SlideShare a Scribd company logo
1 of 33
OAM 3G Network Ericsson
Sharing Discuss OAM 3G Ericsson
• Session 1 : Operation RAN Ericsson
 OSS
 EMAS
 Other Connection to RBS
• Session 2 : Maintenance RAN Ericsson
 Commissioning RBS
 Replace Module
 How to backup all Node in RAN 3G
 How to upgrade capacity RBS
Operation RAN Ericsson
OSS
OSS user guide
• Download and install Citrix di
http://10.2.242.66/citrix/ICAWEB
/ica_32_client/
• Setting IP Citrix di IP:
10.251.72.196
• Username : andit
Password : …….
• Support : Alarm Handling,
WCDMA Explorer, EMAS,
Console/Terminal For check IP
and Trance Route site, and
Remotely Trouble shooting
OSS (Count’)
Fault Management Procedure
The following procedure describes Radio Network Service remote
real-time events/alarms monitoring with the use of OSS-RC Alarm
List Viewer and Alarm Status Matrix.
A. Service & Network problem management
Right click to bring up OSS-RC Workspace Menu, Select Alarm,
Select View Alarm and Alarm Status Matrix
OSS (Count’)
Select and click on the selected Network Object (RNC) to
display the Alarm List Viewer
OSS (Count’)
Check RBS via Telnet OSS
Right click to bring up OSS-RC Workspace Menu, Select Sun
Tools, Select Terminal.
OSS (Count’)
Remotely Troubleshooting via EMAS OSS
Untuk melihat EM menggunakan OSS dapat dilakukan dengan
beberapa cara, salah satunya lewat WCDMA RAN Explorer. Pilih Node
yang akan ditampilkan. Klik kanan, pilih Tools dan Element Manager.
OSS (Count’)
Check/backup/Create CV RBS
Right click to bring up OSS-RC Workspace Menu, Select
Configuration, Select Manage HW & SW Inventory and
Software Management Organizer (SMO)
Element Manager
• Element Manager Service base on Java Platform
dengan java j2re 1.4.2 running on ie7 or Modzilla
• Untuk memudahkan switch IP RBS/RXI/RNC on site,
sebaiknya menggunakan software ShockIpChanger
http://10.184.xxx.xx/em/index_stubbed.html
Element Manager (Count’)
The RBS Element Manager (EM) contains the following
menus:
– Network Element
– Fetch
– Configuration
– Maintenance
– Supervision
– Tools
– Window
– Help
Element Manager (Count’)
EM Components
1. Title Bar
2. menu Bar
3. Panels
4. Information Bar
5. View Sector
6. Views
Element Manager (Count’)
• Running script
Element Manager (Count’)
• Check Alarm
Element Manager (Count’)
• Check attempt traffic
Element Manager (Count’)
• Modify Rack Node B
Other Connection to RBS
• NCLI (Node CLI) menggunakan kabel Emli
– Telnet
– SSH by Putty
– WinFIOL/Mosheel
Other Connection to RBS
Some commands :
– help : list the available CLI commands
– formathd : format Hard Disk
– hdinfo : print hard Disk geometry and identity
– cv : see configuration versions
– ifconfig : configure IP address
– passwd : set login password
– listloaded : list loaded load module
– ping : verify IP connenctivity
– vii : display visual indicator status
– lhsh : remote shell login
– pglist : program list
– reload : restart the GPB (General Purpose Processor Board)
– restart -- : start backup mode
– restartObj me : reload the complete RBS
– vols : check the volume on the GPB (see volume hard disk)
– Setclock : setting timing RBS
Maintenance RAN Ericsson
Tool OAM
• Untuk keperluan OAM, dibutuhkan beberapa kit :
– Kabel Emli+Ethernet LAN
– Kabel Emli+Extention RS232
– Kabel Loop RJ-45
– Kabel Serial
– Kabel Mux Marconi
– Tool kit standard (Kunci Bintang 5, 14, Inggris, Torq 8)
– Insertion tool E1_ET4, Optical (SC-Connector)
– Tool kit Core
Commissioning RBS
• Hal-hal yang dibutuhkan saat re-commisioning :
– Kabel Mli+LAN (EMAS) dan Kabel Mli+ Mli+Extention Hyperterminal (HyperT)
– Kabel loop E1
– Sofware Basic Package R30 (RBS 3107, RBS 3412, RBS 3206)
– Script configurasi :
• Script SE  di run on site
• Script OAM  di run on site
• Script IubLink  di run on site/remotely RNC
Di running bila integrasi new site
• Script Run_at_MGW_(site name)
• Script Run_at_RNC_(site name)_UTRANCELL_(jumlah sector)_sector
• Script Run_at_RNC_(site name)_IubLink_(jumlah E1)_E1
• Script Run_at_RNC_(site name)_RNC_RBS_OAM_RXI
• Script Run_at_RXI_(site name)_IubLink_(jumlah E1)_E1
• Script Run_at_RXI_(site name)_Mub_RXI_RBS_(jumlah E1)_E1
– Create CV
• Langkah-langkah yang dilakukan (see. File SOP re-commissioning)
Commissioning RBS ( Count’)
Langkah Langkah Commissioning RBS:
1. Format flash memory CBU
2. Create username dan password
3. Create ip default (ip: 169.254.1.1, netmask: 255.255.0.0)
4. Download software Basic Package (drive c dan d) ke flash memory CBU dengan
menggunakan tools WSFTP, BisonFTP, atau DiamondFTP
5. Refresh CBU, CBU akan mencreate drive j, sehingga akan terdapat 3 drive yaitu
c2, d, dan j
6. Pastikan ip default aktif, Klik icon Internet Explorer atau Modzilla
