Submit Search
Upload
SECCIONES TRANSVERSALES MAYO DE TRABAJO.pdf
•
0 likes
•
2 views
J
juannolascocristobal1
Follow
SECCIONES DE PLANO
Read less
Read more
Engineering
Report
Share
Report
Share
1 of 13
Download now
Download to read offline
Recommended
AVANCE DE EJECUCION DE OBRA MEJORAMIENTO DE OCORURO
AVANCE DE EJECUCION DE OBRA MEJORAMIENTO DE OCORURO
juannolascocristobal1
DOCUMENTO DE LIMITACION DE CONCURSO PUBLICO
DOCUMENTO DE LIMITACION DE CONCURSO PUBLICO
juannolascocristobal1
0BASES_OCORURO INTEGRADAS_20211230_184036_237.pdf
0BASES_OCORURO INTEGRADAS_20211230_184036_237.pdf
juannolascocristobal1
2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
Marius Sescu
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
Expeed Software
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
Pixeldarts
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
ThinkNow
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
marketingartwork
Recommended
AVANCE DE EJECUCION DE OBRA MEJORAMIENTO DE OCORURO
AVANCE DE EJECUCION DE OBRA MEJORAMIENTO DE OCORURO
juannolascocristobal1
DOCUMENTO DE LIMITACION DE CONCURSO PUBLICO
DOCUMENTO DE LIMITACION DE CONCURSO PUBLICO
juannolascocristobal1
0BASES_OCORURO INTEGRADAS_20211230_184036_237.pdf
0BASES_OCORURO INTEGRADAS_20211230_184036_237.pdf
juannolascocristobal1
2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
Marius Sescu
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
Expeed Software
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
Pixeldarts
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
ThinkNow
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
marketingartwork
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptx
nuruddin69
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
Morshed Ahmed Rahath
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
bhaskargani46
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
hamedmustafa094
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
BhangaleSonal
Computer Networks Basics of Network Devices
Computer Networks Basics of Network Devices
ChandrakantDivate1
School management system project Report.pdf
School management system project Report.pdf
Kamal Acharya
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
NANDHAKUMARA10
Air Compressor reciprocating single stage
Air Compressor reciprocating single stage
Abc194748
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
DineshKumar4165
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
JIT KUMAR GUPTA
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
MairaAshraf6
Online electricity billing project report..pdf
Online electricity billing project report..pdf
Kamal Acharya
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
anil_gaur
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
KOUSTAV SARKAR
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
Health
Hostel management system project report..pdf
Hostel management system project report..pdf
Kamal Acharya
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
Arindam Chakraborty, Ph.D., P.E. (CA, TX)
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
meghakumariji156
Skeleton Culture Code
Skeleton Culture Code
Skeleton Technologies
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
Neil Kimberley
More Related Content
Recently uploaded
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptx
nuruddin69
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
Morshed Ahmed Rahath
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
bhaskargani46
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
hamedmustafa094
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
BhangaleSonal
Computer Networks Basics of Network Devices
Computer Networks Basics of Network Devices
ChandrakantDivate1
School management system project Report.pdf
School management system project Report.pdf
Kamal Acharya
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
NANDHAKUMARA10
Air Compressor reciprocating single stage
Air Compressor reciprocating single stage
Abc194748
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
DineshKumar4165
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
JIT KUMAR GUPTA
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
MairaAshraf6
Online electricity billing project report..pdf
Online electricity billing project report..pdf
Kamal Acharya
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
anil_gaur
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
KOUSTAV SARKAR
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
Health
Hostel management system project report..pdf
Hostel management system project report..pdf
Kamal Acharya
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
Arindam Chakraborty, Ph.D., P.E. (CA, TX)
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
meghakumariji156
Recently uploaded
(20)
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptx
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
Computer Networks Basics of Network Devices
Computer Networks Basics of Network Devices
School management system project Report.pdf
School management system project Report.pdf
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
Air Compressor reciprocating single stage
Air Compressor reciprocating single stage
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
Online electricity billing project report..pdf
Online electricity billing project report..pdf
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
Hostel management system project report..pdf
Hostel management system project report..pdf
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Featured
Skeleton Culture Code
Skeleton Culture Code
Skeleton Technologies
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
Neil Kimberley
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
contently
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
Albert Qian
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
Kurio // The Social Media Age(ncy)
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
Search Engine Journal
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
SpeakerHub
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
Clark Boyd
Getting into the tech field. what next
Getting into the tech field. what next
Tessa Mero
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Lily Ray
How to have difficult conversations
How to have difficult conversations
Rajiv Jayarajah, MAppComm, ACC
Introduction to Data Science
Introduction to Data Science
Christy Abraham Joy
Time Management & Productivity - Best Practices
Time Management & Productivity - Best Practices
Vit Horky
The six step guide to practical project management
The six step guide to practical project management
MindGenius
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
RachelPearson36
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Applitools
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
GetSmarter
ChatGPT webinar slides
ChatGPT webinar slides
Alireza Esmikhani
More than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike Routes
Project for Public Spaces & National Center for Biking and Walking
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
DevGAMM Conference
Featured
(20)
Skeleton Culture Code
Skeleton Culture Code
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
Getting into the tech field. what next
Getting into the tech field. what next
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
How to have difficult conversations
How to have difficult conversations
Introduction to Data Science
Introduction to Data Science
Time Management & Productivity - Best Practices
Time Management & Productivity - Best Practices
The six step guide to practical project management
The six step guide to practical project management
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
ChatGPT webinar slides
ChatGPT webinar slides
More than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike Routes
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
SECCIONES TRANSVERSALES MAYO DE TRABAJO.pdf
1.
C. R.: 4263.979 C.
R.: 4263.956 C. R.: 4263.933 C. R.: 4263.910 C. R.: 4263.887 C. R.: 4263.875 C. R.: 4263.864 C. R.: 4263.852 C. R.: 4263.841 C. R.: 4263.818 C. R.: 4263.795 C. R.: 4263.772 C. R.: 4263.749 C. R.: 4263.726 C. R.: 4263.714 C. R.: 4263.703 C. R.: 4263.691 C. R.: 4263.680 C. R.: 4263.657 C. R.: 4263.645 C. R.: 4263.634 C. R.: 4263.611 C. R.: 4263.599 C. R.: 4263.588 C. R.: 4263.576 C. R.: 4263.565 C. R.: 4263.542 C. R.: 4263.530 4264.629 4264.629 4264.652 4264.550 4264.606 4264.606 4265.615 4264.433 4264.583 4264.583 4264.898 4264.472 4264.560 4264.560 4264.510 4264.576 4264.537 4264.537 4264.427 4264.762 4264.525 4264.525 4264.387 4264.712 4264.514 4264.514 4264.586 4264.704 4264.502 4264.502 4264.459 4264.640 4264.491 4264.491 4264.626 4264.478 4264.468 4264.468 4264.945 4264.609 4264.445 4264.445 4264.841 4264.512 4264.422 4264.422 4264.565 4264.537 4264.399 4264.399 4264.577 4264.511 4264.376 4264.376 4265.315 4264.412 4264.364 4264.364 4265.193 4264.287 4264.353 4264.353 4264.925 4264.219 4264.341 4264.341 4265.100 4264.219 4264.330 4264.330 4264.761 4264.281 4264.307 4264.307 4264.975 4264.258 4264.295 4264.295 4264.377 4264.462 4264.284 4264.284 4264.303 4264.267 4264.261 4264.261 4264.197 4264.179 4264.249 4264.249 4264.220 4264.095 4264.238 4264.238 4264.186 4264.100 4264.226 4264.226 4264.300 4264.088 4264.215 4264.215 4264.186 4264.174 4264.192 4264.192 4264.190 4264.179 4264.180 4264.180 4264.115 4264.280 PROGRESIVA 4262 4263 4264 4265 4266 4267 4262 4263 4264 4265 4266 4267 -6 -4 -2 0 2 4 6 C.T.= 4263.889 C.D.= 4263.704 PROGRESIVA 4262 4263 4264 4265 4266 4267 4262 4263 4264 4265 4266 4267 -6 -4 -2 0 2 4 6 C.T.= 4264.235 C.D.= 4263.681 PROGRESIVA 4262 4263 4264 4265 4266 4267 4262 4263 4264 4265 4266 4267 -6 -4 -2 0 2 4 6 C.T.= 4263.891 C.D.= 4263.658 PROGRESIVA 4261 4262 4263 4264 4265 4266 4261 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.828 C.D.= 4263.635 PROGRESIVA 4262 4263 4264 4265 4266 4267 4262 4263 4264 4265 4266 4267 -6 -4 -2 0 2 4 6 C.T.= 4263.999 C.D.= 4263.612 PROGRESIVA 4262 4263 4264 4265 4266 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4264.185 C.D.= 4263.600 PROGRESIVA 4262 4263 4264 4265 4266 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.826 C.D.= 4263.589 PROGRESIVA 4262 4263 4264 4265 4266 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.965 C.D.= 4263.577 PROGRESIVA 4262 4263 4264 4265 4266 4267 4262 4263 4264 4265 4266 4267 -6 -4 -2 0 2 4 6 C.T.= 4263.801 C.D.= 4263.566 PROGRESIVA 4262 4263 4264 4265 4266 4267 4262 4263 4264 4265 4266 4267 -6 -4 -2 0 2 4 6 C.T.= 4263.849 C.D.= 4263.543 PROGRESIVA 4262 4263 4264 4265 4266 4267 4262 4263 4264 4265 4266 4267 -6 -4 -2 0 2 4 6 C.T.= 4263.746 C.D.= 4263.520 PROGRESIVA 4262 4263 4264 4265 4266 4267 4262 4263 4264 4265 4266 4267 -6 -4 -2 0 2 4 6 C.T.= 4263.736 C.D.= 4263.497 PROGRESIVA 4262 4263 4264 4265 4266 4267 4262 4263 4264 4265 4266 4267 -6 -4 -2 0 2 4 6 C.T.= 4263.713 C.D.= 4263.474 PROGRESIVA 4262 4263 4264 4265 4266 4267 4262 4263 4264 4265 4266 4267 -6 -4 -2 0 2 4 6 C.T.= 4263.715 C.D.= 4263.351 PROGRESIVA 4262 4263 4264 4265 4266 4267 4262 4263 4264 4265 4266 4267 -6 -4 -2 0 2 4 6 C.T.= 4263.760 C.D.= 4263.439 PROGRESIVA 4262 4263 4264 4265 4266 4267 4262 4263 4264 4265 4266 4267 -6 -4 -2 0 2 4 6 C.T.= 4263.750 C.D.= 4263.428 PROGRESIVA 4262 4263 4264 4265 4266 4267 4262 4263 4264 4265 4266 4267 -6 -4 -2 0 2 4 6 C.T.= 4263.664 C.D.= 4263.416 PROGRESIVA 4262 4263 4264 4265 4266 4267 4262 4263 4264 4265 4266 4267 -6 -4 -2 0 2 4 6 C.T.= 4263.603 C.D.= 4263.405 PROGRESIVA 4262 4263 4264 4265 4266 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.630 C.D.= 4263.382 PROGRESIVA 4262 4263 4264 4265 4266 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.570 C.D.= 4263.370 PROGRESIVA 4262 4263 4264 4265 4266 4267 4262 4263 4264 4265 4266 4267 -6 -4 -2 0 2 4 6 C.T.= 4263.563 C.D.= 4263.359 PROGRESIVA 4261 4262 4263 4264 4265 4266 4261 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.567 C.D.= 4263.336 PROGRESIVA 4261 4262 4263 4264 4265 4266 4261 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.569 C.D.= 4263.324 PROGRESIVA 4261 4262 4263 4264 4265 4266 4261 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.563 C.D.= 4263.313 PROGRESIVA 4262 4263 4264 4265 4266 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.514 C.D.= 4263.301 PROGRESIVA 4262 4263 4264 4265 4266 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.504 C.D.= 4263.290 PROGRESIVA 4262 4263 4264 4265 4266 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.475 C.D.= 4263.267 PROGRESIVA 4262 4263 4264 4265 4266 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.435 C.D.= 4263.255 Ac = Ar = 0.78 0.16 Ac = Ar = 1.83 0.36 Ac = Ar = 1.07 0.22 Ac = Ar = 0.79 0.12 Ac = Ar = 1.07 0.21 Ac = Ar = 1.28 0.33 Ac = Ar = 0.88 0.03 Ac = Ar = 1.24 0.14 Ac = Ar = 1.00 0.02 Ac = Ar = 1.28 0.03 Ac = Ar = 1.23 0.02 Ac = Ar = 0.97 0.08 Ac = Ar = 1.03 0.01 Ac = Ar = 1.46 0.12 Ac = Ar = 1.46 0.26 Ac = Ar = 0.98 0.14 Ac = Ar = 1.19 0.21 Ac = Ar = 0.78 0.09 Ac = Ar = 1.31 0.25 Ac = Ar = 0.79 0.04 Ac = Ar = 0.67 0.12 Ac = Ar = 0.67 0.22 Ac = Ar = 0.75 0.29 Ac = Ar = 0.68 0.25 Ac = Ar = 0.70 0.18 Ac = Ar = 0.68 0.14 Ac = Ar = 0.80 0.12 Ac = Ar = 0.84 0.13 SECCIONES TRANSVERSALES TOPOGRAFIA PLANO DE AVANCE " MEJORAMIENTO DEL SISTEMA DE RIEGO DE LA COMUNIDAD CAMPESINA DE OCORURO, DISTRITO DE OCORURO – ESPINAR – CUSCO” LOCALIDAD OCOR RO DISTRITO OCOR RO PROVINCIA ESPINAR REGIÓN C SCO A O 1/100 GEMS MINISTERIO DE AGRICULTURA Y RIEGO PROGRAMA DE DESARROLO PRODUCTIVO AGRARIO RURAL – AGRO RURAL Ubicación: PLANO: ESPECIALIDAD: DIBUJO: ESCALA: FECHA: EMP. EJECUTORA: LÁMINA N°: I OSCAR CANA A C O E CIP RESIDENTE DE OBRA: ENTIDAD: STR-54 PROGRESIVA LEYENDA Símbolo Descripción NOTA :
2.
