Ericsson Internal
INSTRUCTION 1 (22)
Prepared (Subject resp) No.
ESETARI Arif Setiawan
Approved (Document resp) Checked Date Rev Reference
EYULTEN Yulpien Teng 2017-04-17 PA1
MOP BASEBAND INTEGRATION XL PROJECT
Ericsson Internal
INSTRUCTION 2 (22)
Prepared (Subject resp) No.
ESETARI Arif Setiawan
Approved (Document resp) Checked Date Rev Reference
EYULTEN Yulpien Teng 2017-04-17 PA1
Contents
1. Scope 1
2. Revision history 1
3. Software features and tools 2
4. Configuration & procedure 3
5. Procedure 4
6. Concluding routines 5
7. References 6
Ericsson Internal
INSTRUCTION 3 (22)
Prepared (Subject resp) No.
ESETARI Arif Setiawan
Approved (Document resp) Checked Date Rev Reference
EYULTEN Yulpien Teng 2017-04-17 PA1
1 Scope
This document describes method of procedure (MoP) how to commissioning & integration
baseband 521x to OSS RC, RNC, BSC,
2 Revision History
Revision Comment Author Date
PA 1 Initial draft ESETARI 2017/4/17
3 Prerequisites
3.1 Tools
1. Web Browser (recommended use IE)
2. Latest Moshell or minimum moshell 17.0c
3. RJ-45 LAN Cable straigh
4. SFTP aplication
3.2 Software
17A SW : CXP9024418/5_R18BJ
3.3 Hardware
o RBS Type: RBS 6000 Family (RBS 6601,6320,6120)
o Baseband:
o BB5216
o BB5212
o BSC HC/ EVO Controller
o TCU/SIU
o RU/RUS/RRUS/R2219/R2217
Ericsson Internal
INSTRUCTION 4 (22)
Prepared (Subject resp) No.
ESETARI Arif Setiawan
Approved (Document resp) Checked Date Rev Reference
EYULTEN Yulpien Teng 2017-04-17 PA1
4 Configuration
4.1 Type of Configuration existing site (mixedmode)
4.1.1 LTE 1800 + U900 (BB 5216) mixedmode radio with existing G900 (DUG) and
DCS1800 (DUG)
Ericsson Internal
INSTRUCTION 5 (22)
Prepared (Subject resp) No.
ESETARI Arif Setiawan
Approved (Document resp) Checked Date Rev Reference
EYULTEN Yulpien Teng 2017-04-17 PA1
4.1.2 W2100 + U900 (BB5216) mixedmode radio with existing G900 (DUG)
4.1.3 LTE 1800 (BB 5212) mixed mode with existing G1800 (DUG)
Ericsson Internal
INSTRUCTION 6 (22)
Prepared (Subject resp) No.
ESETARI Arif Setiawan
Approved (Document resp) Checked Date Rev Reference
EYULTEN Yulpien Teng 2017-04-17 PA1
4.1.4 U900 (BB 5216) mixed mode with GSM 900 (DUG)
4.1.5 U2100 (BB 5216)
Ericsson Internal
INSTRUCTION 7 (22)
Prepared (Subject resp) No.
ESETARI Arif Setiawan
Approved (Document resp) Checked Date Rev Reference
EYULTEN Yulpien Teng 2017-04-17 PA1
4.1.6 U2100 + LTE 1800 (BB 5216) mixed mode with G1800 (DUG)
Ericsson Internal
INSTRUCTION 8 (22)
Prepared (Subject resp) No.
ESETARI Arif Setiawan
Approved (Document resp) Checked Date Rev Reference
EYULTEN Yulpien Teng 2017-04-17 PA1
4.2 Type of Configuration new site
4.2.1 W2100 + U900 (BB 5216)
4.2.2 W2100 + U900 + LTE 1800 (BB 5216) cascade RU solution
Ericsson Internal
INSTRUCTION 9 (22)
Prepared (Subject resp) No.
ESETARI Arif Setiawan
Approved (Document resp) Checked Date Rev Reference
EYULTEN Yulpien Teng 2017-04-17 PA1
4.2.3 W2100 (BB 5216)
4.2.4 LTE 1800 + W2100 (BB 5216)
Ericsson Internal
INSTRUCTION 10 (22)
Prepared (Subject resp) No.
ESETARI Arif Setiawan
Approved (Document resp) Checked Date Rev Reference
EYULTEN Yulpien Teng 2017-04-17 PA1
4.3 Baseband combination to other RU config
Baseband_RU_com
bination.pptx
5 New NE Procedure
5.1 Flow Chart
5.2 Preparation
This phase describes the activities that should be performed before the execution of the RBS..
5.2.1 Hardware Installation
Make sure all hardware installed properly following standard installation on the MOP.
5.2.2 ATND CDD CDR
IP (ATND) & Radio (CDD) configuration data must be provided
Ericsson Internal
INSTRUCTION 11 (22)
Prepared (Subject resp) No.
ESETARI Arif Setiawan
Approved (Document resp) Checked Date Rev Reference
EYULTEN Yulpien Teng 2017-04-17 PA1
Example :
ATND Jomin Barat
scenario 3.1 PA2.xlsx
ATND Jomin Barat
scenario 3.2 PA2.xlsx
5.2.3 Prepare integration script
To generate the integration scripts is used the Internal tool (Ericsson – PCI tool). The
scripts will be provided by GSC Team, generated via PCI Tools. Download the scripts
from PCI server. The scripts must be contained of below files.
 RBS Summary File
 Site Basic File
 Site Equipment File
 Transport Network File
 Radio Network File
Example configuration script :
5.3 Commissioning (onsite)
5.3.1 Powering up RBS
If the RBS is not already switched on, do the following:
1. Make sure the power supply is available, tested, and approved for supplying the RBS with
power.
2. Switch on the power supply to the RBS
5.3.2 Check RBS status
To verify that the RBS is ready for integration, do the following:
On digital units and radio units, check that the green power indicators are on
5.3.3 Tools preparation& baseband commissioning
Do baseband commissioning using smart laptop or manual
Workshop
Baseband 5212.pptx
Method of
Procedure Baseband 5216 Integration using Smart Laptop.docx
5.4 Integration
Call GSC /TAC to configure in BSC/RNC/OSS side
5.4.1 RNC Integration
RNC integration and scripting are same as G1 node (DUW)
a. Create utrancell
b. Create Iublink
Ericsson Internal
INSTRUCTION 12 (22)
Prepared (Subject resp) No.
ESETARI Arif Setiawan
Approved (Document resp) Checked Date Rev Reference
EYULTEN Yulpien Teng 2017-04-17 PA1
c. Create relation
3453817G_3G_TESBED_KARAWANG_RNBKS07.rar 00_Iublink.rar
5.4.2 OSS Integration
MOP BASEBAND
INTEGRATION-OSS-RC XL PROJECT.docx
5.4.3 License Key File Installation
5.4.3.1 Install LKF File Using OSS-RC SHM GUI
Just for this phase 1 procedure, this is a post-integration activity. As the integration unlock
only is valid for a limit number of days, a proper set of licenses, License Key File (LKF)
need to be ordered and installed for the node. This step will also confirm that proper
license considerations made were correct. The maintained performance and no resource
alarms should confirm the success of this step.
Prerequisite for the following steps is that the ordered LKF(s) has been received and has
been stored by the user at defined directory location on OSS-RC user account file system.
Note that the stored license file is a zip file that contain at least one License Data File
(LDF) and one LKF to be imported. For more details, see reference Error: Reference
source not found.
1. Import License Key File
Open OSS Explorer (Launch -> Application -> Ericsson -> ),
Start SHM GUI (Tools -> Hardware and Software Inventory –> Software
Hardware Management -> ).
Select the License tab on top of SHM GUI.
Click on the Import button at right of the License tab view.
In the “Import new License Key File” dialog box, click Browse. Select the
LKF zip file from chosen location.
Enter a short description and click Import. The new license key files will be