7. Ketik http://169.254.1.1/em/index_stubbed.html ==> loading EMAS (Ericsson
Element Manager)
8. Pastikan all module RBS tercreate dan kondisi Enable, bila ada yang masih disable
lakukan langkah delete-create module
9. Download configurasi OAM
10. Pastikan ip telah berubah sesuai dengan ip RBS sebelumnya
11. Setting update time
12. Ketik http://10.184.xxx.xx/em/index_stubbed.html ==> loading EMAS (Ericsson
Element Manager)
13. Create CV_OAM
14. Download configurasi SE, Create CV_SE
15. Download configurasi Iublink, Create CV_Iublink
16. Restart RBS by CV
17. Download/create configurasi External
Commissioning RBS ( Count’)
Cara Cepat untuk Configurasi OAM, Configurasi SE dengan
menggunakan scrip_OAM dan scrip_SE:
• Script_OAM
Scripts ini berisikan konfigurasi IP untuk RBS serta Routing table
RBS yang akan digunakan untuk OAM
(untuk meng-edit script ini harus berdasarkan file ATND)
• Script_SE
Script ini berisikan konfigurasi semua equipment RBS, mulai dari
frequency yang digunakan, Panjang feeder, Attenuator dll
(untuk meng-edit script ini harus berdasarkan file CDR)
Replace Module
Untuk menganti modul yang bermasalah dapat dilakukan dengan langkah
berikut ini:
• Pada EM RBS, pilih Maintenance Bar, Test dan Board
• Lock Modul yang akan di ganti
• Tukarkan modul yang bermasalah dengan modul yang baru
• Test modul yang telah diganti, jika hasilnya bagus jangan lupa untuk di Unlock kembali
How to backup all Node in RAN 3G
Untuk full backup pada prinsipnya download file dari Node ke local
storage. Sedangkan metodenya bisa kita lakukan dengan
menggunakan fasilitas aplikasi FTP. Untuk syaratnya download
dengan format Binary
Langkah langkah untuk Full backup:
1. Pastikan local storage (pc/laptop) connect ke jaringan yg bisa mengakses ke Node yg
akan diambil fullbackup-nya.
2. Buka aplikasi FTP.
3. Set FTP connection details:
– Session name
– Host name/destination address (ip)
– username: (rnc/rxi/rbs)
– password: (password node)
dapat dilihat seperti contoh dibawah ini : user : rxi, password: rxpbr01
How to backup all Node in RAN 3G (count’)
4. connect ke node.
5. copy/download drive /c dan /d ke local storage (pc/laptop)
Troubleshooting RBS
Untuk troubleshooting replace hardware CBU dapat dilakukan
dengan beberapa cara :
 Tidak mengganti flash card CBU ( jika flash card bekerja
normal)
 Melakukan pengantian modul CBU.
Apabila dilakukan pergantian modul CBU, dapat di
commissioning dengan beberapa cara:
 Commissioning secara normal
 Commisioning dengan cara upload file full backup untuk
node tersebut
lazy-Commissioning
Hal-hal yang harus diperhatikan untuk upload fullback up:
1. Type rack
2. IMA Group
3. Jumlah E1
Langkah Langkah Commissioning dengan cara upload Fullbackup:
• Format flash card CBU
• Setting IP Address dan Password
Set the IP address to the default IP address i.e. 169.254.1.1
subnet 255.255.0.0.
• Loading file full backup.
The software (c2 and d) is downloaded from the thin client to the
RBS over the Ethernet link, using WS_FTP or FTP
lazy-Commissioning (Count’)
• Pastikan semua file sudah tersimpan di CBU
• Masuk EM dengan menggunakan IP RBS yang di full backup
• Parameter yang harus dirubah di EM sebagai berikut:
– Setting IP Address sesuai dengan IP existing
– Setting IPoverATM sesuai dengan IPoverATM existing
– Lock semua AAL2Path yang ada
– Setting ulang A2ea.
– Setting AAL2Path
– Setting ulang RBS Local Cell
– Unlock semua AAL2Path yang ada
– Pastikan semua modul sudah bekerja normal
– Create new CV
– Warm Reload dengan CV terbaru.
RBS Hardware Upgrade Procedure
The following procedure describes the Random Access and
Receiver (RAX) board RAX-B and Transmitter (TX) board hardware
upgrade.
The procedure for adding an RAX or TX board consists of the
following:
• Auto-create detected object is checked
• Installing a Board
• Adding a Board to the Configuration
When a new board is installed in the subrack it will be automatically
configured. The board must be unlocked when the configuration is
finished
RBS Hardware Upgrade Procedure (count’)
1. Auto – create enable
– Set up a thin client - to - RBS Ethernet connection.
– Start the RBS Element Manager (RBS EM)
– Select Network Element Menu – Setting, ensure Auto-create detected object
is checked
RBS Hardware Upgrade Procedure (count’)
2. Installing Board
To install a board, do the following:
• In the RBS EM, select the Equipment view to the left
• Select the applicable subrack and expand it by clicking its plus sign
• Check the slot number in the digital subrack against the work order and
Hardware Configuration Data.
• Replace the relevant installed unit (dummy board) with the new RAX board,
or TX board.
Thank You

