SlideShare a Scribd company logo
SCHOOL OF ARCHITECTURE. BUILDING. DESIGN
Centre for Modern Architecture Studies in Southeast Asia
Bachelor of Quantity Surveying (Honours)
BUILDING SERVICES 1 [BLD 60403]
____________________________________________________________
Assignment (Group Project)
Submission date: Week 12 (21st June 2016)
__________________________________________________________________
Assessment brief
Objectives
• To extend and refine knowledge relating to the building services technology and the management system.
• To develop students understanding of course materials and the current application in construction industry.
• Developing higher-order intellectual skills – evaluating skills and critical thinking skills
• Encourage knowledge sharing about subject taught
Learning Outcomes
Upon successful completion of the subject, students will be able to:
• Understand and explain relevant information related to the selected case study.
• Identify the application, system, installation, process, benefits, problems and anything relevant to support the
documentation.
Project:
• This project is a study on building services system with the selected topics such as ventilation system,
telecommunication, storm water system, cold water supply and hot water supply.
• Students are required to carry out own research study based on given topic supported by at least one case
study either in local or oversea.
In group of students, you are required to prepare one of the topics within the existing topic below:
1. Sustainable Wastewater Treatment
2. Energy Efficient Ventilation System
3. Building Integration of Solar Energy
4. Water Treatment for Domestic Water Supplies
5. Ventilation Problem in Heritage Building
6. Energy Efficient in Heritage Building
7. Telecommunication Service for High Rise Building
8. Sustainable Storm-water Management
9. Indoor Environmental Quality in Healthcare/Office
10. The installation of Hot Water Supply for Hotel/Corporate Building
• You are required to carry out survey on the selected topic, and prepare a documentation report.
You are required to explain the application, system, installation process, benefits, problems and
anything relevant to support the documentation.
• You also encouraged highlighting the recommendations for future improvement.
Submission Requirement:
Documentation& Presentation
• A4 bound report complete with visual and photographs inclusive of detailing and documentation of your
project.
• Word processed, font size 11, Arial, 1.5 spacing, justify and not less than 4500 words (excluding the cover
page and appendices)
• Visual/photographs used in the submission must be clear and well communicated.
• Assumptions can be made through references from books/drawings are allowed. DO NOT PLAGIARISE.
Application must be according to selected topic context.
• Softcopy is required to be attached with the hardcopy.
FORMAT of A4 report/Documentation
1. Cover page – Name and student ID number should be written clearly (TU logo)
2. Table of content
3. Introduction of selected topic
4. Installation process (if applicable)
5. Management system (if applicable)
6. The advantages and Disadvantages
7. Case study: Finding and Explanation
8. Possible problems to the system (if applicable)
9. Recommendations for future improvement
10. Learning from the group work project
11. References (alphabetical order)
12. Bibliography (alphabetical order)
13. Appendices
Assessment Criteria
The assessment for this project will be based on your:-
• Demonstrated understanding of the project brief
• Quality and clarity of the documented drawings/photographs and detailing of the system
• Materiality and richness of contents
• Clear visual and written communication of your understanding of the project
• Appropriate use of drawings/photographs standard e.g. symbols/profiling, label and specifications.

More Related Content

What's hot

ABET / EAC - Proposed Revisions to Criteria 3 and 5
ABET / EAC - Proposed Revisions to Criteria 3 and 5ABET / EAC - Proposed Revisions to Criteria 3 and 5
Co estimating
Co estimating Co estimating
Co estimating
shensin1015
 
Preparation for NBA
Preparation for  NBAPreparation for  NBA
Preparation for NBA
SHIMI S L
 
Outcome Based Education and Assessment
Outcome Based Education and AssessmentOutcome Based Education and Assessment
Outcome Based Education and Assessment
Vijay Kumar Jadon
 
Preparing for ABET EAC Evaluation Visit r032916
Preparing for ABET EAC Evaluation Visit r032916Preparing for ABET EAC Evaluation Visit r032916
Preparing for ABET EAC Evaluation Visit r032916
Susan Schall
 