listed under License tab view when imported to OSS-RC server SMRS.
Ericsson Internal
INSTRUCTION 13 (22)
Prepared (Subject resp) No.
ESETARI Arif Setiawan
Approved (Document resp) Checked Date Rev Reference
EYULTEN Yulpien Teng 2017-04-17 PA1
Note that when the fingerprint present in LKF zip file matches with the
fingerprint of any added node in the OSS-RC server, then ME name will
be updated under Managed Element column in License tab GUI
accordingly. Otherwise empty value will be displayed under that column
with imported license key file details
Ericsson Internal
INSTRUCTION 14 (22)
Prepared (Subject resp) No.
ESETARI Arif Setiawan
Approved (Document resp) Checked Date Rev Reference
EYULTEN Yulpien Teng 2017-04-17 PA1
2. Install Imported License Key File on the Node
Select the License tab on top of SHM GUI, if not already selected.
Select the LKF row under License tab view with node name present on
”Managed Element” column or search for the node in left side panel and
select the node name in left side panel result list.
Click on the Install button at right of the License tab view. Note that Install
button is enabled when node name for imported LKF is selected.
In the “Confirmation” dialog box, click Yes to proceed if status is as
expected (no errors shown).
In the next “Scheduler” dialog box, click “Start Immediately” and “Start
Install”. This schedules a “Install License” job.
Select the Job tab on top of SHM GUI to check the progress of the job.
Once the install is successful on the node SHM will update the “Current
License” column as TRUE under License tab view.
Check status on the node after installed LKF file
Launch EMCLI for selected node from OSS Common Explorer or start AMOS from
opened OSS terminal window. Perform the following first EMCLI/AMOS commands.
> lt all
> alt
At this stage there should not be any licensing related alarms.
Verify the RAN traffic status by the commands according to chapter 5.8.1
Ericsson Internal
INSTRUCTION 15 (22)
Prepared (Subject resp) No.
ESETARI Arif Setiawan
Approved (Document resp) Checked Date Rev Reference
EYULTEN Yulpien Teng 2017-04-17 PA1
5.4.4 Setting primary secondary
Always set baseband to be primary node
Port A Used by Port B Used by
A1 SCU (EC A) B1 DU-1/ Baseband-1
A2 PDU-1 B2 PDU-2
A3 PSU-1/DU-6(1)
/Baseband T503 B3 PSU-2
A4 PSU-3 B4 PSU-4
A5 DU-2/ Baseband-2/ Baseband
T503
B5 BFU
A6 DU-3/ Baseband-3/ Baseband
T503
B6 PSU-5
A7 DU-4/ Baseband-4/ Baseband
T503
B7 PDU-3
A8 PDU-4 B8 CLU
Ericsson Internal
INSTRUCTION 16 (22)
Prepared (Subject resp) No.
ESETARI Arif Setiawan
Approved (Document resp) Checked Date Rev Reference
EYULTEN Yulpien Teng 2017-04-17 PA1
1. Set support system control to be true
2. Define Baseband ecport
Command : set Equipment=1,FieldReplaceableUnit=1,EcPort=1 hubPosition B1
3. Define external node & Ecport
Ericsson Internal
INSTRUCTION 17 (22)
Prepared (Subject resp) No.
ESETARI Arif Setiawan
Approved (Document resp) Checked Date Rev Reference
EYULTEN Yulpien Teng 2017-04-17 PA1
4. Define ecport each of externalnode
5.4.5 Setting eksternal alarm
5.4.6 Define Node Group Sync (sync between DU-Baseband)
1. Define NGS in baseband
Ericsson Internal
INSTRUCTION 18 (22)
Prepared (Subject resp) No.
ESETARI Arif Setiawan
Approved (Document resp) Checked Date Rev Reference
EYULTEN Yulpien Teng 2017-04-17 PA1
NodeGroupSyncMe
mber_LTE_BB.mos
2. Define NGS in DUG
idb_OL1800.dbb idb_UL900.dbb
5.4.7 Define RET baseband (if needed)
Before Create RET, Must be Create RfPort=R at RRU
TSR_Create_RET_BA
SEBAND.mos
5.5 Troubleshooting
 Transport Check
Cek default gateway for each inteface baik OAM and/or traffic
hget Dst=1,NextHop=1 address
==========================================================================
MO address
==========================================================================
Router=vr_OAM,RouteTableIPv4Static=1,Dst=1,NextHop=1 XX.XX.XX.XX
Router=vr_Traffic3G,RouteTableIPv4Static=1,Dst=1,NextHop=1 YY.YY.YY.YY
==========================================================================
Total: 2 MOs
Test ping OAM
mcc Router=vr_OAM ping XX.XX.XX.XX --count 5
Test Ping Traffic
mcc Router=vr_Traffic3G ping YY.YY.YY.YY --count 5
Ericsson Internal
INSTRUCTION 19 (22)
Prepared (Subject resp) No.
ESETARI Arif Setiawan
Approved (Document resp) Checked Date Rev Reference
EYULTEN Yulpien Teng 2017-04-17 PA1
 Hardware and connection cable check
 st FieldReplaceableUnit=
 Verifikasi Sector dan cell
 St SectorEquipmentFunction=
 lst LocalCell
5.6 Setting basic parameter
Run script basic parameter either on site or remotely
run /home/test123/Baseband/Basic_Optim.mos
5.7 Verification & Functionality test
5.7.1 Verification service and call test
This step should be executed by OMC engineer, to verify that the integration was
performed with successful. So the OMC engineer must to check if exist MOs DISABLED
or LOCKED and Alarms after start the integration
l+
confb+
gs+
cvls
st cell
st sector
st ru
st router
st field
lst. Dis
st tma (only if they are present)
st ret (only if they are present)
st Synchronization
alt
hget fieldrep state|indi
hget fieldrep product
hget hwitem= product|serial
/lrat/ue print -bearer
gs-
confb-
l-
and do functionality test(test call) using SRS tool
Ericsson Internal
INSTRUCTION 20 (22)
Prepared (Subject resp) No.
ESETARI Arif Setiawan
Approved (Document resp) Checked Date Rev Reference
EYULTEN Yulpien Teng 2017-04-17 PA1
5.7.2 Primary and secondary status
5.7.3 External Alarm testing
Please doing external alarm testing with rectifier
5.7.4 NGS (node group sync) status
Ericsson Internal
INSTRUCTION 21 (22)
Prepared (Subject resp) No.
ESETARI Arif Setiawan
Approved (Document resp) Checked Date Rev Reference
EYULTEN Yulpien Teng 2017-04-17 PA1
5.7.5 RET status
5.7.6 Hardware and connection cable check
 st FieldReplaceableUnit=
5.7.7 Verification Sector and cell
 St SectorEquipmentFunction=
 lst LocalCell
6 Concluding routines
Before leaving the sites, ensure that the following action have been performs
1. Make sure no alarm appears at the RBS.
2. Save Log (K-get)
3. Tidy the site and leave it in the same condition as you found it.
4. Lock all doors to the site.
5. Report/contact Ericsson supervisor.
6. Report/contact Customer PIC.
7 References & Appendix
1. Upgrade Software Baseband
Upgrade Baseband
52xx via SHM OSS-RC_PA2.docx
Software Upgrade
BB 52xx via Moshell or AMOS OSS-RC.docx
Ericsson Internal
INSTRUCTION 22 (22)
Prepared (Subject resp) No.
ESETARI Arif Setiawan
Approved (Document resp) Checked Date Rev Reference
EYULTEN Yulpien Teng 2017-04-17 PA1

