Frank and Lillian Gilbreth developed the concept of motion study and helped standardize hospital management. They studied motion to improve efficiency, with Frank Gilbreth passing suddenly in 1924 and Lillian Gilbreth continuing the work until her death in 1972, after the couple had 12 children together.
- The document discusses several key figures involved in the scientific management movement in the early 20th century, including Carl Barth, Henry Gantt, Frank and Lillian Gilbreth, and Harrington Emerson.
- Frank and Lillian Gilbreth pioneered the use of motion and time studies to analyze workflows. Frank developed the concept of "therbligs" to categorize basic motions. Lillian continued their work after Frank's death and became a renowned expert in management.
- Henry Gantt is known for developing the Gantt chart, an early project management tool still used today. He also created innovative task-based work systems with bonuses for meeting production standards.
Scientific management is a theory of management that was developed by Frederick Winslow Taylor in the 1880s-1890s. The theory aimed to improve economic efficiency, especially labor productivity, through analyzing and establishing optimized workflow processes. Some key elements of scientific management include selecting the best employees for each job, determining the one best way to perform each job, implementing a system of financial incentives like pay-per-piece work. While it aimed to increase efficiency, scientific management has been criticized for being too focused on specialization and individual performance over group efforts and innovation. It also prioritized monetary motivations over employee development.
Frank Bunker Gilbreth, Sr. was an early advocate of scientific management and pioneer of motion study. He was born in Maine and had no formal education beyond high school. He began as a bricklayer and later became a building contractor, inventor, and management engineer. Gilbreth proposed that surgical nurses hand instruments to surgeons and developed standard techniques for teaching military recruits to assemble and disassemble weapons rapidly. He received posthumous honors from engineering and management associations. Gilbreth died of heart failure in 1924 at age 55.
Scientific management aimed to improve economic efficiency, especially labor productivity, through analyzing and optimizing workflows. Pioneered by Frederick Taylor in the early 1900s, it involved developing scientific methods for each task to replace rule-of-thumb practices, scientifically selecting and training workers, and cooperating between workers and management. Frank and Lillian Gilbreth expanded on Taylor's work through motion and time studies to further reduce inefficiency and improve worker satisfaction. Scientific management transformed industries by standardizing best practices and rationalizing production processes.
Lillian Evelyn Moller was born in 1878 and attended school and university, where she met her future husband Frank Gilbreth. Together, Frank and Lillian worked to increase efficiency and productivity in their professional and personal lives. They wrote several books together and started workshops to train managers. After Frank's death, Lillian continued their work and wrote two additional books, receiving many awards for her contributions to time and motion study.
Frank y Lillian Gilbreth fueron pioneros en el estudio de los movimientos y tiempos en el trabajo. Frank se enfocó en identificar y eliminar movimientos innecesarios, considerando las necesidades de los trabajadores para reducir la fatiga. Lillian fue una de las primeras psicólogas industriales y destacó que la insatisfacción laboral se debe más a la falta de interés de la gerencia por los trabajadores que a la monotonía del trabajo.
Chapter two perspectives in management completeRam Kumar
The document discusses the evolution of early management theories from antiquity to modern times, including classical approaches like scientific management pioneered by Frederick Taylor which emphasized standardization, time studies, and incentives to increase efficiency. It also examines behavioral and quantitative perspectives and integrative frameworks incorporating different situational factors. The theories aimed to enhance organizational performance through principles of planning, organizing, controlling and motivating workers.
- The document discusses several key figures involved in the scientific management movement in the early 20th century, including Carl Barth, Henry Gantt, Frank and Lillian Gilbreth, and Harrington Emerson.
- Frank and Lillian Gilbreth pioneered the use of motion and time studies to analyze workflows. Frank developed the concept of "therbligs" to categorize basic motions. Lillian continued their work after Frank's death and became a renowned expert in management.
- Henry Gantt is known for developing the Gantt chart, an early project management tool still used today. He also created innovative task-based work systems with bonuses for meeting production standards.
