Preparation for NBA
Dr. Shimi S.L ,
NITTTR, Chandigarh
Criterion 1
Vision, Mission and Programme
Objectives
VISION
To be a centre of excellence for promoting education, training
and research in the field of Electrical Engineering.
MISSION
• To offer continuing education and training programs in the area
of Electrical Engineering for the faculty and staff of the
technical education system.
• To develop need based curricula in the area of Electrical
Engineering.
• To develop instructional material in the area of Electrical
Engineering to enhance effectiveness of teaching-learning
process.
• To undertake research and development in the area of
Electrical Engineering.
• To provide extension and consultancy services to technical
education system and industry in the area of Electrical
Engineering.
VISION AND MISSION
PROCESS FOR DEFINING VISION AND
MISSION OF THE DEPARTMENT
PROGRAMME EDUCATIONAL
OBJECTIVES
PEO1
To develop technical knowledge and skills in the
area of Instrumentation and Control at Postgraduate
level
PEO2
To develop ability to undertake research and
development in the areas of Instrumentation and
Control
PEO3
To develop generic skills such as creativity, problem
solving, communication, teamwork, life long
learning, leadership, professional ethics and values.
PROGRAMME EDUCATIONAL
OBJECTIVESThe PEOs are published at
• Institute website
http://www.nitttrchd.ac.in/sitenew1/elect/elect.php#page=page-3
• Admission prospectus
• Departmental brochures
http://www.nitttrchd.ac.in/sitenew1/elect/elect.php
• At various locations in the department.
PROGRAMME EDUCATIONAL
OBJECTIVES
The stakeholders of the program are
• Students
• Faculty and Staff
• Employer’s Organizations (Polytechnics,
Engineering Colleges, Universities,
Directorates, State Board of Technical
Education, Industries)
• Regulatory Administrative and Quality
Assurance Bodies/ Organisation
• Society
PROCESS FOR DEFINING
PEOs
Feedback
Define Programme
Educational Objectives
Vision and mission of the
Institute and the department
Alumni Students
Faculty
Employer
Finalize
PEOs are Published
Mission
Program Educational
Objectives
PEO1 PEO2 PEO3
To offer continuing education and training
programs in the area of Electrical Engineering
for the faculty and staff of the technical
education system
√ √ √
To develop need based curricula in the area of
Electrical Engineering
√
To develop instructional material in the area of
Electrical Engineering to enhance
effectiveness of teaching-learning process
√ √
To undertake research and development in the
area of Electrical Engineering
√ √ √
To provide extension and consultancy
services to technical education system and
industry in the area of Electrical Engineering
√
√ √
CORRELATION BETWEEN PEO AND MISSION
PEOs Core
subjects
Electives Thesis
work
PEO1
To develop technical knowledge and
skills in the area of Instrumentation
and Control at Postgraduate level
√ √ √
PEO2 To develop ability to undertake
research and development in the
areas of Instrumentation and Control
√ √ √
PEO3
To develop generic skills such as
creativity, problem solving,
communication, teamwork, life long
learning, leadership, professional
ethics and values.
√ √ √
CONTRIBUTION OF CURRICULUM WITH PEOs
Criterion 2
Programme Outcomes
PROGRAM OUTCOMES
(a) Ability to understand, apply, analyse, evaluate
and synthesize existing and new knowledge
related to Instrumentation and Control
(b) Ability to identify, formulate and solve engineering
problems creatively and generate new knowledge
(c) Ability to design a system component or process
as per need and specifications
(d) Ability to use modern engineering tools such as
software and equipment related to
Instrumentation and Control
(e) Ability to undertake collaborative research in multi
disciplinary areas for finding solutions to the
problems
f) Ability to understand professional and research
responsibilities and contemporary issues as well
as the impact of engineering solutions on the
society
g) Ability to communicate effectively
h) Ability to continuously update knowledge and skills
as per the changes in discipline, technology and
world of work.
i) Ability to apply the principles of project planning
and management, total quality management and
technology management for managing projects in
Instrumentation & Control and multi disciplinary
areas
PROGRAM OUTCOMES
Mapping of POs to Graduate Attributes
POs
GRADUATE ATTRIBUTES
1 2 3 4 5 6 7 8 9 10 11
Scholarshipof
knowledge
Criticalthinking
Problemsolving
Researchskill
Usageofmodern
tools
collaborativeand
multidisciplinary
work
Project
managementand
finance
Communication
Lifelonglearning
Ethicalpractices
andsocial
responsibility
Independentand
reflective
learning
a √
b √ √
c √
d √
e √ √
f √
g √
h √ √
i √
PROCESS FOR DEFINING POs
Graduate
Attributes
Formulate Programme
Outcomes
Programme Educational
Objectives
Vision and mission of
the department
Publish POs
Stakeholders
Deans, HODs and
External Experts
Programme
Curriculum
Criterion 3
Programme Curriculum
STRUCTURE OF THE CURRICULUM
PROGRAM CURRICULUM
Curricular Composition Credits
Theory Courses 38
Laboratory Courses 12
Preliminary Thesis Work 10
Final Thesis Work 15
Cod
e
No.
Subject L T P
Credits Total
Credit
s
Theor
y
Session
al
Practica
l
Total
L T P
MEI
6101
Measurement
Sciences and
Techniques
3 - 2 3 - 1 4 50 50 50 150
MEI
6102
Process
Dynamics and
Control
3 - 2 3 - 1 4 50 50 50 150
MEI
6103
Digital Signal
Processing
3 - 2 3 - 1 4 50 50 50 150
MEI
6104
Power
Electronic
Devices &
Circuits
3 - 2 3 - 1 4 50 50 50 150
MEI
6105
Industrial
Instrumentation
3 - 2 3 - 1 4 50 50 50 150
Total 20 250 250 250 750
Semester – I CORE SUBJECTS (COMPULSORY)
PROGRAM CURRICULUM
Semester – II CORE SUBJECTS (COMPULSORY)
PROGRAM CURRICULUM
Code
No.
Subject L T P Credits Total
Credits
Theory Session
al
Practical
Tutorial
Total
L T P
MEI
6201
Microcontroller
Based
Embedded
System
3 - 2 3 - 1 4 50 50 50 150
MEI
6202
Advance Control
Theory
3 1 - 3 1 - 4 50 50 50 150
MEI
6203
Opto-Electronic
Instrumentation
3 - 2 3 - 1 4 50 50 50 150
MEI
6204
Soft Computing
Techniques
3 - 2 3 - 1 4 50 50 50 150
MEI
6205
Instrumentation
& Computational
Laboratory
- - 4 - - 2 2 - 50 50 100
Elective Subject
1
4 50 50 50 150
Total 22 250 300 300 850
Semester – II ELECTIVE SUBJECTS (ANY ONE)
PROGRAM CURRICULUM
Cod
e
No.
Subject L T P
Credits Total
Credit
s
Theor
y
Session
al
Practical
Tutorial
Total
L T P
MEI
6206
Power System
Analysis
3 - 2 3 - 1 4 50 50 50 150
MEI
6207
Instrumentation
for
Environmental
Engineering
3 - 2 3 - 1 4 50 50 50 150
MEI
6208
Analytical
Instrumentation
3 - 2 3 - 1 4 50 50 50 150
MEI
6209
Modeling of
Electrical
Machines
3 1 - 3 1 - 4 50 50 50 150
Semester – III
PROGRAM CURRICULUM
Code
No.
Subject L T P Credits Total
Credits
Theory Session
al
Practi
cal
Total
L T P
MEI
7151
Thesis -
Preliminary
- - 20 10 10
Elective Subject II 3 - 2 3 - 1 4 50 50 50 150
Elective Subject
III
4 - - 4 - - 4 50 50 - 100
Total 18 100 100 50 250
ELECTIVE SUBJECT II (ANY ONE)
MEI
7101
Virtual
Instrumentation
3 - 2 3 - 1 4 50 50 50 150
MEI
7102
Digital
Communication
3 - 2 3 - 1 4 50 50 50 150
MEI
7103
Bio-Medical
Instrumentation
3 - 2 3 - 1 4 50 50 50 150
MEI
7104
Advance Digital
Signal Processing
3 - 2 3 - 1 4 50 50 50 150
Semester – III
PROGRAM CURRICULUM
ELECTIVE SUBJECT III (ANY ONE)
MTE
6202
Research
Methodology
4 - - 4 4 50 50 - 100
CSE
8309
Human
Resource
Development
& Training
Methods
4 - - 4 4 50 50 - 100
MEI
7105
Energy
Management
4 - - 4 4 50 50 - 100
MMT
6109
Optimization
Techniques
4 - - 4 4 50 50 - 100
Semester – IV
PROGRAM CURRICULUM
Code
No.
Subject L T P Total Credits Theor
y
Sessiona
l
Total
MEI
7251
Thesis - - 30 30 15 - - -
SEMESTER – I SUBJECTS MAPPING WITH POs AND PEOs
MAPPING OF COURSES WITH POs AND PEOs
SEMESTER – II SUBJECTS MAPPING WITH POs AND PEOs
MAPPING OF COURSES WITH POs AND PEOs
SEMESTER – III SUBJECTS MAPPING WITH POs AND PEOs
MAPPING OF COURSES WITH POs AND PEOs
SEMESTER – IV SUBJECTS MAPPING WITH POs AND PEOs
MAPPING OF COURSES WITH POs AND PEOs
PROCESS TO IDENTIFY CURRICULAR
GAPS
Brainstorming by
Departmental faculty
Feedback from
relevant
industries
Draft
Curriculum
prepared by the
faculty Feedback from experts
from technical
Institutions, Research
Organizations
Finalize Programme
Curriculum in BOS
Feedback from
relevant
industries
Improve and Redefine
Programme Curriculum
Feedback from
Alumni,
University
Officials
CONTENT BEYOND SYLLABUS
IMPARTED FOR ATTAINMENT OF POs
Topic Content (Beyond Syllabus)
Distributed
Control Systems
o Architecture, Design and Implementation of DCS
o Verification and Validation of DCS
MATLAB
o MATLAB Programming
o Signal Processing Toolbox
o Control System Toolbox
o Fuzzy Logic Toolbox
o Neural Network Toolbox
o SIMULINK
o SimPowerSystems
Computer Aided
Power System
Analysis
o Smart Grid
o MATLAB / MiPower software for power system
simulations
CONTENT BEYOND SYLLABUS
IMPARTED FOR ATTAINMENT OF POs
Topic Content (Beyond Syllabus)
Hands-On-
Experience in Ind
ustrial Electronics
o Testing of components
o Design of power electronic circuits
o MATLAB/SIMULINK interface with d SPACE, OPAL RT,
Arduino for real time power system and PE applications.
Hands on
Practices on Multi
Sim and Proteus
o Multisim Software
o Circuit Simulation using proteus software
Control of
Electrical Motors
o MATLAB/SIMULINK for AC/DC Drives simulation
o Intelligent Drives
o Real time control of drives using DSP processor
Criterion 4
Students’ Performance
ADMISSION INTAKE IN THE
PROGRAMME
YEAR
Sanction
ed
strength
of the
program
me
Number
of
students
admitted
Percentage
of seats
filled
%
Number of
students
admitted
with valid
GATE Score/
QIP/ PG
entrance of
state
Percentage
of students
with valid
GATE
Score/PG
entrance of
state
CAY
(2015-2016)
26 21 80.76 21 100
CAYm1
(2014-2015)
26 25 96.15 25 100
CAYm2
(2013-2014)
26 24 92.30 24 100
CAYm3
(2012-2013)
26 12 46.15 0 0
CAYm4
(2011-2012)
26 14 53.84 0 0
SUCCESS RATE
YEAR
Number of
Students
Graduated from
the Programme
(N1)
Number of
Students joined
the Programme
(N2)
GI = N1/N2
LYG (2014-2015) NA 24
LYG (2013-2014) 21 22 0.95
LYG m1(2012-2013) 10 10 1
LYGm2 (2011-2012) 14 14 1
LYGm3 (2010-2011) 11 11 1
LYGm4 (2009-2010) 12 12 1
ACADEMIC PERFORMANCE INDEX
Item
LYG
(2013-2014)
LYGm1
(2012-2013)
LYGm2
(2011-2012)
LYGm3
(2010-2011)
Approximating the API
by the following mid-
point analysis
Number of students with CGPA
9<= 10.0 1 2 0 0
8<= 9.0 10 5 6 2
7 <=8 10 2 6 3
6 <=7 1 1 2 4
5 <=6 0 0 0 2
Total 22 10 14 11
Approximating API by
Mid-CGPA
API = Mean of
CGPA/Percentage of all
the students
8.01 8.37 7.76 7.05
ACADEMIC PERFORMANCE
Year
Number of Students
Admitted
API
LYG
(2013-2014) 22
8.01
LYGm1
(2012-2013) 10
8.37
LYGm2
(2011-2012) 14
7.76
LYGm3
(2010-2011) 11
7.05
Average API (8.01+8.37+7.76)/3 8.05
ACADEMIC PERFORMANCE = 2xAverage API = 16.1
PLACEMENT AND HIGHER STUDIES
Item LYG
(2013-2014)
LYGm1
(2012-2013)
LYGm2
(2011-2012)
LYGm3
(2010-2011)
Number of admitted
students (N)
corresponding to LYG
24 12 14 12
Number of students
who obtained jobs in
industry/ academia
(as per records) (X)
19 7 8 9
Number of students
who opted for higher
studies with valid
qualifying scores/
ranks (Y)
1 1 1 --
Assessment Points 18.33 16.67 15.7 15
Average Assessment Points = 16.9
Assessment Points = 20 * (x + 3y)/N
AWARDS WONSTUDENTS ACHIEVEMENTS
AWARDS WON BY STUDENTS
S.No. Name/Nature of
the Award won
Name of the Awarding
Organization/Authority
Nature of Work
Done
Name of
Faculty/Team
1. Secured the 2nd
position and
won a cash
award of Rs.