More Related Content

Similar to mop-baseband-integration-xl-project-pa-1docxdocx-pr_299cefaa0fd3e32dd950c721867de88c.pdf

Estimation Techniques V1.0
Estimation Techniques V1.0Estimation Techniques V1.0
Estimation Techniques V1.0Uday K Bhatt
 
Q1 Update Top 9 FAQs on Moving AventX to R12.1.3
Q1 Update Top 9 FAQs on Moving AventX to R12.1.3Q1 Update Top 9 FAQs on Moving AventX to R12.1.3
Q1 Update Top 9 FAQs on Moving AventX to R12.1.3STR Software
 
CPT275_Performance_Exam_Practice_NA_Update
CPT275_Performance_Exam_Practice_NA_UpdateCPT275_Performance_Exam_Practice_NA_Update
CPT275_Performance_Exam_Practice_NA_UpdateMoneico Robinson
 
Solution development in iot
Solution development in iotSolution development in iot
Solution development in iotSWAMY J S
 
2018 Genivi Xen Overview Nov Update
2018 Genivi Xen Overview Nov Update2018 Genivi Xen Overview Nov Update
2018 Genivi Xen Overview Nov UpdateThe Linux Foundation
 
11298-Technical Upgrade Best Practices for Oracle E-Business Suite 12.2-Prese...
11298-Technical Upgrade Best Practices for Oracle E-Business Suite 12.2-Prese...11298-Technical Upgrade Best Practices for Oracle E-Business Suite 12.2-Prese...
11298-Technical Upgrade Best Practices for Oracle E-Business Suite 12.2-Prese...ssuser9dce1e1
 
Manual software para acionamneto v75
Manual software para acionamneto v75Manual software para acionamneto v75
Manual software para acionamneto v75FTorres Torres
 
Ebs 121 cum_rcd_atg[1]
Ebs 121 cum_rcd_atg[1]Ebs 121 cum_rcd_atg[1]
Ebs 121 cum_rcd_atg[1]nitingupta1
 
COSC2737 Assignment 2 IT Infrastructure in the Cloud. .docx
COSC2737 Assignment 2  IT Infrastructure in the Cloud.  .docxCOSC2737 Assignment 2  IT Infrastructure in the Cloud.  .docx
COSC2737 Assignment 2 IT Infrastructure in the Cloud. .docxvoversbyobersby
 
Serie dei nuovi processori Xeon Scalabili - Yashi Italia
Serie dei nuovi processori Xeon Scalabili - Yashi ItaliaSerie dei nuovi processori Xeon Scalabili - Yashi Italia
Serie dei nuovi processori Xeon Scalabili - Yashi ItaliaYashi Italia
 