Sp110328
Sp110328Sp110328
Sp110328
Stuart Palmer
 
Measurment 3 (qsb 60304) module outline - 28 march 2016
Measurment 3 (qsb 60304)   module outline - 28 march 2016Measurment 3 (qsb 60304)   module outline - 28 march 2016
Measurment 3 (qsb 60304) module outline - 28 march 2016
Est
 
Sem 2 ct2 module outline
Sem 2 ct2   module outline Sem 2 ct2   module outline
Sem 2 ct2 module outline
Est
 
SEM 6 : PORTFOLIO PROJECT BRIEF
SEM 6 : PORTFOLIO PROJECT BRIEF SEM 6 : PORTFOLIO PROJECT BRIEF
SEM 6 : PORTFOLIO PROJECT BRIEF
Darshiini Vig
 
An Empirical Study on Attainment of Course Outcome for an Engineering course ...
An Empirical Study on Attainment of Course Outcome for an Engineering course ...An Empirical Study on Attainment of Course Outcome for an Engineering course ...
An Empirical Study on Attainment of Course Outcome for an Engineering course ...
iosrjce
 
Nba msr
Nba msrNba msr
Nba msr
drmsrmurty
 
1.4 a state the process for defining the vision and mission of the department...
1.4 a state the process for defining the vision and mission of the department...1.4 a state the process for defining the vision and mission of the department...
1.4 a state the process for defining the vision and mission of the department...
Sekar Subramani
 
Parcc update. may 2013
Parcc update. may 2013Parcc update. may 2013
Parcc update. may 2013
Mona Toncheff
 
B sc(hons)(arch) architecture studio 2 arc 1126 outline august 2014
B sc(hons)(arch) architecture studio 2 arc 1126 outline august 2014B sc(hons)(arch) architecture studio 2 arc 1126 outline august 2014
B sc(hons)(arch) architecture studio 2 arc 1126 outline august 2014
Anthony Chew
 
NBA
NBANBA
0.course outcline
0.course outcline0.course outcline
0.course outcline
Nazrin Nazdri
 
Obe nba
Obe nbaObe nba
Obe nba
NirajNair2
 
Nba sar ppt
Nba sar pptNba sar ppt
Nba sar ppt
Kim J Seelan
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
IJERD Editor
 
4.74 s.e. computer engineering (1)
4.74 s.e. computer engineering (1)4.74 s.e. computer engineering (1)
4.74 s.e. computer engineering (1)
Aditya66086
 

What's hot (20)

ABET / EAC - Proposed Revisions to Criteria 3 and 5
ABET / EAC - Proposed Revisions to Criteria 3 and 5ABET / EAC - Proposed Revisions to Criteria 3 and 5
ABET / EAC - Proposed Revisions to Criteria 3 and 5
 
Co estimating
Co estimating Co estimating
Co estimating
 
Preparation for NBA
Preparation for  NBAPreparation for  NBA
Preparation for NBA
 
Outcome Based Education and Assessment
Outcome Based Education and AssessmentOutcome Based Education and Assessment
Outcome Based Education and Assessment
 
Preparing for ABET EAC Evaluation Visit r032916
Preparing for ABET EAC Evaluation Visit r032916Preparing for ABET EAC Evaluation Visit r032916
Preparing for ABET EAC Evaluation Visit r032916
 
Sp110328
Sp110328Sp110328
Sp110328
 
Measurment 3 (qsb 60304) module outline - 28 march 2016
Measurment 3 (qsb 60304)   module outline - 28 march 2016Measurment 3 (qsb 60304)   module outline - 28 march 2016
Measurment 3 (qsb 60304) module outline - 28 march 2016
 
Sem 2 ct2 module outline
Sem 2 ct2   module outline Sem 2 ct2   module outline
Sem 2 ct2 module outline
 
SEM 6 : PORTFOLIO PROJECT BRIEF
SEM 6 : PORTFOLIO PROJECT BRIEF SEM 6 : PORTFOLIO PROJECT BRIEF
SEM 6 : PORTFOLIO PROJECT BRIEF
 
An Empirical Study on Attainment of Course Outcome for an Engineering course ...
An Empirical Study on Attainment of Course Outcome for an Engineering course ...An Empirical Study on Attainment of Course Outcome for an Engineering course ...
An Empirical Study on Attainment of Course Outcome for an Engineering course ...
 