30,000
“VIMANTRA 2013” 10th
Annual National Technical
Paper Contest by National
Instruments
September 2013
National Level
Technical Paper
Contest for
Research Scholars
Mr. Shishir Sarkar
Faculty Advisers:
Dr S. Chatterji and
Mrs. Shimi S.L
2. Secured the 1st
position and
won a cash
award of Rs.
50,000
“Techexpo” at TechXplore, the
National Level Technical Fest
of Chitkara University, Rajpura Project
Competition
Mrs. Swati Singh
and
Mr. Sandeep Gupta
Faculty Advisers:
Dr Lini Mathew and
Mrs. Shimi S.L
3. Secured the 2nd
position
(National Level)
TECHFEST 2015 at IIT Bombay
December, 2015
All India
International
Robotics Challenge
event
Ms. Babita and
Mr. Manjeet Singh
Faculty Advisers:
Dr Lini Mathew and
Mrs. Shimi S.L
AWARDS WONSTUDENTS ACHIEVEMENTS
AWARDS WON BY STUDENTS
S.No. Name/Nature of
the Award won
Name of the Awarding
Organization/Authority
Nature of Work
Done
Name of
Faculty/Team
4. Secured the 3rd
position
(National Level)
TECHFEST 2015 at IIT Bombay
December, 2015
All India
ROBOWAR event
Mr. Manjeet Singh
Faculty Advisers:
Mrs. Shimi S.L
5. Secured the 2nd
position
TECH MAHOTSAV (College
Level), PEC FEST , PEC
University of Technology ,
2014
Project
competition
Mr. Tejinder
Faculty Advisers:
Mrs. Shimi S.L.
6. Secured the 3rd
position
(National Level)
KSHITIJ 2016 at IIT Kharagpur All India
ROBOWAR event
Mr. Manjeet Singh
Faculty Advisers:
Dr Lini Mathew and
Mrs. Shimi S.L
7. Secured Runner
up position
(National Level)
KSHITIJ 2016 at IIT Kharagpur All India STAIR
CLIMBER event
Ms. Babita and
Mr. Manjeet Singh
Faculty Advisers:
Mrs. Shimi S.L
Techexpo at
Chitkara
University, Rajpura
TECH MAHOTSAV
PEC FEST,
PEC University of
Technology , 2014
AWARDS WONSTUDENTS ACHIEVEMENTS
AWARDS WON BY STUDENTS
S.No. Name/Nature of
the Award won
Name of the Awarding
Organization/Authority
Nature of
Work Done
Name of Faculty/Team
8. Secured Runner
up position
(National Level)
KSHITIJ 2016 at IIT Kharagpur All India
HYDRAULI
C ARM
event
Ms. Babita and
Faculty Advisers:
Dr Lini Mathew and Mrs.
Shimi S.L
9. Secured Runner
up position
(National Level)
KSHITIJ 2016 at IIT Kharagpur
All India
LINE
FOLLOWER
event
Ms. Babita and
Mr. Alok Deep
Faculty Advisers:
Dr Lini Mathew and Mrs.
Shimi S.L
10. Secured the 1st
position
Greenwhiz organized by Civil
Engineering Dept., NITTTR,
Chandigarh on 26th Sept.
20914
Quiz
competitio
n
Vimal Kumar Verma,
Arindam Chowdhury
Faculty Advisers:
Mrs. Shimi S.L
AWARDS WON BY STUDENTS
AWARDS WON BY STUDENTS
PAPER PRESENTATION BY STUDENTS
Students Initiatives
Inaugurated on 16th June,
2014, by Dr. S.Chatterji.
ELECTRICAL ENGINEERING STUDENT
CHAPTER ELECTRINCON
• Development of working projects under minor
project activity- on 16.06.2014.
• Various Experts Lectures are arranged for ME
students.
• Various Industrial Visits are arranged for students
• Teachers’ Day celebration is held annually.
• Various workshops are arranged for students on
latest research areas.
• The first technical event ‘Projectrica’ was
conducted.
EVENTS HELD BY ELECTRINCON
Total eight projects were displayed, out of which two
were chosen as the best projects.
(i) 3D LED Cube developed by Mr. Tejinder K. Devgon .
(ii) TSOP sensor based automatic bottle filling counter
system with encrypted signal developed by Mr. Abhinav
Kant, Mr. Varun, Mr. Mukesh and Mr. Kunal Kishore .
Start up by our Student
• Enovate Skill was started by
a student of Electrical
Engineering Department
(Mr. Alok Deep) along with
a student from Mechanical
Engineering Department
(Mr. Ajay Godara).
• They conduct training for
students around the
country with hands on
experience of the electrical
and electronic devices.
ENTREPRENEURSHIP INNOVATIONS
Criterion 5
Faculty Contributions
AWARDS WONDETAILS OF FACULTY
2012-2014
Name of the
Faculty
member
Highest
Qualificati
on
University Year of
graduat
ion
Designation Date of
joining the
institution
Dr. S. Chatterji PhD Panjab
University
2004 Professor 10/08/1984
Dr. Lini
Mathew
PhD Panjab
University
2012 Associate
Professor
11/11/1988
Dr. Ritula
Thakur
PhD Panjab
University
2016 Assistant
Professor
31/05/2006
Mrs. Shimi SL M.E Anna
university
2008 Assistant
Professor
05/08/2011
AWARDS WONDETAILS OF FACULTY
2015-2016
Name of the
Faculty
member
Highest
Qualificati
on
University Year of
graduat
ion
Designation Date of
joining the
institution
Dr. Lini
Mathew
PhD Panjab
University
2012 Associate
Professor
11/11/1988
Dr. Poonam
Syal
PhD Panjab
University
2012 Associate
Professor
18/02/1986
Dr. Ritula
Thakur
PhD Panjab
University
2016 Assistant
Professor
31/05/2006
Mrs. Shimi SL M.E Anna
university
2008 Assistant
Professor
05/08/2011
FACULTY PROFILE
Dr. LINI MATHEW (Head)
Designation :Associate Professor
Qualifications :Ph.D.(Electrical Engineering)
from Panjab University
Research Interests : Soft Computing Techniques, Digital Signal
Processing, Measurement Instrumentation and Data
Acquisition, Virtual Instrumentation, Power System Stability
No of papers Published in :
International Journals - 46
National Journals - 14
International Conferences - 22
National Conferences - 8
Total – 90
FACULTY PROFILE
Dr. POONAM SYAL
Designation : Associate Professor
Qualifications : Ph.D.(Electrical Engineering)
from Panjab University
Research Interests : Energy Management, Renewable Energy,
Assistive Devices, Manpower Development and Training, Women
Empowerment
No of papers Published in :
International Journals - 22
National Journals - 2
International Conferences - 18
National Conferences - 10
Total – 52
FACULTY PROFILE
Dr. RITULA THAKUR
Designation :Assistant Professor
Qualifications : PhD from Punjab University
Research Interests : Embedded Systems, Power
Systems, Power Quality, Sensing & Instrumentation
No of papers Published in :
International Journals - 41
National Journals - 4
International Conferences - 25
National Conferences - 10
Total – 80
FACULTY PROFILE
Mrs. SHIMI S.L
Designation :Assistant Professor
Qualifications : M.E.(Power Electronics and Drives) from Anna
University Chennai
Research Interests : Power Electronics and Drives, Digital
Control, ANN & Fuzzy Logic Applications, FACTS, Renewable
Energy, Soft Computing Techniques.
No of papers Published in :
International Journals - 77
National Journals - 01
International Conferences - 29
National Conferences - 15
Total – 122
AWARDS WONSTUDENT TEACHER RATIO
Year P1 P2 S F STR =
S/F
Assessment
Obtained
Assessment =
[20 x 13/STR],
Assessment
CAY (2015-2016) 20 24 44 04 11 23.64 20
CAYm1 (2014-2015) 24 22 46 04 11.5 22.61 20
CAY m2 (2013-2014) 22 11 33 04 8.25 31.5 20
CAY m3 (2012-2013) 11 14 25 04 6.25 41.6 20
CAYm4 (2011-2012) 14 11 25 04 6.25 41.6 20
CAYm5 (2010-2011) 11 04 15 03 05 52.0 20
Average Assessment 20
AWARDS WONFACULTY STRENGTH IN PG PROGRAMME
Year No. of faculty
members
with Ph.D
(X)
No. of faculty
members
with M.E
(Y)
Assessment
CAY (2015-2016) 3 4 15
CAYm1 (2014-2015) 2 4 10
CAY m2 (2013-2014) 2 4 10
CAY m3 (2012-2013) 2 4 10
Average Assessment = 20x(X/Y) 11.67
AWARDS WONFACULTY QUALIFICATIONS
Year X
PhD
Y
M.E
N FQI
(10x + 6y)
/N
Assessm
ent
CAYm3 (2012-2013) 2 2 4 8 24
CAYm2 (2013-2014) 2 2 4 8 24
CAYm1 (2014-2015) 2 2 4 8 24
CAY (2015-2016) 3 1 4 9 27
Average Assessment 25
AWARDS WONCORRELATION OF FACULTY COMPETENCIES TO
PROGRAMME CURRICULUM
Course
Code
Course Title Faculty
LM PS RT SSL
MEI 6101 Measurement Sciences and
Techniques  
MEI 6102 Process Dynamics and Control 
MEI 6103 Digital Signal Processing 
MEI 6104
Power Electronics Devices and
Circuits 
MEI 6105 Industrial Instrumentation  
MEI 6201
Microcontrollers and their
Interfacing 
MEI 6202 Advanced Control Theory 
MEI 6203 Opto-Electronic Instrumentation 
AWARDS WONCORRELATION OF FACULTY COMPETENCIES TO
PROGRAMME CURRICULUM
Course
Code
Course Title Faculty
LM PS RT SSL
MEI 6204 Soft Computing Techniques 
MEI 6205
Instrumentation &
Computational Laboratory
 
MEI 6204 Power System Analysis  
MEI 6207
Instrumentation for
Environmental Engineering 
MEI 7101 Virtual Instrumentation  
MIC 6204 Power Plant Instrumentation  
MIC 6207
Data-Communication
and Computer Networks 
AWARDS WONCORRELATION OF FACULTY COMPETENCIES TO
PROGRAMME CURRICULUM
Course
Code
Course Title Faculty
LM PS RT SSL
MIC 7102 Digital Communication 
MTE 7103 Technology Management  
MIC 7104 Energy Management   
MIC 7105 Bio-Medical Instrumentation 
AWARDS WONFACULTY AS RESOURCE PERSONS IN TRAINING
ACTIVITIES
Name of the Faculty CAY m3
(2012-2013)
CAY m2
(2013-2014)
CAY
(2014-2015)
CAY
(2015-2016)
Dr. S.Chatterji 05 05 05 -
Dr. Lini Mathew 05 05 05 05
Dr. Poonam Syal - - - 05
Dr. Ritula Thakur 05 05 05 05
Mrs. Shimi S.L. 05 05 05 05
Sum 20 20 20 20
N 4 4 4 4
Assessment =
3xsum/N
15 15 15 15
Average Assessment 15
AWARDS WONLIST OF TRAINING PROGRAMMES
CONDUCTED BY FACULTY2013-2014
Sr.
No.
Name of the Course Dates Venue Team/
Faculty
01 Electrical Electronics and
Computer Based Projects.
08-12 April,
2013
Govt. Polytechnic,
Biikaner, Rajasthan
SC
02 Power Electronics 13-17 May,
2013
NITTTR, Chandigarh SC
03 MATLAB & LABVIEW 22-26 July,
2013
NITTTR, Chandigarh LM
04 Virtual Instrumentation 02-06 Sept,
2013
NITTTR, Chandigarh LM
AWARDS WONFACULTY RETENTION
Item
CAYm3
(2012-2013)
CAYm2
(2013-2014)
CAYm1
(2014-15)
CAY
(2015-16)
Number of faculty members with
experience less than 1 year (x0)
0 0 0 0
Number of faculty members with
1 to 2 years experience (x1)
01 0 0 0
Number of faculty members with
2 to 3 years experience (x2)
0 01 0 0
Number of faculty members with
3 to 4 years experience (x3)
0 0 01 0
Number of faculty members with
4 to 5 years experience (x4)
0 0 0 01
Number of faculty members with
more than 5 years experience (x5)
03 03 03 03
N 04 04 04 04
RPI = x1 + 2x2 + 3x3 + 4x4 + 5x5 16 17 18 19
Assessment = 3xRPI/N 12 12.75 13.4 14.25
Average Assessment =(12.75+13.4+14.25)/3 13.47
AWARDS WONFACULTY RESEARCH PUBLICATIONS
Name of the Faculty
CAYm3
(2012-2013)
CAYm2
(2013-2014)
CAYm1
(2014-15)
CAY
(2015-16)
Dr.S.Chatterji,
Professor & Head
05 05 05 -
Dr.(Mrs) Lini Mathew,
Associate Professor
05 05 05 05
Dr. Poonam Syal,
Associate Professor
- - - 05
Dr. Ritula Thakur,
Assistant Professor
03 02 05 05
Mrs.Shimi S.L.,
Assistant Professor
05 05 05 05
Sum 18 17 20 20
N (Number of faculty positions
required for an STR of 15)
04 04 04 04
Assessment of FRP = 6 x Sum/N 27 25.5 30 30
Average Assessment =(25.5+30+30)/3= 28.5
SCI Impact Factor 0.935
SCI Impact Factor 0.935
Google Based Impact Factor 0.935
SCI Impact Factor 0.935
SCI Impact Factor 0. 5
SCI Impact Factor 0.962
SCI Impact Factor = 4.81
SCI Impact Factor = 7.896
SCI Impact Factor = 7.896
SCI Impact Factor = 7.896
Scopus Indexed
Scopus Indexed
INTERNATIONAL EXPOSURE TO FACULTY
S.No. Name/Designati
on of Person
Nature of Work
1. Dr. Lini Mathew
Associate
Professor and
Head
(i) Presented a paper titled “Modeling and
Simulation of Hybrid Power Flow Controller
Implemented on SMIB System”, North
American Power Symposium, Washington
State university, Pullman, Washington, USA
September 7-9, 2014.
