COMPANY PROFILE
SER Infrastructure Private Limited
Annexure - I
02
About Company
SER Infrastructure established in 2021, offers
innovative, cutting edge technologies, products and
services via a sustainable and replicable model
through the expertise of experienced and seasoned
technocrats in the field of Renewables to markets and
clients
Our tailormade solutions help our clients setup
projects with a fixed timeline and generate profits for
the stakeholders.
Our core competence lies in the field of hydro pumped
storage projects that could find application as battery
storage solution for RE projects.
SER Infra
03
Vision
To be the best Renewable Energy
Service Provider in Asia
01
Promote use of RE products & Services
to reduce environment impact on
nature
02
Be a leader in promotion of low carbon
technologies
03
77 %
Success rate by
2030
SER Infra
Contact
About Us
Service
Home
04
Mission
To provide reliable &
sustainable RE products /
services in compliance with the
laws of nature.
01
Be a leading service provider
for Battery Storage solutions
based on technologies
available in Asia.
03
To provide best growth
environment to our employees, be
a great place to work.
02
To foster the growth and
sustenance of dedicated supply
chain for the sector.
04
SER Infra
Contact
About Us
Service
Home
05
Eknath Rathod
With 36 years
experience in
Hydro in Survey &
Investigation, Cost
Estimate,Electrom
echanical
equipment design,
Bid & contract
management,
erection activities
of Surya HEP,
Ghatghar PSS and
Koyna Left Bank
HEP.
Meet Our Team
Inderpal Singh Dev
Around 29 years
experience in
Larsen & Toubro,
Alstom , GE in
Leadership roles
in Power,
Renewables
Sector and
expertise in
implementing
scenarios ranging
from Business
Transformation
to Acquisition of
Power Assets.
M S Chaudhari
More than 27
years of
experience in
Hydro in
Investigation
Studies, E&M
equipment & 220
kV switchyard,
transmission line
design, Project
Management of
Ghatghar PSS and
Koyna Left Bank
HEP.
Management Advisory
With over 37 years of
experience in Energy
sector, , Project
Management,
Contractual/Commer
cial, Leadership and
Team Building skills,
experience of
working with
reputed consultants.
He has worked with
MAHAGENCO,
Reliance Energy,
Essar, DSPPL(FIL
Singapore), Unity
Infra Projects
V B Agashe
SER Infra
Contact
About Us
Service
Home
05
Meet Our Team
SER Infra
KEY EXPERTS
Mr. Sharad Dabhadkar, Retd. S.E. Government of Maharashtra Water
Resources Department (GOMWRD)
Mr. Avinash B. Patil, Retd. Sub-Divisional Engineer Government of
Maharashtra Water Resources Department (GOMWRD)
Mr. S.R. Shalu, Sub-Divisional Engineer Government of Maharashtra Water
Resources Department (GOMWRD)
Mrs. L. P. Nayak, Retd Addl Chief Engineer with Government of
Contact
About Us
Service
Home
06
Our Services Survey and Site investigation
Pre Feasibility Report (techno economic viability)
Preparation of DPR
Detailed Engineering and Design of Project
Components
Bid Specification preparation & OE role during
evaluation
Invitation of bids from reputed vendors in the space
Contract Agreement preparation
Review of manufacturing drawings
Project Monitoring
SER Infra
Contact
About Us
Service
Home
06
Experience (Partial List)
Koyna Left Bank PSS ( 2x40MW)
- Detailed Project Report preparation
- Electrical design, Layout design
- Formulation of Bidding process, shortlisting of Bidde
Warasgaon PSS (4x300 MW)
- Preparation of PIR
Koyna Stage-VI PSS (2 x 200 MW)
- Preparation of PIR
Ghatghar PSS –st 2 (2 x 125 MW)
- Preparation of PIR
Mutkhel PSS (1 x 110 MW)
- Preparation of PIR
Kodali PSS (2 x 110 MW)
- Preparation of PIR
Humbarli PSS (KHEP-V)
- Preparation of PIR
SER Infra
Ghatghar Pumped Storage 2x125 MW
- Detailed Project Report preparation
- Electrical design, Layout design
- Formulation of Bidding process, selection of Bidder,
Formalizing Contract Agreement
- Implemented Contract for Main Plant T/G plant, 150 T
EOT crane, 245 kV GIS S/yard, 220 kV XLPE cables, 185
MVA Main Power Transformer
Contact
About Us
Service
Home
08
Key Challenges
Changes in Power evacuation system – change in tapping points
01
Switchyard type conformity to layout available
02
Change in layout due to manufacturing constraints
03
Estimate time required to obtain Forest & Wildlife clearances,
to mitigate delay in execution of project
04
Change in SCADA inputs necessary for interface between T/G
control panels and Transco
05
Route of power evacuation system from Project to tapping
point
06
Environmental and forest wild life dept. clearance for
construction of Dams, power house & transmission line
07
Daily Generation and Pumping cycle, no. of hours
synchronous condenser mode operation
08
SER Infra
Selection of Size and number of T/G units considering
transportation limits from port up to project area
09
R&R issues
10
Contact
About Us
Service
Home
08
Few Key Projects
Financial vetting of 5 MW Solar Plant in Faridabad,
Haryana under PPA agreement
01
220 kv XLPE Cable Systems for 2x125 MW Ghatghar PSS
02
245 KV GIS Switchyard for 2x125 MW Ghatghar PSS
03
Bhatsa HEP ( 1x 15 MW)
04
Surya HEP ( 1x 6 MW)
05
Ghatghar PSS (2 x 125 MW)
06
Koyna left bank HEP (2x40 MW)
07
Koyna St 4 ( 4 x 250 MW)
08
SER Infra
Contact
About Us
Service
Home
07
Facilities
Pune
Deals with Civil
components of the
project.
Facility 01
Kalyan, Thane
Handles
Electromechanical
components of project.
Facility 02
Gurgaon, Haryana
Caters to NCR Region
and engages with
CPSU’s like NTPC and
THDC, SJVNL, BHEL.
Facility 03
Mumbai
Interacts with MERC,
MSETCL and State
Government for
various clearances /
permissions
Facility 04
SER Infra
Contact
About Us
Service
Home
09
Contact
9987172946
edr.seripl@gmail.com
402 DEEPJYOTI CO OP HSG SOC BIRLA
COLLEGE, KALYAN, Thane, THANE,
Maharashtra, India, 421301
SER Infra
Contact
About Us
Service
Home
10
Thank You
SER Infra