C. R.: 4263.519 C.
R.: 4263.496 C. R.: 4263.473 C. R.: 4263.461 C. R.: 4263.450 C. R.: 4263.438 C. R.: 4263.427 C. R.: 4263.404 C. R.: 4263.392 C. R.: 4263.381 C. R.: 4263.358 C. R.: 4263.346 C. R.: 4263.335 C. R.: 4263.312 C. R.: 4263.289 C. R.: 4263.266 C. R.: 4263.254 C. R.: 4263.243 C. R.: 4263.231 C. R.: 4263.220 C. R.: 4263.197 C. R.: 4263.174 C. R.: 4263.162 C. R.: 4263.151 C. R.: 4263.139 C. R.: 4263.128 C. R.: 4263.105 C. R.: 4263.093 4264.169 4264.169 4264.226 4264.227 4264.146 4264.146 4264.414 4264.371 4264.123 4264.123 4264.663 4264.193 4264.111 4264.111 4264.913 4264.152 4264.100 4264.100 4264.801 4264.151 4264.088 4264.088 4264.309 4264.130 4264.077 4264.077 4264.117 4264.233 4264.054 4264.054 4264.323 4263.991 4264.042 4264.042 4264.261 4264.032 4264.031 4264.031 4264.406 4264.076 4264.008 4264.008 4264.112 4263.959 4263.996 4263.996 4264.072 4263.984 4263.985 4263.985 4263.977 4263.984 4263.962 4263.962 4263.941 4264.085 4263.939 4263.939 4263.942 4264.137 4263.916 4263.916 4264.047 4263.922 4263.904 4263.904 4264.002 4264.011 4263.893 4263.893 4263.871 4264.050 4263.881 4263.881 4263.808 4263.958 4263.870 4263.870 4263.841 4263.792 4263.847 4263.847 4263.834 4263.871 4263.824 4263.824 4264.117 4263.797 4263.812 4263.812 4264.271 4263.785 4263.801 4263.801 4264.336 4263.750 4263.789 4263.789 4264.253 4263.642 4263.778 4263.778 4263.964 4263.661 4263.755 4263.755 4263.648 4263.778 4263.743 4263.743 4263.042 4262.899 PROGRESIVA 4262 4263 4264 4265 4266 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.430 C.D.= 4263.444 PROGRESIVA 4262 4263 4264 4265 4266 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.502 C.D.= 4263.421 PROGRESIVA 4262 4263 4264 4265 4266 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.476 C.D.= 4263.198 PROGRESIVA 4262 4263 4264 4265 4266 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.479 C.D.= 4263.186 PROGRESIVA 4262 4263 4264 4265 4266 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.477 C.D.= 4263.175 PROGRESIVA 4262 4263 4264 4265 4266 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.442 C.D.= 4263.163 PROGRESIVA 4262 4263 4264 4265 4266 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.410 C.D.= 4263.152 PROGRESIVA 4262 4263 4264 4265 4266 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.350 C.D.= 4263.329 PROGRESIVA 4262 4263 4264 4265 4266 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.353 C.D.= 4263.317 PROGRESIVA 4262 4263 4264 4265 4266 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.432 C.D.= 4263.106 PROGRESIVA 4262 4263 4264 4265 4266 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.373 C.D.= 4263.083 PROGRESIVA 4262 4263 4264 4265 4266 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.274 C.D.= 4263.071 PROGRESIVA 4262 4263 4264 4265 4266 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.237 C.D.= 4263.060 PROGRESIVA 4261 4262 4263 4264 4265 4266 4261 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.177 C.D.= 4263.037 PROGRESIVA 4262 4263 4264 4265 4266 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.180 C.D.= 4263.214 PROGRESIVA 4262 4263 4264 4265 4266 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.234 C.D.= 4263.191 PROGRESIVA 4262 4263 4264 4265 4266 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.238 C.D.= 4262.979 PROGRESIVA 4261 4262 4263 4264 4265 4266 4261 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.258 C.D.= 4262.968 PROGRESIVA 4261 4262 4263 4264 4265 4266 4261 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.272 C.D.= 4262.956 PROGRESIVA 4261 4262 4263 4264 4265 4266 4261 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.187 C.D.= 4262.945 PROGRESIVA 4262 4263 4264 4265 4266 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.054 C.D.= 4262.922 PROGRESIVA 4261 4262 4263 4264 4265 4266 4267 4261 4262 4263 4264 4265 4266 4267 -6 -4 -2 0 2 4 6 C.T.= 4263.074 C.D.= 4263.000 PROGRESIVA 4261 4262 4263 4264 4265 4266 4267 4261 4262 4263 4264 4265 4266 4267 -6 -4 -2 0 2 4 6 C.T.= 4263.099 C.D.= 4263.087 PROGRESIVA 4261 4262 4263 4264 4265 4266 4261 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.101 C.D.= 4263.076 PROGRESIVA 4261 4262 4263 4264 4265 4266 4261 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.078 C.D.= 4262.864 PROGRESIVA 4261 4262 4263 4264 4265 4261 4262 4263 4264 4265 -6 -4 -2 0 2 4 6 C.T.= 4263.056 C.D.= 4262.853 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4263.118 C.D.= 4262.830 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4263.047 C.D.= 4262.818 Ac = Ar = 0.85 0.06 Ac = Ar = 1.19 0.00 Ac = Ar = 1.11 0.00 Ac = Ar = 1.22 0.06 Ac = Ar = 0.89 0.03 Ac = Ar = 0.98 0.05 Ac = Ar = 0.92 0.09 Ac = Ar = 0.80 0.16 Ac = Ar = 0.94 0.06 Ac = Ar = 1.18 0.06 Ac = Ar = 0.89 0.15 Ac = Ar = 0.83 0.11 Ac = Ar = 0.74 0.11 Ac = Ar = 0.68 0.10 Ac = Ar = 0.89 0.04 Ac = Ar = 0.83 0.09 Ac = Ar = 0.93 0.03 Ac = Ar = 0.93 0.06 Ac = Ar = 0.79 0.19 Ac = Ar = 0.80 0.33 Ac = Ar = 0.79 0.07 Ac = Ar = 0.90 0.06 Ac = Ar = 0.90 0.06 Ac = Ar = 0.90 0.12 Ac = Ar = 0.83 0.30 Ac = Ar = 0.52 0.21 Ac = Ar = 0.75 0.09 Ac = Ar = 0.55 0.57 4265 4265 4265 4265 4266 4266 SECCIONES TRANSVERSALES TOPOGRAFIA PLANO DE AVANCE “MEJORAMIENTO DEL SISTEMA DE RIEGO DE LA COMUNIDAD CAMPESINA DE OCORURO, DISTRITO DE OCORURO – ESPINAR – CUSCO” LOCALIDAD OCOR RO DISTRITO OCOR RO PROVINCIA ESPINAR REGIÓN C SCO A O 1/100 GEMS MINISTERIO DE AGRICULTURA Y RIEGO PROGRAMA DE DESARROLO PRODUCTIVO AGRARIO RURAL – AGRO RURAL Ubicación: PLANO: ESPECIALIDAD: DIBUJO: ESCALA: FECHA: EMP. EJECUTORA: LÁMINA N°: I OSCAR CANA A C O E CIP RESIDENTE DE OBRA: ENTIDAD: STR-55 PROGRESIVA LEYENDA Símbolo Descripción NOTA :
3.