More Related Content

Similar to Sharing-Knowledge-OAM-3G-Ericsson .ppt

Anton Moldovan "Building an efficient replication system for thousands of ter...
Anton Moldovan "Building an efficient replication system for thousands of ter...Anton Moldovan "Building an efficient replication system for thousands of ter...
Anton Moldovan "Building an efficient replication system for thousands of ter...Fwdays
 
Implementing an IPv6 Enabled Environment for a Public Cloud Tenant
Implementing an IPv6 Enabled Environment for a Public Cloud TenantImplementing an IPv6 Enabled Environment for a Public Cloud Tenant
Implementing an IPv6 Enabled Environment for a Public Cloud TenantShixiong Shang
 
AIX Advanced Administration Knowledge Share
AIX Advanced Administration Knowledge ShareAIX Advanced Administration Knowledge Share
AIX Advanced Administration Knowledge Share.Gastón. .Bx.
 
Ceph Day Beijing: CeTune: A Framework of Profile and Tune Ceph Performance
Ceph Day Beijing: CeTune: A Framework of Profile and Tune Ceph Performance Ceph Day Beijing: CeTune: A Framework of Profile and Tune Ceph Performance
Ceph Day Beijing: CeTune: A Framework of Profile and Tune Ceph Performance Ceph Community
 
05 module managing your network enviornment
05  module managing your network enviornment05  module managing your network enviornment
05 module managing your network enviornmentAsif
 
See what happened with real time kvm when building real time cloud pezhang@re...
See what happened with real time kvm when building real time cloud pezhang@re...See what happened with real time kvm when building real time cloud pezhang@re...
See what happened with real time kvm when building real time cloud pezhang@re...LinuxCon ContainerCon CloudOpen China
 
Chef arista devops days a'dam 2015
Chef arista devops days a'dam 2015Chef arista devops days a'dam 2015
Chef arista devops days a'dam 2015Edwin Beekman
 
Windows containers troubleshooting
Windows containers troubleshootingWindows containers troubleshooting
Windows containers troubleshootingAlexey Bokov
 
Known basic of NFV Features
Known basic of NFV FeaturesKnown basic of NFV Features
Known basic of NFV FeaturesRaul Leite
 
Intel's Out of the Box Network Developers Ireland Meetup on March 29 2017 - ...
Intel's Out of the Box Network Developers Ireland Meetup on March 29 2017  - ...Intel's Out of the Box Network Developers Ireland Meetup on March 29 2017  - ...
Intel's Out of the Box Network Developers Ireland Meetup on March 29 2017 - ...Haidee McMahon
 
OVN DBs HA with scale test
OVN DBs HA with scale testOVN DBs HA with scale test
OVN DBs HA with scale testAliasgar Ginwala
 
Building PoC ready ODM Platforms with Arm SystemReady v5.2.pdf
Building PoC ready ODM Platforms with Arm SystemReady v5.2.pdfBuilding PoC ready ODM Platforms with Arm SystemReady v5.2.pdf
Building PoC ready ODM Platforms with Arm SystemReady v5.2.pdfPaul Yang
 
Cisco data center support
Cisco data center supportCisco data center support
Cisco data center supportKrunal Shah
 
Spectre meltdown performance_tests - v0.3
Spectre meltdown performance_tests - v0.3Spectre meltdown performance_tests - v0.3
Spectre meltdown performance_tests - v0.3David Pasek
 
VoiceBootcamp Ccnp collaboration lab guide v1.0 sample
VoiceBootcamp Ccnp collaboration lab guide v1.0 sampleVoiceBootcamp Ccnp collaboration lab guide v1.0 sample
VoiceBootcamp Ccnp collaboration lab guide v1.0 sampleFaisal Khan
 