Nba msr
Nba msrNba msr
Nba msr
 
1.4 a state the process for defining the vision and mission of the department...
1.4 a state the process for defining the vision and mission of the department...1.4 a state the process for defining the vision and mission of the department...
1.4 a state the process for defining the vision and mission of the department...
 
Parcc update. may 2013
Parcc update. may 2013Parcc update. may 2013
Parcc update. may 2013
 
B sc(hons)(arch) architecture studio 2 arc 1126 outline august 2014
B sc(hons)(arch) architecture studio 2 arc 1126 outline august 2014B sc(hons)(arch) architecture studio 2 arc 1126 outline august 2014
B sc(hons)(arch) architecture studio 2 arc 1126 outline august 2014
 
NBA
NBANBA
NBA
 
0.course outcline
0.course outcline0.course outcline
0.course outcline
 
Obe nba
Obe nbaObe nba
Obe nba
 
Nba sar ppt
Nba sar pptNba sar ppt
Nba sar ppt
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
4.74 s.e. computer engineering (1)
4.74 s.e. computer engineering (1)4.74 s.e. computer engineering (1)
4.74 s.e. computer engineering (1)
 

Similar to Sem 2 BS1 assignment

Bs1 assignment semester 2016 august
Bs1 assignment   semester 2016 augustBs1 assignment   semester 2016 august
Bs1 assignment semester 2016 august
Lin Hui
 
Storm water management
Storm water managementStorm water management
Storm water management
Lee Pei Gie
 
Group project bs1
Group project bs1 Group project bs1
Group project bs1
w ss
 
Group project bs1
Group project bs1 Group project bs1
Group project bs1
Penny3688
 
Handbook Points to Know
Handbook Points to KnowHandbook Points to Know
Handbook Points to Know
AndriaCampbell
 
Ash edu 675 week 6 final project action research formal presentation of findi...
Ash edu 675 week 6 final project action research formal presentation of findi...Ash edu 675 week 6 final project action research formal presentation of findi...
Ash edu 675 week 6 final project action research formal presentation of findi...
Suresh touchIndia
 
Course Expectations/Important Handbook Information
Course Expectations/Important Handbook InformationCourse Expectations/Important Handbook Information
Course Expectations/Important Handbook Information
AndriaCampbell
 
Ash edu 675 week 6 final project action research formal presentation of findi...
Ash edu 675 week 6 final project action research formal presentation of findi...Ash edu 675 week 6 final project action research formal presentation of findi...
Ash edu 675 week 6 final project action research formal presentation of findi...
Efharisemica
 
Ash edu 675 week 6 final project action research formal presentation of findi...
Ash edu 675 week 6 final project action research formal presentation of findi...Ash edu 675 week 6 final project action research formal presentation of findi...
Ash edu 675 week 6 final project action research formal presentation of findi...
shyaminfo02
 
The Preliminary Project Report
The Preliminary Project ReportThe Preliminary Project Report
The Preliminary Project Report
Yashika Parekh
 
Chapter Capstone Project Ideas 2024-1.pptx
Chapter Capstone Project Ideas 2024-1.pptxChapter Capstone Project Ideas 2024-1.pptx
Chapter Capstone Project Ideas 2024-1.pptx
villamerorodel
 
How to make a project report for schools, colleges, universities, researchers...
How to make a project report for schools, colleges, universities, researchers...How to make a project report for schools, colleges, universities, researchers...
How to make a project report for schools, colleges, universities, researchers...
Payaamvohra1
 
Dissertation Structure GuidelinesIt will be important to set
Dissertation Structure GuidelinesIt will be important to setDissertation Structure GuidelinesIt will be important to set
Dissertation Structure GuidelinesIt will be important to set
DustiBuckner14
 
1 London School of Business & Management QCF L.docx
 1  London School of Business & Management QCF L.docx 1  London School of Business & Management QCF L.docx
1 London School of Business & Management QCF L.docx
aryan532920
 