C. R.: 4263.082 C.
R.: 4263.059 C. R.: 4263.036 C. R.: 4263.013 C. R.: 4262.990 C. R.: 4262.967 C. R.: 4262.944 C. R.: 4262.921 C. R.: 4262.898 C. R.: 4262.886 C. R.: 4262.875 C. R.: 4262.852 C. R.: 4262.840 C. R.: 4262.829 C. R.: 4262.806 C. R.: 4262.794 C. R.: 4262.783 C. R.: 4262.760 C. R.: 4262.748 C. R.: 4262.737 C. R.: 4262.725 C. R.: 4262.714 C. R.: 4262.702 C. R.: 4262.691 C. R.: 4262.668 C. R.: 4262.641 C. R.: 4262.614 C. R.: 4262.587 C. R.: 4262.573 C. R.: 4262.560 C. R.: 4262.546 C. R.: 4262.533 4263.732 4263.732 4263.170 4263.242 4263.709 4263.709 4263.712 4263.705 4263.686 4263.686 4263.794 4263.814 4263.663 4263.663 4263.953 4263.559 4263.640 4263.640 4264.113 4263.498 4263.617 4263.617 4263.963 4263.521 4263.594 4263.594 4263.903 4263.495 4263.571 4263.571 4263.743 4263.507 4263.548 4263.548 4263.836 4263.501 4263.536 4263.536 4263.723 4263.455 4263.525 4263.525 4263.493 4263.616 4263.502 4263.502 4263.385 4263.603 4263.490 4263.490 4263.388 4263.467 4263.479 4263.479 4263.335 4263.333 4263.456 4263.456 4263.419 4263.450 4263.444 4263.444 4263.679 4263.537 4263.433 4263.433 4263.881 4263.722 4263.410 4263.410 4263.688 4263.337 4263.398 4263.398 4263.410 4263.516 4263.387 4263.387 4263.394 4263.247 4263.375 4263.375 4263.457 4263.310 4263.364 4263.364 4263.427 4263.505 4263.352 4263.352 4263.320 4263.353 4263.341 4263.341 4263.204 4263.426 4263.318 4263.318 4263.353 4263.492 4263.291 4263.291 4263.372 4263.432 4263.264 4263.264 4263.226 4263.515 4263.237 4263.237 4263.416 4263.486 4263.223 4263.223 4263.503 4263.492 4263.210 4263.210 4263.545 4263.562 4263.196 4263.196 4263.406 4263.505 4263.183 4263.183 4263.003 4263.564 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4263.112 C.D.= 4262.807 PROGRESIVA 4261 4262 4263 4264 4265 4261 4262 4263 4264 4265 -6 -4 -2 0 2 4 6 C.T.= 4263.232 C.D.= 4262.784 PROGRESIVA 4261 4262 4263 4264 4265 4261 4262 4263 4264 4265 -6 -4 -2 0 2 4 6 C.T.= 4263.157 C.D.= 4262.761 PROGRESIVA 4261 4262 4263 4264 4265 4261 4262 4263 4264 4265 -6 -4 -2 0 2 4 6 C.T.= 4263.007 C.D.= 4262.738 PROGRESIVA 4261 4262 4263 4264 4265 4266 4261 4262 4263 4264 4265 4266 -6 -4 -2 0 2 4 6 C.T.= 4263.017 C.D.= 4262.715 PROGRESIVA 4261 4262 4263 4264 4265 4261 4262 4263 4264 4265 -6 -4 -2 0 2 4 6 C.T.= 4262.923 C.D.= 4262.692 PROGRESIVA 4261 4262 4263 4264 4265 4261 4262 4263 4264 4265 -6 -4 -2 0 2 4 6 C.T.= 4262.950 C.D.= 4262.669 PROGRESIVA 4261 4262 4263 4264 4265 4261 4262 4263 4264 4265 -6 -4 -2 0 2 4 6 C.T.= 4262.904 C.D.= 4262.646 PROGRESIVA 4261 4262 4263 4264 4265 4261 4262 4263 4264 4265 -6 -4 -2 0 2 4 6 C.T.= 4262.920 C.D.= 4262.623 PROGRESIVA 4261 4262 4263 4264 4265 4261 4262 4263 4264 4265 -6 -4 -2 0 2 4 6 C.T.= 4262.859 C.D.= 4262.611 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.813 C.D.= 4262.600 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.603 C.D.= 4262.677 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.538 C.D.= 4262.565 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.597 C.D.= 4262.654 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.540 C.D.= 4262.531 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.626 C.D.= 4262.519 PROGRESIVA 4261 4262 4263 4264 4265 4261 4262 4263 4264 4265 -6 -4 -2 0 2 4 6 C.T.= 4262.853 C.D.= 4262.508 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.734 C.D.= 4262.485 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.911 C.D.= 4262.473 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.949 C.D.= 4262.462 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.835 C.D.= 4262.450 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.714 C.D.= 4262.439 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.604 C.D.= 4262.427 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.506 C.D.= 4262.416 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.633 C.D.= 4262.393 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.602 C.D.= 4262.366 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.572 C.D.= 4262.339 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.497 C.D.= 4262.312 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.466 C.D.= 4262.298 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.436 C.D.= 4262.285 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.454 C.D.= 4262.271 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.525 C.D.= 4262.258 Ac = Ar = 0.88 0.56 Ac = Ar = 1.00 0.23 Ac = Ar = 0.88 0.22 Ac = Ar = 0.79 0.11 Ac = Ar = 1.04 0.18 Ac = Ar = 0.96 0.10 Ac = Ar = 0.91 0.07 Ac = Ar = 0.85 0.07 Ac = Ar = 1.12 0.19 Ac = Ar = 1.05 0.27 Ac = Ar = 0.73 0.04 Ac = Ar = 0.61 0.10 Ac = Ar = 0.66 0.18 Ac = Ar = 0.69 0.23 Ac = Ar = 0.74 0.31 Ac = Ar = 1.03 0.11 Ac = Ar = 1.29 0.03 Ac = Ar = 1.05 0.28 Ac = Ar = 1.00 0.13 Ac = Ar = 1.34 0.31 Ac = Ar = 1.07 0.19 Ac = Ar = 0.99 0.05 Ac = Ar = 0.75 0.08 Ac = Ar = 0.58 0.17 Ac = Ar = 0.88 0.06 Ac = Ar = 0.88 0.04 Ac = Ar = 0.67 0.14 Ac = Ar = 0.60 0.12 Ac = Ar = 0.60 0.07 Ac = Ar = 0.65 0.06 Ac = Ar = 0.60 0.11 Ac = Ar = 1.02 0.46 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 SECCIONES TRANSVERSALES TOPOGRAFIA PLANO DE AVANCE “MEJORAMIENTO DEL SISTEMA DE RIEGO DE LA COMUNIDAD CAMPESINA DE OCORURO, DISTRITO DE OCORURO – ESPINAR – CUSCO” LOCALIDAD OCOR RO DISTRITO OCOR RO PROVINCIA ESPINAR REGIÓN C SCO A O 1/100 GEMS MINISTERIO DE AGRICULTURA Y RIEGO PROGRAMA DE DESARROLO PRODUCTIVO AGRARIO RURAL – AGRO RURAL Ubicación: PLANO: ESPECIALIDAD: DIBUJO: ESCALA: FECHA: EMP. EJECUTORA: LÁMINA N°: I OSCAR CANA A C O E CIP RESIDENTE DE OBRA: ENTIDAD: STR-56 PROGRESIVA LEYENDA Símbolo Descripción NOTA :
4.
C. R.: 4262.519 C.
R.: 4262.506 C. R.: 4262.479 C. R.: 4262.452 C. R.: 4262.425 C. R.: 4262.411 C. R.: 4262.398 C. R.: 4262.384 C. R.: 4262.371 C. R.: 4262.357 C. R.: 4262.344 C. R.: 4262.330 C. R.: 4262.317 C. R.: 4262.290 C. R.: 4262.276 C. R.: 4262.263 C. R.: 4262.236 C. R.: 4262.209 C. R.: 4262.182 C. R.: 4262.168 C. R.: 4262.155 C. R.: 4262.141 C. R.: 4262.128 C. R.: 4262.101 C. R.: 4262.074 C. R.: 4262.060 C. R.: 4262.047 C. R.: 4262.020 4263.169 4263.169 4263.143 4263.295 4263.156 4263.156 4263.107 4263.133 4263.129 4263.129 4263.108 4262.878 4263.102 4263.102 4263.092 4262.854 4263.075 4263.075 4262.884 4262.879 4263.061 4263.061 4262.718 4262.812 4263.048 4263.048 4262.829 4262.939 4263.034 4263.034 4262.906 4263.032 4263.021 4263.021 4263.109 4262.953 4263.007 4263.007 4263.044 4263.062 4262.994 4262.994 4262.696 4262.949 4262.980 4262.980 4262.730 4262.918 4262.967 4262.967 4262.770 4262.881 4262.940 4262.940 4262.906 4262.682 4262.926 4262.926 4262.932 4262.710 4262.913 4262.913 4262.998 4262.700 4262.886 4262.886 4263.150 4262.628 4262.859 4262.859 4263.193 4262.637 4262.832 4262.832 4263.101 4262.694 4262.818 4262.818 4263.038 4262.737 4262.805 4262.805 4263.229 4262.691 4262.791 4262.791 4263.268 4262.671 4262.778 4262.778 4263.331 4262.665 4262.751 4262.751 4263.072 4262.656 4262.724 4262.724 4262.723 4262.535 4262.710 4262.710 4262.706 4262.523 4262.697 4262.697 4262.990 4262.526 4262.670 4262.670 4263.330 4262.508 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.499 C.D.= 4262.244 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.432 C.D.= 4262.231 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.402 C.D.= 4262.204 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.245 C.D.= 4262.177 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.322 C.D.= 4262.150 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.326 C.D.= 4262.136 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.292 C.D.= 4262.123 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.129 C.D.= 4262.109 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.847 C.D.= 4262.096 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.423 C.D.= 4262.082 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.258 C.D.= 4262.069 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.175 C.D.= 4262.055 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.165 C.D.= 4262.042 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.199 C.D.= 4262.015 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.184 C.D.= 4262.001 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.141 C.D.= 4261.988 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.080 C.D.= 4261.961 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.043 C.D.= 4261.934 PROGRESIVA 4261 4262 4263 4264 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4262.007 C.D.= 4261.907 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.991 C.D.= 4261893 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.978 C.D.= 4261.880 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.969 C.D.= 4261.866 PROGRESIVA 4260 4261 4262 4263 4264 4265 4260 4261 4262 4263 4264 4265 -6 -4 -2 0 2 4 6 C.T.= 4261.967 C.D.= 4261.853 PROGRESIVA 4260 4261 4262 4263 4264 4265 4260 4261 4262 4263 4264 4265 -6 -4 -2 0 2 4 6 C.T.= 4261.969 C.D.= 4261.826 PROGRESIVA 4260 4261 4262 4263 4264 4265 4260 4261 4262 4263 4264 4265 -6 -4 -2 0 2 4 6 C.T.= 4261.912 C.D.= 4261.799 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.919 C.D.= 4261.885 PROGRESIVA 4260 4261 4262 4263 4264 4265 4260 4261 4262 4263 4264 4265 -6 -4 -2 0 2 4 6 C.T.= 4261.952 C.D.= 4261.772 PROGRESIVA 4260 4261 4262 4263 4264 4265 4260 4261 4262 4263 4264 4265 -6 -4 -2 0 2 4 6 C.T.= 4261.813 C.D.= 4261.745 Ac = Ar = 0.54 0.32 Ac = Ar = 0.44 0.36 Ac = Ar = 0.57 0.58 Ac = Ar = 0.45 0.65 Ac = Ar = 0.34 0.48 Ac = Ar = 0.70 0.71 Ac = Ar = 0.38 0.55 Ac = Ar = 0.13 0.39 Ac = Ar = 1.75 0.08 Ac = Ar = 0.91 0.08 Ac = Ar = 0.93 0.57 Ac = Ar = 0.50 0.37 Ac = Ar = 0.43 0.38 Ac = Ar = 0.48 0.46 Ac = Ar = 0.48 0.39 Ac = Ar = 0.43 0.36 Ac = Ar = 0.50 0.43 Ac = Ar = 0.48 0.39 Ac = Ar = 0.49 0.28 Ac = Ar = 0.48 0.23 Ac = Ar = 0.55 0.20 Ac = Ar = 0.67 0.18 Ac = Ar = 0.72 0.17 Ac = Ar = 0.60 0.23 Ac = Ar = 0.30 0.30 Ac = Ar = 0.49 0.30 Ac = Ar = 0.67 0.25 Ac = Ar = 0.80 0.25 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 4265 SECCIONES TRANSVERSALES TOPOGRAFIA PLANO DE AVANCE “MEJORAMIENTO DEL SISTEMA DE RIEGO DE LA COMUNIDAD CAMPESINA DE OCORURO, DISTRITO DE OCORURO – ESPINAR – CUSCO” LOCALIDAD OCOR RO DISTRITO OCOR RO PROVINCIA ESPINAR REGIÓN C SCO A O 1/100 GEMS MINISTERIO DE AGRICULTURA Y RIEGO PROGRAMA DE DESARROLO PRODUCTIVO AGRARIO RURAL – AGRO RURAL Ubicación: PLANO: ESPECIALIDAD: DIBUJO: ESCALA: FECHA: EMP. EJECUTORA: LÁMINA N°: I OSCAR CANA A C O E CIP RESIDENTE DE OBRA: ENTIDAD: STR-57 PROGRESIVA LEYENDA Símbolo Descripción NOTA :
5.