Scientific management is a theory of management that was developed by Frederick Winslow Taylor in the 1880s-1890s. The theory aimed to improve economic efficiency, especially labor productivity, through analyzing and establishing optimized workflow processes. Some key elements of scientific management include selecting the best employees for each job, determining the one best way to perform each job, implementing a system of financial incentives like pay-per-piece work. While it aimed to increase efficiency, scientific management has been criticized for being too focused on specialization and individual performance over group efforts and innovation. It also prioritized monetary motivations over employee development.
Frank Bunker Gilbreth, Sr. was an early advocate of scientific management and pioneer of motion study. He was born in Maine and had no formal education beyond high school. He began as a bricklayer and later became a building contractor, inventor, and management engineer. Gilbreth proposed that surgical nurses hand instruments to surgeons and developed standard techniques for teaching military recruits to assemble and disassemble weapons rapidly. He received posthumous honors from engineering and management associations. Gilbreth died of heart failure in 1924 at age 55.
Scientific management aimed to improve economic efficiency, especially labor productivity, through analyzing and optimizing workflows. Pioneered by Frederick Taylor in the early 1900s, it involved developing scientific methods for each task to replace rule-of-thumb practices, scientifically selecting and training workers, and cooperating between workers and management. Frank and Lillian Gilbreth expanded on Taylor's work through motion and time studies to further reduce inefficiency and improve worker satisfaction. Scientific management transformed industries by standardizing best practices and rationalizing production processes.
Lillian Evelyn Moller was born in 1878 and attended school and university, where she met her future husband Frank Gilbreth. Together, Frank and Lillian worked to increase efficiency and productivity in their professional and personal lives. They wrote several books together and started workshops to train managers. After Frank's death, Lillian continued their work and wrote two additional books, receiving many awards for her contributions to time and motion study.
Frank y Lillian Gilbreth fueron pioneros en el estudio de los movimientos y tiempos en el trabajo. Frank se enfocó en identificar y eliminar movimientos innecesarios, considerando las necesidades de los trabajadores para reducir la fatiga. Lillian fue una de las primeras psicólogas industriales y destacó que la insatisfacción laboral se debe más a la falta de interés de la gerencia por los trabajadores que a la monotonía del trabajo.
Chapter two perspectives in management completeRam Kumar
The document discusses the evolution of early management theories from antiquity to modern times, including classical approaches like scientific management pioneered by Frederick Taylor which emphasized standardization, time studies, and incentives to increase efficiency. It also examines behavioral and quantitative perspectives and integrative frameworks incorporating different situational factors. The theories aimed to enhance organizational performance through principles of planning, organizing, controlling and motivating workers.
This document discusses theories of leadership. It describes that leadership involves guiding, developing, motivating, and inspiring people to achieve goals. Some theories propose that leaders are born with certain traits, while other behavioral theories suggest that leadership can be learned. The document outlines two major behavioral theories - the Ohio State Studies, which identified initiating structure and consideration behaviors, and the University of Michigan studies, which focused on production and employee orientations. It notes that behavioral theories aim to develop leaders by identifying effective leadership actions.
The behavioural theory of management emphasizes understanding the various factors that affect human behavior in organizations. The Hawthorne studies conducted by Elton Mayo at Western Electric found that social and psychological factors, rather than just physical work conditions, influenced productivity. The studies showed that informal social groups within the workplace were important, and non-financial incentives could be more motivating than financial incentives alone. The human relations approach focused on how management interacts with workers and improving social and morale factors.
Scientific management aimed to improve industrial efficiency. Frederick Taylor developed its core principles: (1) scientifically analyze each job element; (2) scientifically select and train workers; (3) cooperate with workers; (4) equally divide work and responsibility. The Gilbreths used time-motion studies to standardize processes. Henry Gantt focused on production scheduling using Gantt charts. While scientific management improved productivity, it was criticized for treating workers like machines and excluding senior management tasks.
Principles of Scientific Management (F.W. Taylor)Deep Gurung
The slide explains the theory proposed by F.W. Taylor. He introduced scientific methods of doing work to increase productivity. Thus he is known as 'Father of Scientific Management;. Thus, the theory 'Principles of Scientific Management'.