KNOWLEDGE ASSESSMENT SELF REVIEW.docx
KNOWLEDGE ASSESSMENT SELF REVIEW.docxKNOWLEDGE ASSESSMENT SELF REVIEW.docx
KNOWLEDGE ASSESSMENT SELF REVIEW.docx
write5
 
KNOWLEDGE ASSESSMENT SELF REVIEW.docx
KNOWLEDGE ASSESSMENT SELF REVIEW.docxKNOWLEDGE ASSESSMENT SELF REVIEW.docx
KNOWLEDGE ASSESSMENT SELF REVIEW.docx
write4
 
Handbook Highlights Presentation
Handbook Highlights PresentationHandbook Highlights Presentation
Handbook Highlights Presentation
AndriaCampbell
 
EEECSE 120 Answer SheetCapstone Design Project .docx
EEECSE 120 Answer SheetCapstone Design Project             .docxEEECSE 120 Answer SheetCapstone Design Project             .docx
EEECSE 120 Answer SheetCapstone Design Project .docx
toltonkendal
 
INFS4887 Business Research Methods S1 2013.pdf
INFS4887 Business Research Methods S1 2013.pdfINFS4887 Business Research Methods S1 2013.pdf
INFS4887 Business Research Methods S1 2013.pdf
BurcerMichael
 
Management Information System Practice Orientations abou.docx
Management Information System Practice Orientations abou.docxManagement Information System Practice Orientations abou.docx
Management Information System Practice Orientations abou.docx
infantsuk
 

Similar to Sem 2 BS1 assignment (20)

Bs1 assignment semester 2016 august
Bs1 assignment   semester 2016 augustBs1 assignment   semester 2016 august
Bs1 assignment semester 2016 august
 
Storm water management
Storm water managementStorm water management
Storm water management
 
Group project bs1
Group project bs1 Group project bs1
Group project bs1
 
Group project bs1
Group project bs1 Group project bs1
Group project bs1
 
Handbook Points to Know
Handbook Points to KnowHandbook Points to Know
Handbook Points to Know
 
Ash edu 675 week 6 final project action research formal presentation of findi...
Ash edu 675 week 6 final project action research formal presentation of findi...Ash edu 675 week 6 final project action research formal presentation of findi...
Ash edu 675 week 6 final project action research formal presentation of findi...
 
Course Expectations/Important Handbook Information
Course Expectations/Important Handbook InformationCourse Expectations/Important Handbook Information
Course Expectations/Important Handbook Information
 
Ash edu 675 week 6 final project action research formal presentation of findi...
Ash edu 675 week 6 final project action research formal presentation of findi...Ash edu 675 week 6 final project action research formal presentation of findi...
Ash edu 675 week 6 final project action research formal presentation of findi...
 
Ash edu 675 week 6 final project action research formal presentation of findi...
Ash edu 675 week 6 final project action research formal presentation of findi...Ash edu 675 week 6 final project action research formal presentation of findi...
Ash edu 675 week 6 final project action research formal presentation of findi...
 
The Preliminary Project Report
The Preliminary Project ReportThe Preliminary Project Report
The Preliminary Project Report
 
Chapter Capstone Project Ideas 2024-1.pptx
Chapter Capstone Project Ideas 2024-1.pptxChapter Capstone Project Ideas 2024-1.pptx
Chapter Capstone Project Ideas 2024-1.pptx
 
How to make a project report for schools, colleges, universities, researchers...
How to make a project report for schools, colleges, universities, researchers...How to make a project report for schools, colleges, universities, researchers...
How to make a project report for schools, colleges, universities, researchers...
 