C. R.: 4261.993 C.
R.: 4261.979 C. R.: 4261.966 C. R.: 4261.952 C. R.: 4261.939 C. R.: 4261.912 C. R.: 4261.898 C. R.: 4261.885 C. R.: 4261.858 C. R.: 4261.844 C. R.: 4261.831 C. R.: 4261.804 C. R.: 4261.777 C. R.: 4261.763 C. R.: 4261.750 C. R.: 4261.723 C. R.: 4261.709 C. R.: 4261.696 C. R.: 4261.669 C. R.: 4261.655 C. R.: 4261.642 C. R.: 4261.615 C. R.: 4261.588 C. R.: 4261.574 C. R.: 4261.561 C. R.: 4261.547 C. R.: 4261.534 C. R.: 4261.507 C. R.: 4261.493 C. R.: 4261.480 C. R.: 4261.466 C. R.: 4261.453 4262.643 4262.643 4263.230 4262.436 4262.629 4262.629 4263.183 4262.442 4262.616 4262.616 4263.190 4262.405 4262.602 4262.602 4263.143 4262.419 4262.589 4262.589 4263.048 4262.419 4262.562 4262.562 4262.715 4262.379 4262.548 4262.548 4262.527 4262.444 4262.535 4262.535 4262.490 4262.440 4262.508 4262.508 4262.526 4262.325 4262.494 4262.494 4262.533 4262.316 4262.481 4262.481 4262.488 4262.346 4262.454 4262.454 4262.447 4262.347 4262.427 4262.427 4262.909 4262.233 4262.413 4262.413 4262.784 4262.153 4262.400 4262.400 4262.599 4262.179 4262.373 4262.373 4262.414 4262.330 4262.359 4262.359 4262.720 4262.200 4262.346 4262.346 4262.952 4262.196 4262.319 4262.319 4262.445 4261.363 4262.305 4262.305 4262.647 4261.818 4262.292 4262.292 4262.884 4262.144 4262.265 4262.265 4262.825 4262.519 4262.238 4262.238 4262.816 4262.405 4262.224 4262.224 4262.889 4262.208 4262.211 4262.211 4262.796 4262.036 4262.197 4262.197 4262.822 4262.074 4262.184 4262.184 4262.742 4262.083 4262.157 4262.157 4262.738 4262.147 4262.143 4262.143 4261.905 4262.212 4262.130 4262.130 4261.866 4262.136 4262.116 4262.116 4261.852 4262.096 4262.103 4262.103 4261.938 4262.047 PROGRESIVA 4260 4261 4262 4263 4264 4265 4260 4261 4262 4263 4264 4265 -6 -4 -2 0 2 4 6 C.T.= 4261.797 C.D.= 4261.718 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.814 C.D.= 4261.704 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.822 C.D.= 4261.691 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.809 C.D.= 4261.677 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.785 C.D.= 4261.664 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.807 C.D.= 4261.637 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.778 C.D.= 4261.623 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.772 C.D.= 4261.610 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.735 C.D.= 4261.583 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.714 C.D.= 4261.569 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.714 C.D.= 4261.556 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.716 C.D.= 4261.529 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.666 C.D.= 4261.502 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.657 C.D.= 4261.488 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.639 C.D.= 4261.475 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.616 C.D.= 4261.448 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.585 C.D.= 4261.434 PROGRESIVA 4260 4261 4262 4263 4264 4265 4260 4261 4262 4263 4264 4265 -6 -4 -2 0 2 4 6 C.T.= 4261.579 C.D.= 4261.421 PROGRESIVA 4260 4261 4262 4263 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4261.555 C.D.= 4261.394 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.685 C.D.= 4261.380 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.486 C.D.= 4261.367 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.454 C.D.= 4261.340 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.382 C.D.= 4261.313 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.364 C.D.= 4261.399 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.337 C.D.= 4261.286 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.325 C.D.= 4261.272 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.376 C.D.= 4261.259 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.366 C.D.= 4261.232 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.353 C.D.= 4261.218 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.360 C.D.= 4261.205 PROGRESIVA 4260 4261 4262 4263 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4261.376 C.D.= 4261.191 PROGRESIVA 4260 4261 4262 4263 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4261.336 C.D.= 4261.178 Ac = Ar = 0.73 0.27 Ac = Ar = 0.86 0.24 Ac = Ar = 1.05 0.25 Ac = Ar = 0.94 0.20 Ac = Ar = 0.69 0.22 Ac = Ar = 0.64 0.25 Ac = Ar = 0.64 0.21 Ac = Ar = 0.64 0.21 Ac = Ar = 0.63 0.29 Ac = Ar = 0.67 0.37 Ac = Ar = 0.61 0.29 Ac = Ar = 0.55 0.19 Ac = Ar = 0.68 0.21 Ac = Ar = 0.89 0.22 Ac = Ar = 0.79 0.19 Ac = Ar = 0.69 0.12 Ac = Ar = 1.24 0.29 Ac = Ar = 1.46 0.31 Ac = Ar = 0.85 1.06 Ac = Ar = 1.30 0.56 Ac = Ar = 1.45 0.21 Ac = Ar = 0.95 0.18 Ac = Ar = 1.06 0.05 Ac = Ar = 1.27 0.17 Ac = Ar = 0.84 0.11 Ac = Ar = 0.94 0.17 Ac = Ar = 0.74 0.10 Ac = Ar = 0.76 0.26 Ac = Ar = 0.57 0.24 Ac = Ar = 0.57 0.25 Ac = Ar = 0.73 0.29 Ac = Ar = 0.69 0.27 SECCIONES TRANSVERSALES TOPOGRAFIA PLANO DE AVANCE “MEJORAMIENTO DEL SISTEMA DE RIEGO DE LA COMUNIDAD CAMPESINA DE OCORURO, DISTRITO DE OCORURO – ESPINAR – CUSCO” LOCALIDAD OCOR RO DISTRITO OCOR RO PROVINCIA ESPINAR REGIÓN C SCO A O 1/100 GEMS MINISTERIO DE AGRICULTURA Y RIEGO PROGRAMA DE DESARROLO PRODUCTIVO AGRARIO RURAL – AGRO RURAL Ubicación: PLANO: ESPECIALIDAD: DIBUJO: ESCALA: FECHA: EMP. EJECUTORA: LÁMINA N°: I OSCAR CANA A C O E CIP RESIDENTE DE OBRA: ENTIDAD: STR-58 PROGRESIVA LEYENDA Símbolo Descripción NOTA :
6.
C. R.: 4261.426 C.
R.: 4261.399 C. R.: 4261.372 C. R.: 4261.358 C. R.: 4261.345 C. R.: 4261.318 C. R.: 4261.304 C. R.: 4261.291 C. R.: 4261.264 C. R.: 4261.250 C. R.: 4261.237 C. R.: 4261.210 C. R.: 4261.183 C. R.: 4261.156 C. R.: 4261.142 C. R.: 4261.129 C. R.: 4261.102 C. R.: 4261.075 C. R.: 4261.048 C. R.: 4261.034 C. R.: 4261.021 C. R.: 4261.007 C. R.: 4260.994 C. R.: 4260.980 C. R.: 4260.967 C. R.: 4260.940 C. R.: 4260.913 C. R.: 4260.899 C. R.: 4260.886 C. R.: 4260.872 C. R.: 4260.859 C. R.: 4260.832 4262.076 4262.076 4262.003 4262.067 4262.049 4262.049 4261.901 4262.053 4262.022 4262.022 4261.906 4262.051 4262.008 4262.008 4262.309 4261.927 4261.995 4261.995 4261.935 4261.914 4261.968 4261.968 4262.271 4261.768 4261.954 4261.954 4262.302 4261.669 4261.941 4261.941 4261.966 4261.739 4261.914 4261.914 4262.426 4261.805 4261.900 4261.900 4262.034 4261.761 4261.887 4261.887 4261.914 4261.754 4261.860 4261.860 4261.856 4261.785 4261.833 4261.833 4261.717 4261.749 4261.806 4261.806 4261.703 4261.701 4261.792 4261.792 4261.666 4261.785 4261.779 4261.779 4261.724 4261.827 4261.752 4261.752 4261.465 4261.809 4261.725 4261.725 4261.571 4261.688 4261.698 4261.698 4261.503 4261.667 4261.684 4261.684 4261.541 4261.669 4261.671 4261.671 4261.532 4261.664 4261.657 4261.657 4261.413 4261.685 4261.644 4261.644 4261.320 4261.591 4261.630 4261.630 4261.258 4261.443 4261.617 4261.617 4261.340 4261.449 4261.590 4261.590 4261.451 4261.412 4261.563 4261.563 4261.425 4261.426 4261.549 4261.549 4261.432 4261.475 4261.536 4261.536 4261.415 4261.508 4261.522 4261.522 4261.475 4261.484 4261.509 4261.509 4261.457 4261.484 4261.482 4261.482 4261.353 4261.460 PROGRESIVA 4260 4261 4262 4263 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4261.256 C.D.= 4261.151 PROGRESIVA 4260 4261 4262 4263 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4261.230 C.D.= 4261.124 PROGRESIVA 4260 4261 4262 4263 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4261.241 C.D.= 4261.097 PROGRESIVA 4260 4261 4262 4263 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4261.186 C.D.= 4261.083 PROGRESIVA 4260 4261 4262 4263 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4261.160 C.D.= 4261.070 PROGRESIVA 4260 4261 4262 4263 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4261.327 C.D.= 4261.043 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.351 C.D.= 4261.029 PROGRESIVA 4260 4261 4262 4263 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4261.193 C.D.= 4261.016 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.145 C.D.= 4261.989 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.151 C.D.= 4261.975 PROGRESIVA 4260 4261 4262 4263 4264 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4261.166 C.D.= 4261.962 PROGRESIVA 4260 4261 4262 4263 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4261.100 C.D.= 4260.935 PROGRESIVA 4260 4261 4262 4263 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4261.089 C.D.= 4260.908 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4261.002 C.D.= 4260.881 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4261.005 C.D.= 4260.867 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.981 C.D.= 4260.854 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4261.062 C.D.= 4260.827 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4261.004 C.D.= 4260.800 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4261.013 C.D.= 4260.773 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4261.031 C.D.= 4260.759 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.957 C.D.= 4260.746 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.988 C.D.= 4260.732 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.986 C.D.= 4260.719 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.957 C.D.= 4260.705 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.941 C.D.= 4260.692 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.889 C.D.= 4260.665 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.819 C.D.= 4260.638 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.787 C.D.= 4260.624 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.793 C.D.= 4260.611 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.803 C.D.= 4260.597 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.778 C.D.= 4260.584 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.751 C.D.= 4260.557 Ac = Ar = 0.61 0.15 Ac = Ar = 0.70 0.22 Ac = Ar = 0.60 0.20 Ac = Ar = 0.56 0.23 Ac = Ar = 0.47 0.33 Ac = Ar = 0.76 0.32 Ac = Ar = 0.93 0.45 Ac = Ar = 0.43 0.39 Ac = Ar = 0.65 0.31 Ac = Ar = 0.64 0.44 Ac = Ar = 0.60 0.46 Ac = Ar = 0.61 0.38 Ac = Ar = 0.47 0.47 Ac = Ar = 0.48 0.23 Ac = Ar = 0.58 0.23 Ac = Ar = 0.47 0.14 Ac = Ar = 0.62 0.34 Ac = Ar = 0.62 0.32 Ac = Ar = 0.71 0.39 Ac = Ar = 0.66 0.27 Ac = Ar = 0.67 0.41 Ac = Ar = 0.61 0.36 Ac = Ar = 0.62 0.44 Ac = Ar = 0.59 0.62 Ac = Ar = 0.55 0.64 Ac = Ar = 0.60 0.47 Ac = Ar = 0.55 0.45 Ac = Ar = 0.55 0.37 Ac = Ar = 0.55 0.29 Ac = Ar = 0.67 0.35 Ac = Ar = 0.58 0.32 Ac = Ar = 0.55 0.41 4264 4264 4264 4264 4264 4264 4264 4264 4264 4264 4264 4264 4264 4264 4264 4264 4264 4264 SECCIONES TRANSVERSALES TOPOGRAFIA PLANO DE AVANCE “MEJORAMIENTO DEL SISTEMA DE RIEGO DE LA COMUNIDAD CAMPESINA DE OCORURO, DISTRITO DE OCORURO – ESPINAR – CUSCO” LOCALIDAD OCOR RO DISTRITO OCOR RO PROVINCIA ESPINAR REGIÓN C SCO A O 1/100 GEMS MINISTERIO DE AGRICULTURA Y RIEGO PROGRAMA DE DESARROLO PRODUCTIVO AGRARIO RURAL – AGRO RURAL Ubicación: PLANO: ESPECIALIDAD: DIBUJO: ESCALA: FECHA: EMP. EJECUTORA: LÁMINA N°: I OSCAR CANA A C O E CIP RESIDENTE DE OBRA: ENTIDAD: STR-59 PROGRESIVA LEYENDA Símbolo Descripción NOTA :
7.