(ii) Dr. Lini Mathew was assigned the duty
to inspect Lagos Skipper Engineering
Academy (LSEA), (Government Technical
College), Ikotun, Lagos, Nigeria and an
institute named Institute of Technology and
Management, Ugep, Cross River State,
Nigeria during 9th to 16th December, 2015 .
S.No. Name/Design
ation of
Person
Nature of Work
2 Dr. Poonam
Syal
Associate
Professor
• Presented a paper titled “Energy
Conservation Opportunities in Institutional
buildings- A case study in India”, at IEEE
International Conference on Power and
Renewable Energy Shanghai, China during
21-23 October, 2016.
• Awarded Best paper Award
INTERNATIONAL EXPOSURE TO FACULTY
INTERNATIONAL EXPOSURE TO FACULTY
S.No. Name/Designation
of Person
Nature of Work
3. Dr. Ritula Thakur,
Assistant Professor
(i) Worked as Visiting Scholar during May- September
2014, at
• National Peanuts Laboratory, Dawson, USA. On
developing technologies for moisture
determination
of peanuts.
• Richard Russell Research Lab, Athens, USA.
Worked on NIR spectroscopy and impedance
based methods for oil content determination
of oil. Developed technology for moisture
determination of fruits.
(ii) Presented paper on “A Low Cost Non-Destructive
Grain Moisture Embedded System for Food
Safety and Quality”, 17th International
Conference on Food Process Engineering,
London, United Kingdom, February, 16-17, 2015.
INTERNATIONAL EXPOSURE TO FACULTY
S.No. Name/Designation
of Person
Nature of Work
4. Mrs. Shimi S.L
Assistant Professor
(i) Presented a paper titled Design and Real Time
Simulation of Artificial Intelligent based MPP
Tracker for Photo- Voltaic System, ASME 2014
Conference on “International Mechanical
Engineering Congress and Exposition” , Montreal,
Canada, November 14-20 , 2014.
(ii) Technical Paper Presentation at 15th ASME
International Conference on “International
Mechanical Engineering Congress & Exposition” at
Houston, Texas, USA, during 13 - 19 November,
2015.
2014-15
Letter of Appreciation of Dr. Ritula Thakur from Dr. Puppala, NMSU, Clovis, US
Dr. Lini Mathew’s Visit to Lagos Skipper Engineering Academy, LSEA
(Government Technical College, Ikotun, Lagos, Nigeria)
2015-16
GLIMPSES OF LSEA
 During the visit of Dr. Lini Mathew to
LSEA the need gaps were analyzed
and plans to fill them in course of
time have been made.
 More teachers from LSEA, Nigeria will
visit NITTTR, India for more
specialized training.
 Electrical Engineering
Department, NITTTR have
been preparing around 100
educational video films which
can be used by the teachers
and students of LSEA for
better instruction.
Dr. Lini Mathew was assigned
another duty to inspect an
institute named Institute of
Technology and Management,
Ugep, Calabar, Nigeria.
The project being a partnership
between the Cross River State
Government and Highbury
College, Portsmouth, UK and has
been contracted to deliver a
curriculum of international
standards.
The report was prepared and submitted to Commissioner
of Education, Cross River State, to hand it over to Governor
Benedict Ayede.
2015-16
Technical Paper Presentation at 17th International Conference
on Food Process Engineering, London, United Kingdom,
February, 16-17, 2015.
2015-16
Technical Paper
Presentation at 15th
ASME International
Conference on
“International
Mechanical
Engineering
Congress & Exposition”
at Houston, Texas
during 13 - 19
November, 2015
Technical Visit at NASA,
Houston , Texas
2016-17
• Technical Paper Presentation at IEEE International Conference on
Power and Renewable Energy held from October 21-23, 2016 at
Shanghai, China.
• Awarded Best Paper Award.
AWARDS WONFACULTY INTELLECTUAL PROPERTY RIGHTS
TWO PATENTS UNDER CONSIDERATION
• Puneet Kaur, Dr S Chatterji, “Design and Development of DC Motor
Performance Analyser”, Patent application filed, The Patent Office, India,
2012.
• Poonam Syal, S. Chatterji, H.K. Sardana, “Spatial tactile apparatus and
method for creation and navigation of virtual graphics for visually
challenged”, Patent application numbered 1739/DEL/2012, The Patent
Office, India, June 06, 2012
LIST OF VIDEOS ON NCTEL BY ELECTRICAL ENGG. DEPARTMENT
Sr. No. Topic Faculty
1. MATLAB Applications in Digital Signal Processing Dr. Lini Mathew
2. Neural Networks Dr. Lini Mathew
3. Introduction to MATLAB Dr. Lini Mathew
4. Getting Started with MATLAB Dr. Lini Mathew
5. Virtual Instrumentation Dr. Lini Mathew
AWARDS WONFACULTY INTELLECTUAL PROPERTY RIGHTS
Name of the Faculty
CAYm3
(2012-13)
CAYm2
(2013-14)
CAYm1
(2014-15)
CAY
(2015-16)
Dr.S Chatterji Nil 5 5 -
Dr. Lini Mathew Nil Nil 5 5
Dr. Poonam Syal - - - 4
Dr. Ritula Thakur Nil Nil 5 5
Mrs. Shimi S.L. Nil Nil 5 5
Sum - 5 20 19
N 4 4 4 4
Assessment of FIPR =
2 x Sum/N
- 2.5 10 9.5
Average Assessment 7.33
AWARDS WONFACULTY CONSULTANCY PROJECTS
Name of
the Faculty
Name of the Project Funding Agency
Amount
(Rs.)
Dr. S
Chatterji
Training Programme for
Assistant Engineers
Punjab State
Transmission
Corporation Limited
7,29,000/-
Dr. Lini
Mathew
Dr. Ritula
Thakur
Mrs. Shimi.
S.L
Inspection of Street Light
installation
Municipal Corporation,
Panchkula. 2,00,000/-
Train the Trainers’ in
Electrical Installation and
Maintenance Work.
LSEA (Government
Technical College),
Ikotun, Lagos,
Nigeria
3,33,754/-
Preparation of 95 video
films for the teachers and
students of LSEA
9,50,000/-
Training Programme for Assistant Engineers of Punjab State Transmission Corporation
Limited, during 23 – 28 September 2013 at NITTTR , Chandigarh
Inaugural Function
Programme on
Train the trainers’ of Lagos Skipper Engineering Academy, Ikotun,
Lagos,Nigeria in Electrical Installation and Maintenance Work
during 18th – 30th April 2015 at NITTTR , Chandigarh
STREET LIGHT INSTALLATION INSPECTION
Course # ID : EE100
Course Title : Repair & Maintenance of Electrical Appliances
Course Faculty :
Team Members
Dr Rajesh Mehra (ECE)
Dr Kanika Sharma(ECE)
Dr Ritula Thakur (EE)
Mrs Shimi S.L (EE)
AWARDS WONFACULTY R&D PROJECTS
Name of the
Faculty
Name of the Project Funding Agency Amount
Dr. Lini
Mathew
Dr. Poonam
Syal
Dr. Ritula
Thakur
Mrs. Shimi.
S.L
Simulation Centre of
Excellence (SCoE) in
collaboration with ABB
India Limited, Bengaluru
ABB India Limited,
Bengaluru 1,65,00,000/-
E-Tree TEQIP-II 1,50,000/-
Design of LED Lighting
Installation
Municipal Corporation,
Chandigarh
5,85,000/-
Emergency Vehicle Pre-
Emption (EVP) Systems
Department of Science
and Technology,
Chandigarh
Administration
2,00,000/-
EMERGENCY VEHICLE PRE-EMPTION (EVP) SYSTEM
• Providing Continuous Movement For Emergency
Vehicles (Ambulances, Fire Brigade Trucks, VIP &
Police Vehicles)
• To design an automatic control system for traffic
lights, to turn green whenever an emergency
vehicle is detected at the previous
roundabout/crossing.
• The same will clear the traffic and give easy and
faster way for the vehicle to pass through.
Name of the
Faculty
Name of the Project Funding Agency Amount
Dr. Lini
Mathew
Dr. Ritula
Thakur
Dr. Poonam
Syal
Development of a real time
river monitoring and
management software sensor
system using fusion non
selective Chemo sensing and
GIS modules.
Ministry of Human
Resource
Development
Government of India
1,12,00,000/-
Food Safety, Security and
Sustainability: Sensor-systems,
and Networks
Ministry of Human
Resource
Development
Government of India
4,65,00,000/-
Design and development of a
novel wearable assistive
device based on
multimodal interface &
shared control architecture.
Department of Science
and Technology, New
Delhi
25,00,000/-
FACULTY R&D PROJECTS
Name of the
Faculty
Name of the Project Funding Agency Amount
Dr. Lini
Mathew
Dr. Ritula
Thakur
i-Sense : Developing In-situ
& In-line Sensing
Techniques & Technologies
for Food Quality, Safety &
Security in Pre-harvest &
Post-harvest Operations
using Spectroscopy &
Imaging
Information
Technology
Research Academy
(ITRA)
1,10,00,000/-
Development of
Exoskeleton Robotic Arm
for fully or partially
paralysed people Brain-
Computer-Interface
Ministry of Human
Resource
Development
Government of
India
2,10,00,000/-
FACULTY R&D PROJECTS
AWARDS WONFACULTY R&D PROJECTS AND CONSULTANCY
Name of the Faculty
CAYm3
(2012-13)
CAYm2
(2013-14)
CAYm1
(2014-15)
CAY
(2015-16)
Dr.S Chatterji Nil 4 4 -
Dr. Lini Mathew Nil Nil 5 5
Dr. Poonam Syal - - - 4
Dr. Ritula Thakur Nil Nil 5 5
Mrs. Shimi S.L. Nil Nil 4 5
Sum - 4 18 19
N 4 4 4 4
Assessment of FRDC =
6 x Sum/N
- 6 27 28.5
Average Assessment 20.5
AWARDS WONFACULTY INTERACTION WITH OUTSIDE WORLD
Name of the Faculty
CAYm2
(2012-2013)
CAYm1
(2013-2014)
CAY
(2014-15)
CAY
(2015-16)
Dr.S Chatterji 5 5 5 -
Dr. Lini Mathew 5 5 5 5
Dr. Poonam Syal - - - 5
Dr. Ritula Thakur 5 5 5 5
Mrs. Shimi S.L. 5 5 5 5
Sum 20 20 20 20
N 4 4 4 4
Assessment of FIP =
3 x Sum/N
15 15 15 15
Average Assessment 15
AWARDS WONFACULTY INTERACTION WITH OUTSIDE WORLD
a) Delivered Expert Lecture on the topic ‘Simulink in MATLAB ‘ at
GGS College of Engg. and Tech., Guru Kashi University, Bathinda
on 19th June, 2013, in the occasion of the Short Term National
Level Training Programme on “ Teaching with MATLAB and
SIMULINK”.
b) Delivered Expert Lecture on the topic ‘Fuzzy and Artificial Neural
Network with MATLAB‘ for faculty and students of Baba Banda
Singh Bahadur Engineering College, Fatehgarh Sahib on October
4th , 2013.
c) Delivered Expert Lecture on the topic ‘MATLAB/SIMULINK
interface using dSPACE‘ at BPS Women University, Khanpur
Kalan, Sonipat on the occasion of one week UGC sponsored
workshop on “Computational Tools in Research"
from 17th February-22nd February, 2014 .
d) Judged the event ‘Magnes Spark’ at Chitkara University, Rajpura
on the occasion of Praudyogikii'13, February 23, 2013.
Dr. Shimi S.L
Criterion 6
Facilities and Technical Support
IOT based Smart Power Electronics Lab
IOT based Smart Class Room
Name Plates for all Laboratories, Classrooms,
Faculty, Departmental Library etc.
