SlideShare a Scribd company logo
The bottom line                                Core Scrum                                                                      the unofficial
If you achieve these you can ignore the
rest of the checklist. Your process is fine.
                                               These are central to Scrum. Without these
                                               you probably shouldn’t call it Scrum.                   Scrum Checklist
      Delivering working, tested                         Retrospective happen after
      software every 4 weeks or less                     every sprint
                                                              Results in concrete                                                  Henrik Kniberg
      Delivering what the business
                                                              improvement proposals
      needs most
                                                              Some proposals actually               Recommended but not always necessary
      Process is continuously                                 get implemented                       Most of these will usually be needed, but not always all of them. Experiment!
      improving
                                                              Whole team + PO
                                                                                                        Team has all skills needed to                   PBL items are broken into
                                                              participates
                                                                                                        bring backlog items to Done                     tasks within a sprint
      Clearly defined product owner                      PO has a product backlog                       Team members not locked into
      (PO)                                               (PBL)                                                                                                Sprint tasks are estimated
                                                                                                        specific roles
            PO is empowered to                                Top items are prioritized                 Iterations that are doomed to                         Estimates for ongoing tasks
            prioritize                                        by business value                         fail are terminated early                             are updated daily
            PO has knowledge to                               Top items are estimated
            prioritize                                                                                  PO has product vision that is in
                                                                                                        sync with PBL                                   Velocity is measured
            PO has direct contact with                        Estimates written by the
            team                                              team                                      PBL and product vision is highly                      All items in sprint plan have
                                                                                                        visible                                               an estimate
            PO has direct contact with                        Top items in PBL small
            stakeholders                                      enough to fit in a sprint                 Everyone on the team                                  PO uses velocity for
                                                                                                        participates in estimating                            release planning
            PO speaks with one voice                          PO understands purpose
            (in case PO is a team)                            of all backlog items                      PO available when team is                             Velocity only includes
                                                                                                        estimating                                            items that are Done

      Team has a sprint backlog                          Have sprint planning meetings                  Estimate relative size (story                   Team has a sprint burndown
                                                                                                        points) rather than time                        chart
            Highly visible                                    PO participates
                                                                                                        Whole team knows top 1-3                              Highly visible
                                                                                                        impediments
            Updated daily                                     PO brings up-to-date PBL
                                                                                                              SM has strategy for how to                      Updated daily
                                                                                                              fix top impediment
            Owned exclusively by the                          Whole team participates
            team                                                                                              SM focusing on removing                   Daily Scrum is every day, same
                                                                                                              impediments                               time & place
                                                              Results in a sprint plan
                                                                                                              Escalated to management                         PO participates at least a
      Daily Scrum happens
                                                              Whole team believes plan                        when team can’t solve                           few times per week
                                                              is achievable
            Whole team participates                                                                     Team has a Scrum Master (SM)                          Max 15 minutes
                                                              PO satisfied with
            Problems & impediments                            priorities
                                                                                                                                                              Each team member knows
            are surfaced                                                                                      SM sits with the team
                                                                                                                                                              what the others are doing
                                                         Timeboxed iterations

      Demo happens after every                                Iteration length 4 weeks or          Scaling                                        Positive indicators
      sprint                                                  less
                                                                                                   These are pretty fundamental to any            Leading indicators of a
            Shows working, tested                                                                  Scrum scaling effort.                          good Scrum implementation.
                                                              Always end on time
            software
                                                                                                        You have a Chief Product
            Feedback received from                            Team not disrupted or                                                                     Having fun! High energy level.
                                                                                                        Owner (if many POs)
            stakeholders & PO                                 controlled by outsiders
                                                                                                        Dependent teams do Scrum of                     Overtime work is rare and
                                                              Team usually delivers
                                                                                                        Scrums                                          happens voluntarily
      Have Definition of Done (DoD)                           what they committed to
                                                                                                        Dependent teams integrate                       Discussing, criticizing, and
            DoD achievable within                                                                       within each sprint                              experimenting with the process
                                                         Team members sit together
            each iteration
                                                                                            PO = Product owner SM = Scrum Master PBL = Product Backlog DoD = Definition of Done
            Team respects DoD                                 Max 9 people per team
                                                                                                      http://www.crisp.se/scrum/checklist | Version 2.1 (2009-08-17)

More Related Content

What's hot

NG BB 52 CONTROL Roadmap
NG BB 52 CONTROL RoadmapNG BB 52 CONTROL Roadmap
NG BB 52 CONTROL RoadmapLeanleaders.org
 
