Mohammad Saquib
Email-msaquib1986@gmail.com
Contact No.-+974-77031863
Skype Name-mohd.saquib86
Profile: A competent and dynamic Engineering professional specializingin Operations& Maintenance, installation &
commissioning,facilities management, service& maintenance for industrial and buildingfacilities.Experienced gained
over the past 5 years in India and Qatar in extremely diverseand challengingenvironment. Demonstrates ability to
lead and manage effectively ensuringperformance in relation to quality,costand delivery of servicewhilst
maintainingcustomer satisfaction. I amcurrently associated with Mosanada UGL, as Site Engineer (MEP) in the
Operations and Maintenance Divison, assigned atAl Gharaffa Sports Club Facility for a clientQOC/ Ministry of Youth
and Affairs, Qatar.
Core Competencies: Electrical & Electronics Engineering ~ Facilities Management ~ Operations & Maintenance ~
installation & commissioning ~ service & maintenance.
Experience Profile: 2.5 yrs Operations & Maintenance for Building Facilities ~ 2 yrs installation & commissioning,
Engineering services and maintenance for industrial and commercial Buildings Facilities ~ 6 months as trainee
Engineer.
Education
A firstclass Bachelor degree in Engineering in the field of Electronics and Communication from Gautam Buddh
Technical University, Lukhnow, India in 2011.
Project: Microcontroller based Energy saver
Employment Record
Mosanada UGL
MEP Site Engineer – Operations and Maintenance Department
Site-Al Gharafa Sports Club for a client Qatar Olympic Committee/Ministry of Youth and Affair, January 2014
onwards
Company Profile:
Mosanada UGL is a joint venture between Aspire Katara Investments, Qatar Olympic Committee and UGL Services.
Mosanada UGL provides integrated facilitiesmanagement services in Qatar, from inception of build design through to
disposal of the property.
UGL's Services business provides end-to-end corporatereal estate and facilities management services to corporations,
governments and institutions in Australia, New Zealand, Asia, North America and the Middle East.
Through five complementary brands – UGL Services (Australia & New Zealand), UGL Services (Middle East), UGL
Services - Premas Operations, UGL Services - Equis and UGL Services - Unicco Operations – the company delivers
clients integrated solutions on a local, regional, national and multi -national basis.
Job Profile
 Reports to Operations Manger.
 Site management, coordination with consultants/architects/contractors for optimum solution.
 Planning and mobilization of team to execute the task as per the scheduled PPM (Planned Preventive
Maintenance) and CM for the MEP equipment (Chiller, AHUs, FCUs,Split & Window ACs, Chilled Water Pumps,
Irrigation Pumps, Electrical Panels, Generators etc .
 Supervises contractor’s technicians and supervisor to ensure the facility equipments are running smoothly as per
the operating specification. The facilities include football pitches, multi -purpose indoor halls, sports academy,
beach plying field, Al Gharaffa Stadium, gymnasiums including Jacuzzis, saunas, and cold pools.
 Oversee and manage the operation and maintenance of water supply systems, fire suppression
systems, electrical utility like Chillers, Boilers, Motors, Pumps, DG set &, MV & DB Panels.
 Monitor and maintain records.
 Work on CMMS (Computerized Maintenance Management System) by Maximo, Work Order creation, PR, RFQ, PO,
Verification, SLA, and KPI.
 Co-ordination with Housekeeping Supervisor, Landscaping Supervisor to ensure the PPM has done as per
requirement, checking the manpower attendance etc.
 Troubleshoot and rectify minor problems. Identify the root causeand advicesupervisor to raiseWork Orders if jobs
have to be carried out by contractor. Includes all Facilities Equipments related to Mechanical, Electrical and
Plumbing.
 To record any system failure, report to the Operations and prepare incident report, defect report, snag report.
 Conduct pass down meeting to colleagues on the status of the equipments and report any incidents.
 Maintain,test and certify electrical supply networks includingpower distribution boards,panels, facilities, lighting
switches, cables / wiring, electric motors, electric pump stations and equipments.