Gantt’s contribution to scientific managementNixon Johny
Henry Gantt made several important contributions to scientific management including developing the Gantt chart, task and bonus system, and emphasizing the social responsibility of businesses. The Gantt chart visually depicts the tasks, start/end dates, durations, and dependencies of a project. Gantt's task and bonus system rewarded workers for completing tasks ahead of schedule. He believed businesses have a duty to improve society and workers' welfare, not just maximize profits.
1) The document discusses how business and management are changing in the 21st century due to factors like new technologies, a more globalized and diverse workforce, and an increased focus on relationships and collaboration.
2) Key changes in the workforce include an aging population, greater diversity, more outsourcing and offshoring, and a shift towards collaboration and work-life balance among younger workers.
3) Successful 21st century managers need strong critical thinking and creativity skills to lead organizational change, as well as the ability to guide employees through challenges and foster innovation.
This document discusses the changing face of business. It begins by defining business and describing the key factors of production. It then outlines the private enterprise system and identifies six eras in the history of business. The document notes how today's workforce is changing in terms of skills needed, diversity, and flexibility. It identifies critical thinking, creativity, and ability to lead change as important skills for 21st century managers. Finally, it discusses what makes a company admired based on profits, growth, work environment, ethics and social responsibility.
This document discusses effective communication and teamwork in organizations. It covers empowering employees, different types of teams, characteristics of effective teams, managing conflict, and the importance of communication. Communication is a key skill and includes both formal and informal channels as well as nonverbal aspects. During a crisis, companies need to respond quickly, provide facts, and communicate openly with stakeholders.
The document discusses key economic concepts including:
- Microeconomics examines small economic units like consumers and businesses, and the forces of supply and demand. Macroeconomics looks at whole economies and issues like growth, inflation, and unemployment.
- Economies can be private, planned, or mixed. Mixed market economies combine features of capitalism and socialism.
- Economic performance is evaluated based on measures like GDP, productivity, employment levels, inflation, and how monetary and fiscal policies are used to manage the economy.
The document provides an overview of the financial system, including its key components and functions. It discusses the flow of money from savers to users through financial institutions and markets. It also outlines various types of securities like money market instruments, bonds, and stocks, as well as the major stock exchanges. Additionally, it describes the role of key organizations in the financial system like the Federal Reserve, FDIC, and SEC.
The document summarizes key concepts in customer-driven marketing. It discusses how marketing creates utility for customers and the evolution of the marketing concept to a customer orientation. It also outlines the basic steps in developing a marketing strategy, including analyzing target markets and creating a marketing mix. Relationship marketing and tools for nurturing customer relationships are also summarized.
This chapter discusses business ethics and social responsibility. It explains that business ethics are the standards governing actions and decisions in the workplace. Social responsibility means balancing profitability with what is right for society. The chapter then describes how organizations can shape ethical conduct through codes of conduct, training, and leadership setting an ethical example. It also discusses how businesses can act responsibly to satisfy society by considering the interests of customers, employees, investors and the public.
Most businesses are small, with over 90% having fewer than 20 employees. Small businesses make significant contributions to the economy through job creation and innovation. However, about half of small businesses fail within the first five years, often due to management issues, lack of financing, or government regulation. Establishing an effective business plan and obtaining financing from sources like the Small Business Administration can help increase a small business's chances of success. Common forms of business organization include sole proprietorships, partnerships, corporations, franchises, and cooperatives. Larger businesses sometimes join forces through mergers, acquisitions, or joint ventures.
This document provides an overview of key concepts in corporate finance and financial management. It discusses the role of financial managers in implementing a company's financial plan and determining optimal sources of funds. It also summarizes various short-term and long-term financing options, tools for managing assets, and strategies for mergers and acquisitions. The overall goal of financial management is to maximize shareholder wealth through balancing risk and return.
Scientific management emerged between 1910-1935 and was pioneered by Frederick Taylor, Henry Gannt, Frank and Lillian Gilbreth, Luther Gulick, Max Weber, and Henri Fayol. They approached management in a scientific manner using tools like research, analysis, and standardization of tasks. Taylor is known for his time and motion studies and piece-rate payment systems. Gannt developed charting methods and incentive plans. The Gilbreths analyzed motions to reduce wasted time. Gulick established principles of administration and coordination. Weber described bureaucratic organization and authority. Fayol identified functions and principles of management. Scientific management emphasized efficiency and standardized work processes.