SR-IOV, KVM and Emulex OneConnect 10Gbps cards on Debian/Stable
SR-IOV, KVM and Emulex OneConnect 10Gbps cards on Debian/StableSR-IOV, KVM and Emulex OneConnect 10Gbps cards on Debian/Stable
SR-IOV, KVM and Emulex OneConnect 10Gbps cards on Debian/Stablejuet-y
 
LTM essentials
LTM essentialsLTM essentials
LTM essentialsbharadwajv
 

Similar to Sharing-Knowledge-OAM-3G-Ericsson .ppt (20)

Anton Moldovan "Building an efficient replication system for thousands of ter...
Anton Moldovan "Building an efficient replication system for thousands of ter...Anton Moldovan "Building an efficient replication system for thousands of ter...
Anton Moldovan "Building an efficient replication system for thousands of ter...
 
Implementing an IPv6 Enabled Environment for a Public Cloud Tenant
Implementing an IPv6 Enabled Environment for a Public Cloud TenantImplementing an IPv6 Enabled Environment for a Public Cloud Tenant
Implementing an IPv6 Enabled Environment for a Public Cloud Tenant
 
AIX Advanced Administration Knowledge Share
AIX Advanced Administration Knowledge ShareAIX Advanced Administration Knowledge Share
AIX Advanced Administration Knowledge Share
 
Chapter5ccna
Chapter5ccnaChapter5ccna
Chapter5ccna
 
Ceph Day Beijing: CeTune: A Framework of Profile and Tune Ceph Performance
Ceph Day Beijing: CeTune: A Framework of Profile and Tune Ceph Performance Ceph Day Beijing: CeTune: A Framework of Profile and Tune Ceph Performance
Ceph Day Beijing: CeTune: A Framework of Profile and Tune Ceph Performance
 
05 module managing your network enviornment
05  module managing your network enviornment05  module managing your network enviornment
05 module managing your network enviornment
 
Netlink-Optimization.pptx
Netlink-Optimization.pptxNetlink-Optimization.pptx
Netlink-Optimization.pptx
 
See what happened with real time kvm when building real time cloud pezhang@re...
See what happened with real time kvm when building real time cloud pezhang@re...See what happened with real time kvm when building real time cloud pezhang@re...
See what happened with real time kvm when building real time cloud pezhang@re...
 
Ha nsf notes
Ha nsf notesHa nsf notes
Ha nsf notes
 
Chef arista devops days a'dam 2015
Chef arista devops days a'dam 2015Chef arista devops days a'dam 2015
Chef arista devops days a'dam 2015
 
Windows containers troubleshooting
Windows containers troubleshootingWindows containers troubleshooting
Windows containers troubleshooting
 
Known basic of NFV Features
Known basic of NFV FeaturesKnown basic of NFV Features
Known basic of NFV Features
 
Intel's Out of the Box Network Developers Ireland Meetup on March 29 2017 - ...
Intel's Out of the Box Network Developers Ireland Meetup on March 29 2017  - ...Intel's Out of the Box Network Developers Ireland Meetup on March 29 2017  - ...
Intel's Out of the Box Network Developers Ireland Meetup on March 29 2017 - ...
 
OVN DBs HA with scale test
OVN DBs HA with scale testOVN DBs HA with scale test
OVN DBs HA with scale test
 
Building PoC ready ODM Platforms with Arm SystemReady v5.2.pdf
Building PoC ready ODM Platforms with Arm SystemReady v5.2.pdfBuilding PoC ready ODM Platforms with Arm SystemReady v5.2.pdf
Building PoC ready ODM Platforms with Arm SystemReady v5.2.pdf
 
Cisco data center support
Cisco data center supportCisco data center support
Cisco data center support
 
Spectre meltdown performance_tests - v0.3
Spectre meltdown performance_tests - v0.3Spectre meltdown performance_tests - v0.3
Spectre meltdown performance_tests - v0.3
 
VoiceBootcamp Ccnp collaboration lab guide v1.0 sample
VoiceBootcamp Ccnp collaboration lab guide v1.0 sampleVoiceBootcamp Ccnp collaboration lab guide v1.0 sample
VoiceBootcamp Ccnp collaboration lab guide v1.0 sample
 
SR-IOV, KVM and Emulex OneConnect 10Gbps cards on Debian/Stable
SR-IOV, KVM and Emulex OneConnect 10Gbps cards on Debian/StableSR-IOV, KVM and Emulex OneConnect 10Gbps cards on Debian/Stable
SR-IOV, KVM and Emulex OneConnect 10Gbps cards on Debian/Stable
 