Pervasive 2012 Talk: Hacking the Natural Habitat
Pervasive 2012 Talk: Hacking the Natural HabitatPervasive 2012 Talk: Hacking the Natural Habitat
Pervasive 2012 Talk: Hacking the Natural Habitat
Sarah Mennicken
 
Model-Based Testing to Help You Enhance Your Agile Testing Process
Model-Based Testing to Help You Enhance Your Agile Testing ProcessModel-Based Testing to Help You Enhance Your Agile Testing Process
Model-Based Testing to Help You Enhance Your Agile Testing Process
Frederic Oehl
 
How to establish SEPG and SPI functions?
How to establish SEPG and SPI functions?How to establish SEPG and SPI functions?
How to establish SEPG and SPI functions?
Panitta Kaewkallaya
 
NG BB 14 DEFINE Tollgate
NG BB 14 DEFINE TollgateNG BB 14 DEFINE Tollgate
NG BB 14 DEFINE TollgateLeanleaders.org
 
NG BB 49 Risk Assessment
NG BB 49 Risk AssessmentNG BB 49 Risk Assessment
NG BB 49 Risk AssessmentLeanleaders.org
 
Physical Percent Complete - june 2010 (6)
Physical Percent Complete - june 2010 (6)Physical Percent Complete - june 2010 (6)
Physical Percent Complete - june 2010 (6)Glen Alleman
 
Thomas.a.greathouse.r
Thomas.a.greathouse.rThomas.a.greathouse.r
Thomas.a.greathouse.rNASAPMC
 
Postdoc Symposium - Abram Hindle
Postdoc Symposium - Abram HindlePostdoc Symposium - Abram Hindle
Postdoc Symposium - Abram Hindle
ICSM 2011
 
Gartner's Maturity Model For Programme Portfolio Management (PPM)
Gartner's Maturity Model For Programme Portfolio Management (PPM)Gartner's Maturity Model For Programme Portfolio Management (PPM)
Gartner's Maturity Model For Programme Portfolio Management (PPM)
Gartner
 
Daisy.mueller
Daisy.muellerDaisy.mueller
Daisy.muellerNASAPMC
 
Teams progress presenation
Teams progress presenationTeams progress presenation
Teams progress presenation
Oleg Seriaga
 
NG BB 22 Process Measurement
NG BB 22 Process MeasurementNG BB 22 Process Measurement
NG BB 22 Process MeasurementLeanleaders.org
 
Ravit Danino HP - Roles and Collaboration in Agile
Ravit Danino HP - Roles and Collaboration in AgileRavit Danino HP - Roles and Collaboration in Agile
Ravit Danino HP - Roles and Collaboration in AgileAgileSparks
 
QFH Consulting Capabilities
QFH Consulting CapabilitiesQFH Consulting Capabilities
QFH Consulting Capabilities
Quinn Harry
 
NG BB 54 Sustain the Gain
NG BB 54 Sustain the GainNG BB 54 Sustain the Gain
NG BB 54 Sustain the GainLeanleaders.org
 

What's hot (20)

NG BB 52 CONTROL Roadmap
NG BB 52 CONTROL RoadmapNG BB 52 CONTROL Roadmap
NG BB 52 CONTROL Roadmap
 
Chapt003a
Chapt003aChapt003a
Chapt003a
 
Pervasive 2012 Talk: Hacking the Natural Habitat
Pervasive 2012 Talk: Hacking the Natural HabitatPervasive 2012 Talk: Hacking the Natural Habitat
Pervasive 2012 Talk: Hacking the Natural Habitat
 
Model-Based Testing to Help You Enhance Your Agile Testing Process
Model-Based Testing to Help You Enhance Your Agile Testing ProcessModel-Based Testing to Help You Enhance Your Agile Testing Process
Model-Based Testing to Help You Enhance Your Agile Testing Process
 
Sparrow
SparrowSparrow
Sparrow
 
How to establish SEPG and SPI functions?
How to establish SEPG and SPI functions?How to establish SEPG and SPI functions?
How to establish SEPG and SPI functions?
 