Scientific Management focused on increasing productivity through efficient production processes. Frederick Taylor is considered the Father of Scientific Management; he published the Principles of Scientific Management and believed managers should develop rules/routines, replace rule-of-thumb methods, select and train workers, and provide wage incentives. Frank and Lillian Gilbreth made important contributions through time and motion studies, establishing standardized elements of tasks. They developed symbols to represent task elements and studied ergonomics through adjustable workstations. Henry Gantt also worked to develop task-based work with bonuses to stimulate performance.
Frank and Lillian Gilbreth were early 20th century management experts known for developing motion study. Frank started his career as a bricklayer and rose to become a construction supervisor. He later founded his own construction company and wrote books on minimizing unnecessary motions. Lillian received her PhD and collaborated with Frank, developing the concept of "micro motion study." Together they identified basic motions, studied worker and workplace variables, and reduced motions in jobs. The Gilbreths criticized some aspects of Taylor's scientific management approach as inaccurate and wasteful, instead advocating reducing unnecessary fatigue through workplace design and necessary fatigue through improved techniques and rest periods.
1. The document discusses economic challenges facing contemporary business, including microeconomics, macroeconomics, different market structures, the business cycle, and monetary and fiscal policy.
2. It defines microeconomics as the study of small economic units like individuals and businesses, and macroeconomics as issues affecting the entire society.
3. The four types of market structure are pure competition, monopolistic competition, oligopoly, and monopoly. Monetary and fiscal policy tools are used to manage the economy.
Evolution of human resources managementTobi Odunowo
Slide presentation for PLVI Learning Podcast 1.
To find video containing podcast, search"Personality Leadership Virtual Institute" on Facebook and like the page.
This document summarizes major management approaches including historical, classical, behavioral, quantitative, and contemporary approaches. The historical approach discusses organized endeavors dating back thousands of years. The classical approach covers scientific management by Taylor and general administrative theory by Fayol. The behavioral approach was pioneered by researchers examining how organizations are social and require cooperation. Quantitative approaches focused on concepts like total quality management and process improvement. Contemporary approaches include systems theory analyzing organizations as interconnected parts and the contingency approach stating there is no universal best way to manage due to different organizational situations.
This document discusses theories of leadership. It describes that leadership involves guiding, developing, motivating, and inspiring people to achieve goals. Some theories propose that leaders are born with certain traits, while other behavioral theories suggest that leadership can be learned. The document outlines two major behavioral theories - the Ohio State Studies, which identified initiating structure and consideration behaviors, and the University of Michigan studies, which focused on production and employee orientations. It notes that behavioral theories aim to develop leaders by identifying effective leadership actions.
The behavioural theory of management emphasizes understanding the various factors that affect human behavior in organizations. The Hawthorne studies conducted by Elton Mayo at Western Electric found that social and psychological factors, rather than just physical work conditions, influenced productivity. The studies showed that informal social groups within the workplace were important, and non-financial incentives could be more motivating than financial incentives alone. The human relations approach focused on how management interacts with workers and improving social and morale factors.
Scientific management aimed to improve industrial efficiency. Frederick Taylor developed its core principles: (1) scientifically analyze each job element; (2) scientifically select and train workers; (3) cooperate with workers; (4) equally divide work and responsibility. The Gilbreths used time-motion studies to standardize processes. Henry Gantt focused on production scheduling using Gantt charts. While scientific management improved productivity, it was criticized for treating workers like machines and excluding senior management tasks.
Principles of Scientific Management (F.W. Taylor)Deep Gurung
The slide explains the theory proposed by F.W. Taylor. He introduced scientific methods of doing work to increase productivity. Thus he is known as 'Father of Scientific Management;. Thus, the theory 'Principles of Scientific Management'.
Gantt’s contribution to scientific managementNixon Johny
Henry Gantt made several important contributions to scientific management including developing the Gantt chart, task and bonus system, and emphasizing the social responsibility of businesses. The Gantt chart visually depicts the tasks, start/end dates, durations, and dependencies of a project. Gantt's task and bonus system rewarded workers for completing tasks ahead of schedule. He believed businesses have a duty to improve society and workers' welfare, not just maximize profits.