ELECTRICAL MACHINES LABORATORY
Design and Fabrication of Data Acquisition Systemfor
Online Incipient Fault Detection on Induction Motors
ELECTRICAL MACHINES LABORATORY
AC Drive, Transducer Parameter Analyzer and Power Factor
Correction unit
ELECTRICAL MACHINES LABORATORY
ELECTRICAL MACHINES LABORATORY
Hardware-in Loop Simulation for Power System Application
POWER ELECTRONICS LABORATORY
Hybrid PV Wind and Fuel Cell System
POWER ELECTRONICS LABORATORY
Design and Analysis of MPPT Algorithms for
Solar Photo-voltaic System
POWER ELECTRONICS LABORATORY
EMBEDDED SYSTEMS LABORATORY
FTIR Spectrometer Cary 630 of
Agilent Technologies
FTIR Spectrometer Cary 630 of
Agilent Technologies
EMBEDDED SYSTEMS LABORATORY
MATLAB Programmed Robo-Analyser
FTIR Spectrometer Cary 630 of
Agilent Technologies
EMBEDDED SYSTEMS LABORATORY
Data Acquisition of EEG and EMG Signals
VIRTUAL INSTRUMENTATION LABORATORY
Vernier Bio-instrumentation Data Acquisition System
VIRTUAL INSTRUMENTATION LABORATORY
PROCESS CONTROL LABORATORY
Microprocessor and PC based process control including flow,
level, temperature etc
Process Control RIG PCT 100
Microprocessor and PC based process control including flow, level, temperature etc
PROCESS CONTROL LABORATORY
FTIR Spectrometer Cary 630 of
Agilent Technologies
Fourier-transform infrared (FTIR) techniques combined with
chemometrics can be used for food quality analysis. Currently research
on detection of adulterants in milk, sugar content in fruit juice and
moisture content in grains using FTIR are on progress
PROCESS CONTROL LABORATORY
INSTRUMENTATION AND CONTROL LABORATORY
Training Boards on Transducers
PLC LABORATORY
Allen-Bradley PLC
Allen-Bradley PLC
PLC LABORATORY
Criterion 7
Teaching - Learning Process
Power Electronics Devices & Circuits - Syllabus
Power Electronics Devices & Circuits - COs
CO1
Analyze and design ac-to-dc, dc-to-dc, dc-
to-ac and ac-to-ac converters such as
rectifiers, choppers, inverters, cyclo-
converters, etc
CO2
Apply power electronic based controllers
such as ac drives, dc drives and FACTS
CO3
Develop proficiency in handling PSPICE,
MATLAB, MultiSim and LabVIEW for
simulation, analysis and design of power
electronics based controllers
CO4
Develop skill for testing, trouble shooting
and repair the thyristorized control
circuits
Evaluation Process
Evaluation Method Marks
External End Semester Test 50
Internal Mid Semester Test (MST1)
Mid Semester Test (MST1)
Seminar
Assignment
15
15
10
10
Practical Laboratory Performance
Practical Report
Viva Voce
20
20
10
Total 150
Power Electronics Devices & Circuits –
Marks Distribution
Power Electronics Devices & Circuits –
Seminar Marks Distribution
Power Electronics Devices & Circuits –
Laboratory Marks Distribution
Power Electronics Devices & Circuits –
CO - PO Mapping
CO/PO a b c d e f g h i
1. Analyze and design ac-to-dc,
dc-to-dc, dc-to-ac and ac-to-ac
converters such as rectifiers,
choppers, inverters, cyclo-
converters, etc.
      
2. Apply power electronic based
controllers such as ac drives, dc
drives and FACTS
      
3. Develop proficiency in handling
PSPICE, MATLAB, Multi-Sim and
LabVIEW for simulation, analysis
and design of power electronics
based controllers
  
4. Develop skill for testing,
trouble shooting and repair the
thyristorized control circuits.
     
Percentage of CO/PO Mapping
75% 75% 75% 100% 100% 0% 50% 100% 0%
Weightage 3 3 3 3 3 1 2 3 1
Power Electronics Devices & Circuits
– Lesson Plan
Power Electronics Devices & Circuits
– Lesson Plan
Power Electronics Devices & Circuits
– Rubrics for MST1
Question
No.
Unsatisfactory
(0-5)
Developing
(5-7)
Satisfactory
(7-8)
Exemplary
(8-10)
1 4 4 1 8
2 7 2 1 0
3 5 9 2 1
4 2 4 3 8
0
1
2
3
4
5
6
7
8
9
10
1 2 3 4
Unsatisfactory (0-5)
Developing (5-7)
Satisfactory (7-8)
Exemplary(8-10)
Power Electronics Devices & Circuits
– Rubrics for MST2
Question
No.
Unsatisfactory
(0-5)
Developing
(5-7)
Satisfactory
(7-8)
Exemplary
(8-10)
1 12 0 0 7
2 5 4 2 2
3 9 6 2 3
4 1 3 0 0
0
2
4
6
8
10
12
14
1 2 3 4
Unsatisfactory (0-5)
Developing (5-7)
Satisfactory (7-8)
Exemplary(8-10)
Power Electronics Devices & Circuits
– Rubrics for Final Exam
Question
No.
Unsatisfactory
(0-5)
Developing
(5-7)
Satisfactory
(7-8)
Exemplary
(8-10)
1 4 2 5 2
2 4 4 3 6
3 3 6 3 6
4 2 1 5 11
5 0 0 0 1
6 3 2 2 10
7 2 2 4 7
8 4 1 0 0
Power Electronics Devices & Circuits
– Rubrics for Final Exam
0
2
4
6
8
10
12
1 2 3 4 5 6 7 8
Unsatisfactory (0-5)
Developing (5-7)
Satisfactory (7-8)
Exemplary(8-10)
8.4 Attainment of Course Outcomes (10)
8.4.1 Describe the assessment processes used to gather the data upon which the
evaluation of Course Outcomes (5)
(Examples of data collection processes may include, but are not limited to, specific
exam questions, laboratory tests, internally developed assessment exams, oral exams
assignments, presentations, tutorial sheets etc.)
The course outcomes are defined by faculty and subject experts through workshops.
Define the assessment process (eg. MST..).
8.4.2 Record the attainment of Course Outcomes (5)
Program shall have set attainment levels.
(The attainment levels shall be set considering average performance levels in the
university examination or any higher value set as target for the assessment years.
Attainment level is to be measured in terms of student performance in internal
assessments with respect the COs of a subject plus the performance in the University
examination)
TOOLS USED FOR PO ASSESSMENT
Courses
considered
Method of
assessment
Source of
data
collection
Target for
performance
PO1-
PO9
For each PO
the contributing
course is
obtained from
CO to PO
mapping
Direct Assessment
• Internal Evaluation
- assignments,
seminars,
sessional
• External
Evaluation
Result file
≥ 75% Excellent
≥70% Very Good
≥65% Satisfactory
<65% Needs
Improvement
PO1-
PO9
Indirect Assessment
Feedback
from
Alumni,
Employer,
Final year
students and
Faculty
≥75% Excellent
≥70% Very Good
≥65% Satisfactory
<65% Needs
Improvement
Direct Assessment
• To assess the attainment of the POs, Grade Point Average of
courses is considered
• PO attainment is evaluated as
𝑃𝑖 =
𝑘=1
𝑁
𝐺 𝑘 𝑆 𝑘 𝑊𝑖𝑘 𝐶 𝑘
𝑘=1
𝑁
10𝑆 𝑘 𝑊𝑖𝑘 𝐶 𝑘
where
Gk = Grade Point Average of kth Course
Sk = Number of students taking kth Course
Wik = Weight assigned for kth Course mapped to ith PO.
Ck = Total credits of kth Course
N = Number of Courses
153
Power Electronics Devices & Circuits –
CO - PO Mapping
CO/PO a b c d e f g h i
1. Analyze and design ac-to-dc,
dc-to-dc, dc-to-ac and ac-to-ac
converters such as rectifiers,
choppers, inverters, cyclo-
converters, etc.
      
2. Apply power electronic based
controllers such as ac drives, dc
drives and FACTS
      
3. Develop proficiency in handling
PSPICE, MATLAB, Multi-Sim and
LabVIEW for simulation, analysis
and design of power electronics
based controllers
  
4. Develop skill for testing,
trouble shooting and repair the
thyristorized control circuits.
     
Percentage of CO/PO Mapping
75% 75% 75% 100% 100% 0% 50% 100% 0%
Weightage 3 3 3 3 3 1 2 3 1
Weightage(Wik) Computation
• Weightage is assigned based on %age of COs which are satisfying ith
PO in the kth subject as follows:
%age of COs Weightage
<33% 1
>=33% and <67% 2
>=67% 3
155
156
Rubrics used:
1. Relevance of Program Outcomes
It is evaluated taking five different scales: Not Important (1),
Somewhat Important (2), Important (3), Very Important (4),
Extremely Important (5)
2. Usefulness of Program Outcomes
It is evaluated on four different scales: Less than 40% (1),
40-60% (2), 60-80% (3), 80-100% (4)
Number in bracket shows weightage assigned to that scale.
Process Used for Indirect
Assessment of Attainment of POs
S.No. Programme
outcome
Relevance Usefulness
Not
Imp.
S.W.
Imp.
Imp. V.
Imp.
Ex.
Imp.
Less
than 40
40 to 60 60 to 80 80 to
100
1. A
2. B
3. C
4. D
5. E
6. F
7. G
8. H
9. I
IndirectAssessment of POs through
Alumni Feedback
157
158
Assessment of ith PO on the basis of Relevance:
𝑃𝑖(𝑅) = 𝑠=1
5 𝑁𝑠∗𝑊𝑠
𝑁×5
Assessment of ith PO on the basis of Usefulness:
𝑃𝑖(𝑈) = 𝑠=1
4 𝑁𝑠∗𝑊𝑠
𝑁×4
Here
Ns = Number of students who agree on scale s
Ws = Weightage assigned to scale s
N = Total number of students
𝑃𝑖 𝐼 = 0.5𝑃𝑖 𝑅 + 0.5𝑃𝑖(𝑈)
Process Used for Indirect Assessment of
Attainment of POs (Contd..)
PO Attainment
• As the Direct assessment (student result) is computed on the basis of various parameters
(sessionals, assignments, university exams, projects, seminars etc.), it has been given a
weightage of 70%.
• On the other hand, Indirect Assessment is computed on the basis of feedback in the form
of questionnaire, so it has been given a weightage of 30%.
PO Attainment = 0.7*Direct PO attainment +0.3*Indirect PO Attainment
159
WORKSHOPS/FIELD VISITS
ORGANISED All POs
are met
WORKSHOPS/FIELD VISITS
ORGANISED All POs
are met
Christmas Celebration
Personality Development Workshop
Farewell to HOD
PO(i)
Ethical Practices
and Social
Responsibility
ACTIVITIES ORGANISED
Song Competition
PO(g)
Ability to
communicate
effectively
Sadhbhawna Divas
Teacher’s Day Sports Day
ACTIVITIES ORGANISED
Annual Day Celebration
PO(i)
Ethical Practices
and Social
Responsibility
INTERNATIONAL CONFERENCE
ORGANISED – RATEE 2014
All POs
are met
NEWS LETTERS – Vol. I & II
To satisfy all POs
PREPARATION OF PROJECTS BY STUDENTS
PREPARATION OF PROJECTS BY STUDENTS
Solar Power Generation
a) 50 kWp Grid interactive Solar PV Power Plant Installed at
rooftop of Homi Bhabha Block, connected to main gird of
electrical supply of this Institute.
b) 15 kWp Grid interactive Solar PV Power Plant Installed at
rooftop of Sir JC Bose Academic Block, connected to main
grid of electrical supply of this Institute.
c) 20 kWp Stand alone Solar PV Power Plant with Battery
Bank Installed at rooftop of Sir JC Bose Academic Block
connected to Server Room for Internet
CREATION OF RENEWABLE ENERGY & ENERGY
EFFICIENT FACILITIES
Solar PV Power Plant 50kWp
Solar PV Power Plant 15kWp
Solar PV Power Plant 20kWp
SOLAR PV POWER BATTERY BANK
Solar PV Street Lights
a)10 Nos. Solar PV Street Lights on Campus Road
b) 2 Nos. Solar PV Street Lights at Main Entry Gate &
Guest House
Energy Efficient Lights
a)Guest House (New & PG Hostel G.F.)
b)Auditorium
c)Corridors
d)Administrative Block (G.F.)
e)Student Centre
CREATION OF RENEWABLE ENERGY & ENERGY
EFFICIENT FACILITIES
Solar PV Street Light
LIST OF DOCUMENTS
•Institute Specific -- 16 files
•Program Specific -- 30 files
P.1 NBA accreditation reports of the past visits, if any
P.2 Department budget and allocations (last 3 years data)
P.3 Admission – seats filled and ranks (last 3 years data)
P.4 List/Number of students who cleared the program in 4
years (last 3 years data)
P.5 Average Grade point (CGPA) (last 3 years data of students’
CGPA/ percentage)
P.6 Placement and higher studies data (last 3 years data)
P.7 Professional society activities, events, conferences
organized etc.
P.8 List of students’ papers along with hard-copies of the
publications; professional society publications/ magazines, etc.
P.9 Sample best and average project reports/thesis
P.10 Details of faculty student ratio
P.11 Faculty details with their service books, salary details, sample
appointment letters, promotion and award letters/certificates
P.12 Faculty list with designation, qualification, joining date,
publication, R & D, interaction details
P.13 List of faculty publications along with DOIs and
publication/citation details
P.14 List of R & D and consultancy projects along with approvals and
project completion reports
P.15 List and proofs of faculty interaction with outside world
P.16 List of class rooms, faculty rooms,
P.17 List of program specific labs and computing facility within
department.
P.18 List of non-teaching staff with their appointment letters etc
P.19 List of short-term courses, workshop arranged and course-
modules developed
P.20 Records of new program specific facility created, if any
P.21 Records of overall program specific improvements, if any
P.22 Curriculum, POs, PEOs, Mission and Vision statements
P.23 Mapping of POs with PEOs
P.24 Mapping of Course Outcome with Program Outcomes
P.25 Course files, plan of course delivery, question papers, answer
scripts, assignments, reports of assignments, project reports,
report of design projects, list of laboratory experiments, reports
of laboratory experiments etc.