OOW15 - technical upgrade best practices for oracle e-business suite 12.2
OOW15 - technical upgrade best practices for oracle e-business suite 12.2OOW15 - technical upgrade best practices for oracle e-business suite 12.2
OOW15 - technical upgrade best practices for oracle e-business suite 12.2vasuballa
 
Functional specification doc Gst purcahse register
Functional specification doc Gst purcahse registerFunctional specification doc Gst purcahse register
Functional specification doc Gst purcahse registerLokesh Modem
 
Chap 5. lsm overview and practice
Chap 5. lsm overview and practiceChap 5. lsm overview and practice
Chap 5. lsm overview and practicesivakumar D
 
Integra sppt-elastix-asterisk-configuration
Integra sppt-elastix-asterisk-configurationIntegra sppt-elastix-asterisk-configuration
Integra sppt-elastix-asterisk-configurationMohammed Taher Alhomadei
 
Design And Opti Lifecycle and NRO Process
Design And Opti Lifecycle and NRO ProcessDesign And Opti Lifecycle and NRO Process
Design And Opti Lifecycle and NRO ProcessNazmul Mridha
 
Troubleshooting OSSEC Common support issues for OSSEC_Atomic OSSEC.pdf
Troubleshooting OSSEC Common support issues for OSSEC_Atomic OSSEC.pdfTroubleshooting OSSEC Common support issues for OSSEC_Atomic OSSEC.pdf
Troubleshooting OSSEC Common support issues for OSSEC_Atomic OSSEC.pdfMohamed Taoufik TEKAYA
 
IPLOOK EPC product information
IPLOOK EPC product informationIPLOOK EPC product information
IPLOOK EPC product informationIPLOOK Networks
 
OBIEE 11g installation steps
OBIEE 11g installation stepsOBIEE 11g installation steps
OBIEE 11g installation stepsDharmaraj Borse
 

Similar to mop-baseband-integration-xl-project-pa-1docxdocx-pr_299cefaa0fd3e32dd950c721867de88c.pdf (20)

Estimation Techniques V1.0
Estimation Techniques V1.0Estimation Techniques V1.0
Estimation Techniques V1.0
 
Q1 Update Top 9 FAQs on Moving AventX to R12.1.3
Q1 Update Top 9 FAQs on Moving AventX to R12.1.3Q1 Update Top 9 FAQs on Moving AventX to R12.1.3
Q1 Update Top 9 FAQs on Moving AventX to R12.1.3
 
CPT275_Performance_Exam_Practice_NA_Update
CPT275_Performance_Exam_Practice_NA_UpdateCPT275_Performance_Exam_Practice_NA_Update
CPT275_Performance_Exam_Practice_NA_Update
 
Solution development in iot
Solution development in iotSolution development in iot
Solution development in iot
 
Lab4 s2
Lab4 s2Lab4 s2
Lab4 s2
 
2018 Genivi Xen Overview Nov Update
2018 Genivi Xen Overview Nov Update2018 Genivi Xen Overview Nov Update
2018 Genivi Xen Overview Nov Update
 
11298-Technical Upgrade Best Practices for Oracle E-Business Suite 12.2-Prese...
11298-Technical Upgrade Best Practices for Oracle E-Business Suite 12.2-Prese...11298-Technical Upgrade Best Practices for Oracle E-Business Suite 12.2-Prese...
11298-Technical Upgrade Best Practices for Oracle E-Business Suite 12.2-Prese...
 
Tyco IS Oracle Apps Support Project
Tyco IS Oracle Apps Support ProjectTyco IS Oracle Apps Support Project
Tyco IS Oracle Apps Support Project
 
Manual software para acionamneto v75
Manual software para acionamneto v75Manual software para acionamneto v75
Manual software para acionamneto v75
 
Ebs 121 cum_rcd_atg[1]
Ebs 121 cum_rcd_atg[1]Ebs 121 cum_rcd_atg[1]
Ebs 121 cum_rcd_atg[1]
 
COSC2737 Assignment 2 IT Infrastructure in the Cloud. .docx
COSC2737 Assignment 2  IT Infrastructure in the Cloud.  .docxCOSC2737 Assignment 2  IT Infrastructure in the Cloud.  .docx
COSC2737 Assignment 2 IT Infrastructure in the Cloud. .docx
 
Serie dei nuovi processori Xeon Scalabili - Yashi Italia
Serie dei nuovi processori Xeon Scalabili - Yashi ItaliaSerie dei nuovi processori Xeon Scalabili - Yashi Italia
Serie dei nuovi processori Xeon Scalabili - Yashi Italia
 
OOW15 - technical upgrade best practices for oracle e-business suite 12.2
OOW15 - technical upgrade best practices for oracle e-business suite 12.2OOW15 - technical upgrade best practices for oracle e-business suite 12.2
OOW15 - technical upgrade best practices for oracle e-business suite 12.2
 
Functional specification doc Gst purcahse register
Functional specification doc Gst purcahse registerFunctional specification doc Gst purcahse register
Functional specification doc Gst purcahse register
 
Chap 5. lsm overview and practice
Chap 5. lsm overview and practiceChap 5. lsm overview and practice
Chap 5. lsm overview and practice
 
Integra sppt-elastix-asterisk-configuration
Integra sppt-elastix-asterisk-configurationIntegra sppt-elastix-asterisk-configuration
Integra sppt-elastix-asterisk-configuration
 
Design And Opti Lifecycle and NRO Process
Design And Opti Lifecycle and NRO ProcessDesign And Opti Lifecycle and NRO Process
Design And Opti Lifecycle and NRO Process
 
Troubleshooting OSSEC Common support issues for OSSEC_Atomic OSSEC.pdf
Troubleshooting OSSEC Common support issues for OSSEC_Atomic OSSEC.pdfTroubleshooting OSSEC Common support issues for OSSEC_Atomic OSSEC.pdf
Troubleshooting OSSEC Common support issues for OSSEC_Atomic OSSEC.pdf
 