Dissertation Structure GuidelinesIt will be important to set
Dissertation Structure GuidelinesIt will be important to setDissertation Structure GuidelinesIt will be important to set
Dissertation Structure GuidelinesIt will be important to set
 
1 London School of Business & Management QCF L.docx
 1  London School of Business & Management QCF L.docx 1  London School of Business & Management QCF L.docx
1 London School of Business & Management QCF L.docx
 
KNOWLEDGE ASSESSMENT SELF REVIEW.docx
KNOWLEDGE ASSESSMENT SELF REVIEW.docxKNOWLEDGE ASSESSMENT SELF REVIEW.docx
KNOWLEDGE ASSESSMENT SELF REVIEW.docx
 
KNOWLEDGE ASSESSMENT SELF REVIEW.docx
KNOWLEDGE ASSESSMENT SELF REVIEW.docxKNOWLEDGE ASSESSMENT SELF REVIEW.docx
KNOWLEDGE ASSESSMENT SELF REVIEW.docx
 
Handbook Highlights Presentation
Handbook Highlights PresentationHandbook Highlights Presentation
Handbook Highlights Presentation
 
EEECSE 120 Answer SheetCapstone Design Project .docx
EEECSE 120 Answer SheetCapstone Design Project             .docxEEECSE 120 Answer SheetCapstone Design Project             .docx
EEECSE 120 Answer SheetCapstone Design Project .docx
 
INFS4887 Business Research Methods S1 2013.pdf
INFS4887 Business Research Methods S1 2013.pdfINFS4887 Business Research Methods S1 2013.pdf
INFS4887 Business Research Methods S1 2013.pdf
 
Management Information System Practice Orientations abou.docx
Management Information System Practice Orientations abou.docxManagement Information System Practice Orientations abou.docx
Management Information System Practice Orientations abou.docx
 

More from Est

SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017
Est
 
Sabd undergraduate pg draft v3
Sabd undergraduate pg draft   v3Sabd undergraduate pg draft   v3
Sabd undergraduate pg draft v3
Est
 
BS 2 Fire protection 4
BS 2 Fire protection 4BS 2 Fire protection 4
BS 2 Fire protection 4
Est
 
CSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscmCSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscm
Est
 
CSCM Partnering
CSCM PartneringCSCM Partnering
CSCM Partnering
Est
 
CSCM Communication in construction
CSCM Communication in constructionCSCM Communication in construction
CSCM Communication in construction
Est
 
CSCM Material delivery problems cscm
CSCM Material delivery problems cscmCSCM Material delivery problems cscm
CSCM Material delivery problems cscm
Est
 
BS 2 Escalators arrangement
BS 2 Escalators arrangementBS 2 Escalators arrangement
BS 2 Escalators arrangement
Est
 
BS 2 Escalators 1of 2
BS 2 Escalators 1of 2BS 2 Escalators 1of 2
BS 2 Escalators 1of 2
Est
 
BS 2 Group assignment brief question august 2016
BS 2 Group assignment brief  question august 2016BS 2 Group assignment brief  question august 2016
BS 2 Group assignment brief question august 2016
Est
 
BS 2 Variable air volume systems
BS 2 Variable air volume systemsBS 2 Variable air volume systems
BS 2 Variable air volume systems
Est
 
CSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmCSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscm
Est
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docx
Est
 
CSCM individual assignment
CSCM individual assignmentCSCM individual assignment
CSCM individual assignment
Est
 
Management science group assignment MS
Management science group assignment MSManagement science group assignment MS
Management science group assignment MS
Est
 
MS Tutorial 12 hrm
MS Tutorial 12 hrmMS Tutorial 12 hrm
MS Tutorial 12 hrm
Est
 
MS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerbergMS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerberg
Est
 
MS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivationMS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivation
Est
 
MS Lecture 8 communication
MS Lecture 8 communicationMS Lecture 8 communication
MS Lecture 8 communication
Est
 
MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016
Est
 

More from Est (20)

SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017
 
Sabd undergraduate pg draft v3
Sabd undergraduate pg draft   v3Sabd undergraduate pg draft   v3
Sabd undergraduate pg draft v3
 
BS 2 Fire protection 4
BS 2 Fire protection 4BS 2 Fire protection 4
BS 2 Fire protection 4
 
CSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscmCSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscm
 
CSCM Partnering
CSCM PartneringCSCM Partnering
CSCM Partnering
 
CSCM Communication in construction
CSCM Communication in constructionCSCM Communication in construction
CSCM Communication in construction
 