C. R.: 4260.805 C.
R.: 4260.778 C. R.: 4260.751 C. R.: 4260.737 C. R.: 4260.724 C. R.: 4260.697 C. R.: 4260.670 C. R.: 4260.656 C. R.: 4260.643 C. R.: 4260.616 C. R.: 4260.602 C. R.: 4260.589 C. R.: 4260.562 C. R.: 4260.548 C. R.: 4260.535 C. R.: 4260.508 C. R.: 4260.494 C. R.: 4260.481 C. R.: 4260.454 C. R.: 4260.427 C. R.: 4260.413 C. R.: 4260.400 C. R.: 4260.386 C. R.: 4260.373 C. R.: 4260.359 C. R.: 4260.346 C. R.: 4260.319 C. R.: 4260.292 4261.455 4261.455 4261.315 4261.418 4261.428 4261.428 4261.300 4261.390 4261.401 4261.401 4261.391 4261.247 4261.387 4261.387 4261.500 4261.207 4261.374 4261.374 4261.616 4261.137 4261.347 4261.347 4261.306 4261.230 4261.320 4261.320 4261.207 4261.169 4261.306 4261.306 4261.245 4261.150 4261.293 4261.293 4261.244 4261.126 4261.266 4261.266 4261.180 4260.974 4261.252 4261.252 4260.938 4260.999 4261.239 4261.239 4261.199 4260.981 4261.212 4261.212 4261.172 4261.056 4261.198 4261.198 4261.321 4261.007 4261.185 4261.185 4261.233 4261.001 4261.158 4261.158 4261.121 4260.972 4261.144 4261.144 4261.328 4260.983 4261.131 4261.131 4261.124 4261.050 4261.104 4261.104 4261.146 4260.983 4261.077 4261.077 4261.127 4260.931 4261.063 4261.063 4261.209 4260.904 4261.050 4261.050 4261.286 4260.765 4261.036 4261.036 4261.220 4260.790 4261.023 4261.023 4261.277 4260.773 4261.009 4261.009 4261.194 4260.741 4260.996 4260.996 4261.225 4260.755 4260.969 4260.969 4261.160 4260.782 4260.942 4260.942 4261.172 4260.704 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.702 C.D.= 4260.530 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.664 C.D.= 4260.503 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.629 C.D.= 4260.476 PROGRESIVA 4259 4260 4261 4262 4263 4264 4259 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4260.624 C.D.= 4260.462 PROGRESIVA 4259 4260 4261 4262 4263 4264 4259 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4260.625 C.D.= 4260.449 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.580 C.D.= 4260.422 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.502 C.D.= 4260.395 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.503 C.D.= 4260.381 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.485 C.D.= 4260.368 PROGRESIVA 4258 4259 4260 4261 4262 4263 4258 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.291 C.D.= 4260.441 PROGRESIVA 4258 4259 4260 4261 4262 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4260.236 C.D.= 4260.327 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.371 C.D.= 4260.314 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.470 C.D.= 4260.287 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.448 C.D.= 4260.273 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.443 C.D.= 4260.260 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.440 C.D.= 4260.233 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.452 C.D.= 4260.219 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.447 C.D.= 4260.206 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.483 C.D.= 4260.179 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.486 C.D.= 4260.152 PROGRESIVA 4259 4260 4261 4262 4263 4264 4259 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4260.545 C.D.= 4260.138 PROGRESIVA 4259 4260 4261 4262 4263 4264 4259 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4260.594 C.D.= 4260.125 PROGRESIVA 4259 4260 4261 4262 4263 4264 4259 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4260.520 C.D.= 4260.111 PROGRESIVA 4259 4260 4261 4262 4263 4264 4259 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4260.468 C.D.= 4260.098 PROGRESIVA 4259 4260 4261 4262 4263 4264 4259 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4260.406 C.D.= 4260.084 PROGRESIVA 4259 4260 4261 4262 4263 4264 4259 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4260.357 C.D.= 4260.071 PROGRESIVA 4259 4260 4261 4262 4263 4264 4259 4260 4261 4262 4263 4264 -6 -4 -2 0 2 4 6 C.T.= 4260.357 C.D.= 4260.044 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.331 C.D.= 4260.017 Ac = Ar = 0.53 0.41 Ac = Ar = 0.43 0.33 Ac = Ar = 0.48 0.33 Ac = Ar = 0.47 0.36 Ac = Ar = 0.60 0.39 Ac = Ar = 0.43 0.34 Ac = Ar = 0.43 0.40 Ac = Ar = 0.53 0.30 Ac = Ar = 0.48 0.31 Ac = Ar = 0.15 0.40 Ac = Ar = 0.04 0.68 Ac = Ar = 0.55 0.55 Ac = Ar = 0.45 0.39 Ac = Ar = 0.51 0.30 Ac = Ar = 0.52 0.29 Ac = Ar = 0.53 0.37 Ac = Ar = 0.63 0.37 Ac = Ar = 0.59 0.34 Ac = Ar = 0.71 0.30 Ac = Ar = 0.78 0.40 Ac = Ar = 0.95 0.38 Ac = Ar = 1.15 0.40 Ac = Ar = 0.99 0.44 Ac = Ar = 0.95 0.46 Ac = Ar = 1.02 0.42 Ac = Ar = 1.05 0.40 Ac = Ar = 0.90 0.40 Ac = Ar = 0.92 0.41 4263 4263 SECCIONES TRANSVERSALES TOPOGRAFIA PLANO DE AVANCE “MEJORAMIENTO DEL SISTEMA DE RIEGO DE LA COMUNIDAD CAMPESINA DE OCORURO, DISTRITO DE OCORURO – ESPINAR – CUSCO” LOCALIDAD OCOR RO DISTRITO OCOR RO PROVINCIA ESPINAR REGIÓN C SCO A O 1/100 GEMS MINISTERIO DE AGRICULTURA Y RIEGO PROGRAMA DE DESARROLO PRODUCTIVO AGRARIO RURAL – AGRO RURAL Ubicación: PLANO: ESPECIALIDAD: DIBUJO: ESCALA: FECHA: EMP. EJECUTORA: LÁMINA N°: I OSCAR CANA A C O E CIP RESIDENTE DE OBRA: ENTIDAD: STR-60 PROGRESIVA LEYENDA Símbolo Descripción NOTA :
8.
C. R.: 4260.265 C.
R.: 4260.238 C. R.: 4260.211 C. R.: 4260.197 C. R.: 4260.184 C. R.: 4260.157 C. R.: 4260.130 C. R.: 4260.103 C. R.: 4260.076 C. R.: 4260.049 C. R.: 4260.022 C. R.: 4259.995 C. R.: 4259.968 C. R.: 4259.941 C. R.: 4259.927 C. R.: 4259.914 C. R.: 4259.900 C. R.: 4259.887 C. R.: 4259.873 C. R.: 4259.860 C. R.: 4259.833 C. R.: 4259.806 C. R.: 4259.792 C. R.: 4259.779 C. R.: 4259.752 C. R.: 4259.725 C. R.: 4259.698 C. R.: 4259.671 4260.915 4260.915 4260.992 4260.755 4260.888 4260.888 4261.312 4260.525 4260.861 4260.861 4261.241 4260.639 4260.847 4260.847 4261.135 4260.694 4260.834 4260.834 4261.324 4260.680 4260.807 4260.807 4261.079 4260.673 4260.780 4260.780 4261.084 4260.679 4260.753 4260.753 4260.725 4260.747 4260.726 4260.726 4260.770 4260.735 4260.699 4260.699 4260.651 4260.619 4260.672 4260.672 4260.638 4260.597 4260.645 4260.645 4260.959 4260.524 4260.618 4260.618 4260.550 4260.760 4260.591 4260.591 4260.643 4260.674 4260.577 4260.577 4260.600 4260.696 4260.564 4260.564 4260.508 4260.775 4260.550 4260.550 4260.679 4260.590 4260.537 4260.537 4260.608 4260.581 4260.523 4260.523 4260.589 4260.505 4260.510 4260.510 4260.614 4260.418 4260.483 4260.483 4260.694 4260.451 4260.456 4260.456 4260.663 4260.508 4260.442 4260.442 4260.639 4260.484 4260.429 4260.429 4260.629 4260.798 4260.402 4260.402 4260.812 4260.763 4260.375 4260.375 4260.854 4260.532 4260.348 4260.348 4260.853 4260.614 4260.321 4260.321 4260.853 4260.629 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.292 C.D.= 4261.990 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.436 C.D.= 4261.963 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.195 C.D.= 4261.936 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.171 C.D.= 4259.922 PROGRESIVA 4259 4260 4261 4262 4263 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.147 C.D.= 4259.909 PROGRESIVA 4258 4259 4260 4261 4262 4263 4258 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.195 C.D.= 4259.882 PROGRESIVA 4258 4259 4260 4261 4262 4263 4258 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.139 C.D.= 4259.855 PROGRESIVA 4258 4259 4260 4261 4262 4263 4258 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.128 C.D.= 4259.828 PROGRESIVA 4258 4259 4260 4261 4262 4263 4258 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4260.063 C.D.= 4259.801 PROGRESIVA 4258 4259 4260 4261 4262 4263 4258 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4259.962 C.D.= 4259.774 PROGRESIVA 4258 4259 4260 4261 4262 4263 4258 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4259.932 C.D.= 4259.747 PROGRESIVA 4258 4259 4260 4261 4262 4263 4258 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4259.940 C.D.= 4259.720 PROGRESIVA 4258 4259 4260 4261 4262 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.940 C.D.= 4259.693 PROGRESIVA 4258 4259 4260 4261 4262 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.957 C.D.= 4259.666 PROGRESIVA 4258 4259 4260 4261 4262 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.903 C.D.= 4259.652 PROGRESIVA 4258 4259 4260 4261 4262 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.868 C.D.= 4259.639 PROGRESIVA 4258 4259 4260 4261 4262 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.858 C.D.= 4259.625 PROGRESIVA 4258 4259 4260 4261 4262 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.803 C.D.= 4259.612 PROGRESIVA 4258 4259 4260 4261 4262 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.789 C.D.= 4259.598 PROGRESIVA 4258 4259 4260 4261 4262 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.797 C.D.= 4259.585 PROGRESIVA 4258 4259 4260 4261 4262 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.754 C.D.= 4259.558 PROGRESIVA 4258 4259 4260 4261 4262 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.677 C.D.= 4259.531 PROGRESIVA 4258 4259 4260 4261 4262 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.644 C.D.= 4259.517 PROGRESIVA 4258 4259 4260 4261 4262 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.607 C.D.= 4259.504 PROGRESIVA 4258 4259 4260 4261 4262 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.618 C.D.= 4259.477 PROGRESIVA 4258 4259 4260 4261 4262 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.621 C.D.= 4259.450 PROGRESIVA 4258 4259 4260 4261 4262 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.564 C.D.= 4259.423 PROGRESIVA 4258 4259 4260 4261 4262 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.543 C.D.= 4259.396 Ac = Ar = 0.84 0.41 Ac = Ar = 1.36 0.47 Ac = Ar = 1.13 0.42 Ac = Ar = 0.94 0.36 Ac = Ar = 0.88 0.39 Ac = Ar = 0.92 0.32 Ac = Ar = 0.82 0.35 Ac = Ar = 0.74 0.38 Ac = Ar = 0.64 0.18 Ac = Ar = 0.57 0.24 Ac = Ar = 0.67 0.24 Ac = Ar = 0.74 0.31 Ac = Ar = 0.65 0.17 Ac = Ar = 0.77 0.21 Ac = Ar = 0.75 0.15 Ac = Ar = 0.74 0.15 Ac = Ar = 0.69 0.17 Ac = Ar = 0.64 0.12 Ac = Ar = 0.69 0.16 Ac = Ar = 0.73 0.17 Ac = Ar = 0.69 0.09 Ac = Ar = 0.70 0.03 Ac = Ar = 0.62 0.07 Ac = Ar = 0.67 0.03 Ac = Ar = 0.86 0.01 Ac = Ar = 1.04 0.09 Ac = Ar = 1.11 0.03 Ac = Ar = 1.10 0.01 4263 4263 4263 4263 4263 4263 4263 4263 4263 4263 SECCIONES TRANSVERSALES TOPOGRAFIA PLANO DE AVANCE “MEJORAMIENTO DEL SISTEMA DE RIEGO DE LA COMUNIDAD CAMPESINA DE OCORURO, DISTRITO DE OCORURO – ESPINAR – CUSCO” LOCALIDAD OCOR RO DISTRITO OCOR RO PROVINCIA ESPINAR REGIÓN C SCO A O 1/100 GEMS MINISTERIO DE AGRICULTURA Y RIEGO PROGRAMA DE DESARROLO PRODUCTIVO AGRARIO RURAL – AGRO RURAL Ubicación: PLANO: ESPECIALIDAD: DIBUJO: ESCALA: FECHA: EMP. EJECUTORA: LÁMINA N°: I OSCAR CANA A C O E CIP RESIDENTE DE OBRA: ENTIDAD: STR-61 PROGRESIVA LEYENDA Símbolo Descripción NOTA :
9.