1) The document discusses how business and management are changing in the 21st century due to factors like new technologies, a more globalized and diverse workforce, and an increased focus on relationships and collaboration.
2) Key changes in the workforce include an aging population, greater diversity, more outsourcing and offshoring, and a shift towards collaboration and work-life balance among younger workers.
3) Successful 21st century managers need strong critical thinking and creativity skills to lead organizational change, as well as the ability to guide employees through challenges and foster innovation.
This document discusses the changing face of business. It begins by defining business and describing the key factors of production. It then outlines the private enterprise system and identifies six eras in the history of business. The document notes how today's workforce is changing in terms of skills needed, diversity, and flexibility. It identifies critical thinking, creativity, and ability to lead change as important skills for 21st century managers. Finally, it discusses what makes a company admired based on profits, growth, work environment, ethics and social responsibility.
This document discusses effective communication and teamwork in organizations. It covers empowering employees, different types of teams, characteristics of effective teams, managing conflict, and the importance of communication. Communication is a key skill and includes both formal and informal channels as well as nonverbal aspects. During a crisis, companies need to respond quickly, provide facts, and communicate openly with stakeholders.
The document discusses key economic concepts including:
- Microeconomics examines small economic units like consumers and businesses, and the forces of supply and demand. Macroeconomics looks at whole economies and issues like growth, inflation, and unemployment.
- Economies can be private, planned, or mixed. Mixed market economies combine features of capitalism and socialism.
- Economic performance is evaluated based on measures like GDP, productivity, employment levels, inflation, and how monetary and fiscal policies are used to manage the economy.
The document provides an overview of the financial system, including its key components and functions. It discusses the flow of money from savers to users through financial institutions and markets. It also outlines various types of securities like money market instruments, bonds, and stocks, as well as the major stock exchanges. Additionally, it describes the role of key organizations in the financial system like the Federal Reserve, FDIC, and SEC.
The document summarizes key concepts in customer-driven marketing. It discusses how marketing creates utility for customers and the evolution of the marketing concept to a customer orientation. It also outlines the basic steps in developing a marketing strategy, including analyzing target markets and creating a marketing mix. Relationship marketing and tools for nurturing customer relationships are also summarized.
This chapter discusses business ethics and social responsibility. It explains that business ethics are the standards governing actions and decisions in the workplace. Social responsibility means balancing profitability with what is right for society. The chapter then describes how organizations can shape ethical conduct through codes of conduct, training, and leadership setting an ethical example. It also discusses how businesses can act responsibly to satisfy society by considering the interests of customers, employees, investors and the public.
Most businesses are small, with over 90% having fewer than 20 employees. Small businesses make significant contributions to the economy through job creation and innovation. However, about half of small businesses fail within the first five years, often due to management issues, lack of financing, or government regulation. Establishing an effective business plan and obtaining financing from sources like the Small Business Administration can help increase a small business's chances of success. Common forms of business organization include sole proprietorships, partnerships, corporations, franchises, and cooperatives. Larger businesses sometimes join forces through mergers, acquisitions, or joint ventures.
This document provides an overview of key concepts in corporate finance and financial management. It discusses the role of financial managers in implementing a company's financial plan and determining optimal sources of funds. It also summarizes various short-term and long-term financing options, tools for managing assets, and strategies for mergers and acquisitions. The overall goal of financial management is to maximize shareholder wealth through balancing risk and return.
Scientific management emerged between 1910-1935 and was pioneered by Frederick Taylor, Henry Gannt, Frank and Lillian Gilbreth, Luther Gulick, Max Weber, and Henri Fayol. They approached management in a scientific manner using tools like research, analysis, and standardization of tasks. Taylor is known for his time and motion studies and piece-rate payment systems. Gannt developed charting methods and incentive plans. The Gilbreths analyzed motions to reduce wasted time. Gulick established principles of administration and coordination. Weber described bureaucratic organization and authority. Fayol identified functions and principles of management. Scientific management emphasized efficiency and standardized work processes.