P.26. Rubrics developed to validate the POs
P.27. Continuous improvement in PEOs
P.28. Improvement in curriculum for mapping POs and PEOs
P.29. Direct and indirect assessment to show attainment of POs
P.30. Stake-holders involvement in the process of improvement of
PEOs and POs
COURSE FILES
 Time Table
 Lecture Plan
 Evaluation Scheme
 Syllabus
 Approved Students List
 Attendance Sheet
 Evaluations mark sheet
 Seminar Performa
 Practical List and marks
• Question Paper Mapping with Question Papers
• Rubrics and mapping
COURSE FILES
 Assignments (Two sheets Best, Two sheets Average
and Two sheets Worst)
 Mid Semester Tests (Two sheets Best, Two sheets
Average and Two sheets Worst)
 Final Exam Answer Sheets (Two sheets Best, Two
sheets Average and Two sheets Worst)
 Laboratory Files (Two sheets Best, Two sheets Average
and Two sheets Worst)
Faculty Profile Files for each faculty
• Personal Details
• Training Courses Attended
• Training Programmes Conducted
• Interaction with Outside World
• List of ME Theses Guided
• List of publications
• Awards won
• Google scholar, Research gate Etc….
Questions, Comments?
Shimi.reji@gmail.com
www.slideshare.net/shimireji
9417588987
Thanks

Preparation for NBA

  • 1.
    Preparation for NBA Dr.Shimi S.L , NITTTR, Chandigarh
  • 2.
    Criterion 1 Vision, Missionand Programme Objectives
  • 3.
    VISION To be acentre of excellence for promoting education, training and research in the field of Electrical Engineering. MISSION • To offer continuing education and training programs in the area of Electrical Engineering for the faculty and staff of the technical education system. • To develop need based curricula in the area of Electrical Engineering. • To develop instructional material in the area of Electrical Engineering to enhance effectiveness of teaching-learning process. • To undertake research and development in the area of Electrical Engineering. • To provide extension and consultancy services to technical education system and industry in the area of Electrical Engineering. VISION AND MISSION
  • 4.
    PROCESS FOR DEFININGVISION AND MISSION OF THE DEPARTMENT
  • 5.
    PROGRAMME EDUCATIONAL OBJECTIVES PEO1 To developtechnical knowledge and skills in the area of Instrumentation and Control at Postgraduate level PEO2 To develop ability to undertake research and development in the areas of Instrumentation and Control PEO3 To develop generic skills such as creativity, problem solving, communication, teamwork, life long learning, leadership, professional ethics and values.
  • 6.
    PROGRAMME EDUCATIONAL OBJECTIVESThe PEOsare published at • Institute website http://www.nitttrchd.ac.in/sitenew1/elect/elect.php#page=page-3 • Admission prospectus • Departmental brochures http://www.nitttrchd.ac.in/sitenew1/elect/elect.php • At various locations in the department.
  • 7.
    PROGRAMME EDUCATIONAL OBJECTIVES The stakeholdersof the program are • Students • Faculty and Staff • Employer’s Organizations (Polytechnics, Engineering Colleges, Universities, Directorates, State Board of Technical Education, Industries) • Regulatory Administrative and Quality Assurance Bodies/ Organisation • Society
  • 8.
    PROCESS FOR DEFINING PEOs Feedback DefineProgramme Educational Objectives Vision and mission of the Institute and the department Alumni Students Faculty Employer Finalize PEOs are Published
  • 9.
    Mission Program Educational Objectives PEO1 PEO2PEO3 To offer continuing education and training programs in the area of Electrical Engineering for the faculty and staff of the technical education system √ √ √ To develop need based curricula in the area of Electrical Engineering √ To develop instructional material in the area of Electrical Engineering to enhance effectiveness of teaching-learning process √ √ To undertake research and development in the area of Electrical Engineering √ √ √ To provide extension and consultancy services to technical education system and industry in the area of Electrical Engineering √ √ √ CORRELATION BETWEEN PEO AND MISSION
  • 10.
    PEOs Core subjects Electives Thesis work PEO1 Todevelop technical knowledge and skills in the area of Instrumentation and Control at Postgraduate level √ √ √ PEO2 To develop ability to undertake research and development in the areas of Instrumentation and Control √ √ √ PEO3 To develop generic skills such as creativity, problem solving, communication, teamwork, life long learning, leadership, professional ethics and values. √ √ √ CONTRIBUTION OF CURRICULUM WITH PEOs
  • 11.
  • 12.
    PROGRAM OUTCOMES (a) Abilityto understand, apply, analyse, evaluate and synthesize existing and new knowledge related to Instrumentation and Control (b) Ability to identify, formulate and solve engineering problems creatively and generate new knowledge (c) Ability to design a system component or process as per need and specifications (d) Ability to use modern engineering tools such as software and equipment related to Instrumentation and Control (e) Ability to undertake collaborative research in multi disciplinary areas for finding solutions to the problems
  • 13.
    f) Ability tounderstand professional and research responsibilities and contemporary issues as well as the impact of engineering solutions on the society g) Ability to communicate effectively h) Ability to continuously update knowledge and skills as per the changes in discipline, technology and world of work. i) Ability to apply the principles of project planning and management, total quality management and technology management for managing projects in Instrumentation & Control and multi disciplinary areas PROGRAM OUTCOMES
  • 14.
    Mapping of POsto Graduate Attributes POs GRADUATE ATTRIBUTES 1 2 3 4 5 6 7 8 9 10 11 Scholarshipof knowledge Criticalthinking Problemsolving Researchskill Usageofmodern tools collaborativeand multidisciplinary work Project managementand finance Communication Lifelonglearning Ethicalpractices andsocial responsibility Independentand reflective learning a √ b √ √ c √ d √ e √ √ f √ g √ h √ √ i √
  • 15.
    PROCESS FOR DEFININGPOs Graduate Attributes Formulate Programme Outcomes Programme Educational Objectives Vision and mission of the department Publish POs Stakeholders Deans, HODs and External Experts Programme Curriculum
  • 16.
  • 17.
    STRUCTURE OF THECURRICULUM PROGRAM CURRICULUM Curricular Composition Credits Theory Courses 38 Laboratory Courses 12 Preliminary Thesis Work 10 Final Thesis Work 15
  • 18.
    Cod e No. Subject L TP Credits Total Credit s Theor y Session al Practica l Total L T P MEI 6101 Measurement Sciences and Techniques 3 - 2 3 - 1 4 50 50 50 150 MEI 6102 Process Dynamics and Control 3 - 2 3 - 1 4 50 50 50 150 MEI 6103 Digital Signal Processing 3 - 2 3 - 1 4 50 50 50 150 MEI 6104 Power Electronic Devices & Circuits 3 - 2 3 - 1 4 50 50 50 150 MEI 6105 Industrial Instrumentation 3 - 2 3 - 1 4 50 50 50 150 Total 20 250 250 250 750 Semester – I CORE SUBJECTS (COMPULSORY) PROGRAM CURRICULUM
  • 19.
    Semester – IICORE SUBJECTS (COMPULSORY) PROGRAM CURRICULUM Code No. Subject L T P Credits Total Credits Theory Session al Practical Tutorial Total L T P MEI 6201 Microcontroller Based Embedded System 3 - 2 3 - 1 4 50 50 50 150 MEI 6202 Advance Control Theory 3 1 - 3 1 - 4 50 50 50 150 MEI 6203 Opto-Electronic Instrumentation 3 - 2 3 - 1 4 50 50 50 150 MEI 6204 Soft Computing Techniques 3 - 2 3 - 1 4 50 50 50 150 MEI 6205 Instrumentation & Computational Laboratory - - 4 - - 2 2 - 50 50 100 Elective Subject 1 4 50 50 50 150 Total 22 250 300 300 850
  • 20.
    Semester – IIELECTIVE SUBJECTS (ANY ONE) PROGRAM CURRICULUM Cod e No. Subject L T P Credits Total Credit s Theor y Session al Practical Tutorial Total L T P MEI 6206 Power System Analysis 3 - 2 3 - 1 4 50 50 50 150 MEI 6207 Instrumentation for Environmental Engineering 3 - 2 3 - 1 4 50 50 50 150 MEI 6208 Analytical Instrumentation 3 - 2 3 - 1 4 50 50 50 150 MEI 6209 Modeling of Electrical Machines 3 1 - 3 1 - 4 50 50 50 150
  • 21.
    Semester – III PROGRAMCURRICULUM Code No. Subject L T P Credits Total Credits Theory Session al Practi cal Total L T P MEI 7151 Thesis - Preliminary - - 20 10 10 Elective Subject II 3 - 2 3 - 1 4 50 50 50 150 Elective Subject III 4 - - 4 - - 4 50 50 - 100 Total 18 100 100 50 250 ELECTIVE SUBJECT II (ANY ONE) MEI 7101 Virtual Instrumentation 3 - 2 3 - 1 4 50 50 50 150 MEI 7102 Digital Communication 3 - 2 3 - 1 4 50 50 50 150 MEI 7103 Bio-Medical Instrumentation 3 - 2 3 - 1 4 50 50 50 150 MEI 7104 Advance Digital Signal Processing 3 - 2 3 - 1 4 50 50 50 150
  • 22.
    Semester – III PROGRAMCURRICULUM ELECTIVE SUBJECT III (ANY ONE) MTE 6202 Research Methodology 4 - - 4 4 50 50 - 100 CSE 8309 Human Resource Development & Training Methods 4 - - 4 4 50 50 - 100 MEI 7105 Energy Management 4 - - 4 4 50 50 - 100 MMT 6109 Optimization Techniques 4 - - 4 4 50 50 - 100
  • 23.
    Semester – IV PROGRAMCURRICULUM Code No. Subject L T P Total Credits Theor y Sessiona l Total MEI 7251 Thesis - - 30 30 15 - - -
  • 24.
    SEMESTER – ISUBJECTS MAPPING WITH POs AND PEOs MAPPING OF COURSES WITH POs AND PEOs
  • 25.
    SEMESTER – IISUBJECTS MAPPING WITH POs AND PEOs MAPPING OF COURSES WITH POs AND PEOs
  • 26.
    SEMESTER – IIISUBJECTS MAPPING WITH POs AND PEOs MAPPING OF COURSES WITH POs AND PEOs
  • 27.
    SEMESTER – IVSUBJECTS MAPPING WITH POs AND PEOs MAPPING OF COURSES WITH POs AND PEOs
  • 31.
    PROCESS TO IDENTIFYCURRICULAR GAPS Brainstorming by Departmental faculty Feedback from relevant industries Draft Curriculum prepared by the faculty Feedback from experts from technical Institutions, Research Organizations Finalize Programme Curriculum in BOS Feedback from relevant industries Improve and Redefine Programme Curriculum Feedback from Alumni, University Officials
  • 32.
    CONTENT BEYOND SYLLABUS IMPARTEDFOR ATTAINMENT OF POs Topic Content (Beyond Syllabus) Distributed Control Systems o Architecture, Design and Implementation of DCS o Verification and Validation of DCS MATLAB o MATLAB Programming o Signal Processing Toolbox o Control System Toolbox o Fuzzy Logic Toolbox o Neural Network Toolbox o SIMULINK o SimPowerSystems Computer Aided Power System Analysis o Smart Grid o MATLAB / MiPower software for power system simulations
  • 33.
    CONTENT BEYOND SYLLABUS IMPARTEDFOR ATTAINMENT OF POs Topic Content (Beyond Syllabus) Hands-On- Experience in Ind ustrial Electronics o Testing of components o Design of power electronic circuits o MATLAB/SIMULINK interface with d SPACE, OPAL RT, Arduino for real time power system and PE applications. Hands on Practices on Multi Sim and Proteus o Multisim Software o Circuit Simulation using proteus software Control of Electrical Motors o MATLAB/SIMULINK for AC/DC Drives simulation o Intelligent Drives o Real time control of drives using DSP processor
  • 34.
  • 35.
    ADMISSION INTAKE INTHE PROGRAMME YEAR Sanction ed strength of the program me Number of students admitted Percentage of seats filled % Number of students admitted with valid GATE Score/ QIP/ PG entrance of state Percentage of students with valid GATE Score/PG entrance of state CAY (2015-2016) 26 21 80.76 21 100 CAYm1 (2014-2015) 26 25 96.15 25 100 CAYm2 (2013-2014) 26 24 92.30 24 100 CAYm3 (2012-2013) 26 12 46.15 0 0 CAYm4 (2011-2012) 26 14 53.84 0 0
  • 36.
    SUCCESS RATE YEAR Number of Students Graduatedfrom the Programme (N1) Number of Students joined the Programme (N2) GI = N1/N2 LYG (2014-2015) NA 24 LYG (2013-2014) 21 22 0.95 LYG m1(2012-2013) 10 10 1 LYGm2 (2011-2012) 14 14 1 LYGm3 (2010-2011) 11 11 1 LYGm4 (2009-2010) 12 12 1
  • 37.
    ACADEMIC PERFORMANCE INDEX Item LYG (2013-2014) LYGm1 (2012-2013) LYGm2 (2011-2012) LYGm3 (2010-2011) Approximatingthe API by the following mid- point analysis Number of students with CGPA 9<= 10.0 1 2 0 0 8<= 9.0 10 5 6 2 7 <=8 10 2 6 3 6 <=7 1 1 2 4 5 <=6 0 0 0 2 Total 22 10 14 11 Approximating API by Mid-CGPA API = Mean of CGPA/Percentage of all the students 8.01 8.37 7.76 7.05
  • 38.
    ACADEMIC PERFORMANCE Year Number ofStudents Admitted API LYG (2013-2014) 22 8.01 LYGm1 (2012-2013) 10 8.37 LYGm2 (2011-2012) 14 7.76 LYGm3 (2010-2011) 11 7.05 Average API (8.01+8.37+7.76)/3 8.05 ACADEMIC PERFORMANCE = 2xAverage API = 16.1
  • 39.