C. R.: 4259.644 C.
R.: 4259.617 C. R.: 4259.603 C. R.: 4259.590 C. R.: 4259.576 C. R.: 4259.563 C. R.: 4259.549 C. R.: 4259.536 C. R.: 4259.509 C. R.: 4259.495 C. R.: 4259.482 C. R.: 4259.468 C. R.: 4259.455 C. R.: 4259.441 C. R.: 4259.428 C. R.: 4259.401 C. R.: 4259.374 C. R.: 4259.360 C. R.: 4259.360 C. R.: 4259.522 C. R.: 4259.508 C. R.: 4259.495 C. R.: 4259.468 C. R.: 4259.454 C. R.: 4259.441 C. R.: 4259.427 C. R.: 4259.414 C. R.: 4259.212 C. R.: 4259.198 4260.294 4260.294 4260.949 4260.712 4260.267 4260.267 4260.795 4260.807 4260.253 4260.253 4260.749 4260.721 4260.240 4260.240 4260.918 4260.471 4260.226 4260.226 4260.800 4260.481 4260.213 4260.213 4260.664 4260.458 4260.199 4260.199 4260.273 4260.655 4260.186 4260.186 4260.094 4260.547 4260.159 4260.159 4260.045 4260.360 4260.145 4260.145 4260.112 4260.551 4260.132 4260.132 4260.480 4260.500 4260.118 4260.118 4260.447 4260.443 4260.105 4260.105 4260.432 4260.351 4260.091 4260.091 4260.302 4260.274 4260.078 4260.078 4260.194 4260.191 4260.051 4260.051 4260.024 4260.399 4260.024 4260.024 4260.414 4260.690 4260.010 4260.010 4260.472 4260.769 4260.010 4260.010 4260.472 4260.769 4260.172 4260.172 4261.492 4260.291 4259.862 4259.862 4259.967 4260.559 4259.848 4259.848 4259.772 4259.695 PROGRESIVA 4258 4259 4260 4261 4262 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.486 C.D.= 4259.369 PROGRESIVA 4258 4259 4260 4261 4262 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.455 C.D.= 4259.342 PROGRESIVA 4258 4259 4260 4261 4262 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.437 C.D.= 4259.328 PROGRESIVA 4258 4259 4260 4261 4262 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.423 C.D.= 4259.315 PROGRESIVA 4258 4259 4260 4261 4262 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.439 C.D.= 4259.301 PROGRESIVA 4258 4259 4260 4261 4262 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.468 C.D.= 4259.288 PROGRESIVA 4258 4259 4260 4261 4262 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.515 C.D.= 4259.274 PROGRESIVA 4258 4259 4260 4261 4262 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.546 C.D.= 4259.261 PROGRESIVA 4258 4259 4260 4261 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4259.502 C.D.= 4259.234 PROGRESIVA 4258 4259 4260 4261 4262 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.400 C.D.= 4259.220 PROGRESIVA 4258 4259 4260 4261 4262 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.389 C.D.= 4259.207 PROGRESIVA 4258 4259 4260 4261 4262 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.397 C.D.= 4259.193 PROGRESIVA 4258 4259 4260 4261 4262 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.364 C.D.= 4259.180 PROGRESIVA 4258 4259 4260 4261 4262 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.359 C.D.= 4259.166 PROGRESIVA 4258 4259 4260 4261 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4259.347 C.D.= 4259.153 PROGRESIVA 4258 4259 4260 4261 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4259.350 C.D.= 4259.126 PROGRESIVA 4258 4259 4260 4261 4262 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.317 C.D.= 4259.099 PROGRESIVA 4258 4259 4260 4261 4262 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.262 C.D.= 4259.185 PROGRESIVA 4258 4259 4260 4261 4262 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.172 C.D.= 4259.247 PROGRESIVA 4258 4259 4260 4261 4262 4263 4258 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4259.087 C.D.= 4259.233 PROGRESIVA 4258 4259 4260 4261 4262 4263 4258 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4259.084 C.D.= 4259.220 PROGRESIVA 4258 4259 4260 4261 4262 4263 4258 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4259.051 C.D.= 4259.193 PROGRESIVA 4258 4259 4260 4261 4262 4263 4258 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4259.042 C.D.= 4259.179 PROGRESIVA 4258 4259 4260 4261 4262 4263 4258 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4259.030 C.D.= 4259.166 PROGRESIVA 4257 4258 4259 4260 4261 4262 4257 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.014 C.D.= 4259.152 PROGRESIVA 4257 4258 4259 4260 4261 4262 4257 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4259.045 C.D.= 4259.139 PROGRESIVA 4258 4259 4260 4261 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4259.122 C.D.= 4258.937 PROGRESIVA 4258 4259 4260 4261 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4259.093 C.D.= 4258.923 Ac = Ar = 1.29 0.00 Ac = Ar = 1.15 0.00 Ac = Ar = 1.05 0.00 Ac = Ar = 1.01 0.14 Ac = Ar = 0.89 0.20 Ac = Ar = 0.76 0.21 Ac = Ar = 0.78 0.18 Ac = Ar = 0.91 0.36 Ac = Ar = 0.67 0.38 Ac = Ar = 0.69 0.09 Ac = Ar = 0.77 0.03 Ac = Ar = 0.71 0.08 Ac = Ar = 0.64 0.13 Ac = Ar = 0.60 0.19 Ac = Ar = 0.56 0.17 Ac = Ar = 0.82 0.17 Ac = Ar = 1.12 0.01 Ac = Ar = 1.15 0.00 Ac = Ar = 1.44 0.14 Ac = Ar = 2.54 0.12 Ac = Ar = 2.22 0.15 Ac = Ar = 1.19 0.20 Ac = Ar = 0.99 0.16 Ac = Ar = 0.92 0.31 Ac = Ar = 0.63 0.37 Ac = Ar = 0.40 0.23 Ac = Ar = 0.82 0.09 Ac = Ar = 0.68 0.45 4263 4263 4263 4263 4263 4263 4263 4263 4263 4263 4263 4263 4262 4262 4262 4262 4262 4262 4262 4262 4262 4262 4263 4263 4260.158 4260.158 4262.245 4260.824 4260.145 4260.145 4262.195 4261.253 4260.118 4260.118 4261.653 4261.416 4260.104 4260.104 4261.281 4261.066 4260.091 4260.091 4261.137 4260.653 4260.077 4260.077 4260.839 4260.077 4260.064 4260.064 4260.496 4260.183 SECCIONES TRANSVERSALES TOPOGRAFIA PLANO DE AVANCE “MEJORAMIENTO DEL SISTEMA DE RIEGO DE LA COMUNIDAD CAMPESINA DE OCORURO, DISTRITO DE OCORURO – ESPINAR – CUSCO” LOCALIDAD OCOR RO DISTRITO OCOR RO PROVINCIA ESPINAR REGIÓN C SCO A O 1/100 GEMS MINISTERIO DE AGRICULTURA Y RIEGO PROGRAMA DE DESARROLO PRODUCTIVO AGRARIO RURAL – AGRO RURAL Ubicación: PLANO: ESPECIALIDAD: DIBUJO: ESCALA: FECHA: EMP. EJECUTORA: LÁMINA N°: I OSCAR CANA A C O E CIP RESIDENTE DE OBRA: ENTIDAD: STR-62 PROGRESIVA LEYENDA Símbolo Descripción NOTA :
10.