LTM essentials
LTM essentialsLTM essentials
LTM essentials
 

More from wafawafa52

515878259-Node-Group-Synch-Workshop.pptx
515878259-Node-Group-Synch-Workshop.pptx515878259-Node-Group-Synch-Workshop.pptx
515878259-Node-Group-Synch-Workshop.pptxwafawafa52
 
385288768-TD-Training-Modules-Mobilis.pptx
385288768-TD-Training-Modules-Mobilis.pptx385288768-TD-Training-Modules-Mobilis.pptx
385288768-TD-Training-Modules-Mobilis.pptxwafawafa52
 
Ericsson Microwave Products Overview.ppt
Ericsson Microwave Products Overview.pptEricsson Microwave Products Overview.ppt
Ericsson Microwave Products Overview.pptwafawafa52
 
BaseBand-6630-Moshell-Commands .pdf
BaseBand-6630-Moshell-Commands      .pdfBaseBand-6630-Moshell-Commands      .pdf
BaseBand-6630-Moshell-Commands .pdfwafawafa52
 
45555555555-4G-Training .pptx
45555555555-4G-Training            .pptx45555555555-4G-Training            .pptx
45555555555-4G-Training .pptxwafawafa52
 
5-LTE-IP-Troubleshooting .ppt
5-LTE-IP-Troubleshooting            .ppt5-LTE-IP-Troubleshooting            .ppt
5-LTE-IP-Troubleshooting .pptwafawafa52
 
LTE-BASICS-ppt .ppt
LTE-BASICS-ppt                      .pptLTE-BASICS-ppt                      .ppt
LTE-BASICS-ppt .pptwafawafa52
 
ran-introicbasictroubleshooting3-230122164831-426c58cd.pdf
ran-introicbasictroubleshooting3-230122164831-426c58cd.pdfran-introicbasictroubleshooting3-230122164831-426c58cd.pdf
ran-introicbasictroubleshooting3-230122164831-426c58cd.pdfwafawafa52
 
toaz.info-5g-solution-overview-pr_306866f43cebfb285586e3dd90989b89.pdf
toaz.info-5g-solution-overview-pr_306866f43cebfb285586e3dd90989b89.pdftoaz.info-5g-solution-overview-pr_306866f43cebfb285586e3dd90989b89.pdf
toaz.info-5g-solution-overview-pr_306866f43cebfb285586e3dd90989b89.pdfwafawafa52
 
mop-baseband-integration-xl-project-pa-1docxdocx-pr_299cefaa0fd3e32dd950c7218...
mop-baseband-integration-xl-project-pa-1docxdocx-pr_299cefaa0fd3e32dd950c7218...mop-baseband-integration-xl-project-pa-1docxdocx-pr_299cefaa0fd3e32dd950c7218...
mop-baseband-integration-xl-project-pa-1docxdocx-pr_299cefaa0fd3e32dd950c7218...wafawafa52
 
FPGA_Logic.pdf
FPGA_Logic.pdfFPGA_Logic.pdf
FPGA_Logic.pdfwafawafa52
 
DWDM-Presentation.pdf
DWDM-Presentation.pdfDWDM-Presentation.pdf
DWDM-Presentation.pdfwafawafa52
 
Verilog HDL Design Examples ( PDFDrive ).pdf
Verilog HDL Design Examples ( PDFDrive ).pdfVerilog HDL Design Examples ( PDFDrive ).pdf
Verilog HDL Design Examples ( PDFDrive ).pdfwafawafa52
 
VHDL summary.pdf
VHDL summary.pdfVHDL summary.pdf
VHDL summary.pdfwafawafa52
 
ROM PAL PLA.ppt
ROM PAL PLA.pptROM PAL PLA.ppt
ROM PAL PLA.pptwafawafa52
 
Lecture 16 RC Architecture Types & FPGA Interns Lecturer.pptx
Lecture 16 RC Architecture Types & FPGA Interns Lecturer.pptxLecture 16 RC Architecture Types & FPGA Interns Lecturer.pptx
Lecture 16 RC Architecture Types & FPGA Interns Lecturer.pptxwafawafa52
 
REVISION SYN3.pptx
REVISION SYN3.pptxREVISION SYN3.pptx
REVISION SYN3.pptxwafawafa52
 
INSTRUMENTATION.pptx
INSTRUMENTATION.pptxINSTRUMENTATION.pptx
INSTRUMENTATION.pptxwafawafa52
 
cnacan (2).ppt
cnacan (2).pptcnacan (2).ppt
cnacan (2).pptwafawafa52
 

More from wafawafa52 (20)

515878259-Node-Group-Synch-Workshop.pptx
515878259-Node-Group-Synch-Workshop.pptx515878259-Node-Group-Synch-Workshop.pptx
515878259-Node-Group-Synch-Workshop.pptx
 
385288768-TD-Training-Modules-Mobilis.pptx
385288768-TD-Training-Modules-Mobilis.pptx385288768-TD-Training-Modules-Mobilis.pptx
385288768-TD-Training-Modules-Mobilis.pptx
 