    PLACEMENT AND HIGHERSTUDIES Item LYG (2013-2014) LYGm1 (2012-2013) LYGm2 (2011-2012) LYGm3 (2010-2011) Number of admitted students (N) corresponding to LYG 24 12 14 12 Number of students who obtained jobs in industry/ academia (as per records) (X) 19 7 8 9 Number of students who opted for higher studies with valid qualifying scores/ ranks (Y) 1 1 1 -- Assessment Points 18.33 16.67 15.7 15 Average Assessment Points = 16.9 Assessment Points = 20 * (x + 3y)/N
  • 40.
    AWARDS WONSTUDENTS ACHIEVEMENTS AWARDSWON BY STUDENTS S.No. Name/Nature of the Award won Name of the Awarding Organization/Authority Nature of Work Done Name of Faculty/Team 1. Secured the 2nd position and won a cash award of Rs. 30,000 “VIMANTRA 2013” 10th Annual National Technical Paper Contest by National Instruments September 2013 National Level Technical Paper Contest for Research Scholars Mr. Shishir Sarkar Faculty Advisers: Dr S. Chatterji and Mrs. Shimi S.L 2. Secured the 1st position and won a cash award of Rs. 50,000 “Techexpo” at TechXplore, the National Level Technical Fest of Chitkara University, Rajpura Project Competition Mrs. Swati Singh and Mr. Sandeep Gupta Faculty Advisers: Dr Lini Mathew and Mrs. Shimi S.L 3. Secured the 2nd position (National Level) TECHFEST 2015 at IIT Bombay December, 2015 All India International Robotics Challenge event Ms. Babita and Mr. Manjeet Singh Faculty Advisers: Dr Lini Mathew and Mrs. Shimi S.L
  • 41.
    AWARDS WONSTUDENTS ACHIEVEMENTS AWARDSWON BY STUDENTS S.No. Name/Nature of the Award won Name of the Awarding Organization/Authority Nature of Work Done Name of Faculty/Team 4. Secured the 3rd position (National Level) TECHFEST 2015 at IIT Bombay December, 2015 All India ROBOWAR event Mr. Manjeet Singh Faculty Advisers: Mrs. Shimi S.L 5. Secured the 2nd position TECH MAHOTSAV (College Level), PEC FEST , PEC University of Technology , 2014 Project competition Mr. Tejinder Faculty Advisers: Mrs. Shimi S.L. 6. Secured the 3rd position (National Level) KSHITIJ 2016 at IIT Kharagpur All India ROBOWAR event Mr. Manjeet Singh Faculty Advisers: Dr Lini Mathew and Mrs. Shimi S.L 7. Secured Runner up position (National Level) KSHITIJ 2016 at IIT Kharagpur All India STAIR CLIMBER event Ms. Babita and Mr. Manjeet Singh Faculty Advisers: Mrs. Shimi S.L
  • 43.
    Techexpo at Chitkara University, Rajpura TECHMAHOTSAV PEC FEST, PEC University of Technology , 2014
  • 44.
    AWARDS WONSTUDENTS ACHIEVEMENTS AWARDSWON BY STUDENTS S.No. Name/Nature of the Award won Name of the Awarding Organization/Authority Nature of Work Done Name of Faculty/Team 8. Secured Runner up position (National Level) KSHITIJ 2016 at IIT Kharagpur All India HYDRAULI C ARM event Ms. Babita and Faculty Advisers: Dr Lini Mathew and Mrs. Shimi S.L 9. Secured Runner up position (National Level) KSHITIJ 2016 at IIT Kharagpur All India LINE FOLLOWER event Ms. Babita and Mr. Alok Deep Faculty Advisers: Dr Lini Mathew and Mrs. Shimi S.L 10. Secured the 1st position Greenwhiz organized by Civil Engineering Dept., NITTTR, Chandigarh on 26th Sept. 20914 Quiz competitio n Vimal Kumar Verma, Arindam Chowdhury Faculty Advisers: Mrs. Shimi S.L
  • 45.
    AWARDS WON BYSTUDENTS
  • 46.
    AWARDS WON BYSTUDENTS
  • 47.
  • 48.
    Students Initiatives Inaugurated on16th June, 2014, by Dr. S.Chatterji. ELECTRICAL ENGINEERING STUDENT CHAPTER ELECTRINCON
  • 49.
    • Development ofworking projects under minor project activity- on 16.06.2014. • Various Experts Lectures are arranged for ME students. • Various Industrial Visits are arranged for students • Teachers’ Day celebration is held annually. • Various workshops are arranged for students on latest research areas. • The first technical event ‘Projectrica’ was conducted. EVENTS HELD BY ELECTRINCON
  • 50.
    Total eight projectswere displayed, out of which two were chosen as the best projects. (i) 3D LED Cube developed by Mr. Tejinder K. Devgon . (ii) TSOP sensor based automatic bottle filling counter system with encrypted signal developed by Mr. Abhinav Kant, Mr. Varun, Mr. Mukesh and Mr. Kunal Kishore .
  • 51.
    Start up byour Student • Enovate Skill was started by a student of Electrical Engineering Department (Mr. Alok Deep) along with a student from Mechanical Engineering Department (Mr. Ajay Godara). • They conduct training for students around the country with hands on experience of the electrical and electronic devices. ENTREPRENEURSHIP INNOVATIONS
  • 52.
  • 53.
    AWARDS WONDETAILS OFFACULTY 2012-2014 Name of the Faculty member Highest Qualificati on University Year of graduat ion Designation Date of joining the institution Dr. S. Chatterji PhD Panjab University 2004 Professor 10/08/1984 Dr. Lini Mathew PhD Panjab University 2012 Associate Professor 11/11/1988 Dr. Ritula Thakur PhD Panjab University 2016 Assistant Professor 31/05/2006 Mrs. Shimi SL M.E Anna university 2008 Assistant Professor 05/08/2011
  • 54.
    AWARDS WONDETAILS OFFACULTY 2015-2016 Name of the Faculty member Highest Qualificati on University Year of graduat ion Designation Date of joining the institution Dr. Lini Mathew PhD Panjab University 2012 Associate Professor 11/11/1988 Dr. Poonam Syal PhD Panjab University 2012 Associate Professor 18/02/1986 Dr. Ritula Thakur PhD Panjab University 2016 Assistant Professor 31/05/2006 Mrs. Shimi SL M.E Anna university 2008 Assistant Professor 05/08/2011
  • 55.
    FACULTY PROFILE Dr. LINIMATHEW (Head) Designation :Associate Professor Qualifications :Ph.D.(Electrical Engineering) from Panjab University Research Interests : Soft Computing Techniques, Digital Signal Processing, Measurement Instrumentation and Data Acquisition, Virtual Instrumentation, Power System Stability No of papers Published in : International Journals - 46 National Journals - 14 International Conferences - 22 National Conferences - 8 Total – 90
  • 56.
    FACULTY PROFILE Dr. POONAMSYAL Designation : Associate Professor Qualifications : Ph.D.(Electrical Engineering) from Panjab University Research Interests : Energy Management, Renewable Energy, Assistive Devices, Manpower Development and Training, Women Empowerment No of papers Published in : International Journals - 22 National Journals - 2 International Conferences - 18 National Conferences - 10 Total – 52
  • 57.
    FACULTY PROFILE Dr. RITULATHAKUR Designation :Assistant Professor Qualifications : PhD from Punjab University Research Interests : Embedded Systems, Power Systems, Power Quality, Sensing & Instrumentation No of papers Published in : International Journals - 41 National Journals - 4 International Conferences - 25 National Conferences - 10 Total – 80
  • 58.
    FACULTY PROFILE Mrs. SHIMIS.L Designation :Assistant Professor Qualifications : M.E.(Power Electronics and Drives) from Anna University Chennai Research Interests : Power Electronics and Drives, Digital Control, ANN & Fuzzy Logic Applications, FACTS, Renewable Energy, Soft Computing Techniques. No of papers Published in : International Journals - 77 National Journals - 01 International Conferences - 29 National Conferences - 15 Total – 122
  • 59.
    AWARDS WONSTUDENT TEACHERRATIO Year P1 P2 S F STR = S/F Assessment Obtained Assessment = [20 x 13/STR], Assessment CAY (2015-2016) 20 24 44 04 11 23.64 20 CAYm1 (2014-2015) 24 22 46 04 11.5 22.61 20 CAY m2 (2013-2014) 22 11 33 04 8.25 31.5 20 CAY m3 (2012-2013) 11 14 25 04 6.25 41.6 20 CAYm4 (2011-2012) 14 11 25 04 6.25 41.6 20 CAYm5 (2010-2011) 11 04 15 03 05 52.0 20 Average Assessment 20
  • 60.
    AWARDS WONFACULTY STRENGTHIN PG PROGRAMME Year No. of faculty members with Ph.D (X) No. of faculty members with M.E (Y) Assessment CAY (2015-2016) 3 4 15 CAYm1 (2014-2015) 2 4 10 CAY m2 (2013-2014) 2 4 10 CAY m3 (2012-2013) 2 4 10 Average Assessment = 20x(X/Y) 11.67
  • 61.
    AWARDS WONFACULTY QUALIFICATIONS YearX PhD Y M.E N FQI (10x + 6y) /N Assessm ent CAYm3 (2012-2013) 2 2 4 8 24 CAYm2 (2013-2014) 2 2 4 8 24 CAYm1 (2014-2015) 2 2 4 8 24 CAY (2015-2016) 3 1 4 9 27 Average Assessment 25
  • 62.
    AWARDS WONCORRELATION OFFACULTY COMPETENCIES TO PROGRAMME CURRICULUM Course Code Course Title Faculty LM PS RT SSL MEI 6101 Measurement Sciences and Techniques   MEI 6102 Process Dynamics and Control  MEI 6103 Digital Signal Processing  MEI 6104 Power Electronics Devices and Circuits  MEI 6105 Industrial Instrumentation   MEI 6201 Microcontrollers and their Interfacing  MEI 6202 Advanced Control Theory  MEI 6203 Opto-Electronic Instrumentation 
  • 63.
    AWARDS WONCORRELATION OFFACULTY COMPETENCIES TO PROGRAMME CURRICULUM Course Code Course Title Faculty LM PS RT SSL MEI 6204 Soft Computing Techniques  MEI 6205 Instrumentation & Computational Laboratory   MEI 6204 Power System Analysis   MEI 6207 Instrumentation for Environmental Engineering  MEI 7101 Virtual Instrumentation   MIC 6204 Power Plant Instrumentation   MIC 6207 Data-Communication and Computer Networks 
  • 64.
    AWARDS WONCORRELATION OFFACULTY COMPETENCIES TO PROGRAMME CURRICULUM Course Code Course Title Faculty LM PS RT SSL MIC 7102 Digital Communication  MTE 7103 Technology Management   MIC 7104 Energy Management    MIC 7105 Bio-Medical Instrumentation 
  • 65.
    AWARDS WONFACULTY ASRESOURCE PERSONS IN TRAINING ACTIVITIES Name of the Faculty CAY m3 (2012-2013) CAY m2 (2013-2014) CAY (2014-2015) CAY (2015-2016) Dr. S.Chatterji 05 05 05 - Dr. Lini Mathew 05 05 05 05 Dr. Poonam Syal - - - 05 Dr. Ritula Thakur 05 05 05 05 Mrs. Shimi S.L. 05 05 05 05 Sum 20 20 20 20 N 4 4 4 4 Assessment = 3xsum/N 15 15 15 15 Average Assessment 15
  • 66.
    AWARDS WONLIST OFTRAINING PROGRAMMES CONDUCTED BY FACULTY2013-2014 Sr. No. Name of the Course Dates Venue Team/ Faculty 01 Electrical Electronics and Computer Based Projects. 08-12 April, 2013 Govt. Polytechnic, Biikaner, Rajasthan SC 02 Power Electronics 13-17 May, 2013 NITTTR, Chandigarh SC 03 MATLAB & LABVIEW 22-26 July, 2013 NITTTR, Chandigarh LM 04 Virtual Instrumentation 02-06 Sept, 2013 NITTTR, Chandigarh LM
  • 67.
    AWARDS WONFACULTY RETENTION Item CAYm3 (2012-2013) CAYm2 (2013-2014) CAYm1 (2014-15) CAY (2015-16) Numberof faculty members with experience less than 1 year (x0) 0 0 0 0 Number of faculty members with 1 to 2 years experience (x1) 01 0 0 0 Number of faculty members with 2 to 3 years experience (x2) 0 01 0 0 Number of faculty members with 3 to 4 years experience (x3) 0 0 01 0 Number of faculty members with 4 to 5 years experience (x4) 0 0 0 01 Number of faculty members with more than 5 years experience (x5) 03 03 03 03 N 04 04 04 04 RPI = x1 + 2x2 + 3x3 + 4x4 + 5x5 16 17 18 19 Assessment = 3xRPI/N 12 12.75 13.4 14.25 Average Assessment =(12.75+13.4+14.25)/3 13.47
  • 68.
    AWARDS WONFACULTY RESEARCHPUBLICATIONS Name of the Faculty CAYm3 (2012-2013) CAYm2 (2013-2014) CAYm1 (2014-15) CAY (2015-16) Dr.S.Chatterji, Professor & Head 05 05 05 - Dr.(Mrs) Lini Mathew, Associate Professor 05 05 05 05 Dr. Poonam Syal, Associate Professor - - - 05 Dr. Ritula Thakur, Assistant Professor 03 02 05 05 Mrs.Shimi S.L., Assistant Professor 05 05 05 05 Sum 18 17 20 20 N (Number of faculty positions required for an STR of 15) 04 04 04 04 Assessment of FRP = 6 x Sum/N 27 25.5 30 30 Average Assessment =(25.5+30+30)/3= 28.5
  • 69.
    SCI Impact Factor0.935 SCI Impact Factor 0.935 Google Based Impact Factor 0.935 SCI Impact Factor 0.935 SCI Impact Factor 0. 5 SCI Impact Factor 0.962
  • 70.