Scientific Management focused on increasing productivity through efficient production processes. Frederick Taylor is considered the Father of Scientific Management; he published the Principles of Scientific Management and believed managers should develop rules/routines, replace rule-of-thumb methods, select and train workers, and provide wage incentives. Frank and Lillian Gilbreth made important contributions through time and motion studies, establishing standardized elements of tasks. They developed symbols to represent task elements and studied ergonomics through adjustable workstations. Henry Gantt also worked to develop task-based work with bonuses to stimulate performance.
Frank and Lillian Gilbreth were early 20th century management experts known for developing motion study. Frank started his career as a bricklayer and rose to become a construction supervisor. He later founded his own construction company and wrote books on minimizing unnecessary motions. Lillian received her PhD and collaborated with Frank, developing the concept of "micro motion study." Together they identified basic motions, studied worker and workplace variables, and reduced motions in jobs. The Gilbreths criticized some aspects of Taylor's scientific management approach as inaccurate and wasteful, instead advocating reducing unnecessary fatigue through workplace design and necessary fatigue through improved techniques and rest periods.
1. The document discusses economic challenges facing contemporary business, including microeconomics, macroeconomics, different market structures, the business cycle, and monetary and fiscal policy.
2. It defines microeconomics as the study of small economic units like individuals and businesses, and macroeconomics as issues affecting the entire society.
3. The four types of market structure are pure competition, monopolistic competition, oligopoly, and monopoly. Monetary and fiscal policy tools are used to manage the economy.
Evolution of human resources managementTobi Odunowo
Slide presentation for PLVI Learning Podcast 1.
To find video containing podcast, search"Personality Leadership Virtual Institute" on Facebook and like the page.
This document summarizes major management approaches including historical, classical, behavioral, quantitative, and contemporary approaches. The historical approach discusses organized endeavors dating back thousands of years. The classical approach covers scientific management by Taylor and general administrative theory by Fayol. The behavioral approach was pioneered by researchers examining how organizations are social and require cooperation. Quantitative approaches focused on concepts like total quality management and process improvement. Contemporary approaches include systems theory analyzing organizations as interconnected parts and the contingency approach stating there is no universal best way to manage due to different organizational situations.
Cover Story - China's Investment Leader - Dr. Alyce SUmsthrill
In World Expo 2010 Shanghai – the most visited Expo in the World History
https://www.britannica.com/event/Expo-Shanghai-2010
China’s official organizer of the Expo, CCPIT (China Council for the Promotion of International Trade https://en.ccpit.org/) has chosen Dr. Alyce Su as the Cover Person with Cover Story, in the Expo’s official magazine distributed throughout the Expo, showcasing China’s New Generation of Leaders to the World.
SATTA MATKA DPBOSS KALYAN MATKA RESULTS KALYAN CHART KALYAN MATKA MATKA RESULT KALYAN MATKA TIPS SATTA MATKA MATKA COM MATKA PANA JODI TODAY BATTA SATKA MATKA PATTI JODI NUMBER MATKA RESULTS MATKA CHART MATKA JODI SATTA COM INDIA SATTA MATKA MATKA TIPS MATKA WAPKA ALL MATKA RESULT LIVE ONLINE MATKA RESULT KALYAN MATKA RESULT DPBOSS MATKA 143 MAIN MATKA KALYAN MATKA RESULTS KALYAN CHART
The report *State of D2C in India: A Logistics Update* talks about the evolving dynamics of the d2C landscape with a particular focus on how brands navigate the complexities of logistics. Third Party Logistics enablers emerge indispensable partners in facilitating the growth journey of D2C brands, offering cost-effective solutions tailored to their specific needs. As D2C brands continue to expand, they encounter heightened operational complexities with logistics standing out as a significant challenge. Logistics not only represents a substantial cost component for the brands but also directly influences the customer experience. Establishing efficient logistics operations while keeping costs low is therefore a crucial objective for brands. The report highlights how 3PLs are meeting the rising demands of D2C brands, supporting their expansion both online and offline, and paving the way for sustainable, scalable growth in this fast-paced market.
