1` 
Muhammad shahab 
Email Address:shahab_55598@yahoo.com 
Mobile Phone Number: 00966-503380724 
Current address: Riyadh Saudi Arab 
OBJETIVES 
To work in a challenging and stimulating environment with opportunity to use my current experience 
and to enrich my knowledge and enhance my experience, to contribute towards the achievement of 
organizational objective by applying my professional skills 
Personal Information 
Birth Date: 30 January 1991 
Gender: Male 
Nationality: Pakistan 
Religion Islam 
Iqama Status: Transferable 
Iqama No: 2329337261 
Driving License: Light vehicle Driving License Saudi Arabia 
Residence Location: Islamabad, Pakistan 
Professional Experience 
Site engineer (ccs company in Pakistan) 
Job Responsibilities 
ď‚· Site inspection for civil works, which includes structural & finishing works and ensure that 
the work is as per the Project Specifications and issued for construction drawing/ final 
approved drawings from authorities. 
ď‚· Ensure that all the works meets the stipulated quality standards. 
ď‚· Issuing site instructions against violations at site. 
ď‚· Issuing NCR against defect works and their follow up. 
ď‚· Monitor the progress of work with respect to the Master Program. 
 Contractor’s submittals reviewing, Sub-contractor’s prequalification documents, material 
submittals, method statements, technical documents, shop drawings, etc... 
ď‚· Rich knowledge in finishing standards & quality control. 
ď‚· Frequent Safety inspection & issue site instructions against violations 
ď‚· BOQ preparation of civil works 
ď‚· Tender offer analysis 
ď‚· Monthly payment invoice revise
2` 
ď‚· Analysis and recommendations of claims for Extension of Time & Variation Order. 
 (DMC company in Pakistan) August 2011 – 2012 July 
Job Responsibilities 
• Preparing and modifying drawing for the project using AutoCAD. 
• Meetings with consultant about the modification and development of project 
• Develops and maintains a detailed project schedule which includes administrative tasks and 
all sites involved in the project. 
• Participation in R&D Team Meetings. 
• Coordinate meetings, including travel arrangements and expense reports. 
• Maintain Project Managers calendars. 
• Sites include all coverage, control locations including central and secondary dispatch 
locations, backhaul locations, and generation plants and associated facilities. 
• Ensure coordination of the interfaces of R&D with DRA, Marketing, Medicine and 
Operations. 
• Prepare and/or edit meeting minutes, presentations and tables. 
• Also included is the scheduled deployment of mobile and portable radios to meet district 
roll-out. 
• Members, ensure adherence to deadlines. 
• File all project documents (hard and soft copies) 
• Ensure coordination of the interfaces of all disciplines within R&D. 
• The detailed schedule will include all project phases and dependencies including at least 
preliminary engineering, property review and acquisition, detailed design, material 
procurement, installation, test and turn-up, and site and system acceptance. 
• Responsible to track project changes and produces updated site based schedule as agreed 
with engineering and project management. 
• Compile summary documents, e.g. Product Development Plan, management Summary and 
Target Product Profile. Collect and include contributions of the Team 
• Reviews project proposal and deliverables with Project Management and other related 
departments that will be involved to determine proper lead time, funding limitations, 
procedures for accomplishing project, staffing requirements, and allotment of available 
resources to various phases of project. 
• Maintain good communication with technicians and contractors to assure timely and 
efficient completion of jobs, proper communication of issues, and proper documentation of 
the entire process at each job site. 
Site engineer (CCS in Saudi Arab) august 2012 – number 2014 
Job Responsibilities 
• Site inspection for civil works, which includes structural & finishing works and ensure that 
the work is as per the Project Specifications and issued for construction drawing/ final 
approved drawings from authorities. 
• Ensure that all the works meets the stipulated quality standards. 
• Issuing site instructions against violations at site. 
• Issuing NCR against defect works and their follow up. 
• Monitor the progress of work with respect to the Master Program. 
• Contractor’s submittals reviewing, Sub-contractor’s prequalification documents, material 
submittals, method statements, technical documents, shop drawings, etc... 
• Rich knowledge in finishing standards & quality control.
• Frequent Safety inspection & issue site instructions against violations 
• BOQ preparation of civil works 
• Tender offer analysis Monthly payment invoice revise Analysis and recommendations of 
3` 
claims for Extension of Time & Variation Order. 
ď‚· Auto cad designer/draftsman January 2008 - January 2009: 
ď‚· Multi soft house of information technology Peshawar 
Specific Duties and Responsibilities: 
• Work closely with project managers and engineering consultants to develop 2D detailed 
drawings, floor plans using AutoCAD 
• Using AutoCAD to generate electronic files of client facilities, including but not limited to, 
floor plans, dimensioning, notes, elevation views, single-line drawings, cut sheets, 
photographs, site plans, plotting/printing, binding, and on-site survey and evaluation 
• Maintain and create CAD library and symbols 
• Organize and maintain AutoCAD files 
• Communicate with clients, vendors, and consultants by telephone, correspondence, electronic 
mail, and meetings 
• Track all tasks. 
• Track, stock, and order CAD related supplies 
• Perform light office duties such as filing, answering phones, faxing, e-mailing, shipping, and 
light lifting 
• Perform other related duties as required 
CV Body Content 
EDUCATION DATA: Division 
• • DAE(diploma associate engineer) 
2010 2nd 
• • Higher Secondary School Certificate 
(comp: science) 
2007 2nd 
PROFESSIONALS: 
ď‚· AutoCAD(one year) 
ď‚· Eagle point(one year) 
ď‚· Microsoft office(6 months)
4` 
ď‚· COMPUTER LITERACY: 
ď‚· DIT(Ms Office, Corel Draw, In page, Internet, Adobe Photoshop, Ulead, Hardware) 
ď‚· Microsoft Office 
ď‚· Microsoft Certified Solutions Associate (MCSA) 
ď‚· Professional certificate in IT 
ď‚· LANGUAGES KNOWN: 
English 
ď‚· Arabic 
Urdu 
Pashto

shahab new cv

  • 1.