 Prepare regular progress reports and Maintained all records of the work orders and repairs done on the facility.
 Attend to all breakdown complaints requests. Follow-up with the contractors on all Service Orders for any
requirement of materials.
 Estimates, prepares and assigns the resources such as manpower, materials, consumables, equipment, tools, etc.,
required for all electrical and related works prior to execution.
 Responsible for checking the contractor weather the planed preventive maintenance (PPM) is being done correctly
as per standards by the contractors.
 Advice facilities supervisorand facilities manager of technical problems concerned with installation, modification
and repair of electrical, mechanical and plumbing assignments.
 Oversee and manage the operation and maintenance of water supply systems, fire suppression
systems, electrical utility like Chillers, Boilers, Motors, Pumps, DG set & LV, MV & DB Panels.
 Review the parameters recorded by technicians and to take necessary action if there is any discrepancies.
 Solving problems by technical analysis, group discussions, explore alternatives, and propose quality solutions at
minimum cost.
 Carry out periodic Safety inspections on contractors’ site works in line with QEHS requirements.
 To escalate any emergencies immediately to the Operations Manager.
Significant Contributions / Achievements
 Efficiently supervises all operations and maintenance of Al Gharaffa Sports Club, Qatar, handling around 2000
assets related to MEP.
 Efficiently organize and supports all events held at Al Gharaffa Stadium.
Harmilap Hotels private Limited, Panipat, Haryana
MEP Assistant Operations & Maintenance Engineer, March 2013 to December 2013
Job Profile
Oversee and manage the operation and maintenance of the following.
- Water supply systems
- Fire suppression systems
- Electrical cablesand wiring
- Facility electrical utility equipment and distribution lines
- Facility mechanical utility equipments such as chillers,boilers,hotwater generators, pumps
- Lighting/switches/air conditioningunits
- Generators and power distribution / breaker panels
- Electrical distribution systems
- Motors/pumps/cables/wiringand all other electrical systems
- Fuel distribution systems
 Report any maintenance problems, safety hazards, accidents, or injuries; complete safety training and
certifications.
 Ensure uniform and personal appearance is clean and professional, maintain confidentiality of proprietary
information, and protect company assets.
 Manage a team of electricians and plumbers to ensure all work is repaired/installed to the highest standards in
accordance with the applicable mechanical / electrical and plumbing standards
 Coordinated with the supervisors and maintained the inventory of the supplies and tools for the facility.
 Develops, establishes, recommends and enforces safety practices applicable with mechanical / electrical and
plumbing systems.
 Operated Fire Alarm and Life Safety systems and monitored their working, and handled all safety equipment at the
time of emergency.
 Coordinated with the Chief Engineer and performed all preventative maintenance for the facility.
 Inspected the fire safety equipment’s in the facility and checked them for their condition.
 Maintain,test and certify electrical supply networks includingpower distribution boards,panels, facilities, lighting
switches, cables / wiring, electric motors, electric pump stations and equipments.
 Prepare regular progress reports and Maintained all records of the work orders and repairs done on the facility.
Thermodyne Engineering System, Ghaziabad, India
Service & Maintenance Engineer, January 2011 - February 2013)
Company Profile
Thermodyne Engineering Systems as a solution provider to Thermal Energy users and help them save maximum
energy and thus resulting in increased Profits.
Through innovation and commitment to customer service, Thermodyne has been consistently changing the way
customers think about Steam Boilers. Thermodyne is constantly striving to extend the Thermal Efficiency Levels,
Waste Heat Recovery, Condensate Heat Recovery and Fuel conversions savings potential at customer’s end.
Thermodyne is manufacturer of steam boiler,hot water generators, blowers & fans and all others related products
used in hospitality industry,paper industry,food processingindustries,cotton textile industry etc. Theromodye also
offers turn Key Projects for installation and commissioning of firefightingpumps, boiler,hot waters generators, pipe
lines,insulation work, electrical panels& cablingfor the boilers and pumps related panels.