Ericsson Microwave Products Overview.ppt
Ericsson Microwave Products Overview.pptEricsson Microwave Products Overview.ppt
Ericsson Microwave Products Overview.ppt
 
BaseBand-6630-Moshell-Commands .pdf
BaseBand-6630-Moshell-Commands      .pdfBaseBand-6630-Moshell-Commands      .pdf
BaseBand-6630-Moshell-Commands .pdf
 
45555555555-4G-Training .pptx
45555555555-4G-Training            .pptx45555555555-4G-Training            .pptx
45555555555-4G-Training .pptx
 
5-LTE-IP-Troubleshooting .ppt
5-LTE-IP-Troubleshooting            .ppt5-LTE-IP-Troubleshooting            .ppt
5-LTE-IP-Troubleshooting .ppt
 
LTE-BASICS-ppt .ppt
LTE-BASICS-ppt                      .pptLTE-BASICS-ppt                      .ppt
LTE-BASICS-ppt .ppt
 
ran-introicbasictroubleshooting3-230122164831-426c58cd.pdf
ran-introicbasictroubleshooting3-230122164831-426c58cd.pdfran-introicbasictroubleshooting3-230122164831-426c58cd.pdf
ran-introicbasictroubleshooting3-230122164831-426c58cd.pdf
 
toaz.info-5g-solution-overview-pr_306866f43cebfb285586e3dd90989b89.pdf
toaz.info-5g-solution-overview-pr_306866f43cebfb285586e3dd90989b89.pdftoaz.info-5g-solution-overview-pr_306866f43cebfb285586e3dd90989b89.pdf
toaz.info-5g-solution-overview-pr_306866f43cebfb285586e3dd90989b89.pdf
 
mop-baseband-integration-xl-project-pa-1docxdocx-pr_299cefaa0fd3e32dd950c7218...
mop-baseband-integration-xl-project-pa-1docxdocx-pr_299cefaa0fd3e32dd950c7218...mop-baseband-integration-xl-project-pa-1docxdocx-pr_299cefaa0fd3e32dd950c7218...
mop-baseband-integration-xl-project-pa-1docxdocx-pr_299cefaa0fd3e32dd950c7218...
 
FPGA_Logic.pdf
FPGA_Logic.pdfFPGA_Logic.pdf
FPGA_Logic.pdf
 
DWDM-Presentation.pdf
DWDM-Presentation.pdfDWDM-Presentation.pdf
DWDM-Presentation.pdf
 
Verilog HDL Design Examples ( PDFDrive ).pdf
Verilog HDL Design Examples ( PDFDrive ).pdfVerilog HDL Design Examples ( PDFDrive ).pdf
Verilog HDL Design Examples ( PDFDrive ).pdf
 
VHDL summary.pdf
VHDL summary.pdfVHDL summary.pdf
VHDL summary.pdf
 
ROM PAL PLA.ppt
ROM PAL PLA.pptROM PAL PLA.ppt
ROM PAL PLA.ppt
 
Lecture 16 RC Architecture Types & FPGA Interns Lecturer.pptx
Lecture 16 RC Architecture Types & FPGA Interns Lecturer.pptxLecture 16 RC Architecture Types & FPGA Interns Lecturer.pptx
Lecture 16 RC Architecture Types & FPGA Interns Lecturer.pptx
 
exam.ppt
exam.pptexam.ppt
exam.ppt
 
REVISION SYN3.pptx
REVISION SYN3.pptxREVISION SYN3.pptx
REVISION SYN3.pptx
 
INSTRUMENTATION.pptx
INSTRUMENTATION.pptxINSTRUMENTATION.pptx
INSTRUMENTATION.pptx
 
cnacan (2).ppt
cnacan (2).pptcnacan (2).ppt
cnacan (2).ppt
 

Recently uploaded

Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 

Recently uploaded (20)

Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 

Sharing-Knowledge-OAM-3G-Ericsson .ppt

  • 1. OAM 3G Network Ericsson
  • 2. Sharing Discuss OAM 3G Ericsson • Session 1 : Operation RAN Ericsson  OSS  EMAS  Other Connection to RBS • Session 2 : Maintenance RAN Ericsson  Commissioning RBS  Replace Module  How to backup all Node in RAN 3G  How to upgrade capacity RBS
  • 4. OSS OSS user guide • Download and install Citrix di http://10.2.242.66/citrix/ICAWEB /ica_32_client/ • Setting IP Citrix di IP: 10.251.72.196 • Username : andit Password : ……. • Support : Alarm Handling, WCDMA Explorer, EMAS, Console/Terminal For check IP and Trance Route site, and Remotely Trouble shooting
  • 5. OSS (Count’) Fault Management Procedure The following procedure describes Radio Network Service remote real-time events/alarms monitoring with the use of OSS-RC Alarm List Viewer and Alarm Status Matrix. A. Service & Network problem management Right click to bring up OSS-RC Workspace Menu, Select Alarm, Select View Alarm and Alarm Status Matrix
  • 6. OSS (Count’) Select and click on the selected Network Object (RNC) to display the Alarm List Viewer
  • 7. OSS (Count’) Check RBS via Telnet OSS Right click to bring up OSS-RC Workspace Menu, Select Sun Tools, Select Terminal.
  • 8. OSS (Count’) Remotely Troubleshooting via EMAS OSS Untuk melihat EM menggunakan OSS dapat dilakukan dengan beberapa cara, salah satunya lewat WCDMA RAN Explorer. Pilih Node yang akan ditampilkan. Klik kanan, pilih Tools dan Element Manager.
  • 9. OSS (Count’) Check/backup/Create CV RBS Right click to bring up OSS-RC Workspace Menu, Select Configuration, Select Manage HW & SW Inventory and Software Management Organizer (SMO)
  • 10. Element Manager • Element Manager Service base on Java Platform dengan java j2re 1.4.2 running on ie7 or Modzilla • Untuk memudahkan switch IP RBS/RXI/RNC on site, sebaiknya menggunakan software ShockIpChanger http://10.184.xxx.xx/em/index_stubbed.html
  • 11. Element Manager (Count’) The RBS Element Manager (EM) contains the following menus: – Network Element – Fetch – Configuration – Maintenance – Supervision – Tools – Window – Help
  • 12. Element Manager (Count’) EM Components 1. Title Bar 2. menu Bar 3. Panels 4. Information Bar 5. View Sector 6. Views
  • 15. Element Manager (Count’) • Check attempt traffic
  • 16. Element Manager (Count’) • Modify Rack Node B
  • 17. Other Connection to RBS • NCLI (Node CLI) menggunakan kabel Emli – Telnet – SSH by Putty – WinFIOL/Mosheel
  • 18. Other Connection to RBS Some commands : – help : list the available CLI commands – formathd : format Hard Disk – hdinfo : print hard Disk geometry and identity – cv : see configuration versions – ifconfig : configure IP address – passwd : set login password – listloaded : list loaded load module – ping : verify IP connenctivity – vii : display visual indicator status – lhsh : remote shell login – pglist : program list – reload : restart the GPB (General Purpose Processor Board) – restart -- : start backup mode – restartObj me : reload the complete RBS – vols : check the volume on the GPB (see volume hard disk) – Setclock : setting timing RBS
  • 20. Tool OAM • Untuk keperluan OAM, dibutuhkan beberapa kit : – Kabel Emli+Ethernet LAN – Kabel Emli+Extention RS232 – Kabel Loop RJ-45 – Kabel Serial – Kabel Mux Marconi – Tool kit standard (Kunci Bintang 5, 14, Inggris, Torq 8) – Insertion tool E1_ET4, Optical (SC-Connector) – Tool kit Core
  • 21. Commissioning RBS • Hal-hal yang dibutuhkan saat re-commisioning : – Kabel Mli+LAN (EMAS) dan Kabel Mli+ Mli+Extention Hyperterminal (HyperT) – Kabel loop E1 – Sofware Basic Package R30 (RBS 3107, RBS 3412, RBS 3206) – Script configurasi : • Script SE  di run on site • Script OAM  di run on site • Script IubLink  di run on site/remotely RNC Di running bila integrasi new site • Script Run_at_MGW_(site name) • Script Run_at_RNC_(site name)_UTRANCELL_(jumlah sector)_sector • Script Run_at_RNC_(site name)_IubLink_(jumlah E1)_E1 • Script Run_at_RNC_(site name)_RNC_RBS_OAM_RXI • Script Run_at_RXI_(site name)_IubLink_(jumlah E1)_E1 • Script Run_at_RXI_(site name)_Mub_RXI_RBS_(jumlah E1)_E1 – Create CV • Langkah-langkah yang dilakukan (see. File SOP re-commissioning)