    1` Muhammad shahab Email Address:shahab_55598@yahoo.com Mobile Phone Number: 00966-503380724 Current address: Riyadh Saudi Arab OBJETIVES To work in a challenging and stimulating environment with opportunity to use my current experience and to enrich my knowledge and enhance my experience, to contribute towards the achievement of organizational objective by applying my professional skills Personal Information Birth Date: 30 January 1991 Gender: Male Nationality: Pakistan Religion Islam Iqama Status: Transferable Iqama No: 2329337261 Driving License: Light vehicle Driving License Saudi Arabia Residence Location: Islamabad, Pakistan Professional Experience Site engineer (ccs company in Pakistan) Job Responsibilities  Site inspection for civil works, which includes structural & finishing works and ensure that the work is as per the Project Specifications and issued for construction drawing/ final approved drawings from authorities.  Ensure that all the works meets the stipulated quality standards.  Issuing site instructions against violations at site.  Issuing NCR against defect works and their follow up.  Monitor the progress of work with respect to the Master Program.  Contractor’s submittals reviewing, Sub-contractor’s prequalification documents, material submittals, method statements, technical documents, shop drawings, etc...  Rich knowledge in finishing standards & quality control.  Frequent Safety inspection & issue site instructions against violations  BOQ preparation of civil works  Tender offer analysis  Monthly payment invoice revise
  • 2.
    2`  Analysisand recommendations of claims for Extension of Time & Variation Order.  (DMC company in Pakistan) August 2011 – 2012 July Job Responsibilities • Preparing and modifying drawing for the project using AutoCAD. • Meetings with consultant about the modification and development of project • Develops and maintains a detailed project schedule which includes administrative tasks and all sites involved in the project. • Participation in R&D Team Meetings. • Coordinate meetings, including travel arrangements and expense reports. • Maintain Project Managers calendars. • Sites include all coverage, control locations including central and secondary dispatch locations, backhaul locations, and generation plants and associated facilities. • Ensure coordination of the interfaces of R&D with DRA, Marketing, Medicine and Operations. • Prepare and/or edit meeting minutes, presentations and tables. • Also included is the scheduled deployment of mobile and portable radios to meet district roll-out. • Members, ensure adherence to deadlines. • File all project documents (hard and soft copies) • Ensure coordination of the interfaces of all disciplines within R&D. • The detailed schedule will include all project phases and dependencies including at least preliminary engineering, property review and acquisition, detailed design, material procurement, installation, test and turn-up, and site and system acceptance. • Responsible to track project changes and produces updated site based schedule as agreed with engineering and project management. • Compile summary documents, e.g. Product Development Plan, management Summary and Target Product Profile. Collect and include contributions of the Team • Reviews project proposal and deliverables with Project Management and other related departments that will be involved to determine proper lead time, funding limitations, procedures for accomplishing project, staffing requirements, and allotment of available resources to various phases of project. • Maintain good communication with technicians and contractors to assure timely and efficient completion of jobs, proper communication of issues, and proper documentation of the entire process at each job site. Site engineer (CCS in Saudi Arab) august 2012 – number 2014 Job Responsibilities • Site inspection for civil works, which includes structural & finishing works and ensure that the work is as per the Project Specifications and issued for construction drawing/ final approved drawings from authorities. • Ensure that all the works meets the stipulated quality standards. • Issuing site instructions against violations at site. • Issuing NCR against defect works and their follow up. • Monitor the progress of work with respect to the Master Program. • Contractor’s submittals reviewing, Sub-contractor’s prequalification documents, material submittals, method statements, technical documents, shop drawings, etc... • Rich knowledge in finishing standards & quality control.
  • 3.
    • Frequent Safetyinspection & issue site instructions against violations • BOQ preparation of civil works • Tender offer analysis Monthly payment invoice revise Analysis and recommendations of 3` claims for Extension of Time & Variation Order.  Auto cad designer/draftsman January 2008 - January 2009:  Multi soft house of information technology Peshawar Specific Duties and Responsibilities: • Work closely with project managers and engineering consultants to develop 2D detailed drawings, floor plans using AutoCAD • Using AutoCAD to generate electronic files of client facilities, including but not limited to, floor plans, dimensioning, notes, elevation views, single-line drawings, cut sheets, photographs, site plans, plotting/printing, binding, and on-site survey and evaluation • Maintain and create CAD library and symbols • Organize and maintain AutoCAD files • Communicate with clients, vendors, and consultants by telephone, correspondence, electronic mail, and meetings • Track all tasks. • Track, stock, and order CAD related supplies • Perform light office duties such as filing, answering phones, faxing, e-mailing, shipping, and light lifting • Perform other related duties as required CV Body Content EDUCATION DATA: Division • • DAE(diploma associate engineer) 2010 2nd • • Higher Secondary School Certificate (comp: science) 2007 2nd PROFESSIONALS:  AutoCAD(one year)  Eagle point(one year)  Microsoft office(6 months)
  • 4.
    4` ď‚· COMPUTERLITERACY: ď‚· DIT(Ms Office, Corel Draw, In page, Internet, Adobe Photoshop, Ulead, Hardware) ď‚· Microsoft Office ď‚· Microsoft Certified Solutions Associate (MCSA) ď‚· Professional certificate in IT ď‚· LANGUAGES KNOWN: English ď‚· Arabic Urdu Pashto