Job Profile
 Testing, Installation and Commissioningof boilers,water softeners and Thermic fluid heaters, furnace oil heater as
per drawings.
 Erection of high pressure MS pipeline steam and water, erection of complete boiler structure and boiler
accessories, heat exchangers, flue gas ducting, ID fans, FD fans, air pre heater, water pre heater, cyclone dust
collector, HVAC system, AHU, HVAC ducting, boiler and chiller insulation.
 Selection and sizing of valves as per requirement of liquid and pressure.
 Installation of firefighting pumps and erection of pipe line for fire safety.
 Commissioning & installation of PLC, AC Drives & DC Drives used in diversified applications .
 Installation, Testing & Commissioning of LV Panel, MV Panel and DB & SMB Panels.
 Giving electrical panel drawings and panel designing for hot water generator, boiler.
 InvolvingP&ID and I/O List preparation Control wiringdrawings verification and testing and control cable sizing to
the project.
 Supervising overall operation of electrical distribution system, boiler and HVAC and also providing
 Training & supervising operators and technician for improving reliability of machines.
 Coordinating with the clients for their feedback, service.
 Perform routine, predictive,preventive and correctivemaintenance on chillers,boilers& RO and providing support
and maintenance to end users and customers on multiple systems and controllers in emergency situations / 24-7
On-call duty.
 MaintainingContractdocuments & collection of all relevantdata from projects.Maintain all documentation at site
office as required by the company including all internal reporting.
Significant Contributions / Achievements
 Independently handled the 5 million project for the installation and commissioning of two 800 kg/hr oil fired
boilers,3 firefightingpumps, 3 domestic water pumps, all pipelinefor oil,water and steam, complete insulation of
steam pipe lineand installation of all electrical wiringand cabling, power and control panels and handling25 skilled
workers at Hotel crown Plaza, Greater Noida, India.
 Independently handled the 2 million projectfor the installation of two 600 kg/hr oil fired boilers, al l water, oil and
steam pipe line and their complete insulation, installation of Water softener, chimney for removal of flue gas,
complete cablingand wiringfor installed equipments and handling20 to 30 skilled workers with complete safety at
Japanese Rubber Plant, Tokai rubber pvt. Ltd. India.
Advance system industrial Automation, Noida, India
Engineer Trainee/Major Project, June 2010 – November 2010
Company Profile
Advance system industrial automation offers installation and commissioning of variable freeqquency drives,
programmablelogic controllers,level,flow,temperature and pressurecontrollers,italso provides service and AMC to
various industries.
Job Profile
 PLC Programming in Ladder & FBD and Commissioning of PLC system.
 InvolvingP&ID and I/O List preparation Control wiringdrawings verification and testing and control cable sizing to
the project.
 Commissioning & installation of AC Drives & DC Drives used in diversified applications.
 Establishing the communication between field Instruments and PLC.
 Motor control and testing (both single phase and three phases)
 Electrical wiring installation for any equipment, motor and testing.
 Knowledge in process control instruments,such as transmitters,flow control valves etc. Proximity sensors, Optical
Sensors, Limit switch, RTD, Thermocouple etc.
 Knowledge of communication protocols Ethernet, Modbus, Profibus, Controlnet, RS 232/485.
Trainings
 Fire Warden Training (conducted by MOI, civil Defense, Qatar).
 SCADA system / Omron PLC Programming / ABB PLC Models ACS 500 & ACS 800 / Electrical Installation Bus.
 Programming in ladder logic in PLC’s, installation and commissioning of PLC’s and Variable frequency drives from
Advance system industrial automation.
Languages
 Languages Known: English, Urdu and Hindi fluent in reading, writing and Speaking.
PERSONAL DETAIL:
Name Mohammad Saquib
Country of Residence: Qatar
Nationality: Indian
Father name Late Shamim Ahmed
Correspondence address Villa no.12, Mosanada UGL Complex, Al Aziyah, salwa road,Qatar
Permanent address Village-Kalheri,Tehsil-Najibabad,Post-Dhansini,Disst-Bijnor,State
U.P.