Adani Group's Active Interest In Increasing Its Presence in the Cement Manufa...Adani case
Time and again, the business group has taken up new business ventures, each of which has allowed it to expand its horizons further and reach new heights. Even amidst the Adani CBI Investigation, the firm has always focused on improving its cement business.
High-Quality IPTV Monthly Subscription for $15advik4387
Experience high-quality entertainment with our IPTV monthly subscription for just $15. Access a vast array of live TV channels, movies, and on-demand shows with crystal-clear streaming. Our reliable service ensures smooth, uninterrupted viewing at an unbeatable price. Perfect for those seeking premium content without breaking the bank. Start streaming today!
https://rb.gy/f409dk
SATTA MATKA DPBOSS KALYAN MATKA RESULTS KALYAN CHART KALYAN MATKA MATKA RESULT KALYAN MATKA TIPS SATTA MATKA MATKA COM MATKA PANA JODI TODAY BATTA SATKA MATKA PATTI JODI NUMBER MATKA RESULTS MATKA CHART MATKA JODI SATTA COM INDIA SATTA MATKA MATKA TIPS MATKA WAPKA ALL MATKA RESULT LIVE ONLINE MATKA RESULT KALYAN MATKA RESULT DPBOSS MATKA 143 MAIN MATKA KALYAN MATKA RESULTS KALYAN CHART
Prescriptive analytics BA4206 Anna University PPTFreelance
Business analysis - Prescriptive analytics Introduction to Prescriptive analytics
Prescriptive Modeling
Non Linear Optimization
Demonstrating Business Performance Improvement
NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...BBPMedia1
Nathalie zal delen hoe DEI en ESG een fundamentele rol kunnen spelen in je merkstrategie en je de juiste aansluiting kan creëren met je doelgroep. Door middel van voorbeelden en simpele handvatten toont ze hoe dit in jouw organisatie toegepast kan worden.
SATTA MATKA DPBOSS KALYAN MATKA RESULTS KALYAN MATKA MATKA RESULT KALYAN MATKA TIPS SATTA MATKA MATKA COM MATKA PANA JODI TODAY BATTA SATKA MATKA PATTI JODI NUMBER MATKA RESULTS MATKA CHART MATKA JODI SATTA COM INDIA SATTA MATKA MATKA TIPS MATKA WAPKA ALL MATKA RESULT LIVE ONLINE MATKA RESULT KALYAN MATKA RESULT DPBOSS MATKA 143 MAIN MATKA KALYAN MATKA RESULTS KALYAN CHART KALYAN CHART
The earliest form of managerial consulting dates back to the turn of the ninetieth century. In that time, factory jobs dominated the work force and much like today, managers were looking for ways to increase productivity and lower costs. Some individuals during this time began applying scientific thought to management, with some of their resulting ideas, such as the Gantt chart, still being used today. In order to better understand where we are going as consultants in the twenty-first century, it is important to look back and understand the history of our profession. We will explore the lives of some of these pioneers.
Often times described as the father of scientific management, Frederick Winslow Taylor grew up with a fascination for order and control. Born on March 20, 1856 in Germantown, Pennsylvania, Taylor is remembered by childhood friends for his scientific approaches to the most basic problems. For example, when playing baseball Taylor would insist on taking detailed measurements of the field before the game, so that all players could be spaced in perfect relation to one another Accepted to Harvard, but choose not to attend due to failing eyesight. Began work as a machinist at a steel company. While working at steel company he observed many workers intentionally work slower when paid hourly to limit the amount of work they have to do. He called this process soldiering, and because of his obsession with control and order this bothered him badly. He went to work designing a system to increase productivity in the factory. he came up with the piece rate system, which succeeded to increase productivity. Taylor developed and implemented a differential piece-rate policy that set in place a expected production rate per employee. Employees who exceeded this rate were paid higher, and employees who did not meet the rate were paid lower Went on the be hired by other ocmpanies as a consultant to design similar systems, but often met a common problem - opposition between managers and employees His work began to be known as Taylorisim Opposition to taylorism increased in the later years of taylors life Workers and unions complained that the system was unfair, and eventually congress investigated and ruled that Taylorisim did not keep in mind the best interest of workers. the system was not used after that, but taylors work laid the groundwork for the modern day consultant Died in 1915.