NG BB 04 DEFINE Roadmap
NG BB 04 DEFINE RoadmapNG BB 04 DEFINE Roadmap
NG BB 04 DEFINE Roadmap
 
NG BB 14 DEFINE Tollgate
NG BB 14 DEFINE TollgateNG BB 14 DEFINE Tollgate
NG BB 14 DEFINE Tollgate
 
NG BB 49 Risk Assessment
NG BB 49 Risk AssessmentNG BB 49 Risk Assessment
NG BB 49 Risk Assessment
 
Physical Percent Complete - june 2010 (6)
Physical Percent Complete - june 2010 (6)Physical Percent Complete - june 2010 (6)
Physical Percent Complete - june 2010 (6)
 
Thomas.a.greathouse.r
Thomas.a.greathouse.rThomas.a.greathouse.r
Thomas.a.greathouse.r
 
Postdoc Symposium - Abram Hindle
Postdoc Symposium - Abram HindlePostdoc Symposium - Abram Hindle
Postdoc Symposium - Abram Hindle
 
Gartner's Maturity Model For Programme Portfolio Management (PPM)
Gartner's Maturity Model For Programme Portfolio Management (PPM)Gartner's Maturity Model For Programme Portfolio Management (PPM)
Gartner's Maturity Model For Programme Portfolio Management (PPM)
 
NG BB 17 Takt Time
NG BB 17 Takt TimeNG BB 17 Takt Time
NG BB 17 Takt Time
 
Daisy.mueller
Daisy.muellerDaisy.mueller
Daisy.mueller
 
Teams progress presenation
Teams progress presenationTeams progress presenation
Teams progress presenation
 
NG BB 22 Process Measurement
NG BB 22 Process MeasurementNG BB 22 Process Measurement
NG BB 22 Process Measurement
 
Ravit Danino HP - Roles and Collaboration in Agile
Ravit Danino HP - Roles and Collaboration in AgileRavit Danino HP - Roles and Collaboration in Agile
Ravit Danino HP - Roles and Collaboration in Agile
 
QFH Consulting Capabilities
QFH Consulting CapabilitiesQFH Consulting Capabilities
QFH Consulting Capabilities
 
NG BB 54 Sustain the Gain
NG BB 54 Sustain the GainNG BB 54 Sustain the Gain
NG BB 54 Sustain the Gain
 

Viewers also liked

6 tips to reduce tension in one minute
6 tips to reduce tension in one minute6 tips to reduce tension in one minute
6 tips to reduce tension in one minutedschon
 
Seminar on basic grammar with a new method
Seminar on basic grammar with a new methodSeminar on basic grammar with a new method
Seminar on basic grammar with a new method
Myno Uddin
 
Checklist of Student Teacher
Checklist of Student TeacherChecklist of Student Teacher
Checklist of Student Teacher
Emilyn Ragasa
 
History of ELT in bangladesh
History of ELT in bangladeshHistory of ELT in bangladesh
History of ELT in bangladesh
Myno Uddin
 
Agile retrospectives - why, what and how
Agile retrospectives - why, what and howAgile retrospectives - why, what and how
Agile retrospectives - why, what and howDmitriyViktorov
 
AWB - 07 - Agile Retrospective
AWB - 07 - Agile RetrospectiveAWB - 07 - Agile Retrospective
AWB - 07 - Agile Retrospective
AXA EMEA-LATAM
 
Juz 30 word to-word
Juz 30 word to-wordJuz 30 word to-word
Juz 30 word to-word
MuQeet
 
Scrum checklists
Scrum checklistsScrum checklists
Scrum checklists
edgarddavidson.com
 
Scrum checklist
Scrum checklistScrum checklist
Scrum checklist
André Heijstek
 
DEVNET-ART-Checklist
DEVNET-ART-ChecklistDEVNET-ART-Checklist
DEVNET-ART-ChecklistJan Hauters
 
Easy way to Learn Reciting THE HOLY QURAN
Easy way to Learn Reciting THE HOLY QURANEasy way to Learn Reciting THE HOLY QURAN
Easy way to Learn Reciting THE HOLY QURAN
Myno Uddin
 
Scrum master checklist
Scrum master checklistScrum master checklist
Scrum master checklist
Shaju Rasheed
 
AWB - 06 - Agile Planning, Release and Sprint
AWB - 06 - Agile Planning, Release and SprintAWB - 06 - Agile Planning, Release and Sprint
AWB - 06 - Agile Planning, Release and Sprint
AXA EMEA-LATAM
 
A Guide for Preparing and Facilitating Retrospectives
A Guide for Preparing and Facilitating RetrospectivesA Guide for Preparing and Facilitating Retrospectives
A Guide for Preparing and Facilitating Retrospectives
Jason Yip
 

Viewers also liked (14)

6 tips to reduce tension in one minute
6 tips to reduce tension in one minute6 tips to reduce tension in one minute
6 tips to reduce tension in one minute
 