More Related Content

Similar to SER Infrastructure Private Limited (1).pptx

OHMS ENERGY-ppt
OHMS ENERGY-pptOHMS ENERGY-ppt
OHMS ENERGY-ppt
OHMS Energy Pvt Ltd
 
Atta Demetre - General 16062015
Atta Demetre - General 16062015Atta Demetre - General 16062015
Atta Demetre - General 16062015
ATTA DEMETRE
 
SUDHAKAR DIVYAPATI
SUDHAKAR DIVYAPATISUDHAKAR DIVYAPATI
SUDHAKAR DIVYAPATI
Sudhakar Divyapati
 
Sankar_ Vaid
Sankar_ VaidSankar_ Vaid
Sankar_ Vaid
Sankar Vaidhynathan
 
kp 103777 kp
kp 103777 kpkp 103777 kp
kp 103777 kp
K PRAKASH
 
Is Indian Power Sector Ready for Ultra Super Critical Power Plants
Is Indian Power Sector Ready for Ultra Super Critical Power PlantsIs Indian Power Sector Ready for Ultra Super Critical Power Plants
Is Indian Power Sector Ready for Ultra Super Critical Power Plants
Infraline Energy
 
RESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPLRESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPL
BISWAJYOTI SWAIN
 
Kiran -cv
Kiran -cvKiran -cv
Kiran -cv
kkirruu
 
solar consultants corporate credentials (1).pdf
solar consultants corporate credentials  (1).pdfsolar consultants corporate credentials  (1).pdf
solar consultants corporate credentials (1).pdf
sanjay vashishtha
 
Enercon Systems Profile
Enercon Systems ProfileEnercon Systems Profile
Nijaz cv .
Nijaz cv .Nijaz cv .
Nijaz cv .
nijaz aboobacker
 
Nijaz cv .
Nijaz cv .Nijaz cv .
Nijaz cv .
nijaz aboobacker
 
Gensol group of companies corporate presentation
Gensol group of companies corporate presentationGensol group of companies corporate presentation
Gensol group of companies corporate presentation
Ashish Verma
 
Resume - Shobhit
Resume - ShobhitResume - Shobhit
Resume - Shobhit
rajputshobhit
 
CV- Electrical Tech.& Design With 4+ years of exp.
CV- Electrical Tech.& Design With 4+ years of exp.CV- Electrical Tech.& Design With 4+ years of exp.
CV- Electrical Tech.& Design With 4+ years of exp.
Maharshi Joshi
 
Firstgreen corporate credentials-solar (1).pdf
Firstgreen corporate credentials-solar (1).pdfFirstgreen corporate credentials-solar (1).pdf
Firstgreen corporate credentials-solar (1).pdf
sanjay vashishtha
 
CHANDER PRAKASH
CHANDER PRAKASHCHANDER PRAKASH
CHANDER PRAKASH
Chander Prakash Yadav
 
A S Enterprise
A S EnterpriseA S Enterprise
A S Enterprise
vipulprakash
 
Resume_Sunil kumar Singh
Resume_Sunil kumar SinghResume_Sunil kumar Singh
Resume_Sunil kumar Singh
Sunil Kumar Singh
 
