Page 1 of 5
Resume
A.B. ImthiyazManzoor
Contact # +91-9789103666
E-mail: imthiyazmanzoor@gmail.com
Career Objective
To Assume a Challenging Position in any organization that will further enhance my ability
and experience and to provide opportunity for Professional Advancement can furnish
excellent references, hailing from decent cultured family committed to high moral and social
value in life.
Precis
Exceptional skills in communication, presentation with demonstrated abilities in team building
for achieving long-term and short-term objectives.
Educational Profile
Academic
Qualification
B.E- Bachelor of Civil Engineering (2007-2011) (64%).
Jerusalem College of Engineering, Affiliated to Anna University
Tamilnadu, India.
M.B.A – Masterof Business Administration (2011-2013)(55%)
Madurai Kamaraj University, Tamilnadu, India.
Technical
Qualification
Completed AUTOCAD, STADD PRO, PRIMA VEERA from
CADD Center, Tamilnadu, India.
Page 2 of 5
Technical Skills
Operating System Windows 95 / 98 / 2000 / XP / Windows 7, MS-Dos
Packages Ms- Excel, Ms-Word, Ms-PowerPoint
Field of Interest
 Execution
 Quantity surveying & Estimation
 Framed Structures
Professional Experience
Company Name : GD Foundation, Tamilnadu, India.
Duration : DEC 2011 to Till Date ( 4 Years & 2 Months)
Position : Civil Site Engineer
Project Details :
 G+4 Residential Apartments,
 Commercial Buildings,
 Rcc Road Work
Responsibilities:
 Responsible for all work planning, scheduling and execution at site .
 Responsible for checking work with quality and properly at site.
 Studying the work plan submitted by the contactor and suggests any modifications.
 To watch and inspect the construction work and assure that it is done in full accordance
with the drawings, technical specifications and bills of quantities.
 Supervising the works on site in accordance with the contract documents and using the
template and procedure established by the consultant.
Page 3 of 5
 Inspecting and testing materials prior to their use at site as per sample approved by the
consultant and ensuring removal of rejected material out from site.
 Ensuring the correct implementation of the works according to technical specifications,
to designs and quality of materials
 Checking of layout and setting out of buildings w.r.t. existing structures and site levels.
 Ensuring that health and safety measures are adopted and followed to the full extent and
 Prepare weekly report and suggest and instruct additional safety measures if needed
 Weekly progress reports per each project/contract assigned
 Compliance of comments on defective or rejected work in the site order book
 Monitoring daily progress of site.
 Preparing weekly progress report to be submitted to the Project director and consultants.
 Keeping track of the days worked in line with the days in the contract.
 To check quality of workmanship.
 Assist with inspection of completed works, prepare necessary lists and handover to
operating authority
 Overseeing the selection and requisition of materials and plant
 Agreeing a price for materials, and making cost-effective solutions and proposals for the
intended project.
 Planning the work and efficiently organising the plant and site facilities in order to meet
agreed deadlines.
 Resolving any unexpected technical difficulties and other problems that may arise.
 Overseeing quality control, health and safety matters on site
 Manage the plan drawing of buildings through auto cad to the requirement by the clients
for alterations in plan.
 Designing 2D drawings in Auto Cad.
 Perform the designing process for renovations and modifications in the existing
products of several clients.
 Provided cost estimates and material specifications.
Page 4 of 5
Personnel Attributes
● Takes initiative and works independently or as part of a group.
● Well organized and easily meets deadlines.
● Disciplined, Determined, Authentic and making difference.
Completed Projects
 Successfully completed Residential Apartment at Madurai,
24 units (35,000 Sq ft – G+4)
 Successfully completed ‘Residential Apartments’ at Madurai,
8 units (22000 Sq ft – G+3)
 Ongoing Project ‘Residential Apartments’ at Madurai,
16 units 2 Blocks (45000 Sq ft – G+4)
Personal Profile
 Name : A.B. ImthiyazManzoor
 Date of birth : 29th Jan 1989
 Sex : Male
 Marital status : Single
 Nationality : Indian
 Languages known : English, Tamil, Hindi, Urdu.
Passport Details
 Passport No. : K6714962
 Expiry Date : 27/08/2022
 Place of Issue : Madurai, India.
Declaration
I hereby declare that to the best of my knowledge and belief, the details given above are true.