IPLOOK EPC product information
IPLOOK EPC product informationIPLOOK EPC product information
IPLOOK EPC product information
 
OBIEE 11g installation steps
OBIEE 11g installation stepsOBIEE 11g installation steps
OBIEE 11g installation steps
 

More from wafawafa52

515878259-Node-Group-Synch-Workshop.pptx
515878259-Node-Group-Synch-Workshop.pptx515878259-Node-Group-Synch-Workshop.pptx
515878259-Node-Group-Synch-Workshop.pptxwafawafa52
 
385288768-TD-Training-Modules-Mobilis.pptx
385288768-TD-Training-Modules-Mobilis.pptx385288768-TD-Training-Modules-Mobilis.pptx
385288768-TD-Training-Modules-Mobilis.pptxwafawafa52
 
Ericsson Microwave Products Overview.ppt
Ericsson Microwave Products Overview.pptEricsson Microwave Products Overview.ppt
Ericsson Microwave Products Overview.pptwafawafa52
 
BaseBand-6630-Moshell-Commands .pdf
BaseBand-6630-Moshell-Commands      .pdfBaseBand-6630-Moshell-Commands      .pdf
BaseBand-6630-Moshell-Commands .pdfwafawafa52
 
45555555555-4G-Training .pptx
45555555555-4G-Training            .pptx45555555555-4G-Training            .pptx
45555555555-4G-Training .pptxwafawafa52
 
5-LTE-IP-Troubleshooting .ppt
5-LTE-IP-Troubleshooting            .ppt5-LTE-IP-Troubleshooting            .ppt
5-LTE-IP-Troubleshooting .pptwafawafa52
 
Sharing-Knowledge-OAM-3G-Ericsson .ppt
Sharing-Knowledge-OAM-3G-Ericsson   .pptSharing-Knowledge-OAM-3G-Ericsson   .ppt
Sharing-Knowledge-OAM-3G-Ericsson .pptwafawafa52
 
LTE-BASICS-ppt .ppt
LTE-BASICS-ppt                      .pptLTE-BASICS-ppt                      .ppt
LTE-BASICS-ppt .pptwafawafa52
 
ran-introicbasictroubleshooting3-230122164831-426c58cd.pdf
ran-introicbasictroubleshooting3-230122164831-426c58cd.pdfran-introicbasictroubleshooting3-230122164831-426c58cd.pdf
ran-introicbasictroubleshooting3-230122164831-426c58cd.pdfwafawafa52
 
toaz.info-5g-solution-overview-pr_306866f43cebfb285586e3dd90989b89.pdf
toaz.info-5g-solution-overview-pr_306866f43cebfb285586e3dd90989b89.pdftoaz.info-5g-solution-overview-pr_306866f43cebfb285586e3dd90989b89.pdf
toaz.info-5g-solution-overview-pr_306866f43cebfb285586e3dd90989b89.pdfwafawafa52
 
FPGA_Logic.pdf
FPGA_Logic.pdfFPGA_Logic.pdf
FPGA_Logic.pdfwafawafa52
 
DWDM-Presentation.pdf
DWDM-Presentation.pdfDWDM-Presentation.pdf
DWDM-Presentation.pdfwafawafa52
 
Verilog HDL Design Examples ( PDFDrive ).pdf
Verilog HDL Design Examples ( PDFDrive ).pdfVerilog HDL Design Examples ( PDFDrive ).pdf
Verilog HDL Design Examples ( PDFDrive ).pdfwafawafa52
 
VHDL summary.pdf
VHDL summary.pdfVHDL summary.pdf
VHDL summary.pdfwafawafa52
 
ROM PAL PLA.ppt
ROM PAL PLA.pptROM PAL PLA.ppt
ROM PAL PLA.pptwafawafa52
 
Lecture 16 RC Architecture Types & FPGA Interns Lecturer.pptx
Lecture 16 RC Architecture Types & FPGA Interns Lecturer.pptxLecture 16 RC Architecture Types & FPGA Interns Lecturer.pptx
Lecture 16 RC Architecture Types & FPGA Interns Lecturer.pptxwafawafa52
 
REVISION SYN3.pptx
REVISION SYN3.pptxREVISION SYN3.pptx
REVISION SYN3.pptxwafawafa52
 
INSTRUMENTATION.pptx
INSTRUMENTATION.pptxINSTRUMENTATION.pptx
INSTRUMENTATION.pptxwafawafa52
 
cnacan (2).ppt
cnacan (2).pptcnacan (2).ppt
cnacan (2).pptwafawafa52
 

More from wafawafa52 (20)

515878259-Node-Group-Synch-Workshop.pptx
515878259-Node-Group-Synch-Workshop.pptx515878259-Node-Group-Synch-Workshop.pptx
515878259-Node-Group-Synch-Workshop.pptx
 
385288768-TD-Training-Modules-Mobilis.pptx
385288768-TD-Training-Modules-Mobilis.pptx385288768-TD-Training-Modules-Mobilis.pptx
385288768-TD-Training-Modules-Mobilis.pptx
 
Ericsson Microwave Products Overview.ppt
Ericsson Microwave Products Overview.pptEricsson Microwave Products Overview.ppt
Ericsson Microwave Products Overview.ppt
 
BaseBand-6630-Moshell-Commands .pdf
BaseBand-6630-Moshell-Commands      .pdfBaseBand-6630-Moshell-Commands      .pdf
BaseBand-6630-Moshell-Commands .pdf
 
45555555555-4G-Training .pptx
45555555555-4G-Training            .pptx45555555555-4G-Training            .pptx
45555555555-4G-Training .pptx
 
5-LTE-IP-Troubleshooting .ppt
5-LTE-IP-Troubleshooting            .ppt5-LTE-IP-Troubleshooting            .ppt
5-LTE-IP-Troubleshooting .ppt
 