C. R.: 4259.185 C.
R.: 4259.171 C. R.: 4259.158 C. R.: 4259.131 C. R.: 4259.117 C. R.: 4259.104 C. R.: 4259.090 C. R.: 4259.077 C. R.: 4259.063 C. R.: 4259.050 C. R.: 4259.036 C. R.: 4259.023 C. R.: 4259.009 C. R.: 4258.996 C. R.: 4258.982 C. R.: 4258.969 C. R.: 4258.955 C. R.: 4258.942 C. R.: 4258.928 C. R.: 4258.915 C. R.: 4258.888 C. R.: 4258.861 C. R.: 4258.847 C. R.: 4258.834 C. R.: 4258.807 C. R.: 4258.780 C. R.: 4258.766 C. R.: 4258.753 C. R.: 4258.726 C. R.: 4258.699 C. R.: 4258.685 C. R.: 4258.672 4259.835 4259.835 4259.710 4260.337 4259.821 4259.821 4259.718 4260.182 4259.808 4259.808 4259.714 4260.056 4259.781 4259.781 4259.472 4259.407 4259.767 4259.767 4259.476 4259.695 4259.754 4259.754 4259.631 4259.675 4259.740 4259.740 4259.716 4259.564 4259.727 4259.727 4260.320 4259.469 4259.713 4259.713 4260.080 4259.616 4259.700 4259.700 4259.613 4259.718 4259.686 4259.686 4259.581 4259.768 4259.673 4259.673 4259.602 4259.672 4259.659 4259.659 4259.847 4259.708 4259.646 4259.646 4259.567 4259.584 4259.632 4259.632 4259.500 4259.940 4259.619 4259.619 4259.488 4260.002 4259.605 4259.605 4259.531 4259.701 4259.592 4259.592 4259.897 4259.260 4259.578 4259.578 4259.492 4259.787 4259.565 4259.565 4259.511 4259.821 4259.538 4259.538 4259.537 4259.564 4259.511 4259.511 4260.025 4259.326 4259.497 4259.497 4260.151 4259.276 4259.484 4259.484 4260.074 4259.249 4259.457 4259.457 4259.463 4259.358 4259.430 4259.430 4259.431 4259.349 4259.416 4259.416 4259.689 4259.238 4259.403 4259.403 4259.343 4259.325 4259.376 4259.376 4259.550 4259.242 4259.349 4259.349 4259.577 4259.231 4259.335 4259.335 4259.364 4259.588 4259.322 4259.322 4259.343 4259.677 PROGRESIVA 4258 4259 4260 4261 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4259.149 C.D.= 4258.910 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4259.160 C.D.= 4258.896 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4259.138 C.D.= 4258.883 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4259.178 C.D.= 4258.856 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4259.206 C.D.= 4258.842 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4259.071 C.D.= 4258.829 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.987 C.D.= 4258.815 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.939 C.D.= 4258.802 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.929 C.D.= 4258.788 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.896 C.D.= 4258.775 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.875 C.D.= 4258.761 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.859 C.D.= 4258.748 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.853 C.D.= 4258.734 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.814 C.D.= 4258.721 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.860 C.D.= 4258.707 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.874 C.D.= 4258.694 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.880 C.D.= 4258.680 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.950 C.D.= 4258.667 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.836 C.D.= 4258.653 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.787 C.D.= 4258.640 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.726 C.D.= 4258.613 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.683 C.D.= 4258.586 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.667 C.D.= 4258.672 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.663 C.D.= 4258.559 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.703 C.D.= 4258.532 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.642 C.D.= 4258.505 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.604 C.D.= 4258.491 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.572 C.D.= 4258.578 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.551 C.D.= 4258.551 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.453 C.D.= 4258.524 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.471 C.D.= 4258.410 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.470 C.D.= 4258.397 Ac = Ar = 0.67 0.32 Ac = Ar = 0.69 0.33 Ac = Ar = 0.62 0.35 Ac = Ar = 0.69 0.89 Ac = Ar = 0.78 0.62 Ac = Ar = 0.59 0.28 Ac = Ar = 0.41 0.40 Ac = Ar = 1.00 0.48 Ac = Ar = 0.71 0.28 Ac = Ar = 0.59 0.26 Ac = Ar = 0.41 0.14 Ac = Ar = 0.34 0.23 Ac = Ar = 0.38 0.16 Ac = Ar = 0.56 0.47 Ac = Ar = 0.54 0.27 Ac = Ar = 0.57 0.30 Ac = Ar = 0.46 0.43 Ac = Ar = 0.76 0.60 Ac = Ar = 0.42 0.53 Ac = Ar = 0.39 0.50 Ac = Ar = 0.33 0.29 Ac = Ar = 0.48 0.55 Ac = Ar = 0.63 0.48 Ac = Ar = 0.34 0.44 Ac = Ar = 0.39 0.42 Ac = Ar = 0.35 0.35 Ac = Ar = 0.39 0.38 Ac = Ar = 0.40 0.46 Ac = Ar = 0.36 0.26 Ac = Ar = 0.60 0.31 Ac = Ar = 0.41 0.12 Ac = Ar = 0.45 0.11 4262 4262 SECCIONES TRANSVERSALES TOPOGRAFIA PLANON DE AVANCE “MEJORAMIENTO DEL SISTEMA DE RIEGO DE LA COMUNIDAD CAMPESINA DE OCORURO, DISTRITO DE OCORURO – ESPINAR – CUSCO” LOCALIDAD OCOR RO DISTRITO OCOR RO PROVINCIA ESPINAR REGIÓN C SCO A O 1/100 GEMS MINISTERIO DE AGRICULTURA Y RIEGO PROGRAMA DE DESARROLO PRODUCTIVO AGRARIO RURAL – AGRO RURAL Ubicación: PLANO: ESPECIALIDAD: DIBUJO: ESCALA: FECHA: EMP. EJECUTORA: LÁMINA N°: I OSCAR CANA A C O E CIP RESIDENTE DE OBRA: ENTIDAD: STR-63 PROGRESIVA LEYENDA Símbolo Descripción NOTA :
11.
C. R.: 4258.658 C.
R.: 4258.645 C. R.: 4258.631 C. R.: 4258.618 C. R.: 4258.591 C. R.: 4258.564 C. R.: 4258.550 C. R.: 4258.537 C. R.: 4258.523 C. R.: 4258.510 C. R.: 4258.483 C. R.: 4258.456 C. R.: 4258.429 C. R.: 4258.415 C. R.: 4258.402 C. R.: 4258.388 C. R.: 4258.375 C. R.: 4258.361 C. R.: 4258.348 C. R.: 4258.334 C. R.: 4258.321 C. R.: 4258.307 C. R.: 4258.294 C. R.: 4258.267 C. R.: 4258.253 C. R.: 4258.240 C. R.: 4258.226 C. R.: 4258.213 C. R.: 4258.186 C. R.: 4258.159 C. R.: 4258.132 C. R.: 4258.118 4259.308 4259.308 4259.133 4259.688 4259.295 4259.295 4259.157 4259.626 4259.281 4259.281 4259.061 4259.730 4259.268 4259.268 4259.075 4259.470 4259.241 4259.241 4259.218 4259.072 4259.214 4259.214 4259.321 4259.153 4259.200 4259.200 4259.169 4259.034 4259.187 4259.187 4259.143 4259.032 4259.173 4259.173 4259.735 4259.030 4259.160 4259.160 4259.938 4259.039 4259.133 4259.133 4259.143 4259.198 4259.106 4259.106 4258.944 4259.087 4259.079 4259.079 4259.278 4258.803 4259.065 4259.065 4259.197 4258.723 4259.052 4259.052 4259.867 4258.711 4259.038 4259.038 4259.758 4258.696 4259.025 4259.025 4258.847 4258.876 4259.011 4259.011 4259.705 4258.763 4258.998 4258.998 4259.527 4258.762 4258.984 4258.984 4259.581 4258.692 4258.971 4258.971 4259.443 4258.766 4258.957 4258.957 4259.501 4258.726 4258.944 4258.944 4259.500 4258.809 4258.917 4258.917 4259.702 4258.972 4258.903 4258.903 4259.671 4258.952 4258.890 4258.890 4259.639 4258.807 4258.876 4258.876 4259.645 4258.875 4258.863 4258.863 4259.746 4259.097 4258.836 4258.836 4259.260 4259.318 4258.809 4258.809 4259.098 4258.930 4258.782 4258.782 4258.776 4258.645 4258.768 4258.768 4259.599 4258.582 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.392 C.D.= 4258.383 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.286 C.D.= 4258.370 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.363 C.D.= 4258.356 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.395 C.D.= 4258.343 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.380 C.D.= 4258.316 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.382 C.D.= 4258.289 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.444 C.D.= 4258.275 PROGRESIVA 4257 4258 4259 4260 4257 4258 4259 4260 -6 -4 -2 0 2 4 6 C.T.= 4258.475 C.D.= 4258.262 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.413 C.D.= 4258.248 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.398 C.D.= 4258.235 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.421 C.D.= 4258.208 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.326 C.D.= 4258.181 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.363 C.D.= 4258.154 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.329 C.D.= 4258.140 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.316 C.D.= 4258.127 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.339 C.D.= 4258.113 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.346 C.D.= 4258.100 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.367 C.D.= 4258.086 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.341 C.D.= 4258.073 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.343 C.D.= 4258.059 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.274 C.D.= 4258.046 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.220 C.D.= 4258.032 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.192 C.D.= 4258.019 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.146 C.D.= 4257.992 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.114 C.D.= 4257.978 PROGRESIVA 4256 4257 4258 4259 4260 4261 4256 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.123 C.D.= 4257.965 PROGRESIVA 4256 4257 4258 4259 4260 4261 4256 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.121 C.D.= 4257.951 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.075 C.D.= 4257.938 PROGRESIVA 4257 4258 4259 4260 4261 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.083 C.D.= 4257.911 PROGRESIVA 4256 4257 4258 4259 4260 4261 4256 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.060 C.D.= 4257.784 PROGRESIVA 4256 4257 4258 4259 4260 4261 4256 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.114 C.D.= 4257.857 PROGRESIVA 4256 4257 4258 4259 4260 4261 4256 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.108 C.D.= 4257.843 Ac = Ar = 0.59 0.24 Ac = Ar = 0.41 0.26 Ac = Ar = 0.53 0.26 Ac = Ar = 0.34 0.24 Ac = Ar = 0.56 0.34 Ac = Ar = 0.36 0.28 Ac = Ar = 0.40 0.43 Ac = Ar = 0.46 0.49 Ac = Ar = 0.63 0.44 Ac = Ar = 0.79 0.44 Ac = Ar = 0.50 0.22 Ac = Ar = 0.49 0.39 Ac = Ar = 0.69 0.44 Ac = Ar = 0.73 0.59 Ac = Ar = 0.84 0.58 Ac = Ar = 1.09 0.54 Ac = Ar = 0.62 0.61 Ac = Ar = 0.68 0.50 Ac = Ar = 0.67 0.53 Ac = Ar = 0.99 0.53 Ac = Ar = 0.67 0.36 Ac = Ar = 0.76 0.38 Ac = Ar = 0.58 0.29 Ac = Ar = 0.72 0.17 Ac = Ar = 0.78 0.12 Ac = Ar = 1.11 0.16 Ac = Ar = 1.12 0.06 Ac = Ar = 1.09 0.00 Ac = Ar = 0.60 0.15 Ac = Ar = 0.51 0.15 Ac = Ar = 0.58 0.44 Ac = Ar = 0.96 0.40 4261 4261 4262 4262 4262 4262 4262 4262 SECCIONES TRANSVERSALES TOPOGRAFIA PLANO DE AVANCE “MEJORAMIENTO DEL SISTEMA DE RIEGO DE LA COMUNIDAD CAMPESINA DE OCORURO, DISTRITO DE OCORURO – ESPINAR – CUSCO” LOCALIDAD OCOR RO DISTRITO OCOR RO PROVINCIA ESPINAR REGIÓN C SCO A O 1/100 GEMS MINISTERIO DE AGRICULTURA Y RIEGO PROGRAMA DE DESARROLO PRODUCTIVO AGRARIO RURAL – AGRO RURAL Ubicación: PLANO: ESPECIALIDAD: DIBUJO: ESCALA: FECHA: EMP. EJECUTORA: LÁMINA N°: I OSCAR CANA A C O E CIP RESIDENTE DE OBRA: ENTIDAD: STR-64 PROGRESIVA LEYENDA Símbolo Descripción NOTA :
12.