    SCI Impact Factor= 4.81 SCI Impact Factor = 7.896 SCI Impact Factor = 7.896 SCI Impact Factor = 7.896 Scopus Indexed Scopus Indexed
  • 71.
    INTERNATIONAL EXPOSURE TOFACULTY S.No. Name/Designati on of Person Nature of Work 1. Dr. Lini Mathew Associate Professor and Head (i) Presented a paper titled “Modeling and Simulation of Hybrid Power Flow Controller Implemented on SMIB System”, North American Power Symposium, Washington State university, Pullman, Washington, USA September 7-9, 2014. (ii) Dr. Lini Mathew was assigned the duty to inspect Lagos Skipper Engineering Academy (LSEA), (Government Technical College), Ikotun, Lagos, Nigeria and an institute named Institute of Technology and Management, Ugep, Cross River State, Nigeria during 9th to 16th December, 2015 .
  • 72.
    S.No. Name/Design ation of Person Natureof Work 2 Dr. Poonam Syal Associate Professor • Presented a paper titled “Energy Conservation Opportunities in Institutional buildings- A case study in India”, at IEEE International Conference on Power and Renewable Energy Shanghai, China during 21-23 October, 2016. • Awarded Best paper Award INTERNATIONAL EXPOSURE TO FACULTY
  • 73.
    INTERNATIONAL EXPOSURE TOFACULTY S.No. Name/Designation of Person Nature of Work 3. Dr. Ritula Thakur, Assistant Professor (i) Worked as Visiting Scholar during May- September 2014, at • National Peanuts Laboratory, Dawson, USA. On developing technologies for moisture determination of peanuts. • Richard Russell Research Lab, Athens, USA. Worked on NIR spectroscopy and impedance based methods for oil content determination of oil. Developed technology for moisture determination of fruits. (ii) Presented paper on “A Low Cost Non-Destructive Grain Moisture Embedded System for Food Safety and Quality”, 17th International Conference on Food Process Engineering, London, United Kingdom, February, 16-17, 2015.
  • 74.
    INTERNATIONAL EXPOSURE TOFACULTY S.No. Name/Designation of Person Nature of Work 4. Mrs. Shimi S.L Assistant Professor (i) Presented a paper titled Design and Real Time Simulation of Artificial Intelligent based MPP Tracker for Photo- Voltaic System, ASME 2014 Conference on “International Mechanical Engineering Congress and Exposition” , Montreal, Canada, November 14-20 , 2014. (ii) Technical Paper Presentation at 15th ASME International Conference on “International Mechanical Engineering Congress & Exposition” at Houston, Texas, USA, during 13 - 19 November, 2015.
  • 75.
  • 76.
    Letter of Appreciationof Dr. Ritula Thakur from Dr. Puppala, NMSU, Clovis, US
  • 77.
    Dr. Lini Mathew’sVisit to Lagos Skipper Engineering Academy, LSEA (Government Technical College, Ikotun, Lagos, Nigeria) 2015-16
  • 78.
  • 79.
     During thevisit of Dr. Lini Mathew to LSEA the need gaps were analyzed and plans to fill them in course of time have been made.  More teachers from LSEA, Nigeria will visit NITTTR, India for more specialized training.  Electrical Engineering Department, NITTTR have been preparing around 100 educational video films which can be used by the teachers and students of LSEA for better instruction.
  • 80.
    Dr. Lini Mathewwas assigned another duty to inspect an institute named Institute of Technology and Management, Ugep, Calabar, Nigeria. The project being a partnership between the Cross River State Government and Highbury College, Portsmouth, UK and has been contracted to deliver a curriculum of international standards.
  • 82.
    The report wasprepared and submitted to Commissioner of Education, Cross River State, to hand it over to Governor Benedict Ayede.
  • 83.
    2015-16 Technical Paper Presentationat 17th International Conference on Food Process Engineering, London, United Kingdom, February, 16-17, 2015.
  • 84.
    2015-16 Technical Paper Presentation at15th ASME International Conference on “International Mechanical Engineering Congress & Exposition” at Houston, Texas during 13 - 19 November, 2015 Technical Visit at NASA, Houston , Texas
  • 85.
    2016-17 • Technical PaperPresentation at IEEE International Conference on Power and Renewable Energy held from October 21-23, 2016 at Shanghai, China. • Awarded Best Paper Award.
  • 86.
    AWARDS WONFACULTY INTELLECTUALPROPERTY RIGHTS TWO PATENTS UNDER CONSIDERATION • Puneet Kaur, Dr S Chatterji, “Design and Development of DC Motor Performance Analyser”, Patent application filed, The Patent Office, India, 2012. • Poonam Syal, S. Chatterji, H.K. Sardana, “Spatial tactile apparatus and method for creation and navigation of virtual graphics for visually challenged”, Patent application numbered 1739/DEL/2012, The Patent Office, India, June 06, 2012 LIST OF VIDEOS ON NCTEL BY ELECTRICAL ENGG. DEPARTMENT Sr. No. Topic Faculty 1. MATLAB Applications in Digital Signal Processing Dr. Lini Mathew 2. Neural Networks Dr. Lini Mathew 3. Introduction to MATLAB Dr. Lini Mathew 4. Getting Started with MATLAB Dr. Lini Mathew 5. Virtual Instrumentation Dr. Lini Mathew
  • 87.
    AWARDS WONFACULTY INTELLECTUALPROPERTY RIGHTS Name of the Faculty CAYm3 (2012-13) CAYm2 (2013-14) CAYm1 (2014-15) CAY (2015-16) Dr.S Chatterji Nil 5 5 - Dr. Lini Mathew Nil Nil 5 5 Dr. Poonam Syal - - - 4 Dr. Ritula Thakur Nil Nil 5 5 Mrs. Shimi S.L. Nil Nil 5 5 Sum - 5 20 19 N 4 4 4 4 Assessment of FIPR = 2 x Sum/N - 2.5 10 9.5 Average Assessment 7.33
  • 88.
    AWARDS WONFACULTY CONSULTANCYPROJECTS Name of the Faculty Name of the Project Funding Agency Amount (Rs.) Dr. S Chatterji Training Programme for Assistant Engineers Punjab State Transmission Corporation Limited 7,29,000/- Dr. Lini Mathew Dr. Ritula Thakur Mrs. Shimi. S.L Inspection of Street Light installation Municipal Corporation, Panchkula. 2,00,000/- Train the Trainers’ in Electrical Installation and Maintenance Work. LSEA (Government Technical College), Ikotun, Lagos, Nigeria 3,33,754/- Preparation of 95 video films for the teachers and students of LSEA 9,50,000/-
  • 89.
    Training Programme forAssistant Engineers of Punjab State Transmission Corporation Limited, during 23 – 28 September 2013 at NITTTR , Chandigarh
  • 90.
    Inaugural Function Programme on Trainthe trainers’ of Lagos Skipper Engineering Academy, Ikotun, Lagos,Nigeria in Electrical Installation and Maintenance Work during 18th – 30th April 2015 at NITTTR , Chandigarh
  • 92.
  • 93.
    Course # ID: EE100 Course Title : Repair & Maintenance of Electrical Appliances Course Faculty :
  • 94.
    Team Members Dr RajeshMehra (ECE) Dr Kanika Sharma(ECE) Dr Ritula Thakur (EE) Mrs Shimi S.L (EE)
  • 95.
    AWARDS WONFACULTY R&DPROJECTS Name of the Faculty Name of the Project Funding Agency Amount Dr. Lini Mathew Dr. Poonam Syal Dr. Ritula Thakur Mrs. Shimi. S.L Simulation Centre of Excellence (SCoE) in collaboration with ABB India Limited, Bengaluru ABB India Limited, Bengaluru 1,65,00,000/- E-Tree TEQIP-II 1,50,000/- Design of LED Lighting Installation Municipal Corporation, Chandigarh 5,85,000/- Emergency Vehicle Pre- Emption (EVP) Systems Department of Science and Technology, Chandigarh Administration 2,00,000/-
  • 96.
    EMERGENCY VEHICLE PRE-EMPTION(EVP) SYSTEM • Providing Continuous Movement For Emergency Vehicles (Ambulances, Fire Brigade Trucks, VIP & Police Vehicles) • To design an automatic control system for traffic lights, to turn green whenever an emergency vehicle is detected at the previous roundabout/crossing. • The same will clear the traffic and give easy and faster way for the vehicle to pass through.
  • 97.
    Name of the Faculty Nameof the Project Funding Agency Amount Dr. Lini Mathew Dr. Ritula Thakur Dr. Poonam Syal Development of a real time river monitoring and management software sensor system using fusion non selective Chemo sensing and GIS modules. Ministry of Human Resource Development Government of India 1,12,00,000/- Food Safety, Security and Sustainability: Sensor-systems, and Networks Ministry of Human Resource Development Government of India 4,65,00,000/- Design and development of a novel wearable assistive device based on multimodal interface & shared control architecture. Department of Science and Technology, New Delhi 25,00,000/- FACULTY R&D PROJECTS
  • 98.
    Name of the Faculty Nameof the Project Funding Agency Amount Dr. Lini Mathew Dr. Ritula Thakur i-Sense : Developing In-situ & In-line Sensing Techniques & Technologies for Food Quality, Safety & Security in Pre-harvest & Post-harvest Operations using Spectroscopy & Imaging Information Technology Research Academy (ITRA) 1,10,00,000/- Development of Exoskeleton Robotic Arm for fully or partially paralysed people Brain- Computer-Interface Ministry of Human Resource Development Government of India 2,10,00,000/- FACULTY R&D PROJECTS
  • 99.
    AWARDS WONFACULTY R&DPROJECTS AND CONSULTANCY Name of the Faculty CAYm3 (2012-13) CAYm2 (2013-14) CAYm1 (2014-15) CAY (2015-16) Dr.S Chatterji Nil 4 4 - Dr. Lini Mathew Nil Nil 5 5 Dr. Poonam Syal - - - 4 Dr. Ritula Thakur Nil Nil 5 5 Mrs. Shimi S.L. Nil Nil 4 5 Sum - 4 18 19 N 4 4 4 4 Assessment of FRDC = 6 x Sum/N - 6 27 28.5 Average Assessment 20.5
  • 100.
    AWARDS WONFACULTY INTERACTIONWITH OUTSIDE WORLD Name of the Faculty CAYm2 (2012-2013) CAYm1 (2013-2014) CAY (2014-15) CAY (2015-16) Dr.S Chatterji 5 5 5 - Dr. Lini Mathew 5 5 5 5 Dr. Poonam Syal - - - 5 Dr. Ritula Thakur 5 5 5 5 Mrs. Shimi S.L. 5 5 5 5 Sum 20 20 20 20 N 4 4 4 4 Assessment of FIP = 3 x Sum/N 15 15 15 15 Average Assessment 15
  • 101.
    AWARDS WONFACULTY INTERACTIONWITH OUTSIDE WORLD a) Delivered Expert Lecture on the topic ‘Simulink in MATLAB ‘ at GGS College of Engg. and Tech., Guru Kashi University, Bathinda on 19th June, 2013, in the occasion of the Short Term National Level Training Programme on “ Teaching with MATLAB and SIMULINK”. b) Delivered Expert Lecture on the topic ‘Fuzzy and Artificial Neural Network with MATLAB‘ for faculty and students of Baba Banda Singh Bahadur Engineering College, Fatehgarh Sahib on October 4th , 2013. c) Delivered Expert Lecture on the topic ‘MATLAB/SIMULINK interface using dSPACE‘ at BPS Women University, Khanpur Kalan, Sonipat on the occasion of one week UGC sponsored workshop on “Computational Tools in Research" from 17th February-22nd February, 2014 . d) Judged the event ‘Magnes Spark’ at Chitkara University, Rajpura on the occasion of Praudyogikii'13, February 23, 2013. Dr. Shimi S.L
  • 102.
    Criterion 6 Facilities andTechnical Support
  • 116.
    IOT based SmartPower Electronics Lab
  • 117.
    IOT based SmartClass Room
  • 118.
    Name Plates forall Laboratories, Classrooms, Faculty, Departmental Library etc.
  • 119.
    ELECTRICAL MACHINES LABORATORY Designand Fabrication of Data Acquisition Systemfor Online Incipient Fault Detection on Induction Motors
  • 120.
  • 121.
    AC Drive, TransducerParameter Analyzer and Power Factor Correction unit ELECTRICAL MACHINES LABORATORY
  • 122.
    ELECTRICAL MACHINES LABORATORY Hardware-inLoop Simulation for Power System Application
  • 123.
    POWER ELECTRONICS LABORATORY HybridPV Wind and Fuel Cell System
  • 124.
  • 125.
    Design and Analysisof MPPT Algorithms for Solar Photo-voltaic System POWER ELECTRONICS LABORATORY
  • 126.
    EMBEDDED SYSTEMS LABORATORY FTIRSpectrometer Cary 630 of Agilent Technologies
  • 127.
    FTIR Spectrometer Cary630 of Agilent Technologies EMBEDDED SYSTEMS LABORATORY MATLAB Programmed Robo-Analyser
  • 128.
    FTIR Spectrometer Cary630 of Agilent Technologies EMBEDDED SYSTEMS LABORATORY Data Acquisition of EEG and EMG Signals
  • 129.
  • 130.
    Vernier Bio-instrumentation DataAcquisition System VIRTUAL INSTRUMENTATION LABORATORY
  • 131.
    PROCESS CONTROL LABORATORY Microprocessorand PC based process control including flow, level, temperature etc Process Control RIG PCT 100
  • 132.
    Microprocessor and PCbased process control including flow, level, temperature etc PROCESS CONTROL LABORATORY
  • 133.