Company_Profile_Kamptech.pptx
Company_Profile_Kamptech.pptxCompany_Profile_Kamptech.pptx
Company_Profile_Kamptech.pptx
ZahedAli9
 

Similar to SER Infrastructure Private Limited (1).pptx (20)

OHMS ENERGY-ppt
OHMS ENERGY-pptOHMS ENERGY-ppt
OHMS ENERGY-ppt
 
Atta Demetre - General 16062015
Atta Demetre - General 16062015Atta Demetre - General 16062015
Atta Demetre - General 16062015
 
SUDHAKAR DIVYAPATI
SUDHAKAR DIVYAPATISUDHAKAR DIVYAPATI
SUDHAKAR DIVYAPATI
 
Sankar_ Vaid
Sankar_ VaidSankar_ Vaid
Sankar_ Vaid
 
kp 103777 kp
kp 103777 kpkp 103777 kp
kp 103777 kp
 
Is Indian Power Sector Ready for Ultra Super Critical Power Plants
Is Indian Power Sector Ready for Ultra Super Critical Power PlantsIs Indian Power Sector Ready for Ultra Super Critical Power Plants
Is Indian Power Sector Ready for Ultra Super Critical Power Plants
 
RESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPLRESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPL
 
Kiran -cv
Kiran -cvKiran -cv
Kiran -cv
 
solar consultants corporate credentials (1).pdf
solar consultants corporate credentials  (1).pdfsolar consultants corporate credentials  (1).pdf
solar consultants corporate credentials (1).pdf
 
Enercon Systems Profile
Enercon Systems ProfileEnercon Systems Profile
Enercon Systems Profile
 
Nijaz cv .
Nijaz cv .Nijaz cv .
Nijaz cv .
 
Nijaz cv .
Nijaz cv .Nijaz cv .
Nijaz cv .
 
Gensol group of companies corporate presentation
Gensol group of companies corporate presentationGensol group of companies corporate presentation
Gensol group of companies corporate presentation
 
Resume - Shobhit
Resume - ShobhitResume - Shobhit
Resume - Shobhit
 
CV- Electrical Tech.& Design With 4+ years of exp.
CV- Electrical Tech.& Design With 4+ years of exp.CV- Electrical Tech.& Design With 4+ years of exp.
CV- Electrical Tech.& Design With 4+ years of exp.
 
Firstgreen corporate credentials-solar (1).pdf
Firstgreen corporate credentials-solar (1).pdfFirstgreen corporate credentials-solar (1).pdf
Firstgreen corporate credentials-solar (1).pdf
 
CHANDER PRAKASH
CHANDER PRAKASHCHANDER PRAKASH
CHANDER PRAKASH
 
A S Enterprise
A S EnterpriseA S Enterprise
A S Enterprise
 
Resume_Sunil kumar Singh
Resume_Sunil kumar SinghResume_Sunil kumar Singh
Resume_Sunil kumar Singh
 
Company_Profile_Kamptech.pptx
Company_Profile_Kamptech.pptxCompany_Profile_Kamptech.pptx
Company_Profile_Kamptech.pptx
 

Recently uploaded

spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
University of Maribor
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
Mukeshwaran Balu
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
ssuser36d3051
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
nooriasukmaningtyas
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
yokeleetan1
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 

Recently uploaded (20)

spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 

SER Infrastructure Private Limited (1).pptx

  • 1. 01 COMPANY PROFILE SER Infrastructure Private Limited Annexure - I
  • 2. 02 About Company SER Infrastructure established in 2021, offers innovative, cutting edge technologies, products and services via a sustainable and replicable model through the expertise of experienced and seasoned technocrats in the field of Renewables to markets and clients Our tailormade solutions help our clients setup projects with a fixed timeline and generate profits for the stakeholders. Our core competence lies in the field of hydro pumped storage projects that could find application as battery storage solution for RE projects. SER Infra
  • 3. 03 Vision To be the best Renewable Energy Service Provider in Asia 01 Promote use of RE products & Services to reduce environment impact on nature 02 Be a leader in promotion of low carbon technologies 03 77 % Success rate by 2030 SER Infra
  • 4. Contact About Us Service Home 04 Mission To provide reliable & sustainable RE products / services in compliance with the laws of nature. 01 Be a leading service provider for Battery Storage solutions based on technologies available in Asia. 03 To provide best growth environment to our employees, be a great place to work. 02 To foster the growth and sustenance of dedicated supply chain for the sector. 04 SER Infra
  • 5. Contact About Us Service Home 05 Eknath Rathod With 36 years experience in Hydro in Survey & Investigation, Cost Estimate,Electrom echanical equipment design, Bid & contract management, erection activities of Surya HEP, Ghatghar PSS and Koyna Left Bank HEP. Meet Our Team Inderpal Singh Dev Around 29 years experience in Larsen & Toubro, Alstom , GE in Leadership roles in Power, Renewables Sector and expertise in implementing scenarios ranging from Business Transformation to Acquisition of Power Assets. M S Chaudhari More than 27 years of experience in Hydro in Investigation Studies, E&M equipment & 220 kV switchyard, transmission line design, Project Management of Ghatghar PSS and Koyna Left Bank HEP. Management Advisory With over 37 years of experience in Energy sector, , Project Management, Contractual/Commer cial, Leadership and Team Building skills, experience of working with reputed consultants. He has worked with MAHAGENCO, Reliance Energy, Essar, DSPPL(FIL Singapore), Unity Infra Projects V B Agashe SER Infra
  • 6. Contact About Us Service Home 05 Meet Our Team SER Infra KEY EXPERTS Mr. Sharad Dabhadkar, Retd. S.E. Government of Maharashtra Water Resources Department (GOMWRD) Mr. Avinash B. Patil, Retd. Sub-Divisional Engineer Government of Maharashtra Water Resources Department (GOMWRD) Mr. S.R. Shalu, Sub-Divisional Engineer Government of Maharashtra Water Resources Department (GOMWRD) Mrs. L. P. Nayak, Retd Addl Chief Engineer with Government of
  • 7. Contact About Us Service Home 06 Our Services Survey and Site investigation Pre Feasibility Report (techno economic viability) Preparation of DPR Detailed Engineering and Design of Project Components Bid Specification preparation & OE role during evaluation Invitation of bids from reputed vendors in the space Contract Agreement preparation Review of manufacturing drawings Project Monitoring SER Infra
  • 8. Contact About Us Service Home 06 Experience (Partial List) Koyna Left Bank PSS ( 2x40MW) - Detailed Project Report preparation - Electrical design, Layout design - Formulation of Bidding process, shortlisting of Bidde Warasgaon PSS (4x300 MW) - Preparation of PIR Koyna Stage-VI PSS (2 x 200 MW) - Preparation of PIR Ghatghar PSS –st 2 (2 x 125 MW) - Preparation of PIR Mutkhel PSS (1 x 110 MW) - Preparation of PIR Kodali PSS (2 x 110 MW) - Preparation of PIR Humbarli PSS (KHEP-V) - Preparation of PIR SER Infra Ghatghar Pumped Storage 2x125 MW - Detailed Project Report preparation - Electrical design, Layout design - Formulation of Bidding process, selection of Bidder, Formalizing Contract Agreement - Implemented Contract for Main Plant T/G plant, 150 T EOT crane, 245 kV GIS S/yard, 220 kV XLPE cables, 185 MVA Main Power Transformer
  • 9. Contact About Us Service Home 08 Key Challenges Changes in Power evacuation system – change in tapping points 01 Switchyard type conformity to layout available 02 Change in layout due to manufacturing constraints 03 Estimate time required to obtain Forest & Wildlife clearances, to mitigate delay in execution of project 04 Change in SCADA inputs necessary for interface between T/G control panels and Transco 05 Route of power evacuation system from Project to tapping point 06 Environmental and forest wild life dept. clearance for construction of Dams, power house & transmission line 07 Daily Generation and Pumping cycle, no. of hours synchronous condenser mode operation 08 SER Infra Selection of Size and number of T/G units considering transportation limits from port up to project area 09 R&R issues 10
  • 10. Contact About Us Service Home 08 Few Key Projects Financial vetting of 5 MW Solar Plant in Faridabad, Haryana under PPA agreement 01 220 kv XLPE Cable Systems for 2x125 MW Ghatghar PSS 02 245 KV GIS Switchyard for 2x125 MW Ghatghar PSS 03 Bhatsa HEP ( 1x 15 MW) 04 Surya HEP ( 1x 6 MW) 05 Ghatghar PSS (2 x 125 MW) 06 Koyna left bank HEP (2x40 MW) 07 Koyna St 4 ( 4 x 250 MW) 08 SER Infra
  • 11. Contact About Us Service Home 07 Facilities Pune Deals with Civil components of the project. Facility 01 Kalyan, Thane Handles Electromechanical components of project. Facility 02 Gurgaon, Haryana Caters to NCR Region and engages with CPSU’s like NTPC and THDC, SJVNL, BHEL. Facility 03 Mumbai Interacts with MERC, MSETCL and State Government for various clearances / permissions Facility 04 SER Infra
  • 12. Contact About Us Service Home 09 Contact 9987172946 edr.seripl@gmail.com 402 DEEPJYOTI CO OP HSG SOC BIRLA COLLEGE, KALYAN, Thane, THANE, Maharashtra, India, 421301 SER Infra