This document discusses how on-demand solutions are revolutionizing business-to-business (B2B) collaboration. It notes that while B2B integration has been used for decades, traditional point-to-point electronic data interchange (EDI) systems were costly to establish and maintain. Newer cloud-based on-demand solutions simplify B2B integration by eliminating the need for separate interfaces with each partner. Such solutions standardize interfaces and processes across a partner network. The document highlights SAP Information Interchange OnDemand as an example of an on-demand solution that uses a centralized content repository and canonical messaging to streamline B2B transactions and collaboration.