Henry L. Gantt was born in 1861 in Calvert County, Maryland. Gantt graduated from McDonogh School in 1878 and went on to the Stevens Institute of Technology in New Jersey. He was a teacher before starting his mechanical engineering career. 1887 Gantt’s consulting career began. He worked with Frederick W. Taylor in applying scientific management principles to their work at Midvale Steel as well as Bethlehem Steel. Between the years of 1910 and 1915, he developed the Gantt chart. The Gantt chart is a type of bar chart that illustrates a project’s schedule. The Gantt chart breaks down the start and finish dates of the terminal elements and summary elements of a plan. The chart also reveals a project’s planned and actual progress. The Gantt chart helps organizations break down different elements of a project and can help companies decipher the roles each employee has. The chart also shows the dependency relationship between activities in a project. Use of the Gantt chart benefited from the development of computers in the 1980s and 90s. The Gantt chart is still used today for project management.
Frank Gilbreth was born to New Englander parents in Fairfield Maine in 1868. After his graduation from high school in 1885, he was accepted to the Massachusetts Institute of Technology, but chose to forego college to go directly into business (Gilbreth, 2008). Gilbreth’s career started in the construction industry, as a bricklayer’s apprentice. Here his interest in ergonomics and efficiency was sparked. He was devoted to finding “the one best way” of performing a task Frank Gilbreth met Lillian in 1903, and began to help her complete her doctoral degree at Brown University. Once married, Frank’s focus shifted from construction to industrial management. Frank published his first book, Field System, in 1908. The book was a collection of ideas gathered from men who worked in Frank’s construction company. He asked for their ideas and recommendations for how to improve processes and tasks that they perform throughout their day. This was the first in a series of similar books detailing the tasks that workers perform
Lillian Gilbreth was born to German parents in Oakland California in 1878. She was the oldest of nine children, three boys and six girls, and it was not expected by her parents that she should attain a college education. Lillian would not need to work, her parents thought, but she desired education (Burns, 1978). She enrolled at the University of California at Berkeley, and earned her bachelor’s degree in 1900 and her master’s in 1902, both in English. While working on her doctoral degree in 1904, she visited Boston, where she met and married Frank Bunker Gilbreth, Lillian worked to complete her doctoral degree at Brown University and published her thesis, The Psychology of Management, which appeared serially in the Industrial Engineering Magazine from May 1912 – May 1913. She completed her doctorate at Brown in 1915.
Once married, Frank’s focus shifted from construction to industrial management. This is in part due to Lillian’s interest in the field of psychology and how it can be applied to management (Burns, 1978). They began to lead the way in the new field of scientific management, all while raising twelve children. Frank developed the Motion Study, a study of the motion taken by a worker when performing a task In 1912 frank applied his motion study to the most delicate tasks of a surgeon. He then worked with Dr. Robert Dickinson to improve the management of hospitals. The integration of the Gilbreths’ scientific management ideas in hospitals “provided the foundation for modern hospital management In 1913 the Gilbreth’s started the Summer School of Scientific Management, which preached their philosophies of integrating psychology and education into management. The school was attended by professionals from all over the world, and effectively established Frank Gilbreths’ reputation as a management consultant The Gilbreths published the paper Motion Study for the Handicapped in 1917. This paper was prompted by the study of injured soldiers returning from World War I. Frank Gilbreth would watch the motions of wounded soldiers and teach them ways to manage the everyday tasks they needed to perform. legged men, or by skilled one-handed men” (Burns, 1978). Frank Gilbreth died suddenly in 1924, leaving Lillian to run a household of 12 children, six girls and six boys. After Frank’s death the consulting firm they had founded together failed, as many companies were hesitant to do business with a woman (Carmody, 2004). This did not keep Lillian down. She continued to hold workshops in her home, lectured and wrote. In 1935 she was appointed to a part-time professorship at Purdue University, in the Management school, and continued there until 1948. She retired in 1968, and passed away in 1972
These individuals were pioneers in the field of scientific management, laying the groundwork for today’s performance improvement professionals. Their work created and advanced the consulting profession as we know it today.