Place:Madurai, India
Date: (A.B. IMTHIYAZ MANZOOR)
Page 5 of 5
kkkf j askl dj f al ksdj f

Resume

  • 1.
    Page 1 of5 Resume A.B. ImthiyazManzoor Contact # +91-9789103666 E-mail: imthiyazmanzoor@gmail.com Career Objective To Assume a Challenging Position in any organization that will further enhance my ability and experience and to provide opportunity for Professional Advancement can furnish excellent references, hailing from decent cultured family committed to high moral and social value in life. Precis Exceptional skills in communication, presentation with demonstrated abilities in team building for achieving long-term and short-term objectives. Educational Profile Academic Qualification B.E- Bachelor of Civil Engineering (2007-2011) (64%). Jerusalem College of Engineering, Affiliated to Anna University Tamilnadu, India. M.B.A – Masterof Business Administration (2011-2013)(55%) Madurai Kamaraj University, Tamilnadu, India. Technical Qualification Completed AUTOCAD, STADD PRO, PRIMA VEERA from CADD Center, Tamilnadu, India.
  • 2.
    Page 2 of5 Technical Skills Operating System Windows 95 / 98 / 2000 / XP / Windows 7, MS-Dos Packages Ms- Excel, Ms-Word, Ms-PowerPoint Field of Interest  Execution  Quantity surveying & Estimation  Framed Structures Professional Experience Company Name : GD Foundation, Tamilnadu, India. Duration : DEC 2011 to Till Date ( 4 Years & 2 Months) Position : Civil Site Engineer Project Details :  G+4 Residential Apartments,  Commercial Buildings,  Rcc Road Work Responsibilities:  Responsible for all work planning, scheduling and execution at site .  Responsible for checking work with quality and properly at site.  Studying the work plan submitted by the contactor and suggests any modifications.  To watch and inspect the construction work and assure that it is done in full accordance with the drawings, technical specifications and bills of quantities.  Supervising the works on site in accordance with the contract documents and using the template and procedure established by the consultant.
  • 3.
    Page 3 of5  Inspecting and testing materials prior to their use at site as per sample approved by the consultant and ensuring removal of rejected material out from site.  Ensuring the correct implementation of the works according to technical specifications, to designs and quality of materials  Checking of layout and setting out of buildings w.r.t. existing structures and site levels.  Ensuring that health and safety measures are adopted and followed to the full extent and  Prepare weekly report and suggest and instruct additional safety measures if needed  Weekly progress reports per each project/contract assigned  Compliance of comments on defective or rejected work in the site order book  Monitoring daily progress of site.  Preparing weekly progress report to be submitted to the Project director and consultants.  Keeping track of the days worked in line with the days in the contract.  To check quality of workmanship.  Assist with inspection of completed works, prepare necessary lists and handover to operating authority  Overseeing the selection and requisition of materials and plant  Agreeing a price for materials, and making cost-effective solutions and proposals for the intended project.  Planning the work and efficiently organising the plant and site facilities in order to meet agreed deadlines.  Resolving any unexpected technical difficulties and other problems that may arise.  Overseeing quality control, health and safety matters on site  Manage the plan drawing of buildings through auto cad to the requirement by the clients for alterations in plan.  Designing 2D drawings in Auto Cad.  Perform the designing process for renovations and modifications in the existing products of several clients.  Provided cost estimates and material specifications.
  • 4.
    Page 4 of5 Personnel Attributes ● Takes initiative and works independently or as part of a group. ● Well organized and easily meets deadlines. ● Disciplined, Determined, Authentic and making difference. Completed Projects  Successfully completed Residential Apartment at Madurai, 24 units (35,000 Sq ft – G+4)  Successfully completed ‘Residential Apartments’ at Madurai, 8 units (22000 Sq ft – G+3)  Ongoing Project ‘Residential Apartments’ at Madurai, 16 units 2 Blocks (45000 Sq ft – G+4) Personal Profile  Name : A.B. ImthiyazManzoor  Date of birth : 29th Jan 1989  Sex : Male  Marital status : Single  Nationality : Indian  Languages known : English, Tamil, Hindi, Urdu. Passport Details  Passport No. : K6714962  Expiry Date : 27/08/2022  Place of Issue : Madurai, India. Declaration I hereby declare that to the best of my knowledge and belief, the details given above are true. Place:Madurai, India Date: (A.B. IMTHIYAZ MANZOOR)
  • 5.
    Page 5 of5 kkkf j askl dj f al ksdj f