Sharing-Knowledge-OAM-3G-Ericsson .ppt
Sharing-Knowledge-OAM-3G-Ericsson   .pptSharing-Knowledge-OAM-3G-Ericsson   .ppt
Sharing-Knowledge-OAM-3G-Ericsson .ppt
 
LTE-BASICS-ppt .ppt
LTE-BASICS-ppt                      .pptLTE-BASICS-ppt                      .ppt
LTE-BASICS-ppt .ppt
 
ran-introicbasictroubleshooting3-230122164831-426c58cd.pdf
ran-introicbasictroubleshooting3-230122164831-426c58cd.pdfran-introicbasictroubleshooting3-230122164831-426c58cd.pdf
ran-introicbasictroubleshooting3-230122164831-426c58cd.pdf
 
toaz.info-5g-solution-overview-pr_306866f43cebfb285586e3dd90989b89.pdf
toaz.info-5g-solution-overview-pr_306866f43cebfb285586e3dd90989b89.pdftoaz.info-5g-solution-overview-pr_306866f43cebfb285586e3dd90989b89.pdf
toaz.info-5g-solution-overview-pr_306866f43cebfb285586e3dd90989b89.pdf
 
FPGA_Logic.pdf
FPGA_Logic.pdfFPGA_Logic.pdf
FPGA_Logic.pdf
 
DWDM-Presentation.pdf
DWDM-Presentation.pdfDWDM-Presentation.pdf
DWDM-Presentation.pdf
 
Verilog HDL Design Examples ( PDFDrive ).pdf
Verilog HDL Design Examples ( PDFDrive ).pdfVerilog HDL Design Examples ( PDFDrive ).pdf
Verilog HDL Design Examples ( PDFDrive ).pdf
 
VHDL summary.pdf
VHDL summary.pdfVHDL summary.pdf
VHDL summary.pdf
 
ROM PAL PLA.ppt
ROM PAL PLA.pptROM PAL PLA.ppt
ROM PAL PLA.ppt
 
Lecture 16 RC Architecture Types & FPGA Interns Lecturer.pptx
Lecture 16 RC Architecture Types & FPGA Interns Lecturer.pptxLecture 16 RC Architecture Types & FPGA Interns Lecturer.pptx
Lecture 16 RC Architecture Types & FPGA Interns Lecturer.pptx
 
exam.ppt
exam.pptexam.ppt
exam.ppt
 
REVISION SYN3.pptx
REVISION SYN3.pptxREVISION SYN3.pptx
REVISION SYN3.pptx
 
INSTRUMENTATION.pptx
INSTRUMENTATION.pptxINSTRUMENTATION.pptx
INSTRUMENTATION.pptx
 
cnacan (2).ppt
cnacan (2).pptcnacan (2).ppt
cnacan (2).ppt
 

Recently uploaded

chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 

Recently uploaded (20)

chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 

mop-baseband-integration-xl-project-pa-1docxdocx-pr_299cefaa0fd3e32dd950c721867de88c.pdf

