2. 02
About Company
SER Infrastructure established in 2021, offers
innovative, cutting edge technologies, products and
services via a sustainable and replicable model
through the expertise of experienced and seasoned
technocrats in the field of Renewables to markets and
clients
Our tailormade solutions help our clients setup
projects with a fixed timeline and generate profits for
the stakeholders.
Our core competence lies in the field of hydro pumped
storage projects that could find application as battery
storage solution for RE projects.
SER Infra
3. 03
Vision
To be the best Renewable Energy
Service Provider in Asia
01
Promote use of RE products & Services
to reduce environment impact on
nature
02
Be a leader in promotion of low carbon
technologies
03
77 %
Success rate by
2030
SER Infra
4. 04
Mission
To provide reliable &
sustainable RE products /
services in compliance with the
laws of nature.
01
Be a leading service provider
for Battery Storage solutions
based on technologies
available in Asia.
03
To provide best growth
environment to our employees, be
a great place to work.
02
To foster the growth and
sustenance of dedicated supply
chain for the sector.
04
SER Infra
5. 05
Eknath Rathod
With 36 years
experience in
Hydro in Survey &
Investigation, Cost
Estimate,Electrom
echanical
equipment design,
Bid & contract
management,
erection activities
of Surya HEP,
Ghatghar PSS and
Koyna Left Bank
HEP.
Meet Our Team
Inderpal Singh Dev
Around 29 years
experience in
Larsen & Toubro,
Alstom , GE in
Leadership roles
in Power,
Renewables
Sector and
expertise in
implementing
scenarios ranging
from Business
Transformation
to Acquisition of
Power Assets.
M S Chaudhari
More than 27
years of
experience in
Hydro in
Investigation
Studies, E&M
equipment & 220
kV switchyard,
transmission line
design, Project
Management of
Ghatghar PSS and
Koyna Left Bank
HEP.
Management Advisory
With over 37 years of
experience in Energy
sector, , Project
Management,
Contractual/Commer
cial, Leadership and
Team Building skills,
experience of
working with
reputed consultants.
He has worked with
MAHAGENCO,
Reliance Energy,
Essar, DSPPL(FIL
Singapore), Unity
Infra Projects
V B Agashe
SER Infra
6. 05
Meet Our Team
SER Infra
KEY EXPERTS
Mr. Sharad Dabhadkar, Retd. S.E. Government of Maharashtra Water
Resources Department (GOMWRD)
Mr. Avinash B. Patil, Retd. Sub-Divisional Engineer Government of
Maharashtra Water Resources Department (GOMWRD)
Mr. S.R. Shalu, Sub-Divisional Engineer Government of Maharashtra Water
Resources Department (GOMWRD)
Mrs. L. P. Nayak, Retd Addl Chief Engineer with Government of
7. 06
Our Services Survey and Site investigation
Pre Feasibility Report (techno economic viability)
Preparation of DPR
Detailed Engineering and Design of Project
Components
Bid Specification preparation & OE role during
evaluation
Invitation of bids from reputed vendors in the space
Contract Agreement preparation
Review of manufacturing drawings
Project Monitoring
SER Infra
8. 06
Experience (Partial List)
Koyna Left Bank PSS ( 2x40MW)
- Detailed Project Report preparation
- Electrical design, Layout design
- Formulation of Bidding process, shortlisting of Bidde
Warasgaon PSS (4x300 MW)
- Preparation of PIR
Koyna Stage-VI PSS (2 x 200 MW)
- Preparation of PIR
Ghatghar PSS –st 2 (2 x 125 MW)
- Preparation of PIR
Mutkhel PSS (1 x 110 MW)
- Preparation of PIR
Kodali PSS (2 x 110 MW)
- Preparation of PIR
Humbarli PSS (KHEP-V)
- Preparation of PIR
SER Infra
Ghatghar Pumped Storage 2x125 MW
- Detailed Project Report preparation
- Electrical design, Layout design
- Formulation of Bidding process, selection of Bidder,
Formalizing Contract Agreement
- Implemented Contract for Main Plant T/G plant, 150 T
EOT crane, 245 kV GIS S/yard, 220 kV XLPE cables, 185
MVA Main Power Transformer
9. 08
Key Challenges
Changes in Power evacuation system – change in tapping points
01
Switchyard type conformity to layout available
02
Change in layout due to manufacturing constraints
03
Estimate time required to obtain Forest & Wildlife clearances,
to mitigate delay in execution of project
04
Change in SCADA inputs necessary for interface between T/G
control panels and Transco
05
Route of power evacuation system from Project to tapping
point
06
Environmental and forest wild life dept. clearance for
construction of Dams, power house & transmission line
07
Daily Generation and Pumping cycle, no. of hours
synchronous condenser mode operation
08
SER Infra
Selection of Size and number of T/G units considering
transportation limits from port up to project area
09
R&R issues
10
10. 08
Few Key Projects
Financial vetting of 5 MW Solar Plant in Faridabad,
Haryana under PPA agreement
01
220 kv XLPE Cable Systems for 2x125 MW Ghatghar PSS
02
245 KV GIS Switchyard for 2x125 MW Ghatghar PSS
03
Bhatsa HEP ( 1x 15 MW)
04
Surya HEP ( 1x 6 MW)
05
Ghatghar PSS (2 x 125 MW)
06
Koyna left bank HEP (2x40 MW)
07
Koyna St 4 ( 4 x 250 MW)
08
SER Infra
11. 07
Facilities
Pune
Deals with Civil
components of the
project.
Facility 01
Kalyan, Thane
Handles
Electromechanical
components of project.
Facility 02
Gurgaon, Haryana
Caters to NCR Region
and engages with
CPSU’s like NTPC and
THDC, SJVNL, BHEL.
Facility 03
Mumbai
Interacts with MERC,
MSETCL and State
Government for
various clearances /
permissions
Facility 04
SER Infra