  • 22. Commissioning RBS ( Count’) Langkah Langkah Commissioning RBS: 1. Format flash memory CBU 2. Create username dan password 3. Create ip default (ip: 169.254.1.1, netmask: 255.255.0.0) 4. Download software Basic Package (drive c dan d) ke flash memory CBU dengan menggunakan tools WSFTP, BisonFTP, atau DiamondFTP 5. Refresh CBU, CBU akan mencreate drive j, sehingga akan terdapat 3 drive yaitu c2, d, dan j 6. Pastikan ip default aktif, Klik icon Internet Explorer atau Modzilla 7. Ketik http://169.254.1.1/em/index_stubbed.html ==> loading EMAS (Ericsson Element Manager) 8. Pastikan all module RBS tercreate dan kondisi Enable, bila ada yang masih disable lakukan langkah delete-create module 9. Download configurasi OAM 10. Pastikan ip telah berubah sesuai dengan ip RBS sebelumnya 11. Setting update time 12. Ketik http://10.184.xxx.xx/em/index_stubbed.html ==> loading EMAS (Ericsson Element Manager) 13. Create CV_OAM 14. Download configurasi SE, Create CV_SE 15. Download configurasi Iublink, Create CV_Iublink 16. Restart RBS by CV 17. Download/create configurasi External
  • 23. Commissioning RBS ( Count’) Cara Cepat untuk Configurasi OAM, Configurasi SE dengan menggunakan scrip_OAM dan scrip_SE: • Script_OAM Scripts ini berisikan konfigurasi IP untuk RBS serta Routing table RBS yang akan digunakan untuk OAM (untuk meng-edit script ini harus berdasarkan file ATND) • Script_SE Script ini berisikan konfigurasi semua equipment RBS, mulai dari frequency yang digunakan, Panjang feeder, Attenuator dll (untuk meng-edit script ini harus berdasarkan file CDR)
  • 24. Replace Module Untuk menganti modul yang bermasalah dapat dilakukan dengan langkah berikut ini: • Pada EM RBS, pilih Maintenance Bar, Test dan Board • Lock Modul yang akan di ganti • Tukarkan modul yang bermasalah dengan modul yang baru • Test modul yang telah diganti, jika hasilnya bagus jangan lupa untuk di Unlock kembali
  • 25. How to backup all Node in RAN 3G Untuk full backup pada prinsipnya download file dari Node ke local storage. Sedangkan metodenya bisa kita lakukan dengan menggunakan fasilitas aplikasi FTP. Untuk syaratnya download dengan format Binary Langkah langkah untuk Full backup: 1. Pastikan local storage (pc/laptop) connect ke jaringan yg bisa mengakses ke Node yg akan diambil fullbackup-nya. 2. Buka aplikasi FTP. 3. Set FTP connection details: – Session name – Host name/destination address (ip) – username: (rnc/rxi/rbs) – password: (password node) dapat dilihat seperti contoh dibawah ini : user : rxi, password: rxpbr01
  • 26. How to backup all Node in RAN 3G (count’) 4. connect ke node. 5. copy/download drive /c dan /d ke local storage (pc/laptop)
  • 27. Troubleshooting RBS Untuk troubleshooting replace hardware CBU dapat dilakukan dengan beberapa cara :  Tidak mengganti flash card CBU ( jika flash card bekerja normal)  Melakukan pengantian modul CBU. Apabila dilakukan pergantian modul CBU, dapat di commissioning dengan beberapa cara:  Commissioning secara normal  Commisioning dengan cara upload file full backup untuk node tersebut
  • 28. lazy-Commissioning Hal-hal yang harus diperhatikan untuk upload fullback up: 1. Type rack 2. IMA Group 3. Jumlah E1 Langkah Langkah Commissioning dengan cara upload Fullbackup: • Format flash card CBU • Setting IP Address dan Password Set the IP address to the default IP address i.e. 169.254.1.1 subnet 255.255.0.0. • Loading file full backup. The software (c2 and d) is downloaded from the thin client to the RBS over the Ethernet link, using WS_FTP or FTP
  • 29. lazy-Commissioning (Count’) • Pastikan semua file sudah tersimpan di CBU • Masuk EM dengan menggunakan IP RBS yang di full backup • Parameter yang harus dirubah di EM sebagai berikut: – Setting IP Address sesuai dengan IP existing – Setting IPoverATM sesuai dengan IPoverATM existing – Lock semua AAL2Path yang ada – Setting ulang A2ea. – Setting AAL2Path – Setting ulang RBS Local Cell – Unlock semua AAL2Path yang ada – Pastikan semua modul sudah bekerja normal – Create new CV – Warm Reload dengan CV terbaru.
  • 30. RBS Hardware Upgrade Procedure The following procedure describes the Random Access and Receiver (RAX) board RAX-B and Transmitter (TX) board hardware upgrade. The procedure for adding an RAX or TX board consists of the following: • Auto-create detected object is checked • Installing a Board • Adding a Board to the Configuration When a new board is installed in the subrack it will be automatically configured. The board must be unlocked when the configuration is finished
  • 31. RBS Hardware Upgrade Procedure (count’) 1. Auto – create enable – Set up a thin client - to - RBS Ethernet connection. – Start the RBS Element Manager (RBS EM) – Select Network Element Menu – Setting, ensure Auto-create detected object is checked
  • 32. RBS Hardware Upgrade Procedure (count’) 2. Installing Board To install a board, do the following: • In the RBS EM, select the Equipment view to the left • Select the applicable subrack and expand it by clicking its plus sign • Check the slot number in the digital subrack against the work order and Hardware Configuration Data. • Replace the relevant installed unit (dummy board) with the new RAX board, or TX board.