  • 1. Ericsson Internal INSTRUCTION 1 (22) Prepared (Subject resp) No. ESETARI Arif Setiawan Approved (Document resp) Checked Date Rev Reference EYULTEN Yulpien Teng 2017-04-17 PA1 MOP BASEBAND INTEGRATION XL PROJECT
  • 2. Ericsson Internal INSTRUCTION 2 (22) Prepared (Subject resp) No. ESETARI Arif Setiawan Approved (Document resp) Checked Date Rev Reference EYULTEN Yulpien Teng 2017-04-17 PA1 Contents 1. Scope 1 2. Revision history 1 3. Software features and tools 2 4. Configuration & procedure 3 5. Procedure 4 6. Concluding routines 5 7. References 6
  • 3. Ericsson Internal INSTRUCTION 3 (22) Prepared (Subject resp) No. ESETARI Arif Setiawan Approved (Document resp) Checked Date Rev Reference EYULTEN Yulpien Teng 2017-04-17 PA1 1 Scope This document describes method of procedure (MoP) how to commissioning & integration baseband 521x to OSS RC, RNC, BSC, 2 Revision History Revision Comment Author Date PA 1 Initial draft ESETARI 2017/4/17 3 Prerequisites 3.1 Tools 1. Web Browser (recommended use IE) 2. Latest Moshell or minimum moshell 17.0c 3. RJ-45 LAN Cable straigh 4. SFTP aplication 3.2 Software 17A SW : CXP9024418/5_R18BJ 3.3 Hardware o RBS Type: RBS 6000 Family (RBS 6601,6320,6120) o Baseband: o BB5216 o BB5212 o BSC HC/ EVO Controller o TCU/SIU o RU/RUS/RRUS/R2219/R2217
  • 4. Ericsson Internal INSTRUCTION 4 (22) Prepared (Subject resp) No. ESETARI Arif Setiawan Approved (Document resp) Checked Date Rev Reference EYULTEN Yulpien Teng 2017-04-17 PA1 4 Configuration 4.1 Type of Configuration existing site (mixedmode) 4.1.1 LTE 1800 + U900 (BB 5216) mixedmode radio with existing G900 (DUG) and DCS1800 (DUG)
  • 5. Ericsson Internal INSTRUCTION 5 (22) Prepared (Subject resp) No. ESETARI Arif Setiawan Approved (Document resp) Checked Date Rev Reference EYULTEN Yulpien Teng 2017-04-17 PA1 4.1.2 W2100 + U900 (BB5216) mixedmode radio with existing G900 (DUG) 4.1.3 LTE 1800 (BB 5212) mixed mode with existing G1800 (DUG)
  • 6. Ericsson Internal INSTRUCTION 6 (22) Prepared (Subject resp) No. ESETARI Arif Setiawan Approved (Document resp) Checked Date Rev Reference EYULTEN Yulpien Teng 2017-04-17 PA1 4.1.4 U900 (BB 5216) mixed mode with GSM 900 (DUG) 4.1.5 U2100 (BB 5216)
  • 7. Ericsson Internal INSTRUCTION 7 (22) Prepared (Subject resp) No. ESETARI Arif Setiawan Approved (Document resp) Checked Date Rev Reference EYULTEN Yulpien Teng 2017-04-17 PA1 4.1.6 U2100 + LTE 1800 (BB 5216) mixed mode with G1800 (DUG)
  • 8. Ericsson Internal INSTRUCTION 8 (22) Prepared (Subject resp) No. ESETARI Arif Setiawan Approved (Document resp) Checked Date Rev Reference EYULTEN Yulpien Teng 2017-04-17 PA1 4.2 Type of Configuration new site 4.2.1 W2100 + U900 (BB 5216) 4.2.2 W2100 + U900 + LTE 1800 (BB 5216) cascade RU solution
  • 9. Ericsson Internal INSTRUCTION 9 (22) Prepared (Subject resp) No. ESETARI Arif Setiawan Approved (Document resp) Checked Date Rev Reference EYULTEN Yulpien Teng 2017-04-17 PA1 4.2.3 W2100 (BB 5216) 4.2.4 LTE 1800 + W2100 (BB 5216)
  • 10. Ericsson Internal INSTRUCTION 10 (22) Prepared (Subject resp) No. ESETARI Arif Setiawan Approved (Document resp) Checked Date Rev Reference EYULTEN Yulpien Teng 2017-04-17 PA1 4.3 Baseband combination to other RU config Baseband_RU_com bination.pptx 5 New NE Procedure 5.1 Flow Chart 5.2 Preparation This phase describes the activities that should be performed before the execution of the RBS.. 5.2.1 Hardware Installation Make sure all hardware installed properly following standard installation on the MOP. 5.2.2 ATND CDD CDR IP (ATND) & Radio (CDD) configuration data must be provided
  • 11. Ericsson Internal INSTRUCTION 11 (22) Prepared (Subject resp) No. ESETARI Arif Setiawan Approved (Document resp) Checked Date Rev Reference EYULTEN Yulpien Teng 2017-04-17 PA1 Example : ATND Jomin Barat scenario 3.1 PA2.xlsx ATND Jomin Barat scenario 3.2 PA2.xlsx 5.2.3 Prepare integration script To generate the integration scripts is used the Internal tool (Ericsson – PCI tool). The scripts will be provided by GSC Team, generated via PCI Tools. Download the scripts from PCI server. The scripts must be contained of below files.  RBS Summary File  Site Basic File  Site Equipment File  Transport Network File  Radio Network File Example configuration script : 5.3 Commissioning (onsite) 5.3.1 Powering up RBS If the RBS is not already switched on, do the following: 1. Make sure the power supply is available, tested, and approved for supplying the RBS with power. 2. Switch on the power supply to the RBS 5.3.2 Check RBS status To verify that the RBS is ready for integration, do the following: On digital units and radio units, check that the green power indicators are on 5.3.3 Tools preparation& baseband commissioning Do baseband commissioning using smart laptop or manual Workshop Baseband 5212.pptx Method of Procedure Baseband 5216 Integration using Smart Laptop.docx 5.4 Integration Call GSC /TAC to configure in BSC/RNC/OSS side 5.4.1 RNC Integration RNC integration and scripting are same as G1 node (DUW) a. Create utrancell b. Create Iublink
  • 12. Ericsson Internal INSTRUCTION 12 (22) Prepared (Subject resp) No. ESETARI Arif Setiawan Approved (Document resp) Checked Date Rev Reference EYULTEN Yulpien Teng 2017-04-17 PA1 c. Create relation 3453817G_3G_TESBED_KARAWANG_RNBKS07.rar 00_Iublink.rar 5.4.2 OSS Integration MOP BASEBAND INTEGRATION-OSS-RC XL PROJECT.docx 5.4.3 License Key File Installation 5.4.3.1 Install LKF File Using OSS-RC SHM GUI Just for this phase 1 procedure, this is a post-integration activity. As the integration unlock only is valid for a limit number of days, a proper set of licenses, License Key File (LKF) need to be ordered and installed for the node. This step will also confirm that proper license considerations made were correct. The maintained performance and no resource alarms should confirm the success of this step. Prerequisite for the following steps is that the ordered LKF(s) has been received and has been stored by the user at defined directory location on OSS-RC user account file system. Note that the stored license file is a zip file that contain at least one License Data File (LDF) and one LKF to be imported. For more details, see reference Error: Reference source not found. 1. Import License Key File Open OSS Explorer (Launch -> Application -> Ericsson -> ), Start SHM GUI (Tools -> Hardware and Software Inventory –> Software Hardware Management -> ). Select the License tab on top of SHM GUI. Click on the Import button at right of the License tab view. In the “Import new License Key File” dialog box, click Browse. Select the LKF zip file from chosen location. Enter a short description and click Import. The new license key files will be listed under License tab view when imported to OSS-RC server SMRS.