    FTIR Spectrometer Cary630 of Agilent Technologies Fourier-transform infrared (FTIR) techniques combined with chemometrics can be used for food quality analysis. Currently research on detection of adulterants in milk, sugar content in fruit juice and moisture content in grains using FTIR are on progress PROCESS CONTROL LABORATORY
  • 134.
    INSTRUMENTATION AND CONTROLLABORATORY Training Boards on Transducers
  • 135.
  • 136.
  • 137.
    Criterion 7 Teaching -Learning Process
  • 138.
    Power Electronics Devices& Circuits - Syllabus
  • 139.
    Power Electronics Devices& Circuits - COs CO1 Analyze and design ac-to-dc, dc-to-dc, dc- to-ac and ac-to-ac converters such as rectifiers, choppers, inverters, cyclo- converters, etc CO2 Apply power electronic based controllers such as ac drives, dc drives and FACTS CO3 Develop proficiency in handling PSPICE, MATLAB, MultiSim and LabVIEW for simulation, analysis and design of power electronics based controllers CO4 Develop skill for testing, trouble shooting and repair the thyristorized control circuits
  • 140.
    Evaluation Process Evaluation MethodMarks External End Semester Test 50 Internal Mid Semester Test (MST1) Mid Semester Test (MST1) Seminar Assignment 15 15 10 10 Practical Laboratory Performance Practical Report Viva Voce 20 20 10 Total 150
  • 141.
    Power Electronics Devices& Circuits – Marks Distribution
  • 142.
    Power Electronics Devices& Circuits – Seminar Marks Distribution
  • 143.
    Power Electronics Devices& Circuits – Laboratory Marks Distribution
  • 144.
    Power Electronics Devices& Circuits – CO - PO Mapping CO/PO a b c d e f g h i 1. Analyze and design ac-to-dc, dc-to-dc, dc-to-ac and ac-to-ac converters such as rectifiers, choppers, inverters, cyclo- converters, etc.        2. Apply power electronic based controllers such as ac drives, dc drives and FACTS        3. Develop proficiency in handling PSPICE, MATLAB, Multi-Sim and LabVIEW for simulation, analysis and design of power electronics based controllers    4. Develop skill for testing, trouble shooting and repair the thyristorized control circuits.       Percentage of CO/PO Mapping 75% 75% 75% 100% 100% 0% 50% 100% 0% Weightage 3 3 3 3 3 1 2 3 1
  • 145.
    Power Electronics Devices& Circuits – Lesson Plan
  • 146.
    Power Electronics Devices& Circuits – Lesson Plan
  • 147.
    Power Electronics Devices& Circuits – Rubrics for MST1 Question No. Unsatisfactory (0-5) Developing (5-7) Satisfactory (7-8) Exemplary (8-10) 1 4 4 1 8 2 7 2 1 0 3 5 9 2 1 4 2 4 3 8 0 1 2 3 4 5 6 7 8 9 10 1 2 3 4 Unsatisfactory (0-5) Developing (5-7) Satisfactory (7-8) Exemplary(8-10)
  • 148.
    Power Electronics Devices& Circuits – Rubrics for MST2 Question No. Unsatisfactory (0-5) Developing (5-7) Satisfactory (7-8) Exemplary (8-10) 1 12 0 0 7 2 5 4 2 2 3 9 6 2 3 4 1 3 0 0 0 2 4 6 8 10 12 14 1 2 3 4 Unsatisfactory (0-5) Developing (5-7) Satisfactory (7-8) Exemplary(8-10)
  • 149.
    Power Electronics Devices& Circuits – Rubrics for Final Exam Question No. Unsatisfactory (0-5) Developing (5-7) Satisfactory (7-8) Exemplary (8-10) 1 4 2 5 2 2 4 4 3 6 3 3 6 3 6 4 2 1 5 11 5 0 0 0 1 6 3 2 2 10 7 2 2 4 7 8 4 1 0 0
  • 150.
    Power Electronics Devices& Circuits – Rubrics for Final Exam 0 2 4 6 8 10 12 1 2 3 4 5 6 7 8 Unsatisfactory (0-5) Developing (5-7) Satisfactory (7-8) Exemplary(8-10)
  • 151.
    8.4 Attainment ofCourse Outcomes (10) 8.4.1 Describe the assessment processes used to gather the data upon which the evaluation of Course Outcomes (5) (Examples of data collection processes may include, but are not limited to, specific exam questions, laboratory tests, internally developed assessment exams, oral exams assignments, presentations, tutorial sheets etc.) The course outcomes are defined by faculty and subject experts through workshops. Define the assessment process (eg. MST..). 8.4.2 Record the attainment of Course Outcomes (5) Program shall have set attainment levels. (The attainment levels shall be set considering average performance levels in the university examination or any higher value set as target for the assessment years. Attainment level is to be measured in terms of student performance in internal assessments with respect the COs of a subject plus the performance in the University examination)
  • 152.
    TOOLS USED FORPO ASSESSMENT Courses considered Method of assessment Source of data collection Target for performance PO1- PO9 For each PO the contributing course is obtained from CO to PO mapping Direct Assessment • Internal Evaluation - assignments, seminars, sessional • External Evaluation Result file ≥ 75% Excellent ≥70% Very Good ≥65% Satisfactory <65% Needs Improvement PO1- PO9 Indirect Assessment Feedback from Alumni, Employer, Final year students and Faculty ≥75% Excellent ≥70% Very Good ≥65% Satisfactory <65% Needs Improvement
  • 153.
    Direct Assessment • Toassess the attainment of the POs, Grade Point Average of courses is considered • PO attainment is evaluated as 𝑃𝑖 = 𝑘=1 𝑁 𝐺 𝑘 𝑆 𝑘 𝑊𝑖𝑘 𝐶 𝑘 𝑘=1 𝑁 10𝑆 𝑘 𝑊𝑖𝑘 𝐶 𝑘 where Gk = Grade Point Average of kth Course Sk = Number of students taking kth Course Wik = Weight assigned for kth Course mapped to ith PO. Ck = Total credits of kth Course N = Number of Courses 153
  • 154.
    Power Electronics Devices& Circuits – CO - PO Mapping CO/PO a b c d e f g h i 1. Analyze and design ac-to-dc, dc-to-dc, dc-to-ac and ac-to-ac converters such as rectifiers, choppers, inverters, cyclo- converters, etc.        2. Apply power electronic based controllers such as ac drives, dc drives and FACTS        3. Develop proficiency in handling PSPICE, MATLAB, Multi-Sim and LabVIEW for simulation, analysis and design of power electronics based controllers    4. Develop skill for testing, trouble shooting and repair the thyristorized control circuits.       Percentage of CO/PO Mapping 75% 75% 75% 100% 100% 0% 50% 100% 0% Weightage 3 3 3 3 3 1 2 3 1
  • 155.
    Weightage(Wik) Computation • Weightageis assigned based on %age of COs which are satisfying ith PO in the kth subject as follows: %age of COs Weightage <33% 1 >=33% and <67% 2 >=67% 3 155
  • 156.
    156 Rubrics used: 1. Relevanceof Program Outcomes It is evaluated taking five different scales: Not Important (1), Somewhat Important (2), Important (3), Very Important (4), Extremely Important (5) 2. Usefulness of Program Outcomes It is evaluated on four different scales: Less than 40% (1), 40-60% (2), 60-80% (3), 80-100% (4) Number in bracket shows weightage assigned to that scale. Process Used for Indirect Assessment of Attainment of POs
  • 157.
    S.No. Programme outcome Relevance Usefulness Not Imp. S.W. Imp. Imp.V. Imp. Ex. Imp. Less than 40 40 to 60 60 to 80 80 to 100 1. A 2. B 3. C 4. D 5. E 6. F 7. G 8. H 9. I IndirectAssessment of POs through Alumni Feedback 157
  • 158.
    158 Assessment of ithPO on the basis of Relevance: 𝑃𝑖(𝑅) = 𝑠=1 5 𝑁𝑠∗𝑊𝑠 𝑁×5 Assessment of ith PO on the basis of Usefulness: 𝑃𝑖(𝑈) = 𝑠=1 4 𝑁𝑠∗𝑊𝑠 𝑁×4 Here Ns = Number of students who agree on scale s Ws = Weightage assigned to scale s N = Total number of students 𝑃𝑖 𝐼 = 0.5𝑃𝑖 𝑅 + 0.5𝑃𝑖(𝑈) Process Used for Indirect Assessment of Attainment of POs (Contd..)
  • 159.
    PO Attainment • Asthe Direct assessment (student result) is computed on the basis of various parameters (sessionals, assignments, university exams, projects, seminars etc.), it has been given a weightage of 70%. • On the other hand, Indirect Assessment is computed on the basis of feedback in the form of questionnaire, so it has been given a weightage of 30%. PO Attainment = 0.7*Direct PO attainment +0.3*Indirect PO Attainment 159
  • 163.
  • 164.
  • 165.
    Christmas Celebration Personality DevelopmentWorkshop Farewell to HOD PO(i) Ethical Practices and Social Responsibility ACTIVITIES ORGANISED Song Competition PO(g) Ability to communicate effectively
  • 166.
    Sadhbhawna Divas Teacher’s DaySports Day ACTIVITIES ORGANISED Annual Day Celebration PO(i) Ethical Practices and Social Responsibility
  • 167.
    INTERNATIONAL CONFERENCE ORGANISED –RATEE 2014 All POs are met
  • 168.
    NEWS LETTERS –Vol. I & II To satisfy all POs
  • 169.
  • 170.
  • 171.
    Solar Power Generation a)50 kWp Grid interactive Solar PV Power Plant Installed at rooftop of Homi Bhabha Block, connected to main gird of electrical supply of this Institute. b) 15 kWp Grid interactive Solar PV Power Plant Installed at rooftop of Sir JC Bose Academic Block, connected to main grid of electrical supply of this Institute. c) 20 kWp Stand alone Solar PV Power Plant with Battery Bank Installed at rooftop of Sir JC Bose Academic Block connected to Server Room for Internet CREATION OF RENEWABLE ENERGY & ENERGY EFFICIENT FACILITIES
  • 172.
    Solar PV PowerPlant 50kWp
  • 173.
    Solar PV PowerPlant 15kWp
  • 174.
    Solar PV PowerPlant 20kWp
  • 175.
    SOLAR PV POWERBATTERY BANK
  • 176.
    Solar PV StreetLights a)10 Nos. Solar PV Street Lights on Campus Road b) 2 Nos. Solar PV Street Lights at Main Entry Gate & Guest House Energy Efficient Lights a)Guest House (New & PG Hostel G.F.) b)Auditorium c)Corridors d)Administrative Block (G.F.) e)Student Centre CREATION OF RENEWABLE ENERGY & ENERGY EFFICIENT FACILITIES
  • 177.
  • 178.
    LIST OF DOCUMENTS •InstituteSpecific -- 16 files •Program Specific -- 30 files P.1 NBA accreditation reports of the past visits, if any P.2 Department budget and allocations (last 3 years data) P.3 Admission – seats filled and ranks (last 3 years data) P.4 List/Number of students who cleared the program in 4 years (last 3 years data) P.5 Average Grade point (CGPA) (last 3 years data of students’ CGPA/ percentage) P.6 Placement and higher studies data (last 3 years data) P.7 Professional society activities, events, conferences organized etc.
  • 179.
    P.8 List ofstudents’ papers along with hard-copies of the publications; professional society publications/ magazines, etc. P.9 Sample best and average project reports/thesis P.10 Details of faculty student ratio P.11 Faculty details with their service books, salary details, sample appointment letters, promotion and award letters/certificates P.12 Faculty list with designation, qualification, joining date, publication, R & D, interaction details P.13 List of faculty publications along with DOIs and publication/citation details P.14 List of R & D and consultancy projects along with approvals and project completion reports
  • 180.
    P.15 List andproofs of faculty interaction with outside world P.16 List of class rooms, faculty rooms, P.17 List of program specific labs and computing facility within department. P.18 List of non-teaching staff with their appointment letters etc P.19 List of short-term courses, workshop arranged and course- modules developed P.20 Records of new program specific facility created, if any P.21 Records of overall program specific improvements, if any P.22 Curriculum, POs, PEOs, Mission and Vision statements P.23 Mapping of POs with PEOs P.24 Mapping of Course Outcome with Program Outcomes
  • 181.
    P.25 Course files,plan of course delivery, question papers, answer scripts, assignments, reports of assignments, project reports, report of design projects, list of laboratory experiments, reports of laboratory experiments etc. P.26. Rubrics developed to validate the POs P.27. Continuous improvement in PEOs P.28. Improvement in curriculum for mapping POs and PEOs P.29. Direct and indirect assessment to show attainment of POs P.30. Stake-holders involvement in the process of improvement of PEOs and POs
  • 182.
    COURSE FILES  TimeTable  Lecture Plan  Evaluation Scheme  Syllabus  Approved Students List  Attendance Sheet  Evaluations mark sheet  Seminar Performa  Practical List and marks • Question Paper Mapping with Question Papers • Rubrics and mapping
  • 183.
    COURSE FILES  Assignments(Two sheets Best, Two sheets Average and Two sheets Worst)  Mid Semester Tests (Two sheets Best, Two sheets Average and Two sheets Worst)  Final Exam Answer Sheets (Two sheets Best, Two sheets Average and Two sheets Worst)  Laboratory Files (Two sheets Best, Two sheets Average and Two sheets Worst)
  • 184.
    Faculty Profile Filesfor each faculty • Personal Details • Training Courses Attended • Training Programmes Conducted • Interaction with Outside World • List of ME Theses Guided • List of publications • Awards won • Google scholar, Research gate Etc….