CSCM Material delivery problems cscm
CSCM Material delivery problems cscmCSCM Material delivery problems cscm
CSCM Material delivery problems cscm
 
BS 2 Escalators arrangement
BS 2 Escalators arrangementBS 2 Escalators arrangement
BS 2 Escalators arrangement
 
BS 2 Escalators 1of 2
BS 2 Escalators 1of 2BS 2 Escalators 1of 2
BS 2 Escalators 1of 2
 
BS 2 Group assignment brief question august 2016
BS 2 Group assignment brief  question august 2016BS 2 Group assignment brief  question august 2016
BS 2 Group assignment brief question august 2016
 
BS 2 Variable air volume systems
BS 2 Variable air volume systemsBS 2 Variable air volume systems
BS 2 Variable air volume systems
 
CSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmCSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscm
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docx
 
CSCM individual assignment
CSCM individual assignmentCSCM individual assignment
CSCM individual assignment
 
Management science group assignment MS
Management science group assignment MSManagement science group assignment MS
Management science group assignment MS
 
MS Tutorial 12 hrm
MS Tutorial 12 hrmMS Tutorial 12 hrm
MS Tutorial 12 hrm
 
MS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerbergMS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerberg
 
MS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivationMS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivation
 
MS Lecture 8 communication
MS Lecture 8 communicationMS Lecture 8 communication
MS Lecture 8 communication
 
MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016
 

Recently uploaded

快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
f3wjr2q2
 
AGM Presentation Probe June 11 Final.pdf
AGM Presentation Probe June 11 Final.pdfAGM Presentation Probe June 11 Final.pdf
AGM Presentation Probe June 11 Final.pdf
Probe Gold
 
ppt-namibia-worldeconomy-standardbank.ppt
ppt-namibia-worldeconomy-standardbank.pptppt-namibia-worldeconomy-standardbank.ppt
ppt-namibia-worldeconomy-standardbank.ppt
TestOrg1
 
Cleades robinson:The Diplomat is Blue
Cleades robinson:The Diplomat is BlueCleades robinson:The Diplomat is Blue
Cleades robinson:The Diplomat is Blue
Cleades Robinson
 
Collective Mining | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024Collective Mining | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024
CollectiveMining1
 
Methanex Investor Presentation - April 2024
Methanex Investor Presentation - April 2024Methanex Investor Presentation - April 2024
Methanex Investor Presentation - April 2024
Methanex Corporation
 
Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024
Osisko Gold Royalties Ltd
 
Mandalay Resouces June 2024 Investor Relations PPT
Mandalay Resouces June 2024 Investor Relations PPTMandalay Resouces June 2024 Investor Relations PPT
Mandalay Resouces June 2024 Investor Relations PPT
MandalayResources
 
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdfZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
SOFTTECHHUB
 
UnityNet World Environment Day Abraham Project 2024 Press Release
UnityNet World Environment Day Abraham Project 2024 Press ReleaseUnityNet World Environment Day Abraham Project 2024 Press Release
UnityNet World Environment Day Abraham Project 2024 Press Release
LHelferty
 
Cyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdf
CyberAgent, Inc.
 
Collective Mining | Corporate Presentation - June 2024
Collective Mining  | Corporate Presentation - June 2024Collective Mining  | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024
CollectiveMining1
 
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptxUnderstanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
cosmo-soil
 
Corporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdfCorporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdf
Probe Gold
 

Recently uploaded (14)

快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
 
AGM Presentation Probe June 11 Final.pdf
AGM Presentation Probe June 11 Final.pdfAGM Presentation Probe June 11 Final.pdf
AGM Presentation Probe June 11 Final.pdf
 
ppt-namibia-worldeconomy-standardbank.ppt
ppt-namibia-worldeconomy-standardbank.pptppt-namibia-worldeconomy-standardbank.ppt
ppt-namibia-worldeconomy-standardbank.ppt
 
Cleades robinson:The Diplomat is Blue
Cleades robinson:The Diplomat is BlueCleades robinson:The Diplomat is Blue
Cleades robinson:The Diplomat is Blue
 