  • 13. Ericsson Internal INSTRUCTION 13 (22) Prepared (Subject resp) No. ESETARI Arif Setiawan Approved (Document resp) Checked Date Rev Reference EYULTEN Yulpien Teng 2017-04-17 PA1 Note that when the fingerprint present in LKF zip file matches with the fingerprint of any added node in the OSS-RC server, then ME name will be updated under Managed Element column in License tab GUI accordingly. Otherwise empty value will be displayed under that column with imported license key file details
  • 14. Ericsson Internal INSTRUCTION 14 (22) Prepared (Subject resp) No. ESETARI Arif Setiawan Approved (Document resp) Checked Date Rev Reference EYULTEN Yulpien Teng 2017-04-17 PA1 2. Install Imported License Key File on the Node Select the License tab on top of SHM GUI, if not already selected. Select the LKF row under License tab view with node name present on ”Managed Element” column or search for the node in left side panel and select the node name in left side panel result list. Click on the Install button at right of the License tab view. Note that Install button is enabled when node name for imported LKF is selected. In the “Confirmation” dialog box, click Yes to proceed if status is as expected (no errors shown). In the next “Scheduler” dialog box, click “Start Immediately” and “Start Install”. This schedules a “Install License” job. Select the Job tab on top of SHM GUI to check the progress of the job. Once the install is successful on the node SHM will update the “Current License” column as TRUE under License tab view. Check status on the node after installed LKF file Launch EMCLI for selected node from OSS Common Explorer or start AMOS from opened OSS terminal window. Perform the following first EMCLI/AMOS commands. > lt all > alt At this stage there should not be any licensing related alarms. Verify the RAN traffic status by the commands according to chapter 5.8.1
  • 15. Ericsson Internal INSTRUCTION 15 (22) Prepared (Subject resp) No. ESETARI Arif Setiawan Approved (Document resp) Checked Date Rev Reference EYULTEN Yulpien Teng 2017-04-17 PA1 5.4.4 Setting primary secondary Always set baseband to be primary node Port A Used by Port B Used by A1 SCU (EC A) B1 DU-1/ Baseband-1 A2 PDU-1 B2 PDU-2 A3 PSU-1/DU-6(1) /Baseband T503 B3 PSU-2 A4 PSU-3 B4 PSU-4 A5 DU-2/ Baseband-2/ Baseband T503 B5 BFU A6 DU-3/ Baseband-3/ Baseband T503 B6 PSU-5 A7 DU-4/ Baseband-4/ Baseband T503 B7 PDU-3 A8 PDU-4 B8 CLU
  • 16. Ericsson Internal INSTRUCTION 16 (22) Prepared (Subject resp) No. ESETARI Arif Setiawan Approved (Document resp) Checked Date Rev Reference EYULTEN Yulpien Teng 2017-04-17 PA1 1. Set support system control to be true 2. Define Baseband ecport Command : set Equipment=1,FieldReplaceableUnit=1,EcPort=1 hubPosition B1 3. Define external node & Ecport
  • 17. Ericsson Internal INSTRUCTION 17 (22) Prepared (Subject resp) No. ESETARI Arif Setiawan Approved (Document resp) Checked Date Rev Reference EYULTEN Yulpien Teng 2017-04-17 PA1 4. Define ecport each of externalnode 5.4.5 Setting eksternal alarm 5.4.6 Define Node Group Sync (sync between DU-Baseband) 1. Define NGS in baseband
  • 18. Ericsson Internal INSTRUCTION 18 (22) Prepared (Subject resp) No. ESETARI Arif Setiawan Approved (Document resp) Checked Date Rev Reference EYULTEN Yulpien Teng 2017-04-17 PA1 NodeGroupSyncMe mber_LTE_BB.mos 2. Define NGS in DUG idb_OL1800.dbb idb_UL900.dbb 5.4.7 Define RET baseband (if needed) Before Create RET, Must be Create RfPort=R at RRU TSR_Create_RET_BA SEBAND.mos 5.5 Troubleshooting  Transport Check Cek default gateway for each inteface baik OAM and/or traffic hget Dst=1,NextHop=1 address ========================================================================== MO address ========================================================================== Router=vr_OAM,RouteTableIPv4Static=1,Dst=1,NextHop=1 XX.XX.XX.XX Router=vr_Traffic3G,RouteTableIPv4Static=1,Dst=1,NextHop=1 YY.YY.YY.YY ========================================================================== Total: 2 MOs Test ping OAM mcc Router=vr_OAM ping XX.XX.XX.XX --count 5 Test Ping Traffic mcc Router=vr_Traffic3G ping YY.YY.YY.YY --count 5
  • 19. Ericsson Internal INSTRUCTION 19 (22) Prepared (Subject resp) No. ESETARI Arif Setiawan Approved (Document resp) Checked Date Rev Reference EYULTEN Yulpien Teng 2017-04-17 PA1  Hardware and connection cable check  st FieldReplaceableUnit=  Verifikasi Sector dan cell  St SectorEquipmentFunction=  lst LocalCell 5.6 Setting basic parameter Run script basic parameter either on site or remotely run /home/test123/Baseband/Basic_Optim.mos 5.7 Verification & Functionality test 5.7.1 Verification service and call test This step should be executed by OMC engineer, to verify that the integration was performed with successful. So the OMC engineer must to check if exist MOs DISABLED or LOCKED and Alarms after start the integration l+ confb+ gs+ cvls st cell st sector st ru st router st field lst. Dis st tma (only if they are present) st ret (only if they are present) st Synchronization alt hget fieldrep state|indi hget fieldrep product hget hwitem= product|serial /lrat/ue print -bearer gs- confb- l- and do functionality test(test call) using SRS tool
  • 20. Ericsson Internal INSTRUCTION 20 (22) Prepared (Subject resp) No. ESETARI Arif Setiawan Approved (Document resp) Checked Date Rev Reference EYULTEN Yulpien Teng 2017-04-17 PA1 5.7.2 Primary and secondary status 5.7.3 External Alarm testing Please doing external alarm testing with rectifier 5.7.4 NGS (node group sync) status
  • 21. Ericsson Internal INSTRUCTION 21 (22) Prepared (Subject resp) No. ESETARI Arif Setiawan Approved (Document resp) Checked Date Rev Reference EYULTEN Yulpien Teng 2017-04-17 PA1 5.7.5 RET status 5.7.6 Hardware and connection cable check  st FieldReplaceableUnit= 5.7.7 Verification Sector and cell  St SectorEquipmentFunction=  lst LocalCell 6 Concluding routines Before leaving the sites, ensure that the following action have been performs 1. Make sure no alarm appears at the RBS. 2. Save Log (K-get) 3. Tidy the site and leave it in the same condition as you found it. 4. Lock all doors to the site. 5. Report/contact Ericsson supervisor. 6. Report/contact Customer PIC. 7 References & Appendix 1. Upgrade Software Baseband Upgrade Baseband 52xx via SHM OSS-RC_PA2.docx Software Upgrade BB 52xx via Moshell or AMOS OSS-RC.docx
  • 22. Ericsson Internal INSTRUCTION 22 (22) Prepared (Subject resp) No. ESETARI Arif Setiawan Approved (Document resp) Checked Date Rev Reference EYULTEN Yulpien Teng 2017-04-17 PA1