Seminar on basic grammar with a new method
Seminar on basic grammar with a new methodSeminar on basic grammar with a new method
Seminar on basic grammar with a new method
 
Checklist of Student Teacher
Checklist of Student TeacherChecklist of Student Teacher
Checklist of Student Teacher
 
History of ELT in bangladesh
History of ELT in bangladeshHistory of ELT in bangladesh
History of ELT in bangladesh
 
Agile retrospectives - why, what and how
Agile retrospectives - why, what and howAgile retrospectives - why, what and how
Agile retrospectives - why, what and how
 
AWB - 07 - Agile Retrospective
AWB - 07 - Agile RetrospectiveAWB - 07 - Agile Retrospective
AWB - 07 - Agile Retrospective
 
Juz 30 word to-word
Juz 30 word to-wordJuz 30 word to-word
Juz 30 word to-word
 
Scrum checklists
Scrum checklistsScrum checklists
Scrum checklists
 
Scrum checklist
Scrum checklistScrum checklist
Scrum checklist
 
DEVNET-ART-Checklist
DEVNET-ART-ChecklistDEVNET-ART-Checklist
DEVNET-ART-Checklist
 
Easy way to Learn Reciting THE HOLY QURAN
Easy way to Learn Reciting THE HOLY QURANEasy way to Learn Reciting THE HOLY QURAN
Easy way to Learn Reciting THE HOLY QURAN
 
Scrum master checklist
Scrum master checklistScrum master checklist
Scrum master checklist
 
AWB - 06 - Agile Planning, Release and Sprint
AWB - 06 - Agile Planning, Release and SprintAWB - 06 - Agile Planning, Release and Sprint
AWB - 06 - Agile Planning, Release and Sprint
 
A Guide for Preparing and Facilitating Retrospectives
A Guide for Preparing and Facilitating RetrospectivesA Guide for Preparing and Facilitating Retrospectives
A Guide for Preparing and Facilitating Retrospectives
 

More from edgarddavidson.com

O programador pragmático
O programador pragmáticoO programador pragmático
O programador pragmático
edgarddavidson.com
 
Scrum checklist pt-br
Scrum checklist pt-brScrum checklist pt-br
Scrum checklist pt-br
edgarddavidson.com
 
qualidade de código: boas práticas, princípios e padrões
qualidade de código: boas práticas, princípios e padrõesqualidade de código: boas práticas, princípios e padrões
qualidade de código: boas práticas, princípios e padrõesedgarddavidson.com
 
Pós Graduação em Engenharia de Software Centrada em Métodos Ágeis
Pós Graduação em Engenharia de Software Centrada em Métodos ÁgeisPós Graduação em Engenharia de Software Centrada em Métodos Ágeis
Pós Graduação em Engenharia de Software Centrada em Métodos Ágeis
edgarddavidson.com
 
Localização de Placas de Veículos Baseada em Métodos Estatísticos
Localização de Placas de Veículos Baseada em Métodos EstatísticosLocalização de Placas de Veículos Baseada em Métodos Estatísticos
Localização de Placas de Veículos Baseada em Métodos Estatísticos
edgarddavidson.com
 
Localização de Placas de Veículos Baseada em Métodos Estatísticos
Localização de Placas de Veículos Baseada em Métodos EstatísticosLocalização de Placas de Veículos Baseada em Métodos Estatísticos
Localização de Placas de Veículos Baseada em Métodos Estatísticos
edgarddavidson.com
 

More from edgarddavidson.com (9)

O programador pragmático
O programador pragmáticoO programador pragmático
O programador pragmático
 
Scrum checklist pt-br
Scrum checklist pt-brScrum checklist pt-br
Scrum checklist pt-br
 
qualidade de código: boas práticas, princípios e padrões
qualidade de código: boas práticas, princípios e padrõesqualidade de código: boas práticas, princípios e padrões
qualidade de código: boas práticas, princípios e padrões
 
Carreira de Professor?
Carreira  de Professor?Carreira  de Professor?
Carreira de Professor?
 
Recursividade
RecursividadeRecursividade
Recursividade
 
Formei, mas não sei nada!!!
Formei, mas não sei nada!!!Formei, mas não sei nada!!!
Formei, mas não sei nada!!!
 