Date of birth 21 December 1986
Gender Male
Marital status Single
DECLARATION:
I hereby declarethat all theinformation provided by me is true to my knowledge and belief.
DATE
PLACE Mohammad Saquib

Saquib Resume

  • 1.
    Mohammad Saquib Email-msaquib1986@gmail.com Contact No.-+974-77031863 SkypeName-mohd.saquib86 Profile: A competent and dynamic Engineering professional specializingin Operations& Maintenance, installation & commissioning,facilities management, service& maintenance for industrial and buildingfacilities.Experienced gained over the past 5 years in India and Qatar in extremely diverseand challengingenvironment. Demonstrates ability to lead and manage effectively ensuringperformance in relation to quality,costand delivery of servicewhilst maintainingcustomer satisfaction. I amcurrently associated with Mosanada UGL, as Site Engineer (MEP) in the Operations and Maintenance Divison, assigned atAl Gharaffa Sports Club Facility for a clientQOC/ Ministry of Youth and Affairs, Qatar. Core Competencies: Electrical & Electronics Engineering ~ Facilities Management ~ Operations & Maintenance ~ installation & commissioning ~ service & maintenance. Experience Profile: 2.5 yrs Operations & Maintenance for Building Facilities ~ 2 yrs installation & commissioning, Engineering services and maintenance for industrial and commercial Buildings Facilities ~ 6 months as trainee Engineer. Education A firstclass Bachelor degree in Engineering in the field of Electronics and Communication from Gautam Buddh Technical University, Lukhnow, India in 2011. Project: Microcontroller based Energy saver Employment Record Mosanada UGL MEP Site Engineer – Operations and Maintenance Department Site-Al Gharafa Sports Club for a client Qatar Olympic Committee/Ministry of Youth and Affair, January 2014 onwards Company Profile: Mosanada UGL is a joint venture between Aspire Katara Investments, Qatar Olympic Committee and UGL Services. Mosanada UGL provides integrated facilitiesmanagement services in Qatar, from inception of build design through to disposal of the property. UGL's Services business provides end-to-end corporatereal estate and facilities management services to corporations, governments and institutions in Australia, New Zealand, Asia, North America and the Middle East. Through five complementary brands – UGL Services (Australia & New Zealand), UGL Services (Middle East), UGL Services - Premas Operations, UGL Services - Equis and UGL Services - Unicco Operations – the company delivers clients integrated solutions on a local, regional, national and multi -national basis. Job Profile  Reports to Operations Manger.  Site management, coordination with consultants/architects/contractors for optimum solution.  Planning and mobilization of team to execute the task as per the scheduled PPM (Planned Preventive Maintenance) and CM for the MEP equipment (Chiller, AHUs, FCUs,Split & Window ACs, Chilled Water Pumps, Irrigation Pumps, Electrical Panels, Generators etc .  Supervises contractor’s technicians and supervisor to ensure the facility equipments are running smoothly as per the operating specification. The facilities include football pitches, multi -purpose indoor halls, sports academy, beach plying field, Al Gharaffa Stadium, gymnasiums including Jacuzzis, saunas, and cold pools.  Oversee and manage the operation and maintenance of water supply systems, fire suppression systems, electrical utility like Chillers, Boilers, Motors, Pumps, DG set &, MV & DB Panels.
  • 2.