Collective Mining | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024Collective Mining | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024
 
Methanex Investor Presentation - April 2024
Methanex Investor Presentation - April 2024Methanex Investor Presentation - April 2024
Methanex Investor Presentation - April 2024
 
Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024
 
Mandalay Resouces June 2024 Investor Relations PPT
Mandalay Resouces June 2024 Investor Relations PPTMandalay Resouces June 2024 Investor Relations PPT
Mandalay Resouces June 2024 Investor Relations PPT
 
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdfZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
 
UnityNet World Environment Day Abraham Project 2024 Press Release
UnityNet World Environment Day Abraham Project 2024 Press ReleaseUnityNet World Environment Day Abraham Project 2024 Press Release
UnityNet World Environment Day Abraham Project 2024 Press Release
 
Cyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdf
 
Collective Mining | Corporate Presentation - June 2024
Collective Mining  | Corporate Presentation - June 2024Collective Mining  | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024
 
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptxUnderstanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
 
Corporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdfCorporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdf
 

Sem 2 BS1 assignment

  • 1. SCHOOL OF ARCHITECTURE. BUILDING. DESIGN Centre for Modern Architecture Studies in Southeast Asia Bachelor of Quantity Surveying (Honours) BUILDING SERVICES 1 [BLD 60403] ____________________________________________________________ Assignment (Group Project) Submission date: Week 12 (21st June 2016) __________________________________________________________________ Assessment brief Objectives • To extend and refine knowledge relating to the building services technology and the management system. • To develop students understanding of course materials and the current application in construction industry. • Developing higher-order intellectual skills – evaluating skills and critical thinking skills • Encourage knowledge sharing about subject taught Learning Outcomes Upon successful completion of the subject, students will be able to: • Understand and explain relevant information related to the selected case study. • Identify the application, system, installation, process, benefits, problems and anything relevant to support the documentation. Project: • This project is a study on building services system with the selected topics such as ventilation system, telecommunication, storm water system, cold water supply and hot water supply. • Students are required to carry out own research study based on given topic supported by at least one case study either in local or oversea. In group of students, you are required to prepare one of the topics within the existing topic below: 1. Sustainable Wastewater Treatment 2. Energy Efficient Ventilation System 3. Building Integration of Solar Energy
  • 2. 4. Water Treatment for Domestic Water Supplies 5. Ventilation Problem in Heritage Building 6. Energy Efficient in Heritage Building 7. Telecommunication Service for High Rise Building 8. Sustainable Storm-water Management 9. Indoor Environmental Quality in Healthcare/Office 10. The installation of Hot Water Supply for Hotel/Corporate Building • You are required to carry out survey on the selected topic, and prepare a documentation report. You are required to explain the application, system, installation process, benefits, problems and anything relevant to support the documentation. • You also encouraged highlighting the recommendations for future improvement. Submission Requirement: Documentation& Presentation • A4 bound report complete with visual and photographs inclusive of detailing and documentation of your project. • Word processed, font size 11, Arial, 1.5 spacing, justify and not less than 4500 words (excluding the cover page and appendices) • Visual/photographs used in the submission must be clear and well communicated. • Assumptions can be made through references from books/drawings are allowed. DO NOT PLAGIARISE. Application must be according to selected topic context. • Softcopy is required to be attached with the hardcopy. FORMAT of A4 report/Documentation 1. Cover page – Name and student ID number should be written clearly (TU logo) 2. Table of content 3. Introduction of selected topic 4. Installation process (if applicable) 5. Management system (if applicable) 6. The advantages and Disadvantages 7. Case study: Finding and Explanation 8. Possible problems to the system (if applicable) 9. Recommendations for future improvement 10. Learning from the group work project 11. References (alphabetical order) 12. Bibliography (alphabetical order) 13. Appendices Assessment Criteria The assessment for this project will be based on your:- • Demonstrated understanding of the project brief • Quality and clarity of the documented drawings/photographs and detailing of the system • Materiality and richness of contents • Clear visual and written communication of your understanding of the project • Appropriate use of drawings/photographs standard e.g. symbols/profiling, label and specifications.