Pós Graduação em Engenharia de Software Centrada em Métodos Ágeis
Pós Graduação em Engenharia de Software Centrada em Métodos ÁgeisPós Graduação em Engenharia de Software Centrada em Métodos Ágeis
Pós Graduação em Engenharia de Software Centrada em Métodos Ágeis
 
Localização de Placas de Veículos Baseada em Métodos Estatísticos
Localização de Placas de Veículos Baseada em Métodos EstatísticosLocalização de Placas de Veículos Baseada em Métodos Estatísticos
Localização de Placas de Veículos Baseada em Métodos Estatísticos
 
Localização de Placas de Veículos Baseada em Métodos Estatísticos
Localização de Placas de Veículos Baseada em Métodos EstatísticosLocalização de Placas de Veículos Baseada em Métodos Estatísticos
Localização de Placas de Veículos Baseada em Métodos Estatísticos
 

Recently uploaded

Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualitySoftware Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Inflectra
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Albert Hoitingh
 
UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
DianaGray10
 
Monitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR EventsMonitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR Events
Ana-Maria Mihalceanu
 
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdfFIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance
 
Elevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object CalisthenicsElevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object Calisthenics
Dorra BARTAGUIZ
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
Frank van Harmelen
 
Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........
Alison B. Lowndes
 
DevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA ConnectDevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA Connect
Kari Kakkonen
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
Safe Software
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
Elena Simperl
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Jeffrey Haguewood
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
Sri Ambati
 
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Tobias Schneck
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
Laura Byrne
 
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
Product School
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance
 
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Product School
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
Product School
 

Recently uploaded (20)

Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualitySoftware Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
 
UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
 
Monitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR EventsMonitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR Events
 
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdfFIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
 
Elevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object CalisthenicsElevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object Calisthenics
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
 
Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........
 
DevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA ConnectDevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA Connect
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
 
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
 
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
 
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
 

Scrum checklist

  • 1. The bottom line Core Scrum the unofficial If you achieve these you can ignore the rest of the checklist. Your process is fine. These are central to Scrum. Without these you probably shouldn’t call it Scrum. Scrum Checklist Delivering working, tested Retrospective happen after software every 4 weeks or less every sprint Results in concrete Henrik Kniberg Delivering what the business improvement proposals needs most Some proposals actually Recommended but not always necessary Process is continuously get implemented Most of these will usually be needed, but not always all of them. Experiment! improving Whole team + PO Team has all skills needed to PBL items are broken into participates bring backlog items to Done tasks within a sprint Clearly defined product owner PO has a product backlog Team members not locked into (PO) (PBL) Sprint tasks are estimated specific roles PO is empowered to Top items are prioritized Iterations that are doomed to Estimates for ongoing tasks prioritize by business value fail are terminated early are updated daily PO has knowledge to Top items are estimated prioritize PO has product vision that is in sync with PBL Velocity is measured PO has direct contact with Estimates written by the team team PBL and product vision is highly All items in sprint plan have visible an estimate PO has direct contact with Top items in PBL small stakeholders enough to fit in a sprint Everyone on the team PO uses velocity for participates in estimating release planning PO speaks with one voice PO understands purpose (in case PO is a team) of all backlog items PO available when team is Velocity only includes estimating items that are Done Team has a sprint backlog Have sprint planning meetings Estimate relative size (story Team has a sprint burndown points) rather than time chart Highly visible PO participates Whole team knows top 1-3 Highly visible impediments Updated daily PO brings up-to-date PBL SM has strategy for how to Updated daily fix top impediment Owned exclusively by the Whole team participates team SM focusing on removing Daily Scrum is every day, same impediments time & place Results in a sprint plan Escalated to management PO participates at least a Daily Scrum happens Whole team believes plan when team can’t solve few times per week is achievable Whole team participates Team has a Scrum Master (SM) Max 15 minutes PO satisfied with Problems & impediments priorities Each team member knows are surfaced SM sits with the team what the others are doing Timeboxed iterations Demo happens after every Iteration length 4 weeks or Scaling Positive indicators sprint less These are pretty fundamental to any Leading indicators of a Shows working, tested Scrum scaling effort. good Scrum implementation. Always end on time software You have a Chief Product Feedback received from Team not disrupted or Having fun! High energy level. Owner (if many POs) stakeholders & PO controlled by outsiders Dependent teams do Scrum of Overtime work is rare and Team usually delivers Scrums happens voluntarily Have Definition of Done (DoD) what they committed to Dependent teams integrate Discussing, criticizing, and DoD achievable within within each sprint experimenting with the process Team members sit together each iteration PO = Product owner SM = Scrum Master PBL = Product Backlog DoD = Definition of Done Team respects DoD Max 9 people per team http://www.crisp.se/scrum/checklist | Version 2.1 (2009-08-17)