     Monitor andmaintain records.  Work on CMMS (Computerized Maintenance Management System) by Maximo, Work Order creation, PR, RFQ, PO, Verification, SLA, and KPI.  Co-ordination with Housekeeping Supervisor, Landscaping Supervisor to ensure the PPM has done as per requirement, checking the manpower attendance etc.  Troubleshoot and rectify minor problems. Identify the root causeand advicesupervisor to raiseWork Orders if jobs have to be carried out by contractor. Includes all Facilities Equipments related to Mechanical, Electrical and Plumbing.  To record any system failure, report to the Operations and prepare incident report, defect report, snag report.  Conduct pass down meeting to colleagues on the status of the equipments and report any incidents.  Maintain,test and certify electrical supply networks includingpower distribution boards,panels, facilities, lighting switches, cables / wiring, electric motors, electric pump stations and equipments.  Prepare regular progress reports and Maintained all records of the work orders and repairs done on the facility.  Attend to all breakdown complaints requests. Follow-up with the contractors on all Service Orders for any requirement of materials.  Estimates, prepares and assigns the resources such as manpower, materials, consumables, equipment, tools, etc., required for all electrical and related works prior to execution.  Responsible for checking the contractor weather the planed preventive maintenance (PPM) is being done correctly as per standards by the contractors.  Advice facilities supervisorand facilities manager of technical problems concerned with installation, modification and repair of electrical, mechanical and plumbing assignments.  Oversee and manage the operation and maintenance of water supply systems, fire suppression systems, electrical utility like Chillers, Boilers, Motors, Pumps, DG set & LV, MV & DB Panels.  Review the parameters recorded by technicians and to take necessary action if there is any discrepancies.  Solving problems by technical analysis, group discussions, explore alternatives, and propose quality solutions at minimum cost.  Carry out periodic Safety inspections on contractors’ site works in line with QEHS requirements.  To escalate any emergencies immediately to the Operations Manager. Significant Contributions / Achievements  Efficiently supervises all operations and maintenance of Al Gharaffa Sports Club, Qatar, handling around 2000 assets related to MEP.  Efficiently organize and supports all events held at Al Gharaffa Stadium. Harmilap Hotels private Limited, Panipat, Haryana MEP Assistant Operations & Maintenance Engineer, March 2013 to December 2013 Job Profile Oversee and manage the operation and maintenance of the following. - Water supply systems - Fire suppression systems - Electrical cablesand wiring - Facility electrical utility equipment and distribution lines - Facility mechanical utility equipments such as chillers,boilers,hotwater generators, pumps - Lighting/switches/air conditioningunits - Generators and power distribution / breaker panels - Electrical distribution systems - Motors/pumps/cables/wiringand all other electrical systems - Fuel distribution systems  Report any maintenance problems, safety hazards, accidents, or injuries; complete safety training and certifications.  Ensure uniform and personal appearance is clean and professional, maintain confidentiality of proprietary information, and protect company assets.  Manage a team of electricians and plumbers to ensure all work is repaired/installed to the highest standards in accordance with the applicable mechanical / electrical and plumbing standards  Coordinated with the supervisors and maintained the inventory of the supplies and tools for the facility.
  • 3.
     Develops, establishes,recommends and enforces safety practices applicable with mechanical / electrical and plumbing systems.  Operated Fire Alarm and Life Safety systems and monitored their working, and handled all safety equipment at the time of emergency.  Coordinated with the Chief Engineer and performed all preventative maintenance for the facility.  Inspected the fire safety equipment’s in the facility and checked them for their condition.  Maintain,test and certify electrical supply networks includingpower distribution boards,panels, facilities, lighting switches, cables / wiring, electric motors, electric pump stations and equipments.  