C. R.: 4258.105 C.
R.: 4258.078 C. R.: 4258.051 C. R.: 4258.024 C. R.: 4258.008 C. R.: 4257.991 C. R.: 4257.975 C. R.: 4257.958 C. R.: 4257.942 C. R.: 4257.926 C. R.: 4257.893 C. R.: 4257.860 C. R.: 4257.828 C. R.: 4257.811 C. R.: 4257.795 C. R.: 4257.779 C. R.: 4257.762 C. R.: 4257.746 C. R.: 4257.729 C. R.: 4257.713 4258.755 4258.755 4259.577 4258.657 4258.728 4258.728 4258.659 4259.034 4258.701 4258.701 4259.580 4258.991 4258.674 4258.674 4259.697 4258.778 4258.658 4258.658 4259.762 4258.675 4258.641 4258.641 4259.814 4258.655 4258.625 4258.625 4259.833 4258.639 4258.608 4258.608 4259.798 4258.813 4258.592 4258.592 4259.850 4258.633 4258.576 4258.576 4259.978 4258.467 4258.543 4258.543 4260.131 4258.679 4258.510 4258.510 4260.541 4258.792 4258.478 4258.478 4259.472 4259.001 4258.461 4258.461 4259.297 4258.925 4258.445 4258.445 4259.581 4258.551 4258.429 4258.429 4258.982 4258.684 4258.412 4258.412 4258.618 4258.694 4258.396 4258.396 4258.788 4258.725 4258.379 4258.379 4259.954 4258.718 4258.363 4258.363 4260.048 4258.349 PROGRESIVA 4256 4257 4258 4259 4260 4261 4256 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.019 C.D.= 4257.830 PROGRESIVA 4256 4257 4258 4259 4260 4261 4256 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.049 C.D.= 4257.803 PROGRESIVA 4256 4257 4258 4259 4260 4261 4256 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4258.050 C.D.= 4257.776 PROGRESIVA 4256 4257 4258 4259 4260 4261 4256 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4257.942 C.D.= 4257.749 PROGRESIVA 4256 4257 4258 4259 4260 4261 4256 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4257.881 C.D.= 4257.733 PROGRESIVA 4256 4257 4258 4259 4260 4261 4256 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4257.860 C.D.= 4257.716 PROGRESIVA 4256 4257 4258 4259 4260 4261 4262 4256 4257 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4257.857 C.D.= 4257.700 PROGRESIVA 4256 4257 4258 4259 4260 4261 4262 4256 4257 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4257.820 C.D.= 4257.683 PROGRESIVA 4256 4257 4258 4259 4260 4261 4262 4256 4257 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4257.761 C.D.= 4257.667 PROGRESIVA 4256 4257 4258 4259 4260 4261 4262 4256 4257 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4257.758 C.D.= 4257.651 PROGRESIVA 4256 4257 4258 4259 4260 4261 4262 4256 4257 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4257.673 C.D.= 4257.818 PROGRESIVA 4256 4257 4258 4259 4260 4261 4262 4256 4257 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4257.620 C.D.= 4257.585 PROGRESIVA 4256 4257 4258 4259 4260 4261 4262 4256 4257 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4257.622 C.D.= 4257.553 PROGRESIVA 4256 4257 4258 4259 4260 4261 4262 4256 4257 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4257.619 C.D.= 4257.536 PROGRESIVA 4255 4256 4257 4258 4259 4260 4261 4262 4255 4256 4257 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4257.582 C.D.= 4257.520 PROGRESIVA 4255 4256 4257 4258 4259 4260 4261 4262 4263 4255 4256 4257 4258 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4257.565 C.D.= 4257.604 PROGRESIVA 4256 4257 4258 4259 4260 4261 4262 4263 4256 4257 4258 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4257.581 C.D.= 4257.487 PROGRESIVA 4256 4257 4258 4259 4260 4261 4262 4263 4256 4257 4258 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4257.559 C.D.= 4257.471 PROGRESIVA 4256 4257 4258 4259 4260 4261 4262 4263 4256 4257 4258 4259 4260 4261 4262 4263 -6 -4 -2 0 2 4 6 C.T.= 4257.506 C.D.= 4257.454 PROGRESIVA 4256 4257 4258 4259 4260 4261 4262 4256 4257 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4257.493 C.D.= 4257.438 Ac = Ar = 0.83 0.18 Ac = Ar = 0.64 0.36 Ac = Ar = 0.90 0.18 Ac = Ar = 0.72 0.09 Ac = Ar = 0.68 0.12 Ac = Ar = 0.66 0.13 Ac = Ar = 0.80 0.09 Ac = Ar = 1.00 0.01 Ac = Ar = 0.82 0.07 Ac = Ar = 0.91 0.26 Ac = Ar = 1.10 0.15 Ac = Ar = 1.45 0.05 Ac = Ar = 1.20 0.03 Ac = Ar = 0.96 0.03 Ac = Ar = 0.89 0.01 Ac = Ar = 0.67 0.03 Ac = Ar = 0.54 0.05 Ac = Ar = 0.64 0.02 Ac = Ar = 1.07 0.03 Ac = Ar = 1.56 0.11 SECCIONES TRANSVERSALES TOPOGRAFIA PLANO DE AVANCE “MEJORAMIENTO DEL SISTEMA DE RIEGO DE LA COMUNIDAD CAMPESINA DE OCORURO, DISTRITO DE OCORURO – ESPINAR – CUSCO” LOCALIDAD OCOR RO DISTRITO OCOR RO PROVINCIA ESPINAR REGIÓN C SCO A O 1/100 GEMS MINISTERIO DE AGRICULTURA Y RIEGO PROGRAMA DE DESARROLO PRODUCTIVO AGRARIO RURAL – AGRO RURAL Ubicación: PLANO: ESPECIALIDAD: DIBUJO: ESCALA: FECHA: EMP. EJECUTORA: LÁMINA N°: I OSCAR CANA A C O E CIP RESIDENTE DE OBRA: ENTIDAD: STR-65 PROGRESIVA LEYENDA Símbolo Descripción NOTA :
13.
C. R.: 4257.697 C.
R.: 4257.680 C. R.: 4257.664 C. R.: 4257.631 C. R.: 4257.599 C. R.: 4257.582 C. R.: 4257.566 C. R.: 4257.549 C. R.: 4257.533 C. R.: 4257.517 C. R.: 4257.500 C. R.: 4257.468 C. R.: 4257.451 C. R.: 4257.435 C. R.: 4257.419 C. R.: 4257.402 C. R.: 4257.370 C. R.: 4257.353 C. R.: 4257.337 C. R.: 4257.320 C. R.: 4257.304 C. R.: 4257.271 C. R.: 4257.239 C. R.: 4257.222 C. R.: 4257.206 4258.347 4258.347 4260.092 4258.266 4258.330 4258.330 4259.855 4258.236 4258.314 4258.314 4259.732 4258.176 4258.281 4258.281 4259.255 4258.242 4258.249 4258.249 4258.419 4258.404 4258.232 4258.232 4258.273 4258.775 4258.216 4258.216 4258.465 4258.064 4258.199 4258.199 4258.426 4258.575 4258.183 4258.183 4258.429 4258.362 4258.167 4258.167 4258.107 4258.472 4258.150 4258.150 4259.048 4258.235 4258.118 4258.118 4259.068 4258.092 4258.101 4258.101 4259.024 4258.022 4258.085 4258.085 4258.807 4258.026 4258.069 4258.069 4259.130 4257.903 4258.052 4258.052 4258.197 4257.958 4258.020 4258.020 4258.284 4257.977 4258.003 4258.003 4258.259 4257.985 4257.987 4257.987 4258.323 4258.011 4257.970 4257.970 4258.359 4258.129 4257.954 4257.954 4258.722 4258.115 4257.921 4257.921 4259.036 4257.845 4257.889 4257.889 4259.017 4257.838 4257.872 4257.872 4259.033 4257.822 4257.856 4257.856 4258.987 4257.807 PROGRESIVA 4256 4257 4258 4259 4260 4261 4262 4256 4257 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4257.881 C.D.= 4257.422 PROGRESIVA 4256 4257 4258 4259 4260 4261 4262 4256 4257 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4257.614 C.D.= 4257.405 PROGRESIVA 4256 4257 4258 4259 4260 4261 4262 4256 4257 4258 4259 4260 4261 4262 -6 -4 -2 0 2 4 6 C.T.= 4257.628 C.D.= 4257.389 PROGRESIVA 4256 4257 4258 4259 4260 4261 4256 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4257.572 C.D.= 4257.356 PROGRESIVA 4256 4257 4258 4259 4260 4256 4257 4258 4259 4260 -6 -4 -2 0 2 4 6 C.T.= 4257.562 C.D.= 4257.324 PROGRESIVA 4256 4257 4258 4259 4260 4256 4257 4258 4259 4260 -6 -4 -2 0 2 4 6 C.T.= 4257.517 C.D.= 4257.307 PROGRESIVA 4256 4257 4258 4259 4260 4256 4257 4258 4259 4260 -6 -4 -2 0 2 4 6 C.T.= 4257.442 C.D.= 4257.291 PROGRESIVA 4256 4257 4258 4259 4260 4256 4257 4258 4259 4260 -6 -4 -2 0 2 4 6 C.T.= 4257.396 C.D.= 4257.374 PROGRESIVA 4256 4257 4258 4259 4260 4256 4257 4258 4259 4260 -6 -4 -2 0 2 4 6 C.T.= 4257.396 C.D.= 4257.258 PROGRESIVA 4256 4257 4258 4259 4260 4256 4257 4258 4259 4260 -6 -4 -2 0 2 4 6 C.T.= 4257.447 C.D.= 4257.242 PROGRESIVA 4256 4257 4258 4259 4260 4261 4256 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4257.455 C.D.= 4257.225 PROGRESIVA 4256 4257 4258 4259 4260 4261 4256 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4257.370 C.D.= 4257.193 PROGRESIVA 4256 4257 4258 4259 4260 4261 4256 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4257.358 C.D.= 4257.176 PROGRESIVA 4256 4257 4258 4259 4260 4261 4256 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4257.337 C.D.= 4257.160 PROGRESIVA 4256 4257 4258 4259 4260 4261 4256 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4257.325 C.D.= 4257.144 PROGRESIVA 4256 4257 4258 4259 4260 4261 4256 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4257.213 C.D.= 4257.227 PROGRESIVA 4256 4257 4258 4259 4260 4261 4256 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4257.244 C.D.= 4257.095 PROGRESIVA 4256 4257 4258 4259 4260 4261 4256 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4257.269 C.D.= 4257.078 PROGRESIVA 4256 4257 4258 4259 4260 4261 4256 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4257.321 C.D.= 4257.062 PROGRESIVA 4256 4257 4258 4259 4260 4261 4256 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4257.244 C.D.= 4257.045 PROGRESIVA 4256 4257 4258 4259 4260 4261 4256 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4257.179 C.D.= 4257.029 PROGRESIVA 4256 4257 4258 4259 4260 4261 4256 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4257.238 C.D.= 4256.996 PROGRESIVA 4255 4256 4257 4258 4259 4260 4261 4255 4256 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4257.212 C.D.= 4256.964 PROGRESIVA 4255 4256 4257 4258 4259 4260 4261 4255 4256 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4257.188 C.D.= 4256.947 PROGRESIVA 4255 4256 4257 4258 4259 4260 4261 4255 4256 4257 4258 4259 4260 4261 -6 -4 -2 0 2 4 6 C.T.= 4257.158 C.D.= 4256.931 Ac = Ar = 1.95 0.30 Ac = Ar = 1.64 0.30 Ac = Ar = 1.57 0.30 Ac = Ar = 0.92 0.15 Ac = Ar = 0.59 0.23 Ac = Ar = 0.68 0.19 Ac = Ar = 0.87 0.38 Ac = Ar = 0.60 0.11 Ac = Ar = 0.57 0.08 Ac = Ar = 0.83 0.22 Ac = Ar = 0.66 0.11 Ac = Ar = 0.90 0.14 Ac = Ar = 0.87 0.17 Ac = Ar = 0.73 0.20 Ac = Ar = 1.18 0.19 Ac = Ar = 0.65 0.11 Ac = Ar = 0.73 0.10 Ac = Ar = 0.79 0.07 Ac = Ar = 1.01 0.14 Ac = Ar = 0.86 0.01 Ac = Ar = 1.03 0.01 Ac = Ar = 1.12 0.16 Ac = Ar = 1.05 0.14 Ac = Ar = 1.22 0.12 Ac = Ar = 1.26 0.10 SECCIONES TRANSVERSALES TOPOGRAFIA PLANO DE AVANCE “MEJORAMIENTO DEL SISTEMA DE RIEGO DE LA COMUNIDAD CAMPESINA DE OCORURO, DISTRITO DE OCORURO – ESPINAR – CUSCO” LOCALIDAD OCOR RO DISTRITO OCOR RO PROVINCIA ESPINAR REGIÓN C SCO A O 1/100 GEMS MINISTERIO DE AGRICULTURA Y RIEGO PROGRAMA DE DESARROLO PRODUCTIVO AGRARIO RURAL – AGRO RURAL Ubicación: PLANO: ESPECIALIDAD: DIBUJO: ESCALA: FECHA: EMP. EJECUTORA: LÁMINA N°: I OSCAR CANA A C O E CIP RESIDENTE DE OBRA: ENTIDAD: STR-66 PROGRESIVA LEYENDA Símbolo Descripción NOTA :
Download now