwaram, Bangalore 560 003, India. Tel: +91 80 23562341 www.etalongroup.org © Etalon Technologies The information contained in this document is the property of Etalon Technologies and may not be copied, or disclosed to a third party, or used, for any purpose other than that for which it is supplied without the permission of Etalon Technologies. © Etalon Technologies