Prepare regular progress reports and Maintained all records of the work orders and repairs done on the facility. Thermodyne Engineering System, Ghaziabad, India Service & Maintenance Engineer, January 2011 - February 2013) Company Profile Thermodyne Engineering Systems as a solution provider to Thermal Energy users and help them save maximum energy and thus resulting in increased Profits. Through innovation and commitment to customer service, Thermodyne has been consistently changing the way customers think about Steam Boilers. Thermodyne is constantly striving to extend the Thermal Efficiency Levels, Waste Heat Recovery, Condensate Heat Recovery and Fuel conversions savings potential at customer’s end. Thermodyne is manufacturer of steam boiler,hot water generators, blowers & fans and all others related products used in hospitality industry,paper industry,food processingindustries,cotton textile industry etc. Theromodye also offers turn Key Projects for installation and commissioning of firefightingpumps, boiler,hot waters generators, pipe lines,insulation work, electrical panels& cablingfor the boilers and pumps related panels. Job Profile  Testing, Installation and Commissioningof boilers,water softeners and Thermic fluid heaters, furnace oil heater as per drawings.  Erection of high pressure MS pipeline steam and water, erection of complete boiler structure and boiler accessories, heat exchangers, flue gas ducting, ID fans, FD fans, air pre heater, water pre heater, cyclone dust collector, HVAC system, AHU, HVAC ducting, boiler and chiller insulation.  Selection and sizing of valves as per requirement of liquid and pressure.  Installation of firefighting pumps and erection of pipe line for fire safety.  Commissioning & installation of PLC, AC Drives & DC Drives used in diversified applications .  Installation, Testing & Commissioning of LV Panel, MV Panel and DB & SMB Panels.  Giving electrical panel drawings and panel designing for hot water generator, boiler.  InvolvingP&ID and I/O List preparation Control wiringdrawings verification and testing and control cable sizing to the project.  Supervising overall operation of electrical distribution system, boiler and HVAC and also providing  Training & supervising operators and technician for improving reliability of machines.  Coordinating with the clients for their feedback, service.  Perform routine, predictive,preventive and correctivemaintenance on chillers,boilers& RO and providing support and maintenance to end users and customers on multiple systems and controllers in emergency situations / 24-7 On-call duty.  MaintainingContractdocuments & collection of all relevantdata from projects.Maintain all documentation at site office as required by the company including all internal reporting. Significant Contributions / Achievements  Independently handled the 5 million project for the installation and commissioning of two 800 kg/hr oil fired boilers,3 firefightingpumps, 3 domestic water pumps, all pipelinefor oil,water and steam, complete insulation of steam pipe lineand installation of all electrical wiringand cabling, power and control panels and handling25 skilled workers at Hotel crown Plaza, Greater Noida, India.  Independently handled the 2 million projectfor the installation of two 600 kg/hr oil fired boilers, al l water, oil and steam pipe line and their complete insulation, installation of Water softener, chimney for removal of flue gas, complete cablingand wiringfor installed equipments and handling20 to 30 skilled workers with complete safety at Japanese Rubber Plant, Tokai rubber pvt. Ltd. India.
  • 4.
    Advance system industrialAutomation, Noida, India Engineer Trainee/Major Project, June 2010 – November 2010 Company Profile Advance system industrial automation offers installation and commissioning of variable freeqquency drives, programmablelogic controllers,level,flow,temperature and pressurecontrollers,italso provides service and AMC to various industries. Job Profile  PLC Programming in Ladder & FBD and Commissioning of PLC system.  InvolvingP&ID and I/O List preparation Control wiringdrawings verification and testing and control cable sizing to the project.  Commissioning & installation of AC Drives & DC Drives used in diversified applications.  Establishing the communication between field Instruments and PLC.  Motor control and testing (both single phase and three phases)  Electrical wiring installation for any equipment, motor and testing.  Knowledge in process control instruments,such as transmitters,flow control valves etc. Proximity sensors, Optical Sensors, Limit switch, RTD, Thermocouple etc.  Knowledge of communication protocols Ethernet, Modbus, Profibus, Controlnet, RS 232/485. Trainings  Fire Warden Training (conducted by MOI, civil Defense, Qatar).  SCADA system / Omron PLC Programming / ABB PLC Models ACS 500 & ACS 800 / Electrical Installation Bus.  Programming in ladder logic in PLC’s, installation and commissioning of PLC’s and Variable frequency drives from Advance system industrial automation. Languages  Languages Known: English, Urdu and Hindi fluent in reading, writing and Speaking. PERSONAL DETAIL: Name Mohammad Saquib Country of Residence: Qatar Nationality: Indian Father name Late Shamim Ahmed Correspondence address Villa no.12, Mosanada UGL Complex, Al Aziyah, salwa road,Qatar Permanent address Village-Kalheri,Tehsil-Najibabad,Post-Dhansini,Disst-Bijnor,State U.P. Date of birth 21 December 1986 Gender Male Marital status Single DECLARATION: I hereby declarethat all theinformation provided by me is true to my knowledge and belief. DATE PLACE Mohammad Saquib